I-15 Transit Station and DAR

Mira Mesa /Scripps Ranch

FACT SHEET



THE CONNECTION

GOALS The project will construct a Transit Station and Direct Access Ramp (DAR)

that will connect to the Interstate 15 Express Lanes in the communities of

Integrate transit services along Mira Mesa and Scripps Ranch. The Transit Station will be located south of

the freeway corridor; the Hillery Drive/Westview Parkway intersection on the northeast edge of

San Diego Miramar College and will join the DAR located at Hillery Drive,

Maximize the coordination of just south of Mira Mesa Boulevard. This improvement will provide a

land uses and transportation seamless connection between the street system and the Express Lanes.

consistent with the regional

goals and community plans;

DAR DETAILS

Provide a direct entrance/exit The Mira Mesa/Scripps Ranch DAR will consist of five structures, including

to the Express Lanes and ease one elevated ramp extending at-grade from Hillery Drive and crossing over

congestion on the southbound I-15 and four on- and off-ramps that will extend to the

interchanges.

Express Lanes. The DAR will give direct access for carpools, vanpools,

buses, motorcycles, permitted clean-air vehicles and FasTrak users into

SCHEDULE the Express Lanes without having to merge through mainline traffic.



CENTER OF ATTENTION

The environmental document The Miramar College Transit Station will have up to 12 bus bays and

was completed in March, 2009.

associated transit furnishings. It will include one center island passenger

Construction is expected to platform with four bus bays. The remaining bus bays and passenger

begin in summer 2012. platforms will be constructed in a circular pattern surrounding the center

island. This Transit Station will serve passenger access and transfer needs

for local and express bus routes and will also accommodate planned Bus

CONTACT Rapid Transit (BRT) services.





Project Manager

THE PLAN

Andrew Rice The project design is scheduled to be completed in 2011 with construction

(619) 688-3284 planned for summer 2012. The estimated cost is $89 million.

or by e-mail at

Andrew.Rice@dot.ca.gov



Department of Transportation

4050 Taylor Street

San Diego, CA 92110

Ph: (619) 688-6670 PROJECT

Fax: (619) 688-3695 AREA

www.dot.ca.gov/dist11



N

Study Area









Scripps

Ranch

Road

Mira Mesa Boulevard









Hillery Drive









Project Vicinity Map

Mira Mesa/Scripps Ranch DAR Project EIR/EA



Related docs
Other docs by yunyi
ASEF TUTORING SUNSHINE SUMMER CAMPS
Views: 1  |  Downloads: 0
Comparative demography and assem
Views: 3  |  Downloads: 0
Equity Release moves
Views: 1  |  Downloads: 0
78565
Views: 0  |  Downloads: 0
AN EXPERIMENT TO ESTIMATE CO CON
Views: 0  |  Downloads: 0
WG_Citizens_of_the_World
Views: 1  |  Downloads: 0
6.5.doc
Views: 6  |  Downloads: 0
Five-layer high speed corrugated
Views: 9  |  Downloads: 1
By registering with docstoc.com you agree to our
privacy policy

You are almost ready to download!

You are almost ready to download!