New Meadowlands Stadium

VIEWS: 6 PAGES: 41

  • pg 1
									New Meadowlands Stadium 
East Rutherford, New Jersey




Presented by: 
Armindo Monteiro, P.E. 
Senior Associate 
October 29, 2008 
New Meadowlands Stadium 

§  Project Description 
§  Foundations 
§  Superstructure 
§  Special Features
New Meadowlands Stadium 

§  Project Description 
§  Foundations 
§  Superstructure 
§  Special Features
New Meadowlands Stadium 
Design and Construction team 

§  Owner :       Giants/Jets 
§  Architect:    360 Architecture/EwingCole 
§  Design­Build CM:  Skanska USA 
§  Structural Engineer:  Thornton Tomasetti 
§  MEP Engineer:  Ewing Cole
New Meadowlands Stadium 
              Away with the Old, 
              in with the new 
                              Old     New 
              Start           1972  2007 
              Opened          1976  2010 
              Owner           NJSEA  Giants/Jets 
              Cost            $78 M  $1.3 B 
              Capacity:       80,242  82,500 
                               nd 
              NFL Rank (cap.) 2        nd 
                                      2 
              Suites          119     217 
              Club seats      142     7200 
              Bldg footprint  450,000 700,000 SF 
              Steel Tons      13,500  25,000
New Meadowlands Stadium 
              §  2.1 Mill sq.ft. on 
                 Eight Levels 
              §  Host NFL & college 
                 football, Intern’l 
                 soccer, concerts 
              §  Four 40’x130’ LED 
                 scoreboards 
              §  Louvered façade, 
                 illuminated by 
                 colors of team 
                 playing
New Meadowlands Stadium 
               Site Location 
               § ~6 Mi from NYC 
               § Meadowlands 
                  Complex 
               § Bounded by I­95 
                  and Route 3 
               § Overall project 
                  impacts 270 acres 
               § Land Leased from 
                  NJSEA
New Meadowlands Stadium
New Meadowlands Stadium 

Milestones 
§  Decision Jets/Giants – Sept. 2005 
§  GMP awarded/Turned D­B – Dec. 2005 
§  Foundation start – May 23, 2007 
§  Steel erection began – Oct. 5, 2007 
§  Expected topping out –Nov. 2008 (Currently 
   4+ months ahead of schedule)
New Meadowlands Stadium 
Fast Track 

§  Multiple early bid packages 
§  4 Mill orders 
§  Fabricator on board in design assist phase 
§  Struct. Steel SIM created using Tekla
New Meadowlands Stadium 
              Steel Quantity Estimate 
              §  Estimate = 23,769 Tons 
              §  Final = ~25,000 Tons 
                 (including all changes & 
                 misc. framing) 
              §  18,800 tons designed, 
                 detailed, submitted, and 
                 fabricated in approx. 17 
                 months (up to May ’08) 
              §  ~14,000 Tons erected in 
                 7 months (up to May 
                 ’08)
New Meadowlands Stadium 

§  Project Description 
§  Foundations 
§  Superstructure 
§  Special Features
New Meadowlands Stadium 
                Driven Piles at Pilecaps 
                §  Concrete filled, 
                   closed end piles, dia 
                   = 13 3/8” 
                §  150 Ton allowable 
                   axial capacity 
                §  10 Ton allowable 
                   uplift capacity 
                §  3 Ton allowable 
                   lateral capacity
New Meadowlands Stadium 
                Pilecaps 
                §  Top of pilecap 
                   typically 3 feet below 
                   top of slab 
                §  Dowels provided to 
                   transfer lateral load 
                   into slab 
                §  2 to 24 Pile Pilecaps 
                   Used
New Meadowlands Stadium 
                Tie Down Anchors 
                §  Required when uplift 
                   load exceeds uplift 
                   capacity of driven piles 
                §  175 kip uplift resistance 
                §  $$$ at ~$150/LF
New Meadowlands Stadium 
                                      Pile Supported Framed 
                                         Slab on Grade 
                                      §  2’­0” thick individual 
             r ox . 25’                  pile caps/haunch slab 
       App
                                      §  150 ton and 75 ton 
                                         slab support piles 
                                      §  12 inch thick normal 
                                         weight concrete slab 
                     ~ 12’ o.c.       §  10 inch thick normal 
                                         weight field slab 
                                      §  Continuous mat 
                                         reinforcement 

 Typ. Service Level  Slab Part Plan
       Field Slab Part Plan 
New Meadowlands Stadium 
Pile Supported Framed 
   Slab on Grade
New Meadowlands Stadium 

§  Project Description 
§  Foundations 
§  Superstructure 
§  Special Features
New Meadowlands Stadium
   Structural System ­ Summary 
§  All steel super structure 
§  Code:  IBC 2000, New Jersey Edition 
§  GRAVITY SYSTEM 
  §  4 ½” N.W. topping on 3” Composite  M.D. 
  §  Typical span = 9’ to 10’ 
§  LATERAL SYSTEM 
  §  Concentrically Braced frames ­both 
     directions 
New Meadowlands Stadium 
Lateral System 
§  Frames located symm. 
§  Diaphragm designed to 
   span between frames 
    §  #4@12” mat each way 
    §  8­#7 add’l chord 
       reinforcement along 
       perimeter of slab                       Longitudinal 
                                              Braced Frames
                             Radial Braced 
                              Frames, Typ. 



                                               Radial  Braced 
                                                   Frames 




          Ÿ  Longitudinal 
           Braced Frames 
New Meadowlands Stadium 
               Typ. Sideline Bent Elevation 


          Precast Seating Units
                                     Upper Bowl 




                    Suite Level C 
                    Suite Level B 
                    Mid Bowl 
                                                   Braced Frame 
         Suite Level A 
 Lower Bowl 
New Meadowlands Stadium 
              Typ. Endzone Bent Elevation 


                                Upper Bowl 




                        Mid Bowl 

Precast Seating Units

                                        Braced Frame 
        Lower Bowl 
     New Meadowlands Stadium
     Structural System­Summary 
§    STADIUM LATERAL LOAD SYSTEM 
     §    WIND LOADS 
          –  Exposure C 
          –  V=100 mph 
          –  I=1.15 
     §    SEISMIC LOADS 
          –  Seismic Design Category C 
          –  R=3 (no special seismic detailing) 
          –  I=1.25 
     §    Seismic loads predominantly control design 
New Meadowlands Stadium 
                          Seismic 
                          §  Code transition period 
                             from IBC2000 to 
                             IBC2006 in NJ 
                          §  Design for worst case 
                          §  IBC2006 reduced forces 
                             but still Cat. D, 
                             borderline 
                          §  TT suggested site 
  S  > 0.5 
                             specific study in hopes 
   DS 

  S      > 0.2 
               } CAT. D      of achieving Cat. C 
   D1 
New Meadowlands Stadium 
                §  Site Specific confirmed 
                   CAT. C 

                Benefits of “C” vs. “D” 
                §  R=3 permitted no 
                   special detailing 
                   provisions 
                §  No special seismic 
                   requirements for MEP/ 
                   Arch systems 
                §  $$$
 New Meadowlands Stadium 
                                   SITE SPECIFIC VS. IBC 
                                   §  Max. 20% reduction 
                                      in Design Response 
                                      coefficients for site 
                                      specific per IBC 
                                   §  Still significant uplift 
                                      in columns at the 
                                      foundation level 
                                   §  Uplift anchor cost 
                                      approx $150/LF, with 
IBC 2000         SITE SPECIFIC        depths ranging 45­90 
§  Sds:0.555g    §  Sds:0.48g         ft. ($6,750­$13,500 
§  Sd  :0.22g 
     1           §  Sd  :0.175g 
                      1 
                                      ea)
§  SDC “D”       §  SDC “C” 
§  R>3           §  R=3 
New Meadowlands Stadium 
                 What can be done to reduce 
                    uplift? 
                 §  Dynamic analysis 
                     §  force distrib based on 
                        location of mass 
                        F=m*a 
                     §  Vb based on T = 1.2 
                        *Ta*Cu…­15.4% 
                        reduction 
                 §  LLRS ‘R’ Factor reduced 
                    forces for increased 
                    system ductility
New Meadowlands Stadium 

              Dynamic Analysis vs Site 
                 Specific and IBC (R=3) 
              §  Significant base shear 
                 reductions 
              §  Significant overturning 
                 moment reductions 
              §  Reduced uplift anchors 
                 proportionately
New Meadowlands Stadium 




Seismic ‘R’ Value 
§ Force inversely proportional to R value 
§ Cs= S  *I/(T*R), & min Cs = 0.044 I*S 
        D1                             DS 
§ For R=3 and R=6, not 2:1 force ratio: min Cs 
  = 0.044 I*S 
             DS
 New Meadowlands Stadium 




Seismic ‘R’ Value 
  § Structure of ~1.4 to 1.9 sec (Cs min controls 
    for higher R) 
  § Impacts Level of detailing of connx & 
    member size criteria
New Meadowlands Stadium 
Ÿ R=3 CONNX            R6 Benefits 
                       § Main member tonnage 
                         reduction 350 Tons 
                       § No uplift anchors 
                         (100+ anchors) 
         Ÿ R=6 CONNX   R6 Penalties 
                       § Full tension capacity 
                         conn. (Ry*Ag*Fy)…$$ 
                       § Brace beam L  <=L 
                                       b    pd 
                       § Other detailing reqm’t 
                       Final Result:  R=3 
                         selected 
New Meadowlands Stadium 

§  Project Description 
§  Foundations 
§  Superstructure 
§  Special Features
New Meadowlands Stadium 

                  Expansion Joints 
                  §  No double 
                     columns and no 
 46’ 




                     slide bearings 
             27
             ’    §  Cantilever floor 
                     system 
                  §  Aesthetically 
        17




                     cleaner 
        ’




                  §  >Tonnage, but < 
                     detailing costs 
New Meadowlands Stadium 
                 Exp. Jt. 
EOS                          EOS 
                                    Expansion Joint 
                                    §  E.O.S. to E.O.S.  Dim = max 
                                       EQ drift + temp + tolerance 
                                    §  Sacrificial element 
                                       between slab edge­ 
                                       dimension based on install 
  Sacrificial 
   Elements                            temp 
                                    §  ‘X’ Dim accommodates 
                                       temp & wind drift 
                                    §  Same detail all floors 
                                    §  Designed for forklift point 
                                       load 
New Meadowlands Stadium 
                                           500 ft 
                                           ~910 ft 
 Max 630 Ft without exp. Jt.




                                                              ~740 ft 
                                      Stadium 
                                      Four Expansion 
                                      Joints at “corners” 




                               Max 670 Ft without exp. Jt. 
New Meadowlands Stadium 
EXP. JOINT
        EXP. JOINT 
                                                   Sideline Braced 
        BRACED FRAME 
                              Ÿ  Radial Braced 
                                   Frames, Typ.    Frame Locations 
                Ÿ  350 FT.
                                                    § Long. frames 
                                                      within 350 ft 
                                                    § Ductile connx 
                                                      detail 
                Ÿ  Longitudinal 
                 Braced Frames 




    Typ. Longitudinal 
      Braced Frame 
   New Meadowlands Stadium 
                     Endzone Braced 
  EXP. JOINT 
                     Frame Locations 
  BRACED FRAME 
                      § Longitudinal 
                        frames centered 
                      § Sim. Ductile 
                        connx’s used 
Ÿ  Longitudinal 
 Braced Frames 




Ÿ  Radial  Braced 
       Frames
New Meadowlands Stadium 

              Typical Bays 
              §  Spans up to 55’, typical 
                 modern stadium span 
                 approx. 40’­45’ 
         55
          ’   §  Reduce number of 
                 pieces and erection 
                 time 
              §  Nominal add’l tonnage 
              §  Restricted live load 
                 deflection at façade 
                 components to 1 ¼” 
New Meadowlands Stadium 




Typical Bay Study 
§  Exist Giant’s stadium ~30 ft bays 
§  Reduce number of pieces of Steel, Precast, facade 
§  Reduces fireproofing quantity
ANY QUESTIONS?
Thank you 
Armindo G. Monteiro, P.E. 
Thornton Tomasetti 
24 Commerce St. 
Newark, NJ 07102 
T 973.286.6100 
F 973.286.6101

								
To top