Drainage Services Department



Drainage Project Division



Contract No. DC/2007/01



Contract Title: Drainage Improvement Works in

Ki Lun Tsuen, Kwu Tung, Ma

Tso Lung and Sha Ling





(August 2011)

Drainage Projects Division

Drainage Services Department









Channel MTL01 Channel FTA04

(Portion B ) (Portions E & E1)









Channel KTN03

(Portion G)





Works Area

(Portion A)









Channel NTM04

(Portions C, C1 & C2) Channel KTS01 & KTSR1

(Portion D)

Drainage Projects Division

Drainage Services Department



General Description of Works

Sha Ling FTA04 covers 0.5km long proposed drain. The outstanding works in Portion E1 are in progress.

(Portions E & For Portion E, the trenchless excavation works from MH5 to MH4A was completed and from MH6

E1) to MH7 is in progress (about 45m/80m long so far).



Ma Tso Lung MTL01 covers 0.5km long Gabion channel and 2 box culverts. Gabion channel construction work

(Portion B) is continued. Around 473m long Gabion walls and 440m/512m long mattress channel bed were

installed. Box Culvert No. 1 was cast and construction of Box Culvert No.2 is in progress.

About ??m long permanent sheet-piles wall was installed.



Ki Lun Tsuen NTM04 covers 1km long channel and 6 box culverts. TTA for construction of Box Culvert No. 5

(Portion s C, C1 (stage 2) was implemented. About 302m/426m long rectangular and 223m/442m long Grasscrete

& C2) channels were cast and 228m long is under construction.

Shek Tsai Leng KTN03 covers 0.37km long channel and 2 box culverts. The substantial completion certificate

(Portion G) dated 4 January 2011 was issued. Outstanding backfilling works, installation of railing and minor

works at bank level are on-going.

Ying Pun KTS01 & KTSR1 cover 0.75km long rectangular channel and 4 box culverts. Total 481m/540m

(Portion D) long rectangular channel was cast and 49m long is under construction. The 900 U-channel and

manhole MH7A at KTSR1 were cast. Access Ramp Nos.1 & 2 were cast. Construction of jacking

pit at downstream side and temporary steel decking at upstream side of Box Culvert No.2 are in

progress.

Chuk Wan In Portion A area, maintenance of the Contractor’s Accommodation and the ERs’ office is continued.

Street

Drainage Projects Division

Drainage Services Department

Programme of the Works

Section of Portion Commencement Original Accumulative Extended Actual Remarks

the of the Date Completion Date EOT Granted Completion Completion

Works Site (Days) Date Date

31/8/2009 24/6/2010

1 E1 28/11/2008 29/7/2009 32.5 Channel FTA04

(noon) (Actual)

30/6/2011

2 E 28/11/2008 28/9/2010 78.0 15/12/2010 Channel FTA04

(Actual)

C, C1 & 20/1/2011 30/6/2011

3 28/11/2008 28/9/2010 113.5 Channel NTM04

C2 (noon) (Actual)

Channel KTS01 &

4 D 28/11/2008 28/9/2010 91.0 28/12/2010 -

KTSR1

1/2/2011 11/5/2011

5 B 28/11/2008 28/9/2010 125.5 Channel MTL01

(noon) (Actual)

4/1/2011

6 G 28/11/2008 28/9/2010 98.0 4/1/2011 Channel KTN03

(Actual)



All of the Works

1/2/2011 other than those to be

7 A 28/11/2008 28/9/2010 125.5 -

(noon) executed under

Section 1 to Section 6





The completion of the Works in term of expenditure was estimated about 71% of the Contract Sum based on the IP

No. 33 (included CPF & Retention).

Drainage Projects Division

Drainage Services Department









B



A









Channel MTL01 at Ma Tso Lung (Portion B)

Drainage Projects Division

Drainage Services Department









View A – Ch140 (looking downstream), excavation for construction of

remaining gabion channel at Ch140 to Ch165

Drainage Projects Division

Drainage Services Department









View B – Ch450 (looking downstream), construction of maintenance

access and granite facing wall at Ch450 to Ch530

Drainage Projects Division

Drainage Services Department









E



D









C









Channel NTM04 at Ki Lun Tsuen (Portion C)

Drainage Projects Division

Drainage Services Department









View C – Ch900 (looking downstream), construction of

maintenance access ramp at Ch920 to Ch940

Drainage Projects Division

Drainage Services Department









View D – Ch600 (looking upstream), construction of

Grasscrete channel from Ch500 to Ch600

Drainage Projects Division

Drainage Services Department









View E – Ch200 (looking upstream), completed rectangular channel

from Ch150 to Ch200

Drainage Projects Division

Drainage Services Department









I









H

G

F









Channel KTS01 & KTSR1 at Ying Pun (Portion D)

Drainage Projects Division

Drainage Services Department









View F – Ch100 (looking downstream), construction of

access ramp no. 1 from Ch100 to Ch150

Drainage Projects Division

Drainage Services Department









View G – Ch290 (looking upstream), construction of Box Culvert. No. 2

Drainage Projects Division

Drainage Services Department









View H – Ch A+80 (looking downstream), jacking of 1650 dia. Pipe

across Fan Kam Road

Drainage Projects Division

Drainage Services Department









View I– Ch560 (looking upstream), construction of

maintenance access ramp 2 from Ch520 to Ch560

Drainage Projects Division

Drainage Services Department









J

K









Channel FTA04 at Sha Ling (Portion E)

Drainage Projects Division

Drainage Services Department









View J – Ch100 (looking upstream) – implemented TTA for construction of

manhole MH4 & MH4A

Drainage Projects Division

Drainage Services Department









View K – Ch 220 (looking upstream), completed road

reinstatement from MH5 to MH6

Drainage Projects Division

Drainage Services Department









L









M









Channel KTN03 at Shek Tsai Leng (Portion G)

Drainage Projects Division

Drainage Services Department









View L – Ch100 (looking downstream), rectangular channel side

backfilling completed from Ch100 to Ch160

Drainage Projects Division

Drainage Services Department









View M – Ch230 (looking downstream), construction of maintenance

access from Ch230 to Ch280



Related docs
Other docs by ajizai
NH_Members
Views: 0  |  Downloads: 0
06 Mr. Wu Jun 16012009
Views: 0  |  Downloads: 0
9i CITY OF RAPID CITY
Views: 0  |  Downloads: 0
K Readiness Doc. July 2010
Views: 0  |  Downloads: 0
LookMaNoHands
Views: 0  |  Downloads: 0
97605964
Views: 0  |  Downloads: 0
NBA 2006-07 data
Views: 0  |  Downloads: 0
By registering with docstoc.com you agree to our
privacy policy

You are almost ready to download!

You are almost ready to download!