Documents
Resources
Learning Center
Upload
Plans & pricing Sign in
Sign Out

Practice Payment Spreadsheet - 2010

VIEWS: 4 PAGES: 16

									Directions: Fiscal Year 2010 EQIP payments will me made by practice. The intent of this form is to provide a format to list
all of the practices for a project with the appropriate practice units that are listed in the 2010 EQIP Practice Payment Schedule.
In addition, it provides a listing of the appropriate Technical Service Payment Unit(formerly NTE rate) and quantity for TSP
reimbursement. Choose a practice in the "Practice" column and then enter the appropriate practice extent (quantity) in the
"Practice Extent" column, and Technical Service Payment Quantity in the Technical Service Payment Quantity column. (If this
project is not a FY - 2010 EQIP contract, then use the appropriate FY spreadsheet.)

      Practice Payment and Technical Service Payment Quantity List (FY 2010 EQIP Contract)
                                                                   Description of Quantites
Certification of Quantities                                              (check one):
Producer: _________________________________________________                         Preliminary Estimate Quantities:

TSP Engineer: ____________________________________________                          Final Design Quantities:

Date: _________________________________________________                             As-Built Quantities:

                                                                                    _________________ Quantities:


                                                                                                           Technical
                                                                                             Practice       Service
                                                                                    Practice Payment       Payment
                                     Practice                                        Extent    Unit        Quantity




                                       84a49c2c-40c5-49b7-a99c-1116b32227c9.xlsx                                   Page 1
84a49c2c-40c5-49b7-a99c-1116b32227c9.xlsx   Page 2
  a format to list
ment Schedule.
 ty for TSP
ntity) in the
 olumn. (If this


ontract)
uantites
 ):




       Technical
        Service
       Payment
       UNIT from
        Techreg




                     84a49c2c-40c5-49b7-a99c-1116b32227c9.xlsx   Page 3
84a49c2c-40c5-49b7-a99c-1116b32227c9.xlsx   Page 4
102 - Comprehensive Nutrient Management Plan - Nutrient Management Plan Development
106 - Forest Management Plan - Forest Management Plan
138 - Conservation Plan Supporting Organic Transition - Crops - 150 to 450 acres
138 - Conservation Plan Supporting Organic Transition - Crops - Greater than 450 acres
138 - Conservation Plan Supporting Organic Transition - Crops - Less than 150 acres
138 - Conservation Plan Supporting Organic Transition - Livestock - 150 to 450 AU
138 - Conservation Plan Supporting Organic Transition - Livestock - Greater than 450 AU
138 - Conservation Plan Supporting Organic Transition - Livestock - Less than 150 AU
313 - Waste Storage Facility - Concrete storage facility < 1,000 AU.
313 - Waste Storage Facility - Concrete storage facility > 1,000 AU.
313 - Waste Storage Facility - Concrete/earthen storage facility - 500 to 1,000 AU.
313 - Waste Storage Facility - Concrete/earthen storage facility < 500 AU.
313 - Waste Storage Facility - Concrete/earthen storage facility > 1,000 AU.
313 - Waste Storage Facility - Earthen holding pond w/ concrete stacking pad - 500 to 1,000 AU
313 - Waste Storage Facility - Earthen holding pond w/ concrete stacking pad < 500 AU
313 - Waste Storage Facility - Earthen holding pond w/ concrete stacking pad > 1,000 AU
313 - Waste Storage Facility - Earthen storage facility - 500 to 1,000 AU
313 - Waste Storage Facility - Earthen storage facility < 500 AU
313 - Waste Storage Facility - Earthen storage facility > 1,000 AU
314 - Brush Management - Chemical
314 - Brush Management - Mechanical
314 - Brush Management - Saltcedar basal bark application
314 - Brush Management - Saltcedar foliar application - 12 Ft.
314 - Brush Management - Saltcedar foliar application - 6 Ft.
316 - Animal Mortality Facility - Structure w/ Concrete Walls
316 - Animal Mortality Facility - Structure w/ Treated Lumber Walls
317 - Composting Facility - Structure w/ Concrete Walls
317 - Composting Facility - Structure w/ Treated Lumber Walls
327 - Conservation Cover - DNC - Native Grass/Forb mix
327 - Conservation Cover - DNC - Tame Grass/Forb mix
327 - Conservation Cover - DNC - Tame/Native Grass/Forb mix
327 - Conservation Cover - Pollinator forb planting
327 - Conservation Cover - Tree establishment
327 - Conservation Cover - Tree establishment with tubes
327 - Conservation Cover - Winter Cover Establishment
328 - Conservation Crop Rotation - Conversion from Irrigated Cropland to non-irrigated cropland
328 - Conservation Crop Rotation - Organic Initiative - Add crop to rotation

338 - Prescribed Burning - Prescribed Burn
340 - Cover Crop - Cover Crop
342 - Critical Area Planting - Critical Area Planting
348 - Dam, Diversion - Earth fill diversion dam
350 - Sediment Basin - Open feedlot - 500 to 1,000 AU
350 - Sediment Basin - Open feedlot < 500 AU
350 - Sediment Basin - Open feedlot > 1,000 AU
351 - Well Decommissioning - Artesian well - flowing
351 - Well Decommissioning - Artesian well - non flowing
351 - Well Decommissioning - Shallow aquifer
356 - Dike - Earth fill dike
359 - Waste Treatment Lagoon - Waste Treatment Lagoon
360 - Closure of Waste Impoundments - Waste Facility Closure
362 - Diversion - Diversion - Channel
362 - Diversion - Diversion - Pipe
365 - Anaerobic Digester - Ambient Temperature - Anaerobic Digester - Ambient Temperature
366 - Anaerobic Digester - Controlled Temperature - Anaerobic Digester - Controlled Temperature
370 - Atmospheric Resource Quality Management - Energy Enhancement
378 - Pond - Embankment Pond < 10,000 CY with principal spillway
378 - Pond - Embankment Pond < 5,000 CY - No Principal Spillway
378 - Pond - Embankment pond > 10,000 CY with principal spillway
378 - Pond - Embankment Pond > 5,000 CY, No Principal Spillway
378 - Pond - Excavated pond
378 - Pond - Fabricated steel structure
380 - Windbreak/Shelterbelt Establishment - Tree/Shrub handplants with fabric mat
380 - Windbreak/Shelterbelt Establishment - Tree/shrub planting
380 - Windbreak/Shelterbelt Establishment - Tree/shrub planting with fabric
382 - Fence - Barbed Wire
382 - Fence - Electric Wire
382 - Fence - Portable fence for intensive grazing management
382 - Fence - Protective Fence
382 - Fence - Sage Grouse Initiative - Fence reflectors
382 - Fence - Woven Wire
386 - Field Border - Field Border
390 - Riparian Herbaceous Cover - Riparian Herbaceous Cover
391 - Riparian Forest Buffer - Tree establishment
391 - Riparian Forest Buffer - Tree establishment with tubes
391 - Riparian Forest Buffer - Trees/shrubs and machine planting
391 - Riparian Forest Buffer - Trees/shrubs, machine planting and fabric
393 - Filter Strip - Filter Strip
394 - Firebreak - Firebreak
410 - Grade Stabilization Structure - Embankment structure < 10,000 CY with principal spillway
410 - Grade Stabilization Structure - Embankment structure < 5,000 CY - No Principal Spillway
410 - Grade Stabilization Structure - Embankment structure > 10,000 CY with principal spillway
410 - Grade Stabilization Structure - Embankment structure > 5,000 CY, No Principal Spillway
410 - Grade Stabilization Structure - Fabricated steel structure
410 - Grade Stabilization Structure - Rock Chute Structure
412 - Grassed Waterway - Grassed Waterway < 25 sq.ft.
412 - Grassed Waterway - Grassed Waterway > 25 sq.ft.


441 - Irrigation System, Microirrigation - Drip watering system for conifers
442 - Irrigation System, Sprinkler - Conversion from gravity irrigation to sprinkler
442 - Irrigation System, Sprinkler - Conversion from high to low pressure irrigation
449 - Irrigation Water Management - Periodic Measurements
449 - Irrigation Water Management - Real Time Measurement
464 - Irrigation Land Leveling - Irrigation land leveling
472 - Access Control - Exclusion for Wildlife Habitat
472 - Access Control - Grazingland - East River
472 - Access Control - Grazingland - West River
472 - Access Control - Hayland establishment - East River
472 - Access Control - Hayland establishment - West River
484 - Mulching - Mulching & Mechanical Anchoring
500 - Obstruction Removal - Fence Removal
500 - Obstruction Removal - Sage Grouse Initiative - Obstruction Removal
511 - Forage Harvest Management - Conversion from Irrigated Cropland to non-irrigated hayland
511 - Forage Harvest Management - Organic Initiative - Forage Harvest Management
512 - Pasture and Hayland Planting - Introduced Species
512 - Pasture and Hayland Planting - Introduced/native species
512 - Pasture and Hayland Planting - Native Species
516 - Pipeline - Central Storage
516 - Pipeline - East River - Plastic, small diameter
516 - Pipeline - Plastic, Above ground/shallow
516 - Pipeline - Plastic, large diameter
516 - Pipeline - Rural Water Connection
516 - Pipeline - West River - Plastic, small diameter
521A - Pond Sealing or Lining, Flexible Membrane - Flexible membrane liner
521A - Pond Sealing or Lining, Flexible Membrane - Flexible membrane liner w/ geotextile underlayment
521B - Pond Sealing or Lining, Soil Dispersant - Soda ash
521C - Pond Sealing or Lining, Bentonite Sealant - Bentonite sealant
528 - Prescribed Grazing - Conversion from Irrigated Cropland to Pasture or Rangeland
528 - Prescribed Grazing - Grazing Sustainability Initiative - East River
528 - Prescribed Grazing - Grazing Sustainability Initiative - West River
528 - Prescribed Grazing - Management Intensity Level I or II
528 - Prescribed Grazing - Management Intensity Level III
528 - Prescribed Grazing - Organic Initiative - 3 to 6 pastures in rotation
528 - Prescribed Grazing - Organic Initiative - 7 or more pastures in rotation
533 - Pumping Plant - Nose pump
533 - Pumping Plant - Pasture pump
533 - Pumping Plant - Pump - 2 to 6 hp
533 - Pumping Plant - Pump < 2 hp
533 - Pumping Plant - Pump > 6 hp
533 - Pumping Plant - Pumping plant - Renewable energy - deep draw
533 - Pumping Plant - Pumping plant - Renewable energy - shallow draw
548 - Grazing Land Mechanical Treatment - Mechanical Treatment
550 - Range Planting - Range Planting
550 - Range Planting - Range Planting w/ pollinator forbs
561 - Heavy Use Area Protection - Fabricated Windbreak
574 - Spring Development - Spring Development
578 - Stream Crossing - Concrete Livestock Crossing
578 - Stream Crossing - Rock Livestock Crossing
580 - Streambank and Shoreline Protection - Bio-technical streambank protection
580 - Streambank and Shoreline Protection - Rock riprap streambank protection
582 - Open Channel - Open Channel
587 - Structure for Water Control - Fabricated steel structure
590 - Nutrient Management - Calibration and recordkeeping
590 - Nutrient Management - Organic Initiative - nutrient management
595 - Pest Management - Non-native, invasive species
595 - Pest Management - Organic Initiative - Pest Management on Cropland
595 - Pest Management - Organic Initiative - Pest Management on Grazingland
595 - Pest Management - Weed Control - Grass establishment
595 - Pest Management - Weed Control - Tree establishment
600 - Terrace - Terrace
610 - Salinity and Sodic Soil Management - Cover Establishment
612 - Tree/Shrub Establishment - Tree/Shrub handplants with fabric mat
614 - Watering Facility - Bottomless steel rim tank > 20' diameter - concrete bottom
614 - Watering Facility - Bottomless steel rim tank > 20' diameter - flexible bottom
614 - Watering Facility - Commercial waterer
614 - Watering Facility - Portable tank
614 - Watering Facility - Precast concrete tank
614 - Watering Facility - Standard tank w/ commercially manufactured lid
614 - Watering Facility - Standard tank with concrete apron
614 - Watering Facility - Standard tank with gravel/earthen base
614 - Watering Facility - Steel bottom tank w/ gravel base
620 - Underground Outlet - Underground Outlet
629 - Waste Treatment - Horizontal Biofilter
629 - Waste Treatment - Mechanical Separator <= 1,000 AU
629 - Waste Treatment - Mechanical Separator > 1,000 AU
629 - Waste Treatment - Sand Separator <= 1,000 AU
629 - Waste Treatment - Sand Separator > 1,000 AU
629 - Waste Treatment - Vertical Biofilter
634 - Waste Transfer - Liquid pump
634 - Waste Transfer - Slurry pump
635 - Vegetated Treatment Area - Leveled VTA
635 - Vegetated Treatment Area - Non-leveled VTA
635 - Vegetated Treatment Area - Sprinkler VTA
638 - Water and Sediment Control Basin - Water and Sediment Control Basin
640 - Waterspreading - Dikes with drain pipes and gates
640 - Waterspreading - Level lip ditches with control structures
642 - Water Well - Artesian well - copper casement
642 - Water Well - Artesian well - PVC casement
642 - Water Well - Deep aquifer well > 6" diameter
642 - Water Well - J-55 steel well
642 - Water Well - Large diameter well
642 - Water Well - Plastic casement well > 75'
642 - Water Well - Shallow well < 75'
643 - Restoration and Management of Declining Species - Native Grass/Forbes
644 - Wetland Wildlife Habitat Management - Vegetative restoration - 0 to 6" depth
644 - Wetland Wildlife Habitat Management - Vegetative restoration - 2" to 3' depth
645 - Upland Wildlife Habitat Management - Conversion from Irrigated Cropland to wildlife cover
645 - Upland Wildlife Habitat Management - DNC - Native Grass/Forb mix
645 - Upland Wildlife Habitat Management - DNC - Tame Grass/Forb mix
645 - Upland Wildlife Habitat Management - DNC - Tame/Native Grass/Forb mix
645 - Upland Wildlife Habitat Management - Implementation of a rotational grazing system
645 - Upland Wildlife Habitat Management - Livestock exclusion/rest rotation for wildlife
645 - Upland Wildlife Habitat Management - Meadow Enhancement
645 - Upland Wildlife Habitat Management - Pollinator forb planting
645 - Upland Wildlife Habitat Management - Winter Cover Establishment
650 - Windbreak/Shelterbelt Renovation - Tree clearing
650 - Windbreak/Shelterbelt Renovation - Tree removal
650 - Windbreak/Shelterbelt Renovation - Under planting
657 - Wetland Restoration - Ditch Plug
657 - Wetland Restoration - Vegetative restoration - 0 to 6" depth
657 - Wetland Restoration - Vegetative restoration - 2" to 3' depth
658 - Wetland Creation - Wetland creation
659 - Wetland Enhancement - Wetland Enhancement
666 - Forest Stand Improvement - Forest Thinning
666 - Forest Stand Improvement - Hardwood Enhancement
798 - Seasonal High Tunnel System for Crops - High Tunnel Hoop Structure
102 - Comprehensive Nutrient Management Plan - Nutrient Management Plan Development
106 - Forest Management Plan - Forest Management Plan
138 - Conservation Plan Supporting Organic Transition - Crops - 150 to 450 acres
138 - Conservation Plan Supporting Organic Transition - Crops - Greater than 450 acres
138 - Conservation Plan Supporting Organic Transition - Crops - Less than 150 acres
138 - Conservation Plan Supporting Organic Transition - Livestock - 150 to 450 AU
138 - Conservation Plan Supporting Organic Transition - Livestock - Greater than 450 AU
138 - Conservation Plan Supporting Organic Transition - Livestock - Less than 150 AU
313 - Waste Storage Facility - Concrete storage facility < 1,000 AU.
313 - Waste Storage Facility - Concrete storage facility > 1,000 AU.
313 - Waste Storage Facility - Concrete/earthen storage facility - 500 to 1,000 AU.
313 - Waste Storage Facility - Concrete/earthen storage facility < 500 AU.
313 - Waste Storage Facility - Concrete/earthen storage facility > 1,000 AU.
313 - Waste Storage Facility - Earthen holding pond w/ concrete stacking pad - 500 to 1,000 AU
313 - Waste Storage Facility - Earthen holding pond w/ concrete stacking pad < 500 AU
313 - Waste Storage Facility - Earthen holding pond w/ concrete stacking pad > 1,000 AU
313 - Waste Storage Facility - Earthen storage facility - 500 to 1,000 AU
313 - Waste Storage Facility - Earthen storage facility < 500 AU
313 - Waste Storage Facility - Earthen storage facility > 1,000 AU
314 - Brush Management - Chemical
314 - Brush Management - Mechanical
314 - Brush Management - Saltcedar basal bark application
314 - Brush Management - Saltcedar foliar application - 12 Ft.
314 - Brush Management - Saltcedar foliar application - 6 Ft.
316 - Animal Mortality Facility - Structure w/ Concrete Walls
316 - Animal Mortality Facility - Structure w/ Treated Lumber Walls
317 - Composting Facility - Structure w/ Concrete Walls
317 - Composting Facility - Structure w/ Treated Lumber Walls
327 - Conservation Cover - DNC - Native Grass/Forb mix
327 - Conservation Cover - DNC - Tame Grass/Forb mix
327 - Conservation Cover - DNC - Tame/Native Grass/Forb mix
327 - Conservation Cover - Pollinator forb planting
327 - Conservation Cover - Tree establishment
327 - Conservation Cover - Tree establishment with tubes
327 - Conservation Cover - Winter Cover Establishment
328 - Conservation Crop Rotation - Conversion from Irrigated Cropland to non-irrigated cropland
328 - Conservation Crop Rotation - Organic Initiative - Add crop to rotation
329 - Residue and Tillage Management, No Till/Strip/Direct Seed - Conversion to No-till or strip-till on irrigated cropland
338 - Prescribed Burning - Prescribed Burn
340 - Cover Crop - Cover Crop
342 - Critical Area Planting - Critical Area Planting
348 - Dam, Diversion - Earth fill diversion dam
350 - Sediment Basin - Open feedlot - 500 to 1,000 AU
350 - Sediment Basin - Open feedlot < 500 AU
350 - Sediment Basin - Open feedlot > 1,000 AU
351 - Well Decommissioning - Artesian well - flowing
351 - Well Decommissioning - Artesian well - non flowing
351 - Well Decommissioning - Shallow aquifer
356 - Dike - Earth fill dike
359 - Waste Treatment Lagoon - Waste Treatment Lagoon
360 - Closure of Waste Impoundments - Waste Facility Closure
362 - Diversion - Diversion - Channel
362 - Diversion - Diversion - Pipe
365 - Anaerobic Digester - Ambient Temperature - Anaerobic Digester - Ambient Temperature
366 - Anaerobic Digester - Controlled Temperature - Anaerobic Digester - Controlled Temperature
370 - Atmospheric Resource Quality Management - Energy Enhancement
378 - Pond - Embankment Pond < 10,000 CY with principal spillway
378 - Pond - Embankment Pond < 5,000 CY - No Principal Spillway
378 - Pond - Embankment pond > 10,000 CY with principal spillway
378 - Pond - Embankment Pond > 5,000 CY, No Principal Spillway
378 - Pond - Excavated pond
378 - Pond - Fabricated steel structure
380 - Windbreak/Shelterbelt Establishment - Tree/Shrub handplants with fabric mat
380 - Windbreak/Shelterbelt Establishment - Tree/shrub planting
380 - Windbreak/Shelterbelt Establishment - Tree/shrub planting with fabric
382 - Fence - Barbed Wire
382 - Fence - Electric Wire
382 - Fence - Portable fence for intensive grazing management
382 - Fence - Protective Fence
382 - Fence - Sage Grouse Initiative - Fence reflectors
382 - Fence - Woven Wire
386 - Field Border - Field Border
390 - Riparian Herbaceous Cover - Riparian Herbaceous Cover
391 - Riparian Forest Buffer - Tree establishment
391 - Riparian Forest Buffer - Tree establishment with tubes
391 - Riparian Forest Buffer - Trees/shrubs and machine planting
391 - Riparian Forest Buffer - Trees/shrubs, machine planting and fabric
393 - Filter Strip - Filter Strip
394 - Firebreak - Firebreak
410 - Grade Stabilization Structure - Embankment structure < 10,000 CY with principal spillway
410 - Grade Stabilization Structure - Embankment structure < 5,000 CY - No Principal Spillway
410 - Grade Stabilization Structure - Embankment structure > 10,000 CY with principal spillway
410 - Grade Stabilization Structure - Embankment structure > 5,000 CY, No Principal Spillway
410 - Grade Stabilization Structure - Fabricated steel structure
410 - Grade Stabilization Structure - Rock Chute Structure
412 - Grassed Waterway - Grassed Waterway < 25 sq.ft.
412 - Grassed Waterway - Grassed Waterway > 25 sq.ft.
430DD - Irrigation Water Conveyance, Pipeline, High-Pressure, Underground, Plastic - High pressure pipeline to pivot
430EE - Irrigation Water Conveyance, Pipeline, Low-Pressure, Underground, Plastic - Gravity pipeline to center pivot
441 - Irrigation System, Microirrigation - Drip watering system for conifers
442 - Irrigation System, Sprinkler - Conversion from gravity irrigation to sprinkler
442 - Irrigation System, Sprinkler - Conversion from high to low pressure irrigation
449 - Irrigation Water Management - Periodic Measurements
449 - Irrigation Water Management - Real Time Measurement
464 - Irrigation Land Leveling - Irrigation land leveling
472 - Access Control - Exclusion for Wildlife Habitat
472 - Access Control - Grazingland - East River
472 - Access Control - Grazingland - West River
472 - Access Control - Hayland establishment - East River
472 - Access Control - Hayland establishment - West River
484 - Mulching - Mulching & Mechanical Anchoring
500 - Obstruction Removal - Fence Removal
500 - Obstruction Removal - Sage Grouse Initiative - Obstruction Removal
511 - Forage Harvest Management - Conversion from Irrigated Cropland to non-irrigated hayland
511 - Forage Harvest Management - Organic Initiative - Forage Harvest Management
512 - Pasture and Hayland Planting - Introduced Species
512 - Pasture and Hayland Planting - Introduced/native species
512 - Pasture and Hayland Planting - Native Species
516 - Pipeline - Central Storage
516 - Pipeline - East River - Plastic, small diameter
516 - Pipeline - Plastic, Above ground/shallow
516 - Pipeline - Plastic, large diameter
516 - Pipeline - Rural Water Connection
516 - Pipeline - West River - Plastic, small diameter
521A - Pond Sealing or Lining, Flexible Membrane - Flexible membrane liner
521A - Pond Sealing or Lining, Flexible Membrane - Flexible membrane liner w/ geotextile underlayment
521B - Pond Sealing or Lining, Soil Dispersant - Soda ash
521C - Pond Sealing or Lining, Bentonite Sealant - Bentonite sealant
528 - Prescribed Grazing - Conversion from Irrigated Cropland to Pasture or Rangeland
528 - Prescribed Grazing - Grazing Sustainability Initiative - East River
528 - Prescribed Grazing - Grazing Sustainability Initiative - West River
528 - Prescribed Grazing - Management Intensity Level I or II
528 - Prescribed Grazing - Management Intensity Level III
528 - Prescribed Grazing - Organic Initiative - 3 to 6 pastures in rotation
528 - Prescribed Grazing - Organic Initiative - 7 or more pastures in rotation
533 - Pumping Plant - Nose pump
533 - Pumping Plant - Pasture pump
533 - Pumping Plant - Pump - 2 to 6 hp
533 - Pumping Plant - Pump < 2 hp
533 - Pumping Plant - Pump > 6 hp
533 - Pumping Plant - Pumping plant - Renewable energy - deep draw
533 - Pumping Plant - Pumping plant - Renewable energy - shallow draw
548 - Grazing Land Mechanical Treatment - Mechanical Treatment
550 - Range Planting - Range Planting
550 - Range Planting - Range Planting w/ pollinator forbs
561 - Heavy Use Area Protection - Fabricated Windbreak
574 - Spring Development - Spring Development
578 - Stream Crossing - Concrete Livestock Crossing
578 - Stream Crossing - Rock Livestock Crossing
580 - Streambank and Shoreline Protection - Bio-technical streambank protection
580 - Streambank and Shoreline Protection - Rock riprap streambank protection
582 - Open Channel - Open Channel
587 - Structure for Water Control - Fabricated steel structure
590 - Nutrient Management - Calibration and recordkeeping
590 - Nutrient Management - Organic Initiative - nutrient management
595 - Pest Management - Non-native, invasive species
595 - Pest Management - Organic Initiative - Pest Management on Cropland
595 - Pest Management - Organic Initiative - Pest Management on Grazingland
595 - Pest Management - Weed Control - Grass establishment
595 - Pest Management - Weed Control - Tree establishment
600 - Terrace - Terrace
610 - Salinity and Sodic Soil Management - Cover Establishment
612 - Tree/Shrub Establishment - Tree/Shrub handplants with fabric mat
614 - Watering Facility - Bottomless steel rim tank > 20' diameter - concrete bottom
614 - Watering Facility - Bottomless steel rim tank > 20' diameter - flexible bottom
614 - Watering Facility - Commercial waterer
614 - Watering Facility - Portable tank
614 - Watering Facility - Precast concrete tank
614 - Watering Facility - Standard tank w/ commercially manufactured lid
614 - Watering Facility - Standard tank with concrete apron
614 - Watering Facility - Standard tank with gravel/earthen base
614 - Watering Facility - Steel bottom tank w/ gravel base
620 - Underground Outlet - Underground Outlet
629 - Waste Treatment - Horizontal Biofilter
629 - Waste Treatment - Mechanical Separator <= 1,000 AU
629 - Waste Treatment - Mechanical Separator > 1,000 AU
629 - Waste Treatment - Sand Separator <= 1,000 AU
629 - Waste Treatment - Sand Separator > 1,000 AU
629 - Waste Treatment - Vertical Biofilter
634 - Waste Transfer - Liquid pump
634 - Waste Transfer - Slurry pump
635 - Vegetated Treatment Area - Leveled VTA
635 - Vegetated Treatment Area - Non-leveled VTA
635 - Vegetated Treatment Area - Sprinkler VTA
638 - Water and Sediment Control Basin - Water and Sediment Control Basin
640 - Waterspreading - Dikes with drain pipes and gates
640 - Waterspreading - Level lip ditches with control structures
642 - Water Well - Artesian well - copper casement
642 - Water Well - Artesian well - PVC casement
642 - Water Well - Deep aquifer well > 6" diameter
642 - Water Well - J-55 steel well
642 - Water Well - Large diameter well
642 - Water Well - Plastic casement well > 75'
642 - Water Well - Shallow well < 75'
643 - Restoration and Management of Declining Species - Native Grass/Forbes
644 - Wetland Wildlife Habitat Management - Vegetative restoration - 0 to 6" depth
644 - Wetland Wildlife Habitat Management - Vegetative restoration - 2" to 3' depth
645 - Upland Wildlife Habitat Management - Conversion from Irrigated Cropland to wildlife cover
645 - Upland Wildlife Habitat Management - DNC - Native Grass/Forb mix
645 - Upland Wildlife Habitat Management - DNC - Tame Grass/Forb mix
645 - Upland Wildlife Habitat Management - DNC - Tame/Native Grass/Forb mix
645 - Upland Wildlife Habitat Management - Implementation of a rotational grazing system
645 - Upland Wildlife Habitat Management - Livestock exclusion/rest rotation for wildlife
645 - Upland Wildlife Habitat Management - Meadow Enhancement
645 - Upland Wildlife Habitat Management - Pollinator forb planting
645 - Upland Wildlife Habitat Management - Winter Cover Establishment
650 - Windbreak/Shelterbelt Renovation - Tree clearing
650 - Windbreak/Shelterbelt Renovation - Tree removal
650 - Windbreak/Shelterbelt Renovation - Under planting
657 - Wetland Restoration - Ditch Plug
657 - Wetland Restoration - Vegetative restoration - 0 to 6" depth
657 - Wetland Restoration - Vegetative restoration - 2" to 3' depth
658 - Wetland Creation - Wetland creation
659 - Wetland Enhancement - Wetland Enhancement
666 - Forest Stand Improvement - Forest Thinning
666 - Forest Stand Improvement - Hardwood Enhancement
798 - Seasonal High Tunnel System for Crops - High Tunnel Hoop Structure
 Pr. Pay.    Tech. Serv. Pay.
  UNIT            UNIT
Acre
Acre
No.
No.
No.
No.
No.
No.
AU          AU
AU          AU
AU          AU
AU          AU
AU          AU
AU          AU
AU          AU
AU          AU
AU          AU
AU          AU
AU          AU
Acre
Acre
Acre
Acre
Acre
AU          AU
AU          AU
AU
AU
Acre        Acre
Acre        Acre
Acre        Acre
Acre        Acre
Acre        Acre
Acre        Acre
Acre        Acre
Acre        Acre
Acre        Acre
Acre        Acre
Acre
Acre
Acre        Acre
Each
AU          Ac. Ft.
AU          Ac. Ft.
AU          Ac. Ft.
Each
Each
Each
LF
AU          AU
Each
LF         LF
DiaIn/LF   LF
AU
AU
Acre
Each       Ac. Ft.
Each       Ac. Ft.
CY         Ac. Ft.
Each       Ac. Ft.
Each       Ac. Ft.
Each       Ac. Ft.
Each       LF
LF         LF
LF         LF
LF         LF
LF         LF
LF         LF
LF         LF
LF         LF
LF         LF
Acre
Acre
Acre
Acre
Acre
Acre
Acre       Acre
Acre
Each       CFS
Each       CFS
CY         CFS
Each       CFS
Each       CFS
Each       CFS
LF         Acre
LF         Acre
DiaIn/LF
DiaIn/LF
Each
Acre       Acre
Acre       Acre
Acre       Acre
Each       Acre
CY
Acre       Acre
Acre       Acre
Acre       Acre
Acre       Acre
Acre       Acre
Acre       Acre
LF
Hr
Acre
Acre
Acre       Acre
Acre       Acre
Acre       Acre
Gal        LF
LF         LF
LF         LF
DiaIn/LF   LF
Each       LF
LF         LF
SF
SF
Ton
Ton
Acre       Acre
Acre       Acre
Acre       Acre
Acre       Acre
Acre       Acre
Acre       Acre
Acre       Acre
Each
Each
Each
Each
Each
Each
Each
Acre       Acre
Acre       Acre
Acre       Acre
LF
Each       Each
LF
LF
LF
LF
CY
Each
AU         Acre
Acre       Acre
Acre       Acre
Acre       Acre
Acre       Acre
Acre       Acre
Acre       Acre
LF         LF
Acre
Each
Each       Each
Each       Each
Each       Each
Each       Each
Each       Each
Each       Each
Each       Each
Each       Each
Each   Each
LF
Each
AU
AU
AU
AU
Each
Each   AU
Each   AU
Acre
Acre
Acre
Each
Acre
Acre
LF     Ea
LF     Ea
LF     Ea
LF     Ea
LF     Ea
LF     Ea
Ea     Ea
Acre
Acre   Acre
Acre   Acre
Acre   Acre
Acre   Acre
Acre   Acre
Acre   Acre
Acre   Acre
Acre   Acre
Acre   Acre
Acre   Acre
Acre   Acre
Acre
Acre
LF
Each   Acre
Acre   Acre
Acre   Acre
Acre
Acre   Acre
Acre
Acre
SF

								
To top