TELECOM

OFFERS Designing, Engineering including

• Head end • Laying of multiple ducts by trenchless

and open cut methods • Network design • OFC

blowing • Supply and installation









Client and Consultant • Bharti Airtel Ltd • Bharti Infratel Ltd

• Bharti Telenet Ltd • Bharti Telesonic Ltd • Essar Commvision Ltd

• Gas Authority of India Ltd • HPCL • ITI Ltd • J. T. Mobiles Ltd

• Power Grid Corporation of India Ltd • Spectra Net Ltd

• Spectra Punjab Ltd • Tata Teleservices Ltd









1 Project Bharti Infratel Ltd Turnkey site build services, installation of tower, shelter including Completed

Management accessories, power management system, DG Set, air-conditioners Jul 2010

Consultancy with DC FCU, battery, battery chillers, SMPS, MW rack, DC-DC

Services converter, phase change material and complete end – to – end

project management including civil, electrical & miscellaneous work

for BTS Infrastructure Development, Bihar and Jharkhand circle.



2 Project Bharti Infratel Ltd Turnkey site build services, installation of tower, shelter & Completed

Management accessories, power management system, DG set, air-conditioners Jul 2010

Consultancy with DC FCU, battery, battery chillers, SMPS, MW rack, DC-DC

Services converter, phase change material and complete end – to – end

project management, civil, electrical & miscellaneous work for BTS

Infrastructure Development for Madhya Pradesh and Chhattisgarh

circle

CLIENT/

PROJECT SCOPE STATUS

CONSULTANT



3 Project Bharti Infratel Ltd Turnkey site build services, installation of tower, shelter & Completed

Management accessories, power management system, DG set, air-conditioners Jul 2010

Consultancy with DC FCU, battery, battery chillers, SMPS, MW rack, DC-DC

Services converter, phase change material and complete end – to – end

project management, civil, electrical & miscellaneous work for BTS

Infrastructure Development for Orissa Circle.



4 OFC Laying Bharti Airtel Ltd Survey, documentation and statutory, clearances trenching, laying Completed

of multiple ducts, pulling/blowing of OFC for 110 km stretch, supply Nov 2009

and installation of joint pit/manholes, electronic route marker,

joint closures, FTB, FDF and other accessories, splicing/jointing/









TELECOM

termination, link test and tower connectivity for GSM network from

Allahabad to Mirzapur via Handia.



5 OFC Laying Bharti Airtel Ltd Survey, documentation and statutory clearances, trenching, laying Completed

of multiple ducts, pulling/blowing of OFC for 280 km stretch, supply Oct 2008

and installation of joint pit/manholes, electronic route marker,

joint closures, FTB, FDF and other accessories, splicing/jointing/

termination, link test and tower connectivity for GSM network from

Lucknow to Allahabad via Rae-Bareily & Pratapgarh.



6 OFC Laying Bharti Airtel Ltd Survey, documentation and statutory clearances, trenching, laying Completed

of multiple ducts, pulling/blowing of OFC for 350 km stretch, supply Aug 2008

and installation of joint pit/manholes, electronic route marker,

joint closures, FTB, FDF and other accessories. splicing/jointing/

termination, link test and tower connectivity for GSM network from

Kannauj to Lucknow via Shahjahanpur & Hardoi



7 OFC Laying HPCL Survey, documentation and statutory clearances, trenching, laying Completed

of multiple ducts, pulling/blowing of OFC for 162 km stretch, supply Jan 2007

and installation of joint pit/manholes, electronic route marker,

joint closures, FTB, FDF and other accessories, splicing/jointing/

termination and link test at Mumbai.



8 OSP Local Access Tata Teleservices Design and construction of CSA, feeder work and backbone Completed

and Backbone Ltd network. Survey, documentation and statutory clearances, Dec 2004

Network trenching, laying of multiple ducts, pulling of copper cables,

blowing of OFC. Supply and installation of joint pit, manholes,

electronic route marker, joint closures, FTB, FDF and other

accessories, splicing, jointing, termination and link test for Delhi,

Karnataka and Andhra Pradesh.



9 OFC Laying ITI Ltd Survey, documentation and statutory clearances, trenching, laying Completed

of multiple ducts, blowing of OFC for 185 km stretch. Supply and Oct 2004

installation of joint pit, manholes, electronic route marker and

installation of joint closures, FDF, FTB and other accessories,

splicing, jointing, termination and link test from Jhansi-Orai and

Dibyapur-Bhognipur.



10 Western Power Grid Corp Supply, storage, preservation, insurance, erection, installation Completed

Region System of India Ltd termination, testing and commissioning of HDPE ducts and Mar 2004

Coordination accessories, OFC, joint closures, termination equipment for

and Control complete execution on turnkey basis from Ahmedabad to Mumbai

(715 km), including the cities of Ahmedabad, Vadodara, Surat

and Mumbai.









WORK EXPERIENCE | 2010

CLIENT/

PROJECT SCOPE STATUS

CONSULTANT



11 OFC Laying Gas Authority Survey, documentation and statutory clearances, trenching, laying Completed

of India Ltd of multiple ducts, blowing of OFC for 201 km stretch. Supply and Aug 2003

installation of joint pit, manholes, electronic route marker and

installation of joint closures, FDF, FTB and other accessories,

splicing, jointing, termination and link test from Vijaipur-Jhansi.



12 OFC Laying Bharti Survey, documentation and statutory clearances, trenching, laying Completed

Telesonic Ltd of multiple ducts, blowing of OFC for 193 km stretch. Supply and Aug 2003

installation of joint pit, manholes, electronic route marker, joint

closures, FDMS and other accessories, splicing, jointing, termination

and link test from Varanasi to Aarah via Ghazipur.









TELECOM

13 OFC Laying Gas Authority Survey, documentation and statutory clearances, trenching, laying Completed

of India Ltd of multiple ducts, blowing of OFC for 168 km stretch. Supply and Dec 2002

installation of joint pit, manholes, electronic route marker and

installation of joint closures, FDF, FTB and other accessories,

splicing, jointing, termination and link test from Khera to Vijaipur.



14 OFC Laying Bharti Telesonic Survey, documentation and statutory clearances, trenching, laying Completed

Ltd of multiple ducts, blowing of OFC for 230 km stretch. Supply and Dec 2002

installation of joint pit, manholes, electronic route marker, joint

closures, FDMS and other accessories, splicing, jointing, termination

and link test from Nagpur to Chandrapur.



15 OFC Laying Bharti Telesonic Survey, documentation and statutory clearances, trenching, laying Completed

Ltd of multiple ducts, blowing of OFC for 225 km stretch. Supply May 2002

and installation of joint pit, manholes, electronic route marker,

joint closures, FTB, FDF and other accessories, splicing, jointing,

termination and link test at Tamil Nadu.



16 OFC Laying Bharti Telesonic Survey, documentation and statutory clearances, trenching, laying Completed

Ltd of multiple ducts, blowing of OFC for 217 km stretch. Supply and May 2002

installation of joint pit, manholes, electronic route marker, joint

closures, FDMS and other accessories, splicing, jointing, termination

and link test from Solapur to Kada.



17 OFC Laying Bharti Telesonic Survey, documentation and statutory clearances, trenching, laying Completed

Ltd of multiple ducts, blowing of OFC for 200 km stretch. Supply May 2002

and installation of joint pit, manholes, electronic route marker,

joint closures, FTB, FDF and other accessories. Splicing, jointing,

termination and link test at Rajasthan.



18 OFC Laying J.T. Mobiles Ltd Survey, documentation and statutory clearances, trenching, laying Completed

of multiple ducts, pulling/blowing of OFC for 200 km stretch. Supply May 2002

and installation of joint pit, manholes, electronic route marker,

joint closures, FTB, FDF and other accessories, splicing, jointing,

termination and link test at Andhra Pradesh.



19 OFC Laying Spectra Net Ltd Survey, planning, designing, engineering and statutory clearances, Completed

trenching (manual/HDD), laying of multiple ducts, blowing of OFC Oct 2001

for 250 km network. Supply and installation of joint pit, manholes

and electronic route marker, splicing, jointing/termination and link

test at Bangalore.



20 OFC Laying Spectra Punjab Survey, planning, designing, engineering and statutory clearances, Completed

Ltd trenching (manual/HDD), laying of multiple ducts, blowing of OFC Sep 2001

for 66 km network, supply and installation of joint pit, manholes and

electronic route marker, splicing, jointing, termination and link test at

Chandigarh and Mohali.









WORK EXPERIENCE | 2010

CLIENT/

PROJECT SCOPE STATUS

CONSULTANT



21 OFC Laying Spectra Net Ltd Survey, planning, designing, engineering and statutory clearances, Completed

trenching (manual/HDD), laying of multiple ducts, blowing of OFC Aug 2001

for 600 km network. Supply and installation of joint pit, manholes

and electronic route marker, splicing, jointing, termination and link

test at Delhi.



22 OFC Laying Bharti Telenet Ltd Survey, documentation and statutory clearances, trenching, laying Completed

Phase II of multiple ducts, pulling, blowing of OFC for 288 km stretch. Dec 2000

Supply and installation of joint pit, manholes, electronic route marker,

joint closures, FTB, FDF and other accessories, splicing, jointing,

termination and link test at Madhya Pradesh.









TELECOM

23 OFC Laying Bharti Telenet Ltd Survey, documentation and statutory clearances, trenching, laying Completed

Phase I of multiple ducts, pulling, blowing of OFC for 1,700 km stretch. Jul 1999

Supply and installation of joint pit, manholes, electronic route marker,

joint closures, FTB, FDF and other accessories, splicing, jointing,

termination and link test at Madhya Pradesh.



24 OFC Laying Essar Survey, documentation and statutory clearances, trenching, laying Completed

Commvision Ltd of multiple ducts, pulling, blowing of OFC for 35 km stretch. Supply Apr 1998

and installation of joint pit, manholes, electronic route marker,

joint closures, FTB, FDF and other accessories, splicing, jointing,

termination and link test at Punjab.









WORK EXPERIENCE | 2010



Related docs
Other docs by huanghengdong
2012_Vendor_Form_Wedding_Expo
Views: 0  |  Downloads: 0
SCOPE 1 GP letter v2.0 12Mar2007
Views: 0  |  Downloads: 0
Boston_immigration_records
Views: 2  |  Downloads: 0
PSC MATRIX of achievement 080709
Views: 0  |  Downloads: 0
Summary - CIRCA
Views: 0  |  Downloads: 0
ieee_wiley_ebooks_library_customer_title_list
Views: 0  |  Downloads: 0
2009-2010_ACC0044_fishers_772_07-dec-2009
Views: 1  |  Downloads: 0
FSP20111216-EN
Views: 0  |  Downloads: 0
Workshops
Views: 0  |  Downloads: 0
By registering with docstoc.com you agree to our
privacy policy

You are almost ready to download!

You are almost ready to download!