Planned
LSU HSC Shreveport
LONI POP Haughton La Tech Monroe Tallulah Edwards Jackson, MS
LONI DWDM LONI POP LONI POP LONI DWDM LONI DWDM LONI DWDM
38Km 89Km 55Km 90Km 56Km 48Km
82Km 35Km
Coushatta Seminary 38Km
Northern DWDM Ring LONI DWDM Mendenhall
LONI DWDM LONI DWDM
82 Tylertown
Km
LONI DWDM Southern
46Km
Derry LONI POP
LONI DWDM
13Km
61Km 35Km
Greensburg NLR BR
LONI DWDM LONI POP 11Km
Alexandria
LONI POP 38Km LPB
72Km 11Km
Zachary
LONI DWDM
Landry 39Km
LONI DWDM 24Km
82Km
Hammond LaPlace
LSU LONI POP LONI DWDM
55Km 80Km
Crowley ULL
m 48Km
LONI DWDM LONI POP Ramah 86K
LONI DWDM LSU
65Km Southern 54Km
65Km 70Km
Port Barre LSU DWDM Ring
42Km LONI DWDM
69Km
13Km
Roanoke
LONI DWDM 75Km 102Km 20Km
Franklin Schriever Tulane UNO LSU HSC NO
Lake Charles LONI POP
LONI POP LONI DWDM LONI DWDM LONI POP LONI POP
Completed:
RSD Metro Ethernet circuit
Submitted ME order for ULM BR Pharmacy School to LONI
General router and optical maintenance
Submitted miscellaneous budget to BoR
Documentation of procedures for NOC involvement
Kenny Welshons attended the Internet 2 Multicast Workshop in Atlanta
Equipment deployment in Jackson, MS for additional Internet bandwidth turn up
Installed the G2 Dell cluster switch at UNO
Lonnie Leger is attending SC’07 in supporting LSU CCT and LITE
Worked with LITE for establish BGP connectivity changes for SC07
Lonnie Leger lonnie@lsu.edu, Director of Network @ LONI 1
September 13, 2007
Short-term Plans:
Working on SULC SMTP issues involving state agencies
Gathering optical site locations that are affected by a Fan Tray hardware model
that causes TCCs to reset
LSU Shreveport access to LONI due this week
Internet Drain in Jackson, MS from Level3 due on November 15th
Move UNO Main Campus to LONI 10GE on November 16th
LETA/LPB to property tag equipment
BoR to property tag equipment
Develop LETA/LPB and BoR project plan
Receive some 60 ME orders from LCTCS
2nd Internet Drain in Shreveport from TWTC due on December 12th
Develop LCTCS project plan
Move Tulane to LONI 10GE on December 20th
Working with UNO for multicast implementation and networking road map for
future plans
Research new code deployment options and bug investigations
IP policy and procedures for connectors
Data collection tweaking of monitoring systems for performance statistics
Alarm investigation and monitoring of the optical gear and system
Scheduling Cisco visit to investigate possible hardware problems with equipment
Long-term Plans:
Peering with LEARN
Permanent LONI bandwidth to ISB for Dell50T
Approval from Grambling to connect to LONI
Approval from Nicholls to connect to LONI
Approval from LSU-E to connect to LONI
Approval from NWU to connect to LONI
Issues:
Unsigned AT&T Local Loop Dark Fiber AUP and CEA
Unsigned AT&T SURA Fiber Contract
Unsigned BoR – LETA CEA
Unsigned LONI Operating Contract for LONI
Missing local loop dark fiber routes
Unapproved LONI billing
Unknown status BoR Video ME project
Lonnie Leger lonnie@lsu.edu, Director of Network @ LONI 2
September 13, 2007
Today
LSU HSC Shreveport
LONI POP Haughton La Tech Monroe Tallulah Edwards Jackson, MS
LONI DWDM LONI POP LONI POP LONI DWDM LONI DWDM LONI DWDM
38Km 89Km 55Km 90Km 56Km 48Km
82Km 35Km
Coushatta Seminary 38Km
Northern DWDM Ring LONI DWDM Mendenhall
LONI DWDM LONI DWDM
82
Km Tylertown (1)
(1) LONI DWDM Southern
46Km
Derry LONI POP
LONI DWDM
13Km
61Km 35Km
Greensburg NLR BR
(1) LONI DWDM LONI POP 11Km
Alexandria (1)
LONI POP 38Km LPB
72Km
Zachary 11Km
LONI DWDM
Landry 39Km
LONI DWDM 24Km
82Km
Hammond LaPlace
LSU LONI POP LONI DWDM
55Km 80Km
Willow
m 48Km
LONI DWDM Ramah 86K
LONI DWDM LSU
(3) Southern 54Km
ULL 65Km 70Km
LONI POP Ramah LSU
(4) (4)
DWDM Ring
(2)
LONI DWDM
69Km
(1)
13Km
(1) (1)
75Km 102Km 20Km
Franklin Schriever Tulane UNO LSU HSC NO
LONI POP
LONI DWDM LONI DWDM LONI POP LONI POP
Lonnie Leger lonnie@lsu.edu, Director of Network @ LONI 3
September 13, 2007