RESULTS-FRAMEWORK DOCUMENT

AGREED BETWEEN



MINISTER OF POWER



AND



SECRETARY



MINISTRY OF POWER









FOR THE PERIOD

APRIL 1, 2011 TO MARCH 31, 2012









1

S ECTION 1

Vision, Mission, Objectives and Functions

VISION

Reliable, adequate and quality power for all at reasonable prices.



MISSION

Ministry of Power seeks to achieve its vision by providing necessary support

and enabling policy framework for integrated development of power

infrastructure in the country to meet the requirements of the growing

economy and to meet the requirements and aspirations of the people for

quality power particularly of poor households in rural areas.



OBJECTIVES:



(I). Improving the Power availability through

i. Fresh Capacity addition

ii. Improved Generation

iii. Capacity requirement saved through Energy Conservation

measures

(II). Expanding the Transmission Network in the country through :

i. Transmission lines addition

ii. Transformation capacity addition

(III). Universal power access through implementation of RGGVY scheme

aiming at :

i. Village electrification

ii. BPL Households electrification

(IV). Reducing AT&C losses through implementation of R-APDRP scheme, by :

i. Setting up a verifiable system of measuring AT&C losses in project

areas.

ii. Distribution infrastructure strengthening which aim at reducing

AT&C losses.

iii. Setting up of SCADA Centres in Project Areas.



(v) Enhancing the availability of trained and skilled manpower for the power

sector through Imparting training at NPTI

(VI) International Co-operation with Bhutan, Nepal and Myanmar



(VII) Efficient functioning of RFD System



(VIII) Improving Internal Efficiency / Responsiveness / Service Delivery of

Ministry/ Department.









2

FUNCTIONS :



The main work items dealt by the Ministry of Power include following :

 General Policy in the electric power sector and issues relating to

energy policy and coordination thereof.

 All matters relating to hydro-electric power (except small/ mini/

micro hydel projects of and below 25 MW capacity) and thermal

power and transmission & distribution system network;

 Research, development and technical assistance relating to hydro-

electric and thermal power, transmission system network and

distribution systems in the States/Union Territories;

 Administration of the Electricity Act, 2003, (36 of 2003), the Energy

Conservation Act, 2001 (52 of 2001), the Damodar Valley

Corporation Act, 1948 (14 of 1948) and Bhakra Beas Management

Board as provided in the Punjab Reorganisation Act, 1966 (31 of

1966)

 All matters relating to Central Electricity Authority, Central

Electricity Board and Central Electricity Regulatory Commission;

 Rural Electrification;

 Power schemes and issues relating to power supply/ development

schemes / programmes / decentralized and distributed generation in

the States and Union Territories;

 All matters concerning energy conservation and energy efficiency

pertaining to Power Sector.

 Matters relating to functioning of Undertakings / Organizations

under its administrative control like NTPC, NHPC, Powergrid, REC,

NEEPCO, PFC, THDC, SJVNL, NPTI, CPRI, BBMB, DVC and BEE.









3

SECTION 2

Inter se Priorities among Key Objectives, Success Indicators and Targets

(Period: April1,2011 to March 31,2012)

S. No. Objectives Weight- Actions Success Indicators Unit Weigh Target Rating (achievement in %)

age (out t-age

of 100) (out of Excellent Very Good Fair Poor

100) 100% Good 80% 70% (60%)

90%

(I). Improving 35 Fresh Capacity addition

Power 15600* (MW) 8 15600 14040 12480 10920 9360

availability

Generation performance

855 (BU) 8 855 770 684 599 513

Fresh Capacity addition

saved through Energy

Conservation Schemes

including National Mission 2600 (MW) 8 2600 2340 2080 1820 1560

on Enhanced Energy

Efficiency (Energy

Savings)

Issue of RFP for Bulk

order for supercritical

9 No. 3 9 8 7 6 5

power plants (800 X 9 =

7200 MW)

Issuance of RFQ for

1 No. 1 1 - - - -

UMPPs

Revision of Tariff Policy

Jan 31 Feb 15 Feb 28 Mar 15 Mar31

2006 & New Hydro Policy Revision Date 1

2012 2012 2012 2012 2012

2008

QPR of PSUs and

monitoring performance

24 No. 2 24 22 19 17 14

of Autonomous Bodies

biannually

Issue of RFS for Issue

Dec 31 Jan 31 Feb 28 Mar 15 Mar 31

remaining capacity(300 of Date 1 2012

2011 2012 2012 2012

MW) under Solar Mission RFS

Workshop on R&M of

power plants, technological

upgradation and improving No. of

project execution 3 work- 2 3 2 1 - -

capabilities with shops

GenCos/States/ Developers

etc.

R&M of Power Plants of

No. of

total estimated capacity of 2 1 2 1 - - -

Plants

750 MW.

(II). Expanding 9 Transmission Central

8159 (ckm) 1 8159 7343 6527 5711 4895

the lines addition

Transmission /ready for State

Network commissioning 8620 (ckm) 2 8620 7758 6896 6034 5172



Private 3013 (ckm) 1 3013 2712 2410 2109 1808

Transformation Central

6885 (MVA) 2 6885 6197 5508 4820 4131

capacity

addition/ ready State

for 20495 (MVA) 2 20495 18446 16396 14347 12297

commissioning

Construction of

New Technologies in 1200 kV D/C line Mar 15 Mar 20 Mar 25 Mar 29 Mar 31

Date 1

Transmission Sector. at Bina National 2012 2012 2012 2012 2012

Test Station

(III). Improving 17 Village electrification

power access 14500 No. 8 14500 13050 11600 10150 8700

through

implementati BPL Households

(no. in

on of electrification 52 8 52 47 42 36 31

lakhs)

RGGVY

scheme Notification of Rural

Electrification Plan by

3 No. of

remaining States** States

1 3 2 1 -

-

IV) Reducing 16 Sanction of projects

AT&C losses (Part B -infrastructure No.

150*** 8 150 135 120 105 90

through strengthening)

implementati Sanction of projects

on of R- No. 15 13 12 11 9

(SCADA) 15*** 7

APDRP No. of Power Ministers’

scheme Conference organized

No. -

2 1 2 1 - -









4

(V) Enhancing Persons imparted training

the by NPTI 16225 No. 16225 14603 12980 11358 9735

availability 5 2

of trained

and skilled

manpower Trainee weeks at NPTI

for the 132000 105600

No. 3 132000 118800 92400 79200

power

sector

(VI) Internation Bhutan: Preparation/

al Co- Updation of DPR 5 No. 1 5 4 3 2 1

operation 3

with Nepal: Submission of FC On time Dec 31 Jan 31 Feb 29 Mar 15 Mar 31

Bhutan, Date 1

clearance application for submission 2011 2012 2012 2012 2012

Nepal and Arun-III Project

Myanmar

Jan 31 Feb 15 Feb 29 Mar 15 Mar 31

Myanmar : Updation of Updation of DPR Date 1

2012 2012 2012 2012 2012

DPR for Tamanthi

Efficient Timely submission of Draft On- time Mar. 7 Mar. 8 Mar. 9 Mar. 10 Mar. 11

Date 2 2011 2011 2011 2011 2011

functioning 3 for Approval submission

(VII)

of the RFD Timely submission of On- time

System Results submission May 1 May 3 May 4 May 5 May 6

Date 1 2012 2012 2012 2012 2012



Improving 10 Identify potential areas of Finalize an action

(VIII)

internal corruption related to plan to mitigate

Feb. 10 Feb. 15 Feb. 20 Feb. 24 Feb. 29

Efficiency/ departmental activities and potential areas of Date 2 2012 2012 2012 2012 2012

responsiven develop an action plan to corruption

ess/ service mitigate them

delivery of Ensure compliance with No. of items on

Ministry Section 4(1) (b) of the RTI which information

No. 2 16 15 14 13 12

/Departmen Act, 2005 is uploaded by

t Feb 10, 2012

Develop an action plan to Finalize an action

implement ISO 9001 plan to implement Feb. 10 Feb. 15 Feb. 20 Feb. 24 Feb. 29

certification ISO 9001 Date 2 2012 2012 2012 2012 2012

certification



Implementation of Resubmission of

Dec. Dec.

Sevottam revised draft of Dec. 15, Dec. 20, Dec. 28,

Date 2 25, 31,

Citizens’ / Clients 2011 2011 2011

2011 2011

Charter

Independent

Audit of

implementation of % 2 100 95 90 85 80

public grievance

redressal system

(IX) Ensuring 2 Timely submission of Percentage of

compliance ATNs on Audit Paras of ATNs submitted

to the C&AG within due date (4

Financial months) from date

Accountabil of presentation of % 0.5 100 90 80 70 60

ity Report to

Framework Parliament by

CAG during the

year.

Timely submission of Percentage of

ATRs to the PAC Sectt. on ATRs submitted

PAC Reports. within due date (6

months) from date

of presentation of % 0.5 100 90 80 70 60

Report to

Parliament by

PAC during the

year.

Early disposal of pending Percentage of

ATNs on Audit Paras of outstanding ATNs

C&AG Reports presented disposed off % 0.5 100 90 80 70 60

to Parliament before during the year.

31.3.2011

Early disposal of pending Percentage of

ATRs on PAC Reports outstanding ATRs

% 0.5 100 90 80 70 60

presented to Parliament disposed off

before 31.3.2011. during the year.

* : Excluding Nuclear.

** : Projects have already been sanctioned to States. There is little leverage available with the Ministry to induce remaining 13 States to

notify RE Plans.

*** : Subject to availability of balance towns as per R-APDRP Guidelines.









5

S ECTION 3

Trend Values of the Success Indicators

S. No. Objectives Actions Success Actual Projected

indicators

Year Unit FY FY FY FY FY FY

2011-12 2007-08 2008-09 2009-10 2010-11 2012-13 2013-14

(I). Improving Fresh Capacity addition 15600^ (MW) 9,263 3,454 9585 12160.5$$

Power

Generation performance 855 (BU) 811.104$$

availability 704.5 723.8 771.5 (Provisional)

Fresh Capacity addition 2,600 (MW) 623 1,504 2868 2600 3200 3500

saved through Energy (100%

Conservation Schemes achieveme

including National Mission nt is

on Enhanced Energy estimated)

Efficiency(Energy

Savings)

Issue of RFP for Bulk 9 No. - - - - -

order for supercritical

power plants (800 X 9 =

7200 MW)

Issuance of RFQ for 1 No. 1 - - Two/ One One

UMPPs One

Revision of Tariff Policy

2006 & New Hydro Policy Revision Date - - - - - -

2008

QPR of PSUs and

monitoring performance of - - -

24 No. -

Autonomous Bodies

biannually.

Issue of RFS for remaining

Issue of

capacity (300 MW) under Date - - - - -

RFS -

Solar Mission

Workshop on R&M of

power plants, technological

upgradation and improving No. of

project execution 3 work- - - - - - -

capabilities with shops

GenCos/States/ Developers

etc.

R&M of Power Plants of

No. of

total estimated capacity of 2 - - - - - -

Plants

750 MW

(II). Expanding the Transmiss Central (ckm)

Transmission ion lines 8159 7,417 5,556 5,515 3,655@ - -

Network addition/

ready for State (ckm)

8620 5,146 4,576 4,917 7,568@ - -

commissi

oning Private (ckm)

3013 0 0 1,358 1,328@ - -



Transfor Central (MVA)

mation 6885 13,075 6,580 10,290 3705@ - -

capacity State (MVA)

addition/ 20495 11,348 12,100 12,585 17,296@ - -

ready for

commissi Private (MVA)

0 0 0 1440 0 - -

oning

New Technologies in Construction

of 1200 kV

Transmission Sector. D/C line at Date - - - - - -

Bina

National Test

Station

(III). Improving Village electrification 14,500 No. 9,301 12,056 18,374 18307$$ &

-

power access (Provisional)

BPL Households (no. in $$

through 52 16.2 30.9 47.18 58.8 &

-

implementatio electrification lakhs) (Provisional)

n of RGGVY Notification of Rural

scheme

Electrification Plan by 3 No. - - - -

remaining States

(IV). Reducing Sanction of projects

AT&C losses (Part B -infrastructure 150 * No. * - 239 536$ - -

through strengthening)

implementatio Sanction of projects (SCADA) 15* No. * 0 3 15$ - -

n of R-APDRP No. of Power Ministers’

Conference organized 2 No. - - - - - -

scheme







6

(V) Enhancing the Persons imparted

availability of training by NPTI 16225 No. 12555 14225 14869 12572$ 17848 19633

trained and

skilled

manpower for Trainee weeks at NPTI

132000 No. 98439 113305 115132 111621$ 145200 159720

the power

sector

(VI) International

Co-operation Bhutan: : Preparation/

5 No.

with Bhutan, Updation of DPR - - - - - -

Nepal and

Myanmar

Nepal: Submission of FC On time

Date

clearance application for submission - - - - - -

Arun-III Project



Myanmar : Updation of Updation of

Date

DPR for Tamanthi DPR - - - - - -



^ - Excluding Nuclear.

$ - Achievement as on 31.01.2011, @ - Achievement as on 28.02.2011, $$ - Achievement as on 31.03.2011.

& - RGGVY is upto 31.03.2012. Target for 2012-13 and onwards will depend on continuation of scheme beyond 11th Plan.

* : - Subject to availability of balance towns as per R-APDRP Guidelines









7

S ECTION 4

Description and Definition of Success Indicators and

Proposed Measurement Methodology

- AT&C – Aggregate Technical and Commercial

- BPL – Below Poverty Line

- Energy Conservation measures are related to energy saved which can be

quantified in terms of equivalent capacity addition avoided through the

saving measures

- Generation capacity added in MW (Mega Watt)

- Generation is in kilo watt hours (kWh), called units (1 Billion Unit= 1x 109

units)

- R-APDRP – Restructured Accelerated Power Development & Reforms

Programme.

- RGGVY – Rajiv Gandhi Grameen Vidyutikaran Yojana

- Village electrified- A village is declared as electrified if basic infrastructure

is provided in the inhabited locality as well as the dalit basti /hamlet where

it exists, electricity is provided to the public places, number of households

electrified is atleast ten per cent of the total number of households in the

village and Gram Panchayat certifies completion of village electrification.

- SCADA – Supervisory Control and Data Acquisition

- Transmission lines measured in line length, in ckm (Circuit kilometers)

- Transformation capacity in term of rating of transformers added in MVA

(Mega Volt Amperes)

- Project area for Part ‘A’ and Part ‘B’ of R-APDRP : Towns with population

above 30,000 (10,000 for special category States).

- Project area for SCADA under R-APDRP : Towns with population above

4,00,000 and annual electricity input above 350 Million Unit.

- NPTI- National Power Training Institute

- One Trainee week – one person trained for a week

- UMPP – Ultra Mega Power Project

- RFS – Request for selection

- RFP – Request for Proposal

- RFQ – Request for Qualification

- R&M – Renovation and Modernisation

- QPR – Quarterly Performance Review









8

S ECTION 5

Specific Performance Requirements from other

Departments

1. Ministry of Coal: - Supply of 335 million tons of Coal during the year from Coal

subsidiaries (CIL and SCCL) and ensuring early clearance of coal block. Long

term arrangement for requirement of coal based on capacity addition

programme in power generation would be finalized.

2. Ministry of P&NG: - Supply of additional gas of about 60 MMSCMD during the

year under APM and from KG Basin (D-6).



3. Ministry of Environment & Forests: Clearance of pending, new and proposed

generation projects and transmission lines, resolution of go and no-go area

issues, and expeditious clearance of hydel projects without waiting for the

reports of comprehensive basin study.

4. State Governments: Support for Land acquisition and settlement of R&R issues,

Right of Way for transmission lines, State Pollution Board clearance and

maintaining law and order in the projects under construction / to be

constructed.

5. Ministry of Labour: To ensure availability of skilled manpower for power sector.

6. Department of Heavy Industry: M/s BHEL to ensure completion of the power

projects targeted for review period through timely supply of main plant

equipment and balance of plant.

7. Power Utilities in the Central and State Sector and their Canalizing Agencies

like MMTC/STC: To ensure import of 35 Million Tons of coal during 2011-12.

8. Power Utilities having Captive Coal Mines : Ensuring supply of 23 Million Tons

coal during the year 2011-12.

9. State Governments (for RGGVY) : Ensuring (a) timely allotment of land for new

sub-stations, especially in the States of Bihar and Jharkhand, (b) time bound

forest clearance in the States especially in Jharkhand, (c) timely clearance of

revised cost estimates by the States, (d) timely energization and taking of

completed villages, especially in Assam, Bihar, Jharkhand and Orissa, (e)

creation of suitable sub-transmission system in Jharkhand for energization of

RGGVY villages, (f) Deployment of franchisees by State Discoms which is

mandatory condition for closure of project and (g) submission of RE plans by

States immediately.

10. State Governments (for APDRP): Ensuring timely preparation and submission of

Part ‘B’ projects as per guidelines issued by Ministry of Power.









9

S ECTION 6

Outcome / Impact of activities of Department / Ministry

S. Outcome / Jointly with Success 2009- 2010- 2011- 2012- 2013-

No Impact of Indicator (s) 2010 2011 2012 2013 2014

(Provisional)

Departme

nt /

Ministry

1. Improving MNRE, i. Number of 18,374 18,307*

access to States unelectrified

power villages

especially electrified

in rural ii. BPL 47.18 58.8* lakhs

areas households lakhs

electrified

2. Improving MNRE, i. Fresh 9585 MW 12160.5* MW

availability Dept. of Capacity

of power Atomic added

Energy,

Ministry of ii. Power 771.5 BU 811.104* BU

Coal, Generation

Ministry of

Environment iii. Fresh

& Forest, Capacity 2868 MW 2600 MW

Department Addition (expected)

of Heavy saved

Industries through

energy

conservatio

n measures



3. Improving Discoms, i. Minimizing 7 2

quality of States, grid

power Regulators disturbance

&

ii. Transmission

Developers 11790 12551**

lines

addition/

ready for

commissioni

ng



iii. Transformati 24315 21001**

on capacity

addition/

ready for

commissioni

ng



*achievement as on 31.3.2011

**achievement as on 28.2.2011



The Ministry of Power shall submit Annual Performance Report against the

performance obligations mentioned in the Part II of this Agreement at end of the

review period.



Shri Sushil Kumar Shinde Shri P. Uma Shankar

Minister of Power Secretary, Ministry of Power

Date : Date :



10



Other docs by xiaoyounan
AUSRANK2011W
Views: 0  |  Downloads: 0
G117464796
Views: 0  |  Downloads: 0
absolutist_vs_constitutionalist
Views: 0  |  Downloads: 0
Seminar_10_12_2011
Views: 0  |  Downloads: 0
Excel-Tool Potentialanalyse VDA-6.3-2010_en
Views: 1  |  Downloads: 0
07sanin-ballot-hirei
Views: 0  |  Downloads: 0
DOGs
Views: 0  |  Downloads: 0
smith-waterman_NDSS
Views: 0  |  Downloads: 0
t31c015
Views: 0  |  Downloads: 0
2011-02-13_sermon
Views: 0  |  Downloads: 0
By registering with docstoc.com you agree to our
privacy policy

You are almost ready to download!

You are almost ready to download!