45 Ames NASA Research Park - EUL Ames has a well-thought out research park that FURTHER STUDY NEEDED

to developer has been included in their master plan. (CURRENTLY BEING STUDIED)

Consider EUL of the complete research park

area through private investors; maintaining long-

TBD

term federal ownership while removing

development risks. In this scenario, NASA does

not become highly involved with development

activities

35 Ames Center Consolidation - Ames core NASA activities are centered around FURTHER STUDY NEEDED

EUL Moffett and NRP; a small portion of the total land-holdings, which

maintain core Center. are very valuable and would not be easy to

acquire in the future if NASA gave them up now.

Additionally, some of the land is part of a

superfund site and clean-up activities will take TBD

time.. Complete partially-constructed fence line

around center core, EUL remaining land to

private entities or master developer. Maintain

long-term ownership.



36 Ames Federal Campus Market Moffett Field to federal Agencies to FURTHER STUDY NEEDED

increase number of Federal tenants who share

similar security requirements; specifically try to

find tenants who can increase the use of the

runway and bring new potential tenants to the

NRP. Also form sharing agreements to utilize

TBD

other expensive/ unique NASA assets. Form

cost-sharing agreements that lower everyone's

occupancy costs. Federal Agency agreement

could be accomplished through Space Act or

EUL, with minor differences.



38 Ames Golf Course - Restructure The air force constructed a golf course which FURTHER STUDY NEEDED

they still maintain on the East Side/Air field. The

Air Force currently leases the golf course from

NASA, although all of the improvements were

provided by the Navy. The AF makes a profit on

TBD

the use of the course. Consider restructuring

the agreement to allow NASA to take

responsibility for the golf course, ultimately

taking over the revenues also.



41 Ames California Space and Air A private group has been formed to consider FURTHER STUDY NEEDED

Center - SpaceWorld taking over Hangar One; they intent to renovate

Hangar and convert to major tourism attraction

TBD

focused on space, aerospace, etc. Divest the

Hangar and remove NASA's obligation and

involvement.









RP Business Plan - All Centers.xls Page 1

RP Business Plan - Version 2 (October 2005)

ID # Center Opportunity Name Potential Strategy Center Determination Planned Completion Comments

Year (study or

implementation)





42 Ames Hangars 1, 2 & 3 Hangars 1, 2 & 3 are unique historic structures, FURTHER STUDY NEEDED

currently being partially used. Full use of the

Hangars, however, require substantial

investment in fire suppression systems; Hangar

One has environmental contamination

TBD

challenges. Consider completely documenting

the Hangars for historical purposes; solicit

interest from the private sector, potentially in

conjunction with the air field, and lease through

EUL.

43 Ames Hangars 1, 2 & 3 Hangars 1, 2 & 3 are unique historic structures, FURTHER STUDY NEEDED

currently being partially used. Full use of the

Hangars, however, require substantial

investment in fire suppression systems; Hangar

TBD

One has environmental contamination

challenges. Consider completely documenting

the Hangars for historical purposes; demolish.



40 Ames California Space and Air A private group has been formed to consider FURTHER STUDY NEEDED

Center - SpaceWorld taking over Hangar One; they intent to renovate

hangar and convert to major tourism attraction TBD

focused on space, aerospace, etc. EUL to

investors.

31 Ames Animal Care Facility - EUL Animal Care Facilities are highly regulated and FURTHER STUDY NEEDED

difficult to manage but a necessary part of some (CURRENTLY BEING STUDIED)

research activities. Therefore, this facility could

be considered "unique" within NASA. Enter into

an EUL arrangement with organization that

TBD

requires an Animal Care facility; turn over facility

and operations completely, outsource animal

care research activities when NASA requires

additional research.



44 Ames Lockheed Park Lockheed Martin had expressed an interest in FURTHER STUDY NEEDED

developing a major presence on the Ames (CURRENTLY BEING STUDIED)

TBD

Research Park. Focus on these discussions in

light of EUL authorities.

49 Ames Master Plan The Center has a well thought out EIS which will IMPLEMENTING

be supported by a master plan - that will allows

TBD

it to be prepared to address its future

proactively.

29 Ames Animal Care Facility - Animal Care Facilities are highly regulated and IMPLEMENTING

Market difficult to manage but a necessary part of some

research activities. Therefore, this facility could

be considered "unique" within NASA. Provide TBD

incentives to the contractor to market to

companies who want access to approved,

proven animal care facilities.









RP Business Plan - All Centers.xls Page 2

RP Business Plan - Version 2 (October 2005)

ID # Center Opportunity Name Potential Strategy Center Determination Planned Completion Comments

Year (study or

implementation)





48 Ames NASA Research Park - Ames has a well-thought out research park that IMPLEMENTING

New Model for NASA has been included in their master plan.

Consider increasing NASA's involvement in

programmatic planning of NRP to serve NASA's TBD

mission needs; consider consolidation of

NASA's research activities in the NRP, and

attracting universities.

52 Ames Historic District The Shenandoah district of Ames is a historic IMPLEMENTING

district. Take advantage of historic district and

lease in historic district to tenants who can

TBD

improve facilities and maintain in case of future

use for NASA. Does not have to use EUL

structure.

46 Ames NASA Research Park - Ames has a well-thought out research park that IMPLEMENTING

EUL, NASA maintain has been included in their master plan.

management Consider NASA maintaining a high involvement

in the development, structuring EUL

opportunities to individual tenants / occupants, TBD

similar to the Carnegie Mellon lease.

Maintaining long-term federal ownership while

removing development risks.



32 Ames Carnegie Mellon University Carnegie Mellon University has an agreement PROPOSED FOR

Center - Grow presence, with NASA; their intent is to develop a campus IMPLEMENTATION

create University Center, at Ames that can service the west coast. Ames

structure as EUL is a high-research Center; Carnegie Mellon is a

wealthy university that can make long term

investments. Engage in active discussions with

them to expand their presence substantially. TBD

Structure new leases as EUL - either whole

campus or individual facilities. Encourage

Carnegie Mellon to incorporate other

universities as part of their campus. Could add

local campus facilities for MIT, etc.



73 Glenn Visitors Center re-located Outsource Visitor's Center activities. Locate FURTHER STUDY NEEDED 2005 (Study) Discussion & study underway to pursue this option

to outside fence - Visitor's Center to a more accessible location, or

Outsource even to downtown Cleveland where it might get

more visitor traffic, freeing up needed space.



71 Glenn Rye Beach Pumping Glenn is planning a potential pumping station PROPOSED FOR 2004 (Study) Erie County Water is pursuing the feasibility of

Station that will offer water to the local community IMPLEMENTATION using this NASA asset throuh a Space Act

Agreement with GRC. Erie county has currently

spent $500K on this effort

69 Glenn Rye Beach Pumping NASA has water supply channel to Lake Erie. PROPOSED FOR 2005 (Study) EUL Authority Required

Station - EUL Consider entering into EUL with investor to take IMPLEMENTATION

over operations and sell water at a profit.



70 Glenn Rye Beach Pumping NASA has water supply channel to Lake Erie. PROPOSED FOR 2005 (Study) EUL Authority Required

Station - Divest Consider entering into EUL with investor to take IMPLEMENTATION

over operations and sell water at a profit.









RP Business Plan - All Centers.xls Page 3

RP Business Plan - Version 2 (October 2005)

ID # Center Opportunity Name Potential Strategy Center Determination Planned Completion Comments

Year (study or

implementation)





68 Glenn Rye Beach Pumping NASA has water supply channel to Lake Erie. PROPOSED FOR 2006 (Implementation) EUL Authority required. Once EUL authority is

Station - Cost reduction Negotiate market-rate profit through EUL for IMPLEMENTATION granted and Erie County study is complete, NASA

water supply; Hire utilities valuation consultants will evaluate the value.

to ensure that NASA is receiving maximum value

when selling water from the pumping station to

the County.

64 Glenn Plum Brook - EUL Consider EUL of Plum Brook with exception of PROPOSED FOR 2005 (Study) EUL Authority required; On-going activity pursuing

most unique specialty facilities that are critical IMPLEMENTATION (WHERE this activity

to NASA's programs and nuclear testing area PRACTICAL)

(Glenn is decommissioning the nuclear reactor

facility but this process will take time). Maintain

ownership in case NASA requires large portion

of land in the future. Consider expanding

agricultural leases.

58 Glenn Office space outside of The buildings and land outside of fence are next FURTHER STUDY NEEDED 2006 (Study) EUL Authority would be required. Preliminary

Main Gate to a major road; keep the facilities in NASA Engineering Report to support Consolidiated

control long term by entering into an EUL to a Office Building

developer for private sector use. Use proceeds

to renovate/build office space inside fence.



56 Glenn Airport Extension Example of how NASA entered into a negotiation IMPLEMENTING (Chg 10-03) 2005 (Implementation) Example; Change from "Further Study Needed" to

with the City of Cleveland to achieve mutual FURTHER STUDY NEEDED "Implementing"

goals.





62 Glenn Federal Campus NASA currently has federal agencies as tenants PROPOSED FOR 2005 (Study) On-going activity pursuing this strategy

at Plum Brook. Market underutilized land to IMPLEMENTATION

security conscious federal agencies to reduce

management costs. Consider marketing as

major secured federal campus for agencies in

northern Ohio.

63 Glenn Federal Campus Consider expanding Plum Brook's role as a PROPOSED FOR 2005 (Study) On-going activity pursuing this strategy

federal campus. IMPLEMENTATION

57 Glenn Office space outside of Divest buildings and land outside of fence and FURTHER STUDY NEEDED 2006 (Study) Preliminary Engineering Report to support

Main Gate use proceeds to renovate/build office space Consolidiated Office Building

inside fence.

74 Glenn Office building next to Market use of building along the fence near the CURRENTLY NOT FEASIBLE See Comment Change from "Further Study Needed" to :Currently

hangar airport to security-conscious contractors. Lease (Chg 10-04) FURTHER STUDY Not Feasible" Current plans have B14 fully utilized

through EUL. NEEDED

75 Goddard Centrifuge - Market Provide incentives to contractor to actively IMPLEMENTING (Chg 10-04) Implemented (2001) Agreement was signed with Contractor to market

market centrifuge to outside groups similar to PROPOSED FOR Centrifuge. Contractor has brought in

DOT agreement IMPLEMENTATION approximately $1.5M/year. Incentives to

continue/expand this program are in place.

91 Goddard Visitors Center, Space The future of Goddard's on-center Visitor Center PROPOSED FOR Study complete. No EUL authority not available. See Item 90.

Camp - EUL near Center is being discussed; one option is to move it IMPLEMENTATION implementation

away from the Center. Consider entering into an planned.

EUL agreement with investor/partners and

expanding into a conference facility and

educational space camp. Utilize the facility for

NASA-related activities that involve foreign

scientists who have difficulty getting on the

Center.









RP Business Plan - All Centers.xls Page 4

RP Business Plan - Version 2 (October 2005)

ID # Center Opportunity Name Potential Strategy Center Determination Planned Completion Comments

Year (study or

implementation)





80 Goddard Mod C Consolidation - Mod C is a logistics consolidation project that FURTHER STUDY NEEDED Study complete. No EUL authority not currently available to GSFC. The

EUL will help Goddard better conduct that operation. Implementation Center is studying other ways to meet institutional

Consider outsourcing some of the logistics planned. needs that minimize new construction.

activities and having private sector build the

facilities to house the activities on NASA land

near the fence through EUL.

89 Goddard Space Science Building - The Space Sciences groups are currently in old PROPOSED FOR Implementing. FY06/07/08 CoF, Construction start 2006, move-in

CoF facilities that inhibit their work. The Goddard IMPLEMENTATION 2009.

Master plan includes a new Space Science

Building. Pursue normal CoF funding.



77 Goddard East Campus - EUL - Prince Georges County and the State of CURRENTLY NOT FEASIBLE (Cg Study Complete GSFC is committed to reducing its Greenbelt real

Alternative master plan to Maryland are focused on increasing research 10-04) PROPOSED FOR 12/2002. No estate holdings via Item 84.

finance development activities, and NASA offers great opportunity for IMPLEMENTATION Implementation

synergy. Consider alternative master plan planned.

consolidating all facilities west of Soil

Conservation Road; EUL east campus to pay for

new facilities on west campus while maintaining

long-term ownership of the land; potential to

turn east into high tech partnering zone;

"showcase for county". Don't move Soil

Conservation Road. Maintain or move radar

stations. EUL new Earth Sciences facilities to

"kick start" project.



85 Goddard Partnering Zone - EUL, Goddard's Master plan includes a partnering CURRENTLY NOT FEASIBLE (Cg Study Complete. No GSFC is committed to reducing its Greenbelt real

NASA maintain zone. EUL the partnering zone to local 10-04) PROPOSED FOR Implementation estate holdings via Item 84.

management developers for a mix of collaborative uses IMPLEMENTATION planned at this time.

including contractor office space and university

space.

86 Goddard Partnering Zone - Divest to Goddard's Master plan includes a partnering CURRENTLY NOT FEASIBLE (Cg Study Complete. No GSFC is committed to reducing its Greenbelt real

master developer zone. Divest the partnering zone to a master 10-04) PROPOSED FOR Implementation estate holdings via Item 84.

developer or local developers for a mix of IMPLEMENTATION planned at this time.

collaborative uses including contractor office

space and university space.

78 Goddard East Campus - Divest - Prince Georges County and the State of CURRENTLY NOT FEASIBLE (Cg Study Complete GSFC is committed to reducing its Greenbelt real

Alternative master plan to Maryland are focused on increasing research 10-04) PROPOSED FOR 12/2002. No estate holdings via Item 84.

finance development activities, and NASA offers great opportunity for IMPLEMENTATION implementation

synergy. Consider alternative master plan planned.

consolidating all facilities west of soil

conservation road; sell east campus to pay for

new facilities on west campus; potential to turn

east into high tech partnering zone; "showcase

for county". Don't move Soil Conservation

Road. Maintain or move radar stations. Sell

new Earth Sciences facilities to "kick start"

project.









RP Business Plan - All Centers.xls Page 5

RP Business Plan - Version 2 (October 2005)

ID # Center Opportunity Name Potential Strategy Center Determination Planned Completion Comments

Year (study or

implementation)





83 Goddard Partnering Zone - Goddard's Master plan includes a partnering CURRENTLY NOT FEASIBLE (Cg Study Complete GSFC is committed to reducing its Greenbelt real

University / Research - zone. Consider a research-oriented partnering 10-04) PROPOSED FOR 6/2003. No estate holdings via Item 84. This would be GSFC's

Space Act. zone similar to Ames; high emphasis on IMPLEMENTATION implementation preferred alternate should EUL authority not

research and university interactions - and planned. become available by the time of implementation,

related organizations. Share maintenance costs but it is less flexible than EUL.

for net cost reduction.



90 Goddard Visitors Center, Space Goddard is reviewing proposals for Visitor CURRENTLY NOT FEASIBLE (Cg Study complete. No GSFC sought but did not find a viable proposal to

Camp - Outsource Center and potential Space Camp activities. 10-04) PROPOSED FOR implementation implement this recommendation.

Currently Goddard maintains its own Visitor IMPLEMENTATION planned.

Center; consider completely outsourcing

activities similar to Marshall; maintain only

"exhibit" input and "Brand" control.

81 Goddard Mod C Consolidation - Consider outsourcing as many logistics FURTHER STUDY NEEDED Study further (6/2005) Subject of ongoing study.

Outsourcing operations outside the fence, removing NASA's

obligation to manage the process and provide

the service.

82 Goddard Mod C Consolidation - Mod C is a logistics consolidation project that FURTHER STUDY NEEDED Study further (6/2005) The Center is studying other ways to meet

CoF will help Goddard better conduct that operation. institutional needs that minimize new construction.

Proceed through the normal CoF process. See item 81.



79 Goddard FFRDC - Convert Goddard, Goddard is a high-research Center similar to FURTHER STUDY NEEDED Ongoing Study by This proposal is currently being studied as a part

EUL real estate to investor JPL. Consider combining with other research- Agency (TBD) of an Agency-wide response to the Aldridge

oriented agencies in DC area to create new Commission. EUL authority not currently available

FFRDC's in DC area. As an FFRDC, EUL to to GSFC.

investors who could access long term financing

and would be responsible for long-term facility

needs. Consider EUL on part or all of Goddard

campus to remove NASA from direct facilities

obligations. Use proceeds to implement master

plan.



84 Goddard Partnering Zone - EUL to Goddard's Master plan includes a partnering PROPOSED FOR Study Complete Though EUL is not currently available, this

master developer zone. EUL the partnering zone to a master IMPLEMENTATION 06/2003. represents the best alternative for reducing NASA's

developer or local developers for a mix of Implementation is real estate holdings at Greenbelt at acceptable cost

collaborative uses including contractor office planned in the and mission risk. GSFC is also exploring an EUL

space and university space. Facilities Master Plan. with State government.



96 Johnson Contractor Strategy - EUL JSC has many contractors that would prefer to FURTHER STUDY NEEDED

Existing Facilities to be on Center, and although JSC's facilities are at

Contractors capacity, the facilities could be space-planned

and renovated to fit additional capacity. Free up

TBD

building(s) then EUL to contractors; use EUL

proceeds to renovate NASA buildings/facilities

to increase their capacity.



99 Johnson Section 400 - EUL 400 section of JSC is not completely used FURTHER STUDY NEEDED

contractor buildings except for radio tower transmission areas.

Consider marketing to university systems or

developers for collaborative uses. Consider TBD

potential to use funds from EUL to move the

transmission towers to increase area available

for EUL.





RP Business Plan - All Centers.xls Page 6

RP Business Plan - Version 2 (October 2005)

ID # Center Opportunity Name Potential Strategy Center Determination Planned Completion Comments

Year (study or

implementation)





100 Johnson Golf Course - EUL A proposed hotel development at Space Center FURTHER STUDY NEEDED

Houston has expressed an interest in putting a

golf course on section 400. The use is

TBD

compatible with the need to maintain the radio

tower transmission areas. Consider structuring

as EUL.

94 Johnson Bioastronautics - CoF JSC needs new facilities to conduct research PROPOSED FOR

process and provide better Astronaut services. Proceed IMPLEMENTATION

TBD

with normal CoF funding cycle.



110 JPL Flight Project Center - CoF The Flight Project Center is a facility that would PROPOSED FOR FY08 Constrcution start in FY06.

improve JPL's operational efficiency. As IMPLEMENTATION

currently planned, continue to build the facility

as a CoF project.

115 JPL Parking Garage - Off Site Identify neighboring site; have private developer FURTHER STUDY NEEDED Study complete in Preliminary discussions have been held with the

construct garage. FY05 Flintrisge Riding Club.

114 JPL Parking Garage - EUL Ground lease land near fence line but close to FURTHER STUDY NEEDED Study complete in Recommendation to NASA for possible

the hub of the workforce in order to provide FY05 construction of parking garage is being prepared.

most efficient location for workers;

developer/investor would construct Garage

through EUL agreement. NASA could "donate"

the land and encourage a longer amortization

period in exchange for lower parking fees

charged to JPL workers (which the developer

would need to pay for construction costs and

profit).

111 JPL Flight Project Center - JPL has a master plan to include a flight project PROPOSED FOR FY08 See item Number 110.

enhancing mission center which will substantially improve it's IMPLEMENTATION

operations operations. This is an example of how strategic

facility planning can help improve mission

capabilities, and potentially reduce long term

tangible and intangible costs.



109 JPL Flight Project Center - EUL Since JPL is an FFRDC and few if any NASA FURTHER STUDY NEEDED See item Number 110. The Flight Projects center will be constructed

Civil Servants will occupy the facility, consider using governement funds. See item number 110.

entering into an EUL agreement with outside

investor to build the facility and lease it back to

Cal Tech.

113 JPL Marketing - Stronger Create incentives or contract requirements IMPLEMENTING on-going The reimburable work at JPL continues to

pursuit of reimbursable whereby GOCO will more strongly pursue increase.

agreements reimbursable agreements.

125 Kennedy Contractor Strategy - EUL Kennedy has many contractors that could be on FURTHER STUDY NEEDED FY 2006 (Agency An agency working group needs to be established

Existing Facilities to Center in office facilities, and although effort and decision to address the legality and benefits to the

Contractors Kennedy's facilities are at capacity, the facilities Government of excluding housing from Agency-

could be space-planned and renovated to fit awarded support and program contracts

additional capacity. Free up building(s) then

EUL to contractors; use EUL proceeds to

renovate NASA buildings/facilities to increase

their capacity.

120 Kennedy International Space Consider the development of the ISRP using PROPOSED FOR In Work Enhance Use Lease expected to be executed in

Research Park (ISRP) - EUL versus currently planned structure. Still IMPLEMENTATION 2005

EUL maintain an arms-length distance.







RP Business Plan - All Centers.xls Page 7

RP Business Plan - Version 2 (October 2005)

ID # Center Opportunity Name Potential Strategy Center Determination Planned Completion Comments

Year (study or

implementation)





119 Kennedy International Space NASA take larger role in planned ISRP FURTHER STUDY NEEDED As required Should the current EUL not be executed by the

Research Park (ISRP) - development; re-evaluate ISRP's planned tenant State of Florida, then this would be the course

Increase NASA's role in mix correlated to NASA's current and future NASA/KSC would take. Currently KSC has

development program and mission goals. EUL portions of the provided a draft lease to HQ and HQ has the option

land as available; consider space act to either execute, reject, or modify the current lease

agreements for university research park-specific agreement.

developments.

122 Kennedy Federal Campus Because KSC needs to maintain buffer zone and PROPOSED FOR Complete The Center has a working agreement with the

high security - similar to Stennis - lease IMPLEMENTATION National Park Service to manage all property not

developable land to security conscious federal being utilized for direct Program opertions.

agencies to reduce faculties management costs. Because they are federal agencies, in-kind services

are and have been provided and the EUL is not

needed.

144 Langley Pull fence line back at Langley is located along fairly major road, near FURTHER STUDY NEEDED FY'04/FY'05 A wetlands re-delineation study is currently in

back gate major highway. A portion of the area is progress looking at all property at Langley

currently designated a forested wet land. Work designated as forested wetlands. This study is

with the Corps to remove the designation. EUL scheduled to be complete by the end of FY 2004.

to private groups. Maintain long-term Preliminary indications are that some of that

ownership in case NASA requires land for use in property appears to be classified incorrectly, but

the future. not all. Further study will continue with final

determinations and classifications by the Corps of

Engineers by the end of FY 2004. Based on the

study results any property declassified that is

situated along our property boundary can then be

evaluated for other uses by NASA, EUL agreements

with property ownership retained, or possible sell

to reduce land holdings.





146 Langley Federal Campus - Increase The Air Force is a growing presence at Langley FURTHER STUDY NEEDED FY'04 thru FY'06 As Langley's master planning concept for "New

Air Force presence on and may need more space. Town" is funded, implemented, and completed

NASA side between now and FY2013 existing buildings will be

vacated for re-use and/or demolition, and "green"

space will become available for NASA use or for

possible use by other Federal organizations such

as the Air Force. Currently we are working with the

Air Force for potential use and/or demolition of

properties on the East Side. When more details of

"New Town" are finalized, this can lead to further

talks and discussions with other potential Federal

tenants.









RP Business Plan - All Centers.xls Page 8

RP Business Plan - Version 2 (October 2005)

ID # Center Opportunity Name Potential Strategy Center Determination Planned Completion Comments

Year (study or

implementation)





143 Langley Swing Space Langley has no room for expansion on their FURTHER STUDY NEEDED FY'05/FY'06 At the present time, Langley does not plan to use

western campus, although a majority of the EUL authority if given to NASA after the test cases

occupants are contractors. Subsequently, as have been evaluated by OMB for obtaining swing

new facilities need renovation, there is a dearth space. Two master planning type activities are

of swing space. Enter into EUL to have simple currently in progress that will hopefully free up

"swing space" facility built near the fence line at space in exisiting facilities for use as "swing

the back gate that can be occupied by space" in support of facility renovations. A Center-

contractors. wide consolidation of space activity is in progress

that has a goal of moving the average office space

occupancy toward the 125 sq. ft. per person, and a

multi-year renovation-by-replacement project

known as New Town to re-invent Langley for the

21st. Century. Both activities could free-up as

much as 700,000 gsf for swing space, re-utilization,

and/or demolition in phased amounts thru FY 2013.





137 Langley East campus - Return to Return all underutilized land and facilities in FURTHER STUDY NEEDED FY'04 thru FY'07 Current real property strategies to support the new

Air Force river area to Air Force. Retain ownership of only NASA mission and vision may require only two

those unique facilities that are critical to NASA facility complexes on the East Side. The Transonic

in the future. Results in net reduction of costs. Dynamics Tunnel (Building 648 complex plus part

of B 647 for Rotocraft ), and the Vertical Spin

Tunnel (B 645 complex). Other facilities have been

abandoned, or now being placed in "Standown"

for further evaluation. Initial discussions have

started with the Air Force relative to the properties

for possible transfer and/or outgrant from NASA,

as well as, potential partnering agreements for the

eventual demolition and "greening" of the sites.

Two properties ( B 584, and B720 ) are awaiting

final Air Force approval for property transfer.

NEPA/NHPA assessment studies have just

commenced for three properties ( B 643 Full Scale

Tunnel, a National Historic Landmark; B 640

Transonic Pressure Tunnel; and B 641 High Speed

Pressure Tunnel, a National Historic Landmark).

B640 & B641 tunnel to be demolished in FY07.









RP Business Plan - All Centers.xls Page 9

RP Business Plan - Version 2 (October 2005)

ID # Center Opportunity Name Potential Strategy Center Determination Planned Completion Comments

Year (study or

implementation)





138 Langley East Campus - Historic Consider designating Langley's East Campus as FURTHER STUDY NEEDED FY'04 thru FY'07 See ID #137 above. All East Side land area belongs

District a historic district, similar to the Shenandoah to the U.S. Air Force. A proposed Air Force

District at Ames. Wherever possible, lease Historic District for much of that property including

facilities to the private sector to help renovation the area where all NASA real property

of the facilities. The net result is a reduction of improvements are located is included in the

CoF funds that need to be spent on the facilities Historic District proposal by the National Park

and lower future occupancy costs. Service. This activity has been and continues to

be in review and study by the Air Force with no

estimated timeframe for resolution or

implementation. Should the Historic District be

officially designated, then NASA could interface

with the Air Force on aspects of this potential

strategy, however, NASA's strategy is to vacate the

East side as mentioned in ID#137 above except for

the two facility complexes mentioned, and work

with the Air Force to transfer and/or demolish the

properties.





134 Langley Cogen (Trash for energy) Through agreement between NASA and Air IMPLEMENTING OPERATIONAL SINCE The Refuse-fired Steam Generating Facility (

Force, trash is burned in a cogen plan and 1980 Building 1288) a NASA owned building operated by

Electrical costs are reduced. the City of Hampton went into operation in 1980.

The plant burns refuse from NASA Langley,

Langley Air Force Base, and the City of Poquoson.

NASA uses all the steam produced by the plant for

process requirements and/or absorption chillers at

various locations. Electrical savings result from

reduced operation of boilers to produce steam at

the Central Heating Plant, and from the use of

absorption chillers driven by steam rather than by

traditional compression units.





136 Langley East Campus - EUL The East campus is one of the oldest at NASA, FURTHER STUDY NEEDED N/A This recommendation is no longer a valid strategy

Buildings but separated from the current main campus. for further consideration of East side properties.

Maintain control of the East Campus (it is See ID # 137.

current a lease from the Air Force), but enter into

EUL agreements with outside groups; utilize

revenues to restore the facilities and improve

facilities in the main part of the Center.



145 Langley Federal Campus - Joint Negotiate a facilities management contract with FURTHER STUDY NEEDED FY'06 We currently have a Base Support Agreement with

facilities management the Air Force - similar to the JBOSC contract at the Air Force that is reviewed and updated every 3

contract KSC to share and reduce overall facilities costs. years. This agreement is in two parts. Services

and activities that NASA provides the Air Force,

and services and activities that the Air Force

provides NASA. We will interface with KSC to

review JBOSC specifics to determine if any

additional features should be considered, or if we

should pursue alternate agreement activities.









RP Business Plan - All Centers.xls Page 10

RP Business Plan - Version 2 (October 2005)

ID # Center Opportunity Name Potential Strategy Center Determination Planned Completion Comments

Year (study or

implementation)





154 Marshall National Center for NCAM operations are research-oriented FURTHER STUDY NEEDED FY05 - FY06 A high percentage of NCAM facilities are fully

Advanced Manufacturing activities focused on the manufacturing utilized for SSP Return to Flight efforts, activities

(NCAM) industry. Increase focus on this effort; to assure technical certifications and a proactive

coordinate with universities and manufacturing program for identifying and implementing future

associations and corporations to increase improvements.

reimbursable funding of these activities. In recognition of the importance of manufacturing

Coordinate with Departments of Energy and technology and the value of interagency

Commerce to reduce costs. coordination on manufacturing R&D, the National

Science and Technology Council’s (NSTC’s)

Committee on Technology has established a

government-wide interagency working group on

Manufacturing R&D. The goal of the Interagency

Working Group is to identify and integrate

requirements, conduct joint program planning, and

develop joint strategies for the manufacturing R&D

programs conducted by the Federal government.

The NCAM strategic plan that is under

development will provide a comprehensive

evaluation of requirements for existing and future

Agency mission specific activities in

manufacturing R&D. Consistent with the strategies

157 Marshall Federal Campus - NASA / Develop JBOSC type agreement with Army to CURRENTLY NOT FEASIBLE FY2004: See of thefurther Manufacturing IWG, the plan will

After NSTC study of this opportunity, we have

Army shared services reduce expenses. (Chg 10-04) FURTHER STUDY Comment determined that it does not appear to be

agreement NEEDED practicable or in NASA's best interest to enter into

a JBOSC type contract with the Army. The Army

Garrison currently has a cost-plus base operations

support contract under a negotiated procurement

with a Native American firm. The contract covers a

10-year time period which began in 1999. Recent

discussions with their base operations personnel

indicate they intend to continue use of this type

contract during the next contract solicitation.

MSFC has found competitively bid fixed-price

contracts to be much more cost effective in

providing our base operations support and we

believe our cost of obtaining base operations

147 Marshall Boeing's commercial use Boeing is occupying a building on Center for CURRENTLY NOT FEASIBLE FY2004: See support would increase ifwork has not increased to

Boeing's satellite related we entered into a joint

of facilities - Expand non-NASA activities. Encourage Boeing to (Chg 10-04) PROPOSED FOR Comment the level they initially anticipated. Their current

increase the commercial work done on site. IMPLEMENTATION plan indicates no further growth in space

Enter into EUL Agreements for facilities to be requirements in Bldg 4708 through 2008. Based on

used. Boeing may be able to consolidate this change in requirements it doesn't appear

commercial activities done elsewhere (reducing worthwhile to convert the current agreement to an

their overall costs) while better utilizing NASA EUL type agreement. If Boeing's plans change, we

underutilized facilities. Reinvest proceeds at will revisit this opportunity. Otherwise, we do not

Marshall. consider it feasible to pursue any changes.









RP Business Plan - All Centers.xls Page 11

RP Business Plan - Version 2 (October 2005)

ID # Center Opportunity Name Potential Strategy Center Determination Planned Completion Comments

Year (study or

implementation)





156 Marshall Renovation by Since NASA is nearly 50 years old, many PROPOSED FOR Ongoing. A MSFC developed a renovation by replacement

Replacement facilities have reached the end of their useful IMPLEMENTATION completion date program, based on Code JX's previous guidelines

lives. Establish clear policy on replacing cannot be accurately and prioritization system, that would have replaced

facilities that have reached their useful lives; projected until the many of our older buildings within a 10-yr period.

determine "pay back" period and criteria to POP05 CoF program However, subsequent revisions by OJX of the CoF

justify investment return; consider 10 year is defined. prioritization and funding processes have resulted

program to replace outdated facilities. in extending the completion timeframe by several

years. MSFC's replacement program can be better

defined after we receive the results of the POP05

CoF program submittal process.

148 Marshall Boeing Building - convert Boeing is occupying a building on Center for FURTHER STUDY NEEDED FY2004: See See #147

to EUL non-NASA activities. Convert the Space Act Comment

agreement to EUL.

149 Marshall Boeing Building - FURTHER STUDY NEEDED

Boeing is leasing a facility, at full reimbursable FY2004: See See #147

reimbursable lease of cost from NASA. Comment

facility

151 Marshall IFMP for Agency on Center NASA rents space for the agency-wide activities; PROPOSED FOR FY07 for study The current plan is to relocate the IFMP

consider moving the operations on Center into IMPLEMENTATION organization onto the Center in FY0X after they

existing facilities or master planned facilities. complete a planned staffing reduction to about XX

Advantages - lowers NASA Overall investment; personnel. Current MSFC workforce projections

increase Marshall cost-sharing. indicate adqequate space should become available

on the Center by that time to accommodate the

IFMP personnel

165 Michoud Market facilities As a GOCO, Michoud has an opportunity to have PROPOSED FOR 2005 A contractual agreement is in process of being

it's contractor market NASA's facilities. Refine IMPLEMENTATION formalized to refine and expand incentives for

and expand incentives for Lockheed Martin to Lockheed Martin to market MAF's facilities and

"market" NASA's underutilized facilities. services.



164 Michoud Lockheed Martin building - Lockheed Martin currently has a Space Act FURTHER STUDY NEEDED 2005 A study will be performed to evaluate the feasibility

Convert to EUL Agreement with NASA to perform Non-NASA of the Enhanced-Use Leasing (EUL) with the

commercial activities at Michoud. Consider current government owned- contractor operated

restructuring agreement as EUL. (GOCO) contract.

159 Michoud Federal Campus - Lease Department of Agriculture already occupies a PROPOSED FOR 2008 MAF has just recently leased an additional 13,000

Headquarters to good portion of the headquarters; move NASA IMPLEMENTATION square feet of the headquarters (Bldg 350) office

Department of Agriculture into other facility and lease the main building to space to the Department of Agriculture. We will

Agriculture on reimbursable basis. Could also reassess the feasibility of this opportunity in light

be accomplished through EUL, with negligible of future NASA missions.

difference.

167 Michoud Ground Lease EUL portion of land not needed for PROPOSED FOR 2007 MAF has recently discussed the leasing of

manufacturing; maintain drainage channel and IMPLEMENTATION additional land to the a joining neighbor, Delgado

dock access if necessary. Community College.

169 Michoud Invest in new Michoud is organized to manufacture large PROPOSED FOR 2005 MAF is investing by way of the NCAM program for

manufacturing facilities scale, high quality facilities. As NASA considers IMPLEMENTATION manufacturing development initiatives and by way

next generation technology, centralize the of the Service Life Extension Program (SLEP) for

manufacturing operations of all potential next generation welding research.

technologies at Michoud.

166 Michoud Federal Campus - Coast Coast Guard (now part of Homeland Security) PROPOSED FOR 2006 The USCG Integrated Support Command have

Guard. Homeland Security, have expressed an interest in the Dock area; IMPLEMENTATION scheduled construction of their new facility at MAF

Customs. engage them in a discussion focusing on in FY06/07. MAF has presented the onsite services

consolidating more facilities on NASA land. and capabilities. These services include perimeter

security, fire and medical, food (cafeterias and

ending operations), recreational/fitness, child care

and bulk rate on electric power and natural gas.

We expect to have a signed agreement by 2006.



RP Business Plan - All Centers.xls Page 12

RP Business Plan - Version 2 (October 2005)

ID # Center Opportunity Name Potential Strategy Center Determination Planned Completion Comments

Year (study or

implementation)





163 Michoud Lockheed Martin's Lockheed Martin is already on site doing PROPOSED FOR 2005 This depends on future contracts at the facility.

commercial use of commercial work in a NASA facility. Encourage IMPLEMENTATION This concept may be mutually exclusive with other

facilities - Expand Lockheed Martin to increase the commercial opportunities without additional construction due

work done on site. Enter into EUL agreements to space limitations.

for facility usage. Lockheed Martin may be able

to consolidate commercial activities done

elsewhere (reducing their overall costs) while

better utilizing NASA underutilized facilities.

Reinvest proceeds at Michoud.



160 Michoud National Center for NCAM operations are research-oriented PROPOSED FOR 2005 This opportunity is presently being implemented.

Advanced Manufacturing activities focused on the manufacturing IMPLEMENTATION The National Center for Advanced Manufacturing

(CAM) industry. Increase focus on this effort; (NCAM) membership includes representatives from

coordinate with universities and manufacturing universities in Texas, Tennessee, Virginia,

associations and corporations to increase Mississippi and Louisiana. Also, NCAM are

reimbursable funding of these activities. presently in the process of developing

Coordinate with Departments of Energy and memberships and agreements with state and

Commerce to reduce costs. federal agencies.



170 Michoud Invest in Michoud Michoud is the only major large-scale "unique" PROPOSED FOR 2006 Investing in next generation weld. We currently are

Manufacturing Expertise; manufacturing operation at NASA. Consider IMPLEMENTATION implementing an aggressive workforce retention

make world-class long-term manufacturing role within NASA; initiative. We will utilize the long range plans of

increase utilization in planning for future NCAM to implement this opportunity.

programs, especially development of SLI-type

research. Market world-class manufacturing

and research capabilities to government

contractors as Space Act agreement; Increase

R&D capabilities.

173 Stennis Army lease - Cancel - Army Land Lease - The army has a long term FURTHER STUDY NEEDED Started FY04 - Army Study underway reviewing need for

market land to Private lease from NASA in the middle of Stennis that Possible completion continued use of Ammunition Plant. May require

Sector they don't need; the army is currently leasing to FY08 legislative action.

other companies; NASA could market the land to

private sector organizations who require high

security; structure agreements through EUL to

gain maximum market value, reinvest proceeds

to improve Stennis.



174 Stennis Army lease - Cancel - The army has a long term lease from NASA in FURTHER STUDY NEEDED Started FY04 - Army Study underway reviewing need for

Incorporate land in Federal the middle of Stennis that the Army may not Possible completion continued use of Ammunition Plant. May require

Campus Strategy need. Cancel the lease with the Army, take over FY08 legislative action.

the land, and market to other Federal Agencies,

including DoD, to increase the federal tenant

mix.

175 Stennis Army lease - Keep lease - Army Land Lease - The Army has a long term FURTHER STUDY NEEDED Started FY04 - Army Study underway reviewing need for

negotiate shared lease from NASA in the middle of Stennis; let Possible completion continued use of Ammunition Plant. May require

management expenses Army keep the lease, set up management for all FY08 legislative action.

of Stennis run by NASA, charge Army for

services.

183 Stennis Boeing Test Stand - EUL Boeing currently has a 20 year MOU on one of IMPLEMENTING (Chg 10-04) 10/21/2028 Current agreement extends an additional 24 years.

the test stands; encourage Boeing to increase FURTHER STUDY NEEDED Changes to agreement at this time would not be

their presence - potentially adding new facilities feasible. Suggest this recommendation be tabled.

through EUL - at Stennis.









RP Business Plan - All Centers.xls Page 13

RP Business Plan - Version 2 (October 2005)

ID # Center Opportunity Name Potential Strategy Center Determination Planned Completion Comments

Year (study or

implementation)





184 Stennis Boeing Test Stand - MOU Boeing currently has a 20 year MOU on one of IMPLEMENTING (Chg 10-04) 10/21/2028 Current agreement extends an additional 24 years.

the test stands; encourage Boeing to increase FURTHER STUDY NEEDED Changes to agreement at this time would not be

their presence - potentially adding new facilities feasible. Suggest this recommendation be tabled.

through EUL - at Stennis.

178 Stennis Lockheed Martin Building NASA currently has a Space Act Agreement with IMPLEMENTING (Chg 10-04) 10/21/2030 Current agreement extends for 26 years. Changes

EUL the State of Mississippi, who in turn has an FURTHER STUDY NEEDED to agreement at this time would not be feasible.

agreement with Lockheed Martin. Restructure Suggest this recommendation be tabled.

agreement with Mississippi and Lockheed

Martin as EUL.

182 Stennis Test Stand Marketing Stennis currently markets the use of it's test IMPLEMENTING Began On-going activity. Stennis will continue to market

stands; increase the profile of this effort to try to implementation in the the use of its test stands within the rocket

help fund the maintenance and operation of 1990's. propulsion test program.

these national assets.

176 Stennis Federal Campus Currently NAVY on site; could add other security IMPLEMENTING Began On-going activity. Stennis will continue to market

conscious agencies, reducing overall operations implementation in the to security concious agencies.

costs. 1970's.

180 Stennis Market to security- Stennis has extensive buffer zone, land IMPLEMENTING Began On-going activity. Stennis will continue to market

conscious private holdings, support services, and Federal-level implementation in the to security concious private companies.

companies security in place to support it's current 1970's.

activities. Lockheed Martin is already on site;

could be additional government contractors or

private companies who could build facilities that

benefit from high security and lower costs.



193 Wallops Utilities Market capability of water, sewage, steam, IMPLEMENTING (Chg 10-04) Marketing During FY04, WFF has actively marketed the

cogeneration of steam power, etc to nearby PROPOSED FOR Implemented 2004 capability of the water treatment facilities, sewage

potential users to defray costs. IMPLEMENTATION treatment facilities, and associated distribution

systems to entities interested in the assets for a

potential Public Public Partnership. A meeting was

held with the Town of Chincoteague, Accomack

County, and the Hampton Roads Sanitation

District. Gene Hubbard of Code OJX attended. As

a result of the meeting, Accomack County asked

the existing Accomack-Northampton PSA to

explore the possibility of operation, services, and

capitalization of the WFF assets under a long term

lease. The PSA has issued a contract with an

engineering firm to develop a preliminary

engineering report on the feasibility of the

business model.







203 Wallops Aircraft Facilities Consider EUL for Hangars, apron areas, support NOT CURRENTLY FEASIBLE Study Complete. Not EUL authority does not exist for GSFC/WFF. GSFC

areas for uses that could co-exist with NASA's (Chg 10-04) FURTHER STUDY Proposed for has chosen to pursue commercialization including

periodic mandatory use of runaway. NEEDED Implementation at this non-government use, on a cost reimbursable

Time. basis, of these facilities, through a new on site

support service contractor.









RP Business Plan - All Centers.xls Page 14

RP Business Plan - Version 2 (October 2005)

ID # Center Opportunity Name Potential Strategy Center Determination Planned Completion Comments

Year (study or

implementation)





196 Wallops Visitor Center and Wallops is part of a relatively new Summer NOT CURRENTLY FEASIBLE Study Complete. Not EUL authority does not exist for GSFC/WFF.

Summer Space Camp Space Camp that has experienced growing (Chg 10-04) FURTHER STUDY Proposed for However, WFF is in the final stages of signing an

collaboration success; NASA's Visitor Center is a modest NEEDED Implementation at this MOA with the Space Flight Academy for joint use

success in the summer, but has access to Time. of NASA facilities and expertise for their summer

tourist traffic. Consider negotiating an EUL with space camp.

partner/investors to build multi-use facilities

near the fence in conjunction with a the current

or a new Visitors Center. Consider KSC model

for re-investment of proceeds into visitor's

experience and marketing.



186 Wallops Launch Facilities Coordinate with VSPA to market use of launch IMPLEMENTING (Chg 10-04) Implemented 2004 NASA WFF is actively working with the Mid-

Marketing facilities. PROPOSED FOR Atlantic Regional Space Port, formerly VSFA, to

IMPLEMENTATION cooperatively market WFF facilities and orbital

launch capability. An example is the annual AIAA

Small Satellite Conference which is jointly attended

by personnel from the Space Port and WFF. One

result of the joint marketing effort is work with the

Air force RSLP NFire mission. Additionally,

NASA's endorsement of the Mid-Atlantic Regional

Space Port concept helped transition the space

port from the VSFA, Virginia sponsored only, to

MARS, sponsored by Virginia and Maryland.



191 Wallops Runway - Global Consider utilizing the runway for air-based NOT CURRENTLY FEASIBLE Study Complete. Not Several alternatives were proposed for increasing

transportation hub transportation hub; EUL land to warehouse (Chg 10-04) FURTHER STUDY Proposed for use of the WFF airport facilities. GSFC has chosen

uses; charge for use of air strip. NEEDED Implementation to pursue commercialization, including non-

government use of these facilities on a cost

reimbursable basis, through a new on site support

service contractor. A commercial transportation

hub would be a significant conflict with the

188 mission of a research airport.

Wallops Federal Campus Navy is already there. Using proximity to DC, IMPLEMENTING (Chg 10-04) Study Complete, The charter of the Wallops Flight Facility

state of VA support of DOD, training capability, FURTHER STUDY NEEDED Federal Campus Partnership established an Executive Council and

add other federal tenants. Additional tenants Implemented a Board of Directors with members from NASA,

could increase training. Navy AEGIS Program, Naval Surface Warfare

Center, Naval Air Warfare Center, Mid-Atlantic

Regional Space Port, National Oceanographic and

Atmospheric Administration, and the U.S. Coast

Guard. The partnership is open and actively seeks

expansion for existing and current federal users.

Programmatic discussions are currently underway

for two potential new federal tenants at the WFF

are the Navy DDX Program and the U.S. Coast

Guard Unmanned Aerial Vehicle operation.

190 Wallops Research park outside Wallops has a conceptual plan for a IMPLEMENTING (Chg 10-04) Implemented 2004 WFF has been working with Accomack County on

Fence research/contractor park outside of fence; PROPOSED FOR the concept for a research/business park adjacent

develop a detailed marketing strategy to attract IMPLEMENTATION to the WFF. The property has been rezoned. A

university satellites, or contractors; market to research park charter is being developed as a

increase payload processing/launch activities. platform for discussions on covenants and

restrictions. The first commercial lease of property

in the proposed park area has been initiated

between an aerospace firm and the property owner

Marine Science Consortium.





RP Business Plan - All Centers.xls Page 15

RP Business Plan - Version 2 (October 2005)

ID # Center Opportunity Name Potential Strategy Center Determination Planned Completion Comments

Year (study or

implementation)





192 Wallops Runway - Federal Increase Navy use; investigate Homeland NOT CURRENTLY FEASIBLE Study Complete. Not WFF runways are being actively marketed to DoD

utilization strategies Security use of runway to increase utilization. (Chg 10-04) FURTHER STUDY Proposed for but no interest has been expressed for Homeland

NEEDED Implementation at this Security use.

Time.

199 White Sands Expand operations in low Review mission - critical activities that may be FURTHER STUDY NEEDED

cost, high security redundant throughout NASA. Consider moving

location the activities to White Sands to reduce costs at

TBD

other centers and to provide protection that

White Sands affords through it's location.









RP Business Plan - All Centers.xls Page 16


Shared by: shenreng9qgrg132
Other docs by shenreng9qgrg1...
Form 941 _Rev January 2012_.pdf
Views: 0  |  Downloads: 0
Form 4_Budget reallocations.xls
Views: 0  |  Downloads: 0
Form - North Carolina Court System.xls
Views: 0  |  Downloads: 0
Foreign Policy in Film.ppt
Views: 0  |  Downloads: 0
FOR YOUR INFORMATION.doc
Views: 0  |  Downloads: 0
Related docs
By registering with docstoc.com you agree to our
privacy policy

You are almost ready to download!

You are almost ready to download!