Docstoc

Vortrag Dorsch Consult

Document Sample
Vortrag Dorsch Consult Powered By Docstoc
					                      DC Airports


I



             Client




April 2007
                                                                                     DC Airports


I



                                            Client




             Presentation of Dorsch Gruppe and Dorsch Consult Airports




April 2007                                           bringing visions to life   Dorsch Gruppe
                                                                              DC Airports


Mission Statement
I


For over fifty years, Dorsch has been a respected consulting and engineering
partner for industrial clients, private investors, and public institutions. With their
                                               Client
specific range of services, the individual companies of the group maintain
excellent market positions which are not only characterized by a large variety of
engineering services but also by significant references from the field of
development cooperation.

Our employees work in a future oriented and quality conscious way for people in
all regions of the world. We offer a complete performance portfolio in the fields of
structural engineering, plant and industrial construction, water, airports,
infrastructure, transport, and environment.

Thus the Dorsch Group companies are able to responsibly plan and competently
oversee projects in all stages on a national and international scale.
                                                       DC Airports


I
Company Information Dorsch Gruppe




    More than     50 Years of Experience
                                       Client


    about       1,600 Staff Members

                60 % Turnover Abroad

    about       1,500 Domestic and Overseas Projects
                      per Year

    over         140 Countries

    over          75 Million € Consulting Fees p. a.

    over          1.5 Billion € Annual Investments
                      Planned and Supervised
                                                                                                                          DC Airports


I
Company Information Dorsch Gruppe

The Company                                   Staff

The company was originally founded in                                         Client
                                              This revenue is generated by a staff of    planning, construction supervision,
1951. Today the companies belonging to        approximately 1,600 permanent              commissioning, maintenance and staff
the Dorsch Group rank at the top of the       employees including engineers,             training. Fees for projects vary from a few
league of Germany’s leading                   architects, economists, scientists and     thousand to several million euros.
consulting engineers.                         experts of other disciplines. Its staff
The Dorsch Gruppe operates in complete        represents the real capital of the
independence of manufacturers and             company.                                   Clients
suppliers within the construction industry.   Collaboration in interdisciplinary teams
The individual companies provide              coupled with the company’s wide range of
                                                                                         The Dorsch Group serves both public and
services and do not perform any               special fields and services offered, as
                                                                                         private sector clients. In Germany clients
deliveries, assembly or construction work.    well as extensive experience gained from
                                                                                         range from municipal authorities to
                                              projects in over 140 countries in 4
The Dorsch Holding GmbH based in                                                         federal ministries and from special-
                                              continents, ensure continuous drive and
Offenbach and Munich is the parent                                                       purpose agencies to industrial
                                              innovation which benefit all projects.
organisation of all companies belonging                                                  enterprises.
to the Dorsch Group. The affiliated                                                      In foreign countries the major clients are
companies operate branch and project                                                     government agencies.
                                              Projects
offices at places of major activities in
                                                                                         The Dorsch Group and its companies
Germany and abroad.
                                                                                         enjoy an excellent reputation among both
The annual revenue of the Dorsch              The Dorsch Group handles up to 1,500
                                                                                         domestic and foreign clients for highest
Gruppe is € 75 million.                       projects each year. These include
                                                                                         professional standards. This is owed to
                                              studies, expert opinions and research
                                                                                         the completion of projects, including
                                              work as well as development planning
                                                                                         those of high complexity, on schedule, in
                                              and feasibility studies up to project
                                                                                         top technical quality and within the given
                                              management, preliminary and detailed
                                                                                         budget.
                                                                                                                                                DC Airports

                                                         Jürgen Röder / Olaf Hoffmann
                                                      100 %
I
Organization Chart                                   hoffmann röder Beteiligungs GmbH
                                                         100 %
                                                              Dorsch Holding GmbH
                                                               Offenbach / Munich




Subsidiaries   Germany                                                           Client                          international
                100 %       100 %       100 %    100 %           90 %       100 %       100 %         90 %        85 %            33 %        95 %           100 %
               Dorsch       Dorsch     Dorsch    Dorsch        hoffmann    Dorsch       BDC          DDC         Dorsch         S.A.E.T.I.   Dorsch         Dorsch
               Consult      Consult    Consult   Consult       röder       Consult      Dorsch       Dorsch      Consult        S.A.         Consult        Consult
               Airports     Anlagen-   Wasser    Verkehr       hochbau     Industrie-   Consult      Consult     India          Algiers      asia           Abu
               GmbH         bau        und       und Infra-    GmbH        planung      GmbH         GmbH        Private                     Ltd.           Dhabi
               Munich       GmbH       Umwelt    struktur      Wiesbaden   GmbH         Berlin       Dresden     Ltd.                        Bangkok
                            Munich     GmbH      GmbH                      Essen                                 Mumbai
                                       Munich    Wiesbaden




Affiliates,     Frankfurt               Essen     Munich                                 Hamburg      Chemnitz
Offices
                Stuttgart                         Bonn                                   Neustadt     Görlitz

                                                                                         Ribnitz      Jena

                                                                                         Rostock      Leipzig

                                                                                         Stralsund

               Germany                                                                   Waren


                Jeddah                  Amman                                                                     Maharashtra                 Jakarta        Al Ain

                Khartoum                Cairo                                                                     Rajasthan                                  Western
                                                                                                                                                             Region
                                        Benin                                                                     Delhi

                                        Siirt                                                                     Haryana

                                        Iringa                                                                    Gujarat

                                        Songea                                                                    West Bengal

                                                                                                                  Andhra Pradesh

               international                                                                                      Tamil Nadu                       struktur-dorsch-gruppe-e
                                                                                                                                         DC Airports


I
Offices in Germany



Head Office of Dorsch Holding GmbH
                                                                                      Client
Offenbach / Munich


                                                                                                                                         Ribnitz-Damgarten
Subsidiaries / Affiliates of Dorsch Gruppe                                                                                          Rostock        Stralsund
                                                                                                                   Hamburg
Dorsch        Dorsch        Dorsch        Dorsch          BDC           DDC           hoffmann
                                                                                                                                                 Waren
Consult       Consult       Consult       Consult         Dorsch        Dorsch        röder
Airports      Wasser und    Anlagenbau    Verkehr und     Consult       Consult       hochbau
                                                                                                                    Neustadt-Glewe               (Müritz)
GmbH          Umwelt        GmbH          Infrastruktur   GmbH          GmbH          GmbH
              GmbH                        GmbH                                                                                                     Berlin
                                                                                                                Essen
                                                                                                                                          Leipzig
                                                                                                                                                         Görlitz
                                                                                                                               Jena        Rochlitz
                                                                                                            Bonn
Head Office   Head Office   Head Office   Head Office     Head Office   Head Office   Head Office
Munich        Munich        Munich        Wiesbaden       Berlin        Dresden       Wiesbaden                     Frankfurt                         Dresden
                                                                                                                                              Chemnitz
                                                                                                    Wiesbaden           Offenbach

Offices:      Office:       Office:       Offices:        Offices:      Offices:      Office:
                                                                                                                        Stuttgart
Frankfurt     Essen         Wiesbaden     Bonn            Hamburg       Chemnitz      Offenbach
Stuttgart                                 Hamburg         Neustadt      Görlitz
                                          Munich          Ribnitz       Jena                                                           Munich
                                                          Rostock       Leipzig
                                                          Stralsund     Rochlitz
                                                          Waren
                                                                                                  DC Airports


Core Markets – Subsidiaries / Affiliates Worldwide
I



                                                Client




                             Germany

                                     Lushnja        Siirt
                             Algiers                      Aleppo        Peshawar
                                    Kafr El Sheikh        Amman
                                              Cairo                         New Delhi
                                                                  Abu Dhabi     Calcutta
                                                Jeddah
                                                                            Mumbai
                                           Khartoum           Sana´a
                                                               Aden                     Bangkok
                                           Addis Abeba                        Chennai
                                       Cotonou

                                                     Iringa / Songea             Jakarta
                                                                                                      DC Airports


I
Worldwide Activities Dorsch Gruppe


Europe                                   Africa                                Asia           America
Albania             Switzerland          Algeria           Namibia             Afghanistan    Argentina
Austria             Turkey               Benin             Niger Client        Bangladesh     Brazil
Azerbaijan          Ukraine              Botswana          Nigeria             Bhutan         Canada
Belarus             United Kingdom       Burkina Faso      Rwanda              Cambodia       Chile
Belgium             (Ex-)Yugoslavia      Burundi           Senegal             P.R.China      Cuba
Bosnia /Herzegov.                        Cameroon          Seychelles          India          Dominican
Bulgaria                                 Cape Verde        Sierra Leone        Indonesia       Republic
Croatia                                  Central African   Somalia             Japan          Jamaica
Cyprus              Middle East           Republic         South Africa        Kyrgyzstan     Mexico
Czech Republic                           Chad              Sudan               Laos           Netherlands
Denmark             Iran                 Congo             Swaziland           Malaysia        Antilles
Estonia             Iraq                 Djibouti          Tanzania/Zanzibar   Maldives       Paraguay
France              Jordan               Egypt             Tunisia             Mongolia       Peru
Georgia             Kuwait               Eritrea           Uganda              Myanmar        Puerto Rico
Germany             Lebanon              Ethiopia          Zaire               Nepal          Trinidad and
Greece              Palestinian          Gambia            Zambia              Pakistan        Tobago
Hungary              Territories         Ghana             Zimbabwe            Papua New      USA
Italy               Saudi Arabia         Guinea                                 Guinea        Venezuela
Latvia              Syria                Ivory Coast                           Philippines
Malta and Gozo      United Arab          Kenya                                 Samoa (West)
Macedonia            Emirates            Lesotho                               South Korea
Moldova             Yemen                Liberia                               Sri Lanka
Netherlands                              Libya                                 Taiwan
Norway                                   Madagascar                            Thailand
Poland                                   Malawi                                Tonga
Portugal                                 Mali                                  Turkmenistan
Romania                                  Mauritania                            Uzbekistan
Russia              Antarctica           Mauritius                             Vanuatu
Slovakia                                 Morocco                               Vietnam
Slovenia            Filchner Shelf Ice   Mozambique
Spain
                              DC Airports


I
Fields of Activity



                     Client
                              DC Airports


I
Fields of Activity



                     Client
                                                                                                         DC Airports


I
Fields of Activity by Companies



                                                                   Client


                                                                            Transportation
   Airside Facilities    Industrial Plants      Water Supply                                 Architecture
                                                                            Planning




   Airport Specific      Pipelines and          Sanitation and                               Buildings,
                                                                            Roads
   Technical Equipment   Tank Farms             Urban Drainage                               Industrial Plants




                         Mechanical Equipm.,    Hydraulic                                    Structural
   Landside Facilities                                                      Railways         Engineering
                         Supply Installations   Engineering



                                                Hazardous Waste, Noise
                                                & Vibrations, Ecology &     Structural       Mechanical Equipm.,
                         Telecommunications
                                                Landscape Conserva-         Engineering      Supply Installations
                                                tion, Geotechnics


                                                Geographical
                                                Information Systems /       Construction     Project Management
                                                Remote Sensing              Supervision
                                                Applications



                                                Social                                       Construction
                                                Infrastructure                               Supervision
                                                                                                        DC Airports


I
Fields of Activities of DC Airports

                         DC Airports
                         CEO: Jürgen Röder, Andrea Pal

                                                               Client

                                           Airport Specific
      Airside Facilities                                                     Landside Facilities
                                           Technical Equipment

        Runways, Taxiways & Aprons           Ground Lighting & Visual Aids     Urban Development

        Runway- &, Taxiway Bridges           Instrument Landing Systems        Terminal Curb Sides


        Passenger - & Cargo Terminals        Aircraft Stand Equipment          Airport Access


        Air Traffic Control Buildings        Air Traffic Control Systems       Parking Lots & Car Park Houses


        Aircraft & Maintenance Buildings     Passenger Boarding Bridges        Power Supply and Distribution


        Fire & Rescue Facilities             FIDS, CUTE, BMS                   Water and Sewage


        Drainage & Sewage Treatment          Baggage Handling Systems


        Refuelling Facilities                Safety & Security Systems

        Landscaping                          IT & Communication Systems
                                                                                                                DC Airports


      I
      Professional Services



                                                                            Client
                  Project Development                         Planning & Design         Special Services

                                             Leipzig/Halle                                                        Munich Int‘l
                      Concept Development     Int‘l Airport         Site Survey           Project Management        Airport

New Khartoum      Forecast & Demand Assessment                  Conceptual Design      Construction Management
  Int‘l Airport
                          Site selection                         Preliminary Design         Site Supervision

                         Masterplanning                           Detailed Design         Quality & Cost Control New Bangalore
                                                                                                                   Int‘l Airport
                        Business Planning                                              Bid & Contract Management
                                                                Approval Documents
  Berlin New
  Int‘l Airport         Financial Analysis                          Final Design            EPC-Contracting

                    Environmental Assessment                     Tender Documents             BOT-Advisor

                    Commercial Development                     Investment Assessment       Operation Transfer
                                                 Riga Int‘l
                                                  Airport
                                                                                              Staff Training

                                                                                                                 New Teheran Int‘l Airport
                                                                                                        DC Airports


I
Company Service Profile

                                                 Client's Task

                                                         Client
                                                        Research
                                 Preinvestment          Expert Assessment
                                                        Masterplanning
                                                        Feasibility Study
            Project Management




                                                                                    Financing Schemes
                                 Project                Preliminary Design
                                                        Detailed Design
                                 Preparation            Tender Documents
                                                        Contracting

                                                        Site Supervision
                                 Project                Budgeting and
                                 Implementation         Cost Control
                                                        Right-of-way
                                                        Procurement
                                                        Acceptance Procedure
                                 Operational            Commissioning
                                 Assistance             Operation and Maintenance
                                                        Institution Building
                                                        Personnel Training


                                           Engineering Solution
                                                                                                                          DC Airports


I
Range of Engineering

                                                            Master-
                                                           planning,
                                                            location
                                               Com-          studies        Feasibility
       Project Handover                      missioning                      studies                           Project Preparation
                                                                       Client
                                                                                          Preliminary
                               Acceptance
                                                                                            design




                       Cost
                     and time                                                                        Project
                      control                                                                        manual

                                                          Project
                                                          Manage-
                                                           ment
                                                                                                   Assisting
                                                                                                  investor in
                         Quality
                                                                                                plan approval/
                         control
                                                                                                    building
                                                                                                     permit



                                                                                          Detailed
Project Implementation        Procurement                                                 design                 Project Design

                                               Cost
                                             planning                       Tendering

                                                          Contracting




                                            Preparation of Construction
                                          DC Airports


I
Quality Management Certificate



                                 Client
                                                                             DC Airports


I



                                    Client




             Selected References in the Airport Sector




April 2007                                   bringing visions to life   Dorsch Gruppe
                                                                                DC Airports


Kazan Int‘l Airport (KZN), Russia
I
Master Plan Services for Airport Extension/Rehabilitation

                                           Client:
                                           Client               Chimimport (Private Investor)
                                           Location:            Kazan, Russia
                                           Construction Cost:   n/a
                                           Capacity:            5 MAP (Ext. by 4 MAP)
                                           Project Period:      2009

                                           Project Services:
                                           • Owner’s Engineer/Owner’s Architect
                                           • Site surveys and investigations
                                           • Status Quo Analysis
                                           • Overall Master Plan and Conceptual Design
                                           • Scenario Writing
                                           • Phased Layout Plans
                                           • Analysis Traffic forecast
                                           • Design Parameterization
                                           • Definition of Expansion Program
                                           • Space Programming / Pax Flow Definition
                                                                                 DC Airports


Medina Int‘l Airport (MED), Saudi Arabia
I
New Passenger Terminal Complex


                                           Client
                                           Client:            General Authority of Civil Aviation
                                                              (GACA)
                                           Location:          Medina, Saudi Arabia
                                           Construction Cost: approx. 400 Mio. €
                                           Capacity:          520.000 m² Terminal Area
                                                              6 MAP
                                           Project Period:    2005 - 2009

                                           Project Services:
                                           • Space Programming,
                                           • Pax Flow Definition
                                           • Conceptual and Preliminary Design


                                           Project Disciplines:
                                           • Architecture and Structure
                                           • Electro-Mechanical Installations
                                           • Airport Specific Systems
                                           • Baggage Handling
                                           • Landside Facilities
                                                                   DC Airports


I
Airport Projects

Najran Airport, Saudi Arabia

                               Client
                               Client:               ZFP, Presidency of
                                                     Civil Aviation
                               Location:             Najran, Saudi Arabia
                               Construction Cost:    n.a.
                               Capacity:             2 MAP
                               Project Period:       2004 - 2007


                               Project Services:
                               • Masterplanning
                               • Project outline
                               • Conceptual design
                               • Final design
                               • Tendering
                                                                               DC Airports


I
Frankfurt Int‘l Airport „Rhein-Main“ (FRA), Germany
Renovation Baggage Claim Hall

                                       Client:             Fraport AG
                                       Client
                                       Location:           Frankfurt, Germany
                                       Construction Cost: approx. 15 Mio €
                                       Capacity:           17.000 m² Area
                                       Project Period:     2001 - 2006


                                       Project Services:
                                       • Preliminary, Detailed and Final Design
                                       • Coordination with local Authorities
                                       • Tendering
                                       • Construction Supervision


                                       Project Disciplines:
                                       • Architecture and Structure
                                       • Electro-Mechanical Installations
                                                                                 DC Airports


I
Airport Projects

Berlin Brandenburg Int‘l Airport (BBI), General Planner Airside

                                           Client
                                           Client:               Flughafen Schönefeld
                                                                 GmbH
                                           Location:             Berlin/Germany
                                           Construction Cost:
                                           Phase 1:              ca. 500 Mio. EUR
                                           Capacity:
                                           Phase 1:              20 MAP
                                           Project Period:       2005 - 2011


                                           Project Services:
                                           • Design and Project Management for entire
                                             airside incl. airfield pavement, drainage and
                                             water treatment, hydrant fuelling, lighting
                                           • Preliminary to final design, tendering
                                           • Time and Cost Control
                                           • Construction Management
                                           • Leading partner of joint venture
                                                              DC Airports


I
Airport Labraq, Libya
New Passenger Terminal


                          Client
                         Client:              SAHARI (Construction Company)
                         Location:            Labrak, Libya
                         Construction Cost:   approx 10 Mio. €
                         Capacity:            6.700 m² Terminal Area
                                              0,8 MAP
                         Project Duration:    2009 - 2009

                         Project Services:
                         • Space Programming
                         • Pax-Flow Definition
                         • Final Design


                         Project Disciplines:
                         • Architecture and Structure
                         • Electro-Mechanical Installations
                         • Airport Specific Systems
                         • Baggage Handling
                         • Landside Facilities (Parking Place, Curb Side,
                           Access Road)
                                                                                 DC Airports


I
Airport Projects

Frankfurt Int‘l Airport (FRA), Apron Terminal 3

                                            Client
                                            Client:               FRAPORT AG
                                            Location:             Frankfurt/Germany
                                            Construction Cost:    ca. 220 million EUR
                                            Capacity:             600.000 m²
                                            Project Period:       2007 - 2008


                                            Project Services:
                                            Preliminary up to Final Design as well as Tendering
                                            and Support in Contract Award for:
                                            • 600.000 m² apron
                                            • Airfield Ground Lighting (AGL)
                                            • Apron Flood Lighting (AFL)
                                            • Power Supply incl. 400 Hz
                                            • Drainage, Sewage
                                            • Water Supply
                                                                                   DC Airports


Xian Int‘l Airport (SIA), China
I
Advisory Services for Privatization Project

                                              Client:
                                              Client               Fraport (Private Investor)
                                              Location:            Xian, China
                                              Construction Cost:   n/a
                                              Capacity:            37 MAP (Ext. by 26 MAP)
                                              Project Period:      2008

                                              Project Services:
                                              • Owner’s Engineer/Owner’s Architect
                                              • Verification Overall Master Plan and Conceptual
                                                Design
                                              • Analysis Design Parameterization
                                              • Definition of Expansion Program
                                              • Space Programming / Pax Flow Definition
                                                                                DC Airports


I
Airport Projects

Al Ain Int‘l Airport, New Maintenance Hangar

                                          Client
                                          Client:                Abu Dhabi Airport Authority
                                          Location:              Abu Dhabi / UAE
                                          Construction Cost:     n/a
                                          Length/Width/Height: 170m / 100m / 25m
                                          Project Period:        2007 - 2009


                                          Project Services:
                                          • Conceptual Studies
                                          • Preliminary Design
                                          • Detailed Design
                                          • Final Design
                                          • Tendering
                                          • Contract Award
                                          • Construction Supervision
                                                                                    DC Airports


I
Airport Projects

Bangalore Int‘l Airport, Greenfield Airport, India

                                             Client
                                             Client:                BIAL Bangalore
                                                                    Int‘l Airport Ltd
                                             Location:              Bangalore/India
                                             Capacity:              11.5 MAP (Phase 1)
                                             Project Period:        2002 - 2008


                                             Project Services:
                                             • Owner‘s engineer/owner‘s architect
                                             • Consulting services for entire airport
                                             • Terminal
                                             • Airside & landside incl. infrastructure
                                             • Airfield lighting, NAVAIDS, airport systems
                                             • Tendering & EPC contracting
                                             • Project & construction management
                                                                              DC Airports


I
Airport Projects

Milan Malpensa Airport, Master Plan Studies

                                         Client:
                                         Client               S.E.A. Milan Airports
                                                              Authority
                                         Location:            Milan/ Italy
                                         Construction Cost:   ca. 1800 Mio. EUR
                                         Capacity:            49 MAP
                                         Project Period:      2006 - 2007
                                         Project Services:
                                         • Site analysis and assessment
                                         • Terminal and Satellite design
                                         • Airside design
                                         • Landside access
                                         • Cargo facilities
                                         • Land Use Plan
                                         • Baggage Handling System
                                         • Landside Access
                                         • Preliminary Master Plan Document
                                                               DC Airports


I
Airport Projects
Kumasi Airport, Ghana

                        Client
                        Client:                 Ghana Civil Aviation
                                                Authority
                        Location:               Kumasi, Ghana
                        Construction Cost:      n/a
                        Capacity:               n/a
                        Project Period:         2005 - 2006
                        Project Services:
                        • Site analysis and assessment
                        • Market analysis
                        • Function and purpose of the airport
                        • Master plan
                        • Environmental overview
                        • Financial appraisal
                        • Concepts of project financing
                                                                         DC Airports


I
Airport Projects

Melville Hall Airport, Dominica

                                  Client
                                  Client:                 European Union / European
                                                          Development Fond
                                  Location:               Melville Hall / Dominica
                                  Construction Cost:      10 Mio €
                                  Capacity:               n/a
                                  Project Period:         2005 - 2008


                                  Project Services:
                                  • Construction Supervision for
                                    - Terminal Building
                                    - Car Park
                                    - Access Road
                                    - 500 m Extension of Runway
                                    - NAVAIDS
                                                                               DC Airports


I
Airport Projects

Saarbrücken Int‘l Airport (SCN), Apron / Aircraft Hangar, Germany

                                          Client
                                          Client:                Saarbrücken Airport
                                                                 Authority
                                          Location:              Saarbrücken
                                          Construction Costs: 15 million EUR
                                          Capacity:              3 MAP
                                          Project Period:        2004 - 2006


                                          Project Services:
                                           Apron Areas incl. Navaids, Airfield Ground
                                           Lighting and Aircraft Hangar (4.000 m2):


                                          • Preliminary design
                                          • Approval design
                                          • Detailed design
                                          • Construction Supervision
                                                                                 DC Airports


I
Airport Projects

Kuwait Int‘l Airport (KWI), Masterplan Update 2nd Terminal, Kuwait

                                          Client
                                          Client:                 Directorate General
                                                                  of Civil Aviation
                                          Location:               Kuwait
                                          Construction Cost:      n.a.
                                          Capacity:               20 MAP
                                          Project Period:         2004 - 2006


                                          Project Services:
                                          • Aerial survey
                                          • Masterplanning
                                          • Feasibility of privatizing new terminal building
                                            and related facilities
                                          • Financial modelling
                                          • Outline design
                                                                               DC Airports


Helicopter Base Oberschleißheim, Germany
I
Extension of existing Helicopter Base for Federal and Regional Police

                                          Client:
                                          Client               Staatl. Bauamt München 1
                                          Location:            Oberschleißheim / Germany
                                          Construction Cost:   8 Mio. € approx.
                                          Project Period:      2008 – 2011

                                          Project Services:
                                          • Design
                                          • Tendering
                                          • Construction Supervision


                                          Project Disciplines:
                                          • Airfield (Helipad, Apron, TWYs)
                                          • Airfield Ground Lighting (AGL)
                                          • Landside (parking places, roads)
                                          • Fuelling
                                          • Drainage
                                          • Water Supply
                                          • Geology
                                          • Contamination
                                                                              DC Airports


I
Airport Projects

Frankfurt-Hahn Int‘l Airport (HHN), Cargo Apron, Germany

                                         Client
                                         Client:              Frankfurt-Hahn Airport
                                                              Authority
                                         Location:            Hahn
                                         Construction Cost:   3.2 million EUR
                                         Capacity:            n/a
                                         Project Period:      2004 - 2006


                                         Project Services:
                                         • Preliminary to Final design
                                         • Tender Documents, Tendering
                                         • Site Supervision and Documentation
                                         • Security and Safety Coordination
                                           for
                                         • Airside Areas
                                         • Drainage System
                                         • Airfield Ground Lighting
                                                                            DC Airports


New Bangkok Int‘l Airport (BKK), Thailand
I

Main Terminal and Concourse Building

                                       Client
                                       Client:             New Bangkok Int’l Airport (NBIA)
                                       Location:           Bangkok, Thailand
                                       Construction Cost: approx. 900 Mio. €
                                       Capacity:           54 MAP
                                       Project Period:     2003-2006


                                       Project Services:
                                       • Construction management
                                       • Construction supervision


                                       Project Disciplines:
                                       • Architecture and Structure
                                       • Electro-Mechanical Installations
                                       • Airport Specific Systems
                                       • Baggage Handling
                                       • Landside Facilities (Parking Place, Curb Side,
                                         Access Road)
                                                                                    DC Airports


I
Airport Projects

Frankfurt Int‘l Airport (FRA), 4th Runway, Germany

                                          Client
                                          Client:                  FRAPORT AG
                                          Location:                Frankfurt/Germany
                                          Construction Cost:       n/a
                                          Capacity:                120 MVT‘s p.h.
                                          Project Period:          2001 - 2006


                                          Project Services:
                                          • Preparation of plan approval documents for
                                            airside areas
                                          • Entire code F aircraft (A 380) upgrading
                                          • Conceptual and detailed design for:
                                          • Runway, taxiways, apron
                                          • Taxiway bridges over 8-line highway
                                          • Fire rescue facility
                                                                                  DC Airports


I
Airport Projects

Vienna Int‘l Airport (VIE), Parallel Runway, Austria

                                            Client
                                            Client:              Vienna Airport
                                                                 Authority
                                            Location:            Vienna/Austria
                                            Construction Cost:   n/a
                                            Capacity:            80 MVTs p.h.
                                            Project Period:      1999 - 2006


                                            Project Services:
                                            • Evaluation and assessment of alternative
                                              layout designs
                                            • Plan approval documents for airside areas
                                            • Preparation of environmental licensing
                                              procedure
                                            • Supervision, coordination, scheduling
                                                                                  DC Airports


I
Airport Projects

Munich Int‘l Airport (MUC), Apron Ramp 2 / 3, Germany

                                         Client
                                         Client:                Munich Airport
                                                                Authority
                                         Location:              Munich/Germany
                                         Construction Cost:     ca. 220 million EUR
                                         Capacity:              40 MAP
                                         Project Period:        1998 - 2006


                                         Project Services:
                                         • Preliminary up to final design, tendering,
                                           awarding of airside facilities (Apron, Fuelling,
                                           Sewage, AGL, AFL, Power Supply)
                                         • General planning
                                         • Site supervision / site-coordination
                                         • Document control
                                         • Project & construction management
                                                                             DC Airports


I
Airport Projects

Köln/Bonn Int‘l Airport (CGN), Runway/Apron, Germany

                                        Client
                                        Client:               Köln/Bonn Airport
                                                              Authority
                                        Location:             Cologne/Germany
                                        Construction Cost:    app. 43 Mio. EUR
                                        Capacity:             12 MAP
                                        Project Period:       1997 - 2006


                                        Project Services (selected):
                                        • Runway rehabilitation / apron extension /
                                          passenger bridges
                                        • Optimisation TWY-System
                                        • Approval documents
                                        • Detailed and final design
                                        • Tender documents
                                        • Site supervision
                                                                             DC Airports


I
Airport Projects

Hahn Airport (HHN), Airside Areas, Germany

                                        Client
                                        Client:               Hahn Airport
                                                              Authority
                                        Location:             Hahn/Germany
                                        Construction Cost:    n. a.
                                        Capacity:             2.0 MAP
                                        Project Period:       1992 - 2006


                                        Project Services (selected):
                                        • Runway rehabilitation incl. ILS Cat.3
                                        • Airside areas, lighting
                                        • Temporary Terminal
                                        • MET equipment
                                        • Approval design, detailed design
                                        • Tender documents
                                        • Project management
                                        • Supervision of works
                                                                    DC Airports


I
Airport Projects
Milano Int‘l Airport, Italy

                              Client
                              Client:               SEA, airport
                              authority             Milan
                              Location:             Milan / Italy
                              Construction Cost:    n.a.
                              Capacity:             56 MAP (Final extension)
                              Project Period:       2005


                              Project Services:
                              • Final capacity considerations
                              • Projection of different Terminal and airside
                                configurations under consideration of existing
                                airport facilities and available development
                                areas
                              • Integration of passenger and baggage
                                transport systems
                              • Extension program for cargo facilities
                                                                         DC Airports


I
Airport Projects

Budapest Int‘l Airport, Hungary

                                  Client
                                  Client:                Tepe Akfen (TAV)
                                  Location:              Budapest/ Hungary
                                  Construction Cost:     n.a.
                                  Capacity:              35 MAP (final extension)
                                  Project Period:        2005


                                  Project Services:
                                  • Technical advisor for privatisation project
                                  • Initial Master Plan incl. Traffic Forecast
                                  • Development strategy
                                  • Technical Consulting Services for entire
                                    Airport incl. Terminal, cargo, Airside &
                                    Landside facilities under consideration of
                                    existing airport facilities
                                  • Calculation of Investment costs
                                                                                    DC Airports


I
Airport Projects

Bratislava Int‘l Airport and Kosice Airport, Slovakia

                                             Client
                                             Client:                Tepe Akfen (TAV)
                                             Location:              Bratislava and Kosice/
                                                                    Slovakia
                                             Construction Cost:     n.a.
                                             Capacity:              12 MAP BTS
                                                                    1.5 MAP KOS
                                             Project Period:        2005


                                             Project Services:
                                             • Technical advisor for privatisation of 2 airports
                                             • Master Planning incl. Traffic Forecast and
                                               market potential
                                             • Site analysis and Investment costs
                                             • Strategic investment program
                                             • Conceptual design
                                                                               DC Airports


I
Airport Projects

Munich Int‘l Airport, Conceptual Study Development Area East

                                         Client
                                         Client:              Munich Airport
                                                              Authority
                                         Location:            Munich/Germany
                                         Construction Cost:   n.a.
                                         Capacity:            70 MAP
                                         Project Period:      2005


                                         Project Services:
                                         • Development and Functional Concepts
                                         • Alternative Terminal designs elaboration
                                         • Baggage handling system
                                         • PTS link
                                         • Airside and Landside Development
                                         • Consideration of urban planning
                                         • Monetary and quantitative evaluation of
                                           alternatives
                                                                               DC Airports


I
Airport Projects

Munich Int‘l Airport (MUC), Extension Taxiway System, Germany

                                        Client:
                                        Client                FMG Munich Airport
                                                              Authority
                                        Location:             Munich, Germany
                                        Construction Cost:    12 million EUR
                                        Capacity:             40 MAP
                                        Project Period:       2000 - 2005


                                        Project Services:
                                        • Preliminary to final design
                                        • Tender documents
                                          for
                                        • Airside areas
                                        • Drainage system
                                                                         DC Airports


I
Airport Projects

Kuwait Int‘l Airport (KWI), Kuwait

                                     Client
                                     Client:               K.U.C.M.
                                     Location:             Kuwait
                                     Construction Cost:    n.a.
                                     Capacity:             5 MAP
                                     Project Period:       2004



                                     Project Services:
                                     • Consulting services terminal extension
                                       program
                                     • Capacity analysis
                                     • Room and functional program
                                     • Terminal masterplanning for extension to 10
                                       Mio. PAX
                                                                                   DC Airports


I
Airport Projects

Imam Khomeini Int‘l Airport (IKIA), Greenfield Airport, Iran

                                            Client
                                            Client:                IKIA Airport Company
                                            Location:              Tehran, Iran
                                            Construction Cost:     n. a.
                                            Capacity:              10 MAP (Phase 1)
                                            Project Period:        2003 - 2004


                                            Project Services:
                                            • Technical advisor
                                            • Consulting services for entire airport incl.
                                              terminal
                                            • Completion of airport
                                            • Testing & commissioning
                                            • Pre-airport operation
                                            • Commercial advisor
                                            • Owners advisor for BOT project
                                                                                    DC Airports


I
Airport Projects

Leipzig/Halle Int‘l Airport (LEJ), Germany

                                             Client
                                             Client:                Leipzig/Halle Airport
                                                                    Authority
                                             Location:              Leipzig/Germany
                                             Capacity:              6 MAP
                                             Project Period:        1994 -2004


                                             Project Services:
                                             • Northern extension
                                             • Realignment south runway
                                             • Plan approval documents
                                             • Preliminary up to final design
                                             • Preparation of tender documents
                                             • Supervision of works
                                             • Project management
                                                                               DC Airports


I
Airport Projects

Luis Muñoz Marín Airport, San Juan, Puerto Rico: Aircraft Refuelling System

                                          Client
                                          Client:               Consultores para el
                                                                Aeropuerto San Juan
                                          Location:             Carolina (San Juan),
                                                                Puerto Rico
                                          Construction Cost:    1.4 Mio USD (estim.)
                                          Capacity:             10 MAP
                                          Project Period:       2003


                                          Project Services:
                                          • Aircraft refueling system extension for the new
                                            domestic terminal for group/cruise passengers
                                            at Luís Muñoz Marín Aiport, San Juan, Puerto
                                            Rico, including rehabilitation of existing
                                            facilities.
                                          • Basic design
                                          • Final design
                                          • Tender dossier
                                                                                DC Airports


I
Airport Projects

Frankfurt Int‘l Airport (FRA), A-380 Hangar Apron, Germany

                                         Client
                                         Client:                Frankfurt Airport
                                                                Authority
                                         Location:              Frankfurt/Germany
                                         Construction Cost:     8.3 million EUR
                                         Capacity:              50 MAP
                                         Project Period:        2002 - 2003


                                         Project Services:
                                         • Plan approval documents for technical design
                                           of airside areas, including:
                                         • Technical drawings
                                         • Interface coordination
                                         • Expertise studies
                                                                              DC Airports


I
Airport Projects

ILS Instrument Landing Systems, various Airports, Germany

                                        Client
                                        Client:               German Air Traffic
                                                              Control (DFS)
                                        Location:             various / Germany
                                        Construction Cost:    n/a
                                        Project Period:       1999 - 2003


                                        Project Services (13 Airports):
                                        • Phase 1:
                                        • Coordination of ILS 4000 stabilizing
                                          programmes
                                        • Scheduling/acceptance/commissioning
                                        • Documentation and assessment of lightning
                                          protection/earthing equipment
                                        • Phase 2:
                                        • Carrying out of concept for lightning protection
                                        • Coordination/acceptance of works
                                                                              DC Airports


I
Airport Projects

Hamburg Int‘l Airport (HAM), Apron/Taxiways, Germany

                                        Client
                                        Client:               Hamburg
                                                              Airport Authority
                                        Location:             Hamburg/Germany
                                        Construction Cost:    n.a.
                                        Capacity:             10 MAP
                                        Project Period:       1998 - 2003


                                        Project Services (selected):
                                        • New apron / taxiway system rehabilitation
                                        • Preliminary up to final design
                                        • Plan approval documents
                                        • Preparation of tender documents
                                        • Supervision of works
                                        • Project management
                                                                               DC Airports


I
Airport Projects

Berlin Brandenburg International Airport (BBI), Privatization, Germany

                                           Client
                                           Client:              PEG/BBIP
                                           Location:            Berlin/Germany
                                           Construction Cost:
                                           Phase 1:             ca. 2.0 billion EUR
                                           Capacity:
                                           Phase 1:             20 MAP
                                           Project Period:      1997 - 2003


                                           Project Services:
                                           • General planning
                                           • Masterplan
                                           • Preliminary to detailed design
                                           • Project management incl. time and cost control
                                           • Contracts & Claim Management
                                                                               DC Airports


I
Airport Projects

Dortmund Int‘l Airport (DTM), Airport Extension, Germany

                                         Client
                                         Client:                Dortmund Airport
                                                                Authority
                                          Location:             Dortmund/Germany
                                          Construction Cost:    ca. 40 million EUR
                                          Capacity:             0.8 MAP
                                          Project Period:       1997 - 2003


                                          Project Services:
                                          • General planner
                                          • Plan approval documents
                                          • Runway extension
                                          • Apron extension
                                          • Baggage handling system
                                          • 400 Hz / PCA / refuelling system
                                          • Passenger bridges
                                          • Site supervision
                                                                         DC Airports


I
Airport Projects

Augsburg Airport (AGB), Germany

                                  Client
                                  Client:                Augsburg Airport
                                                         Authority
                                  Location:              Augsburg/Germany
                                  Construction Cost:     ca. 10 million EUR
                                  Capacity:              0.3 MAP
                                  Project Period:        1996 - 2003


                                  Project Services (selected):
                                  • Airfield lighting incl. ILS system / apron
                                  • extension / tower
                                  • Runway extension
                                  • Masterplan
                                  • Detailed design
                                  • Preparation of tender documents
                                  • Supervision of works
                                  • Project management
                                                                                  DC Airports


I
Airport Projects

Vilnius/Tallinn Int‘l Airports, Ex-Post Evaluation, Lithuania/Estonia

                                             Client
                                             Client:               EIB European
                                                                   Investment Bank
                                             Location:             Lithuania/Estonia
                                             Construction Cost:    14.9/22.4 million EUR
                                             Location:             Lithuania/Estonia
                                             Capacity:             n/a
                                             Project Period:       2002


                                             Project Services:
                                             • Review of adequacy of the design, of
                                               construction standards and maintenance
                                               applied,
                                             • environmental monitoring (Vilnius Airport)
                                             • organisational aspects.
                                                                                 DC Airports


I
Airport Projects

Tuzla Int‘l Airport, Feasibility Study / Masterplan, Bosnia-Hercegovina

                                           Client
                                           Client:               Tuzla Canton
                                           Location:             Tuzla / BiH
                                           Construction Cost:    100 million EUR
                                           Capacity:             n/a
                                           Project Period:       2002


                                           Project Services:
                                           • Review and up-grading of the present
                                             feasibility study and airport master plan
                                           • Elaboration of an airpark feasibility study and
                                             master plan (airport and airpark)
                                           • Marketing strategy and advisory services
                                           • Assessment and launching of privatizations
                                                                                DC Airports


I
Airport Projects

Kassel-Calden Airport, Approval Procedure (ROV), Germany

                                       Client
                                       Client:                 Kassel Airport
                                                               Authority
                                       Location:               Calden/
                                                               Germany
                                       Construction Cost:      n/a
                                       Capacity:               n/a
                                       Project Period:         2001-2002


                                       Project Services:
                                       • Preparation and proceeding of approval
                                         procedure (ROV)
                                       • Preparation of all documents
                                       • Alternative layouts
                                       • Masterplans
                                       • Obstacle plans
                                       • Status quo report
                                                                     DC Airports


I
Airport Projects

Baden Airport (FKB), Germany

                               Client
                               Client:               Baden Airport
                                                     Authority
                               Location:             Baden-Baden/
                                                     Germany
                               Construction Cost:    ca. 5 million EUR
                               Capacity:             0.3 MAP
                               Project Period:       1997 - 2002


                               Project Services (selected):
                               • Airfield lighting and ILS system
                               • Passenger apron
                               • Runway rehabilitation
                               • Plan approval documents
                               • Detailed design
                               • Preparation of tender documents
                               • Supervision of works
                                                                              DC Airports


I
Airport Projects

Augsburg Airport (AGB), ILS CAT 1 / Safety Strip, Germany

                                         Client
                                         Client:               Augsburg Airport
                                                               Authority
                                         Location:             Augsburg/Germany
                                         Construction Cost:    3.8 million EUR
                                         Capacity:             n/a
                                         Project Period:       1996-1997 + 2001


                                         Project Services:
                                         • Electrotechnical lighting equipment,
                                           meteorological equipment with cable
                                           embankment with related below ground civil
                                           engineering
                                         • Preliminary to final design, tendering/awarding,
                                           construction supervsion
                                                                             DC Airports


I
Airport Projects

Paderborn Airport (PAD), Airport Extension, Germany

                                         Client
                                         Client:              Paderborn Airport
                                                              Authority
                                         Location:            Paderborn/Germany
                                         Construction Cost:   ca. 4 million EUR
                                         Capacity:            1 MAP
                                         Project Period:      1994 - 2001


                                         Project Services:
                                         • Plan approval documents
                                         • Detailed design
                                         • Tender documents
                                         • Supervision of works
                                                                               DC Airports


I
Airport Projects

Cochstedt Airport, Airport Conversion and Rehabilitation, Germany

                                         Client
                                         Client:                Harz-Börde Airport
                                                                Authority
                                         Location:              Cochstedt/
                                                                Germany
                                         Construction Cost:     ca. 30 million EUR
                                         Capacity:              n/a
                                         Project Period:        1999 - 2001


                                         Project Services:
                                         • Airfield lighting / Navaids
                                         • New passenger apron and taxiway
                                         • Runway rehabilitation (incl. drainage)
                                         • ATC-tower equipment and MET equipment
                                         • Plan approval documents / detailed design
                                                                               DC Airports


I
Airport Projects

Laos Airports, Airports Improvement Project, Laos

                                          Client
                                          Client:              Airports Authority
                                          Location:            Nationwide, Laos
                                          Construction Cost:   ca. 98 million EUR
                                          Capacity:            1.3 MAP (Vientiane)
                                          Project Period:      1995-2001


                                          Project Services:
                                          • Detailed design
                                          • Tender documents
                                          • Bid evaluation
                                          • Assistance in contract award
                                          • Construction supervision
                                          • Quality control
                                          • Project management
                                                                                  DC Airports


I
Airport Projects

Vienna Int‘l Airport (VIE), Masterplan 2015, Austria

                                            Client
                                            Client:              Vienna Airport
                                                                 Authority
                                            Location:            Vienna/Austria
                                            Construction Cost:   n/a
                                            Capacity:            30 MAP
                                            Project Period:      1999 - 2000


                                            Project Services:
                                            • Capacity demand and requirement program
                                              model as part of the central project
                                              coordination services for the masterplan 2015
                                              implementation
                                                                                 DC Airports


I
Airport Projects

Repairing Surfaces of Apron & Taxiways and Other Works, Abu Dhabi

                                        Client
                                        Client:                 Works Department
                                                                Abu Dhabi – UAE
                                        Construction Cost:      23.151 million €
                                        Project Period:         1990 & 1998 - 2000


                                        Project Services :
                                        • Study, design, tendering, construction
                                          supervision for:
                                        • Repair & reconstruction of 984,000m2 asphalt
                                          for aprons, taxiways, turnouts etc.
                                        • Construction of new taxiways and
                                          accessroads, repair of manholes.
                                        • New temporary & permanent markings,
                                          dismantling, reinstallation of airfield lighting,
                                        • new airfield light, constr. of 2,000 m water
                                          supply pipe incl. valve chambers
                                                                               DC Airports


I
Airport Projects

New Athens Spata International Airport (ATH), Greece

                                         Client
                                         Client:              HochTief AG
                                         Location:            Spata / Greece
                                         Construction Cost:   ca. € 2,300 million
                                         Capacity:            16.0 MAP
                                         Project Period:      1997 - 2000


                                         Project Services:
                                         • Approval of masterplan
                                         • Preliminary design and detailed design of
                                           entire airfield
                                         • General airport planning consultancy until
                                           detailed and final design
                                         • Pavement dimensioning and design
                                         • Preliminary and detailed design for airside and
                                           landside traffic management incl. marking
                                                                                 DC Airports


I
Airport Projects

Munich Int‘l Airport (MUC), Conceptual Design 1st Satellite, Germany

                                          Client
                                          Client:               Munich Airport
                                                                Authority
                                          Location:             Munich/Germany
                                          Construction Cost:    ca. 770 million EUR
                                          Capacity:             50 MAP
                                          Project Period:       1999


                                          Project Services:
                                          • Alternative satellite designs elaboration
                                          • Apron baggage hall incl. baggage handling
                                            system
                                          • PTS link
                                          • Investigation of water/drainage aspects
                                          • Consideration of urban planning
                                          • Monetary and quantitative evaluation of the
                                            various alternatives
                                                                                DC Airports


I
Airport Projects

Graz Int‘l Airport (GRZ), Runway / Masterplan, Austria

                                          Client
                                          Client:                Graz Airport Authority
                                          Location:              Graz/Austria
                                          Construction Cost:     ca. 10 million EUR
                                          Capacity:              0.7 MAP
                                          Project Period:        1998 - 1999


                                          Project Services:
                                          • Runway extension / runway rehabilitation
                                          • Airport masterplan
                                          • Detailed design
                                          • Preparation of tender documents
                                          • Supervision of works
                                                                            DC Airports


I
Airport Projects

Hahn Airport (HHN), Passenger Terminal Building, Germany

                                        Client
                                        Client:              Hahn Airport
                                                             Authority
                                        Location:            Hahn/Germany
                                        Construction Cost:   ca. 15 million EUR
                                        Capacity:            2.0 MAP
                                        Project Period:      1998 - 1999


                                        Project Services:
                                        • Preliminary design planning
                                        • Cost calculation
                                        • for
                                        • Building construction
                                        • Technical building equipment
                                        • Electrical engineering
                                        • Infrastructure
                                                                              DC Airports


I
Airport Projects

Weeze-Laarbruch, Conversion into Civil Airport, Germany

                                        Client
                                        Client:               FN Flughafen
                                                              Niederrhein GmbH
                                        Location:             Weeze/Germany
                                        Construction Cost:    ca. 200 million EUR
                                        Capacity:             0.4 MAP
                                        Project Period:       1997-1999


                                        Project Services:
                                        • Phase 1:
                                        • Analysis of site potential
                                        • Feasibility study including technical, legal and
                                          organizational aspects
                                        • Phase 2:
                                        • Masterplanning
                                        • Strategy development
                                        • Consulting services
                                                                                     DC Airports


I
Airport Projects

Tirana Int‘l Airport (TIA), Rehabilitation Project, Albania

                                              Client
                                              Client:               Albtransport, Tirana
                                              Location:             Tirana/Albania
                                              Construction Cost:    ca. 25 million EUR
                                              Capacity:             1.5 MAP
                                              Project Period:       1996-1999


                                              Project Services:
                                              • Site surveys
                                              • Monitoring of conceptional and financial
                                                design
                                              • Construction supervision
                                              • Quality assurance
                                              • Time and cost scheduling
                                              • Electrical works
                                                                                   DC Airports


I
Airport Projects

Baku Int‘l Airport (BAK), Rehabilitation, Azerbaijan

                                            Client
                                            Client:               Azerbaijan Hava Yollari
                                            Location:             Baku/Azerbaijan
                                            Constr. Cost:         ca. 7.8 million EUR
                                            Capacity:             1 MAP
                                            Project Period:       1996-1999


                                            Project Services:
                                            • Phase I
                                            • Feasibility study
                                            • Phase II
                                            • Topographic surveying
                                            • Detailed design and cost estimates
                                            • Tender documents
                                            • Construction supervision
                                            • Advisory services & training of staff.
                                                                               DC Airports


I
Airport Projects

International Airports Jinan/Qingdao, Pre-Feasibility Study, China

                                           Client
                                           Client:               BStMWVT
                                           Location:             Shandong Province
                                           Construction Cost:    ca. 300 million EUR
                                           Capacity:             6.0 MAP (Jinan)
                                                                 6.5 MAP (Qingdao)
                                           Project Period:       1998


                                           Project Services:
                                           • Pre-Feasibility Study:
                                           • Operations and organization
                                           • Technology/Masterplanning
                                           • Market analysis
                                           • Economic Evaluation
                                           • Legal and organizational conception
                                           • Financing
                                                                                DC Airports


I
Airport Projects

Frankfurt Int‘l Airport (FRA), Refuelling System, Germany

                                          Client
                                          Client:               Frankfurt Airport
                                                                Authority (FAG)
                                          Location:             Frankfurt/Germany
                                          Construction Cost:    ca. 40 million EUR
                                          Capacity:             30 MAP
                                          Project Period:       1982-1997


                                          Project Services:
                                          • Reconstruction and expansion of aircraft
                                            refuelling system including connection with
                                            NATO pipeline system
                                          • Preliminary up to final design
                                          • Procurement
                                          • Construction supervision
                                          • Operation and maintenance
                                                          DC Airports


I



                                                 Client




Dorsch Consult Airports - Consulting Engineers
Hansastrasse 20, D-80686 Munich, Germany
Internet: http://www.dorsch.de
E-mail: airports@dorsch.de
Phone: +49-89-5797-0, Fax: +49-89-570 48 67

				
DOCUMENT INFO
Shared By:
Categories:
Tags:
Stats:
views:33
posted:12/15/2011
language:English
pages:76