Electronic submission Paper submission
Additional paper Submission on paper and/or
Electronic submission
copies electronic summary dossier
Additional
Additional
Additional Summary
Complete Summary Additional Complete
Complete Summary Dossier
NAS Dossier Dossier (word
Dossier
Summary Dossier
Dossier (word
(CADDY) processing Dossier (paper)
(paper) processing
format)
format)
Austria
acting as RMS 1 1 - - 1 - -
not RMS 1 1 - - 1 - -
MS is not RMS
and has no
application for 1 1 - - 1 - -
provisional
authorization
Belgium
acting as RMS contact Ministry for practical details contact Ministry for practical details
application for
provisional contact Ministry for practical details contact Ministry for practical details
authorisation
not RMS 2 - - - - 1 1
MS is not RMS
and has no
application for 2 - - - - 1 1
provisional
authorization
Bulgaria
acting as RMS
not RMS
MS is not RMS
and has no
application for
provisional
authorization
Cyprus
acting as RMS 1 1 - - 1 1 -
not RMS 1 1 - - 1 1 -
MS is not RMS
and has no
application for
provisional
authorization
Czech Republic
1full version 1full version
+ 1 toxicology + 1 toxicology
dossier (IIA 5 dossier (IIA 5
acting as RMS 2 2 + IIIA 7) 2 + IIIA 7) 2 2
+ 1 residues + 1 residues
dossier (IIA 6 dossier (IIA 6
+ IIIA 8) + IIIA 8)
1full version
+ 1 toxicology
dossier (IIA 5
not RMS 2 2 - - + IIIA 7) 2 2
+ 1 residues
dossier (IIA 6
+ IIIA 8)
MS is not RMS
and has no
application for 2 - - - - - 2
provisional
authorization
NAS
Electronic submission Paper submission
Additional paper Submission on paper and/or
Electronic submission
copies electronic summary dossier
Additional
Additional
Additional Summary
Complete Summary Additional Complete
Complete Summary Dossier
NAS Dossier Dossier (word
Dossier
Summary Dossier
Dossier (word
(CADDY) processing Dossier (paper)
(paper) processing
format)
format)
Austria
Denmark
acting as RMS 3 5 1 - 1 1 5
not RMS 3 1 - - 1 1 1
MS is not RMS
and has no
application for 3 1 - - - 1 1
provisional
authorization
Estonia
acting as RMS 1 1 1 - 1 1 1
not RMS 1 - - 1 1 1 -
MS is not RMS
and has no
application for 1 - - 1 1 - -
provisional
authorization
Finland
acting as RMS 3 3 3 - 3 - 3
not RMS 3 3 - - - - 3
MS is not RMS
and has no
application for
provisional
authorization
contact Ministry for practical details contact Ministry for practical details
France
2 (DGAL) ; 6 (INRA) where electronic submission in CADDY
acting as RMS or co-RMS 1(INRA)
6 (INRA) format is not achievable, this electronic
MS is not RMS and has an 2 (DGAL) ; 6 (INRA) submission must be replaced in all
application for a provisional 6 (INRA) cases using pdf processing format,
MS is not RMS and has no 2 (DGAL) ; 6 (INRA) content of each report have to be easily
application for a provisional 6 (INRA) identifiable
Ministere de l'Agriculture, de l'Alimentation,
de la pêche et des affaires Rurales
Direction Générale de l'Alimentation (DGAL)
Sous Direction de la Qualité et de la Protection des Végétaux
Sylvie Malézieux
251, rue de Vaugirard
75732 Parix Cedex 15
INRA - Structure Scientifique Mixte
Secrétariat Scientifique, Annie Rivière
Route de Saint Cyr l'Ecole
78026 Versailles Cedex
Germany
acting as RMS 4 - 2 - 4 2 3*
not RMS 4 - 2 - 3 4 3*
MS is not RMS 4 - 2 - 3 4 3*
and has no
application for
provisional
authorization
* reference list also required in electronic format according to DOK interface
NAS
Electronic submission Paper submission
Additional paper Submission on paper and/or
Electronic submission
copies electronic summary dossier
Additional
Additional
Additional Summary
Complete Summary Additional Complete
Complete Summary Dossier
NAS Dossier Dossier (word
Dossier
Summary Dossier
Dossier (word
(CADDY) processing Dossier (paper)
(paper) processing
format)
format)
Austria
Greece
acting as RMS 6 2 2 1 2 1 2
not RMS 3 2 1 1 1 1 2
MS is not RMS
and has no
application for 3 2 - - - - 2
provisional
authorization
Hungary
acting as RMS
not RMS
MS is not RMS
and has no
application for
provisional
authorization
Ireland
acting as RMS 4 1 1 4 1 4 1
not RMS 1 1 1 1 1 1 1
MS is not RMS
and has no
application for 1 1 1 - 1 - 1
provisional
authorization
Italy
acting as RMS 1 1 1 1 1 - -
not RMS 1 - - - - 1 1
MS is not RMS
and has no
application for 1 1 - - - 1 1
provisional
authorization
Latvia
acting as RMS 1 1 1 1 - - -
not RMS 1 1 - 1 - - -
MS is not RMS
and has no
application for 1 1 - - - - -
provisional
authorization
Lithuania
acting as RMS 1 1 1 1 1 - 1
not RMS 1 1 - 1 1 - 1
MS is not RMS
and has no
application for 1 1 - 1 1 - 1
provisional
authorization
Luxemburg
acting as RMS
not RMS 1 1 1 1
MS is not RMS
and has no
application for
provisional
authorization
contact Ministry for practical details contact Ministry for practical details
NAS
Electronic submission Paper submission
Additional paper Submission on paper and/or
Electronic submission
copies electronic summary dossier
Additional
Additional
Additional Summary
Complete Summary Additional Complete
Complete Summary Dossier
NAS Dossier Dossier (word
Dossier
Summary Dossier
Dossier (word
(CADDY) processing Dossier (paper)
(paper) processing
format)
format)
Austria
Malta
acting as RMS 1 1 1 1 1 1 1
not RMS 1 1 1 - - -
MS is not RMS
and has no
application for - 1 - 1 - - -
provisional
authorization
Poland
acting as RMS 5 1 1 1 - - -
not RMS 1 5 - 1 1 5 5
MS is not RMS
and has no
application for
provisional
authorization
Portugal
4*(only
needed if
word
2 2 1 - 1 2
processing
format is not
acting as RMS available
not RMS 1 - 1 - 1 - -
MS is not RMS
and has no
application for 1 - - - 1 - -
provisional
authorization
Romania
acting as RMS
not RMS
MS is not RMS
and has no
application for
provisional
authorization
Slovakia
acting as RMS 5 - - - - - -
not RMS - 5 - - - - -
MS is not RMS
and has no
application for - - - - - - -
provisional
authorization
Slovenia
acting as RMS 3 - 1 - 1 - -
not RMS - - - - - - -
MS is not RMS
and has no
application for - - - - - - -
provisional
authorization
Spain
acting as RMS 2 - - - 1 - -
not RMS 1 - - - 1 - -
MS is not RMS
and has no
application for - - - - - - -
provisional
authorization
NAS
Electronic submission Paper submission
Additional paper Submission on paper and/or
Electronic submission
copies electronic summary dossier
Additional
Additional
Additional Summary
Complete Summary Additional Complete
Complete Summary Dossier
NAS Dossier Dossier (word
Dossier
Summary Dossier
Dossier (word
(CADDY) processing Dossier (paper)
(paper) processing
format)
format)
Austria
Sweden
acting as RMS 2 2 2 - 2 2 2
not RMS 2 2 - - 1 - 2
MS is not RMS
and has no
application for 2 2 - - 1 - 2
provisional
authorization
The Netherlands
acting as RMS 3 1 2 1 2 1 1
not RMS 1 1 - - 1 1 1
MS is not RMS
and has no
application for 1 1 - - - 1 1
provisional
authorization
United Kingdom
acting as RMS 1 1 1 - 2 - 1
not RMS 1 1 1 - 2 - 1
MS is not RMS
and has no
application for 1 1 - - 1 - 1
provisional
authorization
COM
- 3 - - - - 3
Whereas one dossier shall be sent to the published contact point in DG Health and Consumer
Protection (SANCO), in DG Environment (ENV) and in the European Chemical Bureau-Institute for
Health and Consumer Protection (IHCP), respectively.
EFSA
1 1 - - 1 - 1
(only if
summary
dossier is not
contained on
CADDY set)
explanation:
In addition this
to the column
this column electronic this column relates to
relates to submission relates to the
the number some the number number of
this colums of summary Member of additional this column additional
this column
relates to dossiers in States would summary relates to summary
relates to
the number electronic like to dossiers on the number dossiers
the number
of full format, recieve paper to the of additional in
of full
dossiers in which are paper whole summary electronic
dosiiers on
electronic required copies. request dossiers on format,
paper
format additionally Please fill in regarding paper which are
to the the numer of the required
number of additional electronic on to of
full dossiers paper copies submission the paper
of the full submissio
dossier. n
NAS