Embed
Email

deck

Document Sample

Shared by: gegeshandong
Categories
Tags
Stats
views:
3
posted:
12/29/2011
language:
pages:
26
Second European LTER

ILTER

Scientific Site Coordinators (SSC)

WORKshop

From concepts to a vivid network FOR socio-

ecological research



LTER Europe Conference



Donana, 22.-24 January 2008





Michael Mirtl

Fed. Environment Agency, Austria









Federal Environment Agency

Structure of LTER-Europe

ILTER







Global

(I)LTER



Regional LTER-Europe

Groups (and its LTER-facilities)



National

Networks



Level of LTSER LTSER

PLATFORMS Region Region



Level of

SITES







Federal Environment Agency

Who are WE? Bodies of LTER-Europe

ILTER









National Networks

Representatives Conference

(NNRC)



Co-ordinating

Committee Structure?

(CC) Governance?







EC

Scientific Site Co-ordinator

Conference (SSCC)









Federal Environment Agency

Basic contents of the 1st SSCC, June 2007

ILTER









 Who are we?

 What are we supposed to do?

 How are we going to do it?

 How will we be judged?

 How do we want to organize ourselves?









Federal Environment Agency

Who are we I?



ILTER









Federal Environment Agency

Who are we II?

ILTER









Federal Environment Agency

Who are we III?

ILTER









Federal Environment Agency

Who are we IV?

ILTER









Federal Environment Agency

Our IDEAL job profils

ILTER









Federal Environment Agency

Scientific Coordinators Profile

ILTER



LTER – site LTER manager (numbers refer to the

number of cards which mentioned this skill)

 Data management - 12

 Structure builder - 9

 Recognised scientist - 9

 Communication monster - 7

 Secure position - 6

 Networked - 5

 Locally oriented – 4





LTSER- platform manager

 Scientific generalist - 16

 Manager in power - 12

 Well informed i.e. connected/networked - 9

 Experienced in data management - 6

 Communicative - 5





Federal Environment Agency

What do we represent?

ILTER









Federal Environment Agency

Costs of what we represent



ILTER









Federal Environment Agency

Start of work on

ILTER

research topics

and standard

parameters









Federal Environment Agency

Joint research projects and parameters II

ILTER





 Questions

 Patterns of relative long term change in phenology and

population density and related drivers at individual

sites

 Effects of change in ecosystem input on community

structure and ecosystem functions

 Changes in ecosystem functionality as a result of land

use change

 How are ecosystem service levels (e.g. recreation) and

goods (e.g. timber, fish) affected across Europe by

previous topics



 Standard parameters

 TBC according to first joint research project(s)







Federal Environment Agency

Workflow

ILTER









Federal Environment Agency

ILTER









Federal Environment Agency

& good Hungarian vibes

ILTER









Federal Environment Agency

Basic contents of the 2nd SSCC, Janary 2008

ILTER









 Who are we?

 What are we supposed to do?

 How are we going to do it?

 How will we be judged?

 How do we want to organize ourselves?









Federal Environment Agency

Concepts

Main fields

of activity

Communication

ILTER







Networking, community building and

training







LTER projects, case studies and proof of

concept

Information management, data

architectures and IT tools





Strategic interfaces and fundraising



Formalization, institution building and

management Federal Environment Agency

ILTER

Objectives & tasks





LTER-Europe: structural

objectives/ main fields of activity



Concepts



Communication

LTER-Europe contacts Harmonization of existing lists of

database contacts

Networking, community building and Delivery of contacts database in

training EXCEL format for comments

Transfer into a relational database or

the LTER infobase

Database access through the LTER-

Europe WEB site

LTER projects, case studies and proof of

concept

Information management, data

architectures and IT tools





Strategic interfaces and fundraising



Formalization, institution building and

management Federal Environment Agency

Workflow across events of the week

ILTER





TOPIC Preparatory National Networks Site coordinators Excursion Site coordinators ALTER I3

Date Meetings

18-20 Reps Conf

21 conference

22 23 conference

24 25

Strategy, processes, the

"bigger picture" and long term

LTER Europe research agenda





LTER criteria





Communication, division of

tasks, networking, lobbying

and PR





Networking on the European

level and support of national

LTER projects, case studies

and proof of concept

Information management and

tools

Strategic interfaces and

fundraising

Formalisation and governance

structure





Harmonisation/

Standardisation



Planning/ future

Federal Environment Agency

By the end of the MONDAY (NNRC)

ILTER





•  We survived

  Bylaws adopted

  Status of national networks assessed (implementation, activity)

  Mind map of national networks checked

  First level criteria for LTER-Europe members adopted

  Editorial groups for Letters of Support & Commitment

  Overview of strategic environm. of LTER-Europe achieved

  Priority workflows for LTER-Europe adopted (incl. proj.proposals)

 Agreed structure of the WEB site and national informations

  Standard observations/parameter: agreed list for further

specification by SSCC and following national review

  Expert group to develop the LTER-Europe research agenda

 List of responsibles for the interface with other networks

  Adopted working plan 2008 (as nat. netwerks concerned)

 40 filled individual brainstormings (conference questionnairs) Environment Agency

Federal

By the end of the MONDAY (NNRC)

•  We survived

ILTER



  Bylaws adopted

  Status of national networks assessed (implementation, activity)



  Mind map of national networks checked

  First level criteria for LTER-Europe members adopted

  Editorial groups for Letters of Support & Commitment

  Overview of strategic environm. of LTER-Europe achieved

  Priority workflows for LTER-Europe adopted (incl. proj.proposals)

 Agreed structure of the WEB site and national informations

  Standard observations/parameter: agreed list for further

specification by SSCC and following national review

  Expert group: LTER-Europe research agenda

 List of responsibles for the interface with other networks

  Adopted working plan 2008 (as nat. netwerks concerned)

  40 filled individual brainstormings (conference questionnairs)

Federal Environment Agency

Adopting the programme

ILTER



General meeting 09:00 13:00

Tying up to the first SSC in Balatonfured, June 2006:

Main results and processes (Mirtl)

Introduction of participants

Requirement analysis for SSCC as a networked body:

purpose, mandate, functionalities

Coffee & tea 10:30 11:00

LTER Web site: current design vs. requirements

Options for structuring SSC as a formal body

Brief presentation of the concept for an ESFRI project

proposal (basis for further elaboration of the project

by those interested on Saturday morning!, 26th

January, Donana)



Lunch 13:00 14:30



LTER information management 14:30 18:00

Introduction & overview (Peterseil, Werf)

Update of the LTER-Infobase (Peterseil, Werf)

Interviews with site coordinators and platform

managers (combined I3&I6 teams, detailed

schedule and groupings will be decided according to

registration) Federal Environment Agency

Adopting the programme

ILTER



General meeting 09:00 13:00

Tying up to the first SSC in Balatonfured, June 2006:

Main results and processes (Mirtl)

Introduction of participants

Requirement analysis for SSCC as a networked body:

10:00 Work on standard

purpose, mandate, functionalities

observations/ measurements/

Coffee & tea 10:30 11:00

parameters

LTER Web site: current design vs. requirements

Options for structuring SSC as a formal body Requirement analysis for

Brief presentation of the concept for an ESFRI project SSCC as a networked

proposal (basis for further elaboration of the project body: purpose, mandate,

12:00 LTER-Web site: current functionalities,

by those interested on Saturday morning!, 26th

design and requirements

January, Donana) governance

Lunch 13:00 14:30



LTER information management 14:30 18:00

Introduction & overview (Peterseil, Werf)

Update of the LTER-Infobase (Peterseil, Werf)

Interviews with site coordinators and platform

managers (combined I3&I6 teams, detailed

Poster session, will be decided according

schedule and groupings up-dating of „whoto

are we“

registration) Federal Environment Agency

ILTER









GO!





Federal Environment Agency



Related docs
Other docs by gegeshandong
Streambank Erosion Severity Index no photos
Views: 1  |  Downloads: 0
Capitulo_2_v1.1
Views: 0  |  Downloads: 0
吴永2
Views: 0  |  Downloads: 0
sir2007-5130
Views: 0  |  Downloads: 0
Course Outline
Views: 0  |  Downloads: 0
DFAS_RS_Nov_29_2011
Views: 0  |  Downloads: 0
Math Awards FY05-FY10
Views: 0  |  Downloads: 0
ECE Plan for __Tussey Mountain PreK Counts___
Views: 0  |  Downloads: 0
By registering with docstoc.com you agree to our
privacy policy

You are almost ready to download!

You are almost ready to download!