					        Transport Sector
               Project

• Kabul Airport Navigation Aid
  Rehabilitation
 (Ministry of Civil Aviation and
 Tourism)
Kabul Airport Navigation Aid Rehabilitation

              Project Outline

  Afghanistan has 22 airports with two major
  gateways:
  Ø Kabul International Airport, and
  Ø Kandahar International Airport.

  There are five smaller domestic airports:
  Ø Mazar-e-Sharif,
  Ø Herat,
  Ø Jalalabad,
  Ø Kunduz, and
  Ø Chakcharan.
Kabul Airport Navigation Aid Rehabilitation

         Project Outline (cont.)

   Kabul and Kandahar International Airports
   were operated in the past under
   Instrument Flight Rules (IFR) with day
   and night operations.

   The prolonged state of conflict in
   Afghanistan and the lack of maintenance
   have resulted in large-scale deterioration
   of the civil aviation infrastructure and
   depletion of skilled manpower.
Kabul Airport Navigation Aid Rehabilitation

            Project Outline (cont.)
• Currently, the two entities that provide air navigation
• Currently, the two entities that provide air navigation
  services to civil aviation in Afghanistan are:
  services to civil aviation in Afghanistan are:
   Ø Ministry of Civil Aviation and Tourism (MCAT) and,
   Ø Ministry of Civil Aviation and Tourism (MCAT) and,
   Ø The International Security Assistance Forces (ISAF).
   Ø The International Security Assistance Forces (ISAF).
• Since February 2002, the ISAF has temporarily assumed
• Since February 2002, the ISAF has temporarily assumed
  control of Afghan airspace (the Kabul Flight Information
  control of Afghan airspace (the Kabul Flight Information
  Region (FIR)) and under this arrangement, air
  Region (FIR)) and under this arrangement, air
  navigation services responsibilities have been divided
  navigation services responsibilities have been divided
  between MCAT and the ISAF.
  between MCAT and the ISAF.
• Without adequate funding and technical assistance, and
• Without adequate funding and technical assistance, and
  using only the available communication, surveillance
  using only the available communication, surveillance
  and navigation systems, it is not possible to assure
  and navigation systems, it is not possible to assure
  flight safety when the military air traffic control services
  flight safety when the military air traffic control services
  at Kabul Airport are withdrawn by the end of 2003.
  at Kabul Airport are withdrawn by the end of 2003.
Kabul Airport Navigation Aid Rehabilitation
Kabul Airport Navigation Aid Rehabilitation

             Technical Description
 The World Bank has approved funding to provide
 communication and air traffic control equipment for
 the Kabul International Airport to upgrade it to
 international standards.

 The financing will mainly encompass safety and
 security equipment costs including:
 Ø
 Ø   Upgrading the communication system and radio navigation aids,
      Upgrading the communication system and radio navigation aids,
 Ø
 Ø   Procuring fire fighting equipment,
      Procuring fire fighting equipment,
 Ø
 Ø   Mobile lighting for runway, taxiway, approach and visual aids,
      Mobile lighting for runway, taxiway, approach and visual aids,
 Ø
 Ø   Meteorological equipment,
      Meteorological equipment,
 Ø
 Ø   Ground handling equipment, and
      Ground handling equipment, and
 Ø
 Ø   Airfield Operational Equipment such as maintenance and de-
      Airfield Operational Equipment such as maintenance and de-
     icing equipment.
      icing equipment.
Kabul Airport Navigation Aid Rehabilitation

               Project Site

 The project will be implemented at the
 Kabul International Airport.


       Project Status/Timeline

 It is anticipated that tendering will be
 initiated in the third quarter of 2003.
Kabul Airport Navigation Aid Rehabilitation

           Equipment & Services
 The project will be implemented under the overall
 The project will be implemented under the overall
 coordination of the Afghan Assistance Coordination Agency
 coordination of the Afghan Assistance Coordination Agency
 (AACA), but the various components of the proposed
 (AACA), but the various components of the proposed
 assistance program are to be implemented through the
 assistance program are to be implemented through the
 Ministry of Public Works and the Ministry of Civil Aviation and
 Ministry of Public Works and the Ministry of Civil Aviation and
 Tourism (MCAT).
 Tourism (MCAT).

 Procurement of works, goods and services, and contract
 Procurement of works, goods and services, and contract
 disbursements will be done through AACA, but monitoring of
 disbursements will be done through AACA, but monitoring of
 technical assistance and physical components, project
 technical assistance and physical components, project
 administration, will be done by the implementing ministry,
 administration, will be done by the implementing ministry,
 MCAT.
 MCAT.

 The International Civil Aviation Organization (ICAO) in
 The International Civil Aviation Organization (ICAO) in
 Montreal has been contracted by the Government to assist
 Montreal has been contracted by the Government to assist
 with the procurement and installation of critical equipment
 with the procurement and installation of critical equipment
 and recruitment of air traffic control staff, which will be
 and recruitment of air traffic control staff, which will be
 carried out according to World Bank guidelines.
 carried out according to World Bank guidelines.
Kabul Airport Navigation Aid Rehabilitation

    Equipment & Services (cont.)
 The project will procure the following equipment:
 Ø Air Traffic Control (ATC) Equipment--ATC-Consoles, Radar
 Ø Air Traffic Control (ATC) Equipment--ATC-Consoles, Radar
   Data Recorder, VHF Direction Finder, Radar Data Display
   Data Recorder, VHF Direction Finder, Radar Data Display
   System, Telegraph equipment, Voice Communication
   System, Telegraph equipment, Voice Communication
   system, Voice Recorder and modernization of existing
   system, Voice Recorder and modernization of existing
   radar installations;
   radar installations;
 Ø Airfield Landing Aids--Precision Approach RWY lighting,
 Ø Airfield Landing Aids--Precision Approach RWY lighting,
   RWY lighting System, TWY Lighting System, Non-
   RWY lighting System, TWY Lighting System, Non-
   Precision Approach Lighting system, PAPI and Emergency
   Precision Approach Lighting system, PAPI and Emergency
   Power source;
   Power source;
 Ø Navigational equipment--Instrument Landing System and
 Ø Navigational equipment--Instrument Landing System and
   Non Directional Beacons (NDB); and
   Non Directional Beacons (NDB); and
 Ø Meteorological Equipment--Automatic Map Transmission
 Ø Meteorological Equipment--Automatic Map Transmission
   Equipment and Meteorological Charts Plotter.
   Equipment and Meteorological Charts Plotter.
Kabul Airport Navigation Aid Rehabilitation

           Project Financing


  The project will be financed by a World
  Bank International Development
  Assistance loan for $19.3 million. This
  loan is part of an overall Emergency
  Transportation Rehabilitation loan which
  was approved in January 2003.

				