									Industrial & Infrastructure Fund Investment Corporation (Tokyo Stock Exchange Company Code:                        3249)
News Release – March 18, 2011
                 Notice Concerning The Effect of the Earthquake (continued report)


Industrial & Infrastructure Fund Investment Corporation (IIF) and it’s asset management company,
Mitsubishi Corp.-UBS Realty Inc.’s employees deeply express condolence to all the victims from the
Tohoku region earthquake disaster.
We announced that we are gathering the information how much money is necessary to repair, as described
in the press release “Notice Concerning The Effect of the Earthquake (continued report)” on March 16,
2011. And we announce today the estimated amount for repairing on our properties, as outlined below.


1. Estimated amount for repairing on our entire portfolio
   External research agency has finished their survey and the estimated amount for repairing due to the
   earthquake was calculated.
   In 3 properties of 11 properties we have already owned before the earthquake (total acquisition price:
   96,900 million yen), the expense for repairing will be incurred. The estimated amount for repairing will
   be 17 million yen (approximately 0.02% of total acquisition price).
   Physical damages and operational status of each property are as follows.


      Property
                             Property name                    Physical damage              Operational status
      Number
                                                           Partial damages on the
        L-1       IIF Shinonome Logistics Center                                           Operating as usual
                                                           ditch
        L-4       IIF Noda Logistics Center                None                            Operating as usual
                                                           Partial damages on the
        L-5       IIF Shinsuna Logistics Center                                            Operating as usual
                                                           ditch
                                                           Partial   damages     on
        L-6       IIF Atusgi Logistics Center                                              Operating as usual
                                                           interior (Note 1)

        L-7       IIF Koshigaya Logistics Center           None                            Operating as usual

        L-8       IIF Nishinomiya Logistics Center         None                            Operating as usual
                   IIF Narashino Logistics Center
        L-9                                                 None (Note 2)                        - (Note 3)
                   (land with leasehold interest)
                   IIF Totsuka Logistics Center
        F-1                                                 None                                 - (Note 3)
                   (land with leasehold interest)
                   IIF Yokohama Tsuzuki Technology
        F-2                                                 None                             Operating as usual
                   Center
                   IIF Kobe District Heating and Cooling
        I-1                                                 None                             Operating as usual
                   Center
                   IIF Haneda Airport Maintenance
        I-2                                                 None                             Operating as usual
                   Center
    (Note 1) Although IIF announced “None” in the press release “Notice Concerning The Effect of the Earthquake
            (continued report) dated March 16, 2011, partial damages on interior was reported by external research agency
            after that.
    (Note 2) IIF reported partial damages on the ditch of the outside, however IIF dose not own the ditch part, IIF only own
            the land.
    (Note 3) We do not scribe details because IIF only owns the land, but the facilities are now under operating as usual.
2. Details of 3 properties physical damages occurred
IIF Shinonome Logistics Center

Appearance

(taken on March

14, 2011)


                                                                  No damages on the building frame and exterior




Physical damages (taken on March 14, 2011)                        Damages status and way of repairing

                                                                  1. Cracks on asphalt pavement
                                                                     ⇒Remove the existing pavement and make up
                                                                     again

                                                                  2. Sagging the plant parts on the ditch
                                                                     ⇒Fill in the plants again
                                       Side ditch changing

   Pavement repairing                                             3. Damages on curbside on the ditch
                                                                     ⇒Change the curb

                                                                  4. Other slight damages


IIF Shinsuna Logistics Center

Appearance

(taken on March

16,2011)


                                                                  No damages on the building frame and exterior




Physical damages (taken on March 16, 2011)                        Damages status and way of repairing

                                                                  1. Cracks on asphalt pavement
                                                                     ⇒Remove the existing pavement and make up
                                                                     again

                                                                  2. Damages on part of external rainwater pipe
                                                                     ⇒Change the pipe

                                                                  3. Spaces between part of asphalt pavement and
                  Pavement repairing              Pipe changing      building connection
                                                                     ⇒Repair the pavement

                         舗装補修                                     4. Damages on part of ceiling board on the resting
                                                                     room in the office building
                                                                     ⇒Change the ceiling board
IIF Atusgi Logistics Center

Appearance

(taken on March

16, 2011)



                                                                                     No damages on the building frame and exterior




Physical damages (taken on March 16, 2011)                                           Damages status and way of repairing

                                                                                     1. Damages on part of ALC board
                                                                                        ⇒Repair the ALC board

                                                                                     2. Damages on fire-retardant board on the column
                                                                                        ⇒Change the board

                                                                                     3. Breaks away the fire-retardant cover
                                                                                        ⇒Repair the fire-retardant cover
                ALC board repairing                           Board changing
                                                                                     4. Changes in shape of hanging rings with indoor
                                                                                        pipe
                                                                                        ⇒Change the hanging rings

                                                                                     5. Damages on part of the restroom’s interior in the
                                                                                        office
                                                                                        ⇒Repair the interior



3. Effects on the forecast of our operating results
The transaction has slight impact on our operating results for the 8th Fiscal Period ended June 30, 2011, so
we do not revise the forecast of our operating results in the press release “IIF raises its Forecast for
Operating Results and Distribution for the 8th and 9th Fiscal Period” dated on February 21, 2011.



About IIF: Industrial and Infrastructure Fund Investment Corporation (“IIF”) is the first J-REIT focused on acquiring and
operating both industrial and infrastructure properties in Japan-properties that play a vital role in the Japanese economy,
and for which IIF expects to see stable demand in the mid to long term. With respect to industrial properties, IIF intends to
invest in a diverse portfolio of properties, including manufacturing and research and development facilities. Please refer to
our website at http://www.iif-reit.com/english/index.html
Contacts: For the further information relating to this press release as well as the Fund and its Asset Manager, please feel free
to contact Mr. Yoshito Nishikawa (Telephone Number: 81-3-5293-7090), Head of Industrial Division at Mitsubishi Corp.-UBS
Realty, Inc., Asset Manager for Industrial & Infrastructure Fund Investment Corporation.