W0904A_Gregg
Chsci: Mike Gregg
Scientist List:
Jack Miller
Danielle Wain
David Winkel
Rob Hall
Ren-Chieh Lien
Glenn Carter
Andrew Cookson
Steve Bayer
John Mickett
Paul Aguilar
Watch Bridge Deck Engineer
08-12 Capt. AB Chief Engr.
20-24 Rick Verlini John Dove Bob Ashely
12-16 2nd Mate AB Engr.
00-04 Tony Monocandilos Patrick Breshears Jay JeanBart
16-20 Chief Mate AB Engr.
04-08 Gary Stephenson Doug Andrews Chip Millard
Galley: Doug Capps , Cook
Mike Lyons, Steward
Bosu’n:
Doug Beck
Martech:
Daryl Swensen
All times GMT
03-29-2009 Transit
18:45 Leave Dock
19:09 Start ADCP
19:07 Start Flow Through
03-31-2009 Transit
Echo off
11:50 ADCP Off
11:47 Pumps off
04-03-2009 At Dock
15:27 Cleaned MET Sensors
04-04-2009
15:00 Leave dock
15:01 Echo on
15:16 ADCP on 150kHz and 75kHz
15:40 Flow Through on
17:08 Full ship power out Re-started DAS
17:08 ADCP off4
17:08 Pumps off
17:14 ADCP back on
17:16 pumps back on
21:09 stop adcp
21:26 ADCP back on. Bob needed to do a test. On Gen. 01. Back on Gen.02
04-05-2009
11:40 – 11:54 Dave ran interference tests on OS-150 OS-75 and bio.
11:54 ADCP on with deep water settings
04-06-2009
20:01 Stop ADCP for test
20:25 Start W0904A_Gregg_t1: Run from North to South (Flat to over the canyon)
150 kHz only
NB Bins = 50
NB Bin Length = 8
BB Bins = 75
BB Bin Length = 4
Blank = 4
BT = on
BT max = 1000
TP = 2
21:10
21:14 Start W0904A_Gregg_t2: Run from South to North (Over the mid canyon to flat)
150 kHz only
NB Bins = 50
NB Bin Length = 8
BB Bins = 75
BB Bin Length = 4
Blank = 4
BT = on
BT max = 1000
TP = 2
22:04 Stop
22:08 Start W0904A_Gregg_t3: Run from North to South (Flat to over the canyon)
75 kHz only
NB Bins = 70
NB Bin Length = 16
BB Bins = 80
BB Bin Length = 8
Blank = 8
BT = on
BT max = 1000
TP = 4
22:59 Stop
23:01 Start W0904A_Gregg_t4: Run from South to North (Over the mid canyon to flat)
75 kHz only
NB Bins = 70
NB Bin Length = 16
BB Bins = 80
BB Bin Length = 8
Blank = 8
BT = on
BT max = 1000
TP = 4
00:00 Stop
04-07-2009
00:15 Start W0904A_Gregg_t5: Run from North to South (Across the canyon) 2knts
75 kHz only
NB = Off
BB Bins = 80
BB Bin Length = 8
Blank = 8
BT = off
TP = 3
02:00 Stop
02:02 Start W0904A_Gregg_t6: Run from South to North (Across the canyon) 2knts
75 kHz only
NB = Off
BB Bins = 80
BB Bin Length = 8
Blank = 8
BT = off
TP = 3
04:00 Stop
Stop and Start with the same settings and file W0904A_Greagg_02
23:40 Cleaned MET sensors.
04-08-2009
01:46 Flow through on Flur. Back on. There was a bad O-ring on the trans. Trying to fix.
Flur. was cleaned.
18:24 Stop ADCP
18:25 Start W0904A_Gregg_04: Run w/ swims
75 kHz only
NB = On
NBB Bins = 70
NB Bin Length = 16
Blank = 8
BT = off
Replaced encoder in hydro winch. This looks to be what was making the winch lock up
for payout.
21:28 Stop ADCP
21:28 Start W0904A_Gregg_05: Run w/ swims
75 kHz only
NB = On
NBB Bins = 80
NB Bin Length = 8
Blank = 8
BT = off
04-09-2009
08:31 Stop ADCP
08:33 Start ADCP with NB 150 on.
04-10-2009
17:36 Dog house sensors down.
17:43 Dog house sensors up
I noticed that the Humidity sensor was 999999 around 04:00 PDT. Can not find
the back up system. Trying to find a fix for the system in place.
04-13-2009
04:00 Stop ADCP
04:04 ADCP On
W0904A_Gregg_t7
75 kHz only
BB = On
NBB Bins = 80
NB Bin Length = 08
Blank = 8
TP = 3
BT = off
12:41 Stop ADCP
12:46 Start W0904A_Gregg_06: Run w/ AMP (DU S/N 198)
75 kHz only
NB = On
NBB Bins = 80
NB Bin Length = 8
Blank = 8
BT = off
TP = 3
04-14-2009
21:00??? There looks to be an outage with the DAS Back on at 22:53
Only thing I did is wiggle the serial cables in the back of the DAS cptrs.
04-15-2009
00:04 SWIMS on deck and halting ops for weather.
15:30 Heading back out from Anchor to try SWIMS
21:09 PTU300 off to check humidity sensor
21:27 PTU300 back on
Tried to do the manual purge and checked that the PUR command. NO Joy still
out.
04-16-2009
Recovered 4 moorings. Everything went well.
04-17-2009
Recovered 3 moorings. Everything went well.
The HD on DOP the gen-use computer would not boot. Took it apart and gave the
HD a good hit. Put it back together and it worked fine.
23:15 Cleaned met sensors
04-19-2009
Cleaned all CPU filters. Noticed that there is only one fan working on Concord.
23:30 Break off sampling to pump tanks
04-20-2009
00:00 Stop ADCP
00:06 Start ADCP
W0904A_Gregg_t8
75 kHz only Deck unit S/N 198 (good one)
NB Bins = 70
NB Bin Length = 08
BB Bins = 80
BB Bin Length = 08
Blank = 8
BT = on
TP = 3
02:08 Stop ADCP
02:14 Start ADCP
W0904A_Gregg_t9
75 kHz only Deck unit S/N 198 (good one)
NB Bins = 70
NB Bin Length = 16
Blank = 8
BB Bins = 80
BB Bin Length = 08
Blank = 8
BT = off
TP = 3
150 kHz
NB Bins = 70
NB Bin Length = 08
Blank = 4
BB Bins = 75
BB Bin Length = 04
Blank = 4
BT = off
TP = 1.2
03:30 Stop ADCP
03:46 Start ADCP
W0904A_Gregg_t10
75 kHz only Deck unit S/N 10008 (bad one)
NB Bins = 70
NB Bin Length = 16
Blank = 8
BB Bins = 80
BB Bin Length = 08
Blank = 8
BT = off
TP = 3
150 kHz
NB Bins = 70
NB Bin Length = 08
Blank = 4
BB Bins = 75
BB Bin Length = 04
Blank = 4
BT = off
TP = 1.2
08:10 ADCP Off
Done pumping tanks and testing ADCP
08:22 Start W0904A_Gregg_07: Deck Unit 198 (good one)
75 kHz only
NB = On
NBB Bins = 80
NB Bin Length = 8
Blank = 8
BT = off
TP = 3
16:30 Cleaned MET Sensors
04-26-2009
17:05 Stopped flow to flur. and trans. Cleaned
17:15 Flow started back up
04-27-2009
04:15 Clean up deck and head for the barn.
Stop ADCP, ECHO, DAS for DVD burning
04:29 Start ADCP with 300 and OS75