W0904A_Gregg



Chsci: Mike Gregg

Scientist List:

Jack Miller

Danielle Wain

David Winkel

Rob Hall

Ren-Chieh Lien

Glenn Carter

Andrew Cookson

Steve Bayer

John Mickett

Paul Aguilar



Watch Bridge Deck Engineer



08-12 Capt. AB Chief Engr.

20-24 Rick Verlini John Dove Bob Ashely



12-16 2nd Mate AB Engr.

00-04 Tony Monocandilos Patrick Breshears Jay JeanBart



16-20 Chief Mate AB Engr.

04-08 Gary Stephenson Doug Andrews Chip Millard



Galley: Doug Capps , Cook

Mike Lyons, Steward



Bosu’n:

Doug Beck



Martech:

Daryl Swensen



All times GMT

03-29-2009 Transit

18:45 Leave Dock

19:09 Start ADCP

19:07 Start Flow Through



03-31-2009 Transit

Echo off

11:50 ADCP Off

11:47 Pumps off



04-03-2009 At Dock

15:27 Cleaned MET Sensors



04-04-2009

15:00 Leave dock

15:01 Echo on

15:16 ADCP on 150kHz and 75kHz

15:40 Flow Through on

17:08 Full ship power out Re-started DAS

17:08 ADCP off4

17:08 Pumps off

17:14 ADCP back on

17:16 pumps back on

21:09 stop adcp

21:26 ADCP back on. Bob needed to do a test. On Gen. 01. Back on Gen.02



04-05-2009

11:40 – 11:54 Dave ran interference tests on OS-150 OS-75 and bio.

11:54 ADCP on with deep water settings



04-06-2009

20:01 Stop ADCP for test



20:25 Start W0904A_Gregg_t1: Run from North to South (Flat to over the canyon)

150 kHz only

NB Bins = 50

NB Bin Length = 8

BB Bins = 75

BB Bin Length = 4

Blank = 4

BT = on

BT max = 1000

TP = 2

21:10



21:14 Start W0904A_Gregg_t2: Run from South to North (Over the mid canyon to flat)

150 kHz only

NB Bins = 50

NB Bin Length = 8

BB Bins = 75

BB Bin Length = 4

Blank = 4

BT = on

BT max = 1000

TP = 2

22:04 Stop



22:08 Start W0904A_Gregg_t3: Run from North to South (Flat to over the canyon)

75 kHz only

NB Bins = 70

NB Bin Length = 16

BB Bins = 80

BB Bin Length = 8

Blank = 8

BT = on

BT max = 1000

TP = 4

22:59 Stop



23:01 Start W0904A_Gregg_t4: Run from South to North (Over the mid canyon to flat)

75 kHz only

NB Bins = 70

NB Bin Length = 16

BB Bins = 80

BB Bin Length = 8

Blank = 8

BT = on

BT max = 1000

TP = 4

00:00 Stop



04-07-2009

00:15 Start W0904A_Gregg_t5: Run from North to South (Across the canyon) 2knts

75 kHz only

NB = Off

BB Bins = 80

BB Bin Length = 8

Blank = 8

BT = off

TP = 3

02:00 Stop



02:02 Start W0904A_Gregg_t6: Run from South to North (Across the canyon) 2knts

75 kHz only

NB = Off

BB Bins = 80

BB Bin Length = 8

Blank = 8

BT = off

TP = 3

04:00 Stop



Stop and Start with the same settings and file W0904A_Greagg_02



23:40 Cleaned MET sensors.



04-08-2009



01:46 Flow through on Flur. Back on. There was a bad O-ring on the trans. Trying to fix.

Flur. was cleaned.



18:24 Stop ADCP



18:25 Start W0904A_Gregg_04: Run w/ swims

75 kHz only

NB = On

NBB Bins = 70

NB Bin Length = 16

Blank = 8

BT = off



Replaced encoder in hydro winch. This looks to be what was making the winch lock up

for payout.



21:28 Stop ADCP



21:28 Start W0904A_Gregg_05: Run w/ swims

75 kHz only

NB = On

NBB Bins = 80

NB Bin Length = 8

Blank = 8

BT = off



04-09-2009

08:31 Stop ADCP

08:33 Start ADCP with NB 150 on.



04-10-2009

17:36 Dog house sensors down.

17:43 Dog house sensors up

I noticed that the Humidity sensor was 999999 around 04:00 PDT. Can not find

the back up system. Trying to find a fix for the system in place.



04-13-2009

04:00 Stop ADCP

04:04 ADCP On

W0904A_Gregg_t7

75 kHz only

BB = On

NBB Bins = 80

NB Bin Length = 08

Blank = 8

TP = 3

BT = off



12:41 Stop ADCP



12:46 Start W0904A_Gregg_06: Run w/ AMP (DU S/N 198)

75 kHz only

NB = On

NBB Bins = 80

NB Bin Length = 8

Blank = 8

BT = off

TP = 3



04-14-2009



21:00??? There looks to be an outage with the DAS Back on at 22:53

Only thing I did is wiggle the serial cables in the back of the DAS cptrs.



04-15-2009



00:04 SWIMS on deck and halting ops for weather.

15:30 Heading back out from Anchor to try SWIMS



21:09 PTU300 off to check humidity sensor

21:27 PTU300 back on

Tried to do the manual purge and checked that the PUR command. NO Joy still

out.



04-16-2009

Recovered 4 moorings. Everything went well.



04-17-2009

Recovered 3 moorings. Everything went well.

The HD on DOP the gen-use computer would not boot. Took it apart and gave the

HD a good hit. Put it back together and it worked fine.

23:15 Cleaned met sensors

04-19-2009

Cleaned all CPU filters. Noticed that there is only one fan working on Concord.



23:30 Break off sampling to pump tanks



04-20-2009

00:00 Stop ADCP



00:06 Start ADCP

W0904A_Gregg_t8

75 kHz only Deck unit S/N 198 (good one)

NB Bins = 70

NB Bin Length = 08

BB Bins = 80

BB Bin Length = 08

Blank = 8

BT = on

TP = 3



02:08 Stop ADCP



02:14 Start ADCP

W0904A_Gregg_t9

75 kHz only Deck unit S/N 198 (good one)

NB Bins = 70

NB Bin Length = 16

Blank = 8

BB Bins = 80

BB Bin Length = 08

Blank = 8

BT = off

TP = 3

150 kHz

NB Bins = 70

NB Bin Length = 08

Blank = 4

BB Bins = 75

BB Bin Length = 04

Blank = 4

BT = off

TP = 1.2



03:30 Stop ADCP



03:46 Start ADCP

W0904A_Gregg_t10

75 kHz only Deck unit S/N 10008 (bad one)

NB Bins = 70

NB Bin Length = 16

Blank = 8

BB Bins = 80

BB Bin Length = 08

Blank = 8

BT = off

TP = 3

150 kHz

NB Bins = 70

NB Bin Length = 08

Blank = 4

BB Bins = 75

BB Bin Length = 04

Blank = 4

BT = off

TP = 1.2



08:10 ADCP Off



Done pumping tanks and testing ADCP



08:22 Start W0904A_Gregg_07: Deck Unit 198 (good one)

75 kHz only

NB = On

NBB Bins = 80

NB Bin Length = 8

Blank = 8

BT = off

TP = 3



16:30 Cleaned MET Sensors



04-26-2009



17:05 Stopped flow to flur. and trans. Cleaned

17:15 Flow started back up



04-27-2009

04:15 Clean up deck and head for the barn.

Stop ADCP, ECHO, DAS for DVD burning

04:29 Start ADCP with 300 and OS75



Related docs
Other docs by gegeshandong
A_E_KY-4PSE30WUSeries-Rev1012A
Views: 0  |  Downloads: 0
688_xls
Views: 0  |  Downloads: 0
2-1 辫措康
Views: 0  |  Downloads: 0
VINPR Lit Order Form New Jan 09
Views: 0  |  Downloads: 0
WRECKED - Torino Film Festival
Views: 0  |  Downloads: 0
project2btestcases
Views: 0  |  Downloads: 0
Fund Account transfer form9.2011
Views: 0  |  Downloads: 0
By registering with docstoc.com you agree to our
privacy policy

You are almost ready to download!

You are almost ready to download!