Docstoc

Concrete Pour Card

Document Sample
Concrete Pour Card Powered By Docstoc
					                                                      Concrete Pour Card
CLIENT :                                                                        DATE :
PROJECT :                                                                       STRUCTURE :
DRG NO :                                                                        LEVEL :
CONCRETE GRADE/QTY : M                          /           CUM                 START TIME :
                                                                                COMPLETION TIME :

SR
                                           ITEM                         YES      NO                  REMARKS
NO
 1                       Center Lines Checked
                         Formwork and Staging Checked For Accuracy,
 2
     BEFORE CONCRETING




                         Strength & Finish
 3                       Reinforcement Checked
 4                       Cover to Reinforcement Checked

 5                       Checked the Location of Construction Joint

 6                       Verified Test Certificate for Cement/Steel


 7                       Adequacy of Materials / Equipments for Pour


                         Embeded parts       Civil
                         Checked
 8                                           Mechenical
                         (Location &
                         Plumb)              Electrical

 Site Engineer ____________________                                             Client / Consultant _________________
     AFTER CONCTRETE




 9                       Softfit(S) and Pour Top(T) Levels Checked     S (B)                 T (B)
                         Before (B) and After Form Removal (Only of
                         Beams of Over to M Span & Important
                         Structure)                                     S (A)                T (A)

10                       Cement Consumption
11                       No of Cubes and Identification Mark
12                       test Cubes Results (7 days / 28 days)
13                       Concrete Condition on Form Removal            V.GOOD/GOOD/FAIR/POOR

Site Engineer (For 9,10) __________________ Q C Engineer (For 11,12,13) ____________________

				
DOCUMENT INFO
Shared By:
Categories:
Tags:
Stats:
views:2876
posted:1/2/2012
language:
pages:1