Embed
Email

BBS 2546

Document Sample

Shared by: xiaoyounan
Categories
Tags
Stats
views:
0
posted:
12/24/2011
language:
pages:
2
Pay Item Worksheet

Standard or Metric





Project Description



Existing S.N. County



Proposed S.N. Route



Contract Number Section



Proposed Letting Designer





Deck / Superstructure Removal



Existing Superstructure Description:







The existing structure is: Composite Non Composite Other



Concrete in existing deck to be removed: Cu Yd. Cu. m.



PPC Deck Beams to be removed: Sq. Ft. Sq. m.



PPC I-Beams to be removed: Ft. m.



Weight of existing structural steel to be removed: Lb. kg.



Wearing surface to be removed (thickness in. mm.): Cu. Yd. Cu. m.



Other items not listed above: (List items, Quantities and Units)









Substructure Removal

(Substructure removal according to Standard Specifications Article 501)



Existing Substructure Description:







Total existing substructure concrete: Cu. Yd. Cu. m.



Concrete in existing substructure to be removed: Cu. Yd. Cu. m. Percent removal:





Box Culvert Removal

(Culvert removal according to Standard Specifications Article 501)



Existing Box Culvert Description:







Fill Height: Ft. m.



Total Existing Box Culvert Concrete Volume Cu. Yd. Cu. m.



Concrete in existing Box Culvert to be removed: Cu. Yd. Cu. Percent removal:

m.m.

BBS 2546 (9/02)

Page 1 of 2

(Proposed SN )



Temporary Support System / Temporary Shoring or Bracing



Temporary Support, Shoring, or Bracing System Description:









Struts, Wales, etc. total weight (if applicable): Lb. kg.



Concrete (if applicable): Cu. Yd. Cu. m.



Reinforcement Bars (if applicable): Lb. kg.

Sheet Piling (if applicable): Sq. Ft. Sq. m.





Cofferdam / Underwater Structure Excavation Protection



Cofferdam / Structure Excavation Protection Description:









Cofferdam Top Elevation: Bottom of cofferdam excavation elevation:



Total Cofferdam / Structure Excavation Protection Sheeting Area: Sq. Ft. Sq. m.



Struts, Wales, etc. Total Weight (if applicable): Lb. kg.





Cleaning and Painting Existing Steel Structures



Total Surface Area of Steel Sq. Ft. Sq. m.



Area to be Blast Cleaned per SSPC-SP 10 Sq. Ft. Sq. m.



Area to be Power Tool Cleaned per SSPC-SP 3 (Mod) Sq. Ft. Sq. m.



Area to be Power Tool Cleaned per SSPC-SP 15 Sq. Ft. Sq. m.



Feature(s) Crossed Waterway Roadway Railroad Other





Drainage System



Approximate Length of Drainage System Ft. m





Other Major Lump Sum Items and/or Each Major Item

(Be sure to include any pertinent information needed to estimate the Lump Sum or Each Item not listed above.)









BBS 2546 (9/02)

Page 2 of 2



Related docs
Other docs by xiaoyounan
uses chart
Views: 2  |  Downloads: 0
least_squares_fit_manual
Views: 0  |  Downloads: 0
ENTERING_THE_ROADWAY_AND_BACKING_NOTES
Views: 0  |  Downloads: 0
FFaith presentation
Views: 0  |  Downloads: 0
Ward_Nutritioin
Views: 1  |  Downloads: 0
0604477_Goldburg
Views: 0  |  Downloads: 0
salary-delegation-authority-summary-temporary
Views: 0  |  Downloads: 0
August 2011 _excel format_
Views: 19  |  Downloads: 0
1350 Tally FINANCE
Views: 1  |  Downloads: 0
Ch. 6.3.Martinez
Views: 0  |  Downloads: 0
By registering with docstoc.com you agree to our
privacy policy

You are almost ready to download!

You are almost ready to download!