MAPRsn Dates of Use Principal Investigator / Ship Location Operations/Use



MAPR-01 Feb-1996 Dan Schierer SE Indian Ridge - 42S88E to 33S78E 45 dredges, 48 rock cores (MAPR-02 also sent, not sure how much either MAPR was actually

used)

10-Jun-1996 Calibration (Neph only) in lab

16-Jul to 9 Aug - 1996 Bill Chadwick / DISCOVERER (last cruise) JDFR (CoAx, N.Cleft), Escanaba, 7 AMS-60 tows (side scan sonar) - 75m above depressor weight - MAPR-01 damaged during

N.Gorda first tow, MAPR-02 used on all tows

MAPR-01 damaged on first tow during Chadwick's cruise - no note of how it was damaged or what was done to repair it.

30-Aug-1996 Calibration (Press only) in lab

Nov-1996 Rachel Haymon SEPR 9 tows total => Argo, AMS, other - Both MAPRs used on all tows

May-1997 Calibration (Neph, Press, Temp) in lab

May to Nov-1997 Catherine Mevel, Jean Luc Charlou, SWIR dredges, wax cores, CTD hydorcasts

Philippe Jean-Baptiste / MARION

DUFRESNE

Catherine Mevel reported damage to neph cables, corrosion of neph connector pins and loss of some data (esp. with MAPR-02)

Dec-1998 Calibration (Temp, Neph) in lab large T residuals for this cal - used coefficients anyway; Neph cal OK

Jan to Feb - 1999 Chris German / JAME CLARK ROSS East Scotia Ridge (S.Atlantic) TOBI tows and wax cores - MAPR-01 deployed on wax cores

Chris German reported neph data was different on downcasts/upcasts; also towards end of cruise it seemed to "get tired"

Dec-1999 in lab neph data problems - EDD to repair neph circuit (Pat McLain)









MAPR-02 Feb-1996 Dan Schierer SE Indian Ridge - 42S88E - 33S78E 45 dredges, 48 rock cores (MAPR-01 also sent, not sure how much either MAPR was actually

used)

10-Jun-1996 Calibration (Neph)

16-Jul to 9 Aug - 1996 Bill Chadwick / DISCOVERER (last cruise) JDFR (CoAx, N.Cleft), Escanaba, N. 7 AMS-60 tows (side scan sonar) - 75m above depressor weight - MAPR-01 damaged during

Gorda first tow, MAPR-02 used on all tows

30-Aug-1996 Calibration (Press)

Nov-1996 Rachel Haymon SEPR 9 tows total => Argo, AMS, other - Both MAPRs used on all tows

May-1997 Calibration (Neph, Press, Temp) in lab

May to Nov-1997 Catherine Mevel, Jean Luc Charlou, SWIR dredges, wax cores, CTD hydorcasts

Philippe Jean-Baptiste / MARION

Catherine Mevel reported damage to neph cables, corrosion of neph connector pins and loss of some data (esp. with MAPR-02)

Dec-1998 Calibration (Temp, Neph) - attempted in lab large T residuals for this cal - coefficients not used; no data for Neph

Jan to Feb - 1999 Chris German / JAME CLARK ROSS East Scotia Ridge (S.Atlantic) TOBI tows and wax cores - MAPR-02 apparently not used

Dec-1999 in lab electronics do not slide easily in/out of pressure case - machine shop fixxed it, neph circuit

ground jumper added; new coin cell battery; general regular maintenance (new hardware, o-

rings, P sensor oil, etc.)

Dec-1999 Calibrations (N, P, T) - Workbook updated in lab







MAPR-03 25-Jun-1997 delivered from EDD (Floyd Mader)

July to Aug - 1997 Bench Testing and Calibrations (N, P, T) in lab

01-Aug-1997 Jim Cowen / SHINKAI EPR or SEPR 2 submersible dives: problems configuring MAPR so no data from first dive - damaged on

second dive

Jim Cowen reported damage to Neph bracket and Neph when manipulator sheared it off - connector on LSS was damaged, also cable

March to April - 1998 Baker / MELVILLE SEPR 6 AMS-120 tows (~2 days each) and several CTD casts - damage to some neph brackets during

first tow (screws sheared off or backed out, damage to connector pins); MAPR-03 OK

throughout cruise

Sep-1998 Cornel DeRonde / SONNE Kermadec Arc Volcanoes 4 box cores, 1 water pump station, 6 heat flow probe stations, 3 TV Grabs, 14 camera tows

during cruise (deployments averaged 2-6 hours) - MAPR-03 used on 4 box cores, 1 water pump,

3 heat flow probe sta's- no problems noted

Dec-1998 to Jan-1999 Cornel DeRonde / ATLANTIS (Lupton SEPR 24 Alvin dives, 1 CTD cast - MAPR-05 did not work (tried on 2 dives); MAPR-03 used on 23

cruise) dives, 1 CTD cast

Dec-1999 in lab neph circuit ground jumper added; new coin cell battery; general regular maintenance (new

hardware, o-rings, P sensor oil, etc.)

Dec-1999 Calibrations (N, P, T) - Workbook updated in lab

Jan to May-2000 Dan Fornari / MELVILLE and ATLANTIS EPR for use on AMS-120









12/11/2011 - 7:16 PM

Page 1 of 93

MAPRsn Dates of Use Principal Investigator / Ship Location Operations/Use



MAPR-04 25-Jun-1997 delivered from EDD (Floyd Mader)

July to Aug - 1997 Bench Testing and Calibrations (N, P, T) in lab

Sep-1997 Ed Baker / R.BROWN (leg2) JDFR (N. Cleft) 2 CTD casts and deployed on Lavelle's short-term mooring (~5 days) at Pipe Organ vent

Nov-1997 Charlie Langmuir / MELVILLE SEPR ~185 lowerings (total, alternated MAPR-04 and -07 until -07 was lost) - rock cores and dredges -

lost MAPR-07 during this cruise - cruise was otherwise very successful

Jan-1998 Jill Karsten / MELVILLE Chile Ridge 107 dredges, 20 wax cores - MAPR-04 flooded, neph problems with MAPR-09

Jill Karsten reported MAPR-04 flooded during this cruise









MAPR-05 25-Jun-1997 delivered from EDD (Floyd Mader)

July to Aug - 1997 Bench Testing and Calibrations (N, P, T) in lab

Sept-Nov 1997 Chris German / MARION DUFRESNE SWIR used on one TOBI tow - damage to neph bracket, loss of LSS

Chris German reported damage to MAPR-05 Neph bracket (screws sheared off) and LSS lost on first tow- noted clamps slid down wire some

March to April - 1998 Baker / MELVILLE SEPR 6 AMS-120 tows (~2 days each) and several CTD casts - damage to some neph brackets during

first tow (screws sheared off or backed out, damage to connector pins); MAPR-05 OK

throughout cruise

Sep-1998 Cornel DeRonde / SONNE Kermadec Arc Volcanoes 4 box cores, 1 water pump station, 6 heat flow probe stations, 3 TV Grabs, 14 camera tows

during cruise (deployments averaged 2-6 hours) - MAPR-05 used on 3 TV Grabs, 3 heat flow

probe sta's, 14 camera tows - no problems noted

Dec-1998 to Jan-1999 Cornel DeRonde / ATLANTIS (Lupton SEPR 24 Alvin dives, 1 CTD cast - MAPR-05 did not work (tried on 2 dives); MAPR-03 used on 23

cruise) dives, 1 CTD cast

Cornel DeRonde reported MAPR-05 did not work at all this cruise (tried on 2 Alvin dives)

Dec-1999 in lab neph circuit ground jumper added; new coin cell battery; general regular maintenance (new

hardware, o-rings, P sensor oil, etc.)

Dec-1999 Calibrations (N, P, T) - Workbook updated in lab

Jan to May-2000 Dan Fornari / MELVILLE and ATLANTIS EPR for use on AMS-120





MAPR-06 25-Jun-1997 ENGINEERING MAPR - bench model has never been calibrated or used





MAPR-07 25-Jun-1997 delivered from EDD (Floyd Mader)

July to Aug - 1997 Bench Testing and Calibrations (N, P, T) in lab

20-Aug-1997 NEW BOARD - calibrations redone

Sep-1997 Ed Baker / R.BROWN (leg2) JDFR (N. Cleft) 2 CTD casts and deployed on Lavelle's short-term mooring (~5 days) at Pipe Organ vent

Nov-1997 Charlie Langmuir / MELVILLE SEPR ~185 lowerings (total, alternated MAPR-04 and -07 until -07 was lost) - rock cores and dredges -

lost MAPR-07 during this cruise - cruise was otherwise very successful

MAPR-07 was lost on a dredge during this cruise









MAPR-08 25-Jun-1997 delivered from EDD (Floyd Mader)

July to Aug - 1997 Bench Testing and Calibrations (N, P, T) in lab

Sept-Nov 1997 Chris German / MARION DUFRESNE SWIR TOBI tows - one test tow (4hrs), two long tows (4-5 days each) - LSS lost on second tow

Chris German reported LSS was lost - cable unscrewed at LSS connector - cable at end cap was loose also - good data for ~24hrs

March to April - 1998 Baker / MELVILLE SEPR 6 AMS-120 tows (~2 days each) and several CTD casts - damage to some neph brackets during

first tow (screws sheared off or backed out, damage to connector pins); MAPR-08 OK

throughout cruise

Aug-1998 Baker / R.BROWN (leg1) JDFR (Axial) short-term mooring for Bill Lavelle at Axial (~5 days) - MAPR-09 had questionable neph data;

also possibly on some CTD casts

Sep-1998 to June-1999 Baker / R.BROWN (leg2 - deployment) / JDFR (Axial) long-term moorings - 1yr - neph bracket screws badly corroded (esp M-12) and some MAPRs

WECOMA (recovery) covered with a brown slime (including LSS lenses - esp MAPRs -11 and -12 deployed at mooring

98V108); field check on CTD cast at time of recovery (WECOMA criuse - Jun-1999)



Dec-1999 in lab neph circuit ground jumper added; new coin cell battery; general regular maintenance (new

hardware, o-rings, P sensor oil, etc.)



12/11/2011 - 7:16 PM

Page 2 of 93

MAPRsn Dates of Use Principal Investigator / Ship Location Operations/Use

Dec-1999 Calibrations (N, P, T) - Workbook updated in lab

Jan to May-2000 Dan Fornari / MELVILLE and ATLANTIS EPR for use on AMS-120









12/11/2011 - 7:16 PM

Page 3 of 93

MAPRsn Dates of Use Principal Investigator / Ship Location Operations/Use



MAPR-09 25-Jun-1997 delivered from EDD (Floyd Mader)

July to Aug - 1997 Bench Testing and Calibrations (N, P, T) in lab

Sept-Nov 1997 Chris German / MARION DUFRESNE SWIR 2 long TOBI tows (4-5 days each) - neph bracket or cable connectors loosened during both tows

(vibration)

Chris German reported LSS bracket screws loosened during first tow, LSS cable was coming unscrewed at both ends during second tow (data compromised)

Jan-1998 Jill Karsten / MELVILLE Chile Ridge 107 dredges, 20 wax cores - MAPR-04 flooded, neph problems with MAPR-09

Jill Karsten reported neph data quality concerns with MAPR-09 - later found neph bulkhead connector pins on top plate had corrosion

March to April - 1998 Baker / MELVILLE SEPR 6 AMS-120 tows (~2 days each) and several CTD casts - damage to some neph brackets during

first tow (screws sheared off or backed out, damage to connector pins); MAPR-09 damaged and

not used after first tow

MAPR-09 neph bracket dangling after first tow - one neph bracket screws sheared off, one fell out and connectors had broken pins (not used after first tow)

Aug-1998 Baker / R.BROWN (leg1) JDFR (Axial) short-term mooring for Bill Lavelle at Axial (~5 days) - MAPR-09 had questionable neph data;

also possibly on some CTD casts

noted that neph data from MAPR-09 (short term mooring) was questionable

Jan to Feb - 1999 Chris German / JAME CLARK ROSS East Scotia Ridge (S.Atlantic) TOBI tows and wax cores - MAPR-09 deployed on TOBI - suffered extensive vibration while ship

had to ride out a big storm, fine black powder inside pressure casing when recovered - did not

respond (broken wires from computer connector?)

Chris German reported MAPR-09 was suffered extensive vibrations after being deployed during a huge storm - MAPR would not respond when recovered

Dec-1999 in lab new neph connector on top plate; broken wires fixxed; battery cable connector replaced; neph

circuit ground jumper added; new coin cell battery; general regular maintenance (new hardware,

o-rings, P sensor oil, etc.)

Dec-1999 Calibrations (N, P, T) - Workbook updated in lab

Jan to May-2000 Dan Fornari / MELVILLE and ATLANTIS EPR for use on AMS-120









MAPR-10 25-Jun-1997 delivered from EDD (Floyd Mader)

July to Aug - 1997 Bench Testing and Calibrations (N, P, T) in lab

Sept-Nov 1997 Chris German / MARION DUFRESNE SWIR 2 long TOBI tows (4-5 days each) - no problems noted for MAPR-10

March to April - 1998 Baker / MELVILLE SEPR 6 AMS-120 tows (~2 days each) and several CTD casts - damage to some neph brackets during

first tow (screws sheared off or backed out, damage to connector pins); MAPR-10 OK

throughout cruise (configuration error resulted in no data on first tow)

Aug-1998 Baker / R.BROWN (leg1) JDFR (Axial) short-term mooring for Bill Lavelle at Axial (~5 days) - MAPR-09 had questionable neph data;

also possibly on some CTD casts

Sep-1998 to June-1999 Baker / R.BROWN (leg2 - deployment) / JDFR (Axial) long-term moorings - 1yr - neph bracket screws badly corroded (esp M-12) and some MAPRs

WECOMA (recovery) covered with a brown slime (including LSS lenses - esp MAPRs -11 and -12 deployed at mooring

98V108)

Dec-1999 in lab neph circuit ground jumper added; new coin cell battery; general regular maintenance (new

hardware, o-rings, P sensor oil, etc.)

Dec-1999 Calibrations (N, P, T) - Workbook updated in lab

Jan to May-2000 Dan Fornari / MELVILLE and ATLANTIS EPR for use on AMS-120









MAPR-11 25-Jun-1997 delivered from EDD (Floyd Mader)

July to Aug - 1997 Bench Testing and Calibrations (N, P, T) in lab

Sept-Nov 1997 Chris German / MARION DUFRESNE SWIR 2 long TOBI tows (4-5 days each) - no problems noted for MAPR-11

March to April - 1998 Baker / MELVILLE SEPR 6 AMS-120 tows (~2 days each) and several CTD casts - damage to some neph brackets during

first tow (screws sheared off or backed out, damage to connector pins); MAPR-11 damaged and

not used after first tow

Aug-1998 Baker / R.BROWN (leg1) JDFR (Axial) short-term mooring for Bill Lavelle at Axial (~5 days) - MAPR-09 had questionable neph data;

also possibly on some CTD casts

Sep-1998 to June-1999 Baker / R.BROWN (leg2 - deployment) / JDFR (Axial) long-term moorings - 1yr - neph bracket screws badly corroded (esp M-12) and some MAPRs

WECOMA (recovery) covered with a brown slime (including LSS lenses - esp MAPRs -11 and -12 deployed at mooring

98V108); MAPR-11 did not work

MAPR-11 did not work - no data recovered - apparent battery failure or configuration error - MAPR responded normally when tested

Dec-1999 in lab neph circuit ground jumper added; new coin cell battery; general regular maintenance (new

hardware, o-rings, P sensor oil, etc.)

Dec-1999 Calibrations (N, P, T) - Workbook updated in lab

Jan to May-2000 Dan Fornari / MELVILLE and ATLANTIS EPR for use on AMS-120



12/11/2011 - 7:16 PM

Page 4 of 93

MAPRsn Dates of Use Principal Investigator / Ship Location Operations/Use









MAPR-12 25-Jun-1997 delivered from EDD (Floyd Mader)

July to Aug - 1997 Bench Testing and Calibrations (N, P, T) in lab

Sep-1997 Ed Baker / R.BROWN (leg2) JDFR (N. Cleft and Axial) 2 CTD casts and deployed on Lavelle's short-term mooring (~5 days) at Pipe Organ vent

March to April - 1998 Baker / MELVILLE SEPR 6 AMS-120 tows (~2 days each) and several CTD casts - damage to some neph brackets during

first tow (screws sheared off or backed out, damage to connector pins); MAPR-12 OK

throughout cruise

Aug-1998 Baker / R.BROWN (leg1) JDFR (Axial) short-term mooring for Bill Lavelle at Axial (~5 days) - MAPR-09 had questionable neph data;

also possibly on some CTD casts

Sep-1998 to June-1999 Baker / R.BROWN (leg2 - deployment) / JDFR (Axial) long-term moorings - 1yr - neph bracket screws badly corroded (esp M-12) and some MAPRs

WECOMA (recovery) covered with a brown slime (including LSS lenses - esp MAPRs -11 and -12 deployed at mooring

98V108)

Dec-1999 in lab neph data problems - EDD repair of neph circuit (Pat McLain); neph circuit ground jumper added;

new coin cell battery; general regular maintenance (new hardware, o-rings, P sensor oil, etc.)



Dec-1999 Calibrations (N, P) - Workbook updated in lab









MAPR-13 25-Jun-1997 delivered from EDD (Floyd Mader)

July to Aug - 1997 Bench Testing and Calibrations (N, P, T) in lab

Sept-Nov 1997 Chris German / MARION DUFRESNE SWIR 2 long TOBI tows (4-5 days each) - no problems noted for MAPR-13

March to April - 1998 Baker / MELVILLE SEPR 6 AMS-120 tows (~2 days each) and several CTD casts - damage to some neph brackets during

first tow (screws sheared off or backed out, damage to connector pins); MAPR-13 neph data

problems, but used throughout cruise for T and P data

MAPR-13 neph bracket dangling after first tow - screws fell out - neph data no good but MAPR used throughout cruise for T and P data

Aug-1998 Baker / R.BROWN (leg1) JDFR (Axial) short-term mooring for Bill Lavelle at Axial (~5 days) - MAPR-09 had questionable neph data;

also possibly on some CTD casts

Sep-1998 to June-1999 Baker / R.BROWN (leg2 - deployment) / JDFR (Axial) long-term moorings - 1yr - neph bracket screws badly corroded (esp M-12) and some MAPRs

WECOMA (recovery) covered with a brown slime (including LSS lenses - esp MAPRs -11 and -12 deployed at mooring

98V108)

Dec-1999 in lab neph data problems - EDD repair of neph circuit (Pat McLain); neph circuit ground jumper added;

new coin cell battery; general regular maintenance (new hardware, o-rings, P sensor oil, etc.)



Dec-1999 Calibrations (N, P) - Workbook updated in lab









MAPR-14 Jun-1999 Calibrations (N, T) in lab NEW MAPRs from EDD - pressure cal in Pressure vessel at shop

(no pressure)









MAPR-15

(no pressure)







MAPR-16

(no pressure)









MAPR-17

(no pressure)





12/11/2011 - 7:16 PM

Page 5 of 93

MAPRsn Dates of Use Principal Investigator / Ship Location Operations/Use









12/11/2011 - 7:16 PM

Page 6 of 93

MAPRsn Dates of Use Principal Investigator / Ship Location Operations/Use



MAPR-18

(no pressure)







MAPR-19

(no pressure)







MAPR-20

(no pressure)







MAPR-21

(no pressure)







MAPR-22

(no pressure)









MAPR-23

(no pressure)









MAPR-24 NEW MAPRs from EDD - pressure cal in Pressure vessel at shop

(pressure)







MAPR-25 NEW MAPRs from EDD - pressure cal in Pressure vessel at shop

(pressure)







MAPR-26 NEW MAPRs from EDD - pressure cal in Pressure vessel at shop

(pressure)









MAPR-27 NEW MAPRs from EDD - pressure cal in Pressure vessel at shop

(pressure) Jun-1999 Ed Baker / WECOMA JDFR (Axal) 1 CTD cast for field check; intended for long-term mooring; flooded on CTD cast - not deployed



MAPR-27 flooded during test CTD cast (V99B-10) during the 1999 WECOMA cruise









MAPR-28 NEW MAPRs from EDD - pressure cal in Pressure vessel at shop

(pressure)









12/11/2011 - 7:16 PM

Page 7 of 93

Dates of Use Principal Investigator / Ship MAPRsn Location Operations



Feb-1996 Dan Schierer MAPRs -01, -02 SE Indian Ridge - 42S88E to 33S78E 45 dredges, 48 rock cores (not sure how much each MAPR was actually used)





10-Jun-1996 MAPRs -01, -02 in lab Calibration - Neph only



16-Jul to 9 Aug - 1996 Bill Chadwick / DISCOVERER (last cruise) MAPRs -01, -02 JDFR (CoAx, N.Cleft), Escanaba, 7 AMS-60 tows (side scan sonar) - 75m above depressor weight (MAPR-01

N.Gorda was damaged on first tow)



30-Aug-1996 MAPRs -01, -02 in lab Calibration - Press only



Nov-1996 Rachel Haymon MAPRs -01, -02 SEPR 9 tows total => Argo, AMS, other - Both MAPRs used on all tows



May-1997 MAPRs -01, -02 in lab Calibrations - Neph, Temp, Press



May to Nov-1997 Catherine Mevel, Jean Luc Charlou, Philippe MAPRs -01, -02 SWIR dredges, rock cores, CTD hydorcasts - reported damage to neph cables,

Jean-Baptiste / MARION DUFRESNE connectors and loss of some data (esp. for MAPR-02)





01-Aug-1997 Jim Cowen / SHINKAI MAPR-03 EPR or SEPR 2 submersible dives: problems configuring MAPR so no data from first dive -

damaged on second dive



Sep-1997 Ed Baker / R.BROWN (leg2) MAPRs -4, -07, -12 JDFR (N. Cleft) on 2 CTD casts and deployed on Lavelle's short-term mooring (~5 days) at

Pipe Organ vent



Sept-Nov 1997 Chris German / MARION DUFRESNE MAPRs -05, -08, -09, -10, -11, -13 SWIR TOBI tows - one test tow (4hrs; M-08 and M-13), two long tows (4-5 days each) -

some damage to neph brackets, cables and connectors reported (M-05

damaged on first tow - neph bracket sheared off and LSS lost; M-08 LSS lost

on second tow; M-09 neph bracket screws or cable connectors loosened during

both tows)



Nov-1997 Charlie Langmuir / MELVILLE MAPRs -04, -07 SEPR ~185 lowerings (total, alternated MAPR-04 and -07 until -07 was lost) - rock

cores and dredges - MAPR-07 was lost during this cruise - cruise was

otherwise very successful





Jan-1998 Jill Karsten / MELVILLE MAPRs -04, -09 Chile Ridge 107 dredges, 20 wax cores - MAPR-04 flooded, neph problems with MAPR-09



March to April - 1998 Ed Baker / MELVILLE MAPRs -03, -05, -08, -09, -10, -11, -12, -13 SEPR 6 AMS-120 tows (~2 days each) and several CTD casts - damage to some

neph brackets and connectors during first tow (screws sheared off or backed

out), after securing screws better, no further problems; MAPRs -09 and -11

neph bracket screws sheared off and connectors had broken pins (not used

after first tow); MAPR-13 neph data no good from mid-way through first tow

(neph bracket fell off because screws backed out) but MAPR continued to be

used for P and T data during cruise.



Aug-1998 Ed Baker / R.BROWN (leg1) MAPRs -08, -09, -10, -11, -12, -13 JDFR (Axial) short-term mooring for Bill Lavelle at Axial (~5 days) - MAPR-09 had

questionable neph data; also possibly on some CTD casts



Sep-1998 to June-1999 Ed Baker / R.BROWN (leg2 - deployment) / MAPRs -08, -10, -11, -12, -13 JDFR (Axial) long-term moorings - 1yr - MAPR-11 did not work; neph bracket screws badly

WECOMA (recovery) corroded (esp M-12) and some MAPRs covered with a brown slime (including

LSS lenses - esp MAPRs -11 and -12 deployed at mooring 98V108)





Sep-1998 Cornel DeRonde / SONNE MAPRs -03, -05 Kermadec Arc Volcanoes 4 box cores, 1 water pump station, 6 heat flow probe stations, 3 TV Grabs, 14

camera tows during cruise (deployments averaged 2-6 hours) - MAPR-05

mostly used - no problems noted



24 Alvin dives, 1 CTD cast - MAPR-05 did not work (tried on 2 dives); MAPR-

Dec-1998 to Jan-1999 Cornel DeRonde / ATLANTIS (Lupton cruise) MAPRs -03, -05 SEPR 03 used on 23 dives, 1 CTD cast





12/11/2011 - 7:16 PM

Page 8 of 93

Dates of Use Principal Investigator / Ship MAPRsn Location Operations

Jan to Feb - 1999 Chris German / JAME CLARK ROSS MAPRs -01, -02, -09 East Scotia Ridge (S.Atlantic) TOBI tows and wax cores - MAPR-09 deployed on TOBI - suffered extensive

vibration while ship had to ride out a big storm, fine black powder inside

pressure casing when recovered - did not respond (broken wires from

computer connector?)





May-Jun 1999 MAPRs -14, -15, -16, -17, -18, -19, in lab and aboard WECOMA Calibrations - Neph, Temp, Press (NEW MAPRs delivered from EDD)

-20, -21, -22, -23, -24, -25, -26, 27, -

28





Jun-1999 to summer 2000 Ed Baker / WECOMA MAPRs -08, -10, -11, -12, -13 JDFR (Axial) Recovered MAPRs -08 through -13 (long-term moorings at Axial - 1 yr); MAPRs

MAPRs -14, -15, -16, -17, -18, -19, -14 through -28 deployed on CTD cast for field check (sta V99B-10); Deployed

-20, -21, -22, -23, -24, -25, -26, 27, - MAPRs -14 through -28 (except MAPR-27) for long term moorings at Axial;

28 MAPR-27 flooded



Dec-1999 MAPRs -01, -02, -03, -05, -08, -09, - in lab clean, refurbish MAPRs - added ground jumper to all neph circuits; repairs as

10, -11, -12, -13 necessary (MAPR-01, -02, -12, -13 problems with neph data; MAPR-09 needed

new neph connector in top plate, fixxed some broken wires, new connector for

battery pack); replaced stainless hardware, o-rings, changed Press sensor oil





Dec-1999 MAPRs -02, -03, -05, -08, -09, -10, - in lab Calibrations - Neph, Temp, Press ; Workbook updated

11, -12, -13



Jan to May-2000 Dan Fornari / MELVILLE and ATLANTIS MAPRs -03, -05, -08, -09, -10, -11 EPR for use on AMS-120









12/11/2011 - 7:16 PM

Page 9 of 93

MAPRsn Dates of Use Principal Investigator / Ship



MAPR-01 Feb-1996 Dan Schierer



10-Jun-1996 Calibration (Neph only)

16-Jul to 9 Aug - 1996 Bill Chadwick / DISCOVERER (last cruise)



MAPR-01 damaged on first tow dur

30-Aug-1996 Calibration (Press only)

Nov-1996 Rachel Haymon

May-1997 Calibration (Neph, Press, Temp)

May to Nov-1997 Catherine Mevel, Jean Luc Charlou,

Philippe Jean-Baptiste / MARION

DUFRESNE

Catherine Mevel reported damage to ne

Dec-1998 Calibration (Temp, Neph)

Jan to Feb - 1999 Chris German / JAME CLARK ROSS

Chris German reported neph data w

Dec-1999

Location



SE Indian Ridge - 42S88E to 33S78E



in lab

JDFR (CoAx, N.Cleft), Escanaba,

N.Gorda

MAPR-01 damaged on first tow during Chadwick's cruise - no note of how it was damaged or what was done to repair it.

in lab

SEPR

in lab

SWIR





erine Mevel reported damage to neph cables, corrosion of neph connector pins and loss of some data (esp. with MAPR-02)

in lab

East Scotia Ridge (S.Atlantic)

Chris German reported neph data was different on downcasts/upcasts; also towards end of cruise it seemed to "get tired"

in lab

Operations/Use



45 dredges, 48 rock cores (MAPR-02 also sent, not sure how much either MAPR was actually

used)



7 AMS-60 tows (side scan sonar) - 75m above depressor weight - MAPR-01 damaged during first

tow, MAPR-02 used on all tows

dwick's cruise - no note of how it was damaged or what was done to repair it.



9 tows total => Argo, AMS, other - Both MAPRs used on all tows



dredges, wax cores, CTD hydorcasts





les, corrosion of neph connector pins and loss of some data (esp. with MAPR-02)

large T residuals for this cal - used coefficients anyway; Neph cal OK

TOBI tows and wax cores - MAPR-01 deployed on wax cores

rent on downcasts/upcasts; also towards end of cruise it seemed to "get tired"

neph data problems - EDD to repair neph circuit (Pat McLain)

MAPRsn Dates of Use Principal Investigator / Ship



MAPR-02 Feb-1996 Dan Schierer



10-Jun-1996 Calibration (Neph)

16-Jul to 9 Aug - 1996 Bill Chadwick / DISCOVERER (last cruise)



30-Aug-1996 Calibration (Press)

Nov-1996 Rachel Haymon

May-1997 Calibration (Neph, Press, Temp)

May to Nov-1997 Catherine Mevel, Jean Luc Charlou,

Philippe Jean-Baptiste / MARION

DUFRESNE

Catherine Mevel reported damage to ne

Dec-1998 Calibration (Temp, Neph) - attempted

Jan to Feb - 1999 Chris German / JAME CLARK ROSS

Dec-1999





Dec-1999 Calibrations (N, P, T) - Workbook updated

Location



SE Indian Ridge - 42S88E - 33S78E





JDFR (CoAx, N.Cleft), Escanaba, N.

Gorda



SEPR

in lab

SWIR





erine Mevel reported damage to neph cables, corrosion of neph connector pins and loss of some data (esp. with MAPR-02)

in lab

East Scotia Ridge (S.Atlantic)

in lab





in lab

Operations/Use



45 dredges, 48 rock cores (MAPR-01 also sent, not sure how much either MAPR was actually

used)



7 AMS-60 tows (side scan sonar) - 75m above depressor weight - MAPR-01 damaged during first

tow, MAPR-02 used on all tows



9 tows total => Argo, AMS, other - Both MAPRs used on all tows



dredges, wax cores, CTD hydorcasts





les, corrosion of neph connector pins and loss of some data (esp. with MAPR-02)

large T residuals for this cal - coefficients not used; no data for Neph

TOBI tows and wax cores - MAPR-02 apparently not used

electronics do not slide easily in/out of pressure case - machine shop fixxed it, neph circuit ground

jumper added; new coin cell battery; general regular maintenance (new hardware, o-rings, P

sensor oil, etc.)

MAPRsn Dates of Use Principal Investigator / Ship



MAPR-03 25-Jun-1997 delivered from EDD (Floyd Mader)

July to Aug - 1997 Bench Testing and Calibrations (N, P, T)

01-Aug-1997 Jim Cowen / SHINKAI



Jim Cowen reported damage to Neph brac

March to April - 1998 Baker / MELVILLE





Sep-1998 Cornel DeRonde / SONNE





Dec-1998 to Jan-1999 Cornel DeRonde / ATLANTIS (Lupton

cruise)

Dec-1999



Dec-1999 Calibrations (N, P, T) - Workbook updated

Jan to May-2000 Dan Fornari / MELVILLE and ATLANTIS

Location





in lab

EPR or SEPR



wen reported damage to Neph bracket and Neph when manipulator sheared it off - connector on LSS was damaged, also cable

SEPR





Kermadec Arc Volcanoes





SEPR



in lab



in lab

EPR

Operations/Use







2 submersible dives: problems configuring MAPR so no data from first dive - damaged on second

dive

Neph when manipulator sheared it off - connector on LSS was damaged, also cable

6 AMS-120 tows (~2 days each) and several CTD casts - damage to some neph brackets during

first tow (screws sheared off or backed out, damage to connector pins); MAPR-03 OK throughout

cruise

4 box cores, 1 water pump station, 6 heat flow probe stations, 3 TV Grabs, 14 camera tows during

cruise (deployments averaged 2-6 hours) - MAPR-03 used on 4 box cores, 1 water pump, 3 heat

flow probe sta's- no problems noted

24 Alvin dives, 1 CTD cast - MAPR-05 did not work (tried on 2 dives); MAPR-03 used on 23 dives,

1 CTD cast

neph circuit ground jumper added; new coin cell battery; general regular maintenance (new

hardware, o-rings, P sensor oil, etc.)



for use on AMS-120

MAPRsn Dates of Use Principal Investigator / Ship



MAPR-04 25-Jun-1997 delivered from EDD (Floyd Mader)

July to Aug - 1997 Bench Testing and Calibrations (N, P, T)

Sep-1997 Ed Baker / R.BROWN (leg2)

Nov-1997 Charlie Langmuir / MELVILLE



Jan-1998 Jill Karsten / MELVILLE

Jill K

Location





in lab

JDFR (N. Cleft)

SEPR



Chile Ridge

Jill Karsten reported MAPR-04 flooded during this cruise

Operations/Use







2 CTD casts and deployed on Lavelle's short-term mooring (~5 days) at Pipe Organ vent

~185 lowerings (total, alternated MAPR-04 and -07 until -07 was lost) - rock cores and dredges -

lost MAPR-07 during this cruise - cruise was otherwise very successful

107 dredges, 20 wax cores - MAPR-04 flooded, neph problems with MAPR-09

reported MAPR-04 flooded during this cruise

MAPRsn Dates of Use Principal Investigator / Ship



MAPR-05 25-Jun-1997

July to Aug - 1997 Bench Testing and Calibrations (N, P, T)

Sept-Nov 1997 Chris German / MARION DUFRESNE

Chris German reported damage to Neph

March to April - 1998 Baker / MELVILLE





Sep-1998 Cornel DeRonde / SONNE





Dec-1998 to Jan-1999 Cornel DeRonde / ATLANTIS (Lupton

cruise)

Cornel DeRonde re

Dec-1999



Dec-1999 Calibrations (N, P, T) - Workbook updated

Jan to May-2000 Dan Fornari / MELVILLE and ATLANTIS

Location





in lab

SWIR

German reported damage to Neph bracket (screws sheared off) and LSS lost on first tow- noted clamps slid down wire some

SEPR





Kermadec Arc Volcanoes





SEPR



Cornel DeRonde reported MAPR-05 did not work at all this cruise (tried on 2 Alvin dives)

in lab



in lab

EPR

Operations/Use



delivered from EDD (Floyd Mader)



used on one TOBI tow - damage to neph bracket, loss of LSS

t (screws sheared off) and LSS lost on first tow- noted clamps slid down wire some

6 AMS-120 tows (~2 days each) and several CTD casts - damage to some neph brackets during

first tow (screws sheared off or backed out, damage to connector pins); MAPR-05 OK throughout

cruise

4 box cores, 1 water pump station, 6 heat flow probe stations, 3 TV Grabs, 14 camera tows during

cruise (deployments averaged 2-6 hours) - MAPR-05 used on 3 TV Grabs, 3 heat flow probe

sta's, 14 camera tows - no problems noted

24 Alvin dives, 1 CTD cast - MAPR-05 did not work (tried on 2 dives); MAPR-03 used on 23 dives,

1 CTD cast

MAPR-05 did not work at all this cruise (tried on 2 Alvin dives)

neph circuit ground jumper added; new coin cell battery; general regular maintenance (new

hardware, o-rings, P sensor oil, etc.)



for use on AMS-120

MAPRsn Dates of Use Principal Investigator / Ship



MAPR-06 25-Jun-1997 ENGINEERING MAPR - bench model has never been calibrated or u

Location



odel has never been calibrated or used

Operations/Use

MAPRsn Dates of Use Principal Investigator / Ship



MAPR-07 25-Jun-1997

July to Aug - 1997 Bench Testing and Calibrations (N, P, T)

20-Aug-1997

Sep-1997 Ed Baker / R.BROWN (leg2)

Nov-1997 Charlie Langmuir / MELVILLE



M

Location





in lab



JDFR (N. Cleft)

SEPR



MAPR-07 was lost on a dredge during this cruise

Operations/Use



delivered from EDD (Floyd Mader)



NEW BOARD - calibrations redone

2 CTD casts and deployed on Lavelle's short-term mooring (~5 days) at Pipe Organ vent

~185 lowerings (total, alternated MAPR-04 and -07 until -07 was lost) - rock cores and dredges -

lost MAPR-07 during this cruise - cruise was otherwise very successful

7 was lost on a dredge during this cruise

MAPRsn Dates of Use Principal Investigator / Ship



MAPR-08 25-Jun-1997

July to Aug - 1997 Bench Testing and Calibrations (N, P, T)

Sept-Nov 1997 Chris German / MARION DUFRESNE

Chris German reported LSS was lost - ca

Aug-1998 Baker / R.BROWN (leg1)



Sep-1998 to June-1999 Baker / R.BROWN (leg2 - deployment) /

WECOMA (recovery)





Dec-1999



Dec-1999 Calibrations (N, P, T) - Workbook updated

Jan to May-2000 Dan Fornari / MELVILLE and ATLANTIS

Location





in lab

SWIR

German reported LSS was lost - cable unscrewed at LSS connector - cable at end cap was loose also - good data for ~24hrs

JDFR (Axial)



JDFR (Axial)









in lab



in lab

EPR

Operations/Use



delivered from EDD (Floyd Mader)



TOBI tows - one test tow (4hrs), two long tows (4-5 days each) - LSS lost on second tow

crewed at LSS connector - cable at end cap was loose also - good data for ~24hrs

short-term mooring for Bill Lavelle at Axial (~5 days) - MAPR-09 had questionable neph data;

also possibly on some CTD casts

long-term moorings - 1yr - neph bracket screws badly corroded (esp M-12) and some MAPRs

covered with a brown slime (including LSS lenses - esp MAPRs -11 and -12 deployed at mooring

98V108); field check on CTD cast at time of recovery (WECOMA criuse - Jun-1999)



neph circuit ground jumper added; new coin cell battery; general regular maintenance (new

hardware, o-rings, P sensor oil, etc.)



for use on AMS-120

MAPRsn Dates of Use Principal Investigator / Ship



MAPR-09 25-Jun-1997

July to Aug - 1997 Bench Testing and Calibrations (N, P, T)

Sept-Nov 1997 Chris German / MARION DUFRESNE



Chris German reported LSS bracket screws loosened

Jan-1998 Jill Karsten / MELVILLE

Jill Karsten reported neph data quality con

March to April - 1998 Baker / MELVILLE





MAPR-09 neph bracket dangling after first tow - one n

Aug-1998 Baker / R.BROWN (leg1)



noted that ne

Jan to Feb - 1999 Chris German / JAME CLARK ROSS





Chris German reported MAPR-09 was suffered exten

Dec-1999





Dec-1999 Calibrations (N, P, T) - Workbook updated

Jan to May-2000 Dan Fornari / MELVILLE and ATLANTIS

Location





in lab

SWIR



rted LSS bracket screws loosened during first tow, LSS cable was coming unscrewed at both ends during second tow (data co

Chile Ridge

sten reported neph data quality concerns with MAPR-09 - later found neph bulkhead connector pins on top plate had corrosion

SEPR





acket dangling after first tow - one neph bracket screws sheared off, one fell out and connectors had broken pins (not used aft

JDFR (Axial)



noted that neph data from MAPR-09 (short term mooring) was questionable

East Scotia Ridge (S.Atlantic)





ported MAPR-09 was suffered extensive vibrations after being deployed during a huge storm - MAPR would not respond when

in lab





in lab

EPR

Operations/Use



delivered from EDD (Floyd Mader)



2 long TOBI tows (4-5 days each) - neph bracket or cable connectors loosened during both tows

(vibration)

irst tow, LSS cable was coming unscrewed at both ends during second tow (data compromised)

107 dredges, 20 wax cores - MAPR-04 flooded, neph problems with MAPR-09

with MAPR-09 - later found neph bulkhead connector pins on top plate had corrosion

6 AMS-120 tows (~2 days each) and several CTD casts - damage to some neph brackets during

first tow (screws sheared off or backed out, damage to connector pins); MAPR-09 damaged and

not used after first tow

acket screws sheared off, one fell out and connectors had broken pins (not used after first tow)

short-term mooring for Bill Lavelle at Axial (~5 days) - MAPR-09 had questionable neph data;

also possibly on some CTD casts

from MAPR-09 (short term mooring) was questionable

TOBI tows and wax cores - MAPR-09 deployed on TOBI - suffered extensive vibration while ship

had to ride out a big storm, fine black powder inside pressure casing when recovered - did not

respond (broken wires from computer connector?)

brations after being deployed during a huge storm - MAPR would not respond when recovered

new neph connector on top plate; broken wires fixxed; battery cable connector replaced; neph

circuit ground jumper added; new coin cell battery; general regular maintenance (new hardware, o-

rings, P sensor oil, etc.)



for use on AMS-120

MAPRsn Dates of Use Principal Investigator / Ship



MAPR-10 25-Jun-1997

July to Aug - 1997 Bench Testing and Calibrations (N, P, T)

Sept-Nov 1997 Chris German / MARION DUFRESNE

March to April - 1998 Baker / MELVILLE





Aug-1998 Baker / R.BROWN (leg1)



Sep-1998 to June-1999 Baker / R.BROWN (leg2 - deployment) /

WECOMA (recovery)



Dec-1999



Dec-1999 Calibrations (N, P, T) - Workbook updated

Jan to May-2000 Dan Fornari / MELVILLE and ATLANTIS

Location





in lab

SWIR

SEPR





JDFR (Axial)



JDFR (Axial)





in lab



in lab

EPR

Operations/Use



delivered from EDD (Floyd Mader)



2 long TOBI tows (4-5 days each)

6 AMS-120 tows (~2 days each) and several CTD casts - damage to some neph brackets during

first tow (screws sheared off or backed out, damage to connector pins); MAPR-10 OK throughout

cruise (configuration error resulted in no data on first tow)

short-term mooring for Bill Lavelle at Axial (~5 days) - MAPR-09 had questionable neph data;

also possibly on some CTD casts

long-term moorings - 1yr - neph bracket screws badly corroded (esp M-12) and some MAPRs

covered with a brown slime (including LSS lenses - esp MAPRs -11 and -12 deployed at mooring

98V108)

neph circuit ground jumper added; new coin cell battery; general regular maintenance (new

hardware, o-rings, P sensor oil, etc.)



for use on AMS-120

MAPRsn Dates of Use Principal Investigator / Ship



MAPR-11 25-Jun-1997

July to Aug - 1997 Bench Testing and Calibrations (N, P, T)

Sept-Nov 1997 Chris German / MARION DUFRESNE

March to April - 1998 Baker / MELVILLE





Aug-1998 Baker / R.BROWN (leg1)



Sep-1998 to June-1999 Baker / R.BROWN (leg2 - deployment) /

WECOMA (recovery)



MAPR-11 did not work - no data recovere

Dec-1999



Dec-1999 Calibrations (N, P, T) - Workbook updated

Jan to May-2000 Dan Fornari / MELVILLE and ATLANTIS

Location





in lab

SWIR

SEPR





JDFR (Axial)



JDFR (Axial)





-11 did not work - no data recovered - apparent battery failure or configuration error - MAPR responded normally when tested

in lab



in lab

EPR

Operations/Use



delivered from EDD (Floyd Mader)



2 long TOBI tows (4-5 days each)

6 AMS-120 tows (~2 days each) and several CTD casts - damage to some neph brackets during

first tow (screws sheared off or backed out, damage to connector pins); MAPR-11 damaged and

not used after first tow

short-term mooring for Bill Lavelle at Axial (~5 days) - MAPR-09 had questionable neph data;

also possibly on some CTD casts

long-term moorings - 1yr - neph bracket screws badly corroded (esp M-12) and some MAPRs

covered with a brown slime (including LSS lenses - esp MAPRs -11 and -12 deployed at mooring

98V108); MAPR-11 did not work

arent battery failure or configuration error - MAPR responded normally when tested

neph circuit ground jumper added; new coin cell battery; general regular maintenance (new

hardware, o-rings, P sensor oil, etc.)



for use on AMS-120

MAPRsn Dates of Use Principal Investigator / Ship



MAPR-12 25-Jun-1997

July to Aug - 1997 Bench Testing and Calibrations (N, P, T)

Sep-1997 Ed Baker / R.BROWN (leg2)

March to April - 1998 Baker / MELVILLE





Aug-1998 Baker / R.BROWN (leg1)



Sep-1998 to June-1999 Baker / R.BROWN (leg2 - deployment) /

WECOMA (recovery)



Dec-1999





Dec-1999 Calibrations (N, P) - Workbook updated

Location





in lab

JDFR (N. Cleft and Axial)

SEPR





JDFR (Axial)



JDFR (Axial)





in lab





in lab

Operations/Use



delivered from EDD (Floyd Mader)



2 CTD casts and deployed on Lavelle's short-term mooring (~5 days)

6 AMS-120 tows (~2 days each) and several CTD casts - damage to some neph brackets during

first tow (screws sheared off or backed out, damage to connector pins); MAPR-12 OK throughout

cruise

short-term mooring for Bill Lavelle at Axial (~5 days) - MAPR-09 had questionable neph data;

also possibly on some CTD casts

long-term moorings - 1yr - neph bracket screws badly corroded (esp M-12) and some MAPRs

covered with a brown slime (including LSS lenses - esp MAPRs -11 and -12 deployed at mooring

98V108)

neph data problems - EDD repair of neph circuit (Pat McLain); neph circuit ground jumper added;

new coin cell battery; general regular maintenance (new hardware, o-rings, P sensor oil, etc.)

MAPRsn Dates of Use Principal Investigator / Ship



MAPR-13 25-Jun-1997

July to Aug - 1997 Bench Testing and Calibrations (N, P, T)

Sept-Nov 1997 Chris German / MARION DUFRESNE

March to April - 1998 Baker / MELVILLE





MAPR-13 neph bracket dangling after first

Aug-1998 Baker / R.BROWN (leg1)



Sep-1998 to June-1999 Baker / R.BROWN (leg2 - deployment) /

WECOMA (recovery)



Dec-1999





Dec-1999 Calibrations (N, P) - Workbook updated

Location





in lab

SWIR

SEPR





3 neph bracket dangling after first tow - screws fell out - neph data no good but MAPR used throughout cruise for T and P data

JDFR (Axial)



JDFR (Axial)





in lab





in lab

Operations/Use



delivered from EDD (Floyd Mader)



TOBI tows - one test tow (4hrs), two long tows (4-5 days each)

6 AMS-120 tows (~2 days each) and several CTD casts - damage to some neph brackets during

first tow (screws sheared off or backed out, damage to connector pins); MAPR-13 neph data

problems, but used throughout cruise for T and P data

rews fell out - neph data no good but MAPR used throughout cruise for T and P data

short-term mooring for Bill Lavelle at Axial (~5 days) - MAPR-09 had questionable neph data;

also possibly on some CTD casts

long-term moorings - 1yr - neph bracket screws badly corroded (esp M-12) and some MAPRs

covered with a brown slime (including LSS lenses - esp MAPRs -11 and -12 deployed at mooring

98V108)

neph data problems - EDD repair of neph circuit (Pat McLain); neph circuit ground jumper added;

new coin cell battery; general regular maintenance (new hardware, o-rings, P sensor oil, etc.)

MAPRsn Dates of Use Principal Investigator / Ship

Location

Operations/Use

MAPRsn Dates of Use Principal Investigator / Ship

Location

Operations/Use

MAPRsn Dates of Use Principal Investigator / Ship

Location

Operations/Use

MAPRsn Dates of Use Principal Investigator / Ship

Location

Operations/Use

MAPRsn Dates of Use Principal Investigator / Ship

Location

Operations/Use

MAPRsn Dates of Use Principal Investigator / Ship

Location

Operations/Use

MAPRsn Dates of Use Principal Investigator / Ship

Location

Operations/Use

MAPRsn Dates of Use Principal Investigator / Ship

Location

Operations/Use

MAPRsn Dates of Use Principal Investigator / Ship

Location

Operations/Use

MAPRsn Dates of Use Principal Investigator / Ship

Location

Operations/Use

MAPRsn Dates of Use Principal Investigator / Ship

Location

Operations/Use

MAPRsn Dates of Use Principal Investigator / Ship

Location

Operations/Use

MAPRsn Dates of Use Principal Investigator / Ship

Location

Operations/Use

MAPRsn Dates of Use Principal Investigator / Ship

Location

Operations/Use

MAPRsn Dates of Use Principal Investigator / Ship

Location

Operations/Use



Other docs by panniuniu
organization_of_slp_working_files_3-23-10
Views: 1  |  Downloads: 0
Lesson 2 2011 key
Views: 0  |  Downloads: 0
Site Survey
Views: 2  |  Downloads: 0
alt energy project SP11
Views: 1  |  Downloads: 0
Effie Biography
Views: 0  |  Downloads: 0
Download-Organization-application-letter
Views: 0  |  Downloads: 0
TWIN_Nomination_form_2010
Views: 0  |  Downloads: 0
Engineering Change Order Master Log
Views: 2  |  Downloads: 0
360654.f1
Views: 0  |  Downloads: 0
By registering with docstoc.com you agree to our
privacy policy

You are almost ready to download!

You are almost ready to download!