Embed
Email

Staff costs - British Council

Document Sample

Shared by: gegeshandong
Categories
Tags
Stats
views:
0
posted:
12/29/2011
language:
pages:
12
How to calculate your Comenius Regio budget?

This excel file should help you to calculate your budget. It provides automatic calculations of the percentages

spent in each budget category, the maximum amounts eligible for equipment and subcontracting and the total

grant amount. Although the sheet has been tested, applicants are advised to check calculations before

transferring the results into their application form. The responsibility for the information given in the application

form remains with the applicant.



How to use the different excel tables?



The sheet "Summary" reflects the structure of the application form. For the categories "Equipment" and

"Subcontracting" it calculates the maximum amounts eligible, respecting the ceiling of 10% resp. 30% of the total

project costs. The table E3 "Total requested grant amount" takes its information from the section E1 and E2 and

calculates the total.

The sheet "Calculation equipment" helps you in calculating the eligible costs for equipment, taking into account

the depreciation of any purchase. Calculation results in this table are not automatically transfered to the summary

sheet.



The sheet "Staff costs" helps you in calculating staff costs, based on daily rates.







The sheet "Co-financing travel and subsistence" shall help you to calculate these costs in case you want to

cover the travel of external experts under the heading "other costs". You will have to respect the calculation rules

outlined in the Guide for Applicants; the tables provide you with the correct format on how to calculate them.



You are of course not obliged to use this excel file to calculate your budget. In case of simple budgets with only a

few items you will probably not need it. You can use it for more complicated budget scenarios and / or to verify

that your calculations are in line with the existing rules.



Please note, that cells containing formulas or text are protected. If you have questions concerning the formulas

used, please contact your National Agency. They can unprotect the sheet, help you with problems and verify if

there are any hidden logical or mathematical mistakes.

E. Requested EU funding

Preliminary remarks: In order to compile your own budget, it is sufficient to fill in the figures for your region only. Please fill in all cost categories before checking

the ceilings in the categories "Equipment" and "Subcontracting". Only this will safeguard a reliable plausibility check of the total requested grant amount (section

E.3).





E.1 Mobility



Distance between the two applicant institutions (in km):







Partnership type No. of planned mobilities Grant amount requested (€)

Partner region 1

Partner region 2







E.2 Other (non-mobility) costs

Please refer to sections 4.E and 4.F of the Guide for Applicants when filling in the following tables.

Indirect costs are not eligible for funding support.

Travel and subsistence costs (incl. local transport during mobilites) have to be covered by the mobility lump sum.

Other (non-mobility) costs can only be funded up to 75% of the eligible non-mobility costs within a region and up to a maximum of 25. 000 EUR per



Possible cost categories in "other (non-mobility) costs"

Staff costs: costs relating to statutory or temporary staff, based on real daily staff cost rates which cannot exceed the maximum eligible daily rates indicated in

the LLP Guide, part 4.F.



Subcontracting: costs incurred by procurement contracts, e.g. translation, interpreting, printing, (These costs mustn't exceed 30 % of the total project costs.)

Equipment: purchase, rent or lease of equipment justified and necessary for the project, depreciated in accordance with tax and accounting rules (these costs

mustn't exceed 10 % of the total project costs.)

Other project costs: on the basis of real costs (e.g. rental costs, purchase of consumables, travel costs for experts or speakers at conferences)





STAFF COSTS

(add rows if necessary)









Seite 2 von 12

Cost per

Staff category N° of working days working day Costs (in EUR)

(in EUR)

Partner Region 1

Partner Region 1

Partner Region 1

Partner Region 1



Total staff costs in partner region 1 0.00





Cost per

Staff category N° of working days working day Costs (in EUR)

(in EUR)

Partner Region 2

Partner Region 2

Partner Region 2

Partner Region 2

Partner Region 2



Total staff costs in partner region 1 0.00





SUBCONTRACTING

(add rows if necessary)

Costs

Service or task subcontracted

(in EUR)

Partner region 1

Partner region 1

Partner region 1

Partner region 1

Partner region 1

Total subcontracting costs in partner region 1 0.00



The costs for subcontracting should not exceed 30 % total project costs. In the budget compiled by you so far, this maximum amount would be

EUR







Seite 3 von 12

Costs

Service or task subcontracted

(in EUR)

Partner region 2

Partner region 2

Partner region 2

Partner region 2

Partner region 2

Total subcontracting costs in partner region 2



The costs for subcontracting should not exceed 30 % total project costs. In the budget compiled by you so far, this maximum amount would be

EUR



EQUIPMENT

(add rows if necessary)

Costs

Equipment

(in EUR)

Partner region 1

Partner region 1

Partner region 1

Partner region 1

Partner region 1

Total equipment costs partner region 1 0.00



The costs for subcontracting should not exceed 10 % total project costs. In the budget compiled by you so far, this maximum amount would be

EUR



Costs

Equipment

(in EUR)

Partner region 2

Partner region 2

Partner region 2

Partner region 2

Partner region 2

Total equipment costs partner region 2 0.00



The costs for subcontracting should not exceed 10 % total project costs. In the budget compiled by you so far, this maximum amount would be

EUR







Seite 4 von 12

OTHER COSTS

(add rows if necessary)

Costs

Type of costs

(in EUR)

Partner region 1

Partner region 1

Partner region 1

Partner region 1

Partner region 1

Total other costs partner region 1 0.00



Costs

Type of costs

(in EUR)

Partner region 2

Partner region 2

Partner region 2

Partner region 2

Partner region 2

Total other costs partner region 2 0.00



E.3 Total requested grant amount

Please note, that it is not possible to grant more than 25 000 Euro for non-mobility project costs. In case the calculated amount (75% of the non-mobility project

costs) is higher than 25 000 Euro, the table will automatically show only 25 000 Euro.





Partner region 1 Partner region 2

in % in %

Requested lump sum amount #DIV/0! 0.00 #DIV/0! 0.00



Staff costs #DIV/0! 0.00 #DIV/0! 0.00

Subcontracting #DIV/0! 0.00 #DIV/0! 0.00

Equipment #DIV/0! 0.00 #DIV/0! 0.00

Other costs #DIV/0! 0.00 #DIV/0! 0.00

Total other (non-mobility) project costs 0.00 0.00



75% of the total non mobility project costs 0.00 0.00



Total project costs 0.00 0.00









Seite 5 von 12

Total grant amount requested 0.00 0.00









Seite 6 von 12

Calculation of equipment costs

Please use the depreciation rates which are in accordance with the tax and accounting rules of the beneficiary incurring the costs.





Annual Period of Use

Purchase or Degree of Eligible

Description Total Costs Cost date Depreciation in Project

Rent/Lease ? Use (%) Costs

rate (%) (months)

Partner region 1

Partner region 1

Partner region 1

Partner region 1

Partner region 1

Partner region 1

Partner region 1





total 0.00









Annual Period of Use

Purchase or Degree of Eligible

Description Total Costs Cost date Depreciation in Project

Rent/Lease ? Use (%) Costs

rate (%) (months)

Partner region 2

Partner region 2

Partner region 2

Partner region 2

Partner region 2

Partner region 2

Partner region 2





total 0.00

Staff Costs

This table shall help you to calculate staff costs according to the rules outlined in the Guide for Applicants.

All figures in Euro



Staff by category

Overall 1. Manager 2. Researcher, teacher and / or trainer 3. Technical 4. Administrative

Overall

Partner total days on the Cost per day Total staff days on the Cost per day Total staff days on the Cost per day Total staff days on the Cost per day Total staff

total staff

region number of project cost by project cost by project cost by project cost by

costs

working category category category category

0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00

Total 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Co-financing Travel and Subsistence Costs 1/0/1900 1/0/1900

This table shall help you to calculate travel and subsistence costs



All figures in Euro



City and Country of City and Country of Start End Total costs

Partner Name of the person Purpose of the trip Travel costs Subsistence costs

departure destination Date Date 0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

All figures in Euro (Call 2012 ceilings)

Country STAFF

Researcher

Description Manager Teacher Technical

Trainer

Belgique/Belgie BE Belgium 460 360 240

Balgarija BG Bulgaria 40 26 22

Česká republika CZ Czech Republic 134 88 72

Danemark DK Denmark 361 284 236

Deutschland DE Germany 419 310 221

Eesti EE Estonia 102 73 59

Ellas EL Greece 279 218 142

España ES Spain 321 212 163

France FR France 435 351 257

Eire IE Ireland 309 328 239

Italia IT Italy 454 298 200

Kypros CY Cyprus 316 217 142

Latvija LV Latvia 78 63 50

Lietuva LT Lithuania 75 55 42

Luxembourg LU Luxembourg 496 331 282

Magyarország HU Hungary 107 79 57

Malta MT Malta 119 99 74

Nederland NL Netherlands 305 262 212

Österreich AT Austria 449 302 244

Polska PL Poland 109 77 51

Portugal PT Portugal 258 181 122

Romania RO Romania 84 51 34

Slovenia SI Slovenia 240 161 109

Slovenská republika SK Slovakia 95 54 45

Suomi /Finland FI Finland 368 255 196

Sverige SE Sweden 360 256 226

United Kingdom GB United Kingdom 355 334 231

Island IS Iceland 338 219 193

Liechtenstein LI Liechtenstein 449 302 244

Norge NO Norway 440 345 311

Hrvatska HR Croatia 141 102 66

Schweiz / Suisse / Svizzera / Svizra CH Switzerland 478 354 252

Türkiye TR Turkey 86 60 42

STAFF



Administrative



214

15

53

197

203

42

118

117

193

178

174

96

38

34

197

44

58

170

194

39

77

28

89

34

163

176

153

151

194

239

49

232

36

Maximun elegible daily rates (in EUR) for Subsistence costs for Multilateral projects, Networks,

Accompanying measures, Studies and Comparative research (Call 2012 ceilings)









Country Daily rate

Belgique/Belgie BE Belgium 232

Balgarija BG Bulgaria 145

Česká republika CZ Czech Republic 195

Danemark DK Denmark 311

Deutschland DE Germany 220

Eesti EE Estonia 175

Ellas EL Greece 220

España ES Spain 227

France FR France 269

Eire IE Ireland 253

Italia IT Italy 247

Kypros CY Cyprus 194

Latvija LV Latvia 172

Lietuva LT Lithuania 168

Luxembourg LU Luxembourg 232

Magyarország HU Hungary 184

Malta MT Malta 191

Nederland NL Netherlands 242

Österreich AT Austria 246

Polska PL Poland 179

Portugal PT Portugal 197

Romania RO Romania 161

Slovenia SI Slovenia 208

Slovenská republika SK Slovakia 186

Suomi/Finland FI Finland 277

Sverige SE Sweden 275

United Kingdom GB United Kingdom 312

Island IS Iceland 235

Liechtenstein LI Liechtenstein 340

Norge NO Norway 340

Schweiz / Suisse / Svizzera / Svizra CH Switzerland 340

Hrvatska - HR HR Croatia 214

Türkiye TR Turkey 190



Related docs
Other docs by gegeshandong
Streambank Erosion Severity Index no photos
Views: 1  |  Downloads: 0
Capitulo_2_v1.1
Views: 0  |  Downloads: 0
吴永2
Views: 0  |  Downloads: 0
sir2007-5130
Views: 0  |  Downloads: 0
Course Outline
Views: 0  |  Downloads: 0
DFAS_RS_Nov_29_2011
Views: 0  |  Downloads: 0
Math Awards FY05-FY10
Views: 0  |  Downloads: 0
ECE Plan for __Tussey Mountain PreK Counts___
Views: 0  |  Downloads: 0
By registering with docstoc.com you agree to our
privacy policy

You are almost ready to download!

You are almost ready to download!