HEADED TO THE FUTURE



Elmore County Board

of Education

Town Hall Meeting

April 12, 2005

Guidelines for the Evening

• Your questions are welcome

• You have been provided an index card

to write your question

• These cards will be collected at the end

of my presentation

• These questions will be read aloud and

answered as time permits tonight

• Frequently asked questions will be

posted to the Elmore County schools

website (www.elmoreco.com)

Meeting Objectives

• To present historical data on capital

project accomplishments to date by

Elmore County BOE

• To present enrollment data

• To inform stakeholders of proposed

10 year plan for Elmore County

schools

• To discuss contingency plans if

Millbrook forms new school system

Elmore County Public Schools

Construction and Major Improvements

1995-2004





• Countywide Projects $2.9 Million

• Eclectic Community $7.0 Million

• Holtville Community $5.5 Million

• Wetumpka Community $6.2 Million

• Millbrook Community $9.2 Million

Elmore County Public Schools

Construction and Major Improvements

1995-2004

In all, a total of….





$30,997,349



During the last ten years…and the

best is yet to come

Facility Planning for Future Needs:

A Challenging Process



A major source of our school revenue

comes through the State

Department of Education’s (SDE)

Foundation Program

40 day enrollment as reported to the

SDE is a key factor in the decision

making process of school systems

ALL FUNDING IS BASED ON THE

40 DAY ENROLLMENT REPORT

The Planning Process:

A Challenging Task





40 Day

Reporting

By School &

Grade

The Planning Process:

A Challenging Task





(+-) % Difference

00-01 01-02 02-03 03-04 04-05 Enrollment









Eclectic 1,634 1,642 1,620 1,626 1,674 +40 2.45%



Holtville 1,498 1,459 1,449 1,463 1,524 +26 1.74%



Millbrook 3,576 3,643 3,673 3,760 3,768 +192 5.37%



Wetumpka 3,301 3,326 3,341 3,344 3,365 +64 1.94%



Total 10,009 10,070 10,083 10,193 10,331 +322 3.22%

A Critical Component…

• During the summer of 2003, an outside

consultant developed a set of enrollment

projections for each school area through

school year 2010-11.

• Specific results of this projection study

regarding the Stanhope Elmore High

School and the Millbrook area

enrollment are as follows:

Stanhope Elmore HS 2003-04

•Projected ADM 40thDay

1064

•Actual ADM 40 th Day



1056

•Difference

8

Stanhope Elmore HS 2004-05

•Projected ADM 40thDay

1113

•Actual ADM 40 th Day



1112

•Difference

1

All Grades Millbrook Area 2004-05

•Projected ADM 40

Day th



3754

•Actual ADM 40 th Day



3767

•Difference

13

That’s Pretty Close

Therefore…

•These results indicate the

previous projections are a

valid predictor of future

enrollments

Projection Results…

•In addition to the projections, a

“Capacity Analysis” of each school was

developed which compared the

instructional capacity of the building to

the current (at that time) and projected

enrollment. The results for the

Millbrook area are as follows:

Capacity Analysis 2002-03

(As presented August, 2003)

CURRENT SCHOOL Classrooms ENR. Classrooms STATUS

GRADE Available 2002-03 Required

ORG. Elem. 1-18X1.30

Mid/Hi 1-27X1.35





K-1 Coosada Elementary 32 547 40 -8



2-3 Robinson Springs 41 589 43 -2



4-8 Millbrook Junior High 69 1489 74 -5



9-12 Stanhope Elmore High 48 1029 51 -3





Sub-total Millbrook Community 190 3654 208 -18

Capacity Analysis 2007-08

(As presented August, 2003)

CURRENT SCHOOL Classrooms PROJ. ENR Classrooms STATUS

GRADE Available 2007-08 Required

ORG. Elem. 1-18X1.30

Mid/Hi 1-27X1.35





K-1 Coosada Elementary 32 646 47 -15



2-3 Robinson Springs 41 662 48 -7



4-8 Millbrook Junior High 69 1428 71 -2



9-12 Stanhope Elmore High 48 1131 57 -9





Sub-total Millbrook Community 190 3867 222 -32

Capacity Analysis 2010-11

(As presented August, 2003)

CURRENT SCHOOL Classrooms PROJ. ENR Classrooms STATUS

GRADE Available 2010-11 Required

ORG. Elem. 1-18X1.30

Mid/Hi 1-27X1.35





K-1 Coosada Elementary 32 691 50 -18



2-3 Robinson Springs 41 686 50 -9



4-8 Millbrook Junior High 69 1562 78 -9



9-12 Stanhope Elmore High 48 1051 53 -5





Sub-total Millbrook Community 190 3990 230 -40

Projection Results…

•These projections indicated that most of

the growth in the school district in

general, as well as in Millbrook area

will be more in the lower grades instead

of the upper grades. That has proven to

be the case over the last two years.

Therefore, our proposed bond program is

developed toward that end.

The Planning Process:

A Challenging Task



Even with the best plans….



PRORATION can interrupt

the journey at any time!!!

HEADED TO THE FUTURE

Let’s take a look at the next 10 years

in terms of capital outlay projects for

Elmore County Schools

GOAL:

Improve and foster the teaching and learning

environment by planning, organizing, and

implementing a program of construction,

renovation, and maintenance; outlining

systematic procedures and schedules that will

ensure safe, well-maintained, and attractive

schools

Phase 1: 2 year plan

2005-2007

$12 MILLION BOND ISSUE

Elmore Co. High Bandroom 500,000

Holtville High Gym 1,200,000

Holtville Elem. 10 Classrooms 1,000,000

Coosada Elem. 8 classrooms 800,000

Eclectic Middle 8 classrooms 800,000

Millbrook MJHS Cafeteria/Land/Gym 2,000,000

Millbrook MJHS Roof 1,000,000

Millbrook Area Land for New School 1,000,000 **At present,

Wetumpka Elem. Roof 600,000 additional

projects are

TOTAL

** 8,950,000 under

consideration.

Estimated

cost=$3.05

million.

Utilize existing comprehensive

study of enrollment projections

and capacity analysis to predict

trends in projected school area

populations for next 10-20 years

Phase 2: 5 year plan

2005-2010

1. Construction of new school in Millbrook area $15+ MILLION

as need indicated in comprehensive study Funded by Public School Funds (PSF), local

of enrollment projections and capacity bond issue funds, additional local revenue

analysis (ad valoreum and/or sales tax)

2. Meet with local legislative delegation, school

board members, county commissioners,

and other relevant entities to design

strategies to enhance county school board

revenues

3. Purchase land for school to serve Redland Funded through PSF (Public School Funds)

Community (50 acres +)

4. New additions/renovations to school Funded through PSF (Public School Funds)

communities as needed & funds available

5.Develop stronger collaborations with city and

county municipalities, businesses, non-

profit organizations, individuals, colleges,

clubs, and associations for increased

financial support for Elmore County

Schools

6. Develop a plan for Elmore County

Commissioners to provide and maintain a

facility for the Elmore County Board of

Education’s central office building

Phase 3: 10 years +

2005-2015

1. New school to serve $6-$8 million Funded by Public

Redland School Funds

Community (PSF), local

bond issue

funds, additional

local revenue

(ad valoreum

and /or sales

tax)







2. Other community $5 million Funded by Public

specific School Funds

construction needs (PSF), local

as dictated by bond issue

enrollment funds, additional

numbers local revenue

(ad valoreum

and /or sales

tax)

Contingency Plan



What happens if the

Millbrook community

forms its own school

system????

State Law & City Schools



According to the …







Laws of Alabama Relating to

Education

State Law & City Schools

Section 16-18-20

“The county board of education shall retain

supervision of said school…until an

agreement has been made between the

county board of education and the city

board of education…with reference to

the matter of existing indebtedness and

of providing the same or equivalent

school facilities for the children in that

part of the territory in the school district

or districts not annexed or made part of

such city.”

State Law & City Schools



Section 16-18-21

“If an agreement under Section 16-8-

20 is not reached within 30 days

after the annexation….it shall then

be mandatory to refer the final

disposition of the matter to

arbitration by a board consisting of

three members…

State Law & City Schools

Section 16-8-22

“The Board of Arbitration shall secure all

facts available relative to the matter, hold

a public hearing for the purpose of giving

an opportunity for every contention to be

presented by both evidence and

argument and determine all matters

relative to the transfer of the control,

existing indebtedness and use of such

school. The findings of a majority of said

Board of Arbitration shall be binding on

all concerned.”

FACTS TO REMEMBER



1. Negotiation will occur between

the Elmore County Board of

Education and the Millbrook

City Board of Education

Birmingham News-March 18, 2005



Front Page Headline:

Trussville, Jeffco work out plans for

new school system



Negotiation is key to the

process!!!!!

Alabama School Journal-March 21,

2005 page 3

“First, nothing in the law requires that you

sell the county school buildings to the

city or the city school system.”



Negotiation is the key!!!!!



Everything…from the buses, to the

copiers, to the textbooks…everything

will be negotiated!

Negotiation



This negotiation may be a long term

process…



Ex: Madison City & Limestone

County

FACTS TO REMEMBER



2. “Nothing in the law prevents a

county board of education from

operating a school within a

municipality with its own school

system”

--Alabama School Journal

March 21, 2005

FACTS TO REMEMBER

“All too often, a city will break off and the

children who live outside the city limits

but attend the county school in town

have to be bussed all the way across the

county to the nearest county school.”



--ASJ March 21, 2005

Does this thought

cause you concern?

Remain calm…



Here is a key fact to

remember…..

FACTS TO REMEMBER



“The COUNTY COULD CONTINUE

TO OPERATE ITS SCHOOLS FOR

THOSE CHILDREN, and would

prevent those buildings from

standing empty if they aren’t sold”

--Alabama School Journal

March 21, 2005







(Ex: Talladega County & Sylacauga City)

Current enrollment (within existing city limits)

School 40 day Millbrook Elmore Co.

City Students Schools

ADM

Students

Coosada 586 321 (55%) 265 (45%)



Robinson 555 317 (57%) 238 (43%)

Springs



Millbrook 1,514 858 (57%) 656 (43%)

Mid/Jr.High



Stanhope 1,113 587 (53%) 526 (47%)





TOTALS 3,768 2,083 1,685

(55%) (45%)

Enrollment Projections (Proposed annexation)



School 40 day Millbrook Elmore Co.

City Students Schools

ADM

Students

Coosada 586 457 (78%) 129 (22%)



Robinson 555 447 (81%) 108 (19%)

Springs



Millbrook 1,514 1,195 319 (21%)

Mid/Jr.High (79%)

Stanhope 1,113 825 (74%) 288 (26%)





TOTALS 3,768 2,924 844 (22%)

(78%)

Contingency Plan A



• Convert Coosada Elementary from

K-1 to K-6 school by utilizing bond

issue monies



• Retain Stanhope Elmore High

School to house 7-12 population

Contingency Plan B



• Convert Coosada Elementary to K-

6 school utilizing bond issue monies



• Retain current Millbrook Middle/Jr.

High facilities as a 7-12 school and

complete proposed capital projects

Contingency Plan C



• Convert Coosada Elementary to K-

6 school



• Build a new 7-12 facility

Special Guests



• Mr. Craig Pouncey

Assistant State Superintendent

Administrative & Financial Services Division

Alabama State Department of Education





• Mr. Perry Taylor

Director, School Architect

Alabama State Department of Education

Creative Funding Solutions



• The Talladega Plan



• Georgia’s SPLOST (Special

Purpose Local Option Sales Tax)

GOAL:

Improve and foster the teaching and learning

environment by planning, organizing, and

implementing a program of construction,

renovation, and maintenance; outlining

systematic procedures and schedules that will

ensure safe, well-maintained, and attractive

schools

HEADED TO THE FUTURE



Questions??



Related docs
Other docs by wuyunqing
Abstraction_of_student_and_master_work
Views: 1  |  Downloads: 0
Наталия_ здравствуйте
Views: 4  |  Downloads: 0
Embedded IP-PBX
Views: 18  |  Downloads: 0
RESPRO Comment Summary
Views: 0  |  Downloads: 0
1992-03-31
Views: 0  |  Downloads: 0
Organic Chemistry
Views: 0  |  Downloads: 0
Hello there
Views: 0  |  Downloads: 0
User Product Manual
Views: 4  |  Downloads: 0
By registering with docstoc.com you agree to our
privacy policy

You are almost ready to download!

You are almost ready to download!