Embed
Email

progress_report

Document Sample

Shared by: xiaopangnv
Categories
Tags
Stats
views:
0
posted:
12/13/2011
language:
pages:
9
100 Interactive Project Evaluation

102 Preliminary Roadway Design

103 Preliminary Conceptual Mitigation Design Plan

105 Environmental Resource Reports

106 Preliminary Geotech & Materials

107 Geotechnical Wetland Evaluation

108 Preliminary Survey

110 Preliminary R/W

111 Phase One S.U.E.

112 Preliminary Traffic

114 Preliminary Bridge Layout

116 Preliminary Environmental Doc. & Final Resource Reports

118 Roadway Alignment Plan

119 Conceptual Mitigation Design Plan

120 Engineering / Cadastral Survey

122 Alignment & Grade Traffic Plans

124 Finalize Align & Grade

125 Finalize Conceptual Mitigation Design Selection Meeting

126 Prepare Categorical Exclusion

128 Prepare Scope of Work

129 Prepare Wetland Scope of Work

130 Geotech & Materials for PIH

131 Final Geotechnical Revisions - Wetland

134 Prepare Plans for PIH

135 Prepare Final Mitigation Design

136 Preliminary Structure Plans for PIH

138 Preliminary R/W Plan for PIH

140 Plan In Hand

141 Final Mitigation Design Plan In Hand

142 R/W Plans

144 R/W Plan Revision

146 Structure Design

147 Final Structure Design

148 Final Environmental & Permits

149 Final Wetland Mitigation Permits & Clearances

150 Appraise R/W By Consultant

152 Final Plan Preparation

153 Final Mitigation Design Plan

154 Conduct and Complete R/W Negotiation by Consultant

156 R/W Plan Revisions

158 Materials and Geotech Revisions

160 Process For Condemnation

162 Final Plan Revisions

164 Prepare Traffic Plans for PIH

166 Utility Plans

170 Preliminary Hydraulics Report

171 Preliminary Hydraulics Report

172 Final Hydraulics Report

173 Final Wetlands Hydraulics Report

174 Final Hydraulics Updates-Permits and Miscellaneous Revisions

175 Final Plan Review

177 Cultural Resource Management - Consultant

178 Request Environmental Information

179 Traffic Noise Impact Assessment

180 Air Quality Assessment

181 Haz Mat/Sub/H2O Quality-ISA

182 Biological Resources Report

190 Utility Plan Revisions

192 Administrative Draft Environmental Document (EA-EIS Only)

195 Prepare Environmental Assessment

196 Prepare Environmental Decision Document (FONSI/EIS)

197 Prepare Draft Environmental Impact Statement

198 Prepare Final Environmental Impact Statement

199 Prepare Record of Decision

12/13/2011









MDT PROGRESS REPORT

Consultant: Project Name:

Consultant Project Manager: Project No.

MDT Project Manager: Control No. XXXX

Period: MONTH, YEAR – MONTH, YEAR Percent of Budget Expended



Actual

% Early Finish Completion

Activity Description Complete Date* Date

100 Interactive Project Evaluation 1/20/2006

170 Preliminary Hydraulics Report

106 Preliminary Geotech & Materials

114 Preliminary Bridge Layout

112 Preliminary Traffic

108 Preliminary Survey

102 Preliminary Roadway Design

110 Preliminary R/W

S 111 Phase One S.U.E.

u 177 Cultural Resource Management - Consultant

r 178 Request Environmental Information

v 179 Traffic Noise Impact Assessment

e 180 Air Quality Assessment

y 181 Haz Mat/Sub/H2O Quality-ISA

182 Biological Resources Report

P 122 Alignment & Grade Traffic Plans

h 120 Engineering / Cadastral Survey

a 118 Roadway Alignment Plan

s 116 Preliminary Environmental Doc. & Final Resource Reports

e 124 Finalize Align & Grade

126 Prepare Categorical Exclusion

192 Administrative Draft Environmental Document (EA-EIS Only)

195 Prepare Environmental Assessment

196 Prepare Environmental Decision Document (FONSI/EIS)

197 Prepare Draft Environmental Impact Statement

198 Prepare Final Environmental Impact Statement

199 Prepare Record of Decision

128 Prepare Scope of Work

172 Final Hydraulics Report

D

130 Geotech & Materials for PIH

e

134 Prepare Plans for PIH

s

138 Preliminary R/W Plan for PIH

i

164 Prepare Traffic Plans for PIH

g

136 Preliminary Structure Plans for PIH

n

140 Plan In Hand

148 Final Environmental & Permits

146 Structure Design

R 174 Final Hydraulics Updates-Permits and Miscellaneous Revisions

/ 152 Final Plan Preparation

W 158 Materials and Geotech Revisions

166 Utility Plans

142 R/W Plans

144 R/W Plan Revision

156 R/W Plan Revisions

150 Appraise R/W By Consultant

154 Conduct and Complete R/W Negotiation by Consultant

160 Process For Condemnation

190 Utility Plan Revisions

R

/

W 147 Final Structure Design

175 Final Plan Review









Version 26.2b

12/13/2011







MDT PROGRESS REPORT

Consultant: Project Name:

Consultant Project Manager: Project No.

MDT Project Manager: Control No. XXXX

Period: MONTH, YEAR – MONTH, YEAR Percent of Budget Expended



Actual

% Early Finish Completion

Activity Description Complete Date* Date

162 Final Plan Revisions



* Early Finish Date as per contract, amendment or agreement with MDT project manager.



Tasks Accomplished This Period

1 Activity 106 - The Geotech Report was submitted October 7, 2004.

2 Activity 116 -Processing MDT's comments on Draft EA.

3 Activity 118 - Alignment and Grade Plans - work is proceeding.

S 4 Activity 120 - The Cadastral Survey was submitted October 22, 2004.

u 5 Activity 170 - The LHSR and Preliminary Hydraulics Report were submitted October 5, 2004.

r

v Tasks Planned For Next Period

e 1 Prepare Activity 110

y 2 Submit Activity 118 revisions to plans



P Critical Issues

h 1 The schedule for this project needs adjustment.

a

s

e Approved by Title Date: 12/13/2011



Printed Name and Title









Version 26.2b

12/13/2011

MDT PROGRESS REPORT

Consultant: Project Name:

Consultant Project Manager: Project No.

MDT Project Manager: Control No. XXXX

Period: MONTH, YEAR – MONTH, YEAR Percent of Budget Expended





% Early Finish

Activity Description Complete Date*

100 Interactive Project Evaluation 1/20/2006

171 Preliminary Hydraulics Report

107 Geotechnical Wetland Evaluation

103 Preliminary Conceptual Mitigation Design Plan

111 Phase One S.U.E.

105 Environmental Resource Reports

108 Preliminary Survey

119 Conceptual Mitigation Design Plan

116 Preliminary Environmental Doc. & Final Resource Reports

125 Finalize Conceptual Mitigation Design Selection Meeting

126 Prepare Categorical Exclusion

192 Administrative Draft Environmental Document (EA-EIS Only)

195 Prepare Environmental Assessment

196 Prepare Environmental Decision Document (FONSI/EIS)

129 Prepare Wetland Scope of Work

173 Final Wetlands Hydraulics Report

131 Final Geotechnical Revisions - Wetland

135 Prepare Final Mitigation Design

120 Engineering / Cadastral Survey

141 Final Mitigation Design Plan In Hand

150 Appraise R/W By Consultant

149 Final Wetland Mitigation Permits & Clearances

174 Final Hydraulics Updates-Permits and Miscellaneous Revisions

153 Final Mitigation Design Plan

175 Final Plan Review

162 Final Plan Revisions



* Early Finish Date as per contract, amendment or agreement with MDT project manager.



Tasks Accomplished This Period

1 Activity 106 - The Geotech Report was submitted October 7, 2004.

2 Activity 116 -Processing MDT's comments on Draft EA.

3 Activity 118 - Alignment and Grade Plans - work is proceeding.

4 Activity 120 - The Cadastral Survey was submitted October 22, 2004.

5 Activity 170 - The LHSR and Preliminary Hydraulics Report were submitted October 5, 2004.



Tasks Planned For Next Period

1 Prepare Activity 110

2 Submit Activity 118 revisions to plans



Critical Issues

1 The schedule for this project needs adjustment.





Approved by Title Date:



Printed Name and Title









Version 26.2b

MDT PROGRESS REPORT 12/13/2011

Consultant: Project Name:

Consultant Project Manager: Project No.

MDT Project Manager: Control No. XXXX

Period: MONTH, YEAR – MONTH, YEAR Percent of Budget Expended





% Early Finish

Activity Description Complete Date*









Version 26.2b

12/13/2011









dget Expended



Actual

Completion

Date









12/13/2011









Version 26.2b

12/13/2011







dget Expended



Actual

Completion

Date









Version 26.2b

MDT Progress Report (CE Services)

Project:

From:

To:

Who Time

Date of Date of Request Made

Description Responded Spent on

Request Completion By:

to Request Request



Related docs
Other docs by xiaopangnv
180617
Views: 0  |  Downloads: 0
apostar-por-crear-una-empresa
Views: 0  |  Downloads: 0
Contemplative Pedagogy Principles and Design
Views: 1  |  Downloads: 0
PreApplications
Views: 1  |  Downloads: 0
Basic or Pure Science vs. Applied Science
Views: 0  |  Downloads: 0
Algorithmic Problems Related To The Internet
Views: 0  |  Downloads: 0
E07-PC-23-03a_EFET Wish list
Views: 0  |  Downloads: 0
ATT
Views: 2  |  Downloads: 0
1793A_Example
Views: 1  |  Downloads: 0
By registering with docstoc.com you agree to our
privacy policy

You are almost ready to download!

You are almost ready to download!