FOR IMMEDIATE RELEASE
Road Information Bulletin
District 5
50 Higuera Street
San Luis Obispo, CA 93401-5415
Internet access - www.dot.ca.gov/dist05/
CALTRANS
TRAFFIC UPDATE
THIS SCHEDULE IS SUBJECT TO CHANGE DEPENDING ON WEATHER CONDITIONS.
NO TWO CONSECUTIVE RAMPS CLOSED AT THE SAME TIME.
For further details contact:
Public Affairs Office
(831) 753-0187, (831) 372-0862 or (805) 549-3138
E-Mail info-d5@dot.ca.gov
The following is a tentative schedule for State Highway Construction, Maintenance, and Permit projects for the week of:
Report for December 23, 2011 - December 30, 2011
Santa Cruz
Post Estimated
Miles Date / Time Delay Lanes Total
Route LC ID Dir Start End Begin & End Limit (minutes) Description Type Closed Status Lanes
22.7 DIMEO LANE
COAST ROAD (SOUTH)
1 M1DA NB/SB 25.17 12/28/2011 9:30 12/28/2011 14:45 5 Lane Pavement Work #2 Approved 2
22.7 DIMEO LANE
COAST ROAD (SOUTH)
1 M1DA NB/SB 25.17 12/29/2011 9:30 12/29/2011 14:45 5 Lane Pavement Work #2 Approved 2
8.71 SUGARLOAF ROAD
W VINE HILL ROAD (SOUTH)
17 M17AA SB 7.08 12/27/2011 9:30 12/27/2011 14:45 5 Lane Pavement Work #2 Approved 2
8.71 SUGARLOAF ROAD
W VINE HILL ROAD (SOUTH)
17 M17AA SB 7.08 12/28/2011 9:30 12/28/2011 14:45 5 Lane Pavement Work #2 Approved 2
1
2
3
FOR IMMEDIATE RELEASE
Road Information Bulletin
District 5
50 Higuera Street
San Luis Obispo, CA 93401-5415
Internet access - www.dot.ca.gov/dist05/
CALTRANS
TRAFFIC UPDATE
THIS SCHEDULE IS SUBJECT TO CHANGE DEPENDING ON WEATHER CONDITIONS.
NO TWO CONSECUTIVE RAMPS CLOSED AT THE SAME TIME.
For further details contact:
Public Affairs Office
(831) 753-0187, (831) 372-0862 or (805) 549-3138
E-Mail info-d5@dot.ca.gov
The following is a tentative schedule for State Highway Construction, Maintenance, and Permit projects for the week of:
Report for December 23, 2011 - December 30, 2011
San Benito
4
5
FOR IMMEDIATE RELEASE
Road Information Bulletin
District 5
50 Higuera Street
San Luis Obispo, CA 93401-5415
Internet access - www.dot.ca.gov/dist05/
CALTRANS
TRAFFIC UPDATE
THIS SCHEDULE IS SUBJECT TO CHANGE DEPENDING ON WEATHER CONDITIONS.
NO TWO CONSECUTIVE RAMPS CLOSED AT THE SAME TIME.
For further details contact:
Public Affairs Office
(831) 753-0187, (831) 372-0862 or (805) 549-3138
E-Mail info-d5@dot.ca.gov
The following is a tentative schedule for State Highway Construction, Maintenance, and Permit projects for the week of:
Report for December 23, 2011 - December 30, 2011
Santa Barbara Estimate
Post d
Miles Date / Time Delay Lanes Total
Route LC ID Dir Start End Begin & End Limit (minutes) Description Type Closed Status Lanes
#1, #2, Left
Median
33.85 EL CAPITAN STATE BEACH Shoulder,
GAVIOTA STATE PARK ENTR Right
101 C101PD NB 46.36 12/23/2011 4:01 12/23/2011 12:01 5 Alternate Lanes Paving Operation Shoulder Approved 2
62.98 ZACA STATION ROAD
BETTERAVIA ROAD
101 C101XE NB/SB 86.59 12/27/2011 5:01 12/27/2011 18:01 10 Lane Striping Operation #1, #2 Approved 2
#1, #2, Left
Median
33.85 EL CAPITAN STATE BEACH Shoulder,
GAVIOTA STATE PARK ENTR Right
101 C101CA NB 46.36 12/27/2011 8:01 12/27/2011 15:01 Lane Paving Operation Shoulder Approved 2
#1, #2, Left
Median
33.85 EL CAPITAN STATE BEACH Shoulder,
GAVIOTA STATE PARK ENTR Right
101 C101OA SB 12/27/2011 9:01 12/27/2011 17:01 Lane Shoulder Work Shoulder Approved 2
6
#1, #2, Left
Median
Shoulder,
Right
101 C101OA SB 46.36 12/27/2011 9:01 12/27/2011 17:01 Lane Shoulder Work Shoulder Approved 2
#1, #2, Left
Median
33.85 EL CAPITAN STATE BEACH Shoulder,
GAVIOTA STATE PARK ENTR Right
101 C101MA NB 46.36 12/28/2011 6:01 12/28/2011 15:01 Lane Paving Operation Shoulder Approved 2
#1, #2, Left
Median
33.85 EL CAPITAN STATE BEACH Shoulder,
GAVIOTA STATE PARK ENTR Right
101 C101OA SB 46.36 12/28/2011 9:01 12/28/2011 17:01 Lane Shoulder Work Shoulder Approved 2
#1, #2, Left
Median
33.85 EL CAPITAN STATE BEACH Shoulder,
GAVIOTA STATE PARK ENTR Right
101 C101MA NB 46.36 12/29/2011 6:01 12/29/2011 15:01 Lane Paving Operation Shoulder Approved 2
#1, #2, Left
Median
33.85 EL CAPITAN STATE BEACH Shoulder,
GAVIOTA STATE PARK ENTR Right
101 C101OA SB 46.36 12/29/2011 9:01 12/29/2011 17:01 Lane Shoulder Work Shoulder Approved 2
62.98 ZACA STATION ROAD
BETTERAVIA ROAD
101 C101XE NB/SB 86.59 12/29/2011 5:01 12/29/2011 18:01 10 Lane Striping Operation #1, #2 Approved 2
62.98 ZACA STATION ROAD
BETTERAVIA ROAD
101 C101XE NB/SB 86.59 12/28/2011 5:01 12/28/2011 18:01 10 Lane Striping Operation #1, #2 Approved 2
25.92 PARK STREET
JCT HWY 101
246 P246DA EB 26.27 12/23/2011 8:01 12/23/2011 16:01 3 Lane Miscellaneous Work #2 Approved 4
26.07
246 P246FA EB 26.07 12/29/2011 8:01 12/29/2011 16:30 AVENUE OF THE FLAGS 3 Lane Miscellaneous Work #2 Approved 4
26.07
246 P246FA EB 26.07 12/28/2011 8:01 12/28/2011 16:30 AVENUE OF THE FLAGS 3 Lane Miscellaneous Work #2 Approved 4
7
26.07
246 P246FA EB 26.07 12/27/2011 8:01 12/27/2011 16:30 AVENUE OF THE FLAGS 3 Lane Miscellaneous Work #2 Approved 4
8
9
FOR IMMEDIATE RELEASE
Road Information Bulletin
District 5
50 Higuera Street
San Luis Obispo, CA 93401-5415
Internet access - www.dot.ca.gov/dist05/
CALTRANS
TRAFFIC UPDATE
THIS SCHEDULE IS SUBJECT TO CHANGE DEPENDING ON WEATHER CONDITIONS.
NO TWO CONSECUTIVE RAMPS CLOSED AT THE SAME TIME.
For further details contact:
Public Affairs Office
(831) 753-0187, (831) 372-0862 or (805) 549-3138
E-Mail info-d5@dot.ca.gov
The following is a tentative schedule for State Highway Construction, Maintenance, and Permit projects for the week of:
Report for December 23, 2011 - December 30, 2011
Monterey
Post Estimated
Miles Date / Time Delay Lanes Total
Route LC ID Dir Start End Begin & End Limit (minutes) Description Type Closed Status Lanes
0 SAN LUIS OBISPO CO. LINE
ROCKY CREEK BRIDGE
1 C1LA NB/SB 60.05 12/27/2011 8:01 12/27/2011 16:01 15 Moving Bridge Work #1 Approved 1
7.07
1 C1LA NB/SB 7.07 12/27/2011 8:01 12/27/2011 16:01 VILLA CREEK BRIDGE 15 Moving Bridge Work #1 Approved 1
75.11
1 C1AA SB 75.11 12/27/2011 9:01 12/27/2011 15:01 SOUTH JCT HWY 68 20 Full Electrical Work #1 Approved 1
0 SAN LUIS OBISPO CO. LINE
ROCKY CREEK BRIDGE
1 C1LA NB/SB 60.05 12/28/2011 8:01 12/28/2011 16:01 15 Moving Bridge Work #1 Approved 1
10
7.07
1 C1LA NB/SB 7.07 12/28/2011 8:01 12/28/2011 16:01 VILLA CREEK BRIDGE 15 Moving Bridge Work #1 Approved 1
75.11
1 C1AA SB 75.11 12/28/2011 20:01 12/29/2011 5:01 SOUTH JCT HWY 68 20 Full Electrical Work #1 Approved 1
7.07
1 C1LA NB/SB 7.07 12/29/2011 8:01 12/29/2011 16:01 VILLA CREEK BRIDGE 15 Moving Bridge Work #1 Approved 1
75.11
1 C1AA SB 75.11 12/29/2011 20:01 12/30/2011 5:01 SOUTH JCT HWY 68 20 Full Electrical Work #1 Approved 1
75.11
1 C1AA SB 75.11 12/29/2011 9:01 12/29/2011 15:01 SOUTH JCT HWY 68 20 Full Electrical Work #1 Approved 1
0 SAN LUIS OBISPO CO. LINE
ROCKY CREEK BRIDGE
1 C1LA NB/SB 60.05 12/29/2011 8:01 12/29/2011 16:01 15 Moving Bridge Work #1 Approved 1
75.11
1 C1AA SB 75.11 12/28/2011 9:01 12/28/2011 15:01 SOUTH JCT HWY 68 20 Full Electrical Work #1 Approved 1
75.11
1 C1AA SB 75.11 12/27/2011 20:01 12/28/2011 5:01 SOUTH JCT HWY 68 20 Full Electrical Work #1 Approved 1
15.2
Highway
68 C68FA EB/WB 15.8 12/27/2011 8:30 12/27/2011 16:30 10 Lane Construction #1 Approved 2
15.2
Highway
68 C68FA EB/WB 15.8 12/28/2011 8:30 12/28/2011 16:30 10 Lane Construction #1 Approved 2
3.95
68 C68GA EB 3.95 12/28/2011 9:01 12/28/2011 15:01 EAST JCT HWY 1 20 Full Electrical Work #1 Approved 1
3.95
68 C68GA EB 3.95 12/29/2011 20:01 12/30/2011 5:01 EAST JCT HWY 1 20 Full Electrical Work #1 Approved 1
4.26
68 C68EA EB/WB 4.5 12/29/2011 20:01 12/30/2011 5:01 WEST JCT HWY 1 10 Lane Electrical Work #1 Approved 2
3.95
68 C68GA EB 12/29/2011 9:01 12/29/2011 15:01 EAST JCT HWY 1 20 Full Electrical Work #1 Approved 1
11
68 C68GA EB 3.95 12/29/2011 9:01 12/29/2011 15:01 EAST JCT HWY 1 20 Full Electrical Work #1 Approved 1
4.26
68 C68DA EB/WB 4.5 12/29/2011 9:01 12/29/2011 15:01 WEST JCT HWY 1 10 Lane Electrical Work #1 Approved 2
15.2
Highway
68 C68FA EB/WB 15.8 12/29/2011 8:30 12/29/2011 16:30 10 Lane Construction #1 Approved 2
3.95
68 C68GA EB 3.95 12/28/2011 20:01 12/29/2011 5:01 EAST JCT HWY 1 20 Full Electrical Work #1 Approved 1
4.26
68 C68EA EB/WB 4.5 12/28/2011 20:01 12/29/2011 5:01 WEST JCT HWY 1 10 Lane Electrical Work #1 Approved 2
4.26
68 C68DA EB/WB 4.5 12/28/2011 9:01 12/28/2011 15:01 WEST JCT HWY 1 10 Lane Electrical Work #1 Approved 2
4.26
68 C68DA EB/WB 4.5 12/27/2011 9:01 12/27/2011 15:01 WEST JCT HWY 1 10 Lane Electrical Work #1 Approved 2
3.95
68 C68GA EB 3.95 12/27/2011 20:01 12/28/2011 5:01 EAST JCT HWY 1 20 Full Electrical Work #1 Approved 1
4.26
68 C68EA EB/WB 4.5 12/27/2011 20:01 12/28/2011 5:01 WEST JCT HWY 1 10 Lane Electrical Work #1 Approved 2
3.95
68 C68GA EB 3.95 12/27/2011 9:01 12/27/2011 15:01 EAST JCT HWY 1 20 Full Electrical Work #1 Approved 1
5.17 SOUTH JCT HWY 101
PRUNEDALE NORTH ROAD Crack Seal
156 M156AA EB 5.14 12/23/2011 9:01 12/23/2011 12:01 5 Lane Operation #1 Approved 2
14 JCT HWY 25
SUMMIT (MUSTANG)
198 M198AA EB/WB 18.46 12/23/2011 8:01 12/23/2011 14:01 10 One-Way Shoulder Work #1 Approved 1
12
13
14
15
16
FOR IMMEDIATE RELEASE
Road Information Bulletin
District 5
50 Higuera Street
San Luis Obispo, CA 93401-5415
Internet access - www.dot.ca.gov/dist05/
CALTRANS
TRAFFIC UPDATE
THIS SCHEDULE IS SUBJECT TO CHANGE DEPENDING ON WEATHER CONDITIONS.
NO TWO CONSECUTIVE RAMPS CLOSED AT THE SAME TIME.
For further details contact:
Public Affairs Office
(831) 753-0187, (831) 372-0862 or (805) 549-3138
E-Mail info-d5@dot.ca.gov
The following is a tentative schedule for State Highway Construction, Maintenance, and Permit projects for the week of:
Report for December 23, 2011 - December 30, 2011
San Luis Obispo
Post Estimated
Miles Date / Time Delay Lanes Total
Route LC ID Dir Start End Begin & End Limit (minutes) Description Type Closed Status Lanes
29.76 NORTH JCT HWY 101
ESTRELLA ROAD
46 M46BA EB/WB 39.88 12/27/2011 8:01 12/27/2011 14:30 5 Moving Vegetation Spraying #1 Approved 2
29.76 NORTH JCT HWY 101
ESTRELLA ROAD
46 M46BA EB/WB 39.88 12/28/2011 8:01 12/28/2011 14:30 5 Moving Vegetation Spraying #1 Approved 2
29.76 NORTH JCT HWY 101
ESTRELLA ROAD
46 M46BA EB/WB 39.88 12/29/2011 8:01 12/29/2011 14:30 5 Moving Vegetation Spraying #1 Approved 2
39.03 BITTER WATER ROAD
KERN COUNTY LINE
58 P58DA EB/WB 57.15 12/23/2011 9:01 12/23/2011 16:30 15 Moving Miscellaneous Work #1 Approved 2
39.03 BITTER WATER ROAD
KERN COUNTY LINE
58 P58BA EB/WB 57.15 12/28/2011 9:01 12/28/2011 16:30 15 Moving Miscellaneous Work #1 Approved 2
17
39.03 BITTER WATER ROAD
KERN COUNTY LINE
58 P58BA EB/WB 57.15 12/27/2011 9:01 12/27/2011 16:30 15 Moving Miscellaneous Work #1 Approved 2
39.03 BITTER WATER ROAD
KERN COUNTY LINE
58 P58BA EB/WB 57.15 12/29/2011 9:01 12/29/2011 16:30 15 Moving Miscellaneous Work #1 Approved 2
42.87
101 C101UF NB 42.87 12/27/2011 0:01 1/6/2012 23:59 SAN DIEGO ROAD 5 Full Highway Construction #1 Approved 1
35.7 SOUTHERN PACIFIC R.R.
ROSARIO AVENUE
101 C101BF SB 46.2 12/27/2011 18:01 12/28/2011 6:01 5 Lane Highway Construction #2 Approved 2
42.87
101 C101JF SB 42.87 12/27/2011 19:01 12/28/2011 6:01 SAN DIEGO ROAD 5 Lane Highway Construction #1 Approved 1
44.01
101 C101LF NB/SB 44.01 12/27/2011 19:01 12/28/2011 6:01 SANTA ROSA ROAD 5 Lane Highway Construction #1 Approved 1
44.84
101 C101NF NB/SB 44.84 12/27/2011 19:01 12/28/2011 6:01 CURBARIL AVENUE 5 Lane Highway Construction #1 Approved 1
45.96
TRAFFIC WAY
101 C101QF NB/SB 45.96 12/27/2011 19:01 12/28/2011 6:01 (ATASCADERO) 5 Lane Highway Construction #1 Approved 1
45.57
101 C101OF NB/SB 45.57 12/27/2011 20:01 12/28/2011 6:01 JCT HWY 41 5 Lane Highway Construction #1 Approved 1
37.86
101 C101FF NB/SB 37.86 12/27/2011 20:01 12/28/2011 6:01 JCT HWY 58 5 Lane Highway Construction #1 Approved 1
37.86
101 C101EF NB/SB 37.86 12/27/2011 20:01 12/28/2011 6:01 JCT HWY 58 5 Lane Highway Construction #1 Approved 1
45.57
101 C101PF NB/SB 45.57 12/27/2011 20:01 12/28/2011 6:01 JCT HWY 41 5 Lane Highway Construction #1 Approved 1
42.27
101 C101HF NB/SB 42.27 12/27/2011 20:01 12/28/2011 6:01 SANTA BARBARA ROAD 5 Lane Highway Construction #1 Approved 1
42.27
101 C101GF NB/SB 42.27 12/27/2011 20:01 12/28/2011 6:01 SANTA BARBARA ROAD 5 Lane Highway Construction #1 Approved 1
18
7.85 LOS BERROS ROAD
HINDS AVENUE
101 C101ZA NB 16.62 12/27/2011 19:01 12/28/2011 6:01 10 Lane Miscellaneous Work #1, #2 Approved 2
46.2
101 C101SF NB 46.2 12/27/2011 19:01 12/28/2011 6:01 ROSARIO AVENUE 5 Lane Highway Construction #1 Approved 1
45.96
TRAFFIC WAY
101 C101RF SB 45.96 12/27/2011 19:01 12/28/2011 6:01 (ATASCADERO) 5 Lane Highway Construction #1 Approved 1
11.83
101 C101BC NB/SB 11.83 12/27/2011 21:01 12/28/2011 6:01 EL CAMPO ROAD 10 Full Miscellaneous Work #1 Approved 1
7.85
101 C101FB NB/SB 7.85 12/27/2011 21:01 12/28/2011 6:01 LOS BERROS ROAD 10 Full Miscellaneous Work #1 Approved 1
16.05
101 C101LE NB/SB 16.05 12/27/2011 21:01 12/28/2011 6:01 FIVE CITIES DRIVE 10 Full Miscellaneous Work #1 Approved 1
15.58
101 C101JE NB/SB 15.58 12/27/2011 21:01 12/28/2011 6:01 4TH STREET 10 Full Miscellaneous Work #1 Approved 1
14.61
101 C101IE NB/SB 14.61 12/27/2011 21:01 12/28/2011 6:01 OAK PARK BLVD 10 Full Miscellaneous Work #1 Approved 1
14.61
101 C101HE NB/SB 14.61 12/27/2011 21:01 12/28/2011 6:01 OAK PARK BLVD 10 Full Miscellaneous Work #1 Approved 1
42.27
101 C101DF SB 42.27 12/27/2011 21:01 12/28/2011 6:01 SANTA BARBARA ROAD 5 Full Highway Construction #1, #2 Approved 2
16.05
101 C101VE SB 16.05 12/27/2011 21:01 12/28/2011 6:01 FIVE CITIES DRIVE 10 Full Miscellaneous Work #1 Approved 1
16.32
101 C101UE SB 16.32 12/27/2011 21:01 12/28/2011 6:01 PRICE STREET 10 Full Miscellaneous Work #1 Approved 1
46.2
101 C101SF NB 46.2 12/28/2011 19:01 12/29/2011 6:01 ROSARIO AVENUE 5 Lane Highway Construction #1 Approved 1
45.96
TRAFFIC WAY
101 C101RF SB 45.96 12/28/2011 19:01 12/29/2011 6:01 (ATASCADERO) 5 Lane Highway Construction #1 Approved 1
19
45.96
TRAFFIC WAY
101 C101QF NB/SB 45.96 12/28/2011 19:01 12/29/2011 6:01 (ATASCADERO) 5 Lane Highway Construction #1 Approved 1
7.85 LOS BERROS ROAD
HINDS AVENUE
101 C101EB SB 16.62 12/28/2011 19:01 12/29/2011 6:01 10 Lane Miscellaneous Work #1, #2 Approved 2
44.84
101 C101NF NB/SB 44.84 12/28/2011 19:01 12/29/2011 6:01 CURBARIL AVENUE 5 Lane Highway Construction #1 Approved 1
44.84
101 C101MF NB/SB 44.84 12/28/2011 19:01 12/29/2011 6:01 CURBARIL AVENUE 5 Lane Highway Construction #1 Approved 1
44.01
101 C101LF NB/SB 44.01 12/28/2011 19:01 12/29/2011 6:01 SANTA ROSA ROAD 5 Lane Highway Construction #1 Approved 1
44.01
101 C101KF NB/SB 44.01 12/28/2011 19:01 12/29/2011 6:01 SANTA ROSA ROAD 5 Lane Highway Construction #1 Approved 1
42.87
101 C101JF SB 42.87 12/28/2011 19:01 12/29/2011 6:01 SAN DIEGO ROAD 5 Lane Highway Construction #1 Approved 1
16.05
101 C101VE SB 16.05 12/28/2011 21:01 12/29/2011 6:01 FIVE CITIES DRIVE 10 Full Miscellaneous Work #1 Approved 1
16.32
101 C101UE SB 16.32 12/28/2011 21:01 12/29/2011 6:01 PRICE STREET 10 Full Miscellaneous Work #1 Approved 1
16.32
101 C101QE NB 16.32 12/28/2011 21:01 12/29/2011 6:01 PRICE STREET 10 Full Miscellaneous Work #1 Approved 1
16.32
101 C101OE SB 16.32 12/28/2011 21:01 12/29/2011 6:01 PRICE STREET 10 Full Miscellaneous Work #1 Approved 1
15.58
101 C101KE NB/SB 15.58 12/28/2011 21:01 12/29/2011 6:01 4TH STREET 10 Full Miscellaneous Work #1 Approved 1
13.75
101 C101GE NB/SB 13.75 12/28/2011 21:01 12/29/2011 6:01 BRISCO ROAD 10 Full Miscellaneous Work #1 Approved 1
13.75
101 C101FE NB/SB 13.75 12/28/2011 21:01 12/29/2011 6:01 BRISCO ROAD 10 Full Miscellaneous Work #1 Approved 1
20
12.52
TRAFFIC WAY (ARROYO
101 C101UC NB 12.52 12/28/2011 21:01 12/29/2011 6:01 GRANDE) 10 Full Miscellaneous Work #1 Approved 1
11.83
101 C101MC NB/SB 11.83 12/28/2011 21:01 12/29/2011 6:01 EL CAMPO ROAD 10 Full Miscellaneous Work #1 Approved 1
44.01
101 C101KF NB/SB 44.01 12/29/2011 19:01 12/30/2011 6:01 SANTA ROSA ROAD 5 Lane Highway Construction #1 Approved 1
42.87
101 C101JF SB 42.87 12/29/2011 19:01 12/30/2011 6:01 SAN DIEGO ROAD 5 Lane Highway Construction #1 Approved 1
42.87
101 C101IF NB 42.87 12/29/2011 19:01 12/30/2011 6:01 SAN DIEGO ROAD 5 Lane Highway Construction #1 Approved 1
35.7 SOUTHERN PACIFIC R.R.
ROSARIO AVENUE
101 C101BF SB 46.2 12/29/2011 18:01 12/30/2011 6:01 5 Lane Highway Construction #2 Approved 2
35.7 SOUTHERN PACIFIC R.R.
ROSARIO AVENUE
101 C101AF NB 46.2 12/29/2011 18:01 12/30/2011 12:01 5 Lane Highway Construction #2 Approved 2
56.32 PASO ROBLES STREET #1, Left
NORTH JCT RTE 46 (EAST) Median
101 C101WB SB 57.92 12/29/2011 8:30 12/29/2011 14:30 10 Lane Roadway Excavation Shoulder Approved 2
13.17
GRAND AVENUE (ARROYO
101 C101EE NB/SB 13.17 12/28/2011 21:01 12/29/2011 6:01 GRANDE) 10 Full Miscellaneous Work #1 Approved 1
13.17
GRAND AVENUE (ARROYO
101 C101DE NB/SB 13.17 12/28/2011 21:01 12/29/2011 6:01 GRANDE) 10 Full Miscellaneous Work #1 Approved 1
12.52
101 C101CE SB 12.52 12/28/2011 21:01 12/29/2011 6:01 BRIDGE STREET 10 Full Miscellaneous Work #1 Approved 1
12.52
TRAFFIC WAY (ARROYO
101 C101UC NB 12.52 12/29/2011 21:01 12/30/2011 6:01 GRANDE) 10 Full Miscellaneous Work #1 Approved 1
11.83
101 C101MC NB/SB 11.83 12/29/2011 21:01 12/30/2011 6:01 EL CAMPO ROAD 10 Full Miscellaneous Work #1 Approved 1
7.85
101 C101ZB NB/SB 12/29/2011 21:01 12/30/2011 6:01 LOS BERROS ROAD 10 Full Miscellaneous Work #1 Approved 1
21
101 C101ZB NB/SB 7.85 12/29/2011 21:01 12/30/2011 6:01 LOS BERROS ROAD 10 Full Miscellaneous Work #1 Approved 1
45.57
101 C101OF NB/SB 45.57 12/29/2011 20:01 12/30/2011 6:01 JCT HWY 41 5 Lane Highway Construction #1 Approved 1
37.86
101 C101FF NB/SB 37.86 12/29/2011 20:01 12/30/2011 6:01 JCT HWY 58 5 Lane Highway Construction #1 Approved 1
37.86
101 C101EF NB/SB 37.86 12/29/2011 20:01 12/30/2011 6:01 JCT HWY 58 5 Lane Highway Construction #1 Approved 1
45.57
101 C101PF NB/SB 45.57 12/29/2011 20:01 12/30/2011 6:01 JCT HWY 41 5 Lane Highway Construction #1 Approved 1
42.27
101 C101HF NB/SB 42.27 12/29/2011 20:01 12/30/2011 6:01 SANTA BARBARA ROAD 5 Lane Highway Construction #1 Approved 1
42.27
101 C101GF NB/SB 42.27 12/29/2011 20:01 12/30/2011 6:01 SANTA BARBARA ROAD 5 Lane Highway Construction #1 Approved 1
13.17
GRAND AVENUE (ARROYO
101 C101DE NB/SB 13.17 12/29/2011 21:01 12/30/2011 6:01 GRANDE) 10 Full Miscellaneous Work #1 Approved 1
12.52
101 C101CE SB 12.52 12/29/2011 21:01 12/30/2011 6:01 BRIDGE STREET 10 Full Miscellaneous Work #1 Approved 1
12.8
101 C101BE SB 12.8 12/29/2011 21:01 12/30/2011 6:01 FAIR OAKS AVENUE 10 Full Miscellaneous Work #1 Approved 1
11.83
101 C101BC NB/SB 11.83 12/29/2011 21:01 12/30/2011 6:01 EL CAMPO ROAD 10 Full Miscellaneous Work #1 Approved 1
7.85
101 C101FB NB/SB 7.85 12/29/2011 21:01 12/30/2011 6:01 LOS BERROS ROAD 10 Full Miscellaneous Work #1 Approved 1
16.05
101 C101LE NB/SB 16.05 12/29/2011 21:01 12/30/2011 6:01 FIVE CITIES DRIVE 10 Full Miscellaneous Work #1 Approved 1
15.58
101 C101JE NB/SB 15.58 12/29/2011 21:01 12/30/2011 6:01 4TH STREET 10 Full Miscellaneous Work #1 Approved 1
22
14.61
101 C101IE NB/SB 14.61 12/29/2011 21:01 12/30/2011 6:01 OAK PARK BLVD 10 Full Miscellaneous Work #1 Approved 1
14.61
101 C101HE NB/SB 14.61 12/29/2011 21:01 12/30/2011 6:01 OAK PARK BLVD 10 Full Miscellaneous Work #1 Approved 1
13.17
GRAND AVENUE (ARROYO
101 C101EE NB/SB 13.17 12/29/2011 21:01 12/30/2011 6:01 GRANDE) 10 Full Miscellaneous Work #1 Approved 1
42.27
101 C101DF SB 42.27 12/29/2011 21:01 12/30/2011 6:01 SANTA BARBARA ROAD 5 Full Highway Construction #1, #2 Approved 2
16.05
101 C101VE SB 16.05 12/29/2011 21:01 12/30/2011 6:01 FIVE CITIES DRIVE 10 Full Miscellaneous Work #1 Approved 1
16.32
101 C101UE SB 16.32 12/29/2011 21:01 12/30/2011 6:01 PRICE STREET 10 Full Miscellaneous Work #1 Approved 1
16.32
101 C101QE NB 16.32 12/29/2011 21:01 12/30/2011 6:01 PRICE STREET 10 Full Miscellaneous Work #1 Approved 1
16.32
101 C101OE SB 16.32 12/29/2011 21:01 12/30/2011 6:01 PRICE STREET 10 Full Miscellaneous Work #1 Approved 1
15.58
101 C101KE NB/SB 15.58 12/29/2011 21:01 12/30/2011 6:01 4TH STREET 10 Full Miscellaneous Work #1 Approved 1
13.75
101 C101GE NB/SB 13.75 12/29/2011 21:01 12/30/2011 6:01 BRISCO ROAD 10 Full Miscellaneous Work #1 Approved 1
13.75
101 C101FE NB/SB 13.75 12/29/2011 21:01 12/30/2011 6:01 BRISCO ROAD 10 Full Miscellaneous Work #1 Approved 1
7.85 LOS BERROS ROAD
HINDS AVENUE
101 C101ZA NB 16.62 12/29/2011 19:01 12/30/2011 6:01 10 Lane Miscellaneous Work #1, #2 Approved 2
46.2
101 C101SF NB 46.2 12/29/2011 19:01 12/30/2011 6:01 ROSARIO AVENUE 5 Lane Highway Construction #1 Approved 1
45.96
TRAFFIC WAY
101 C101RF SB 12/29/2011 19:01 12/30/2011 6:01 (ATASCADERO) 5 Lane Highway Construction #1 Approved 1
23
TRAFFIC WAY
101 C101RF SB 45.96 12/29/2011 19:01 12/30/2011 6:01 (ATASCADERO) 5 Lane Highway Construction #1 Approved 1
45.96
TRAFFIC WAY
101 C101QF NB/SB 45.96 12/29/2011 19:01 12/30/2011 6:01 (ATASCADERO) 5 Lane Highway Construction #1 Approved 1
7.85 LOS BERROS ROAD
HINDS AVENUE
101 C101EB SB 16.62 12/29/2011 19:01 12/30/2011 6:01 10 Lane Miscellaneous Work #1, #2 Approved 2
44.84
101 C101NF NB/SB 44.84 12/29/2011 19:01 12/30/2011 6:01 CURBARIL AVENUE 5 Lane Highway Construction #1 Approved 1
44.84
101 C101MF NB/SB 44.84 12/29/2011 19:01 12/30/2011 6:01 CURBARIL AVENUE 5 Lane Highway Construction #1 Approved 1
44.01
101 C101LF NB/SB 44.01 12/29/2011 19:01 12/30/2011 6:01 SANTA ROSA ROAD 5 Lane Highway Construction #1 Approved 1
12.8
101 C101BE SB 12.8 12/28/2011 21:01 12/29/2011 6:01 FAIR OAKS AVENUE 10 Full Miscellaneous Work #1 Approved 1
11.83
101 C101BC NB/SB 11.83 12/28/2011 21:01 12/29/2011 6:01 EL CAMPO ROAD 10 Full Miscellaneous Work #1 Approved 1
7.85
101 C101FB NB/SB 7.85 12/28/2011 21:01 12/29/2011 6:01 LOS BERROS ROAD 10 Full Miscellaneous Work #1 Approved 1
16.05
101 C101LE NB/SB 16.05 12/28/2011 21:01 12/29/2011 6:01 FIVE CITIES DRIVE 10 Full Miscellaneous Work #1 Approved 1
15.58
101 C101JE NB/SB 15.58 12/28/2011 21:01 12/29/2011 6:01 4TH STREET 10 Full Miscellaneous Work #1 Approved 1
14.61
101 C101IE NB/SB 14.61 12/28/2011 21:01 12/29/2011 6:01 OAK PARK BLVD 10 Full Miscellaneous Work #1 Approved 1
14.61
101 C101HE NB/SB 14.61 12/28/2011 21:01 12/29/2011 6:01 OAK PARK BLVD 10 Full Miscellaneous Work #1 Approved 1
42.27
101 C101DF SB 12/28/2011 21:01 12/29/2011 6:01 SANTA BARBARA ROAD 5 Full Highway Construction #1, #2 Approved 2
24
101 C101DF SB 42.27 12/28/2011 21:01 12/29/2011 6:01 SANTA BARBARA ROAD 5 Full Highway Construction #1, #2 Approved 2
7.85
101 C101ZB NB/SB 7.85 12/28/2011 21:01 12/29/2011 6:01 LOS BERROS ROAD 10 Full Miscellaneous Work #1 Approved 1
45.57
101 C101OF NB/SB 45.57 12/28/2011 20:01 12/29/2011 6:01 JCT HWY 41 5 Lane Highway Construction #1 Approved 1
37.86
101 C101FF NB/SB 37.86 12/28/2011 20:01 12/29/2011 6:01 JCT HWY 58 5 Lane Highway Construction #1 Approved 1
37.86
101 C101EF NB/SB 37.86 12/28/2011 20:01 12/29/2011 6:01 JCT HWY 58 5 Lane Highway Construction #1 Approved 1
45.57
101 C101PF NB/SB 45.57 12/28/2011 20:01 12/29/2011 6:01 JCT HWY 41 5 Lane Highway Construction #1 Approved 1
42.27
101 C101HF NB/SB 42.27 12/28/2011 20:01 12/29/2011 6:01 SANTA BARBARA ROAD 5 Lane Highway Construction #1 Approved 1
42.27
101 C101GF NB/SB 42.27 12/28/2011 20:01 12/29/2011 6:01 SANTA BARBARA ROAD 5 Lane Highway Construction #1 Approved 1
7.85 LOS BERROS ROAD
HINDS AVENUE
101 C101ZA NB 16.62 12/28/2011 19:01 12/29/2011 6:01 10 Lane Miscellaneous Work #1, #2 Approved 2
42.87
101 C101IF NB 42.87 12/28/2011 19:01 12/29/2011 6:01 SAN DIEGO ROAD 5 Lane Highway Construction #1 Approved 1
35.7 SOUTHERN PACIFIC R.R.
ROSARIO AVENUE
101 C101BF SB 46.2 12/28/2011 18:01 12/29/2011 6:01 5 Lane Highway Construction #2 Approved 2
35.7 SOUTHERN PACIFIC R.R.
ROSARIO AVENUE
101 C101AF NB 46.2 12/28/2011 18:01 12/29/2011 12:01 5 Lane Highway Construction #2 Approved 2
56.32 PASO ROBLES STREET
#1, Left
NORTH JCT RTE 46 (EAST) Median
101 C101WB SB 57.92 12/28/2011 8:30 12/28/2011 14:30 10 Lane Roadway Excavation Shoulder Approved 2
13.17
GRAND AVENUE (ARROYO
101 C101EE NB/SB 13.17 12/27/2011 21:01 12/28/2011 6:01 GRANDE) 10 Full Miscellaneous Work #1 Approved 1
25
13.17
GRAND AVENUE (ARROYO
101 C101DE NB/SB 13.17 12/27/2011 21:01 12/28/2011 6:01 GRANDE) 10 Full Miscellaneous Work #1 Approved 1
12.52
101 C101CE SB 12.52 12/27/2011 21:01 12/28/2011 6:01 BRIDGE STREET 10 Full Miscellaneous Work #1 Approved 1
12.8
101 C101BE SB 12.8 12/27/2011 21:01 12/28/2011 6:01 FAIR OAKS AVENUE 10 Full Miscellaneous Work #1 Approved 1
16.32
101 C101QE NB 16.32 12/27/2011 21:01 12/28/2011 6:01 PRICE STREET 10 Full Miscellaneous Work #1 Approved 1
16.32
101 C101OE SB 16.32 12/27/2011 21:01 12/28/2011 6:01 PRICE STREET 10 Full Miscellaneous Work #1 Approved 1
15.58
101 C101KE NB/SB 15.58 12/27/2011 21:01 12/28/2011 6:01 4TH STREET 10 Full Miscellaneous Work #1 Approved 1
13.75
101 C101GE NB/SB 13.75 12/27/2011 21:01 12/28/2011 6:01 BRISCO ROAD 10 Full Miscellaneous Work #1 Approved 1
13.75
101 C101FE NB/SB 13.75 12/27/2011 21:01 12/28/2011 6:01 BRISCO ROAD 10 Full Miscellaneous Work #1 Approved 1
12.52
TRAFFIC WAY (ARROYO
101 C101UC NB 12.52 12/27/2011 21:01 12/28/2011 6:01 GRANDE) 10 Full Miscellaneous Work #1 Approved 1
11.83
101 C101MC NB/SB 11.83 12/27/2011 21:01 12/28/2011 6:01 EL CAMPO ROAD 10 Full Miscellaneous Work #1 Approved 1
7.85
101 C101ZB NB/SB 7.85 12/27/2011 21:01 12/28/2011 6:01 LOS BERROS ROAD 10 Full Miscellaneous Work #1 Approved 1
7.85 LOS BERROS ROAD
HINDS AVENUE
101 C101EB SB 16.62 12/27/2011 19:01 12/28/2011 6:01 10 Lane Miscellaneous Work #1, #2 Approved 2
44.84
101 C101MF NB/SB 44.84 12/27/2011 19:01 12/28/2011 6:01 CURBARIL AVENUE 5 Lane Highway Construction #1 Approved 1
44.01
101 C101KF NB/SB 12/27/2011 19:01 12/28/2011 6:01 SANTA ROSA ROAD 5 Lane Highway Construction #1 Approved 1
26
101 C101KF NB/SB 44.01 12/27/2011 19:01 12/28/2011 6:01 SANTA ROSA ROAD 5 Lane Highway Construction #1 Approved 1
42.87
101 C101IF NB 42.87 12/27/2011 19:01 12/28/2011 6:01 SAN DIEGO ROAD 5 Lane Highway Construction #1 Approved 1
35.7 SOUTHERN PACIFIC R.R.
ROSARIO AVENUE
101 C101AF NB 46.2 12/27/2011 18:01 12/28/2011 12:01 5 Lane Highway Construction #2 Approved 2
56.32 PASO ROBLES STREET
#1, Left
NORTH JCT RTE 46 (EAST) Median
101 C101WB SB 57.92 12/27/2011 8:30 12/27/2011 14:30 10 Lane Roadway Excavation Shoulder Approved 2
42.87
101 C101TF SB 42.87 12/27/2011 0:01 1/6/2012 23:59 SAN DIEGO ROAD 5 Full Highway Construction #1 Approved 1