STUDY REQUEST FORM Glossary of terms
ER- Energy Resource NR- Network Resource
FeSR- Feasibility Study Report New- Application received
Adobe Acrobat
Contact: Document
Rowena Bishop FSR- Facility Study Report PIA- PURPA GIA
rbishop@idahopower.com GIA- Generator Interconnect Agreement PURPA-PublicUtilitiesRegulatory Act
Generator Interconnection Queue 208-388-2658 LGIA - Large GIA SISR - System Impact Study
Last Update: 1/19/11
Interconnection Status Location of Interconnection In Service Date Generator Capacity (MW) Studies
Request Gen
Interconnect Study Not
Status (In Available Type of Deviation
Study Phase Point of Known Complete
Application Service, Reports Service s from
Queue # (FeS, SIS, County State Interconn Projected Deviation to Fuel Type Summer Winter Max d Notes
Date Active, (FeSR, FS) (NR, ER, Study
ection Date Explanati
Withdrawn SIS, FSR) PURPA) Timeline
on
)
1 1/11/2001 Withdrawn . Canyon ID 2/1/2005 273
2 2/12/2001 In Service Elmore ID 7/1/2001 NR 90
3 2/14/2001 Withdrawn Elmore ID 12/1/2001 86
4 2/26/2001 Withdrawn Elmore ID 6/25/1905 30
5 3/12/2001 Withdrawn Ada ID 5/15/2001 Diesel 3
6 3/14/2001 Withdrawn Ada ID 5/1/2001 Diesel 50
7 3/14/2001 Withdrawn Canyon ID 7/15/2001 7
Cliff
8 3/14/2001 Withdrawn Twin Falls ID Substation 9/1/2007 NR Hydro 64 64 64
9 3/16/2001 Withdrawn Minidoka ID 3/15/2002 15
10 3/16/2001 Withdrawn Twin Falls ID 9/1/2001 15
11 3/16/2001 In Service Twin Falls ID 3/15/2002 3
12 3/26/2001 Withdrawn Cassia ID Diesel 6
13 3/26/2001 Withdrawn Minidoka ID 6/1/2001 Diesel 6
14 3/26/2001 Withdrawn Minidoka ID fall 2001 Diesel 6
15 3/26/2001 Withdrawn Jerome ID fall 2001 Diesel 6
16 3/26/2001 Withdrawn Minidoka ID Diesel 6
Washingto
17 4/4/2001 Withdrawn n ID 6/27/1905 275
18 4/4/2001 Withdrawn Payette ID 6/27/1905 275
19 4/4/2001 Withdrawn Lincoln ID 6/27/1905 275
20 4/6/2001 Withdrawn Ada ID 5/15/2001 Diesel 6
21 4/9/2001 Withdrawn Gooding ID 6/27/1905 275
22 4/16/2001 Withdrawn Twin Falls ID 8/1/2001 Gas 100
24 4/30/2001 Withdrawn Gem ID 6/15/2001 Cogen 15
25 5/1/2001 Withdrawn Minidoka ID 7/1/2001 Diesel 10
26 5/4/2001 Withdrawn Minidoka ID 6/1/2001 Diesel 3
May-Nov.
27 5/4/2001 Withdrawn Jerome ID 2001 Diesel 28
May-Nov.
28 5/4/2001 Withdrawn Minidoka ID 2001 Diesel 28
May-Nov.
29 5/4/2001 Withdrawn Twin Falls ID 2001 Diesel 28
July-Aug.
30 5/4/2001 Withdrawn Minidoka ID 2001 Diesel 28
July-Aug
31 5/4/2001 Withdrawn Minidoka ID 2001 Diesel 28
July-Aug
32 5/4/2001 Withdrawn Cassia ID 2001 Diesel 28
July-Aug
33 5/4/2001 Withdrawn Cassia ID 2001 Diesel 28
12/27/2011 1
Request Gen
Study Not
Status (In Available Interconnect Type of Deviation
Study Phase Point of Known Complete
Application Service, Reports Service s from
Queue # (FeS, SIS, County State Interconn Projected Deviation to Fuel Type Summer Winter Max d Notes
Date Active, (FeSR, FS) (NR, ER, Study
ection Date Explanati
Withdrawn SIS, FSR) PURPA) Timeline
on
)
July-Aug
34 5/4/2001 Withdrawn Cassia ID 2001 Diesel 28
July-Aug
35 5/4/2001 Withdrawn Payette ID 2001 Diesel 28
36 5/4/2001 Withdrawn Gooding ID 2/1/2002 Diesel 28
37 5/4/2001 Withdrawn Gooding ID 2/1/2002 Diesel 28
38 5/4/2001 Withdrawn Jerome ID 2/2/2001 Diesel 28
39 5/4/2001 Withdrawn Gooding ID 2/1/2002 Diesel 28
40 5/8/2001 Withdrawn Minidoka ID 11/1/2002 200
41 5/11/2001 Withdrawn Ada ID 6/1/2001 Diesel 18
42 5/15/2001 Withdrawn Gooding ID 6/1/2001 0.075
43 5/15/2001 Withdrawn Gooding ID 6/1/2001 0.07
summer
44 5/18/2001 Withdrawn Cassia ID 2001 Diesel 28
summer
45 5/18/2001 Withdrawn Ada ID 2001 Diesel 28
46 5/23/2001 Withdrawn Owyhee ID 7/1/2001 Diesel 1.75
47 5/30/2001 Withdrawn Owyhee ID 7/1/2001 Diesel 0.95
48 6/20/2001 In Service Twin Falls ID 46 kV 6/26/2006 PURPA Hydro 0.5
49 7/3/2001 Withdrawn Gooding ID 5/1/2002 Cogen 0.99
50 7/3/2001 Withdrawn Jerome ID 5/1/2002 Cogen 0.2
51 7/3/2001 Withdrawn Gooding ID 5/1/2002 Cogen 0.5
52 7/3/2001 Withdrawn Jerome ID 5/1/2002 Cogen 0.4
53 8/24/2001 Withdrawn Payette ID 5/1/2004 600
54 9/5/2001 Withdrawn Ada ID 1/1/2003 Hydro 0.95
55 9/5/2001 Withdrawn Canyon ID 1/1/2003 Hydro 0.54
56 9/5/2001 Withdrawn Ada ID 1/1/2003 Hydro 0.95
57 9/5/2001 Withdrawn Canyon ID 1/1/2003 Hydro 0.5
58 9/5/2001 Withdrawn Canyon ID 1/1/2003 Hydro 0.7
59 9/5/2001 Withdrawn Ada ID 1/1/2003 Hydro 0.3
60 9/5/2001 Withdrawn Canyon ID 1/1/2003 Hydro 0.385
61 9/6/2001 Withdrawn Ada ID 10/31/2001 Cogen 10
63 9/12/2001 Withdrawn Power ID 5/1/2004 1577
64 9/18/2001 Withdrawn Canyon ID 1/1/2003 Hydro 0.825
65 9/18/2001 Withdrawn Power ID 5/1/2004 778
66 9/18/2001 Withdrawn Power ID 5/1/2004 778
67 12/26/2001 Withdrawn Lemhi ID 12/1/2002 Hydro 0.6
68 1/3/2002 Withdrawn Ada ID 4/1/2003 Cogen 0.375
69 1/3/2002 Withdrawn Ada ID 4/1/2003 Cogen 0.375
distribution
70 2/5/2002 Withdrawn Elmore ID feeder 3/15/2002 Wind 0.3
71 2/6/2002 Withdrawn Twin Falls ID 6/24/1905 Wind 1.8
72 2/22/2002 Withdrawn Ada ID Fall 2004 Cogen 2
73 3/18/2002 Withdrawn Union OR 9/1/2003 Wind 300
74 4/2/2002 Withdrawn Baker OR 9/1/2003 Wind 202.5
75 4/22/2002 Withdrawn Canyon ID 6/1/2002 Cogen 0.0025
Union &
76 4/29/2002 Withdrawn Baker OR 9/1/2003 Wind 400.5
July-Sept
80 8/30/2002 Withdrawn Jerome ID 2003 Cogen 0.75
81 9/3/2002 Withdrawn Jerome ID 5/1/2003 Hydro 0.2
82 9/9/2002 Withdrawn Canyon ID Cogen 20
83 9/17/2002 Withdrawn Elmore ID 6/27/1905 Wind 10
12/27/2011 2
Request Gen
Study Not
Status (In Available Interconnect Type of Deviation
Study Phase Point of Known Complete
Application Service, Reports Service s from
Queue # (FeS, SIS, County State Interconn Projected Deviation to Fuel Type Summer Winter Max d Notes
Date Active, (FeSR, FS) (NR, ER, Study
ection Date Explanati
Withdrawn SIS, FSR) PURPA) Timeline
on
)
84 10/7/2002 Withdrawn Elmore ID 6/27/1905 Wind 10
86 3/19/2003 Withdrawn Jerome ID 4/1/2004 PURPA Hydro 0.125
Danskin
88 4/21/2003 In Service LGIA Elmore ID Sub 9/15/2008 NR Gas 164 177.4 200
90 5/9/2003 Withdrawn Cassia ID 5/1/2004 Wind 0.6
91 5/22/2003 Withdrawn Gooding ID 6/15/2003 Hydro .045
92 7/14/2003 Withdrawn Twin Falls ID 4/1/2005 Hydro 2.3
94 8/5/2003 Withdrawn Ada ID summer 04 PURPA Hydro 1.7
95 8/18/2003 Withdrawn Harney OR 4/1/2005 Cogen 9.9
Boise
Bench-
Midpoint
97 10/7/2003 In Service LGIA Elmore ID 230kV #2 4/1/2005 NR Gas 190 235 162
Boise
Cascade
Emmett
69kV
98 10/20/2003 Withdrawn Gem ID Substation 9/1/2008 PURPA Wood 17.5
99 10/21/2003 Withdrawn Minidoka ID 6/1/2004 Biomass 0.41
distribution
103 1/13/2004 Withdrawn Elmore ID feeder 7/1/2004 Wind 0.108
expansion
Joint Study project is
105 3/18/2004 In Service SISR FSR Cassia ID 34.5kV 1/1/2004 12/1/2010 PURPA Wind 10.5 Group GI 301
230kV
lines
between
Midpoint &
106 4/27/2004 Withdrawn FeSR Elmore ID Boise 1/1/2011 NR Coal 765 765 750
500kV
lines
between
Midpoint &
109 6/10/2004 Withdrawn FeSR Elmore ID Boise 1/1/2011 NR Coal 765 765 750
Joint Study
110 7/13/2004 In Service SISR Twin Falls ID FSGL041 12/30/2004 1/1/2005 PURPA Wind 10 Group
PURPA &
Commerci
111 8/6/2004 Withdrawn Elmore ID 5/1/2007 al Hydro 15
113 10/12/2004 Withdrawn Twin Falls ID 1/1/2006 PURPA Wind 3
Dale 044
FeSR Constructi 35kV Cluster
114 11/16/2004 Withdrawn SISR on Gooding ID feeder 10/1/2004 PURPA Biomass 10 group 1
FeSR FSGL041 Joint Study
116 1/13/2005 In Service SISR FSR Twin Falls ID 34.5 kV 10/1/2005 12/3/2010 PURPA Wind 10.5 Group
FeSR Joint Study
117 1/13/2005 In Service SISR FSR Twin Falls ID 138 kV 10/31/2005 12/31/2010 NR/ER Wind 101.5 Group
118 1/31/2005 Withdrawn Elmore ID tbd early 2006 NR Wind 10
119 1/31/2005 Withdrawn Elmore ID tbd early 2006 NR Wind 10
12/27/2011 3
Request Gen
Study Not
Status (In Available Interconnect Type of Deviation
Study Phase Point of Known Complete
Application Service, Reports Service s from
Queue # (FeS, SIS, County State Interconn Projected Deviation to Fuel Type Summer Winter Max d Notes
Date Active, (FeSR, FS) (NR, ER, Study
ection Date Explanati
Withdrawn SIS, FSR) PURPA) Timeline
on
)
FeSR Brownlee/
SISR FSR Quartz 230
120 1/31/2005 In Service LGIA Union OR kV line 12/1/2007 NR/ER Wind 100
Minidoka-
Adelaide
121 2/22/2005 Withdrawn FeSR Cassia ID 138kV line 9/1/2007 NR Wind 240 240 240
Ontario
Substation
125 4/26/2005 Withdrawn FeSR Malheur OR 69kV 12/31/2006 NR Gas 90 90 90
138kV
FeSR Lower
SISR FSR Malad-Mtn Joint Study
128 5/26/2005 In Service PIA Twin Falls ID Home Jct. 6/1/2006 2/16/2009 PURPA Wind 10.5 Group
Fossil
Gulch 041
35 kV
feeder on
FeSR 138kV Cluster
129 6/7/2005 Withdrawn SISR Twin Falls ID Bliss-King 12/31/2006 PURPA Wind 10 group 1
34.5 kV
feeder
KUNA011-
132 6/13/2005 In Service FeSR FSR Ada ID 041 9/27/2006 7/1/2006 PURPA Hydro 1.7
133 6/15/2005 In Service FeSR FSR Ada ID 6/29/2006 PURPA Landfill 3.2
138kV
FeSR Lower
SISR FSR Malad-Mtn Joint Study
134 6/16/2005 In Service PIA Twin Falls ID Home Jct. 12/31/2005 2/16/2009 PURPA Wind 18.9 16.8 Group
BUGU042
FeSR 35 kV Joint Study
135 6/17/2005 Active SISR FSR Twin Falls ID feeder 12/25/2005 6/1/2011 PURPA Wind 20 Group
FeSR Rimview Joint Study
136 6/23/2005 Active SISR FSR Twin Falls ID Substation 9/30/2010 9/30/2013 NR Hydro 64 Group
Bennett
137 7/8/2005 Withdrawn FeSR Elmore ID Mtn 4/1/2007 NR Gas 91 99 99
Bennett
138 7/8/2005 Withdrawn FeSR Elmore ID Mtn 4/1/2007 NR Gas 170 196 196
Bennett
139 7/8/2005 Withdrawn FeSR Elmore ID Mtn 4/1/2007 NR Gas 100 124 124
Danskin
140 7/8/2005 Withdrawn FeSR Elmore ID Substation 4/1/2007 NR Gas 91 100 100
Danskin
141 7/8/2005 Withdrawn FeSR Elmore ID Substation 4/1/2007 NR Gas 100 124 124
12/27/2011 4
Request Gen
Study Not
Status (In Available Interconnect Type of Deviation
Study Phase Point of Known Complete
Application Service, Reports Service s from
Queue # (FeS, SIS, County State Interconn Projected Deviation to Fuel Type Summer Winter Max d Notes
Date Active, (FeSR, FS) (NR, ER, Study
ection Date Explanati
Withdrawn SIS, FSR) PURPA) Timeline
on
)
Garnet
142 7/8/2005 Withdrawn FeSR Canyon ID Substation 4/1/2007 NR Gas 174 200 200
Garnet
143 7/8/2005 Withdrawn FeSR Canyon ID Substation 4/1/2007 NR Gas 86 94 94
Boise
Bench
Caldwell
144 7/8/2005 Withdrawn FeSR Ada ID 230 kV tap 4/1/2007 NR Gas 174 200 200
Boise
Bench
Caldwell
145 7/8/2005 Withdrawn FeSR Ada ID 230 kV tap 4/1/2007 NR Gas 73.1 85 85
Midpoint
500 kV
146 7/11/2005 Withdrawn FeSR Jerome ID Substation 6/1/2011 NR Coal 725
Danskin
148 8/10/2005 Withdrawn FeSR Elmore ID Substation 4/1/2007 NR Gas 91 100 100
138kV
American
Falls area
152 10/28/2005 Withdrawn FeSR Power ID tbd 9/1/2006 NR Wind 90
Upper
Salmon/W
153 11/28/2005 Withdrawn FeSR Twin Falls ID ells 138kV 12/31/2007 NR Wind 90
46 kV Low
FeSR Line Canal Joint Study
154 12/12/2005 In Service SISR FSR Twin Falls ID Tap 7/18/2007 PURPA Hydro 2.3 Group
FeSR Joint Study
155 12/19/2005 In Service SISR FSR Cassia ID 12.5 kV 5/1/2007 11/23/2010 PURPA Wind 11.62 Group
Haven 042
FeSR 35 kV
156 12/19/2005 Active SISR FS Bingham ID feeder 5/1/2007 PURPA Wind 18
FeSR Milner 043 Joint Study
157 12/19/2005 In Service SISR FSR Cassia ID 35 kV 5/1/2007 PURPA Wind 19.92 Group
FeSR;
FeSR Cluster
restudy 12.5kV group 1-
158 12/19/2005 Withdrawn SISR FS Lincoln ID dist feeder 5/1/2007 6/1/2010 PURPA Wind 18 NOT PAID
FeSR Joint Study
159 12/19/2005 In Service SISR FSR Twin Falls ID 34.5kV 5/1/2007 1/3/2011 PURPA Wind 19.92 Group
164 1/25/2006 Withdrawn White Pine NV 500 kV 6/1/2010 NR/ER Coal 1070
12/27/2011 5
Request Gen
Study Not
Status (In Available Interconnect Type of Deviation
Study Phase Point of Known Complete
Application Service, Reports Service s from
Queue # (FeS, SIS, County State Interconn Projected Deviation to Fuel Type Summer Winter Max d Notes
Date Active, (FeSR, FS) (NR, ER, Study
ection Date Explanati
Withdrawn SIS, FSR) PURPA) Timeline
on
)
138kV
Quartz/Hin
166 2/28/2006 Withdrawn Baker OR es/WJDay NR/ER Hydro 3.2
distribution
168 5/3/2006 Withdrawn Canyon ID feeder 12/1/2006 PURPA Biomass 3.2
Notch
Butte 011
12.5 kV Cluster
169 5/31/2006 Withdrawn FeSR Jerome ID feeder 10/31/2007 PURPA Biomass 3.2 group 1
Fossil
Gulch 041 modificatio
FeSR 35 kV Cluster n to GI#
170 6/29/2006 Withdrawn SISR Twin Falls ID feeder 6/1/2007 PURPA Wind 1 group 1 110
Delamar
172 7/31/2006 Withdrawn Owyhee ID area 9/30/2008 NR Wind 51.2
FeSR 69kV
Constructio SISR FSR Vale/Drew Geotherm
179 10/12/2006 n LGIA Malheur OR sey 11/30/2010 111/30/11 NR al 36
Geotherm Cluster
180 10/13/2006 Withdrawn FeSR Blaine ID 138kV 6/1/2009 NR/ER al 50 group 1
Delamar
182 10/17/2006 Withdrawn FeSR Owyhee ID area 9/30/2008 NR Wind 200
FesR Goshen affected
183 10/19/2006 Withdrawn SISR FS Bingham ID Substation 12/31/2007 NR/ER Wind 90 systems
184 10/24/2006 Withdrawn FeSR Elmore ID 69kV 10/1/2007 PURPA Wind 19.8
185 10/24/2006 Withdrawn FeSR Elmore ID 69kV 10/1/2007 PURPA Wind 19.8
MtnHome
Junction/U
FeSR pper
SISR FSR Salmon see GI#
186 10/24/2006 In Service PIA Elmore ID 138kV 9/15/2008 PURPA Wind 19.8 195
MtnHome
Junction/U
FeSR pper
SISR FSR Salmon see GI#
187 10/24/2006 In Service PIA Elmore ID 138kV 9/15/2008 PURPA Wind 19.8 196
188 10/24/2006 Withdrawn Elmore ID 230kV 7/31/2007 NR Wind 19.8
189 10/24/2006 Withdrawn Elmore ID 230kV 7/31/2007 NR Wind 19.8
King
190 10/25/2006 Withdrawn Elmore ID 138kV 12/31/2007 PURPA Wind 18
MtnHome
Junction/U
pper
FeSR Salmon
191 10/25/2006 Withdrawn SISR FS Elmore ID 138kV 6/1/2009 PURPA Wind 18
FeSR TOPN 042
SISR FSR 34.5 kV Joint Study
192 3/15/2007 In Service PIA Gooding ID dist feeder 1/1/2009 1/15/2009 PURPA Biomass 1.5 Group
Lime
193 3/22/2007 Withdrawn FeSR Baker OR substation 1/1/2008 PURPA wind 2
12/27/2011 6
Request Gen
Study Not
Status (In Available Interconnect Type of Deviation
Study Phase Point of Known Complete
Application Service, Reports Service s from
Queue # (FeS, SIS, County State Interconn Projected Deviation to Fuel Type Summer Winter Max d Notes
Date Active, (FeSR, FS) (NR, ER, Study
ection Date Explanati
Withdrawn SIS, FSR) PURPA) Timeline
on
)
FeSR ARTN
SISR FSR 12.5kV Joint Study
194 5/7/2007 In Service PIA Twin Falls ID dist feeder 9/1/2008 PURPA Biomass 2.25 Group
MtnHome
Junction/U
pper modificatio
Salmon n to GI#
195 6/6/2007 In Service Elmore ID 138kV 9/1/2008 PURPA Wind 1 186
MtnHome
Junction/U
pper modificatio
Salmon n to GI#
196 6/6/2007 In Service Elmore ID 138kV 9/1/2008 PURPA Wind 1 187
Quartz
Weiser
FeSR Ontario
197 7/16/2007 Withdrawn SISR SIS Baker OR 138kV 12/30/2009 PURPA Wind 10
Quartz
Weiser
FeSR Ontario
198 7/16/2007 Withdrawn SISR SIS Baker OR 138kV 12/30/2009 PURPA Wind 10
Quartz
Weiser
FeSR Ontario
199 7/16/2007 Withdrawn SISR SIS Baker OR 138kV 12/30/2009 PURPA Wind 10
Quartz
Weiser
FeSR Ontario
200 7/16/2007 Withdrawn SISR SIS Baker OR 138kV 12/30/2009 PURPA Wind 10
Quartz
Weiser
FeSR Ontario
201 7/16/2007 Withdrawn SISR SIS Baker OR 138kV 12/30/2009 PURPA Wind 10
Quartz
Weiser
FeSR Ontario
202 7/16/2007 Withdrawn SISR SIS Baker OR 138kV 12/30/2009 PURPA Wind 10
Lower
FeSR Malad/MH Joint Study
203 7/26/2007 In Service SISR FSR Twin Falls ID Jct 138kV 12/1/2009 4/15/2010 PURPA Wind 16.8 Group
Notch
Butte 011 Cluster
FeSR 12.5 kV group 1-
204 8/23/2007 Withdrawn SISR FSR Lincoln ID feeder 5/1/2007 1/1/2011 PURPA Biomass 4.5 NOT PAID
Danskin
FeSR Substation
205 9/17/2007 Withdrawn SISR FS Elmore ID 230kV 4/1/2012 NR Gas 293 325 325
Hydra 041
FeSR 12.5kV Cluster
206 10/1/2007 Withdrawn SISR FSR FS Jerome ID dist feeder 6/1/2008 PURPA Biomass 1.08 group 1
Hydra 043
FeSR 12.5kV Joint Study
207 10/1/2007 In Service SISR FSR Gooding ID dist feeder 5/1/2008 10/5/2009 PURPA Biomass 2.13 Group
12/27/2011 7
Request Gen
Study Not
Status (In Available Interconnect Type of Deviation
Study Phase Point of Known Complete
Application Service, Reports Service s from
Queue # (FeS, SIS, County State Interconn Projected Deviation to Fuel Type Summer Winter Max d Notes
Date Active, (FeSR, FS) (NR, ER, Study
ection Date Explanati
Withdrawn SIS, FSR) PURPA) Timeline
on
)
Vale/Unity
208 11/5/2007 Withdrawn FeSR Malheur OR 69kV 10/1/2009 PURPA Wind 9.9
proposed
FeSR; Boardman/
FeSR Hemingwa
restudy; y Project
209 11/15/2007 Active SISR FS Baker OR 500 kV 10/15/2012 12/31/2014 NR/ER Wind 200 timeline
210 12/5/2007 Withdrawn FeSR Canyon ID tbd 4/1/2012 NR Gas 586 650 650
211 12/5/2007 Withdrawn FeSR Payette ID tbd 4/1/2012 NR Gas 586 650 650
212 12/5/2007 Withdrawn FeSR Ada ID tbd 4/12/2012 NR Gas 586 650 650
213 12/5/2007 Withdrawn FeSR Elmore ID tbd 4/12/2012 NR Gas 586 650 650
214 12/5/2007 Withdrawn FeSR Canyon ID tbd 4/12/2012 NR Gas 586 650 650
215 12/5/2007 Withdrawn FeSR Malheur OR tbd 4/12/2012 NR Gas 586 650 650
216 12/5/2007 Withdrawn FeSR Payette ID tbd 4/12/2012 NR Gas 586 650 650
217 12/5/2007 Withdrawn FeSR Elmore ID tbd 4/12/2012 NR Gas 586 650 650
218 12/5/2007 Withdrawn FeSR Elmore ID tbd 4/12/2012 NR Gas 586 650 650
219 12/5/2007 Withdrawn FeSR Payette ID tbd 4/12/2012 NR Gas 586 650 650
220 12/5/2007 Withdrawn FeSR Canyon ID tbd 4/12/2012 NR Gas 293 325 325
221 12/5/2007 Withdrawn FeSR Payette ID tbd 4/12/2012 NR Gas 293 325 325
222 12/5/2007 Withdrawn FeSR Ada ID tbd 4/12/2012 NR Gas 293 325 325
223 12/5/2007 Withdrawn FeSR Elmore ID tbd 4/12/2012 NR Gas 293 325 325
224 12/5/2007 Withdrawn FeSR Canyon ID tbd 4/12/2012 NR Gas 293 325 325
225 12/5/2007 Withdrawn FeSR Malheur OR tbd 4/12/2012 NR Gas 293 325 325
226 12/5/2007 Withdrawn FeSR Payette ID tbd 4/12/2012 NR Gas 293 325 325
227 12/5/2007 Withdrawn FeSR Elmore ID tbd 4/12/2012 NR Gas 293 325 325
228 12/5/2007 Withdrawn FeSR Elmore ID tbd 4/12/2012 NR Gas 293 325 325
229 12/5/2007 Withdrawn FeSR Payette ID tbd 4/12/2012 NR Gas 293 325 325
230 12/5/2007 Withdrawn FeSR Elmore ID tbd 4/12/2012 NR Gas 586 650 650
231 12/5/2007 Withdrawn FeSR Elmore ID tbd 4/12/2012 NR Gas 90 100 100
FeSR Enterprise
232 2/12/2008 Withdrawn SISR FS Wallowa OR 230kV 9/1/2010 NR/ER Wind 252
FeSR Lime 011
233 3/6/2008 Active SISR FSR Baker OR 12.5 kV 1/1/2009 10/31/2011 PURPA Wind 3
Heyburn
234 3/17/2008 Withdrawn FeS Minidoka ID substation tbd PURPA Biomass 3.2
affected
systems-
FeSR; see BPA
235 3/17/2008 Active SISR FS Union OR 230 kV 10/15/2012 NR/ER Wind 150 GO293
34.5 kV
236 4/1/2008 Withdrawn FeSR FeS Canyon ID feeder 9/1/2008 2/1/2009 PURPA Biomass 3.5
grandfathe
r contract
expiration
to OATT
for existing
Power
237 10/1/2007 In Service LGIA Ada ID 230kV 1/1/2008 ER Hydro 100 Plant
proposed
230kV
238 4/11/2008 Withdrawn FeSR SIS Elmore ID station 4/1/2012 NR Gas 650
12/27/2011 8
Request Gen
Study Not
Status (In Available Interconnect Type of Deviation
Study Phase Point of Known Complete
Application Service, Reports Service s from
Queue # (FeS, SIS, County State Interconn Projected Deviation to Fuel Type Summer Winter Max d Notes
Date Active, (FeSR, FS) (NR, ER, Study
ection Date Explanati
Withdrawn SIS, FSR) PURPA) Timeline
on
)
FeSR proposed
239 4/11/2008 Active SISR FSR Payette ID 230kV line 7/1/2012 6/1/2012 NR CCCT 325
proposed
240 4/11/2008 Withdrawn FeSR SIS Payette ID 230kV line 4/1/2012 NR Gas 650
proposed
241 4/11/2008 Withdrawn FeSR SIS Payette ID 230kV line 4/1/2012 NR Gas 325
proposed
242 4/11/2008 Withdrawn FeSR SIS Payette ID 230kV line 4/1/2012 NR Gas 650
proposed
243 4/11/2008 Withdrawn FeSR SIS Gem ID 230kV line 4/1/2012 NR Gas 650
proposed
244 4/11/2008 Withdrawn FeSR SIS Gem ID 230kV line 4/1/2012 NR Gas 325
proposed
245 4/11/2008 Withdrawn FeSR SIS Payette ID 230kV line 4/1/2012 NR Gas 325
proposed
246 4/11/2008 Withdrawn FeSR SIS Payette ID 230kV line 4/1/2012 NR Gas 650
proposed
247 4/11/2008 Withdrawn FeSR SIS Payette ID 230kV line 4/1/2012 NR Gas 650
proposed
248 4/11/2008 Withdrawn FeSR SIS Payette ID 230kV line 4/1/2012 NR Gas 325
proposed
230kV line;
or Boise
Bench
Mora
249 4/11/2008 Withdrawn FeSR SIS Elmore ID 230kV line 4/1/2012 NR Gas 650
proposed
230kV line;
or Boise
Bench
Mora
250 4/11/2008 Withdrawn FeSR SIS Elmore ID 230kV line 4/1/2012 NR Gas 325
proposed
Boardman/
Hemingwa
FeSR y Project
251 4/21/2008 Active SISR FS Baker OR 500 kV 10/15/2012 NR/ER Wind 215 timeline
12/27/2011 9
Request Gen
Study Not
Status (In Available Interconnect Type of Deviation
Study Phase Point of Known Complete
Application Service, Reports Service s from
Queue # (FeS, SIS, County State Interconn Projected Deviation to Fuel Type Summer Winter Max d Notes
Date Active, (FeSR, FS) (NR, ER, Study
ection Date Explanati
Withdrawn SIS, FSR) PURPA) Timeline
on
)
modificatio
Bliss/King n to
252 4/30/2008 Withdrawn FeSR FeS Twin Falls ID 138kV line PURPA Wind 10.5 GI#110
FeSR proposed
253 5/9/2008 Withdrawn SISR FS Elmore ID 230kV line 4/1/2012 NR CCCT 325
proposed
254 5/9/2008 Withdrawn FeSR FeS Elmore ID 230kV line 4/1/2012 NR CCCT 650
Geotherm
255 6/6/2008 Withdrawn FeS Elko NV 38N 62E 12/1/2013 NR/ER al 19.9
Eckert 041
34.5kV
256 6/11/2008 In Service FeSR FSR Ada ID feeder 12/31/2009 1/31/2010 NR Hydro 18
new
substation
on the
Midpoint-
Humboldt
257 6/12/2008 Withdrawn FeSR SIS Twin Falls ID 345kV line 12/31/2009 NR/ER Wind 200
distribution
258 6/12/2008 Withdrawn FeSR SIS Elmore ID feeder 9/30/2010 NR/ER Wind 20
distribution
259 6/12/2008 Withdrawn FeSR SIS Elmore ID feeder 9/30/2010 NR/ER Wind 20
260 6/25/2008 Withdrawn FeSR SIS Payette ID 230kV line 4/1/2012 NR CCCT 325
261 6/26/2008 Withdrawn FeSR SIS Payette ID 230kV line 4/1/2012 NR CCCT 650
262 6/30/2008 Withdrawn FeSR SIS Payette ID 230kv line 4/1/2012 NR/ER CCCT 306
Geotherm
263 7/21/2008 Withdrawn FeS Elko NV 345kV line 11/1/2010 NR al 75
Emmett
264 8/18/2008 Withdrawn FeSR SIS Gem ID Sub 6/1/2012 NR CT 300 340 340
265 8/18/2008 Withdrawn FeSR SIS Elmore ID 230kV 6/1/2012 NR CT 300 340 340
266 8/19/2008 Withdrawn FeSR SIS Ada ID 230kV 5/1/2012 NR/ER CT 174 200 200
267 8/19/2008 Withdrawn FeSR SIS Elmore ID 230kV 5/1/2012 NR/ER Steam 125 125 125
Clover 012
FeSR 12.5kV
268 9/10/2008 Withdrawn SISR FS Twin Falls ID feeder 9/1/2010 PURPA Biomass 1.2
proposed
Danskin-
Hubbard
269 9/24/2008 Withdrawn FeSR SIS Elmore ID 230kV line 5/1/2012 NR/ER CCCT 300
FeSR modificatio
270 10/20/2008 In Service SISR Elmore ID 230 kV na NR CCCT 173 210 210 n to GI# 97
34.5 kV
271 11/20/2008 Withdrawn FeSR FS Canyon ID feeder 9/30/2009 PURPA Biomass 1.5
12/27/2011 10
Request Gen
Study Not
Status (In Available Interconnect Type of Deviation
Study Phase Point of Known Complete
Application Service, Reports Service s from
Queue # (FeS, SIS, County State Interconn Projected Deviation to Fuel Type Summer Winter Max d Notes
Date Active, (FeSR, FS) (NR, ER, Study
ection Date Explanati
Withdrawn SIS, FSR) PURPA) Timeline
on
)
FeSR
FeSReS
272 1/26/2009 Withdrawn SISR FS Malheur OR 69 kV 8/31/2009 8/1/2010 PURPA Solar 10
273 2/3/2009 Withdrawn FeSR SIS Boise ID 69kV 3/1/2011 NR/ER Biomass 13
274 2/11/2009 Withdrawn FeSR FS Owyhee ID 35kV 11/30/2009 PURPA Solar 10
275 2/24/2009 Withdrawn FeSR FS Elmore ID 34.5 kV 3/1/2010 PURPA Solar 10
276 2/26/2009 Withdrawn FeSR FS Malheur OR 69 kV 3/1/2010 PURPA Solar 10
FeSR
277 3/9/2009 Withdrawn SISR FS Baker OR 138kV 6/30/2010 12/15/2011 PURPA Wind 10
FeSR
278 3/9/2009 Withdrawn SISR FS Baker OR 138kV 6/30/2010 12/15/2011 PURPA Wind 10
FeSR
279 3/9/2009 Withdrawn SISR FS Baker OR 138kV 6/30/2010 12/15/2011 PURPA Wind 10
FeSR
280 3/9/2009 Withdrawn SISR FS Baker OR 138kV 6/30/2010 12/15/2011 PURPA Wind 10
FeSR
281 3/9/2009 Withdrawn SISR FS Baker OR 138kV 6/30/2010 12/15/2011 PURPA Wind 10
FeSR
282 3/9/2009 Withdrawn SISR FS Baker OR 138kV 6/30/2010 12/15/2011 PURPA Wind 10
Geotherm
283 3/10/2009 Withdrawn FeS Twin Falls ID tbd 12/31/2010 NR/ER al 100
distribution
284 3/11/2009 Withdrawn FeSR FS Ada ID feeder 3/1/2010 PURPA Biogas 1
FeSR Geotherm
285 3/16/2009 Withdrawn RFeSR FS Gem ID tbd 3/1/2010 PURPA al 3.5
286 3/31/2009 Withdrawn FeSR FS Malheur OR 69kV 12/1/2012 NR/ER Biomass 19
287 4/28/2009 Withdrawn FeSR SIS Malheur OR 69kV 10/1/2010 NR/ER Biomass 20
288 4/29/2009 Withdrawn Elmore ID tbd 10/31/2010 ER Wind 21
FeSR
289 5/1/2009 Withdrawn SISR FS Elmore ID 34.5kV 10/31/2010 PURPA Wind 22
290 5/15/2009 Withdrawn FeS Malheur OR 69kV 10/1/2010 NR/ER Biomass 20
modificatio
n to
291 5/18/2009 Active FeSR FS Ada ID 12.5 kV 3/31/2010 12/31/2010 PURPA Landfill 3.2 GI#133
expansion
to existing
small
292 5/29/2009 Active FeSR FS Lincoln ID 34.5 kV 5/31/2010 PURPA Hydro 1.2 cogen
SISR
FSR1
293 6/4/2009 Active FSR2 Power ID 138 kV 11/15/2010 11/15/2012 PURPA Wind 80
294 6/15/2009 Active FeSR SIS Power ID 345kV 11/1/2011 NR/ER Wind 160
295 5/15/2009 Withdrawn FeSR SIS Gem ID 69kV 10/31/2010 NR/ER Biomass 20
12.5kV
296 8/4/2009 In Service FSR Canyon ID Parma 042 3/31/2010 9/1/2010 PURPA Hydro 0.45
297 9/3/2009 Withdrawn FeSR SIS Twin Falls ID 138kV 2/28/2011 NR/ER Wind 272
298 9/9/2009 Withdrawn FeS Owyhee ID 69kV 3/31/2011 PURPA Wind 20
Golden
Valley 013
12.5kV Expansion
299 9/10/2009 In Service FeSR Cassia ID feeder 12/31/2009 11/5/2010 PURPA Wind 1.2 to GI#155
12/27/2011 11
Request Gen
Study Not
Status (In Available Interconnect Type of Deviation
Study Phase Point of Known Complete
Application Service, Reports Service s from
Queue # (FeS, SIS, County State Interconn Projected Deviation to Fuel Type Summer Winter Max d Notes
Date Active, (FeSR, FS) (NR, ER, Study
ection Date Explanati
Withdrawn SIS, FSR) PURPA) Timeline
on
)
Expansion
300 9/10/2009 In Service FeSR FSR Twin Falls ID 34.5kV 2/28/2010 12/31/2010 PURPA Wind 2.5 to GI#159
Milner 041
35 kV Expansion
301 9/10/2009 In Service FeS FSR Cassia ID feeder 12/31/2009 11/12/2010 PURPA Wind 10.8 to GI#105
302 9/10/2009 Active SISR FS Cassia ID 138kV 12/31/2011 12/31/2014 NR/ER Wind 177
expansion
303 9/11/2009 Withdrawn FS Malheur OR 69kV 12/1/2012 NR/ER Biomass 1 to GI#286
304 9/21/2009 Active FeSR FS Adams ID 138kV 12/31/2012 10/1/2013 PURPA Biomass 10
ETGT16
12.5kV
305 9/25/2009 Withdrawn FS Twin Falls ID feeder 1/31/2012 PURPA Solar/Wind 0.2
306 10/7/2009 Active SISR FS Union OR 230kV 10/15/2011 NR/ER Wind 150
12.5kV
307 10/12/2009 Active FeSR FSR Twin Falls ID dist feeder 7/31/2010 4/1/2011 PURPA Biogas 1.2
12.5kV
308 10/12/2009 Active FeSR FSR Cassia ID dist feeder 7/31/2010 4/1/2011 PURPA Biogas 1.2
12.5kV
309 10/13/2009 Active FeSR FS Twin Falls ID dist feeder 7/31/2010 4/1/2011 PURPA Biogas 2.4
310 11/13/2009 Withdrawn FeSR SIS Harney OR 138kV 12/31/2012 NR/ER Wind 102.5
311 11/16/2009 Withdrawn Owyhee ID tbd 7/31/2012 NR/ER Wind 100
FeSR
312 11/19/2009 Active SISR FSR Elmore ID 34.5 kV 10/31/2010 5/15/2011 PURPA Solar 20
proposed expansion
313 11/20/2009 Active SISR Payette ID 230kV line 6/1/2012 4/1/2012 NR CCCT 20 to #239
see #311
different
314 12/9/2009 Withdrawn FeSR SIS Owyhee ID 230 kV 7/31/2012 NR/ER Wind 300 voltage
315 2/17/2010 Active FeSR FSR Gem ID 69 kV 9/1/2011 PURPA Biogas 10
316 2/22/2010 Withdrawn FeSR FS Malheur OR 34.5kV fall 2010 PURPA solar 20
see #289,
different
317 2/23/2010 Active SISR FSR Elmore ID 138kV 11/15/2010 10/15/2011 PURPA Wind 22 voltage
see #311
and 314;
different
318 3/2/2010 Active FeSR FS Owyhee ID 69kV 7/31/2012 10/31/2012 NR/ER Wind 5 voltage
319 3/5/2010 Withdrawn FeSR FS Malheur OR 138kV fall 2010 NR Solar 20
320 3/5/2010 Withdrawn FeSR Malheur OR 69 kV fall 2010 NR Solar 10
see # 289
& #317
different
321 3/10/2010 Withdrawn Elmore ID 69 kV 11/15/2010 PURPA Wind 22 voltage
FeSR
322 3/10/2010 Active SISR FS Twin Falls ID 138kV 12/31/2011 6/30/2012 NR Wind 20
FeSR
323 3/15/2010 Active SISR FS Twin Falls ID 138kV 12/31/2011 6/30/2012 NR Wind 20
FeSR
324 3/15/2010 Active SISR FS Twin Falls ID 138kV 12/31/2011 6/30/2012 NR Wind 20
325 3/15/2010 Active FeSR SIS Twin Falls ID 345kV 12/31/2011 6/30/2012 NR Wind 20
12/27/2011 12
Request Gen
Study Not
Status (In Available Interconnect Type of Deviation
Study Phase Point of Known Complete
Application Service, Reports Service s from
Queue # (FeS, SIS, County State Interconn Projected Deviation to Fuel Type Summer Winter Max d Notes
Date Active, (FeSR, FS) (NR, ER, Study
ection Date Explanati
Withdrawn SIS, FSR) PURPA) Timeline
on
)
numbering
326 Withdrawn error
327 3/15/2010 Active FeSR SIS Twin Falls ID 345kV 12/31/2011 NR/ER Wind 200
FeSR
328 4/2/2010 Withdrawn SISR FS Malheur OR 69kV 10/1/2011 NR/ER Biomass 20
12.5kV expansion
329 4/2/2010 Active FeS Twin Falls ID dist feeder 12/1/2010 PURPA Biogas 1.6 of GI 309
12.5kV
330 5/19/2010 Withdrawn FeSR FS Jerome ID dist feeder 1/1/2012 NR Hydro 1.25
NR/PURP
331 5/27/2010 Withdrawn FeSR SIS Elmore ID 138kV 12/30/2012 A solar/wind 20
NR/PURP
332 6/3/2010 Active FeSR FS Elmore ID 34.5kV 12/30/2012 A solar/wind 20
333 6/4/2010 Withdrawn FeSR FS Elmore ID 12.5kV 12/30/2012 PURPA solar 5
334 6/15/2010 Active FeSR SIS Twin Falls ID 138kV 12/31/2010 9/1/2011 PURPA Wind 40
335 6/16/2010 Withdrawn FeSR SIS Ada ID 138kV 12/31/2012 PURPA solar/wind 20
336 6/18/2010 Active SISR FS Elmore ID 230kV 6/30/2011 PURPA Wind 20
337 6/18/2010 Active SISR FS Elmore ID 230kV 6/30/2011 PURPA Wind 20
338 6/18/2010 Active SISR FS Elmore ID 230kV 6/30/2011 PURPA Wind 20
339 6/18/2010 Active SISR FS Elmore ID 230kV 6/30/2011 PURPA Wind 20
340 6/18/2010 Active SISR FS Elmore ID 230kV 6/30/2011 PURPA Wind 20
341 6/18/2010 Active SISR FS Elmore ID 230kV 6/30/2011 PURPA Wind 20
342 7/1/2010 Withdrawn FeS Elmore ID 138kV 12/30/2012 PURPA Solar 20
Morrow /
343 7/16/2010 Active FeS Umatilla OR 500kV 12 2015 NR/ER Wind 600
344 7/19/2010 Active FeSR SIS Ada ID 138kV 10/1/2011 PURPA Landfill 15.7
345 7/26/2010 Active FeSR FS Owyhee ID 34.5kV 12/31/2012 4/1/2012 PURPA Solar 20
Dynamic
data
delayed
the study
346 8/5/2010 Active FeSR SIS Owyhee ID 138kV 7/31/2011 PURPA Wind 20 timeline
Dynamic
data
delayed
the study
347 8/5/2010 Active FeS SIS Owyhee ID 138kV 7/31/2011 PURPA Wind 20 timeline
348 8/11/2010 Active FeSR FS Lincoln ID 12.5 kV 1/1/2012 PURPA Biogas 4.5
349 8/16/2010 Active FS Lincoln ID 12.5kV 6/1/2011 9/1/2011 PURPA Wind 6.5
350 8/16/2010 Withdrawn FeSR SIS Twin Falls ID 34.5kV 12/1/2011 PURPA Wind 20
351 8/16/2010 Active FeSR SIS Owyhee ID 138kV 7/31/2011 PURPA Wind 20
352 8/24/2010 Active SIS Blaine ID 138kV 12/31/2011 PURPA Wind 20
353 8/24/2010 Active SIS Blaine ID see 352 12/31/2011 PURPA Wind 20
354 9/2/2010 Active FeS Jerome ID 138kV 6/1/2012 PURPA Wind 20
355 9/2/2010 Active FeS Jerome ID 138kV 6/1/2012 PURPA Wind 20
356 9/13/2010 Withdrawn FeS Owyhee ID 138kV 8/1/2011 PURPA Solar 20
357 10/1/2010 Active FS Twin Falls ID 34.5kV 7/15/2011 PURPA Wind 21
see #345
different
358 10/5/2010 Active FeS Owyhee ID 34.5kV 12/31/2012 PURPA Solar 20 voltage
359 11/8/2010 Active FeS Lincoln ID 12.5kV 9/1/2011 PURPA Wind 11.5
360 12/3/2010 Active Canyon ID 12.5kV 12/1/2011 PURPA Hydro 1
361 1/3/2011 Active Malheur OR tbd 10/1/2011 NR/ER Biomass 20
12/27/2011 13
Request Gen
Study Not
Status (In Available Interconnect Type of Deviation
Study Phase Point of Known Complete
Application Service, Reports Service s from
Queue # (FeS, SIS, County State Interconn Projected Deviation to Fuel Type Summer Winter Max d Notes
Date Active, (FeSR, FS) (NR, ER, Study
ection Date Explanati
Withdrawn SIS, FSR) PURPA) Timeline
on
)
362 1/11/2011 Active Lemhi ID tbd 5/1/2012 Hydro 1
expansion
363 1/14/2011 Active Ada ID 138kV 10/1/2011 7/1/2012 PURPA Landfill 4.3 to GI 344
12.5kV expansion
364 1/14/2011 Active Twin Falls ID dist feeder 7/31/2010 9/1/2011 PURPA Biogas 0.8 to GI 307
12.5kV expansion
365 1/14/2011 Active Cassia ID dist feeder 7/31/2010 9/1/2011 PURPA Biogas 0.8 to GI 308
Done
12/27/2011 14