Embed
Email

Chg Prop Log - mercury.pr.erau.edu

Document Sample

Shared by: huanghengdong
Categories
Tags
Stats
views:
0
posted:
12/14/2011
language:
pages:
2
RTCA SC135/EUROCAE WG14 DO 160G/ED-14G Open Items and Users Guide Change Proposal Log

Updated Oct 4, 2010

CP Request SC-135 WG-14 WG-14

# Other Paper # Sect Sub-sect Author Date Meeting SC-135 Disposition SC-135 Comments Meeting Disposition WG-14 Comments Final Disposition Refer to Open?

New Input Capacitor

Requirement for Variable

9 Open_Item_001 16 New Frequency Systems Kamiar Karimi - Boeing 20-Oct-05 Mar-10 Defer to Rev H Yes

Add: At a minimum, the radiator

shall be positioned every 0.15m

along each side of the UUT and

at a 0, 45, 90 and 135 degrees

of rotation with respect to the

side being tested. And delete

the word "laterally" from the next Deferred until more details and

sentence. drawings of test layout are provided Deferred until more details and drawings of

18 Open_Item_002 19 19.3.1 Paul Schwerman 22-Nov-05 Mar-10 Defer as proposal is unclear. Jan-06 Deferred test layout are provided as proposal is unclear. Yes

Add new voltage spike test

20 Open_Item_003 16 16.7.x JP Chaussonnet 5-Apr-06 Mar-10 Defer to Rev H Dec-08 defer sub group 16 Yes

Provide figure and text change

for Current Modulation in steady

21 Open_item_004 16 16.7.3 state operation. (refer to #054) JP Chaussonnet 7-Apr-06 Mar-10 Defer to Rev H Dec-08 defer sub group 16 Yes



Merge Ground survival & short-

time operating high temperature

test and Operating High

163 Open_Item_005 4 Fig 4.3 & 4.4 Temperature Test. Eurocopter 15-Mar-10 Mar-10 Defer to H Yes

Clarify allowed over test with

167 User_Guide_001 16 16.2 tightened test tolerances. Paul Schwerman 17-Mar-10 Mar-11 Defer to H Yes

Correction and clarification of

Fig 20-12, 20- Reverb Chamber Cal & Test

169 User_Guide_002 20 13 figures. Erik Borgstrom 17-Mar-10 Mar-10 Defer to H Yes

177 User_Guide_003 2 2.6 Clarification & Changes Lee Nguyen 18-Aug-10 Oct-10 Defer to H Yes

178 Open_Item_006 18 Fig 18-1 &18-2 Clarification Rémi Bergé 15-Sep-10 Oct-10 Defer to H Yes

189 Open_Item_007 20 1.3 (5) Clarification Gilles CROUSIER 1-Sep-10 Oct-10 Defer to H Yes

190 Open_Item_008 20 1.5. (b) Clarification Gilles CROUSIER 1-Sep-10 Oct-10 Defer to H Yes

191 Open_item_009 20 1.6.3.1 Clarification Gilles CROUSIER 1-Sep-10 Oct-10 Defer to H Yes

197 Open_Item_010 2 2.9 Improve Guidance Marc Ponçon 15-Sep-10 Oct-10 Defer to H Yes

UG2

200 User_Guide_004 0 UG 20.6.2.1 Clarification Cecile Dorgan 15-Sep-10 Oct-10 Defer to H Yes

Specify tolerance of

thermocouples to be better than The section 3 does not really adress the topic

+/- 3 ° C. of max admissible value. In that specific

section 204° must not be exceeded. Therfore it

is proposed to request that any me'asurement

Need Details, accepted as uncertaincy has to be taken into account by

502 Open_Item_011 9 9.7.3.1 B.Badonnel, Thales 1-Dec-08 Mar-09 Defer to H Jun-09 modified reducing the 204° value accord Yes

Modify the requirement for

inductive switching spikes to

accommodate for known, and

often intended, spike amplitude

236 Open_Item_012 19 Figure 19-6 variability. David Kerr, Garmin International

6-Oct-10 Oct-10 Defer to H

ChgP #1 20 All UG Draft Marc Ponçon

ChgP #2 20 20-Various Many Editorial Comments David Kerr, Garmin International

Time Constant Terry Donohoe,

ChgP #3 20 20.6.3.2.ii Honeywell

Reverb Chambe data Curve Terry Donohoe,

ChgP #4 20 UG20.6.2.c Fitting Honeywell

Forward Power Measurement Terry Donohoe,

ChgP #5 20 UG20.6.2.c Honeywell

UG20.4e, Acceptable Practice, Level, CW,

ChgP #6 20 UG20.5e AM Al Meyer

User_Guide_005 21 21.6 Paddle Speed Philippe Leroux, Sagem

WG14_Comments 20 Various Various You're OK









Page 1 of 2

If hyperlinks are not working properly, Open "the "Properties" tab in

the "Files" menu and paste the link below in the "Hyperlink Base"

box.

http://mercury.pr.erau.edu/~lyallj/SC135/Rev_G/



Jump Drive:

F:\SC135\Rev_G\





C:\Users\Jim\Documents\SC135\



Related docs
Other docs by huanghengdong
pozvanka popela 2011
Views: 2  |  Downloads: 0
Making Connections_18_
Views: 2  |  Downloads: 0
20100121125409223
Views: 4  |  Downloads: 0
385-390
Views: 2  |  Downloads: 0
09-uncertainty
Views: 2  |  Downloads: 0
2010Cal
Views: 2  |  Downloads: 0
Schedule by Date September 2011
Views: 5  |  Downloads: 0
supmpr
Views: 2  |  Downloads: 0
Science and our Food Supply video guide
Views: 2  |  Downloads: 0
By registering with docstoc.com you agree to our
privacy policy

You are almost ready to download!

You are almost ready to download!