Embed
Email

Revision

Document Sample

Shared by: benben zhou
Categories
Tags
Stats
views:
14
posted:
12/17/2011
language:
pages:
51
DPTI 2006/15489









INVITATION







THE PROVISION OF



RUST RECTIFICATION PROGRAM FOR PUBLIC TRANSPORT BUSES



(PANEL AGREEMENT









CONTACT FOR FURTHER Enquiries are to be directed to:

INFORMATION Mr Livio Pennino

Telephone: (08) 8226 4480 Mobile:0401 124 203

Fax: (08) 8226 4440

E-mail: livio.pennino@sa.gov.au



If the above person is unavailable, the enquiry may be directed to:

Mr Alan Castree

Telephone: (08) 8226 4550 Mobile: 0401 124 050

Fax: (08) 8226 4440

E-mail: alan.castree@sa.gov.au





APPLICATIONS MAY BE Posted to GPO Box 1533, ADELAIDE SA 5001;

EITHER:

Delivered to 77 Grenfell Street, ADELAIDE SA 5000; or

Emailed to DPTI.Tenders@sa.gov.au

Note: If submitting via email, please phone (08) 8343 2029 to

confirm receipt. Also, it may be necessary to split the application

into several emails to keep it to an acceptable size.

Revision 0 Contents



CONTENTS





Introduction



Conditions for Submission of an Application including:

Annexure A: Application Details.

Annexure B: Evaluation of Submissions.

Annexure C: Supplementary Information for Applicants.



Statement of Requirements



Appendices



Panel Agreement for the Provision of Services



Application Form



Schedules







____________









DPTI Rust Rectification for Public Buses (Panel Agreement) Page 2

Revision 0 Introduction



INTRODUCTION





The Department for Transport, Energy and Infrastructure (DPTI) invites submissions from suitably qualified

organisations for inclusion in a Panel for Provision of a Rust Rectification Program for public transport

buses. The services required consist of rust rectification and repairs to structural components of the

chassis and body, refurbishment and painting of buses owned by DPTI.







__________









DPTI Rust Rectification for Public Buses (Panel Agreement) Page 1

Edition: March 2011 Conditions for Submission of an Application





CONDITIONS FOR SUBMISSION OF AN APPLICATION

FOR A PANEL CONTRACT



CT 1 INVITATION DOCUMENTS



These Invitation Documents comprise of the documents listed in the contents page. The Principal may

amend the Invitation Documents at any time.



Any DPTI publications referred to in these documents are available from the internet at:

http://www.transport.sa.gov.au or http://www.dtei.sa.gov.au/dtei_contractor_documents.



CT 2 APPLICANT’S WARRANTIES AND OBLIGATIONS



These Conditions of Submission prescribe the rules for the conduct of the application process. By

submitting an application, an Applicant agrees to comply with, and be bound by, the rules contained

within these Conditions of Submission.



Except for any express statement contained in these Invitation Documents, the Applicant warrants that in

lodging its application it did not rely on any express or implied statement, warranty or representation,

whether oral, written, or otherwise made by or on behalf of the Principal, its officers, employees, agents or

advisers. An Applicant cannot rely upon any document designated as “For Information Only”.



This invitation is not an offer and these Conditions of Submission will not form part of any Contract.



Prior to submitting an application, an Applicant is deemed to have:

a) examined all written documentation made available by the Principal to the Applicants for the

purpose submitting an Application; and

b) examined all information relevant to the risks, contingencies and other circumstances having an

effect on the application and obtainable by the making of reasonable enquiries.



CT 3 ENQUIRIES



Enquiries are to be directed to the Contact Officer(s) nominated on the cover sheet of this Invitation

document. Applicants cannot rely on communication with any other person(s) with regard to the

application process.



It is the responsibility of the Applicant to request any clarifications or additional information arising from

analysis of these Invitation Documents. The DPTI Contact Officer may stipulate that any request for

clarification or additional information arising from analysis of this document be forwarded in writing.



CT 4 CODE OF CONDUCT



Applicants, their employees and agents shall:

a) at all times act with integrity;

b) declare any actual or potential conflict of interest;

c) not seek to employ or engage the services of any person who has a duty to the Principal as an

adviser, consultant or employee in relation to this process;

d) not collude or enter into any agreement with any other Applicant concerning the preparation of its

application, pay any amount to an unsuccessful Applicant or seek to obtain knowledge of the

price of any other application;

e) not attempt to influence the outcome of this process by offering gifts, employment or other

benefits to SA Government employees or persons engaged by the Principal and others who are

in a position to influence the award of the contract;

f) not attempt to seek confidential information in respect of this application process from the SA

Government employees and others who have access to confidential information; and





DPTI Rust Rectification for Public Buses (Panel Agreement) Page 2

Edition: March 2011 Conditions for Submission of an Application





g) not make any news releases or responses to media enquiries and questions pertaining to this

application process without the Principal’s written approval.



CT 5 SUBMISSION OF APPLICATIONS



The Applicant’s submission must comply with the following:

a) the submission shall be lodged in accordance with the requirements stated on the cover sheet of

this Invitation document;

b) all documents and schedules listed in CT Annexure A shall be included in the submission; and

c) hard copy documents shall be sealed in an envelope or package, marked confidential and clearly

identified as a submission for this Panel Contract.



The Applicant’s submission shall become the property of the Principal.



CT 6 COSTS OF APPLICATION PREPARATION



Applicants bear all costs that they incur in the application process, which includes any subsequent

contract negotiation phase prior to the award of a contract.



CT 7 NON-CONFORMING OR ALTERNATIVE APPLICATIONS



A conforming application must address every matter and comply with every requirement specified in

these Invitation Documents. An incomplete application or an application which does not comply with

every requirement specified in these Invitation Documents will be deemed to be a non-conforming

application. At the absolute discretion of the Principal, a non-conforming application may be rejected.



CT 8 APPLICATION ASSESSMENT AND NEGOTIATION



Applications will be assessed in accordance with DPTI evaluation procedures and the criteria listed in

CT Annexure B "Assessment of Applications".



At any time prior to award of a contract, the Principal reserves the right to:

a) seek clarification of any aspect of a application;

b) seek the advice and / or assistance of external consultants regarding the assessment of

applications; and

c) make enquiries of any person, company or organisation to ascertain information regarding any

Applicant and its application.



If requested by the Principal, selected Applicant(s) must provide additional written information regarding

their application or attend an interview.



CT 9 REPRESENTATIONS



No representation made by or on behalf of the Principal in relation to these Invitation Documents (or its

subject matter) will be binding on the Principal unless that representation is expressly incorporated into

the contract ultimately entered into between the Principal and a successful Applicant.



CT 10 CONFIDENTIAL INFORMATION AND DISCLOSURE OF CONTRACT



The Principal will treat applications (including information submitted at the request of the Principal after

the date of close of applications) as confidential and will not disclose application contents, except:

a) as required by law;

b) to the Principal’s agents and advisors for the sole purpose of application evaluation;

c) to the Australian Competition and Consumer Commission (or other government authority having

relevant jurisdiction) if the Principal reasonably suspects that there is cartel conduct in relation to

this application process; and







DPTI Rust Rectification for Public Buses (Panel Agreement) Page 3

Edition: March 2011 Conditions for Submission of an Application





d) where an Applicant is successful, in accordance with Premier and Cabinet Circular 27 (PCO27)

on the South Australian Government’s Contracts website http://www.tenders.sa.gov.au



The Applicant agrees to comply with PCO27, a copy of which is available from

http://www.premcab.sa.gov.au/dpc/publications_circulars.html



The Applicant agrees that unless indicated otherwise, all information provided by the Principal to the

Applicant after the date of close of applications is confidential and the Applicant shall undertake to

maintain such information as confidential.



CT 11 APPLICATION VALIDITY PERIOD



The Applicant warrants that it will maintain the validity of its application for a period of 90 days from date

of submission of application.



CT 12 ACCEPTANCE OF APPLICATION



The Applicant agrees and acknowledges that the Principal is under no obligation to accept the lowest or

any application received. In its absolute discretion, the Principal may reject any application at any time or

abandon this application process.



Nothing in these Invitation Documents or any subsequent application assessment or negotiation process

is to be construed as creating a binding contract (express or implied) between the Principal and any

Applicant. No legal relationship will exist between the Principal and any Applicant unless and until the

Principal has delivered (either by post, courier, hand delivery or facsimile) a written notice of acceptance

of application to the successful Applicant at the address stated on the application form.







____________









DPTI Rust Rectification for Public Buses (Panel Agreement) Page 4

Revision 0 CS Annexures



CS ANNEXURE A



APPLICATION DETAILS





APPLICANTS MUST INCLUDE THE FOLLOWING IN THE SUBMISSION:



Application Form

The following Schedules:

1. Schedule of Prices

2. Schedule of Rates.

3. Certificate of Currency of Public Liability Insurance.

4. Experience:

4.1 Provide an overview of the company, including its structure as is relevant to this

submission including facility location.

4.2 Provide brief details of relevant experience, including examples of similar work

undertaken (type of vehicles) and names of referees.

4.3 Brief details of key personnel and other personnel who would be engaged in the

repair of buses, i.e. competency in operating equipment, trade certificates etc.. A

statement that only qualified tradespersons will be used may suffice with details of

supervisor or design personnel.

5. Equipment:

5.1 Provide a list including a detailed description of the equipment to be used especially

spray paint booths including size, cleaning equipment including inspection and

cleaning of the underside of buses, paint drying ovens, 2 pack paint systems.

5.2 Demonstrate that the facility and equipment is suitable to handle all size buses.

5.3 Provide evidence or a signed statement that equipment meets all legal, safety

requirements and environmental standards and will for the term of the contract.

5.4 Briefly describe methods and/or facilities for handling waste products and any

certificates required by the EPA.

5.5 Describe the organisations contingency plans should the equipment not be

operational.

5.6 Provide details of quality accreditations or methods/systems to ensure quality of

product and workmanship.

6. Personnel:

6.1 Provide staff turn-over rates for last 12 months.

6.2 Provide details of on going training for personnel.

6.3 Provide brief an overview of the organisation’s Occupational Health and Safety

systems as they relate to this submission.

7. Contract Management

7.1 Provide the details of the person responsible for the contract including contact

details.

7.2 Provide details of the organisation’s warranty policy.

7.3 Provide an overview of the organisations Risk Management systems especially

relating to safety critical repairs.

7.4 Provide an overview of customer focus especially on meeting dead-lines and dispute

resolution.

7.5 Provide details of Continuous Improvement activities ie suggestions to DPTI to

reduce work, repairs to last longer etc.





Number of copies to be submitted: One original (unbound) plus 3 copies (may be bound or unbound).









DPTI Rust Rectification for Public Buses (Panel Agreement) Page 1

Revision 0 CS Annexures



____________









DPTI Rust Rectification for Public Buses (Panel Agreement) Page 2

Revision 0 CS Annexures



CS ANNEXURE B



ASSESSMENT OF SUBMISSIONS





Applicants will be evaluated in accordance with the following process;



1) Assessment for Completeness and Compliance, including Certificate of Insurance.



2) Non price assessment using the following criteria and weightings:



Criteria Weighting (%)

 Demonstrated company experience 27

 Equipment 33

 Personnel 11

 Approach to Contract Management 29





3) Price assessment using those prices submitted in the Schedules.



4) Selection of Preferred Applicants



Applicants will be ranked using the non price score and a shortlist prepared. Where a notional

price of a short-listed Application is notably higher than the average notional price for no

additional benefits, that Applicant will be excluded from further assessment.



5) Finalisation of Agreement



Following any clarification and negotiation necessary, the preferred Applicant will be requested to

enter into a formal agreement for the provision of the services.







____________









DPTI Rust Rectification for Public Buses (Panel Agreement) Page 3

Revision 0 CS Annexures



CS ANNEXURE C



SUPPLEMENTARY INFORMATION FOR APPLICANTS





The Principal intends to select a panel of Contractors to provide these services. The need for the

services will be dependent on the Principal’s program of works.







____________









DPTI Rust Rectification for Public Buses (Panel Agreement) Page 4

Revision 0 Statement of Requirements









STATEMENT OF REQUIREMENTS









DPTI Rust Rectification for Public Buses (Panel Agreement) Page 1

Revision 0 Statement of Requirements



STATEMENT OF REQUIREMENTS



INDEX





1. Introduction

2. Definitions and Abbreviations

3. Allocation of Work and Performance Assessment

4. Time for Repairs

5. Liquidated Damages

6. Payment

7. Materials

8. Standards

9. Associated Work Not in Contract

10. Transport of Buses to and from Contractor’s Premises

11. Inspections

12. Hold Points

13. Welded Fabrication

14. Material Cutting

15. Frame Painting

16. Exterior Painting

17. Corporate Colours

18. Bus Operator’s Equipment

19. Crouzet Ticketing Equipment

20. Site Access



APPENDICES



Appendix A Approved Materials List

Appendix B Out of Contract Work



WORK BRIEFS



Appendix C1 (Not used and not included)

Appendix C2 (Not used and not included)

Appendix C3 (Not used and not included)

Appendix C4 Corporate Colours On All White Buses

Appendix C5 Corporate Colours On Non-White Buses

Appendix C6 Minimum Work Associated with Rust Rectification and Refurbishment of MAN NL202, MIDI

HOCL, AND SL202 Bus Floor



SAMPLE INSPECTION FORMS



Appendix D1 (Not used and not included)

Appendix D2 (Not used and not included)

Appendix D3 (Not used and not included)

Appendix D4 Bus Inspection Form, MAN NL202 Buses

Appendix D5 Bus Inspection Form, MAN SL202 Buses

Appendix D6 Bus Inspection Form, MAN MIDI HOCL Buses



Appendix E Description of Corporate Colours



ATTACHMENTS



Attachment 1 Proposed Bus Body Rectification Work

Attachment 2 Locations of Principal Owned Buses







____________









DPTI Rust Rectification for Public Buses (Panel Agreement) Page 2

Revision 0 Statement of Requirements





1. PROVISION OF SERVICES



The Services required consist of rust rectification and repairs, refurbishment and painting of buses owned by the

Principal. These buses are located in DPTI depots in the metropolitan and outer metropolitan areas.



All work and services shall be carried out in accordance with this Specification and the General Conditions of

Contract for Services. Work Briefs for selected metro buses are shown in Appendix C. The Principal may vary or

add work briefs as the need arises.



Refer to Attachment 1 for proposed rust rectification program for period 2007/2010 and location of bus depots and

Bus Operators. The works program may be revised by DPTI as required.



The Parties agree that:

 The Contractor is a member of Panel of Providers ("Panel") that has been established by the Principal to

provide the Services specified in the Brief;

 The Principal may select any member of the Panel to provide the Services; and

 If selected by the Principal, the Contractor shall provide the Services upon the terms and conditions of this

Agreement.



The Principal may:

 request that all or any members of the Panel provide a quotation for the provision of the Services,

notwithstanding that pre-agreed rates may form part of this Agreement;

 seek offers from providers not on the Panel; and

 appoint new providers as members of the Panel.



The Principal is not obliged to engage the Contractor to provide any Services during the term of this Agreement. If

the Principal engages the Contractor to provide Services and does not seek a quotation, the Services shall be paid for

at any pre-agreed rates forming part of this Agreement.



2. DEFINITIONS AND ABBREVIATIONS



Hold Points



A “Hold Point” is an identified point in a work-related process, beyond which the stated activity cannot proceed

without release of the Hold Point. A Hold Point shall only be released by the Principal.



Release of a Hold Point shall not, in whole or in part, absolve the Contractor from responsibility for the satisfactory

performance or execution of the work subject to the Hold Point.



Buses



Any buses owned by the Principal regardless of make, type and configuration



Bus Operator



The bus operating companies who lease the buses from the Principal and are responsible for providing the public

transport service.



Abbreviations



The following abbreviations are used throughout the Contract Documents:



AS Australian Standard

APAS Australian Paint Approval Scheme

DPTI Department for Transport Energy and Infrastructure

NATA National Association of Testing Authorities





DPTI Rust Rectification for Public Buses (Panel Agreement) Page 3

Revision 0 Statement of Requirements





3. ALLOCATION OF WORK AND PERFORMANCE ASSESSMENT



Work will be allocated on a 6 monthly basis. The second and subsequent 6 monthly allocation of work will be

based on an assessment of the Contractor’s performance. The assessment will consider:

 Timeliness of work completed

 Contractor’s ability to manage and control the total repair cost per unit to the satisfaction of the Principal.

 Quality of work completed.



The Principal may allocate minor repair work (generally less than $7000) on the basis of who the Principal

determines the most appropriate contractor at the time.



The quotation shall consist of lump sum component/s, and hourly rate for rust rectification.



4. TIME FOR REPAIRS



4.1 Time for Commencement of Repairs



The Contractor will be given 1 weeks notice of availability of a bus for commencement of work.



4.2 Time for Completion of Repairs



Work described in Appendix C6 on each individual bus shall be completed within 3 weeks plus negotiated rust

repair days from the time of delivery to the Contractor of each individual bus.



Work described in Appendix C4 on each individual bus shall be completed within 3 days.



Work described in Appendix C5 on each individual bus shall be completed within 4 days.



The rust repair days will be calculated based on the following formula:



HRS

Days 

83

Where for the purpose of equivalent treatment of each Contractor, 8 is a predetermined 8 hour working day and 3 is

a predetermined number of employees working on the bus.



Times for completion for work not described above will be stated in the Request for Quotation.



5. LIQUIDATED DAMAGES



For each bus not completed by the required time as determined under Clause 4.2 above, the following liquidated

damages shall apply and will be deducted from moneys due to the Contractor:

 $250 per day - indexed in line with the movement of the Australian Consumer price Index as published by

the Australian Bureau of Statistics



6. PAYMENT



Further to Clause 8 of the General Conditions of Contract, payment will be made after all the work under the

Contract is completed for each individual bus and accepted by the Principal. In relation to work described in work

briefs C6 and where nominated by the Principal and only if required, the Contractor may apply to the Principal for

one milestone payment to be made before all the work under the Contract is completed for each individual bus. The

milestone payment will amount to 50% of total Contract value for that bus and will be made at the time of the bus

entering the paint booth provided that all Hold Points up to that time have been released.



Where applicable, the amount of payment for repair of rust will be determined on the basis of the required hours of

work as agreed between the Contractor and the Principal after the individual bus has been stripped. The hourly rate

quoted for the repair of rust shall include an allowance for materials that are likely to be used for these repairs.







DPTI Rust Rectification for Public Buses (Panel Agreement) Page 4

Revision 0 Statement of Requirements



7. MATERIALS



All materials required under this Contract shall be supplied by the Contractor. Only materials approved by the

Principal shall be used in repair work. The current approved materials are listed in Appendix A “Approved

Materials List”.



The Contractor may propose alternative materials for approval by the Principal. The Contractor shall demonstrate

that proposed alternative materials are equivalent or superior in performance to the approved materials. Alternative

materials shall not be used unless written approval from the Principal is received by the Contractor.



All equipment, plant, tools, patterns, jigs and materials required for the Contract shall be supplied by the Contractor.



8. STANDARDS



Repair work shall be carried out in accordance with relevant Australian Standards and Codes of Practice including,

but not limited to, the following:



The South Australian Central Inspection Authority, "Code of Practice for Buses", July 1985.



WORKSAFE AUSTRALIA STANDARD:



NOHSC: 1012 (1994) National Standard for the Control of Inorganic Lead at Work.



STANDARDS ASSOCIATION OF AUSTRALIA:



AS 1554.1 Welding of Steel Structures

AS 1627.1 Cleaning using Liquid Solvents and Alkaline Solutions

AS 1627.4 Abrasive Blast Cleaning

AS 2312 Guide to the Protection of Iron and Steel Against Exterior Atmospheric Corrosion.



9. ASSOCIATED WORK NOT IN CONTRACT



Work that is not included in this Contract is shown in Appendix B “Out of Contract Work”. It is the Contractor’s

and Bus Operator’s responsibility to negotiate separately if this work is to be performed. The work shall not

interfere with the time schedule of this Contract and the Principal has no responsibility for this work. If any

associated work proceeds, the cost of the work shall be borne by the Bus Operator.



10. TRANSPORT OF BUSES TO AND FROM CONTRACTOR'S PREMISES



The Contractor shall deliver and pick-up buses by arrangement with the Bus Operator.



11. INSPECTIONS



11.1 Initial Inspection



Each individual bus will undergo an Initial Inspection with its condition recorded as per relevant Inspection 1, Bus

Inspection Form (Appendix D). This inspection will be performed at the Bus Operator's depot by the Principal, with

the Bus Operator, to ascertain the condition of the bus before release to the Contractor.



11.2 Final and Re-inspections



Each individual bus shall undergo a Final acceptance Inspection at the Contractor’s premises with its condition

recorded on the Bus Inspection Form (Appendix D).



Re-inspections will be required if the work performed by the Contractor is not to the Principal’s satisfaction.

The Contractor shall be responsible for the cost of re-inspections after the first final acceptance inspection. This

cost will be $60.00 per hour which will be deducted from moneys due to the Contractor.



12. HOLD POINTS



To ensure compliance with critical aspects of the Contract, Hold Points shall apply. Hold Points required by the

Principal shall be as shown in Work Briefs, Appendix C.





DPTI Rust Rectification for Public Buses (Panel Agreement) Page 5

Revision 0 Statement of Requirements





When a Hold Point has been reached the Contractor shall contact the Principal to arrange a suitable inspection time.



The Principal will be available to perform the inspection during customary working hours on ordinary working days

within 2 working days of being notified of a Hold Point being reached.



The Contractor shall not proceed to the next stage of the works until the Hold Point has been released by the

Principal.



The Principal shall have the right to withhold payment for work done subsequent to a Hold Point not being released.

The Principal shall also have the right for the work to be "opened up" for inspection at the Contractor’s cost should

installation work proceed beyond the Hold Point and the area to be inspected is covered.



The following is a brief description of the Hold Points required in this Contract.



For work generally described in Appendix C:



HOLD POINT 1



Contractor’s verification signature on the Bus Inspection Form as per Clause 11.1 “Initial Inspection”.



HOLD POINT 2



Inspection to allow the Principal to determine the amount of work required to perform the rust rectification

process.



HOLD POINT 3



Inspection to ensure the rust rectification repairs have been performed to the required standards.



HOLD POINT 4



Inspection to ensure that the repaired bus framework has been adequately protected from future corrosion.



HOLD POINT 5



Final inspection and acceptance of the bus as per Clause 11.2 “Final and Re-inspections”.



For work described in Appendix C4 and C5 (Corporate Colours only):



HOLD POINT 1



Contractor’s verification signature on the Bus Inspection Form as per Clause 11.1 “Initial Inspection”.



HOLD POINT 2



Final inspection and acceptance of the bus as per Clause 11.2 “Final and Re-inspections”.





13. WELDED FABRICATION



All welding shall be SP category in accordance with AS 1554.1.



All welds shall be pre-qualified in accordance with Clause 4.3 of AS 1554.1 and subject to visual inspection of work

in accordance with Clause 6.2 of AS 1554.1.



14. MATERIAL CUTTING



Surfaces produced by cutting shall be finished true and smooth to the required dimensions. All burrs and sharp

edges on cut surfaces shall be removed.









DPTI Rust Rectification for Public Buses (Panel Agreement) Page 6

Revision 0 Statement of Requirements



15. FRAME PAINTING



15.1 Paint



Paint shall be approved by the APAS, unless otherwise approved by the Principal.



All coatings used in a system shall be from the one manufacturer and applied in accordance with the manufacturer’s

written recommendations.



15.2 Preliminary Cleaning



Deposits of oil and grease shall be removed by solvent cleaning in accordance with AS 1627.1.



15.3 Final Cleaning



Metal work shall be thoroughly cleaned back to bare metal, removing all rust, mill scale, weld slag, paint or any

extraneous material by sanding or other method approved by the Principal.



Note:

(a) The first coat of the protection system, as specified, shall be applied on the same day as cleaning, within

4 hours of cleaning or before discolouration occurs, whichever is the sooner. In the event of the surface

becoming contaminated between cleaning and applying the protective treatment, it shall be re-cleaned.

(b) All material including rust, paint, mill scale shall be contained and disposed of in accordance with

appropriate State Authorities Regulations.



15.4 First Coat



One coat of International Intercure 200 (or Principal approved equivalent) to minimum 75 m shall be applied.



15.5 Final Coat



One coat of International Interplus 356 (or Principal approved equivalent) to minimum 125 m shall be applied.



16. EXTERIOR PAINTING



16.1 Preliminary Cleaning



All excess sealer shall be removed prior to painting. All surfaces shall be thoroughly degreased using wax and

grease remover, as recommended by the paint manufacturer. All openings and other items requiring protection from

paint shall be masked.



16.2 Paint



Paint shall be approved by the APAS, unless otherwise approved by the Principal.

All paints used in a system shall be from the one manufacturer and applied according to the paint manufacturer's

written recommendations. Where appropriate, paint TSA White – PPG XNP1 (or Principal approved equivalent)

shall be used on bus exterior.



16.3 Coating System



A minimum of 2 coats of FILLER/SURFACER, as recommended by the manufacturer or equivalent as approved by

the Principal, shall be applied by spray to fibreglass panels and any other repairs completed.



The surfaces shall be lightly sanded.



A minimum of 2 coats of PRIMER SURFACER, PPG F391 Chromate Free Epoxy Primer or equivalent as approved

by the Principal shall be applied by spray.



A minimum of 2 coats of TWO PACK ACRYLIC URETHANE, PPG Delfleet Topcoat (TSA White PPG XNP1) or

equivalent as approved by the Principal, shall be applied by spray.







DPTI Rust Rectification for Public Buses (Panel Agreement) Page 7

Revision 0 Statement of Requirements



17. CORPORATE COLOURS



Corporate Colours described in Appendix E maybe requested to be applied at the time of performing rust

rectification and refurbishment works.



18. BUS OPERATOR’S EQUIPMENT



Bus Operator’s equipment, including video surveillance cameras, closed circuit television and radio communication

equipment shall not be interfered with without the express permission of the Bus Operator.



19. CROUZET TICKETING EQUIPMENT



Where necessary, the Contractor shall be responsible for arranging the removal and installation of the Crouzet

Ticketing equipment. The Passenger Transport Services Division staff are authorised to perform this work and the

Contractor shall contact Dave Powditch on 8226 4481 or 0401 125 701 to arrange for this work to be carried out.



20. SITE ACCESS



The Contractor shall provide safe access to the Principal and its representatives, as necessary, for the purpose of

administering this Contract.







____________









DPTI Rust Rectification for Public Buses (Panel Agreement) Page 8

Revision 0 Statement of Requirements

Appendix A



APPENDIX A



APPROVED MATERIALS LIST





Contractors shall submit details of materials used when requested. The following materials shall be used in the

work, unless otherwise approved by the Principal.



Relating to all works and bus types, if necessary:

Skinning Butyl Mastic Windscreen Sealer.

Sikaflex 221 Black.

International Intercure 200 or approved equivalent.

International Interplus 356 or approved equivalent.

Filler/Surfacer, as recommended by the manufacturer of the painting system.

Primer Surfacer, PPG F391 Chromate Free Epoxy Primer or approved equivalent.

Two Pack Acrylic Urethane, PPG Delfleet Topcoat (TSA White PPG XNP1) or approved equivalent.

Two Pack Acrylic Urethane, PPG Delfleet Topcoat (PTB Yellow, Code XBN5) or approved equivalent.

Two Pack Acrylic Urethane, PPG Delfleet Topcoat (PTB Red, Code XBN4) or approved equivalent.

Two Pack Acrylic Urethane, PPG Delfleet Topcoat (PTB Blue, Code XBN6) or approved equivalent.

Exterior Grade Plywood, 12, 15 or 16 mm thick.

RHS and other profile metals to match existing size and type.

Floor Vinyl, Eminent 2.0 mm thick, colour 459 (Black).

5.4 mm Sealed Stainless Steel or monel Rivets throughout.

Aluminium Step Nosing – Custom Coach RK20 or equivalent.

Yellow Step Insert – Custom Coach R37FL028 or equivalent.

FS 14114 Pozi Floor Screws Z.Y. to fix plywood to floor frame.





EXTERIOR PANELS.



Relating to works on Mercedes 0305 Rigid, 0305G Artic and MAN SG280H Artic buses only:

Zinc Annealed Sheet Metal, 1.2 mm thick.



Relating to works on MAN SL200 buses only:

Aluminium Waist Panels, 1.0mm, ¾ Hard Grade. If anodised finish to BS 1615:1961.

Aluminium Skirt Panels, 0.9mm, ½ Hard Grade. If anodised finish to BS 1615:1961.



Relating to works on MAN NL202 buses only,

3mm Aluminium , Grade R1119



Relating to works MAN Midi and SL202 buses only:

1.2mm zincanneal









DPTI Rust Rectification for Public Buses (Panel Agreement) Page 9

Revision 0 Statement of Requirements

Appendix B



APPENDIX B



OUT OF CONTRACT WORK





Work that is not included in the Specification but may be performed at the Bus Operator’s expense includes:



Repair seats/seat frames

Repair handrails

Repair partitions

Repaint front or rear inside header panels

Replace or repair damaged bumper bars

Replace front door guides

Replace Laminex inside linings

Repairs to roof

Fit new windscreens, windows or other glass

Replace or repair window frames

Replace or repair access doors

Replace or repair passenger entry or exit doors

New passenger door seals and door window rubber

Repair or replace articulated curtains

Accident damage repairs

Decals

Electrical repairs as noted in the inspection

Exterior paint works

Replace number plates.

Other as requested by the Bus Operator.







_____________









DPTI Rust Rectification for Public Buses (Panel Agreement) Page 10

Revision 0 Statement of Requirements

Appendix C



APPENDIX C4



WORK BRIEF FOR CORPORATE COLOURS ON

ALL WHITE BUSES





MINIMUM WORK ASSOCIATED WITH PAINTING OF CORPORATE COLOURS

ON ALL WHITE BUSES





HOLD POINT 1



It is the Contractor’s responsibility to review the relevant Bus Inspection report, (as per Clause 12 "Hold Points")

and verify on the inspection form, that this has occurred. Work shall only commence once the Inspection 1 form has

been certified by the Contractor.



All items below shall be completed prior to Hold Point 2



C4-A Stripping of Bus



The following steps are required as part of stripping the bus:

(1) Disconnect batteries and bus electronics.

(2) Remove fittings to aid in painting of bus.

(3) Prepare surfaces for painting.

(4) Mark up Colour Scheme as per Appendix E.



C4-3 Painting of Body



The Contractor shall carry out the exterior painting of the body as specified in Clause 16 "Exterior Painting".



C4-C Final Assembly



The Contractor shall carry out final assembly of the bus, ensuring to meet all required safety standards and

regulations, taking note of the following:

(1) All remaining fittings and components shall be refitted ensuring that they are adjusted and

operating correctly.

(2) The bus shall be free of visible paint overspray, cleaned and detailed.

(3) The bus shall be tested and road tested.

(4) The bus shall be fully operational on completion.



HOLD POINT 2



Arrange for Principal to perform final acceptance inspection. The inspection shall be recorded on the bus inspection

form, (Inspection 4). The Contractor shall arrange delivery of the bus. The Principal will arrange sign off with the

Bus Operator.









DPTI Rust Rectification for Public Buses (Panel Agreement) Page 11

Revision 0 Statement of Requirements

Appendix C



APPENDIX C5



WORK BRIEF FOR CORPORATE COLOURS ON

NON-WHITE BUSES





MINIMUM WORK ASSOCIATED WITH

PAINTING OF CORPORATE COLOURS ON NON-WHITE BUSES





HOLD POINT 1



It is the Contractor’s responsibility to review the relevant Bus Inspection report, (as per Clause 12 "Hold Points")

and verify on the inspection form, that this has occurred. Work shall only commence once the Inspection 1 form has

been certified by the Contractor.



All items below shall be completed prior to Hold Point 2



C5-A Stripping of Bus



The following steps are required as part of stripping the bus:

(1) Disconnect batteries and bus electronics.

(2) Remove fittings to aid in painting of bus.

(3) Prepare surfaces for painting.

(4) Mark up Colour Scheme as per Appendix E.



C5-B Painting of Body



The Contractor shall carry out the exterior painting of the body as specified in Clause 16 "Exterior Painting"

ensuring the old corporate colour scheme is removed and the new corporate colour scheme is painted on.



C5-C Final Assembly



The Contractor shall carry out final assembly of the bus, ensuring to meet all required safety standards and

regulations, taking note of the following:

(1) All remaining fittings and components shall be refitted ensuring that they are adjusted and

operating correctly.

(2) The bus shall be free of visible paint overspray, cleaned and detailed.

(3) The bus shall be tested and road tested.

(4) The bus shall be fully operational on completion.



HOLD POINT 2



Arrange for Principal to perform final acceptance inspection. The inspection shall be recorded on the bus inspection

form, (Inspection 4). The Contractor shall arrange delivery of the bus. The Principal will arrange sign off with the

Bus Operator.







_____________









DPTI Rust Rectification for Public Buses (Panel Agreement) Page 12

Revision 0 Statement of Requirements

Appendix C



APPENDIX C6



MINIMUM WORK ASSOCIATED WITH

RUST RECTIFICATION AND REFURBISHMENT OF MAN NL202 BUS FLOORS





HOLD POINT 1



It is the Contractor’s responsibility to review the MAN Bus Inspection report, (as per Clause 12 "Hold Points") and

verify on the inspection form, that this has occurred. Work shall only commence once the Inspection 1 form has

been certified by the Contractor.



All items below shall be completed prior to Hold Point 2



C6-A Stripping of Bus



The following steps are required as part of stripping the bus:

(1) Disconnect batteries and bus electronics.

(2) Arrange for the removal of the Crouzet Ticketing Equipment.

(3) Remove seat and seat frames.

(4) Remove handrails and partitions.

(5) Remove vinyl floor covering, including drivers platform area.

(6) Remove passenger doors.

(7) Principal will determine the removal and replacement of the rear wheel chair ramp and

mechanism.

(8) Scrape all sealer from floor frame.

(9) Reinforce all flat steel in floor frame with 50mm x 50mm x 5mm steel angle.





MANDATORY HOLD POINT 2



Arrange for the Principal to view the bus frame to determine the repairs required and hours required. Determined

repairs and hours shall be recorded on the bus inspection form, (Inspection 2) and signed by Principal and

Contractor.



The items listed below shall be completed prior to Hold Point 3.



C5-B Repair of Rust



Areas of rust shall be repaired as determined by the Principal





MANDATORY HOLD POINT 3



Arrange for the Principal to preview work to ensure quality of work. The inspection shall be recorded on the bus

inspection form, (Inspection 3).



All items listed below shall be completed prior to Hold Point 4.



C6-C Frame and Chassis Painting



The frame shall be painted as specified in Clause 15 "Frame Painting".





MANDATORY HOLD POINT 4









DPTI Rust Rectification for Public Buses (Panel Agreement) Page 13

Revision 0 Statement of Requirements

Appendix C



Arrange for Principal to preview work to ensure quality of work. The inspection shall be recorded on the bus

inspection form, (Inspection 4).



All items listed below shall be completed prior to Hold Point 5.



C6-D Final Assembly



The Contractor shall reassemble the bus to meet all required safety standards and regulations, ready for painting,

taking note of the following:

(1) Replace all floor ply with 16mm exterior plywood; seal underside of flooring to steel frame of

bus; prepare and paint underside of floor in green grey enamel.

(2) Manufacture new floor traps and fit new aluminium edging as recommended by Principal.

(3) Lay new vinyl floor with Tarket 094-NCS8500-N

(4) Supply and fit red vinyl to two (2) wheel chair access areas and cut wheel chair logo’s in colour

black in centre of tile.

(5) Fit aluminium nosing RK 20 at step wells, aisles and step risers if original aluminium step nosing

is damaged at removal.

(6) Fit YELLOW step nosing insert R37SLO28

(7) Prepare and paint all step wells.

(8) Arrange for installation of Crouzet Ticketing Equipment.

(9) All remaining fittings and components shall be refitted ensuring that they are adjusted and

operating correctly.

(10) The bus shall be cleaned and detailed.

(11) The bus shall be fully operational on completion.





MANDATORY HOLD POINT 5



Arrange for Principal to perform final acceptance inspection. The inspection shall be recorded on the bus inspection

form, (Inspection 5). The Contractor will arrange delivery of the bus. The Principal shall arrange sign off with the

Bus Operator.





Extras.



Any extra work as noted below shall be arranged with the Principal before the installation of new plywood floor.

1. Reinforcement of rear axel shock absorber top mounting brackets.

2. Any corrosion repairs requiring the replacement of chassis tubing or step riser panelling.

3 Removal of rear mechanical wheelchair ramp.







______________









DPTI Rust Rectification for Public Buses (Panel Agreement) Page 14

Revision 0 Statement of Requirements

Appendix D









APPENDIX D4 – Bus Inspection Form



MAN NL 202 Buses



(Contact a Contact officer listed on the cover sheet of this Invitation for a copy of this Form)









DPTI Rust Rectification for Public Buses (Panel Agreement) Page 15

Revision 0 Statement of Requirements

Appendix D









APPENDIX D5 – Bus Inspection Form



MAN SL 202 Buses



(Contact a Contact officer listed on the cover sheet of this Invitation for a copy of this Form)









DPTI Rust Rectification for Public Buses (Panel Agreement) Page 16

Revision 0 Statement of Requirements

Appendix D









APPENDIX D6 – Bus Inspection Form



MAN MIDI HOCL Buses



(Contact a Contact officer listed on the cover sheet of this Invitation for a copy of this Form)









DPTI Rust Rectification for Public Buses (Panel Agreement) Page 17

Revision 0 Statement of Requirements

Appendix E









APPENDIX E – DESCRIPTION OF CORPORATE COLOURS



(Contact a Contact officer listed on the cover sheet of this Invitation for a copy of the CD-ROM containing this

information)









DPTI Rust Rectification for Public Buses (Panel Agreement) Page 18

Revision 0 Statement of Requirements

Attachment 1



ATTACHMENT 1



PROPOSED BUS BODY RECTIFICATION WORK BY DPTI - 2007/2010





As a guide to the amount of bus repair work that DPTI plans to undertake, refer to the table below. Note that these

numbers may change from time to time due to various reasons such as unforseen work, unavailability of buses,

funding constraints, etc..





APPLICATION OF

INTERNAL Minor

BUS TYPE QUANTITY CORPORATE

FLOOR Works

COLOURS



MAN SL200 40 As required As required

MAN SL200 CNG 10 As required As required

Mercedes 0305 Artic 51 As required As required

Mercedes 0305 41 As required As required

MAN SG280 Artic 40 As required As required

MAN NL 202 Prototype 4 As required As required

MAN SL 202 Diesel 25 As required As required

MAN SL 202 CNG 100 25 As required As required

MAN MIDI HOCL 50 50 As required As required

MAN NL 202 Diesel 75 40 As required As required

MAN NL 202 CNG 42 42 As required As required

MAN NL 202 CB61A CNG 11 11 As required As required

MAN 232 CNG 50 As required As required

MAN 18.280NL 76 As required As required

Scania L94UA 6x2/2 Artic 51 As required As required

Scania L94UB 4x2 15 As required As required

Scania L94UB 4x2 CNG 1 As required As required

Scania L94UB 4x2 OBAHN 22 As required As required









DPTI Rust Rectification for Public Buses (Panel Agreement) Page 19

Revision 0 Statement of Requirements

Attachment 2





ATTACHMENT 2



LOCATION OF BUSES OWNED BY THE PRINCIPAL







BUS OPERATOR DEPOT ADDRESS

LONSDALE DEPOT 21 Krawarri Street

LONSDALE SA

SOUTHLINK

ELIZABETH DEPOT Ridgeway Road

ELIZABETH WEST SA



ALDGATE DEPOT 300 – 308 Mt Barker Road

TRANSITPLUS ALDGATE SA



MILE END DEPOT 71 Richmond Road

MILE END SA



PORT ADELAIDE DEPOT 244 Port Road

ALBERTON SA



CAMDEN PARK DEPOT 99-103 Morphett Road

CAMDEN PARK SA

TORRENS TRANSIT

NEWTON DEPOT Cnr Papagni & Meredith Streets

NEWTON SA



MORPHETTVILLE DEPOT 171 Morphett Road

MORPHETTVILLE SA



ST AGNES DEPOT 1146 North East Road

ST AGNES SA









DPTI Rust Rectification for Public Buses (Panel Agreement) Page 20

PANEL AGREEMENT





FOR





THE PROVISION OF SERVICES









DPTI Rust Rectification for Public Buses (Panel Agreement)

Edition: September 2009 Panel Agreement



PANEL AGREEMENT FOR THE PROVISION OF SERVICES



INDEX







1. OBJECTIVE AND SCOPE

2. DEFINITIONS

3. INTERPRETATION

4. QUOTATIONS

5. CONTRACTOR’S OBLIGATIONS

6. ADMINISTRATION

7. TERM

8. FORCE MAJEURE

9. EXTENSION OF TIME

10. Reserved

11. INTELLECTUAL PROPERTY RIGHTS

12. PAYMENT

13. VARIATIONS

14. REMEDIES

15. RELATIONSHIP BETWEEN THE PARTIES

16. THE CONTRACTOR’S EMPLOYEES

17. SUB-CONTRACTING AND ASSIGNMENT

18. TERMINATION

19. INSURANCE

20. RESOLUTION OF DISPUTES

21. NOTICES

22. CONFIDENTIALITY

23. CONSTRUCTION OF AGREEMENT

24. WAIVER

25. ENTIRE AGREEMENT

26. SEVERABILITY

27. GOODS AND SERVICES TAX

28. OCCUPATIONAL HEALTH AND SAFETY

29. (Reserved)

30. ASSISTANCE WITH GOVERNMENT REPORTING AND PUBLIC ENQUIRIES

31. AUDIT









DPTI Rust Rectification for Public Buses (Panel Agreement) Page 2

Edition: September 2009 Panel Agreement



1. OBJECTIVE AND SCOPE



The Parties agree that:

A. The Contractor is a member of panel of providers ("Panel") that has been established by the Principal to

provide the Services specified in the Statement of Requirements;

B. The Principal may select any member of the Panel to provide the Services; and

C. If selected by the Principal, the Contractor shall provide the Services upon the terms and conditions of this

Agreement.



The provisions of this Agreement shall be construed so as to give full effect to the objectives contained in this

clause.



2. DEFINITIONS



In this Agreement unless something else is clearly intended:



"Administrator" has the same meaning as that term has in the Corporations Act;



"Agreement" means the agreement between the Principal and the Contractor, and comprises of the documents

listed in the “Schedule of Agreement Documents”.



"Statement of Requirements" means the document, designated as such, which stipulates the nature and scope of

Services to be provided under this Agreement, including performance requirements for timeliness, cost and quality

of the Services;



"Business Day" means any day between Monday and Friday (both inclusive) excluding public holidays proclaimed

as such under the Holidays Act 1910;



"Confidential Information" means all information that:

(a) is by its nature confidential;

(b) is designated as confidential by the disclosing Party;

(c) is designated as confidential by a third party who supplies the information to the disclosing Party; or

(d) the receiving Party knows or ought to know is confidential,

and includes:

(a) any information that is confidential by virtue of the circumstances in which a third party may have

submitted that information to the disclosing Party;

(b) any information relating to the policies, strategies, practices and procedures of the Contractor, the

Principal or of the Government;

but does not include information:

(a) which is or becomes public knowledge or public domain other then by a breach of the Agreement;

(b) which is required to be disclosed by law;

(c) which has been independently developed or acquired by a Party; or

(d) of which disclosure is permitted in writing by the disclosing Party;



"Contractor" means the person, firm, partnership, company or other legal entity who as a party to this Agreement

is bound to execute the service in accordance with this Agreement;



"Contractor’s Representative" means the person the Contractor nominates in writing from time to time and with

the approval of the Principal to represent the Contractor in all matters relating to the Agreement;



"Contractor’s Employees" means all servants, employees, agents and subcontractors of the Contractor, and who

are involved, (either directly or indirectly) in the provision of the Services;



"Expiry Date" means the date specified in the Annexure, or where a period of time is specified in the Annexure,

the last day of the period;



DPTI Rust Rectification for Public Buses (Panel Agreement) Page 3

Edition: September 2009 Panel Agreement





"Fee" means the amounts (submitted by the Contractor and agreed to by the Principal) to be paid by the Principal;



"Government" means the Government of the State of South Australia;



"Handover Date" means the date and time when the Contractor shall cease the provision of the Services or part of

the Services following written notice from the Principal in accordance with this Agreement;



"Insolvency Administration" means the happening of any of these events:

(a) an Administrator is appointed or any action is taken to make such appointment over the Contractor or any

"subsidiary" (as that term is defined in Section 9 of the Corporations Act) of the Contractor;

(b) an application is made to a court for an order or an order is made that the Contractor be wound up;

(c) an application is made to a court for an order appointing a liquidator or provisional liquidator in respect of

the Contractor, or one of them is appointed, whether or not under an order;

(d) a meeting is convened or a resolution is passed to appoint an official manager in respect of the Contractor;

(e) except to reconstruct or amalgamate while solvent on terms approved by the Principal, the Contractor

enters into, or resolves to enter into, a scheme of arrangement or composition with, or assignment for the

benefit of, all or any class of its creditors, or it proposes a re-organisation, moratorium or other

administration involving any of them;

(f) the Contractor resolves to wind itself up, or otherwise dissolve itself, or gives notice of intention to do so,

except to reconstruct or amalgamate while solvent on terms approved by the Principal or is otherwise

wound up or dissolved;

(g) the Contractor is or states that it is unable to pay its debts when they fall due;

(h) the Contractor is or states that it is unable to pay its debts within the meaning of Section 95A of the

Corporations Act;

(i) the Contractor becomes an "insolvent under administration" as defined in Section 9 of the Corporations

Act or action is taken which could result in that event; or

(j) anything having a substantially similar effect to any of the events specified above happens to or in respect

of the Contractor or the Parent Company or any significant shareholder under the law of any applicable

jurisdiction;



"Intellectual Property Rights" means any patent, copyright, rights in circuit layouts, trademark, tradename,

registered design, plant breeder’s rights, trade secret, know how or other form of Confidential Information, or any

application or right to apply for registration of such rights and any other form of intellectual property right whether

arising before or after the execution of this Agreement;



"Minister" means the Minister for Transport, Minister for Infrastructure or Minister for Energy as applicable, its

successors or permitted assigns;



"Notice" means a notice; or a consent, approval or other communication required to be in writing under this

Agreement;



"Parties" means the Principal and the Contractor and "Party" means either of the Parties;



"Principal" means the person named in the Annexure and includes any person to whom the Principal has delegated

its functions and powers for the purposes of this Agreement or for the purpose of any negotiations, consultations, or

approvals that may be required for the work to be performed under this Agreement;



"Principal’s Representative" means the person named and described in the Annexure or such other person as the

Principal may nominate in writing from time to time to the Contractor;



"Records" means calculations, drawings, data, deliverables, records of meetings or discussions and any other

relevant documentation collected or prepared for the purpose of providing the Services, but excludes the

Contractor’s internal administrative records;



"Services" means part or all the Services specified in the Statement of Requirements and may include the provision

of goods or the construction of works;





DPTI Rust Rectification for Public Buses (Panel Agreement) Page 4

Edition: September 2009 Panel Agreement



"Specification" means the "Statement of Requirements";



"Term" means the Term of this Agreement as identified in the Annexure;



"Time Performance Criteria" means any period stipulated in the Statement of Requirements that the Contractor

shall perform a specific service within.



3. INTERPRETATION



In this Agreement, unless something else is clearly intended:

(a) the clause headings are for ease of reference only and do not form part of this Agreement;

(b) words in the singular number include the plural and vice versa;

(c) words importing a gender include any other gender;

(d) a reference to a person includes bodies corporate and unincorporated associations and partnerships;

(e) a reference to a clause number includes a reference to its sub-clauses;

(f) a reference to a sub-clause includes a reference to the sub-clause of the clause in which that reference is

made;

(g) here a word or phrase is given a particular meaning, other parts of speech and grammatical forms of that

word or phrase have corresponding meanings;

(h) a reference to any legislation or to any provision of any legislation includes:

 all legislation, regulation, proclamations, ordinances, by-laws and instruments issued under that

legislation or provision; and

 any modification, consolidation, amendment, re-enactment or substitution of that legislation or

provision;

(i) a reference to a schedule, annexure or appendix includes a reference to any part of that schedule, annexure

or appendix which is incorporated by reference;

(j) monetary references are references to Australian currency, and

(k) in resolving inconsistencies, the Statement of Requirements shall have priority over this Agreement.



4. QUOTATIONS



The Principal may:

(a) request that all or any members of the Panel provide a quotation for the provision of the Services,

notwithstanding that pre-agreed rates may form part of this Agreement;

(b) seek quotations from providers not on the Panel; and

(c) appoint new providers as members of the Panel.



The Principal is not obliged to engage the Contractor to provide any Services during the term of this Agreement. If

the Principal engages the Contractor to provide Services and does not seek a quotation, the Services shall be paid for

at any pre-agreed rates forming part of this Agreement.



5. CONTRACTOR’S OBLIGATIONS



The Contractor agrees, warrants, represents and undertakes to the Principal that:

(a) all Services will be rendered with promptness and diligence and shall be executed in accordance with

relevant and/or applicable industry or Government standards, and if standards differ, the Contractor must

comply with the higher standard;

(b) it will use adequate numbers of qualified individuals with suitable training, education, experience and skill

to perform the Services;

(c) it will use its best efforts to perform the Services in the most cost-effective manner consistent with the

required level of quality and performance;







DPTI Rust Rectification for Public Buses (Panel Agreement) Page 5

Edition: September 2009 Panel Agreement



(d) it will perform the Services in a manner that complies with all laws and codes applicable to the

Contractor’s provision of the Services, including without limitation identifying and using best endeavours

to procure the required permits, certificates, approvals and inspections;

(e) to the best of its knowledge and belief, after making its usual enquiries, it has disclosed to the Principal any

real or potential conflict of interest in relation to this Agreement that would prevent or restrict it from

performing the Services;

(f) it shall immediately inform the Principal as soon as it becomes aware of any matter that may give rise to a

conflict of interest and not engage in any activity or obtain any interest likely to conflict with or restrict it in

providing the Services fairly and independently; and

(g) it shall ensure its agents, employees or contractors observe and comply with the provisions of this

Agreement.



The Contractor acknowledges that it:

(a) enters into this Agreement after having carried out its own diligent investigations into all matters relating to

the provision of the Services, not relying on any representations made by the Principal, its agents or

employees; and

(b) is fully informed in respect to its obligations under this Agreement.



6. ADMINISTRATION



Each Party shall at all times throughout the Term have a Representative who has authority to bind their Party in

relation to any matter arising out of or in connection with this Agreement.



The Principal’s Representative will be that person described in the Annexure or such other person as the Principal

may nominate in writing from time to time. The Principal's Representative may exercise all the powers and

functions of the Principal under this Agreement. The Principal’s Representative may further delegate some powers

and functions to other employees of the Principal by notice in writing to the Contractor. The Principal may

nominate multiple Principal’s Representatives where geographical separation or functional subdivision of the

provision of Services makes it practicable to do so.



The Contractor shall nominate in writing a Contractor’s Representative. The Contractor may nominate multiple

Contractor’s Representatives where geographical separation or functional subdivision of the provision of Services

makes it practicable to do so.



Appointment of the Contractor’s Representative shall be subject to the approval of the Principal, which shall not be

unreasonably withheld. The Principal may require the Contractor to remove or replace a Contractor’s

Representative determined by the Principal to be negligent, unsuitable or otherwise unacceptable to the Principal by

written notice to the Contractor.



The Principal’s Representative may arrange periodic meetings to discuss performance of the Services. Each Party

shall ensure that it’s Representative or an authorised representative of the Representative is present at all of these

meetings.



The Contractor shall maintain (and provide copies to the Principal) all Records in respect of the Services as required

by this Agreement. The Principal may undertake inspections of the provision of the services at any time or location.



7. TERM



This Agreement shall commence on the date of execution of this Agreement and expire upon the Expiry Date as

specified in the Annexure, unless terminated earlier in accordance with this Agreement. The parties may extend the

Agreement by mutual agreement.



8. FORCE MAJEURE



Notwithstanding anything else contained in this Agreement:

(a) neither Party will be liable for any delay in performing its obligations under this Agreement if that delay is

caused by circumstances beyond its reasonable control (including without limitation any delay caused by

any act or omission of the other Party); and







DPTI Rust Rectification for Public Buses (Panel Agreement) Page 6

Edition: September 2009 Panel Agreement



(b) any delay by a subcontractor of a Party shall not relieve that party from liability for delay except where that

delay is beyond the reasonable control of the subcontractor concerned.



For the purpose of this Agreement, provided the party delaying promptly notifies the other Party in writing of the

reasons for the delay and the likely duration of the delay, the performance of the delaying party’s obligations will be

suspended during the period that such circumstances persist and the delaying party shall be granted an extension of

time for performance equal to the period of the delays.



Except where delay is caused by the act or omission of the other Party (in which event the rights, remedies and

liabilities of the Parties will be those conferred and imposed by the other terms of this Agreement and by law):

(a) any cost arising from this delay will be borne by the Party incurring the same; and

(b) either Party may, if such delay continues for more than ten weeks, terminate this Agreement forthwith on

giving notice in writing to the other in which event neither party shall be liable to the other by reason of

such termination save that the Principal will pay the Contractor a reasonable sum in respect of any work

carried out by it prior to such termination and for that purpose the Contractor may deduct such sum from

any amounts previously paid by the Principal under this Agreement (the balance (if any) of which shall be

refunded to the Principal whether paid by way of a deposit or otherwise).



9. EXTENSION OF TIME



Where the Contractor is delayed in the discharge of an obligation under this Agreement by any case beyond the

reasonable control of the Contractor (except a cause arising out of any act or omission on the part of the Contractor’s

employees, agents Nominated Sub-Contractors or Sub Contractors of their employees or agents) which the

Contractor considers justifies an extension of the time specified in this Agreement for the performance of the

Contractors’ obligations under this Agreement, the Contractor shall:

(a) notify the Principal in writing of the facts giving rise to such delay within 7 days after such facts have come

to the Contractor’s notice; and

(b) within 7 days after the circumstances causing the delay have ceased, notify the Principal in writing of the

period of delay so caused and give details of the likely effect on this Agreement.



The Principal shall give consideration to the Contractor’s request and shall, within 30 days after receiving a notice

that the circumstances causing the delay have ceased, notify the Contractor of its decision.



Notwithstanding that the Contractor has not given notice under this Clause 9, where the Principal considers that a

delay has arisen, in whole or in part, because of an act or omission on the part of the Principal or its employees or

agents then the Principal may, by notice in writing to the Contractor, extend the time for performance of the relevant

obligation of the Contractor by nominating in the notice a date for such performance and the date so specified shall,

for the purposes of this Agreement, be the date for performance of that obligation.



Failure by the Principal to grant an extension of time, or delay by the Principal in granting an extension of time

shall, notwithstanding any right of the Contractor to damages, not cause the date for the performance of the

Contractor’s obligations to be set at large.



10. (Reserved)



11. INTELLECTUAL PROPERTY RIGHTS



This Agreement does not and shall not be construed so as to assign to or vest in the Principal Intellectual Property

Rights:

(a) vesting in the Contractor prior to the date of this Agreement;

(b) any modifications or enhancements to the Contractor’s Intellectual Property Rights created during the term

of this Agreement; or

(c) created or arising otherwise than in the course of the performance of the Services.



The Principal owns all Intellectual Property Rights in all Records generated in connection with the performance of

the Services.



The Contractor warrants that in providing the Services, it is not infringing the Intellectual Property Rights of any

person.



DPTI Rust Rectification for Public Buses (Panel Agreement) Page 7

Edition: September 2009 Panel Agreement





The Contractor shall keep the Principal indemnified against all costs, expenses and liabilities arising out of (but only

to the extent caused or contributed to by) infringement by the Contractor of the Intellectual Property Rights of any

person in connection with the performance of the Services by the Contractor.



The Contractor shall disclose all Intellectual Property Rights created or arising out of or in connection with the

performance of the Services to the Principal and shall do everything necessary to assign to or vest in the Principal

those Intellectual Property Rights.



Where the Contractor intends to reproduce, copy or use material in its reports that is work in which copyright

subsists and is owned by a third party the Contractor shall:

(a) Obtain the prior written permission of or licence from the owner of the copyright in such work to

reproduce, copy or use the work.

(b) Where it is proposed that the Contractor’s report will be published (either in the whole or in part) by the

Principal, inform the owner of any copyright accordingly and obtain his written permission for the

publication and distribution of the reports by the Principal.

(c) State, when submitting reports to the Principal, whether or not permission referred to in (b) above has been

obtained and whether or not it extends to use of the material by the Principal.

(d) Include in reports sufficient acknowledgment of any work reproduced in whole or in part in reports or to

which reference is made in reports.



The Contractor shall within 14 days after the termination or expiry of this Agreement and at any other time upon

demand by the Principal deliver to the Principal a copy of any Records created in connection with this Agreement

not previously forwarded to the Principal.



12. PAYMENT



The amount payable under this Agreement shall be ascertained in accordance with the following methods, as stated

in the Annexure:



Lump Sum



For work for which the Principal has accepted a Lump Sum, the Principal will pay the Lump Sum, adjusted

by any additions or deletions made pursuant to the Agreement. Payment shall not exceed the Lump Sum

unless the Principal has issued a Variation, in writing, in accordance with Clause 13 "Variations".



The Lump Sum shall be deemed to full payment for the provision of all supplies, tasks, services, activities,

incidentals, overheads, fees and disbursements relating to the Lump Sum part of the Agreement, regardless

of whether or not these are mentioned in any Schedule of Prices. If a Schedule of Prices has been provided,

it shall be used for the purpose of assisting in the determination of progress payments only. Progress

payments will be made as a portion of the Lump Sum commensurate with the amount of Services provided

as of the date of invoice.





Schedule of Rates



For work for which the Principal has accepted a Schedule of Rates, the Principal will pay the sum

ascertained by multiplying the measured quantity of each item of service actually carried out under the

Agreement by the rate accepted by the Principal for the item of service, adjusted by any additions or

deletions made pursuant to the Agreement.



Except where a disbursement has been specifically included in the schedules, the rates are deemed to allow

for all supplies, tasks, services, activities, incidentals, overheads, fees and disbursements relating to the

item of service listed in the schedule. No separate payment will be made for any work or expense required

for the item of service listed in the schedule but not specifically mentioned in the description of the item of

service.



Upper Limiting Fee



For work for which the Principal has accepted an Upper Limiting Fee, the Principal will pay an amount

ascertained on the same basis as a Schedule of Rates, up to the amount of the Upper Limiting Fee.



DPTI Rust Rectification for Public Buses (Panel Agreement) Page 8

Edition: September 2009 Panel Agreement



Payment shall not exceed the Upper Limiting Fee unless the Principal has issued a Variation, in writing, in

accordance with Clause 13 "Variations".



At the times specified in the Statement of Requirements, or if no time is specified, monthly, the Contractor shall

invoice the Principal in respect of the moneys due for Services satisfactorily performed. The invoice shall be

accompanied by such information and documentation as required by the Principal to verify the invoice. Subject to

the provisions of this Clause, the Principal will pay the Contractor within 30 days of receiving a valid invoice.



If the Contractor's performance of the Services is in breach of this Agreement, the Principal may withhold payment

of the moneys due for that part of the services not provided in accordance with the Agreement. If payment is to be

withheld, the Principal will notify the Contractor within 14 days of the receipt of the Contractor's invoice of its

intention to and reasons for withholding payment of the moneys due, or any part thereof. If the Principal disputes a

claim for payment, the Principal will pay any undisputed portion of the invoice.



Payment will not be subject to Rise and Fall unless specified otherwise in the Statement of Requirements.



13. VARIATIONS



The Services may be varied in accordance with this clause.



The Principal may propose varying the Services by notice in writing to the Contractor setting out the proposed

variation. If the proposed variation would increase the scope of the Services, the Contractor shall:

(a) notify the Principal that the proposed variation will cause the scope of the Services to increase;

(b) provide to the Principal a written quotation indicating the additional cost of providing the Services should

the proposed variation be implemented; and

(c) indicate the amount of additional time (if any) which will be required to perform the Services if varied.



The Contractor shall not provide any services additional to the Services, until the Contractor has received a written

notice from the Principal accepting the quotation and altering the time in which the Services, as varied, are to be

provided.



If the proposed variation would decrease the scope of the Services, the Principal shall give written notice to the

Contractor indicating:

(a) how the scope of the Services are decreased;

(b) how the Fee will be adjusted; and

(c) how the Expiry Date will be adjusted.



The Services, as varied under this clause, shall be provided in accordance with the terms and conditions of this

Agreement.



If the Contractor proposes to provide Services which the Contractor considers to be a variation and the matter has

not been brought to the attention of the Principal, the Contractor shall inform the Principal as soon as practicable.

The Principal shall not be liable for payment for any additional services provided by the Contractor if the Principal

has not been notified of the Contractor’s intent for the additional services to be classified as a variation.



Any dispute arising in relation to the operation of this clause shall be resolved in accordance with the Clause 20

"Resolution of Disputes".



14. REMEDIES



If the Contractor fails to provide any part of the Services in accordance with the requirements of this Agreement, the

Contractor shall rectify the default as soon as practicable and within any timeframe specified elsewhere in this

Agreement. The Principal may provide written direction to the Contractor of reasonable times within which the

Contractor must rectify the default.



If the Contractor fails to comply with a written direction given by the Principal in accordance with this clause and

the direction includes notification that Principal may elect to have the Services or part of the Services carried out by

others, the Principal may have the Services carried out by others.







DPTI Rust Rectification for Public Buses (Panel Agreement) Page 9

Edition: September 2009 Panel Agreement



If those Services are so carried out, the Principal will give written notice to the Contractor of the dollar ($) value

under the Agreement of the part of the Services the Contractor has satisfactorily performed in accordance with this

Agreement, and the Contractor shall:



(a) cancel any tax invoice which the Contractor has submitted which relates to those Services; and

(b) issue a tax invoice to the Principal for the correct amount so notified by the Principal.



15. RELATIONSHIP BETWEEN THE PARTIES



The relationship between the Principal and the Contractor is that of principal and independent contractor. The

Contractor is not for any purpose an agent (unless specified otherwise in this Agreement), servant or employee of

the Principal.



No Party shall have any authority to bind the other Party in any manner whatsoever except with the express approval

by notice in writing of the other Party.



16. THE CONTRACTOR’S EMPLOYEES



Except for as provided for under Clause 17 "Sub-contracting and Assignment", the Contractor shall only permit the

Contractor’s Employees to provide the Services.



The Contractor shall ensure that the Contractor's Employees comply with this Agreement.



The Contractor shall immediately notify the Principal of the occurrence of any event that may affect the approval

granted by the Principal with respect to the Contractor’s Employees.



The Contractor acknowledges and agrees that:

(a) there is no contract of any nature in existence pursuant to this Agreement between the Principal and the

Contractor's Employees (and any other person employed or engaged by the Contractor for purposes of this

Agreement);

(b) the Contractor is liable for all remuneration, claims and other entitlements payable to the Contractor's

Employees; and

(c) the Contractor solely is responsible for complying with State and Commonwealth taxation, superannuation

and pay-roll tax legislation in respect of the Contractor’s Employees and the Principal is not required to

make any payments or deductions from any amount payable for or in respect of the Services.



If the Contractor's Employees are workers within the meaning of the Workers Rehabilitation and Compensation Act,

1986 then the Contractor shall comply with all the requirements of an employer under that Act arising out of or in

conjunction with the provision of the Services.



If any of the Contractor's Employees are not workers within the meaning of the Workers Rehabilitation and

Compensation Act 1986, then the Contractor shall ensure that the Contractor's Employees effect and maintain a

policy of insurance providing sickness and accident benefits similar to those provided for under the Workers

Rehabilitation and Compensation Act, 1986.



If during the Term the Principal’s Representative forms the opinion, on reasonable grounds, that any of the

Contractor’s Employees:

(a) do not have the capacity or capability to satisfactorily perform the Services;

(b) do not maintain the standard of work required by this Agreement; or

(c) are responsible for any disruption of work being undertaken as part of this Agreement,



the Principal’s Representative may notify the Contractor accordingly, and the Contractor immediately shall

withdraw those Contractor’s Employees from performing the Services.



The Contractor shall indemnify and keep indemnified the Principal and the Government against any claims in

respect of remuneration and other entitlements payable to or in respect of by the Contractor’s Employees.



17. SUB-CONTRACTING AND ASSIGNMENT







DPTI Rust Rectification for Public Buses (Panel Agreement) Page 10

Edition: September 2009 Panel Agreement



Neither Party may assign, subcontract or otherwise transfer any of its rights or obligations pursuant to this

Agreement whether in whole or in part without the prior written consent of the other Party.



If during the course of this Agreement, the Contractor wishes to engage a subcontractor, the Contractor shall notify

the Principal in writing. Engagement of the subcontractor shall be subject to the approval of the Principal, which

shall not be unreasonably withheld. The Principal’s approval may be given subject to such conditions as the

Principal sees fit. If the Principal does not approve a proposed subcontractor, within 7 days the Principal will

inform the Contractor in writing, why the subcontractor was not approved.



The Principal shall have the right during the Term to revoke its prior approval of a subcontractor if:

(a) the subcontractor’s performance is deficient; or

(b) there have been material misrepresentations made to the Principal by or concerning the subcontractor.



The Contractor shall remain responsible for obligations performed by subcontractors to the same extent as if such

obligations were performed by the Contractor. In addition, the Contractor shall not disclose any Confidential

Information of the Principal to any subcontractor unless and until the subcontractor has agreed with the Contractor

in writing to protect the confidentiality of Confidential Information in a manner substantially equivalent to that

required of the Contractor by this Agreement. In any event the Contractor shall provide to the subcontractor

information that is limited to that which is required for the subcontractor to provide the Services or part of the

Services to the Contractor.



18. TERMINATION



18.1 Termination without Notice



The Principal may terminate this Agreement immediately and without prior written notice to the Contractor upon the

occurrence of any of the following events:

(a) if the Contractor or the Contractor’s Employee has breached the requirements of confidentiality or security

procedures under this Agreement;

(b) if the Contractor or the Contractor’s Employee has used the Principal’s property for any reason other than

accordance with directions of the Principal from time to time;

(c) the Contractor enters into any form of Insolvency Administration, an assignment for the benefit of its

creditors or an arrangement or composition with its creditors;

(d) execution is levied against the Contractor which is not discharged within 30 days;

(e) the Contractor has engaged in any conduct or practice that is, in the reasonable opinion of the Principal,

detrimental or harmful to the good name, reputation or interests of the Principal;

(f) any director, secretary, officer of the Contractor, has been convicted of a criminal offence and the

Contractor fails to remove such person from his or her office immediately after a conviction is made,

delivered or recorded;



Termination pursuant to this sub-clause will be effected on the date and time specified by the Principal as the

Handover Date. The Contractor shall cease providing the Services after the Handover Date.



If the Agreement is terminated pursuant to this sub-clause, the Contractor is only entitled to payment in respect of

Services performed under this Agreement up to the Handover Date.



18.2 Termination with Notice



In addition to any other rights of termination of the Principal, this Agreement may be terminated by the Principal if,

in its reasonable opinion, any of the following events occur:



(a) a substantial, repeated or persistent breach by the Contractor of any provision of the Agreement whether or

not written notice of the breach has been given to the Contractor;

(b) subject to the operation of Clauses 12 "Payment" and 14 "Remedies", the Contractor has failed to remedy a

breach of this Agreement within the time specified by the Principal in a written notice to the Contractor that

monitoring of the Contractor’s performance of the Services has detected a deficiency in the delivery or

standard of the Services.





DPTI Rust Rectification for Public Buses (Panel Agreement) Page 11

Edition: September 2009 Panel Agreement



Prior to any termination pursuant to this clause, the Principal will give a notice of default to the Contractor

specifying the event of default which has given rise to the right of termination. The notice shall require the

Contractor to rectify that default to the reasonable satisfaction of the Principal in writing within 14 days of receipt of

such notice or such other time agreed by the Principal. If the default has not been remedied within the period, the

Contractor shall cease providing the Services on the Date specified by the Principal.



18.3 Effect of Termination



Any termination of this Agreement, whether pursuant to this clause or pursuant to another provision of this

Agreement or otherwise, shall not, unless expressly otherwise provided, affect any claim for damages or other right,

remedy or liability to which either Party become entitled or subject, or which either Party may claim under the

provisions of this Agreement or as a result of any breach act or omission by the other Party.



It will not affect the coming into force or the continuance in force of any provision of this Agreement which is

expressly or by implication intended to come into or continue in force on or after such termination, including

(without limiting the generality of the foregoing) any disengagement provisions.



19. INSURANCE



The Contractor shall maintain in force at its own expense during the Term of this Agreement the following

insurance:



Public Liability



Public liability insurance on an occurrence based policy wording, in the name of the Contractor for not less than the

amount specified in the Annexure; and



Professional Indemnity Insurance



If specified in the Annexure, a professional indemnity policy in the name of the Contractor for an amount not less

than the amount specified in the Annexure. The Contractor shall ensure that the professional indemnity policy is

renewed and maintained for the period stated in the Annexure after the Date of Expiration or early termination of

this Agreement. If no period is specified, it shall be 12 months for insurance for an amount less than $3.0 million

and 2 years for an amount $3.0 million or greater.



Evidence of Policies



Whenever requested, the Contractor must provide the Principal with evidence of any insurance policy effected in

accordance with this clause in the form of a certificate of currency or any other proof of insurance which is

acceptable to the Principal.



If the Contractor does not satisfy all the requirements of this clause or within any time specified, and

notwithstanding that the Contractor may have partially satisfied some or all of the requirements, the Principal may

terminate this Agreement by giving written notice to the Contractor. No liability whatsoever will attach to the

Principal for termination under this clause.



20. RESOLUTION OF DISPUTES



20.1 Notice of Claim



If the Contractor wishes to make a claim against the Principal for breach of Agreement, the Contractor shall notify

the Principal’s Representative in writing of the Contractor’s intention to make a claim within 14 days of the day

when the Contractor could have reasonably become aware of the breach.



Within 14 days of the notification to make a claim, the Contractor shall forward to the Principal’s Representative

full particulars on which the claim is based, in sufficient detail to enable the Principal to make a determination.



The Principal’s Representative will not be required to consider a claim unless the Contractor satisfies all the time

requirements of this clause.



The Principal’s Representative will make a determination, with supporting reasoning, as soon as practicable after

receipt of particulars of the claim. The Contractor shall not dispute the determination unless the Contractor gives a





DPTI Rust Rectification for Public Buses (Panel Agreement) Page 12

Edition: September 2009 Panel Agreement



"Notice of Dispute" to the Principal’s Representative in accordance with Clause 20.2 within 21 days of receipt of the

Principal’s Representative’s determination.



20.2 Notice of Dispute



If a dispute arises, then the representative of either Party shall forward a Notice of Dispute to the representative of

the other Party. The Notice of Dispute shall be delivered by hand or by registered mail and shall provide adequate

details of the alleged cause and consequences of the dispute.



Within 14 days of receipt of the Notice of Dispute, the Parties shall meet at least once to discuss the dispute or a

mechanism to resolve the dispute. At the meeting a senior manager who has not been involved in the day to day

management of the Agreement and who has authority to agree to a settlement of the dispute, shall represent each

Party. If the Parties agree, an independent facilitator may attend the meeting.



If the Parties through the above process cannot resolve the dispute, the Parties shall refer the dispute to an expert

selected by mutual agreement for a determination. If the parties fail to agree on selection of an expert within 7 days

of one Party giving notice in writing, then the expert shall be selected by the President of the Law Society of South

Australia Inc.



The expert’s findings shall be final and binding on the Parties and the Parties in equal shares shall pay the expert’s

fees.



Notwithstanding the existence of a dispute, each Party shall continue to perform its obligations under this

Agreement.



Nothing in this Agreement prevents a Party seeking urgent interlocutory relief through court proceedings.



This clause survives the expiration or termination of this Agreement.



21. NOTICES



A notice shall be in writing and signed by or on behalf of the sender addressed to the recipient and be:

(a) delivered to the recipient's address;

(b) sent by pre-paid mail to the recipient's address;

(c) transmitted by facsimile to the recipient's address; or

(d) transmitted by e-mail to the recipient's e-mail address.



A notice given to a party in accordance with this clause is treated as having been given and received:

(a) on the day of delivery if delivered before 5.00 p.m. on a Business Day, otherwise on the next Business

Day;

(b) if sent by pre-paid mail, on the third Business Day after posting;

(c) if transmitted by facsimile and a correct and complete transmission report is received on the day of

transmission, on that day if the report states that transmission was completed before 5.00 p.m. on a

Business Day, otherwise on the next Business Day; or

(d) if transmitted by e-mail, then on the next Business Day.



If the recipient receives by facsimile transmission a notice that is illegible, the recipient shall notify the sender

immediately and the sender shall continue to retransmit the notice until the recipient confirms that it has received a

legible notice.



If the sender of an e-mail message receives a rejection message the sender shall either choose another method for

sending the message or continue to transmit the message until such time as the sender is reasonably satisfied that the

message has been successfully communicated.



22. CONFIDENTIALITY



Except for as provided for by the SA Government Contract Disclosure Policy or where required by law, each Party

shall treat as strictly confidential all Confidential Information obtained from the other Party or any other information





DPTI Rust Rectification for Public Buses (Panel Agreement) Page 13

Edition: September 2009 Panel Agreement



acquired by it for the purposes of this Agreement. Information shall not be divulged to any person without the other

Party’s prior written consent.



The Contractor agrees to disclosure of this Agreement in accordance with Treasurer’s Instruction No. 27

"Disclosure of Government Contracts", available from http://www.treasury.sa.gov.au.



A Party shall, if requested by the other Party, require the Party's employees, subcontractors or agents to provide the

other Party with written undertakings not to divulge any Confidential Information to any other person.



A Party shall immediately notify the other Party if it becomes aware of any disclosure or distribution of information

in breach of this clause by any person. The party shall give the other Party all reasonable assistance in connection

with any proceedings, which the Party may institute against that person in respect of the disclosure or distribution.



The obligations as to confidentiality pursuant to this clause survive any expiry or termination of this Agreement. For

the purposes of this clause information is not confidential which is already public knowledge or becomes so at a

future date (otherwise than as a result of breach of this clause) or which is trivial or obvious.



The Contractor indemnifies and shall keep indemnified the Principal and the Government against any loss or

damage of any kind which the Principal or the Government may sustain or incur as a result of any disclosure or

distribution of any information in violation of this Agreement by any employee or agent of the Contractor.



The Contractor shall not use the Principal’s or the Government’s name or that of a service provider without the

Principal’s prior written consent, which may be given subject to conditions.



23. CONSTRUCTION OF AGREEMENT



This Agreement shall be governed by and construed in accordance with the laws for the time being in force in the

State of South Australia and the Parties agree to submit to the jurisdiction of the courts of that State. Any

proceeding brought in a Federal Court shall be instituted in the Adelaide Registry of that Federal Court and not be

transferred to another registry of that Federal Court.



24. WAIVER



Any waiver of any provision of this Agreement is ineffective unless it is in writing and signed by the Party waiving

its rights.



A waiver by either Party in respect of a breach of a provision of this Agreement by the other Party is not a waiver in

respect of any other breach of that or any other provision. The failure of either Party to enforce at any time any of

the provisions of this Agreement shall not be interpreted as a waiver of that provision.



25. ENTIRE AGREEMENT



This Agreement incorporates any attached schedules and Annexure. This Agreement contains the entire agreement

between the Parties with respect to its subject matter and supersedes all prior agreement, understandings or

representation of the Parties on the subject matter. Any modification of this Agreement must be in writing and

signed by each Party.



26. SEVERABILITY



If a court holds part or all of any clause to be invalid or unenforceable, it is deemed to be deleted from this

Agreement and the Agreement shall otherwise remain in full force and effect.



27. GOODS AND SERVICES TAX



Payment from the Principal to the Contractor will include the GST payable.



Any invoice for payment under this Agreement shall be a tax invoice in accordance with "A New Tax System

(Goods and Services Tax) Act 1999". The Principal is not obliged to make any payment under this Agreement

unless the Contractor has provided a tax invoice in respect of that payment.



28. OCCUPATIONAL HEALTH AND SAFETY







DPTI Rust Rectification for Public Buses (Panel Agreement) Page 14

Edition: September 2009 Panel Agreement



The Principal is committed to the provision of a healthy and safe working environment. The Contractor shall make

the same commitment to occupational health, safety and welfare (OHS&W) and the Contractor shall comply, and

ensure that its employees, agents and subcontractors comply, with the Occupational Health, Safety and Welfare Act

(SA), 1986 and any reasonable instruction issued by the Principal in relation to OHS&W.



If requested by the Principal, the Contractor shall provide:

(a) evidence satisfactory to the Principal of its capacity to comply with the Occupational Health, Safety and

Welfare Act (SA), 1986;

(b) evidence that its employees, agents and subcontractors have received appropriate training in and are aware

of their legal obligation and responsibilities in relation to OHS&W; and

(c) the Contractor’s Workcover Registration Number.



The Contractor shall permit the Principal to carry out any inspections the Principal deems necessary to ensure that

the Contractor is complying with the OHS&W practices referred to in this Agreement.



If all or part of the work under this Agreement is to be provided on the premises of the Principal and under the

direction of the Principal, the Contractor shall comply with the Principal’s OHS&W policies, procedures,

instructions and directions. If the Contractor becomes aware of any potentially hazardous situation on the

Principal’s premises, the Contractor shall immediately bring it to the Principal’s attention for a direction regarding

the matter.



If the Principal has additional requirements regarding the preparation and implementation of OHS&W systems and

plans, these will be detailed in the Statement of Requirements.



29. (Reserved)



30. ASSISTANCE WITH GOVERNMENT REPORTING AND PUBLIC ENQUIRIES



The Contractor acknowledges that the Minister is subject to public accountability, reporting and responsibility to the

Government, Parliamentary Committees and public inquiries.



The Contractor agrees to provide to the Minister, within 48 hours of a request, sufficient information to enable the

Minister to report on matters relevant to this Agreement. Any response provided shall be treated as a Variation in

accordance with Clause 13 "Variations".



31. AUDIT



The Contractor shall permit the Principal, its nominated representatives or the Auditor General for the State of South

Australia to audit:

(a) the Contractor’s operational practices and procedures, including general controls and security practices;

and

(b) the accuracy of the Contractor’s charges.



Any costs incurred by the Contractor resulting from any disruption caused by an audit shall be borne by the

Contractor. The Contractor shall disclose the results of any internal audit of its operations to the extent it may be

relevant to provision of the Services.







____________









DPTI Rust Rectification for Public Buses (Panel Agreement) Page 15

Edition: September 2009 Panel Agreement

Annexure





ANNEXURE PART A





The Principal: Minister for Transport





The address of the Principal: Roma Mitchell House

136 North Terrace

ADELAIDE 5000.



The Principal’s Representative Director, Asset Management

Passenger Transport Services Division



The address of the Principal’s Representative Roma Mitchell House

136 North Terrace

ADELAIDE 5000.



Expiry Date 29 June 2012



The amount of Public Liability Insurance shall be A$10 000 000

not less than:



The amount of Professional Indemnity Insurance Not applicable

shall be not less than:



The period for which Professional Indemnity Not applicable

Insurance shall be maintained is:



Payment will be by the method: Part Lump Sum, Part Schedule of Rates



The Contract Documents are: This Panel Agreement

The Specification

The Appendices

The Applicant’s submission

The letter of acceptance

Any other documents agreed by the parties to be part of

the Contract Documents and noted as such.







_____________









DPTI Rust Rectification for Public Buses (Panel Agreement) Page 16

Revision 0



APPLICATION FORM





TO THE EXECUTIVE DIRECTOR:



THE PROVISION OF



RUST RECTIFICATION PROGRAM FOR PUBLIC TRANSPORT BUSES





I/We the undersigned, do hereby apply to perform the above mentioned works in accordance with the Invitation

Documents.









Applicant’s Name ................................................................................................................................................

(BLOCK LETTERS)



ACN ........................................................................... ABN ................................................................................





Address ...............................................................................................................................................................





Telephone No. ............................................................... Fax No. ......................................................................





Signature of Applicant ......................................................... Name ....................................................................





Position in Company ............................................. ..............................................................................................





Signature of Witness ...................................................... Name of Witness .......................................................





Dated the ......................................................................... day of ....................................................... 200 ..........









FOR OFFICE USE ONLY



.............Tender(s) opened on ........./........./...... Tender No. .........

by ...................................................... (........................................................) Examined:

in the presence of .......................................................................................... Checked:

(.....................................................................) Date ......../....../......

Revision 0



SCHEDULE CHECKLIST FOR SUBMISSION





For each item please tick the box to indicate that the Schedule has been completed in accordance with Conditions of

Submission Annexure A and included with your submission.







1 Schedule of Prices.



2 Schedule of Rates.



3 Certificate of Currency of Public Liability Insurance.



4 Experience.



5 Equipment.



6 Personnel.



7 Contract Management.











………………………….. ………………

Applicant’s signature Date



DPTI Rust Rectification for Public Buses (Panel Agreement) Page 1

Revision 0



SCHEDULE 1



SCHEDULE OF PRICES





RATES SHALL BE EXCLUSIVE OF GST



ITEM AMOUNT

DESCRIPTION

No. ($)



Rust Rectification of MAN NL202 Bus (Appendix C6 – itemsC6-A to C6-D)

1.

(Lump Sum)









………………………….. ………………

Applicant’s signature Date



DPTI Rust Rectification for Public Buses (Panel Agreement) Page 2

Revision 0



SCHEDULE 2



SCHEDULE OF RATES





RATES SHALL BE EXCLUSIVE OF GST



ITEM RATE

DESCRIPTION

No. (per hour)



1 Repair of rust and other minor works*



2 Painting Corporate colours only, on various all white buses (Appendix C4)





* Applicant to provide information if the hourly rate for rust repairs and minor works includes an

allowance for consumables that are likely to be used for these repairs.









………………………….. ………………

Applicant’s signature Date



DPTI Rust Rectification for Public Buses (Panel Agreement) Page 3



Related docs
Other docs by benben zhou
All About Avian Flu
Views: 1  |  Downloads: 0
DIRECTORS SENIOR MANAGEMENT AND EMPLOYEES
Views: 1  |  Downloads: 0
Feds Drop Ban on Lighters on Planes mascara
Views: 1  |  Downloads: 0
Real Estate Division RE
Views: 0  |  Downloads: 0
X C I Nvervous pathway collagen
Views: 2  |  Downloads: 0
By registering with docstoc.com you agree to our
privacy policy

You are almost ready to download!

You are almost ready to download!