World Class









Executive Director

Senior Vice President, General Shallow Water Energy Security Coalition

Counsel and Chief Compliance Officer www.shallowwaterenergy.org

ww.herculesoffshore.com twitter: @shallowwaternrg





James W. Noe





The Post-Macondo World

40388

Topics



 The Regulatory and Legislative Aftermath in the

Post-Macondo World

 Contract Risk Management in the Post-Macondo

World









1

World Class

Regulatory and Legislative Aftermath in the Post-

Macondo World









2

World Class

Regulatory and Legislative Aftermath in the Post-

Macondo World



 In the aftermath of Macondo, both the Obama Administration and the then-

Democratic controlled Congress reacted in a broad and restrictive manner

 Administration imposed sweeping, across-the-board offshore drilling

moratorium

 Ultimately lifted moratorium on shallow water and then deep water

 de facto moratorium replaced the express moratorium

 “Dynamic regulatory environment” imposed

 All resulting in a dramatic slowing of pace of permitting









3

World Class

Shallow Water Permitting Activity



U.S. GOM Shallow Water Total Permits Approval History (1)

40 38

36 36

35

32



28 29

30 27

27 26 26 26

25 24

22 22

21

21 19

20 17

16

15 15

14

15 17 12 12

15 11

8 11

10 12



5

2



0

Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec



3-Year Avg (07-09) 2010 2011







 Permit issuances down by roughly half since new regulations in June 2010

 Year-to-date, 37% of permits issued are for new wells, up from 30% during June thru

December 2010

 Backlog of permits seeking approval at the highest level, post Macondo (2)



(1) Source: Bureau of Ocean Energy Management, Regulation and Enforcement as of August 24, 2011

(2) As of August 24, 2011, there were 29 shallow water permits pending, with another 14 permits returned to operators seeking additional information







World Class

Time Delays in Permit Review



 Prior to new

regulations, it took Approval Time for Permits to Drill New Wells

operators less than two (Average Days)

weeks to receive a

permit for new wells 70.0





 Since the new 60.0 57.9

regulations, it takes

operators almost two 50.0

(Number of days)

months to receive a

permit for new wells 40.0





 Time delays create 30.0

operator confusion and

frustration with new 20.0

regulations 13.3



10.0





-

Jan '09 thru May '10 Jun '10 thru Sep '11







Source: Bureau of Ocean Energy Management, Regulation and Enforcement









5

World Class

Regulatory and Policy Actions



 BOEMRE: “The Obama Administration launched the most aggressive and

comprehensive reforms to offshore oil and gas regulation and oversight in U.S.

history”



Drilling Safety

 NTL-06 – operators required to demonstrate that they are prepared to deal

with a blowout and the “worst-case discharge”

 Drilling Safety Rule – “codifying” NTL-05 – permit applications for drilling

projects must meet new standards for well-design, casing and cement and be

independently certified by professional engineer

 NTL-10 – operators must provide a corporate compliance statement and

review of subsea blowout containment resources for deepwater drilling









6

World Class

Regulatory and Policy Actions (cont’d.)



Workplace Safety

 Workplace Safety Rule – operators must maintain comprehensive safety and

environmental programs. Mandates implementation of a Safety and

Environmental Management System (SEMS)

 September, 2011 – announced proposed revisions requiring

 Stop work authority

 Identification of ultimate authority

 Employee participation in development of SEMS









7

World Class

Regulatory and Policy Actions (cont’d.)



Reorganization of former MMS

 Three separate agencies

 Office of Natural Resources Revenue – collection of revenue and lease

bonus payments

 Bureau of Ocean Energy Management (BOEM) – to manage

development of offshore resources – leasing, plans, environmental studies,

NEPA analysis, geological risk analysis

 Bureau of Safety Environmental Enforcement (BSEE) – issue permits,

enforce safety and environmental regulations, inspections, oil spill

response, training and compliance

 Recusal policy implemented

 Ocean Energy Safety Advisory Committee – DOI/BOEMRE established

permanent advisory group consisting of scientific, engineering and technical

experts to provide guidance on improving offshore drilling safety, well

containment and spill response





8

World Class

Legislative Actions – Background of Existing Law



Oil Pollution Act of 1990

 Responsible party liable for removal costs, clean-up costs and damages

 Damages

 Injuries to natural resources

 Loss of subsistence use of natural resources

 Lost government revenues resulting form destruction of property or

natural resource injury

 Lost profits and earnings resulting form property loss or resource injury

 Cost of providing extra public services during or after spill response

33 U.S.C. 2702(b)









9

World Class

“Liability Cap”



 Total of all removal costs plus $75 million.

33 U.S.C. 2704(a)

 Cap does not apply if spill caused by

 Gross negligence

 Willful misconduct

 Violation of an applicable federal safety, construction or operating

regulation

33 U.S.C. 2704(c)

 Fines and liability under state law

33 U.S.C. 2718









10

World Class

Legislative Actions – 111th Congress



 HR 3534 – Consolidated Land, Energy and Aquatic Resources Act of 2009

(“Clear Act”) (passed House only)

 Amended various regulations regarding well engineering, well design, BOP

testing and spill response and containment

 Amended OPA 90 to repeal limits on liability for certain vessels and

offshore facilities

 Increased minimum COFR amounts to $300 million, with ability of

President to lower to $105 million for offshore facility seaward of state’s

boundary

 Expanded liability to include damages to human health

 S 3663 – Clean Energy Jobs and Oil Company Accountability Act (introduced

by then-Senate Majority Leader Reid – no Senate action)

 Amended OPA 90 to remove limits of liability for offshore facilities

 Repeal Limitation of Liability Act for claim for wages or pollution







11

World Class

Legislative Actions – 111th Congress (cont’d.)



 S 3763 – Restoring Ecosystem Sustainability and Protection of the Delta Act

(RESPOND Act) (introduced by Senator Landrieu – no Senate action taken)

 Amended OPA 90 to remove $75 million “limit”

 Amended OCSLA to establish Offshore Facilities Oil Spill Mutual Insurance

Fund

 Mandated mutual insurance pool requiring operators to pay $250

million per occurrence deductible with pool covering up to $10 billion









12

World Class

Legislative Actions - 112th Congress



 S 512 and HR 993 – LEASE Act – extended leases impacted by express and

de facto moratorium by one year

 HR 1229 – Putting Gulf Back to Work Act – ended de facto moratorium by

imposing deadlines on permit review process

 HR 1230 – Restoring American Offshore Leasing Now Act – requires

Administration to hold Gulf of Mexico and Virginia lease sales

 HR 1231 – Reversing President Obama’s Offshore Moratorium Act – lifted the

Administration’s ban on new offshore drilling by requiring movement on the

2012 – 2017 Lease Plan









- No Senate action on bills.





13

World Class

Policy Actions



 National Commission recommendations:1

 Establish a mutual liability pool, including risk-based premiums

 Phasing in higher liability limits for pollution

 Promoting joint ventures between smaller and larger operators

 Increase size and per occurrence limit of Oil Spill Liability Trust Fund

 Currently $1 billion single incident limit and $500,000 limit for natural

resource damage

 Report Regarding the Causes of the April 20, 2010 Macondo Well Blowout

released September 14, 2011 – expected to generate additional regulatory

changes2









1. Deep Water, The Gulf Oil Disaster and the Future of Offshore Drilling, Recommendations, the National Commission on the BP Deepwater Horizon Oil Spill and

Offshore Drilling, January 2011.

2. http://www.BOEMR.gov/pdfs/maps/DWHFINAL.pdf







14

World Class

Legislative and Regulatory Actions – Looking Ahead



 Amending/increasing liability limits – less likely

 Creating mutual insurance pools – less likely

 Additional taxes/removing “subsidies” and tax benefits – more likely

 Additional technical/operational regulations regarding well design and

construction, BOP, temporary abandonment, cementing and spill response and

containment possible









15

World Class

Contract Risk

Management in the

Post-Macondo World







The tug-of-war and

the growing

importance of “gross

negligence”







16

World Class

Traditional Allocation of Offshore Drilling Risks –

“Knock-for-Knock”



Responsibility of Contractor Responsibility of Operator





Own people - bodily injury, Own people – bodily injury,

illness and death illness and death

Own property Own property

Rig pollution Loss or damage to hole and

downhole tools

All other pollution/down-hole

pollution

Damage to reservoir

Costs of controlling wild well

17

World Class

Traditional Allocation of Offshore Drilling Risks –

“Knock-for-Knock” (cont’d.)

 Risk allocation and indemnities apply regardless of fault

 Typically intended to include gross negligence of party seeking indemnity









18

World Class

Gross Negligence Defined



 Ordinary negligence is a failure to exercise the degree of care that a person

with ordinary prudence would exercise under the same or similar

circumstances

 What lifts ordinary negligence into gross negligence is the mental attitude of

the defendant

 The plaintiff must show that the defendant was consciously, i.e., knowingly,

indifferent to his rights, welfare and safety

 In other words, the plaintiff must show that the defendant knew about the peril,

but his acts or omissions demonstrated that he didn’t care









19

World Class

BP - Transocean



 BP: May seek ruling that Transocean and other contractors were “grossly

negligent” in order to make indemnity obligations unenforceable

 Pollution indemnity clause – neither expressly includes or excludes “gross

negligence”:



Company shall assume full responsibility for and shall protect,

release, defend, indemnify and hold contractor harmless from

and against any loss, damage, expense, claim, fine, penalty,

demand, or liability for pollution or contamination, including

control and removal thereof, arising out of or connected with

operations under this contract . . . Without regard for

negligence of any party or parties and specifically without

regard for whether the pollution or contamination is caused in

whole or in part by the negligence or fault of contractor.









20

World Class

Enforceability of Indemnities for Gross Negligence



 Maritime law: appears federal courts applying general maritime law feel that it is

against public policy to be indemnified for gross negligence.

 Energy XXI v. New Tech Engineering C.P., 2011 WL 1458638 (S.D. Tex. 2011);

see also Todd Shipyards v. Turbine Services, Inc., 674 F.2d 401, 411 (5th Cir.

1982) (noting, in dicta, that gross negligence would “invalidate an exemption

from liability”)

 Texas Law

 Unsettled whether contractual indemnity agreements releasing a party from

liability for its gross negligence will be upheld. See Atlantic Richfield v.

Petroleum Personnel, Inc., 768 SW2d 724 (Tex. 1989)

 Seems trend in recent cases is to uphold enforcing contractual provisions

negotiated at arm’s length

 “any negligence . . .” likely broad enough to include “gross negligence” RLI

Insurance Company v. Union Pacific Rail Road Company, 463 F.Supp 2d 646

(S.D. Tex. 2006)

 Louisiana Law

 Enforceable. See Urban v. Acadian Contractors, Inc., 627 F.Supp. 2d 699

(W.D La. 2007)

21

World Class

Contractor – Operator Tug-of-War



 Operators increasingly pushing to exclude gross negligence from

pollution/blowout indemnities

 Operators pushing to increase use of contractor limits for “feel the pain”

provisions in indemnities

 Contractors responding by offering “gross negligence” as trigger for any

pollution/blowout liability

 Operators requesting access to contractors insurance for pollution/blowout

OEE









22

World Class

World Class



Other docs by xiaoyounan
uses chart
Views: 2  |  Downloads: 0
least_squares_fit_manual
Views: 0  |  Downloads: 0
ENTERING_THE_ROADWAY_AND_BACKING_NOTES
Views: 0  |  Downloads: 0
FFaith presentation
Views: 0  |  Downloads: 0
Ward_Nutritioin
Views: 1  |  Downloads: 0
0604477_Goldburg
Views: 0  |  Downloads: 0
salary-delegation-authority-summary-temporary
Views: 0  |  Downloads: 0
August 2011 _excel format_
Views: 19  |  Downloads: 0
1350 Tally FINANCE
Views: 1  |  Downloads: 0
Ch. 6.3.Martinez
Views: 0  |  Downloads: 0
By registering with docstoc.com you agree to our
privacy policy

You are almost ready to download!

You are almost ready to download!