NAVFAC 11013/7 (1-78) PRICE BREAK DOWN DATE PREPARED: SHEET Three of Four
Supersedes NAVDOCKS 2417 and 2417A 3
ACTIVITY AND LOCATION US NAVAL MEDICAL RESEARCH UNIT NO. 3 CAIRO EGYPT SOLICITATION NO. N33191- 09 -R- 0224 IDENTIFICATION NUMBER
ESTIMATED BY : CONTRACTOR NAME CATEGORY CODE NUMBER
PROJECT TITLE: CONSTRUCTIONOF BSL-3 FACILITY IN BUILDING 30 NAMRU-3
STATUS OF DESIGN JOB ORDER NUMBER
SOLICITATION NUMBER: N33191- 09 -R- 0224 PED 30% 100% FINAL Other ( Specify ) .
QUANTITY MATERIAL COST LABOR COST
No ITEM DESCRIPTION NUMBER UNIT UNIT COST TOTALUNIT COST TOTAL TOTAL
38 DDC Control System 1.00 EA
39 Variable Frequency Drive 4.00 EA
40 Differential Presure Transmitter 7.00 ES
41 Flow Measuring Station 2.00 EA
42 Pressure Sensor 2.00 EA
43 ON / OFF Damper 6.00 EA
44 Wiring System for the HVAC Control 1.00 LS
45 Provide and Install Water Proof Light Fixtures Complete With Conduits,
4.00 EA
Conductors etc. ( 4 Lamps )
46 Provide and Install Water Proof Light Fixtures Complete With Conduits,
4.00 EA
Conductors etc. ( 3 Lamps )
47 Provide and Install Water Proof Light Fixtures Complete With Conduits,
2.00 EA
Conductors etc. ( 2 Lamps )
48 Provide and Install Water Proof Light Fixtures Complete With Conduits,
3.00 EA
Conductors etc. ( 1 Lamp )
49 Provide and Install Incondescent Light ( water Proof ) Complete with all
8.00 EA
Conduits, Conductors etc.
Provide and Install Emergency & exit lights Complete with all Conduits &
50 4.00 EA
Conductors
51 Provide and Install 220 V & 115 V Complete with all Conduits, conductors
45.00 EA
and Accessories. The number of Outlets for the 220 V shall be 45 units.
The number of the Cupper Cable for the 115 16 Mm Complete with
52 Provide and Install double outlets 3X70 + 35 + V shall 2be 45 units.
70.00 MTL
Trench, Conduits and Floor Finish ( B - 50 to B - 30 )
53 Provide and Install Cupper Cable 3X70 + 35 + 16 Mm2 Complete with
10.00 MTL
Trench, Conduits ( DP Adjacent B30 to B30 )
54 Provide and Install Main Distribution Panel as Specified 1.00 EA
55 Provide and Install Circuit Breaker 150 Amps 3 Phase 380 V Complete with
1.00 EA
Euclosure
56 Provide and Install Motor Control Center 1.00 EA