Fit/Gap Analysis Phase http://web.princeton.edu/dms/public/methodology/dev/gapanal.html









Fit/Gap Analysis Phase

In this phase, the package is installed in a development or test area, and the stakeholders get together in

one room to compare the features and functions of the package with the needs identified in the system

analysis phase of the Selection stage. Any required functionality that is not included in the package is

identified, in addition to any changes to the package that are required. If necessary, the system analysis

may need to be revisited, to incorporate the functions of the package.



The primary participants in this phase are the core team and all additional stakeholders identified as

extended team members and scheduled in the Fit/Gap Analysis Planning phase.





Deliverables



Package Installation

The package is installed in a development/test area for functional appraisal,

using University data.



Use Cases and Scripts

Use cases are specific examples of business processes. Scripts are

step-by-step instructions for appraising functionality. At this time, there are

neither templates nor samples for these items.



Updated Business Process Models

These models show the triggering event, the primary and secondary outputs,

and the inputs of the desired system. These models must be updated from

the original Business Process models to reflect the customized package, and

any new processes must be modeled using Visio templates available on the

M drive.



Note: If you do not have Visio on your machine, you will not be able to use

the template. In this case, you can use the PC in the hallway where Visio is

installed.



Updated Business Process Document

This document is the text companion to the Business Process models.

Update the original document with the new processes, and change the

previously-defined processes as required.



Updated Activity Flow Diagrams

This diagram documents the flow of activities for a business process or

sub-process. Update existing activity flow diagrams as needed to reflect the

customized package. If there is an attached Word document describing the

activity flow, be sure to update that too.



Updated Extended Entity Object Model

The extended object model includes aggregates and inheritance, as needed.

If the package is very different from the projected system defined in System

Analysis, you will have to create a new model; otherwise, you can update

the existing model to reflect the customized package. This model is updated

or created in Visio.







1 of 3 22-11-2011 13:12

Fit/Gap Analysis Phase http://web.princeton.edu/dms/public/methodology/dev/gapanal.html







Object Life Cycle Models

If new objects have been added, or an existing object has a different life

cycle in the package than the projected system, new models may be

required. These models are created in Visio.



Customization Report

This is a brief explanation of the adaptations and adjustments required to

make the package work for Princeton. At this time, there is no template and

no sample for the Customization Report.



Updated Project Plan with Phase Section for Logical Design

The project plan produced in the System Analysis phase is updated with

information on deliverables, resourcing, and schedules gleaned from the

Fit/Gap Analysis. In addition, a phase section is produced for the Logical

Design phase and attached to the project plan.



Methodology Compliance Form

This form is initialized by the project team, and completed by a methodology

representative who has reviewed the project documentation and found it

acceptable. It is completed in Word.



At this time, no sample is available.



Recommendation Form

This form is completed by the project team, and contains the

recommendation to the approving authority on whether or not the project

should continue. The form is completed in Word.



At this time, no sample is available.









Steps

1. The project team reviews the documentation from the previous phases, and pulls in extended team

members with business and technical expertise.

2. The team meets to review the data, and map the legacy data into the package database. Pay

particular attention to multiple mapping of single data items, since these will require decisions about

where to locate the data. If you do place the data in multiple locations, plan how you will key the

updates to be sure to update all locations.

3. The team meets to generate a list of what people are going to try to do with the system (examples

rather than models), and creates use cases to be used in scripts for appraising the functionality of

the package.

4. Scripts are written based on the use cases. Keep in mind that deviations from the script can be

useful, provided that scripted functionality is not skipped.

5. The team meets to map the business processes discovered in business and system analysis against

the package functions, using the scripts, and noting which processes are not available in the

package, or work differently in the package. Be sure to check security requirements.

6. The team meets to determine where the differences are between the expected system and the

delivered package and discusses the following:

Which differences can you live with, and which must be fixed?

What can you do about the differences you can't live with?

What can you get the vendor to change?

7. Based on the preceding steps, the team updates the business process models, activity flow diagrams,





2 of 3 22-11-2011 13:12

Fit/Gap Analysis Phase http://web.princeton.edu/dms/public/methodology/dev/gapanal.html





entity object model, and object life cycle models to reflect the customized system.

8. Based on the preceding discussions, the team writes the customization report, detailing what

changes will be required to make the package work at Princeton. This includes any interfaces to

existing systems, and additions and changes to the packaged system. The report also indicates for

each item whether the work is to be done by Princeton staff or the vendor.

9. Based on the customization report, the team updates the Project Plan, and completes a phase

section for the Logical Design phase.

10. The project team forwards the deliverables to the methodology representative for review. The

methodology representative reviews the documents for compliance, and completes the Compliance

Form. If the deliverables conform to methodology requirements, they are returned with the

completed compliance form to the team, which then proceeds with the next step.



If the deliverables do not conform to the methodology requirements, the deliverables and the

compliance form are returned to the team with an explanation of what is wrong. The team then

corrects the deliverables as required and returns them to the methodology representative for a

follow-up review. When the reviewer approves the deliverables, the team continues with the next

step.



11. The project team writes a recommendation indicating whether they think the project should

continue or not, using the Recommendation Form. The recommendation form is attached to the

updated project plan and any other project documentation, and forwarded to the project sponsor for

review. If there are significant changes to the scope, schedule, or budget, the project sponsor

forwards the documentation and recommendation form to the approving authority for review.

12. The project sponsor or approving authority decides whether or not to move forward with the



project.









3 of 3 22-11-2011 13:12


Related docs
Other docs by srinivas garig...
DME
Views: 13  |  Downloads: 0
SMART FORMS
Views: 104  |  Downloads: 1
SAP FOREIGN CURRENCY REVALUATIN
Views: 275  |  Downloads: 15
CROSS APPLI 2
Views: 19  |  Downloads: 0
mixed costing
Views: 10  |  Downloads: 0
sap fi hr integration
Views: 42  |  Downloads: 0
gap analysis
Views: 0  |  Downloads: 0
VOLUME 2
Views: 4  |  Downloads: 0
VOLUME 1
Views: 6  |  Downloads: 0
By registering with docstoc.com you agree to our
privacy policy

You are almost ready to download!

You are almost ready to download!