ESB National Grid has provided this program as an aid to Suppliers and Demand Customers. Although every effort has been made to ensure the accuracy of the material
contained in this spreadsheet, complete accuracy cannot be guaranteed. ESB National Grid cannot accept any responsibility whatsoever for loss or damage occasioned or
claimed to have been occasioned, in part or in full, as a consequence of any person acting, or refraining from acting, as a result of a matter contained in this spreadsheet.

                  NATIONAL GRID

Demand TUoS Sample Charges
Customer Parameters                                                                                                       Input Assumptions
Charging Period                                                                                                             01-31 Jan 2005
Supplier                                                                                                                    ABC Energy Plc.
Supplier's Customer                                                                                                          XYZ Factory
Connection to                                                                                                           Distribution System


Connection Voltage                                                                                                      110 kV or higher


Maximum Import Capacity @ exit point *                                                                                             4.800 MW                                     if none select "0"
Load Factor *                                                                                                                         72%                                                                       1460
Day Load Factor * (Day Hours - 8am to 11pm)                                                                                           66%                                                                       1000
Highest Metered Demand @ exit point *                                                                                              4.258 MW                                     required if MIC is "0"   0.684931507
Unauthorised Usage estimate *                                                                                                     0.000 MWh
Applicable Tariff Schedule                                                                                                          DTS-D1
For MIC values in MVa multiply by 0.95 MW/MVa
* input based on demand & consumption at customer location exclusive of application of distribution loss factors

DTS-D1 per unit charges before VAT**                                                                                             € 7.43/MWh
                                                                                                                                 0.743 ¢/kWh

DTS-D1 per unit charges after VAT**                                                                                              € 8.99/MWh
                                                                                                                                 0.899 ¢/kWh

**based on customer consumption before distribution loss adjustment if applicable

Disclaimer:
ESB National Grid has provided this program as an aid to Suppliers and Demand Customers. Although every effort has been made to ensure the accuracy of the material
contained in this spreadsheet, complete accuracy cannot be guaranteed. ESB National Grid cannot accept any responsibility whatsoever for loss or damage occasioned or
claimed to have been occasioned, in part or in full, as a consequence of any person acting, or refraining from acting, as a result of a matter contained in this spreadsheet.
EXAMPLE CHARGES: TARIFF SCHEDULE DTS-T                                                                                                                NATIONAL GRID

Customer Parameters                                                                                                          Input Assumptions
Tariffs approved by the CER effective                                                                                          January 1st 2005
Charging Period                                                                                                                 01-31 Jan 2005
Supplier                                                                                                                       ABC Energy Plc.
Supplier's Customer                                                                                                               XYZ Factory
Connection Voltage                                                                                                             110 kV or higher
Connection to                                                                                                                 Distribution System
Maximum Import Capacity @ exit point *                                                                                             4.800 MW
Load Factor *                                                                                                                         72%
Day Load Factor * (Day Hours - 8am to 11pm)                                                                                           66%
Highest Metered Demand @ exit point *                                                                                              4.258 MW
Day Hours in month                                                                                                                    456
Total Average Hours in Month                                                                                                          730
Day Time Metered Energy Transferred                                                                                             1,282.190 MWh
Total Metered Energy Transferred                                                                                                2,238.005 MWh
Charge Calculation                                                                                                                   Values
                                                                                                                                     € Euro
(a) Network Capacity Charge                                                                                                        € 5,638.69
    MIC                                                                                                                              4.800 MW                                   3.84   80% of MIC
    Network Capacity Charge Rate (DTS-T)                                                                                      € 1,324.2589/MW/Month                              0.8   MIC minus 4 MW
    Highest Metered Demand                                                                                                           4.258 MW
    Charging Capacity                                                                                                                4.258 MW
(b) Network Unauthorised Usage Charge                                                                                                    € 0.00
    Network Unauthorised Usage Charge Rate                                                                                         € 613.0000/MWh
    Unauthorised Usage                                                                                                                0.000 MWh
(c) Network Transfer Charge                                                                                                           € 4,744.79
    Network Transfer Charge Rate                                                                                                     € 2.1201/MWh
    Total Metered Energy Transferred                                                                                                2,238.005 MWh
(d) System Services Charge                                                                                                            € 5,272.74
    System Services Charge Rate                                                                                                      € 2.3560/MWh
    Total Metered Energy Transferred                                                                                                2,238.005 MWh
(e) Capacity Margin Charge                                                                                                            € 1,859.18
    Capacity Margin Charge Rate                                                                                                      € 1.4500/MWh
    Metered Energy Transferred in Day Hours                                                                                         1,282.190 MWh
Total Account Charges before VAT                                                                                                     € 17,515.40
  VAT                                                                                                                                 € 3,678.23
Total Account Charges after VAT                                                                                                      € 21,193.63

                                                                                                                                    € 7.83/MWh
DTS-T per unit charges before VAT
                                                                                                                                    0.783 ¢/kWh

                                                                                                                                    € 9.47/MWh
DTS-T per unit charges total
                                                                                                                                    0.947 ¢/kWh

Disclaimer:
ESB National Grid has provided this program as an aid to Suppliers and Demand Customers. Although every effort has been made to ensure the accuracy of the material
contained in this spreadsheet, complete accuracy cannot be guaranteed. ESB National Grid cannot accept any responsibility whatsoever for loss or damage occasioned or
claimed to have been occasioned, in part or in full, as a consequence of any person acting, or refraining from acting, as a result of a matter contained in this spreadsheet.
EXAMPLE CHARGES: TARIFF SCHEDULE DTS-D1                                                                                                          NATIONAL GRID

Customer Parameters                                                                                                      Input Assumptions
Tariffs approved by the CER effective                                                                                      January 1st 2005
Charging Period                                                                                                             01-31 Jan 2005
Supplier                                                                                                                   ABC Energy Plc.
Supplier's Customer                                                                                                           XYZ Factory
Connection Voltage                                                                                                         110 kV or higher
Connection to                                                                                                             Distribution System
Maximum Import Capacity @ exit point *                                                                                         4.800 MW
Load Factor *                                                                                                                     72%
Day Load Factor * (Day Hours - 8am to 11pm)                                                                                       66%
Highest Metered Demand @ exit point *                                                                                          4.258 MW
Day Hours in month                                                                                                                 456
Total Average Hours in Month                                                                                                       730
Day Time Metered Energy Transferred                                                                                         1,282.190 MWh
Total Metered Energy Transferred                                                                                            2,238.005 MWh
Distribution Loss Factor - Day Hours                                                                                              1.000
Distribution Loss Factor - Night Hours                                                                                            1.000
Adjusted Day Hours Metered Energy Transfer                                                                                  1,282.190 MWh
Adjusted Nights Hours Metered Energy Transfer                                                                                955.815 MWh
Adjusted Total Hours Metered Energy Transfer                                                                                2,238.005 MWh
Adjusted Unauthorized Usage Metered Energy Transfer                                                                           0.000 MWh                                         - Unauthorised consumption is assumed to occur during Day hours
Charge Calculation                                                                                                               Values
                                                                                                                                 € Euro
(a) Network Capacity Charge                                                                                                    € 4,748.98
    MIC                                                                                                                           4.800 MW                                            4.8       MIC x HADLAF
    Network Capacity Charge Rate (DTS-D1)                                                                                € 1,115.3072/MW/Month                                       3.84       80% of MIC x HADLAF
    Highest Metered Demand                                                                                                        4.258 MW                                            0.8       MIC x HADLAF minus 4 MW
    Charging Capacity                                                                                                             4.258 MW
(b) Network Unauthorised Usage Charge                                                                                               € 0.00
    Network Unauthorised Usage Charge Rate                                                                                    € 613.0000/MWh
    Unauthorised Usage                                                                                                            0.000 MWh
(c) Network Transfer Charge                                                                                                      € 4,744.79
    Network Transfer Charge Rate                                                                                                € 2.1201/MWh
    Total Metered Energy Transferred                                                                                           2,238.005 MWh
(d) System Services Charge                                                                                                       € 5,272.74
    System Services Charge Rate                                                                                                 € 2.3560/MWh
    Total Metered Energy Transferred                                                                                           2,238.005 MWh
(e) Capacity Margin Charge                                                                                                       € 1,859.18
    Capacity Margin Charge Rate                                                                                                 € 1.4500/MWh
    Metered Energy Transferred in Day Hours                                                                                    1,282.190 MWh
Total Account Charges before VAT                                                                                                € 16,625.69
   VAT                                                                                                                          € 3,491.39
Total Account Charges after VAT                                                                                                 € 20,117.08

DTS-D1 per unit charges before VAT                                                                                             € 7.43/MWh
(based on customer consumption before loss adjustment)                                                                         0.743 ¢/kWh

DTS-D1 per unit charges after VAT                                                                                              € 8.99/MWh
(based on customer consumption before loss adjustment)                                                                         0.899 ¢/kWh
* input based on demand & consumption at customer location exclusive of application of distribution loss factors

Disclaimer:
ESB National Grid has provided this program as an aid to Suppliers and Demand Customers. Although every effort has been made to ensure the accuracy of the material contained
in this spreadsheet, complete accuracy cannot be guaranteed. ESB National Grid cannot accept any responsibility whatsoever for loss or damage occasioned or claimed to have
been occasioned, in part or in full, as a consequence of any person acting, or refraining from acting, as a result of a matter contained in this spreadsheet.
EXAMPLE CHARGES: TARIFF SCHEDULE DTS-D2                                                                                                         NATIONAL GRID

Customer Parameters                                                                                                     Input Assumptions
Tariffs approved by the CER effective                                                                                     January 1st 2005
Charging Period
Supplier
Supplier's Customer
Connection Voltage                                                                                                        110 kV or higher
Connection to                                                                                                            Distribution System
Maximum Import Capacity @ exit point *                                                                                        4.800 MW
Load Factor *                                                                                                                    72%
Day Load Factor * (Day Hours - 8am to 11pm)                                                                                      66%
Highest Metered Demand @ exit point *                                                                                         4.258 MW
Day Hours in month                                                                                                                456
Total Average Hours in Month                                                                                                      730
Day Time Metered Energy Transferred                                                                                       1,282.190 MWh
Total Metered Energy Transferred                                                                                          2,238.005 MWh
Distribution Loss Factor - Day Hours                                                                                             1.000
Distribution Loss Factor - Night Hours                                                                                           1.000
Adjusted Day Hours Metered Energy Transfer                                                                                1,282.190 MWh
Adjusted Nights Hours Metered Energy Transfer                                                                               955.815 MWh
Adjusted Total Hours Metered Energy Transfer                                                                              2,238.005 MWh
Adjusted Unauthorized Usage Metered Energy Transfer                                                                          0.000 MWh                                          - Unauthorised consumption is assumed to occur during Day hours
Charge Calculation                                                                                                              Values
                                                                                                                                € Euro
(a) Network Capacity Charge                                                                                                     € 0.00
    Network Capacity Charge Rate (DTS-D2)                                                                                      € 0.0000/MWh
    Metered Energy Transferred in Day Hours                                                                                    1,282.190 MWh
(b) Network Transfer Charge                                                                                                         € 0.00
    Network Transfer Charge Rate                                                                                               € 0.0000/MWh
    Total Metered Energy Transferred                                                                                           2,238.005 MWh
(c) System Services Charge                                                                                                          € 0.00
    System Services Charge Rate                                                                                                € 0.0000/MWh
    Total Metered Energy Transferred                                                                                           2,238.005 MWh
(d) Capacity Margin Charge                                                                                                          € 0.00
    Capacity Margin Charge Rate                                                                                                € 0.0000/MWh
    Metered Energy Transferred in Day Hours                                                                                    1,282.190 MWh
Total Account Charges before VAT                                                                                                    € 0.00
   VAT                                                                                                                              € 0.00
Total Account Charges after VAT                                                                                                     € 0.00

DTS-D2 per unit charges before VAT                                                                                             € 0.00/MWh
(based on customer consumption before loss adjustment)                                                                         0.000 ¢/kWh

DTS-D2 per unit charges after VAT                                                                                              € 0.00/MWh
(based on customer consumption before loss adjustment)                                                                         0.000 ¢/kWh
* input based on demand & consumption at customer location exclusive of application of distribution loss factors

Disclaimer:
ESB National Grid has provided this program as an aid to Suppliers and Demand Customers. Although every effort has been made to ensure the accuracy of the material contained
in this spreadsheet, complete accuracy cannot be guaranteed. ESB National Grid cannot accept any responsibility whatsoever for loss or damage occasioned or claimed to have
been occasioned, in part or in full, as a consequence of any person acting, or refraining from acting, as a result of a matter contained in this spreadsheet.
                  Tariff Parameters               Value €        DLAF TABLE
Network Capacity Charge Rate (DTS-T)     € 1,324.2589/MW/Month     LU     DAY          NIGHT     VOLTAGE LEVEL
Network Capacity Charge Rate (DTS-D1)    € 1,115.3072/MW/Month      1     1.000        1.000   110 kV or higher
Network Capacity Charge Rate (DTS-D2)      € 4.5846/MW/Month        2     1.017        1.014   38 kV
Network Unauthorised Usage Charge Rate       € 613.0000/MWh         3     1.044        1.036   MV (10/20kV)
Network Transfer Charge Rate                  € 2.1201/MWh          4     1.096        1.078   LV (<10 kV)
System Services Charge Rate                   € 2.3560/MWh          1   Box 3 Output
Capacity Margin Charge Rate                   € 1.4500/MWh
Tariff Effective Date                        January 1st 2005      VAT                  LU     TARIFF                VALID
                                                                  21.0%                  0     DTS-D2                  0
                                                                                         1     DTS-T                   1
                                                                                         2     DTS-D1                  1
                                                                                         2     DTS-D1

                                                                                        LU     CONN TO
                                                                                         1     Transmission System
                                                                                         2     Distribution System
                                                                                         2     Box 2 Output

								