** NEW YORK STATE DEPARTMENT OF TRANSPORTATION **
Friday, August 26, 2011 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) on Draft Program Page 1 of 84
for REGION 10
AGENCY PROJECT DESCRIPTION TOTAL 4-YEAR PROGRAM (FFY)
4-YEAR PHASE Starting October 01, 2010
FUND SOURCES FFY
PIN PROGRAM
FFY FFY FFY FFY
in millions
of dollars 2011 2012 2013 2014
AQ CODE COUNTY TOTAL PROJECT COST
NYSDOT CONSTRUCT THE FIRST SECTION OF A 14.4 MILE SHARED-USE PATH FROM THE NFA 2012 0.600 CONINSP 0.600
WANTAGHSTATE PKWY TO TOBAY BEACH ON THE NORTH SIDE OF OCEAN NFA 2012 5.500 CONST 5.500
000611 PKWY TO PROVIDE MULTIMODAL ACCESS TOWNS OF OYSTERBAY AND
HEMPSTEAD
AQC:C2P NASSAU TPC : $4.6-$7.5 M TOTAL 4YR COST : 6.100 0.000 6.100 0.000 0.000
NYSDOT IMPROVE STRUCTURAL INTEGRITY OF THE ROBERT MOSES CAUSEWAY OVER HBRR 2013 2.319 PRELDES 2.319
FIRE ISLAND INLET BRIDGE TO ENSURE PUBLIC SAFETY TOWN OF ISLIP, NFA 2013 0.600 PRELDES 0.600
001756 SUFFOLK COUNTY (BIN#1058770)
AQC:A19P SUFFOLK TPC : $175-$385 M TOTAL 4YR COST : 2.919 0.000 0.000 2.919 0.000
NYSDOT SPOT BRIDGE REPAIR TO MAINTAIN STRUCTURAL INTEGRITY ON ROBERT NFA 2011 0.808 CONINSP 0.808
MOSES CAUSEWAY OVER FIRE ISLAND INLET BRIDGE IN ISLIP TOWN, SUFFOLK NFA 2011 8.080 CONST 8.080
001764 COUNTY.
AQC:A19S SUFFOLK TPC : $7.5-$12 M TOTAL 4YR COST : 8.888 8.888 0.000 0.000 0.000
NYSDOT CONSTRUCT RECHARGE BASIN TO ELIMINATE A FLOODING PROBLEM ON NY454 NFA 2012 0.429 CONINSP 0.429
BETWEEN LINCOLN AVE AND GRUNDY AVE, ISLIP TOWN, SUFFOLK COUNTY. NFA 2012 4.291 CONST 4.291
003012
AQC:A2P SUFFOLK TPC : $9.5-15.5 M TOTAL 4YR COST : 4.720 0.000 4.720 0.000 0.000
NYSDOT NY454 ITS - WILL INSTALL CLOSED CIRCUIT ITS CAMERAS,REMOTELY CMAQ 2014 0.548 DETLDES 0.548
ACCESSIBLE ITS DEVICES AND SIGNAL INTERFACE SOFTWARE AND HARDWARE NFA 2014 0.137 DETLDES 0.137
003016 ALONG NY454 CORRIDOR TO UPGRADE THE SYSTEM IN TOWN OF ISLIP AND
BROOKHAVEN
AQC:NON SUFFOLK TPC : $15-$25 M TOTAL 4YR COST : 0.685 0.000 0.000 0.000 0.685
NYSDOT NY25 PAVEMENT REPAIRS,SEALING OF CRACKS, RESURFACING, PROV. TURNING HSIP 2012 0.738 CONINSP 0.738
LANES @ INTERSECTIONS INCLUDING CENTER LEFT TURN LANE, MOD. TO NFA 2012 0.084 CONINSP 0.084
004195 TRAFFIC SIGNAL EQUIPMENT & OPERATIONS, REPAIRS TO CURB & SIDEWALK HSIP 2012 7.381 CONST 7.381
BET. : NYC LINE TO GLEN COVE RD TO PROV. FOR SAFETY NFA 2012 0.837 CONST 0.837
NHS 2012 0.992 CONINSP 0.992
NFA 2012 0.253 CONINSP 0.253
NHS 2012 9.921 CONST 9.921
NFA 2012 2.529 CONST 2.529
AQC:A10P NASSAU TPC : $32-$50 M TOTAL 4YR COST : 22.735 0.000 22.735 0.000 0.000
** NEW YORK STATE DEPARTMENT OF TRANSPORTATION **
Friday, August 26, 2011 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) on Draft Program Page 2 of 84
for REGION 10
AGENCY PROJECT DESCRIPTION TOTAL 4-YEAR PROGRAM (FFY)
4-YEAR PHASE Starting October 01, 2010
FUND SOURCES FFY
PIN PROGRAM
FFY FFY FFY FFY
in millions
of dollars 2011 2012 2013 2014
AQ CODE COUNTY TOTAL PROJECT COST
NYSDOT IMPROVE NY110 SOUTHBOUND @ NY25 ,NY25 NY110 TO NEW YORK AVE FOR TO NFA 2012 0.539 CONINSP 0.539
PROVIDE SAFETY IMPROVEMENTS INCLUDING CONSTRUCT ONE-WAY NEW NFA 2012 5.393 CONST 5.393
004218 ROAD TO ALLOW FOR WESTBOUND LEFT TURNS; EASTBOUND LEFT TURNS WILL
BE DIVERTED TO NEW YORK AVE, HUNTINGTON TOWN, SUFFOLK COUNTY.
AQC:D3P SUFFOLK TPC : $7.5-$12 M TOTAL 4YR COST : 5.932 0.000 5.932 0.000 0.000
NYSDOT BRIDGE REHABILITATION OF NY25 OVER I495 AND CR58 IN RIVERHEAD TO IM 2013 0.868 CONINSP 0.868
MAINTAIN STATE OF GOOD REPAIR TOWN OF RIVERHEAD, SUFFOLK NFA 2013 0.096 CONINSP 0.096
004233 COUNTY.BIN#1056219,1056230 IM 2013 8.677 CONST 8.677
NFA 2013 0.965 CONST 0.965
AQC:A19P SUFFOLK TPC : $21-$31 M TOTAL 4YR COST : 10.606 0.000 0.000 10.606 0.000
NYSDOT RESURFACING; REPLACE STEEL MEDIAN BARRIER WITH CONCRETE MEDIAN NFA 2011 4.092 CONINSP 4.092
BARRIER TO MAINTAIN PAVEMENT AND PROVIDE SAFETY IMPROVEMENTS ON NFA 2012 40.919 CONST 40.919
005027 NY135 BETWEEN MERRICK RD AND NY24 IN THE TOWNS OF HEMPSTEAD &
OYSTER BAY, NASSAU COUNTY.
AQC:A10P NASSAU TPC : $40-$60 M TOTAL 4YR COST : 45.011 4.092 40.919 0.000 0.000
NYSDOT RECONSTRUCT NY347 FROM HALLOCK RD TO NICOLLS RD TO IMPROVE SAFETY, NFA 2014 6.408 DETLDES 6.408
OPERATION, AND MOBILITY FOR VEHICLES, PEDESTRIANS, BICYCLISTS AND NFA 2014 5.340 ROWACQU 5.340
005409 TRANSIT USERS IN BROOKHAVEN TOWN, SUFFOLK COUNTY.
AQC:NON SUFFOLK TPC : $40-$60 M TOTAL 4YR COST : 11.748 0.000 0.000 0.000 11.748
NYSDOT RECONSTRUCT NY347 FROM NY111 TO TERRY RD TO IMPROVE SAFETY, NHS 2014 3.318 CONINSP 3.318
OPERATION, AND MOBILITY FOR VEHICLES, PEDESTRIANS, BICYCLISTS AND NFA 2014 3.729 CONINSP 3.729
005420 TRANSIT USERS IN BROOKHAVEN TOWN, SUFFOLK COUNTY. NHS 2014 33.181 CONST 33.181
NFA 2014 37.293 CONST 37.293
AQC:AQC SUFFOLK TPC : $70-$130 M TOTAL 4YR COST : 77.521 0.000 0.000 0.000 77.521
NYSDOT NY347 & NY112 INTERSECTION RECONSTRUCTION TO IMPROVE SAFETY, NFA 2011 0.100 DETLDES 0.100
OPERATION, AND MOBILITY FOR VEHICLES, PEDESTRIANS, BICYCLISTS AND NHS 2013 1.656 CONINSP 1.656
005421 TRANSIT USERS IN BROOKHAVEN TOWN, SUFFOLK COUNTY. NFA 2013 0.424 CONINSP 0.424
NHS 2013 16.565 CONST 16.565
NFA 2013 4.245 CONST 4.245
AQC:NON SUFFOLK TPC : $21-$31 M TOTAL 4YR COST : 22.990 0.100 0.000 22.890 0.000
** NEW YORK STATE DEPARTMENT OF TRANSPORTATION **
Friday, August 26, 2011 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) on Draft Program Page 3 of 84
for REGION 10
AGENCY PROJECT DESCRIPTION TOTAL 4-YEAR PROGRAM (FFY)
4-YEAR PHASE Starting October 01, 2010
FUND SOURCES FFY
PIN PROGRAM
FFY FFY FFY FFY
in millions
of dollars 2011 2012 2013 2014
AQ CODE COUNTY TOTAL PROJECT COST
NYSDOT INSTALL MEDIAN BARRIER ON NY27 FROM ROBERT MOSES CAUSEWAY TO 5TH NFA 2013 0.333 DETLDES 0.333
AVENUE TO PREVENT CROSSING OF CENTER MEDIAN TOWN OF ISLIP, SUFFOLK
005903 COUNTY.
AQC:A9P SUFFOLK TPC : $7.5-$12 M TOTAL 4YR COST : 0.333 0.000 0.000 0.333 0.000
NYSDOT INSTALL MEDIAN BARRIER ALONG I495 AND NY27 EAST OF NY112 TO PREVENT IM 2014 0.167 CONINSP 0.167
CROSSOVERS OF THE CENTER MEDIAN IN THE TOWNS OF BROOKHAVEN, NFA 2014 0.017 CONINSP 0.017
005909 RIVERHEAD & SOUTHAMPTON IN SUFFOLK COUNTY. IM 2014 1.675 CONST 1.675
NFA 2014 0.129 CONST 0.129
NHS 2014 0.396 CONINSP 0.396
NFA 2014 0.044 CONINSP 0.044
NHS 2014 3.958 CONST 3.958
NFA 2014 0.440 CONST 0.440
AQC:A9P SUFFOLK TPC : $6-$9.4 M TOTAL 4YR COST : 6.826 0.000 0.000 0.000 6.826
NYSDOT OPERATIONAL IMPROVEMENTS ON NASSAU EXPRESSWAY(NY878) TOWN OF NFA 2013 2.500 DETLDES 2.500
HEMPSTEAD, NASSAU COUNTY (SCOPE TO BE DETERMINED) NFA 2014 3.328 ROWACQU 3.328
007214
AQC:J1Z NASSAU TPC : $26-$40 M TOTAL 4YR COST : 5.828 0.000 0.000 2.500 3.328
NYSDOT RECONSTRUCT NY110 TO PROVIDE SAFETY IMPROVEMNTS AND INCREASED HSIP 2013 0.376 CONINSP 0.376
CAPACITY FROM I495 NORTH SERVICE ROAD TO ARLINGTON ROAD AND NFA 2013 1.776 CONINSP 1.776
011256 MELVILLE MALL TO ARROWWOOD IN HUNTINGTON TOWN, SUFFOLK COUNTY. HSIP 2013 3.765 CONST 3.765
HIGH ACCIDENT LOCATION DETERMINED AS OF MARCH 2010 NFA 2013 15.981 CONST 15.981
STP FLEX 2013 0.732 CONINSP 0.732
NFA 2013 0.429 CONINSP 0.429
STP FLEX 2013 7.320 CONST 7.320
NFA 2013 1.876 CONST 1.876
AQC:NON SUFFOLK TPC : $26-$40 M TOTAL 4YR COST : 32.255 0.000 0.000 32.255 0.000
NYSDOT I495 HOV ENFORCEMENT CONTRACTExit 48 to 64 SUFFOLKCOUNTY NHS 2011 0.630 OPER 0.630
NFA 2011 0.158 OPER 0.158
022871 NHS 2012 0.650 OPER 0.650
NFA 2012 0.162 OPER 0.162
NHS 2013 0.669 OPER 0.669
NFA 2013 0.167 OPER 0.167
NHS 2014 0.689 OPER 0.689
NFA 2014 0.172 OPER 0.172
AQC:A7P SUFFOLK TPC : $12.5-$19 M TOTAL 4YR COST : 3.297 0.788 0.812 0.836 0.861
** NEW YORK STATE DEPARTMENT OF TRANSPORTATION **
Friday, August 26, 2011 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) on Draft Program Page 4 of 84
for REGION 10
AGENCY PROJECT DESCRIPTION TOTAL 4-YEAR PROGRAM (FFY)
4-YEAR PHASE Starting October 01, 2010
FUND SOURCES FFY
PIN PROGRAM
FFY FFY FFY FFY
in millions
of dollars 2011 2012 2013 2014
AQ CODE COUNTY TOTAL PROJECT COST
NYSDOT PARK & RIDE LOT SECURITY SURVEILLANCE CONTRACT TO PROVIDE FOR NFA 2011 0.250 OPER 0.250
SECURITY FORCES TO SURVEIL THE PARK AND RIDE LOTS IN NASSAU AND NFA 2012 0.250 OPER 0.250
022874 SUFFOLK COUNTIES NFA 2013 0.250 OPER 0.250
NFA 2014 0.250 OPER 0.250
AQC:C1P SUFFOLK TPC : $3.3-$5.6 M TOTAL 4YR COST : 1.000 0.250 0.250 0.250 0.250
NYSDOT TO PROVIDE FOR HIG OCCUPANCY VEHICLE LANE POLICE ENFORCEMENT ON NHS 2011 0.784 OPER 0.784
I495 BETWEEN EXIT 32 TO 48 NASSAU COUNTY NFA 2011 0.196 OPER 0.196
022903 NHS 2012 0.807 OPER 0.807
NFA 2012 0.202 OPER 0.202
NHS 2013 0.832 OPER 0.832
NFA 2013 0.208 OPER 0.208
NHS 2014 0.857 OPER 0.857
NFA 2014 0.214 OPER 0.214
AQC:C1P NASSAU TPC : $12.5-$19 M TOTAL 4YR COST : 4.100 0.980 1.009 1.040 1.071
NYSDOT REPLACE BRIDGE STRUCTURE OF CR19, PATCHOGUE/HOLBROOK RD OVER I495 IM 2013 1.041 CONINSP 1.041
STATE OF GOOD REPAIR IN BROOKHAVEN TOWN,SUFFOLK COUNTY. NFA 2013 0.116 CONINSP 0.116
022934 IM 2013 10.413 CONST 10.413
NFA 2013 1.156 CONST 1.156
AQC:A19P SUFFOLK TPC : $9.5-15.5 M TOTAL 4YR COST : 12.726 0.000 0.000 12.726 0.000
NYSDOT CREATE NEW HIGH OCCUPANCY VEHICLE LANE ACCESS POINT ON I495 IM 2011 0.280 CONINSP 0.280
BETWEEN EXITS 37 & 38 TO ALLOW SAFER INGRESS AND EGRESS. TOWN OF NFA 2011 0.031 CONINSP 0.031
022935 NORTH HEMPSTEAD, NASSAU COUNTY. IM 2011 2.336 CONST 2.336
NFA 2011 0.260 CONST 0.260
AQC:NON NASSAU TPC : $2-$4 M TOTAL 4YR COST : 2.907 2.907 0.000 0.000 0.000
NYSDOT ADD A SUPPLEMENTAL THIRD LANE OF I495 SERVICE ROADS FROM WALT NFA 2012 0.820 CONINSP 0.820
WHITMAN RD TO NY 110, TO IMPROVE THE FUNCTIONAL OPERATIONS NFA 2012 8.202 CONST 8.202
022938 HUNTINGTON TOWN, SUFFOLK COUNTY.
AQC:D1 SUFFOLK TPC : $7.5-$12 M TOTAL 4YR COST : 9.022 0.000 9.022 0.000 0.000
NYSDOT ADDITIONAL WORK NEEDED TO COMPLETE ROSLYN VIADUCT BRIDGE NFA 2012 2.108 CONINSP 2.108
REPLACEMENT STATE OF GOOD REPAIRTOWN OF NORTH HEMPSTEAD, NASSAU NFA 2012 21.079 CONST 21.079
032804 COUNTY
AQC:A6P NASSAU TPC : $21-$31 M TOTAL 4YR COST : 23.187 0.000 23.187 0.000 0.000
** NEW YORK STATE DEPARTMENT OF TRANSPORTATION **
Friday, August 26, 2011 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) on Draft Program Page 5 of 84
for REGION 10
AGENCY PROJECT DESCRIPTION TOTAL 4-YEAR PROGRAM (FFY)
4-YEAR PHASE Starting October 01, 2010
FUND SOURCES FFY
PIN PROGRAM
FFY FFY FFY FFY
in millions
of dollars 2011 2012 2013 2014
AQ CODE COUNTY TOTAL PROJECT COST
NYSDOT SAGTIKOS STATE PKWY/SUNKEN MEADOW STATE PKWY STUDY: SOUTHERN NHS 2013 2.598 SCOPING 2.598
STATE PKWY TO NY25A INCLUDING THE PARALLEL ROADWAY TOWNS OF ISLIP NFA 2013 0.812 SCOPING 0.812
033909 AND SMITHTOWN, SUFFOLK COUNTY NHS 2014 8.744 PRELDES 8.744
NFA 2014 2.208 PRELDES 2.208
AQC:C3P SUFFOLK TPC : $15-$25 M TOTAL 4YR COST : 14.362 0.000 0.000 3.410 10.952
NYSDOT CONSTRUCT FIRST PHASE OF THE INTERMODAL FREIGHT FACILITY ON THE NFA 2011 2.500 DETLDES 2.500
PILGRIM STATE HOSPITAL PROPERTY WHICH MAY INVOLVE HIGHWAY NFA 2013 3.707 CONINSP 3.707
033912 INFRASTRUCTURE IMPROVEMENTS AND/OR RAIL FREIGHT IMPROVEMENTS IN NFA 2013 37.070 CONST 37.070
ISLIP TOWN, SUFFOLK COUNTY.
AQC:NON SUFFOLK TPC : $40-$60 M TOTAL 4YR COST : 43.277 2.500 0.000 40.777 0.000
NYSDOT RECONSTRUCT NORTHERN STATE PARKWAY & NY110 INTERCHANGE AND NFA 2011 1.300 CONINSP 1.300
REPLACE THE NORTHERN STATE PARKWAY BRIDGE OVER NY110 TO PROVIDE NFA 2011 40.400 CONST 40.400
051641 INCREASED SAFETY AND STATE OF GOOD REPAIR IN HUNTINGTON TOWN, NFA 2011 2.362 ROWACQU 2.362
SUFFOLK COUNTY.
NHS 2011 2.090 CONINSP 2.090
NFA 2011 3.420 CONINSP 3.420
NHS 2011 20.897 CONST 20.897
NFA 2011 7.781 CONST 7.781
AQC:NON SUFFOLK TPC : $70-$130 M TOTAL 4YR COST : 78.250 78.250 0.000 0.000 0.000
NYSDOT CONSTRUCT 13.5 MILE LONG - 4 METER WIDE SHARED USE BIKEPATH WHICH NFA 2011 0.240 ROWACQU 0.240
INCLUDES RE-TIMING OF SIGNALS, SIGNING, PAVEMENT MARKING, GUIDE RAIL,
051723 CONCRETE BARRIER INSTALL/RELOC & BIKE LOCKER INSTALLATIONS Town of
Hempstead, Nassau County
AQC:C2P NASSAU TPC : $21-$31 M TOTAL 4YR COST : 0.240 0.240 0.000 0.000 0.000
NYSDOT PROVIDE SAFETY IMPROVEMENTS TO RAMPS ON WANTAGH STATE PARKWAY NFA 2011 0.660 PRELDES 0.660
AT INTERCHANGE WITH OLD COUNTRY ROAD SCOPE TO BE DETERMINED TOWN NFA 2014 0.454 CONINSP 0.454
051735 OF NORTH HEMPSTEAD NFA 2014 4.540 CONST 4.540
AQC:A6P NASSAU TPC : $4.6-$7.5 M TOTAL 4YR COST : 5.654 0.660 0.000 0.000 4.994
NYSDOT MEADOWBROOK STATE PKWY/SOUTHERN STATE PKWY INTERCHANGE NFA 2012 1.000 DETLDES 1.000
RECONSTRUCTION TO ELIMINATE TRAFFIC BACKUP -- CONSTRUCT A WIDER
052323 RAMP FROM W/B SOUTHERN STATE PAKWY TO N/B MEADOWBROOK STATE
PKWY INCLUDING WIDER BRIDGES AT MEADOWBROOK ROAD & NORTH
JERUSALEM,HEMPSTEAD
AQC:D3 NASSAU TPC : $26-$40 M TOTAL 4YR COST : 1.000 0.000 1.000 0.000 0.000
** NEW YORK STATE DEPARTMENT OF TRANSPORTATION **
Friday, August 26, 2011 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) on Draft Program Page 6 of 84
for REGION 10
AGENCY PROJECT DESCRIPTION TOTAL 4-YEAR PROGRAM (FFY)
4-YEAR PHASE Starting October 01, 2010
FUND SOURCES FFY
PIN PROGRAM
FFY FFY FFY FFY
in millions
of dollars 2011 2012 2013 2014
AQ CODE COUNTY TOTAL PROJECT COST
NYSDOT EXTEND THE MULTI-USE BIKEPATH 6 MILES FROM BETHPAGE ST PK TO I495 & NFA 2011 0.929 CONINSP 0.929
THEN FOLLOWING I495 & NY135 ROW TO SYOSSET RR STATION; INCLUDES PED NFA 2011 9.287 CONST 9.287
053457 IMPVTS @ STREET CROSSINGS, REPLANTING OF ERODED AREAS, PARKING &
SIGNING, TOWN OF OYSTER BAY, NASSAU CO.
AQC:C2P NASSAU TPC : $9.5-15.5 M TOTAL 4YR COST : 10.216 10.216 0.000 0.000 0.000
NYSDOT UPGRADE LIGHTING CABLE ON VARIOUS STATE PARKWAYS AS A SAFETY STP LG URBAN 2014 1.097 DETLDES 1.097
IMPROVEMENT IN NASSAU AND SUFFOLK COUNTIES NFA 2014 0.274 DETLDES 0.274
053466
AQC:A18P MULTI TPC : $15-$25 M TOTAL 4YR COST : 1.371 0.000 0.000 0.000 1.371
NYSDOT REHABILITATE THE HECKSCHER STATE PARKWAY BRIDGE OVER NY27, STATE HBRR 2012 0.594 CONINSP 0.594
OF GOOD REPAIR ISLIP TOWN, SUFFOLK COUNTY. NFA 2012 0.148 CONINSP 0.148
053472 HBRR 2012 5.940 CONST 5.940
NFA 2012 1.485 CONST 1.485
AQC:A19P MULTI TPC : $7.5-$12 M TOTAL 4YR COST : 8.167 0.000 8.167 0.000 0.000
SUFFOLK CO. INTERSECTION REALIGNMENT OF CR 3, PINELAWN ROAD/WELLWOOD ROAD NFA 2012 1.300 CONINSP 1.300
WITH CONKLIN STREET AND LONG ISLAND AVENUE, TO IMPROVE SAFETY AND NFA 2012 11.700 CONST 11.700
075656 TRAFFIC CONGESTION, IN THE TOWN OF BABYLON. ACT NO.600
AQC:D1P SUFFOLK TPC : $15-$25 M TOTAL 4YR COST : 13.000 0.000 13.000 0.000 0.000
SUFFOLK CO. IMPROVE CR 39 FROM NY 27 TO NY 27A, SUFFOLK COUNTY: HPP 2011 0.300 CONINSP 0.300
RECONSTRUCTION FROM NORTH SEA ROAD WEST TO NY27A,CR39 (NORTH NFA 2011 0.075 CONINSP 0.075
075736 HIGHWAY) TO INCLUDE 4 LANE SECTION WITH FULL SHOULDERSTO REDUCE HPP 2011 2.700 CONST 2.700
THE TRAFFIC CONGESTION.(HPP#3232 ,NY 576) NFA 0.675 CONST 0.675
2011
NHS 2011 0.060 CONINSP 0.060
NFA 2011 0.015 CONINSP 0.015
NHS 2011 0.540 CONST 0.540
NFA 2011 0.135 CONST 0.135
STP LG URBAN 2011 0.320 CONINSP 0.320
NFA 2011 0.080 CONINSP 0.080
STP LG URBAN 2011 0.480 CONST 0.480
NFA 2011 0.120 CONST 0.120
STP LG URBAN 2011 0.001 DETLDES 0.001
AQC:NON SUFFOLK TPC : $4.6-$7.5 M TOTAL 4YR COST : 5.501 5.501 0.000 0.000 0.000
** NEW YORK STATE DEPARTMENT OF TRANSPORTATION **
Friday, August 26, 2011 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) on Draft Program Page 7 of 84
for REGION 10
AGENCY PROJECT DESCRIPTION TOTAL 4-YEAR PROGRAM (FFY)
4-YEAR PHASE Starting October 01, 2010
FUND SOURCES FFY
PIN PROGRAM
FFY FFY FFY FFY
in millions
of dollars 2011 2012 2013 2014
AQ CODE COUNTY TOTAL PROJECT COST
LOCAL EXTENSION OF WEST AVENUE TO BEACH AVENUE TO PROVIDE A DIRECT HPP 2011 1.435 CONST 1.435
ACCESS TO FERRIES, LIRR & WATERFRONT, ACT #294. VILLAGE OF PATCHOGUE NFA 2011 0.359 CONST 0.359
075739
AQC:C2P SUFFOLK TPC : $1.2-$2.5 M TOTAL 4YR COST : 1.794 1.794 0.000 0.000 0.000
LOCAL CONGESTION MITIGATION PROJECT, TOWN OF BROOKHAVEN. ACT NO. 748 . HPP 2011 2.512 CONST 2.512
EMERGENCY VEHICLE PREEMPTION SYSTEM FOR EXISTING TRAFFIC SIGNALS NFA 2011 0.628 CONST 0.628
075743 .TEA-21 SECTION 1600
AQC:A7P SUFFOLK TPC : $2-$4 M TOTAL 4YR COST : 3.140 3.140 0.000 0.000 0.000
SUFFOLK CO. CONSTRUCT 11 MILES OF PEDESTRIAN/BICYCLE TRAIL ALONG THE ABANDONED HPP 2011 0.359 DETLDES 0.359
PORT JEFFERSON-WADING RIVER RAILROAD CORRIDOR NFA 2011 0.090 DETLDES 0.090
075816 SECTION 1602 #1257, NY-139, NY 267 HPP 2012 0.500 CONINSP 0.500
NFA 2012 0.125 CONINSP 0.125
HPP 2012 5.970 CONST 5.970
NFA 2012 1.492 CONST 1.492
AQC:C14 SUFFOLK TPC : $7.5-$12 M TOTAL 4YR COST : 8.536 0.449 8.087 0.000 0.000
LOCAL CONSTRUCT TWO-WAY BIKEWAY ON RIVER ROAD FROM VICTORY AVENUE TO HPP 2011 0.112 CONINSP 0.112
MORICHES-MIDDLE ISLAND ROAD,INCLUDING ,NEW PAVEMENT MARKING NFA 2011 0.028 CONINSP 0.028
075827 DELINEATING BIKEWAY ALONG THE SIDE OF RIVER ROAD, NEW BIKE WAY HPP 2011 1.126 CONST 1.126
SIGNS ON RIVER ROAD & ADJOINING ROADWAYS,(TEA-21) NFA 0.281 CONST 0.281
2011
AQC:A7 SUFFOLK TPC : $1.2-$2.5 M TOTAL 4YR COST : 1.547 1.547 0.000 0.000 0.000
LOCAL IMPROVE CR80, MONTAUK HIGHWAY, FROM NY112 TO CR101 IN THE TOWN OF HPP 2011 0.149 CONINSP 0.149
BROOKHAVEN. 05 APPROPRIATION SEC 117.NY232 NFA 2011 0.037 CONINSP 0.037
075850 HPP 2011 0.843 CONST 0.843
NFA 2011 0.149 CONST 0.149
AQC:A2P SUFFOLK TPC : $0.6-$1.5 M TOTAL 4YR COST : 1.178 1.178 0.000 0.000 0.000
LOCAL RECONSTRUCT OLD NICHOLS ROAD FROM MORICHES ROAD TO SMITHTOWN HPP 2011 0.296 CONINSP 0.296
BOULEVARD IN THE TOWN OF SMITHTOWN. REPLACE CURBS, SIDEWALKS, NFA 2011 0.074 CONINSP 0.074
075877 DRAINAGE & ADA COMPLIANT RAMPS AS NEEDED FOR PED. SAFETY,REPAIR HPP 2011 1.927 CONST 1.927
DETERIORATED ROAD IN NISSEQUOQUE RIVER WATERSHED IN SMITHTOWN. NFA CONST
2011 0.482 0.482
NY243
HPP 2011 0.200 DETLDES 0.200
NFA 2011 0.050 DETLDES 0.050
AQC:A10 SUFFOLK TPC : $2-$4 M TOTAL 4YR COST : 3.029 3.029 0.000 0.000 0.000
** NEW YORK STATE DEPARTMENT OF TRANSPORTATION **
Friday, August 26, 2011 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) on Draft Program Page 8 of 84
for REGION 10
AGENCY PROJECT DESCRIPTION TOTAL 4-YEAR PROGRAM (FFY)
4-YEAR PHASE Starting October 01, 2010
FUND SOURCES FFY
PIN PROGRAM
FFY FFY FFY FFY
in millions
of dollars 2011 2012 2013 2014
AQ CODE COUNTY TOTAL PROJECT COST
LOCAL ENHANCE AND BEAUTIFY LIGHTING, INSTALL BIKE RACKS AND PLANT STREET HPP 2011 0.043 CONINSP 0.043
TREES ON NY 27/SUNRISE HIGHWAY FROM THE QUEENS LINE TO THE LYNBROOK NFA 2011 0.011 CONINSP 0.011
075886 BORDER IN THE VILLAGE OF VALLEY STREAM.HPP#1686, NY 427 HPP 2011 0.918 CONST 0.918
NFA 2011 0.230 CONST 0.230
AQC:A18 NASSAU TPC : $1.2-$2.5 M TOTAL 4YR COST : 1.202 1.202 0.000 0.000 0.000
LOCAL RELOCATE OAK BEACH ROAD NORTHWARD TO RESULT IN A HIGHWAY HPP 2011 0.456 CONINSP 0.456
INTERCHANGE AT OCEAN PARKWAY THAT MEETS MODERN DESIGN NFA 2011 0.140 CONINSP 0.140
075887 STANDARDS, IN THE TOWN OF BABYLON.HPP# 690,HPP-1441, HPP#4611 HPP 2011 4.076 CONST 4.076
NFA 2011 1.019 CONST 1.019
HPP 2011 0.001 DETLDES 0.001
HPP 2011 0.491 PRELDES 0.491
NFA 2011 0.200 PRELDES 0.200
AQC:D4 SUFFOLK TPC : $6-$9.4 M TOTAL 4YR COST : 6.383 6.383 0.000 0.000 0.000
LOCAL REHAB. OF VARIOUS VILLAGE STREETS WITHIN THE VILLAGE OF HPP 2011 0.117 CONINSP 0.117
PATCHOGUE.RESURFACING TOTAL OF 2.5 MILES ON VARIOUS VILLAGE ROADS. NFA 2011 0.029 CONINSP 0.029
075888 RESURFACING, EXIST. DRAINAGE SYSTEMS WILL BE REHAB.TO PREVENT HPP 2011 0.975 CONST 0.975
FLOODING, DAMAGED CURB & SIDEWALK WILL BE REPAIRED.NY628, HPP#3600 NFA 2011 0.244 CONST 0.244
HPP 2011 0.078 DETLDES 0.078
NFA 2011 0.020 DETLDES 0.020
HPP 2011 0.021 PRELDES 0.021
NFA 2011 0.005 PRELDES 0.005
AQC:A10 SUFFOLK TPC : $1.2-$2.5 M TOTAL 4YR COST : 1.489 1.489 0.000 0.000 0.000
LOCAL VILLAGE OF PATCHOGUE MAIN STREET PEDESTRIAN SAFETY IMPROVEMENTS HPP 2011 0.048 CONINSP 0.048
INCLUDING CROSSWALKS LIGHTING AND ADA COMPLIANT CURB RAMPS. NFA 2011 0.012 CONINSP 0.012
075889 HPP#2445 HPP 2011 0.394 CONST 0.394
NFA 2011 0.098 CONST 0.098
HPP 2011 0.009 DETLDES 0.009
NFA 2011 0.002 DETLDES 0.002
AQC:C2 SUFFOLK TPC : $0.6-$1.5 M TOTAL 4YR COST : 0.563 0.563 0.000 0.000 0.000
** NEW YORK STATE DEPARTMENT OF TRANSPORTATION **
Friday, August 26, 2011 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) on Draft Program Page 9 of 84
for REGION 10
AGENCY PROJECT DESCRIPTION TOTAL 4-YEAR PROGRAM (FFY)
4-YEAR PHASE Starting October 01, 2010
FUND SOURCES FFY
PIN PROGRAM
FFY FFY FFY FFY
in millions
of dollars 2011 2012 2013 2014
AQ CODE COUNTY TOTAL PROJECT COST
LOCAL REPLACED INCOSISTANT AND UNATTRACTIVE SIGNAGE WITH NEW SIGNAGE TO HPP 2011 0.009 CONINSP 0.009
AVOID DETERMINETAL EFFECT TO RESIDENTS AND VISITORS ALONG NY25, CR48 NFA 2011 0.002 CONINSP 0.002
075890 AND SOUND AVE BETWEEN LAUREL TO ORIENT POINT IN THE TOWN HPP 2011 0.171 CONST 0.171
OFSOUTHOLD TOWN, SUFFOLK COUNTY.HPP#741 NFA 2011 0.043 CONST 0.043
HPP 2011 0.010 OPER 0.010
NFA 2011 0.002 OPER 0.002
AQC:C13 SUFFOLK TPC : < $0.75 M TOTAL 4YR COST : 0.237 0.237 0.000 0.000 0.000
LOCAL THE VILLAGE OF HEMPSTEAD IS REPAIRING DAMAGED AND MIS-ALIGNED HPP 2011 0.141 CONINSP 0.141
SIDEWALKS AND CURB AND INSTALLING LIGHTING TO PROVIDE A PEDESTRIAN NFA 2011 0.035 CONINSP 0.035
075895 FRIENDLY ENVIRONMENT& RESURFACE MAIN STREET.(HPP#1396,NY 269) HPP 2011 1.180 CONST 1.180
NFA 2011 0.295 CONST 0.295
AQC:C2 NASSAU TPC : $1.2-$2.5 M TOTAL 4YR COST : 1.651 1.651 0.000 0.000 0.000
LOCAL IMPROVE DETERIORATED PAVEMENT, DRAINAGE TO PREVENT FLOODING, HPP 2011 0.080 CONINSP 0.080
REPLACED DETERIORATED SIDE WALKS FOR PEDESTRIAN SAFETY & IMPROVE NFA 2011 0.020 CONINSP 0.020
075899 TRAFFIC SIGNAL OPERATION ON EAST GATE & WEST GATE AVENUES FROM HPP 2011 0.669 CONST 0.669
STRONG AVE. TO DELAWARE AVE IN VILLAGE OF LINDENHURST.(NY282) NFA 2011 0.167 CONST 0.167
AQC:A10 SUFFOLK TPC : $0.6-$1.5 M TOTAL 4YR COST : 0.936 0.936 0.000 0.000 0.000
LOCAL REHABILITATION OF DETERIORATED PAVEMENT, DRAINGAGE TO PREVENT HPP 2011 0.061 CONINSP 0.061
FLLODING, SIDE WALKS & CURBS FOR PEDESRIAN SAFETY IN NORTH QUEENS NFA 2011 0.015 CONINSP 0.015
075900 AVE FROM GRAND AVE TO FRANK ST AND FROM GRAND AVE FROM NORTH HPP 2011 0.505 CONST 0.505
RAILROAD TO FRANK STREET IN LINDENHURST VILLAGE.(NY 287,HPP#280 NFA 2011 0.126 CONST 0.126
AQC:A10 SUFFOLK TPC : $0.6-$1.5 M TOTAL 4YR COST : 0.707 0.707 0.000 0.000 0.000
LOCAL REHABILITATION & RECONSTRUCTION OF DETERIORATED SIDE WALKS, HPP 2011 0.082 CONINSP 0.082
PAVEMENT, DRAINAGE,CURBS TO REGAINS THE INTERGRETY OF ROADWAY IN NFA 2011 0.021 CONINSP 0.021
075901 EAST AND WEST JOHN STREETS FROM NEW YORK AVE TO CENTER AVENUE IN HPP 2011 0.685 CONST 0.685
VILLAGE OF LINDENHURST.(NY 344,HPP#876) NFA 0.171 CONST 0.171
2011
HPP 2011 0.034 DETLDES 0.034
NFA 2011 0.009 DETLDES 0.009
AQC:A10 SUFFOLK TPC : $0.6-$1.5 M TOTAL 4YR COST : 1.002 1.002 0.000 0.000 0.000
** NEW YORK STATE DEPARTMENT OF TRANSPORTATION **
Friday, August 26, 2011 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) on Draft Program Page 10 of 84
for REGION 10
AGENCY PROJECT DESCRIPTION TOTAL 4-YEAR PROGRAM (FFY)
4-YEAR PHASE Starting October 01, 2010
FUND SOURCES FFY
PIN PROGRAM
FFY FFY FFY FFY
in millions
of dollars 2011 2012 2013 2014
AQ CODE COUNTY TOTAL PROJECT COST
LOCAL THE TOWN OF SMITHTOWN IS INSTALLING TRAFFIC SIGNAL PREEMPTION HPP 2011 0.008 CONINSP 0.008
DEVICES ON TRAFFIC SIGNALS THROUGHOUT THE TOWN. THESE DEVICES WILL NFA 2011 0.002 CONINSP 0.002
075904 AUTOMATICALLY CHANGE TRAFFIC SIGNALS TO GREEN FOR EMERGENCY HPP 2011 0.352 CONST 0.352
VEHICLE DURING EMERGENCIES. SAFETEA-LU# 3676 NFA 2011 0.088 CONST 0.088
AQC:A7 SUFFOLK TPC : < $0.75 M TOTAL 4YR COST : 0.450 0.450 0.000 0.000 0.000
LOCAL REHABILITATE PAVEMENT, DRAINAGE SYSTEM A, CURB & SIDEWALK TO AVID HPP 2011 0.032 CONINSP 0.032
FLOODING PROBLEM AND PEDESTRIAN SAFETY ON CHURCH STREET BETWEEN NFA 2011 0.008 CONINSP 0.008
075905 NY25A AND KOHR RD IN SMITHTOWN.(HPP#3590,NY622,HPP#2286, NY 490) HPP 2011 0.336 CONST 0.336
NFA 2011 0.084 CONST 0.084
HPP 2011 0.080 DETLDES 0.080
NFA 2011 0.020 DETLDES 0.020
HPP 2011 0.032 SCOPING 0.032
NFA 2011 0.008 SCOPING 0.008
AQC:A10 SUFFOLK TPC : < $0.75 M TOTAL 4YR COST : 0.600 0.600 0.000 0.000 0.000
LOCAL REHABILITATION OF DETERIORATED PAVEMENT,CURBS AND SIDEWALKS FOR HPP 2011 0.236 CONINSP 0.236
RIDERS, PEDESTRIAN SAFETY ON WEST NECK ROAD FROM THE NFA 2011 0.059 CONINSP 0.059
075913 HUNTINGTON-LLOYD HARBOR BOUNDARY TO THE END OF THE VILLAGE IN THE HPP 2011 1.967 CONST 1.967
VILLAGE OF LLOYD HARBOR.HPP # 1675 NFA 2011 0.492 CONST 0.492
HPP 2011 0.197 DETLDES 0.197
NFA 2011 0.049 DETLDES 0.049
AQC:A10 SUFFOLK TPC : $2-$4 M TOTAL 4YR COST : 3.000 3.000 0.000 0.000 0.000
NASSAU CO. REHABILITATION OF BROOKSIDE AVENUE FROM FOREST AVE TO GREENWICH STP LG URBAN 2012 0.400 CONINSP 0.400
STREET IN ROOSEVELT INCLUDES RESURFACING OF DETERIORATED NFA 2012 0.100 CONINSP 0.100
075919 PAVEMENT,DRAINAGE, NEW CURBS, SIDEWALK, DRAINAGE AS WELL AS STP LG URBAN 2012 3.600 CONST 3.600
INTERSECTION TURNING RADII MPROVEMENTS TO IMPROVE DRIVER SAFETY NFA 2012 0.900 CONST 0.900
AQC:D1P NASSAU TPC : $4.6-$7.5 M TOTAL 4YR COST : 5.000 0.000 5.000 0.000 0.000
** NEW YORK STATE DEPARTMENT OF TRANSPORTATION **
Friday, August 26, 2011 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) on Draft Program Page 11 of 84
for REGION 10
AGENCY PROJECT DESCRIPTION TOTAL 4-YEAR PROGRAM (FFY)
4-YEAR PHASE Starting October 01, 2010
FUND SOURCES FFY
PIN PROGRAM
FFY FFY FFY FFY
in millions
of dollars 2011 2012 2013 2014
AQ CODE COUNTY TOTAL PROJECT COST
LOCAL RECONSTRUCTION OF BROOKSITE DRIVE FROM NY 25/25A TO RT. 347, HPP 2011 0.048 CONINSP 0.048
RESURFACE DETERIORATED PAVEMENT, REPAIR DRAINAGE SYSTEM PREVENT NFA 2011 0.012 CONINSP 0.012
075928 FLOODING .REPAIR DAMAGED CURBS & SIDEWALKS FOR PEDESTRAIN AND HPP 2011 0.400 CONST 0.400
TRAFFIC SAFETY(NY619 NFA 2011 0.100 CONST 0.100
HPP 2011 0.088 DETLDES 0.088
NFA 2011 0.022 DETLDES 0.022
HPP 2011 0.040 PRELDES 0.040
NFA 2011 0.010 PRELDES 0.010
AQC:A10 SUFFOLK TPC : $0.6-$1.5 M TOTAL 4YR COST : 0.720 0.720 0.000 0.000 0.000
LOCAL HERB HILL/GARVIES POINT ROAD RECONSTRUCTION PROJECT INCLUDING STP LG URBAN 2011 1.497 DETLDES 1.497
PAVING, DRAINAGE AND SIDEWALKS. THIS PROJECT WILL GO FROM THE NFA 2011 0.374 DETLDES 0.374
075934 GLENCOVE CONNECTOR (075745) TO THE PROPOSED FERRY TERMINAL. THIS 1.2 TCSP 2011 0.534 DETLDES 0.534
MILE SECTION ABUTTING GLEN COVE CREEK IS AN ACCESS ROAD NFA 0.133 DETLDES 0.133
2011
AQC:A10P NASSAU TPC : $7.5-$12 M TOTAL 4YR COST : 2.538 2.538 0.000 0.000 0.000
LOCAL REPLACE OCEAN BEACH FERRY TERMINAL , FIRE ISLAND NATIONAL SEASHORE FBD 2011 0.249 CONINSP 0.249
WITH NEW SUB & SUPERSTRUCTURE. NEW DECK WILL HOUSE STORAGE NFA 2011 0.062 CONINSP 0.062
075950 FACILITIES, PUBLIC RESTROOMS, BOARD ROOM & POLICE BARRACKS. ELEVATE FBD 2011 2.339 CONST 2.339
STRUCTURE TO RELIEVE MAJOR FLOODING PROBLEM. NFA 2011 0.585 CONST 0.585
FBD 2011 0.160 DETLDES 0.160
NFA 2011 0.040 DETLDES 0.040
FBD 2011 0.060 PRELDES 0.060
NFA 2011 0.015 PRELDES 0.015
AQC:B8 SUFFOLK TPC : $3.3-$5.6 M TOTAL 4YR COST : 3.510 3.510 0.000 0.000 0.000
SUFFOLK CO. DESIGN AND CONSTRUCTION OF NEW COMPRESSED NATURAL GAS FUELING CMAQ 2011 0.400 DETLDES 0.400
STATIONS & ACCESSORY FACILITIES THAT WILL FACILITATE THE CONVERSION NFA 2011 0.100 DETLDES 0.100
075961 OF SUFFOLK COUNTY FLEET VEHICLES TO "GREEN" LESS POLLUTING VEHICLES NFA 2014 2.000 CONST 2.000
AND COUNTY EMPLOYEE CNG FUEL TRAINING PROGRAM.
AQC:K01P SUFFOLK TPC : $2-$4 M TOTAL 4YR COST : 2.500 0.500 0.000 0.000 2.000
NASSAU CO. NASSAU COUNTY INCIDENT MANAGEMENT SYSTEM PHASE 2. MAXIMIZES THE CMAQ 2011 0.144 CONINSP 0.144
EFFICIENCY OF TRAFFIC FLOW ALONG MAJOR ARTERIES BY INSTALLING AN NFA 2011 0.036 CONINSP 0.036
075963 INCIDENT MANAGEMENT SYSTEM (VIDEO CAMERAS). (FORMERLY PIN: 0T1938) CMAQ 2011 1.296 CONST 1.296
NFA 2011 0.324 CONST 0.324
AQC:A6P NASSAU TPC : $1.2-$2.5 M TOTAL 4YR COST : 1.800 1.800 0.000 0.000 0.000
** NEW YORK STATE DEPARTMENT OF TRANSPORTATION **
Friday, August 26, 2011 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) on Draft Program Page 12 of 84
for REGION 10
AGENCY PROJECT DESCRIPTION TOTAL 4-YEAR PROGRAM (FFY)
4-YEAR PHASE Starting October 01, 2010
FUND SOURCES FFY
PIN PROGRAM
FFY FFY FFY FFY
in millions
of dollars 2011 2012 2013 2014
AQ CODE COUNTY TOTAL PROJECT COST
LOCAL VILLAGE OF NEW HYDE PARK WILL INSTALL A PLANTED MEDIAN AREA FOR .5 HPP 2011 0.160 CONINSP 0.160
MILE AS WELL AS RECONSTRUCT EXISTING SIDEWALKS WITH BRICK PAVERS, NFA 2011 0.040 CONINSP 0.040
075973 INSTALL SIDEWALK LIGHTING AND BENCHES AND TREE PLANTING FOR HPP 2011 1.440 CONST 1.440
PEDESTRIAN SAFETY. NY398 NFA 2011 0.360 CONST 0.360
NFA 2011 0.450 DETLDES 0.450
AQC:C11 NASSAU TPC : $2-$4 M TOTAL 4YR COST : 2.450 2.450 0.000 0.000 0.000
LOCAL TOWN OF HEMPSTEAD REVITALIZE GENERAL BUSINESS DISTRICT IN THE VLG. TCSP 2011 0.133 CONST 0.133
OF CEDARHURST TO UPGRADE A DETERIORATED MAJOR REGIONAL SHOPPING NFA 2011 0.063 CONST 0.063
075976 HUB. THE PROJECT INCLUDES ADDITIONAL STREET LIGHTING,REFURBISH
SIDEWALKS, REHAB.DRAINAGE, BRICK CROSS WALKS WAYS PED. & SIGN
AQC:A10 NASSAU TPC : < $0.75 M TOTAL 4YR COST : 0.196 0.196 0.000 0.000 0.000
LOCAL MASONRY AND LIGHTING IMPROVEMENTS TO PEDESTRIAN SIDEWALKS ALONG TCSP 2011 0.043 CONINSP 0.043
HEMPSTEAD AVE. BETWEEN LAKEVIEW AVE AND OCEAN AVENUE IN THE NFA 2011 0.010 CONINSP 0.010
075977 VILLAGE OF MALVERNE, NASSAU COUNTY (FORMERLY PIN: 0T2399). THIS TCSP 2011 0.313 CONST 0.313
PROJECT WILL INCREASE PEDESTRIAN/BICYCLE ACTIVITY IN AN ATTRACTIVE, NFA CONST
2011 0.078 0.078
SAFER, AND ADA COMPLIANT ENVIRONMENT.
AQC:A18 NASSAU TPC : < $0.75 M TOTAL 4YR COST : 0.444 0.444 0.000 0.000 0.000
SUFFOLK CO. BRIDGE REPLACEMENT OF CR 46 (WILLIAM FLOYD PARKWAY) OVER NARROW STP LG URBAN 2011 0.800 PRELDES 0.800
BAY,DUE TO STRUCTURAL DEFICIENCIES AND IMPROVE ALIGNMENT, IN THE NFA 2011 0.200 PRELDES 0.200
075978 TOWN OF BROOKHAVEN. BIN 3300770. STP LG URBAN 2012 0.800 SCOPING 0.800
NFA 2012 0.200 SCOPING 0.200
HBRR 2014 6.000 DETLDES 6.000
NFA 2014 1.500 DETLDES 1.500
AQC:J1Z SUFFOLK TPC : $7.5-$12 M TOTAL 4YR COST : 9.500 1.000 1.000 0.000 7.500
SUFFOLK CO. CR16, HORSEBLOCK ROAD/LIRR BRIDGE REPLACEMENT DUE TO STRUCTURAL STP LG URBAN 2011 0.680 PRELDES 0.680
DEFICIENCIES, IN THE TOWN OF BROOKHAVEN. BIN 3300800. NFA 2011 0.170 PRELDES 0.170
075979 HBRR 2014 1.018 CONINSP 1.018
NFA 2014 0.254 CONINSP 0.254
HBRR 2014 10.182 CONST 10.182
NFA 2014 2.545 CONST 2.545
AQC:A19P SUFFOLK TPC : $21-$31 M TOTAL 4YR COST : 14.849 0.850 0.000 0.000 13.999
** NEW YORK STATE DEPARTMENT OF TRANSPORTATION **
Friday, August 26, 2011 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) on Draft Program Page 13 of 84
for REGION 10
AGENCY PROJECT DESCRIPTION TOTAL 4-YEAR PROGRAM (FFY)
4-YEAR PHASE Starting October 01, 2010
FUND SOURCES FFY
PIN PROGRAM
FFY FFY FFY FFY
in millions
of dollars 2011 2012 2013 2014
AQ CODE COUNTY TOTAL PROJECT COST
NASSAU CO. CONSTRUCT ACCESS ROAD AND EXIT LANES FOR CENTER FOR ADVANCED HPP 2011 0.179 CONINSP 0.179
MEDICINE OF LIJ HOSPITAL ON LAKEVILLE ROAD. SAFETEA-LU #2575, NY 525. NFA 2011 0.045 CONINSP 0.045
075980 THE PRIMARY ACCESS ROAD TO THE FACILITY ON THE WESTSIDE OF LAKEVILLE HPP 2011 1.433 CONST 1.433
ROAD WILL ENLARGED WITH EXTRA LANE. NFA 2011 0.358 CONST 0.358
HPP 2011 0.159 DETLDES 0.159
NFA 2011 0.040 DETLDES 0.040
HPP 2011 0.020 PRELDES 0.020
NFA 2011 0.005 PRELDES 0.005
AQC:J1Z NASSAU TPC : $2-$4 M TOTAL 4YR COST : 2.239 2.239 0.000 0.000 0.000
NASSAU CO. NASSAU COUNTY RESURFACING 2011. REHABILITAE EXISTING ROAD STP LG URBAN 2011 3.000 CONST 3.000
PAVEMENTS IN ORDER TO PROVIDE FOR BETTER AND SAFTER SURFACES NFA 2011 0.750 CONST 0.750
075981
AQC:A10P NASSAU TPC : $3.3-$5.6 M TOTAL 4YR COST : 3.750 3.750 0.000 0.000 0.000
LOCAL THE TOWN OF BROOKHAVEN IS RESURFACING VARIOUS ROADWAYS IN MASTIC HPP 2011 0.027 CONINSP 0.027
BEACH. THESE ROADS HAVE DETERIORATED TO THE POINT THAT PAVEMENT NFA 2011 0.007 CONINSP 0.007
075982 RESURFACING IS NECESSARY TO MAINTAIN THE CURRENT TRANSPORTATION HPP 2011 0.248 CONST 0.248
SYSTEM.HPP#3601,NY 629 NFA 0.062 CONST 0.062
2011
AQC:A10 SUFFOLK TPC : < $0.75 M TOTAL 4YR COST : 0.344 0.344 0.000 0.000 0.000
LOCAL THE TOWN OF BROOKHAVEN IS RESURFACING TOTAL 2.8 MILES IN OLD TOWN HPP 2011 0.029 CONINSP 0.029
RD. FROM RTE 347 TO SLATTERY RD.THESE ROADS ARE DETERIORATED TO THE NFA 2011 0.007 CONINSP 0.007
075983 POINT THAT PAVEMENT RESURFACING IS NECESSARY TO MAINTAIN THE HPP 2011 0.261 CONST 0.261
CURRENT TRANSPORTATION SYSTEM, NY623 NFA 2011 0.065 CONST 0.065
AQC:A10 SUFFOLK TPC : < $0.75 M TOTAL 4YR COST : 0.362 0.362 0.000 0.000 0.000
LOCAL THE TOWN OF BROOKHAVEN IS RESURFACING 3.33 MILES OF ROADWAYS IN THE HPP 2011 0.034 CONINSP 0.034
HAMLET OF MEDFORD. THESE ROADS ARE DETERIORATED TO THE POINT THAT NFA 2011 0.009 CONINSP 0.009
075984 PAVEMENT IMPROVEMENT IS NECESSARY TO MAINTAIN THE CURRENT HPP 2011 0.310 CONST 0.310
TRANSPORTATION SYSTEM. NY626 NFA 2011 0.077 CONST 0.077
AQC:A10 SUFFOLK TPC : < $0.75 M TOTAL 4YR COST : 0.430 0.430 0.000 0.000 0.000
** NEW YORK STATE DEPARTMENT OF TRANSPORTATION **
Friday, August 26, 2011 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) on Draft Program Page 14 of 84
for REGION 10
AGENCY PROJECT DESCRIPTION TOTAL 4-YEAR PROGRAM (FFY)
4-YEAR PHASE Starting October 01, 2010
FUND SOURCES FFY
PIN PROGRAM
FFY FFY FFY FFY
in millions
of dollars 2011 2012 2013 2014
AQ CODE COUNTY TOTAL PROJECT COST
LOCAL THE TOWN OF BROOKHAVEN IN HAMLET OF GORDON HEIGHT INSTALLING SIDE HPP 2011 0.029 CONINSP 0.029
WALKS, CURBS WHERE DOES NOT EXIST AND DRAINGAGE SYSTEM TO NFA 2011 0.008 CONINSP 0.008
075985 PREVENT WATER FILTERATION ON SIDE WALKS AND CURBS. NY 627 HPP 2011 0.266 CONST 0.266
NFA 2011 0.067 CONST 0.067
AQC:C2 SUFFOLK TPC : < $0.75 M TOTAL 4YR COST : 0.370 0.370 0.000 0.000 0.000
LOCAL GLEN COVE FERRY TERMINAL & BOAT BASIN PHASE 2 - THE CONSTRUCTION OF FBD 2011 0.195 CONINSP 0.195
A FERRY TERMINAL BUILDING. NFA 2011 0.744 CONINSP 0.744
075986 FBD 2011 1.755 CONST 1.755
NFA 2011 0.439 CONST 0.439
AQC:B10 NASSAU TPC : $2-$4 M TOTAL 4YR COST : 3.133 3.133 0.000 0.000 0.000
SUFFOLK CO. INTERSECTION RECONSTRUCTION AT CR3, PINELAWN ROAD/RULAND HPP 2011 1.776 ROWACQU 1.776
ROAD/COLONIAL SPRINGS ROAD INCLUDING ADDING A LANE EACH DIRECTION NFA 2011 0.444 ROWACQU 0.444
075987 ON COLONIAL SPRING RD. APPROXIMATELY 3,500 FEET FROM THE STP LG URBAN 2012 1.025 CONINSP 1.025
INTERSECTION TO LITTLE EAST NECK ROAD, IN THE TOWN OF HUNTINGTON NFA CONINSP
2012 0.256 0.256
ACT600
STP LG URBAN 2012 9.225 CONST 9.225
NFA 2012 2.306 CONST 2.306
AQC:D1P SUFFOLK TPC : $12.5-$19 M TOTAL 4YR COST : 15.032 2.220 12.812 0.000 0.000
LOCAL HOFSTRA UNIVERSITY IS RESURFACE AND UPGRADE THE PARKING LOTS, TCSP 2011 0.580 CONST 0.580
INSTALL SIGNAGE , PUT NEW SIDE WALKS TO ENHANCE PEDESTRIAN FLOW NFA 2011 0.145 CONST 0.145
075988 THROUGHOUT CAMPUS & PROMOTE SAFETY & BUILD PEDESTRIAN BRIDGE
UNIFYING HOFSTRA UNIVERSITYS CAMPUS ON THE NORTH & SOUTH SIDE
AQC:A10 NASSAU TPC : $0.6-$1.5 M TOTAL 4YR COST : 0.725 0.725 0.000 0.000 0.000
LOCAL HOFSTRA UNIVERSITY SAFE AND SUSTANINABLE PROJECTS- PURCHASES CNG TCSP 2011 0.184 CONST 0.184
SHUTTLE BUSES FOR SOUTH AND NORTH CAMPUS. (SPLIT FROM NFA 2011 0.046 CONST 0.046
075989 PIN#075988)TCSP08NY001UNIFYING HOFSTRA UNIVERSITYS CAMPUS ON THE
NORTH & SOUTH SIDE
AQC:A10 NASSAU TPC : $0.6-$1.5 M TOTAL 4YR COST : 0.230 0.230 0.000 0.000 0.000
** NEW YORK STATE DEPARTMENT OF TRANSPORTATION **
Friday, August 26, 2011 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) on Draft Program Page 15 of 84
for REGION 10
AGENCY PROJECT DESCRIPTION TOTAL 4-YEAR PROGRAM (FFY)
4-YEAR PHASE Starting October 01, 2010
FUND SOURCES FFY
PIN PROGRAM
FFY FFY FFY FFY
in millions
of dollars 2011 2012 2013 2014
AQ CODE COUNTY TOTAL PROJECT COST
NYSDOT LONG ISLAND COMMUTER CHOICE: CONTINUE TRAVEL DEMAND MANAGEMENT CMAQ 2011 2.000 OPER 2.000
CONSULTANT PROGRAM TO REDUCE TRAVEL DEMAND IN NASSAU AND NFA 2011 0.500 OPER 0.500
080395 SUFFOLK COUNTY CMAQ 2012 2.000 OPER 2.000
NFA 2012 0.500 OPER 0.500
CMAQ 2013 2.000 OPER 2.000
NFA 2013 0.500 OPER 0.500
CMAQ 2014 2.000 OPER 2.000
NFA 2014 0.500 OPER 0.500
AQC:NON MULTI TPC : $21-$31 M TOTAL 4YR COST : 10.000 2.500 2.500 2.500 2.500
NYSDOT PROVIDE ACCESS SIGNS ON LOCAL ROADS TO NY25 IN THE TOWN OF OYSTER NFA 2012 0.322 CONINSP 0.322
BAY, I495 IN THE TOWN OF ISLIP, NSP IN THE TOWN OF HUNTINGTON AND NY27 NFA 2012 3.225 CONST 3.225
080429 IN THE TOWNS OF BABYLON, BROOKHAVEN & SOUTHAMPTON , NASSAU &
SUFFOLK COUNTIES.
AQC:C13P MULTI TPC : $3.3-$5.6 M TOTAL 4YR COST : 3.547 0.000 3.547 0.000 0.000
NYSDOT PROVIDE SAFETY IMPROVEMENTS AT INTERCHANGES (LOCATIONS NFA 2011 0.215 PRELDES 0.215
TO-BE-DETERMINED) ON VARIOUS STATE HIGHWAYS & PARKWAYS IN NASSAU NFA 2012 0.506 CONINSP 0.506
080434 & SUFFOLK COUNTIES. NFA 2012 5.058 CONST 5.058
AQC:A6P MULTI TPC : $4.6-$7.5 M TOTAL 4YR COST : 5.779 0.215 5.564 0.000 0.000
NYSDOT BRIDGE PARAPET REPLACEMENTS TO UPGRADE NON STANDARD PAPRAPET AND HBRR 2013 0.609 CONINSP 0.609
APPROACH GUIDERAIL AND INSTALLATION OF PEDESTRIAN FENCING NFA 2013 0.450 CONINSP 0.450
080495 (LOCATIONS TO BE DETERMINED) ON VARIOUS STATE HIGHWAYS & PKWYS IN HBRR 2013 6.090 CONST 6.090
THE TOWNS OF HEMPSTEAD, N. HEMPSTEAD & OYSTER BAY, NASSAU COUNTY NFA 2013 4.501 CONST 4.501
AQC:A19P MULTI TPC : $9.5-15.5 M TOTAL 4YR COST : 11.650 0.000 0.000 11.650 0.000
NYSDOT INCIDENT MANAGEMENT--HELP VEHICLES ON THE LONG ISLAND EXPRESSWAY CMAQ 2011 2.400 OPER 2.400
AND PARKWAYS TO REDUCE THE HIGHWAY CONGESTION. NASSAU AND NFA 2011 0.600 OPER 0.600
080556 SUFFOLK COUNTY CMAQ 2013 2.400 OPER 2.400
NFA 2013 0.600 OPER 0.600
AQC:A6P MULTI TPC : $9.5-15.5 M TOTAL 4YR COST : 6.000 3.000 0.000 3.000 0.000
** NEW YORK STATE DEPARTMENT OF TRANSPORTATION **
Friday, August 26, 2011 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) on Draft Program Page 16 of 84
for REGION 10
AGENCY PROJECT DESCRIPTION TOTAL 4-YEAR PROGRAM (FFY)
4-YEAR PHASE Starting October 01, 2010
FUND SOURCES FFY
PIN PROGRAM
FFY FFY FFY FFY
in millions
of dollars 2011 2012 2013 2014
AQ CODE COUNTY TOTAL PROJECT COST
NASSAU CO. IMP. OF PRG TO REDUCE THE # OF SOV ON THE RD DURING COMM. HRS. ACT AS NFA 2011 0.160 MISC 0.160
AN INFORM. RESOURCE FOR LOC GOVTS AND PVT INDUSTRIES INT. IN EST.
080634 CAR/VANPOOLING, PREF PARKING, GUAR. RIDE HOME PGMS, FLEXTIME, ENC.
EMP. USE OF PUB TRANSIT & THE ADOPT OF IRC SECT.132. THIS PROJECT
ATTEMPTS TO PROMOTE ALTERNATIVES TO SOV USE THROUGH
EMPLOYER/EMPLOYEE PROMOTIONAL CAMPAIGNS FOCUSED TOWARD LARGE
EMPLOYERS (ORGANIZATIONS WITH OVER 500 EMPLOYEES) THROUGHOUT
NASSAU COUNTY.
AQC:C1P NASSAU TPC : $1.2-$2.5 M TOTAL 4YR COST : 0.160 0.160 0.000 0.000 0.000
NYSDOT SUFFOLK EXPRESS COMMUTER BUS SERVICE ALONG THE LONG ISLAND STP FLEX 2011 0.752 OPER 0.752
EXPRESSWAY I495 FROM CENTERAL SUFFOLK COUNTY TO THE HAUPPAUGE NFA 2011 0.300 OPER 0.300
080659 INDUSTRIAL PARK AND NY 110 CORRIDOR STP FLEX 2012 0.752 OPER 0.752
NFA 2012 0.188 OPER 0.188
STP FLEX 2013 0.752 OPER 0.752
NFA 2013 0.188 OPER 0.188
STP FLEX 2014 0.806 OPER 0.806
NFA 2014 0.200 OPER 0.200
AQC:B1P SUFFOLK TPC : $4.6-$7.5 M TOTAL 4YR COST : 3.938 1.052 0.940 0.940 1.006
NYSDOT INTELLIGENT TRANSPORTATION SERVICE PERSONAL SERVICE CONSULTANT NHS 2011 4.000 OPER 4.000
CONTRACT TO PROVIDE SUPPORT STAFF TO INFORM OPERATIONS NFA 2011 1.000 OPER 1.000
080665 NHS 2012 3.200 OPER 3.200
NFA 2012 0.800 OPER 0.800
NHS 2013 4.000 OPER 4.000
NFA 2013 1.000 OPER 1.000
NHS 2014 4.000 OPER 4.000
NFA 2014 1.000 OPER 1.000
AQC:A6P MULTI TPC : $26-$40 M TOTAL 4YR COST : 19.000 5.000 4.000 5.000 5.000
NYSDOT ANNUAL PROGRAM TO PROVIDE STAFF TO OPERATE THE INFORM CONTROL NHS 2011 1.440 OPER 1.440
CENTER IN HAUPPAUGUE, SUFFOLK COUNTY NFA 2011 0.360 OPER 0.360
080676 CMAQ 2014 2.800 OPER 2.800
NFA 2014 0.700 OPER 0.700
AQC:A7P MULTI TPC : $21-$31 M TOTAL 4YR COST : 5.300 1.800 0.000 0.000 3.500
** NEW YORK STATE DEPARTMENT OF TRANSPORTATION **
Friday, August 26, 2011 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) on Draft Program Page 17 of 84
for REGION 10
AGENCY PROJECT DESCRIPTION TOTAL 4-YEAR PROGRAM (FFY)
4-YEAR PHASE Starting October 01, 2010
FUND SOURCES FFY
PIN PROGRAM
FFY FFY FFY FFY
in millions
of dollars 2011 2012 2013 2014
AQ CODE COUNTY TOTAL PROJECT COST
NYSDOT PROVIDE MAINTENANCE TO COMMUNICATION EQUIPMENT INCL. ALL NHS 2012 2.000 OPER 2.000
COMPUTERIZED TRAFFIC MANAGEMENT SYSTEMS, VIDEO SURVEILLANCE & NFA 2012 0.500 OPER 0.500
080720 DETECTORS, VARIABLE MESSAGE SIGNS, CLOSED CIRCUIT TELEVISIONS, NHS 2013 1.200 OPER 1.200
HIGHWAY ADVISORY RADIO & RELATED EQUIP. TO MAINT. STATE OF GOOD NFA 2013 0.300 OPER 0.300
REPAIR
NHS 2014 1.200 OPER 1.200
NFA 2014 0.300 OPER 0.300
AQC:A10P MULTI TPC : $9.5-15.5 M TOTAL 4YR COST : 5.500 0.000 2.500 1.500 1.500
NYSDOT PROVIDE ENGINEERING SERVICES & CONSTRUCTION SUPPORT FOR THE INFORM NHS 2011 2.000 PRELDES 2.000
SYSTEM NFA 2011 0.500 PRELDES 0.500
080730 NHS 2012 2.000 PRELDES 2.000
NFA 2012 0.500 PRELDES 0.500
NHS 2013 2.000 PRELDES 2.000
NFA 2013 0.500 PRELDES 0.500
NHS 2014 2.200 PRELDES 2.200
NFA 2014 0.550 PRELDES 0.550
AQC:A7P MULTI TPC : $26-$40 M TOTAL 4YR COST : 10.250 2.500 2.500 2.500 2.750
NYSDOT TRAFFIC ENGINEERING AND SAFETY STUDIES, VARIOUS LOCATIONS HSIP 2012 1.827 SCOPING 1.827
THROUGHOUT NASSAU AND SUFFOLK COUNTIES. NFA 2012 0.203 SCOPING 0.203
080732
AQC:C3 MULTI TPC : $2-$4 M TOTAL 4YR COST : 2.030 0.000 2.030 0.000 0.000
NYSDOT TRAFFIC SIGNAL TIMING AND ARTERIAL OPTIMIZATION VARIOUS STATE CMAQ 2011 1.200 OPER 1.200
HIGHWAYS IN NASSAU COUNTY NFA 2011 0.300 OPER 0.300
080768 CMAQ 2013 1.200 OPER 1.200
NFA 2013 0.300 OPER 0.300
AQC:A7P NASSAU TPC : $3.3-$5.6 M TOTAL 4YR COST : 3.000 1.500 0.000 1.500 0.000
NYSDOT SIGNAL TIMING UPGRADE AND ARTERIAL OPTIMIZATION VARIOUS STATE CMAQ 2011 1.200 OPER 1.200
HIGHWAYS IN SUFFOLK COUNTY NFA 2011 0.300 OPER 0.300
080769 CMAQ 2013 1.200 OPER 1.200
NFA 2013 0.300 OPER 0.300
AQC:A7P SUFFOLK TPC : $3.3-$5.6 M TOTAL 4YR COST : 3.000 1.500 0.000 1.500 0.000
** NEW YORK STATE DEPARTMENT OF TRANSPORTATION **
Friday, August 26, 2011 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) on Draft Program Page 18 of 84
for REGION 10
AGENCY PROJECT DESCRIPTION TOTAL 4-YEAR PROGRAM (FFY)
4-YEAR PHASE Starting October 01, 2010
FUND SOURCES FFY
PIN PROGRAM
FFY FFY FFY FFY
in millions
of dollars 2011 2012 2013 2014
AQ CODE COUNTY TOTAL PROJECT COST
NYSDOT DEDICATED STATE POLICE SERVICES TO HELP LANE CLOSURES DURING NFA 2011 0.400 MISC 0.400
MAINTENANCE OPERATIONS ON VARIOUS STATE PARKWAYS IN NASSAU AND NFA 2012 0.400 MISC 0.400
080787 SUFFOLK COUNTIES NFA 2013 0.400 MISC 0.400
NFA 2014 0.400 MISC 0.400
AQC:A2P MULTI TPC : $2-$4 M TOTAL 4YR COST : 1.600 0.400 0.400 0.400 0.400
NYSDOT CONSTRUCT REMAINING SECTIONS OF RECREATIONAL TRAIL ALONG THE NFA 2012 0.084 CONINSP 0.084
UNDEVELOPED NY25A BYPASS ROW - PHASE 2 POSSUM LANE TO NY112 AND NFA 2012 0.833 CONST 0.833
080797 NY25A TO GNARLED HOLLOW RD IN BROOKHAVEN TOWN, SUFFOLK COUNTY.
AQC:C2P SUFFOLK TPC : $0.6-$1.5 M TOTAL 4YR COST : 0.917 0.000 0.917 0.000 0.000
NYSDOT CORRECT PRIORITY HIGHWAY FLOODING LOCATIONS AND REPLACE CATCH STP FLEX 2011 0.759 CONINSP 0.759
BASINS WITHIN ESTUARY WATERSHED AREAS WITH VORTEX TYPE BASINS ON NFA 2011 0.190 CONINSP 0.190
080810 VARIOUS STATE HIGHWAYS IN NASSAU & SUFFOLK COUNTIES. STP FLEX 2011 7.589 CONST 7.589
NFA 2011 1.900 CONST 1.900
AQC:A2P MULTI TPC : $9.5-15.5 M TOTAL 4YR COST : 10.438 10.438 0.000 0.000 0.000
NYSDOT BRIDGE PARAPET REPLACEMENTS TO MAINTAIN STATE OF GOOD REPAIR IN THE NFA 2012 1.246 CONINSP 1.246
TOWNS OF BABYLON, HEMPSTEAD & ISLIP, NASSAU & SUFFOLK COUNTIES. NFA 2012 12.460 CONST 12.460
080812
AQC:A19P MULTI TPC : $12.5-$19 M TOTAL 4YR COST : 13.706 0.000 13.706 0.000 0.000
NYSDOT PROVIDE MAINTENANCE TO COMMUNICATION EQUIPMENT INCLUD. ALL NHS 2012 5.600 OPER 5.600
COMPUTERIZED TRAFFIC MANAGEMENT SYSTEMS, VIDEO SURVEILLANCE & NFA 2012 1.400 OPER 1.400
080814 DETECTORS, VARIABLE MESSAGE SIGNS, HIGHWAY ADVISORY RADIO & NHS 2013 5.600 OPER 5.600
RELATED EQUIP. TO MAINT. STATE OF GOOD REPAIR IN NASSAU AND SUFFOLK NFA 2013 1.400 OPER 1.400
CO.
AQC:A6P MULTI TPC : $26-$40 M TOTAL 4YR COST : 14.000 0.000 7.000 7.000 0.000
NYSDOT CORRECT PRIORITY HIGHWAY FLOODING LOCATIONS AND REPLACE CATCH STP FLEX 2012 0.430 CONINSP 0.430
BASINS WITHIN ESTUARY WATERSHED AREAS WITH VORTEX TYPE BASINS ON NFA 2012 0.107 CONINSP 0.107
080821 VARIOUS STATE HIGHWAYS IN NASSAU & SUFFOLK COUNTIES. STP FLEX 2012 4.300 CONST 4.300
NFA 2012 1.075 CONST 1.075
AQC:A2P MULTI TPC : $6-$9.4 M TOTAL 4YR COST : 5.912 0.000 5.912 0.000 0.000
** NEW YORK STATE DEPARTMENT OF TRANSPORTATION **
Friday, August 26, 2011 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) on Draft Program Page 19 of 84
for REGION 10
AGENCY PROJECT DESCRIPTION TOTAL 4-YEAR PROGRAM (FFY)
4-YEAR PHASE Starting October 01, 2010
FUND SOURCES FFY
PIN PROGRAM
FFY FFY FFY FFY
in millions
of dollars 2011 2012 2013 2014
AQ CODE COUNTY TOTAL PROJECT COST
NYSDOT INTERSECTION SAFETY IMPROVEMENTS TO EXTEND ACCELERATION AND CMAQ 2011 0.209 PRELDES 0.209
DECELERATION LANES NORTHERN STATE PARKWAY AT NY135, SOUTHERN NFA 2011 0.052 PRELDES 0.052
080823 STATE PARKWAY AT EAGLE AVENUE, NSP AT WILLIS AVENUE, SUNKEN CMAQ 2013 0.172 CONINSP 0.172
MEADOW PARKWAY AT NORTHERN STATE PARKWAY, NSP AT SO OYSTER BAY NFA CONINSP
2013 0.043 0.043
RD
CMAQ 2013 1.720 CONST 1.720
NFA 2013 0.430 CONST 0.430
HSIP 2013 0.270 CONINSP 0.270
NFA 2013 0.068 CONINSP 0.068
HSIP 2013 2.700 CONST 2.700
NFA 2013 0.300 CONST 0.300
AQC:D2P MULTI TPC : $4.6-$7.5 M TOTAL 4YR COST : 5.964 0.261 0.000 5.703 0.000
NYSDOT REIMBURSEMENTS FOR NASSAU POLICE FOR CONSTRUCTION AND NFA 2011 0.650 MISC 0.650
MAINTENANCE OPERATIONS NFA 2012 0.650 MISC 0.650
080825 NFA 2013 0.650 MISC 0.650
NFA 2014 0.650 MISC 0.650
AQC:A2S NASSAU TPC : $3.3-$5.6 M TOTAL 4YR COST : 2.600 0.650 0.650 0.650 0.650
NYSDOT REIMBURSEMENT FOR SUFFOLK COUNTY POLICE WORK FOR CONSTRUCTION NFA 2011 0.650 MISC 0.650
AND MAINTENANCE OPERATIONS NFA 2012 0.650 MISC 0.650
080826 NFA 2013 0.650 MISC 0.650
NFA 2014 0.650 MISC 0.650
AQC:A2S SUFFOLK TPC : $3.3-$5.6 M TOTAL 4YR COST : 2.600 0.650 0.650 0.650 0.650
NYSDOT RESTORE THE STRUCTURAL INTEGRITY OF DRAINAGE BASINS AND PIPES, AND NFA 2011 0.743 PRELDES 0.743
CONTROL FLOODING AT 8 LOCATIONS ON VARIOUS STATE ROADWAYS IN THE STP FLEX 2014 0.441 CONINSP 0.441
080838 TOWNS OF BABYLON, HUNTINGTON & ISLIP IN SUFFOLK COUNTY. NFA 2014 0.110 CONINSP 0.110
STP FLEX 2014 4.407 CONST 4.407
NFA 2014 1.102 CONST 1.102
AQC:C11P MULTI TPC : $6-$9.4 M TOTAL 4YR COST : 6.803 0.743 0.000 0.000 6.060
NYSDOT PROVIDE LANDSCAPE RESTORATION & MAINTAIN EXISTING LANDSCAPE AREAS, NFA 2011 0.238 CONINSP 0.238
TRIM OR REMOVE TREES THAT IMPEDE VISIBILITY ON VARIOUS STATE NFA 2011 1.983 CONST 1.983
080847 HIGHWAYS IN NASSAU & SUFFOLK COUNTIES. LOCATIONS TO BE DETERMINED.
AQC:C11S MULTI TPC : $2-$4 M TOTAL 4YR COST : 2.221 2.221 0.000 0.000 0.000
** NEW YORK STATE DEPARTMENT OF TRANSPORTATION **
Friday, August 26, 2011 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) on Draft Program Page 20 of 84
for REGION 10
AGENCY PROJECT DESCRIPTION TOTAL 4-YEAR PROGRAM (FFY)
4-YEAR PHASE Starting October 01, 2010
FUND SOURCES FFY
PIN PROGRAM
FFY FFY FFY FFY
in millions
of dollars 2011 2012 2013 2014
AQ CODE COUNTY TOTAL PROJECT COST
NYSDOT REPAIR AND REPLACE GUIDERAIL SECTIONS ON SOUTHERN STATE PARKWAY NFA 2011 1.040 CONINSP 1.040
AND OCEAN PARKWAY TO MAINTAIN A STATE OF GOOD REPAIR IN THE TOWNS NFA 2011 10.400 CONST 10.400
080852 OF BABYLON, HEMPSTEAD, ISLIP & OYSTER BAY - NASSAU & SUFFOLK
COUNTIES.
AQC:A9P NASSAU TPC : $9.5-15.5 M TOTAL 4YR COST : 11.440 11.440 0.000 0.000 0.000
NYSDOT DRAINAGE IMPROVEMENT BLOCK - CORRECT DEBILITATED DRAINAGE STP LG URBAN 2011 0.199 CONINSP 0.199
SYSTEMS OR INDIVIDUAL BASINS, RESTORE STRUCTURAL INTEGRITY OF NFA 2011 0.050 CONINSP 0.050
080857 DRAINAGE STRUCTURES/PIPES, CONTROL FLOODING ON ROUTES 24, 102 AND 25 STP LG URBAN 2011 1.616 CONST 1.616
IN HEMPSTEAD & N. HEMPSTEAD TOWNS IN NASSAU COUNTY. NFA 0.404 CONST 0.404
2011
AQC:A2P NASSAU TPC : $2-$4 M TOTAL 4YR COST : 2.269 2.269 0.000 0.000 0.000
NYSDOT DRAINAGE IMPROVEMENT BLOCK - CORRECT DEBILITATED DRAINAGE STP LG URBAN 2011 0.068 CONINSP 0.068
SYSTEMS OR INDIVIDUAL BASINS, RESTORE STRUCTURAL INTEGRITY OF NFA 2011 0.340 CONINSP 0.340
080858 DRAINAGE STRUCTURES/PIPES, CONTROL FLOODING ON ROUTES 25 AND 908K IN STP LG URBAN 2011 0.675 CONST 0.675
SUFFOLK COUNTY NFA 2011 3.537 CONST 3.537
AQC:A2P SUFFOLK TPC : $4.6-$7.5 M TOTAL 4YR COST : 4.620 4.620 0.000 0.000 0.000
NYSDOT REPAIR DETERIORATED STEEL GIRDER, INCREASE STRUCTURAL CONDITION, IM 2011 0.594 CONINSP 0.594
REMOVAL STRUCTURE FLAGS AND INCREASE THEIR RATINGS ON 16 BRIDGES IN NFA 2011 1.192 CONINSP 1.192
080860 NASSAU AND SUFFOLK COUNTIES. IM 2011 5.374 CONST 5.374
NFA 2011 11.929 CONST 11.929
AQC:C19P MULTI TPC : $15-$25 M TOTAL 4YR COST : 19.089 19.089 0.000 0.000 0.000
NYSDOT REPLACE PANELS OF OVERHEAD SIGNS WITH NEWER MORE RETRO REFLECTIVE NFA 2012 1.180 CONINSP 1.180
SIGNS TO MAINTAIN STATE OF GOOD REPAIR ON FEDERAL AID HIGHWAYS IN NFA 2012 11.800 CONST 11.800
080861 NASSAU AND SUFFOLK COUNTIES.
AQC:C13P MULTI TPC : $9.5-15.5 M TOTAL 4YR COST : 12.980 0.000 12.980 0.000 0.000
NYSDOT REHABILITATION AND REPAIR 10 CONCRETE ARCH BRIDGES TO MAINTAIN NFA 2011 0.700 CONINSP 0.700
STRUCTURAL INTEGRITY IN BABYLON TOWN, HEMPSTEAD TOWN, HUNTINGTON NFA 2011 7.000 CONST 7.000
080863 TOWN & OYSTER BAY TOWN IN NASSAU & SUFFOLK COUNTIES.
AQC:A19Z MULTI TPC : $7.5-$12 M TOTAL 4YR COST : 7.700 7.700 0.000 0.000 0.000
** NEW YORK STATE DEPARTMENT OF TRANSPORTATION **
Friday, August 26, 2011 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) on Draft Program Page 21 of 84
for REGION 10
AGENCY PROJECT DESCRIPTION TOTAL 4-YEAR PROGRAM (FFY)
4-YEAR PHASE Starting October 01, 2010
FUND SOURCES FFY
PIN PROGRAM
FFY FFY FFY FFY
in millions
of dollars 2011 2012 2013 2014
AQ CODE COUNTY TOTAL PROJECT COST
NYSDOT PREVENTATIVE MAINTENANCE BRIDGE REPAIRS TO MAINTAIN STRUCTURAL HBRR 2012 0.207 CONINSP 0.207
INTEGRITY IN NASSAU & SUFFOLK COUNTIES. (FORMERLY PIN: 0T1465) NFA 2012 0.052 CONINSP 0.052
080865 HBRR 2012 1.721 CONST 1.721
NFA 2012 0.431 CONST 0.431
AQC:A19P MULTI TPC : $2-$4 M TOTAL 4YR COST : 2.411 0.000 2.411 0.000 0.000
NYSDOT REHABILITATE 15 RECHARGE BASINS TO MAINTAIN STATE OF GOOD REPAIR ON NFA 2011 0.253 CONINSP 0.253
VARIOUS STATE HIGHWAYS IN BABYLON TOWN & HUNTINGTON TOWN IN NFA 2011 2.112 CONST 2.112
080866 SUFFOLK COUNTY.
AQC:A2S MULTI TPC : $2-$4 M TOTAL 4YR COST : 2.365 2.365 0.000 0.000 0.000
NYSDOT CLEAN CULVERTS FILLED WITH DEBRIS, REPAIR DAMAGED OR IN-NEED NFA 2011 0.238 CONINSP 0.238
CULVERTS TO PREVENT HIGHWAY FLOODING ON VARIOUS STATE HIGHWAYS IN NFA 2011 1.984 CONST 1.984
080870 NASSAU & SUFFOLK COUNTIES.
AQC:A6S MULTI TPC : $2-$4 M TOTAL 4YR COST : 2.222 2.222 0.000 0.000 0.000
NYSDOT REMOVAL OR PAINT OVER OF GRAF, REPAIR NOISE WALLS WHERE WOOD &/OR NFA 2011 0.322 CONINSP 0.322
PLASTIC PLANKING HAS WARPED, MAINTAIN THE 7 PARK & RIDE LOTS ALONG NFA 2011 3.219 CONST 3.219
080872 I495, ALL NYS BIKEWAYS, REST AREAS, PUBLIC TELEPHONE AREAS ALONG
PARKWAYS & BUS SHELTERS ON NYS RIGHT-OF-WAY NAS&SUF CO.
AQC:C8S MULTI TPC : $3.3-$5.6 M TOTAL 4YR COST : 3.541 3.541 0.000 0.000 0.000
NYSDOT IMPROVE DEBILITATED DRAINAGE SYSTEMS AND ISOLATED FLOODING AREAS; NFA 2011 0.638 DETLDES 0.638
CONTROL FLOODING TO PROMOTE SAFER TRAFFIC MOVEMENT; IMPROVE NFA 2011 0.051 SCOPING 0.051
080874 QUALITY OF HIGHWAY RUNOFF TO ADJACENT SURFACE WATERS IN THE TOWNS NFA 2013 1.150 ROWACQU 1.150
OF E. HAMPTON, RIVERHEAD, SOUTHAMPTON & SOUTHOLD, SUFFOLK CO. NFA CONINSP
2014 0.681 0.681
NFA 2014 6.809 CONST 6.809
AQC:A2P SUFFOLK TPC : $7.5-$12 M TOTAL 4YR COST : 9.329 0.689 0.000 1.150 7.490
NYSDOT RESPOND TO EMERGENCIES THAT ARE BEYOND THE CAPABILITIES OF NYS NFA 2011 0.249 CONINSP 0.249
MAINTENANCE FORCES TO ENSURE THE SAFETY OF THE PUBLIC ON VARIOUS NFA 2011 2.077 CONST 2.077
080875 STATE HIGHWAYS IN NASSAU & SUFFOLK COUNTIES.
AQC:A2S MULTI TPC : $2-$4 M TOTAL 4YR COST : 2.326 2.326 0.000 0.000 0.000
** NEW YORK STATE DEPARTMENT OF TRANSPORTATION **
Friday, August 26, 2011 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) on Draft Program Page 22 of 84
for REGION 10
AGENCY PROJECT DESCRIPTION TOTAL 4-YEAR PROGRAM (FFY)
4-YEAR PHASE Starting October 01, 2010
FUND SOURCES FFY
PIN PROGRAM
FFY FFY FFY FFY
in millions
of dollars 2011 2012 2013 2014
AQ CODE COUNTY TOTAL PROJECT COST
NYSDOT PROVIDE BRIDGE REPAIRS ON AN AS-NEEDED OR EMERGENCY BASIS ON NFA 2011 0.258 CONINSP 0.258
VARIOUS STATE HIGHWAYS IN NASSAU & SUFFOLK COUNTIES. NFA 2011 2.147 CONST 2.147
080876
AQC:A19S MULTI TPC : $2-$4 M TOTAL 4YR COST : 2.405 2.405 0.000 0.000 0.000
NYSDOT PROVIDE FOR AMERICANS WITH DISABILITES ACT REQUIREMENTS, INCLUDING NFA 2012 0.267 CONINSP 0.267
ADDITIONAL SIGNING, PAVEMENT MARKINGS, REPAIR DRAINAGE GRATES NFA 2012 2.223 CONST 2.223
080877 ALONG EXISTING ON STREET BIKEPATHS CONST OR REHAB PEDESTRIAN
FACILITIES IN NASSAU & SUFFOLK COUNTIES.
AQC:C2P MULTI TPC : $2-$4 M TOTAL 4YR COST : 2.490 0.000 2.490 0.000 0.000
NYSDOT INSTALLATION AND REPLACEMENT OF DETERIORATED PAVEMENT MARKINGS NFA 2011 0.496 CONINSP 0.496
& PLOWABLE REFLECTIVE MARKERS ON VARIOUS STATE HIGHWAYS & NFA 2011 4.958 CONST 4.958
080878 PARKWAYS IN NASSAU & SUFFOLK COUNTIES.
AQC:A10P MULTI TPC : $4.6-$7.5 M TOTAL 4YR COST : 5.454 5.454 0.000 0.000 0.000
NYSDOT BRIDGE PARAPET RECONSTRUCTION TO UPGRADE NON STANDARD PARAPET, NFA 2011 0.505 CONINSP 0.505
TOWN OF HEMPSTEAD, NASSAU COUNTY. BIN # 1057651, 1057652, 1058550, 1058560, NFA 2011 5.050 CONST 5.050
080879 1059651 & 1059652.
AQC:A19S MULTI TPC : $4.6-$7.5 M TOTAL 4YR COST : 5.555 5.555 0.000 0.000 0.000
NYSDOT BRIDGE PARAPET RECONSTRUCTION TO UPGRADE NON STANDARD PARAPET IN NFA 2011 0.278 DETLDES 0.278
THE TOWNS OF HEMPSTEAD, OYSTER BAY & SMITHTOWN, NASSAU & SUFFOLK NFA 2012 0.523 CONINSP 0.523
080880 COUNTIES. BIN # 1058260, 1059080, 1059189, 1059440 & 5059069. NFA 2012 5.228 CONST 5.228
AQC:A10S MULTI TPC : $4.6-$7.5 M TOTAL 4YR COST : 6.029 0.278 5.751 0.000 0.000
NYSDOT CLEAN BASINS FILLED W/ DEBRIS, REPAIR, REPLACE OR PROVIDE MISSING STP FLEX 2011 0.100 CONINSP 0.100
COLLARS, REPAIR BASIN WALLS, CLEAN CLOGGED PIPES, REPAIR OR REPLACE NFA 2011 0.025 CONINSP 0.025
080881 GRATES, REPLACE BASINS, PROVIDE NEW BASINS, CONNECT ISOLATED BASINS STP FLEX 2011 0.830 CONST 0.830
TO DRAINAGE SYSTEM NAS/SUF CO. TO PREVENT FLOODING NFA 2011 0.211 CONST 0.211
AQC:A10P MULTI TPC : $2-$4 M TOTAL 4YR COST : 1.166 1.166 0.000 0.000 0.000
** NEW YORK STATE DEPARTMENT OF TRANSPORTATION **
Friday, August 26, 2011 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) on Draft Program Page 23 of 84
for REGION 10
AGENCY PROJECT DESCRIPTION TOTAL 4-YEAR PROGRAM (FFY)
4-YEAR PHASE Starting October 01, 2010
FUND SOURCES FFY
PIN PROGRAM
FFY FFY FFY FFY
in millions
of dollars 2011 2012 2013 2014
AQ CODE COUNTY TOTAL PROJECT COST
NYSDOT RESPOND TO EMERGENCIES AND NEEDED REPAIRS THAT ARE BEYOND THE NFA 2011 0.120 CONINSP 0.120
CAPABILITIES OF NYS MAINTENANCE FORCES TO ENSURE THE SAFETY OF THE NFA 2011 1.000 CONST 1.000
080882 PUBLIC ON VARIOUS STATE HIGHWAYS IN NASSAU & SUFFOLK COUNTIES.
(FORMERLY PIN: 0T2011)
AQC:C14P NASSAU TPC : $2-$4 M TOTAL 4YR COST : 1.120 1.120 0.000 0.000 0.000
NYSDOT FUNDING FOR NEW BUS SERVICE TO REDUCE VMT AND IMPROVE AIR QUALITY CMAQ 2012 1.000 OPER 1.000
TO BE DEVELOPED BY PUBLIC TRANSIT OPERATORS NFA 2012 0.250 OPER 0.250
080883 CMAQ 2013 1.000 OPER 1.000
NFA 2013 0.250 OPER 0.250
CMAQ 2014 1.000 OPER 1.000
NFA 2014 0.250 OPER 0.250
AQC:C1P MULTI TPC : $7.5-$12 M TOTAL 4YR COST : 3.750 0.000 1.250 1.250 1.250
NYSDOT REPLACE OR UPGRADE SIGNALS AND/OR APPURTENANCES & INSTALL NEW NFA 2011 0.316 CONINSP 0.316
SIGNALS TO MAINTAIN STATE OF GOOD REPAIR ON VARIOUS STATE HIGHWAYS NFA 2011 3.162 CONST 3.162
080884 IN NASSAU & SUFFOLK COUNTIES (FORMERLY PIN: 0T1517)
AQC:D2P MULTI TPC : $3.3-$5.6 M TOTAL 4YR COST : 3.478 3.478 0.000 0.000 0.000
NYSDOT PROVIDE EMERGENCY SAFETY & PAVEMENT IMPROVEMENTS REPAIRS ON AN NFA 2011 0.400 CONINSP 0.400
AS-NEEDED-BASIS ON VARIOUS STATE HIGHWAYS IN NASSAU & SUFFOLK NFA 2011 4.000 CONST 4.000
080885 COUNTIES.
AQC:A10P MULTI TPC : $3.3-$5.6 M TOTAL 4YR COST : 4.400 4.400 0.000 0.000 0.000
NYSDOT SIGN REPAIRS & INSTALLATIONS TO MAINTAIN STATE OF GOOD REPAIR ON STP FLEX 2011 0.202 CONINSP 0.202
VARIOUS STATE HIGHWAYS & PARKWAYS IN NASSAU & SUFFOLK NFA 2011 0.050 CONINSP 0.050
080886 COUNTIES(FORMERLY PIN: 0T1700) STP FLEX 2011 1.687 CONST 1.687
NFA 2011 0.422 CONST 0.422
AQC:C13P MULTI TPC : $2-$4 M TOTAL 4YR COST : 2.361 2.361 0.000 0.000 0.000
NYSDOT ROUT & SEAL ASPHALT PAVEMENT CRACKS AND JOINT OVERLAY REPAIR ON STP FLEX 2011 0.192 CONINSP 0.192
NY27 FROM NY106 TO MSP, NY27 MSP TO WSP, I495 EX 52 TO EX 57, SSP NY135 TO NFA 2011 0.169 CONINSP 0.169
080888 SGSP TO MAINTAIN PAVEMENT. TOWNS OF OYSTER BAY, HEMPSTEAD, STP FLEX 2011 1.603 CONST 1.603
BABYLON, HUNTINGTON, ISLIP AND SMITHTOWN,NASSAU & SUFFOLK COUNTIES NFA 2011 1.688 CONST 1.688
AQC:A10P MULTI TPC : $4.6-$7.5 M TOTAL 4YR COST : 3.652 3.652 0.000 0.000 0.000
** NEW YORK STATE DEPARTMENT OF TRANSPORTATION **
Friday, August 26, 2011 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) on Draft Program Page 24 of 84
for REGION 10
AGENCY PROJECT DESCRIPTION TOTAL 4-YEAR PROGRAM (FFY)
4-YEAR PHASE Starting October 01, 2010
FUND SOURCES FFY
PIN PROGRAM
FFY FFY FFY FFY
in millions
of dollars 2011 2012 2013 2014
AQ CODE COUNTY TOTAL PROJECT COST
NYSDOT REHABILITATE RECHARGE BASINS INCLUDING SLOPE STABILIZATION, HEAD NFA 2011 0.149 DETLDES 0.149
WALL REPAIR, ET AL(LOCATIONS TO-BE-DETERMINED) TO MAINTAIN STATE OF NFA 2012 0.258 CONINSP 0.258
080889 GOOD REPAIR ON VARIOUS STATE HIGHWAYS IN NASSAU & SUFFOLK COUNTIES. NFA 2012 2.151 CONST 2.151
AQC:A2P MULTI TPC : $2-$4 M TOTAL 4YR COST : 2.558 0.149 2.409 0.000 0.000
NYSDOT REHABILITATE RECHARGE BASINS INCLUDING SLOPE STABILIZATION, HEAD NFA 2012 0.152 DETLDES 0.152
WALL REPAIR, ET AL(LOCATIONS TO-BE-DETERMINED) TO MAINTAIN STATE OF NFA 2013 0.265 CONINSP 0.265
080891 GOOD REPAIR ON VARIOUS STATE HIGHWAYS IN NASSAU & SUFFOLK COUNTIES. NFA 2013 2.206 CONST 2.206
AQC:A2P MULTI TPC : $2-$4 M TOTAL 4YR COST : 2.623 0.000 0.152 2.471 0.000
NYSDOT BRIDGE CLEANING CONTRACT ON VARIOUS STATE HIGHWAYS TO MAINTAIN HBRR 2011 0.101 CONINSP 0.101
STRUCTURAL INTEGRITY IN NASSAU & SUFFOLK COUNTIES. 0T1713 NFA 2011 0.025 CONINSP 0.025
080892 HBRR 2011 0.843 CONST 0.843
NFA 2011 0.211 CONST 0.211
NFA 2011 0.056 DETLDES 0.056
AQC:A19P MULTI TPC : $1.2-$2.5 M TOTAL 4YR COST : 1.236 1.236 0.000 0.000 0.000
NYSDOT CORRECT PRIORITY HIGHWAY FOODING LOCATIONS, PROVIDE STORMWATER NFA 2013 0.160 DETLDES 0.160
RUN-OFF IMPROVEMENTS INCLUDING 1 LOC IN TOWN OF RIVERHEAD FOR
080894 SAFETEA-LU EARMARK & OTHER LOC NAS & SUF.
AQC:C11P MULTI TPC : $6-$9.4 M TOTAL 4YR COST : 0.160 0.000 0.000 0.160 0.000
NYSDOT CLEAN BASINS FILLED W/DEBRIS, REPAIR, REPLACE OR PROVIDE MISSING NFA 2011 0.090 DETLDES 0.090
COLLARS, REPAIR BASIN WALLS, CLEAN CLOGGED PIPES, REPAIR OR REPLACE STP FLEX 2012 0.103 CONINSP 0.103
080895 BROKEN PIPES, REPLACE GRATES, REPLACE BASINS, PROVIDE CONNECT NFA 2012 0.026 CONINSP 0.026
ISOLATED BASINS TO DRAINAGE SYSTEM TO PREVENT HIGHWAY FLOODING
STP FLEX 2012 0.860 CONST 0.860
NASSAU AND SUFFOLK COUNTY
NFA 2012 0.215 CONST 0.215
AQC:A10P MULTI TPC : $1.2-$2.5 M TOTAL 4YR COST : 1.294 0.090 1.204 0.000 0.000
NYSDOT CONSULTANT CONTRACT TO PROVIDETRAFFIC SIGNAL & MISC DESIGN NFA 2011 0.300 DETLDES 0.300
TASKS.TRAFFIC SIGNAL & MISC. DESIGN TASKS CONULTANT CONTRACT NFA 2012 0.300 DETLDES 0.300
080896 (LOCATIONS TO BE DETEREMINED) AT VARIOUS HIGHWAYS AND PARKWAYS IN NFA 2013 0.300 DETLDES 0.300
NASSAU & SUFFOLK COUNTIES. NFA DETLDES
2014 0.300 0.300
0T2398
AQC:A7P MULTI TPC : $1.2-$2.5 M TOTAL 4YR COST : 1.200 0.300 0.300 0.300 0.300
** NEW YORK STATE DEPARTMENT OF TRANSPORTATION **
Friday, August 26, 2011 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) on Draft Program Page 25 of 84
for REGION 10
AGENCY PROJECT DESCRIPTION TOTAL 4-YEAR PROGRAM (FFY)
4-YEAR PHASE Starting October 01, 2010
FUND SOURCES FFY
PIN PROGRAM
FFY FFY FFY FFY
in millions
of dollars 2011 2012 2013 2014
AQ CODE COUNTY TOTAL PROJECT COST
NYSDOT INSTALLATION AND REPLACEMENT OF DETERIORATED PAVEMENT MARKINGS NFA 2011 0.449 DETLDES 0.449
& PLOWABLE REFLECTIVE MARKERS ON VARIOUS STATE HIGHWAYS & STP FLEX 2012 0.422 CONINSP 0.422
080898 PARKWAYS IN NASSAU & SUFFOLK COUNTIES. NFA 2012 0.406 CONINSP 0.406
STP FLEX 2012 4.216 CONST 4.216
NFA 2012 4.066 CONST 4.066
AQC:A10P MULTI TPC : $7.5-$12 M TOTAL 4YR COST : 9.559 0.449 9.110 0.000 0.000
NASSAU CO. THE COUNTY HAS INITIATED AN ALTERNATIVES ANALYSIS TO EXAMINE FTA 5309 2011 0.990 SCOPING 0.990
OPPORTUNITIES FOR INTRODUCING TRANSIT IMPROVEMENTS AND IDENTIFY NFA 2011 0.247 SCOPING 0.247
082498 LAND USE STRATEGIES TO PROMOTE ECONOMIC DEVELOPMENT, AND IMPROVE HPP 2011 5.771 SCOPING 5.771
ACCESS, REGIONAL CONNECTIVITY AND MOBILITY IN THE NASSAU HUB. NFA 1.443 SCOPING 1.443
2011
AQC:C3P NASSAU TPC : $7.5-$12 M TOTAL 4YR COST : 8.451 8.451 0.000 0.000 0.000
MTA-LI BUS / PURCHASE 48 REPLACEMENT CNG 40' BUSES INSPECTION SERVICES & SPARE CMAQ 2011 4.500 MISC 4.500
NASSAU PARTS - TO MAINTAIN OPERATING EFFICIENCY, CAPACITY, AND THE NFA 2011 1.126 MISC 1.126
082565 CONTINUED USE OF ALTERNATIVE FUEL FTA 5307 2011 1.200 MISC 1.200
NFA 2011 0.300 MISC 0.300
CMAQ 2013 1.500 MISC 1.500
NFA 2013 0.376 MISC 0.376
FTA 5307 2013 0.368 MISC 0.368
NFA 2013 0.092 MISC 0.092
AQC:B10P NASSAU TPC : $15-$25 M TOTAL 4YR COST : 9.462 7.126 0.000 2.336 0.000
MTA-LI BUS / ENGINEERING/DESIGN SERVICES - TO PROVIDE GENERAL ENGINEERING NEEDS FTA 5307 2011 0.240 MISC 0.240
NASSAU TO SUPPORT THE CAPITAL PROGRAM NFA 2011 0.060 MISC 0.060
082572 FTA 5307 2012 0.240 MISC 0.240
NFA 2012 0.060 MISC 0.060
FTA 5307 2013 0.240 MISC 0.240
NFA 2013 0.060 MISC 0.060
AQC:C7P NASSAU TPC : $2-$4 M TOTAL 4YR COST : 0.900 0.300 0.300 0.300 0.000
MTA-LI BUS / ITS CUSTOMER INFORMATION & VEHICLE LOCATION/MONITORING SYSTEM - TO FTA 5307 2011 6.720 MISC 6.720
NASSAU INSTALL A NEW CUSTOMER INFORMATION SYSTEM AND UPGRADE THE NFA 2011 1.680 MISC 1.680
082577 VEHICLE LOCATION AND MONITORING SYSTEMS FTA 5307 2012 3.200 MISC 3.200
NFA 2012 0.800 MISC 0.800
AQC:B6P NASSAU TPC : $9.5-15.5 M TOTAL 4YR COST : 12.400 8.400 4.000 0.000 0.000
** NEW YORK STATE DEPARTMENT OF TRANSPORTATION **
Friday, August 26, 2011 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) on Draft Program Page 26 of 84
for REGION 10
AGENCY PROJECT DESCRIPTION TOTAL 4-YEAR PROGRAM (FFY)
4-YEAR PHASE Starting October 01, 2010
FUND SOURCES FFY
PIN PROGRAM
FFY FFY FFY FFY
in millions
of dollars 2011 2012 2013 2014
AQ CODE COUNTY TOTAL PROJECT COST
MTA-LI BUS / PURCHASE NEW/REPLACEMENT SERVICE SUPPORT EQUIPMENT, AND VEHICLES FTA 5307 2011 0.720 MISC 0.720
NASSAU THAT ARE BEYOND THEIR USEFUL LIVES NFA 2011 0.180 MISC 0.180
082582 FTA 5307 2012 0.720 MISC 0.720
NFA 2012 0.180 MISC 0.180
FTA 5307 2013 1.072 MISC 1.072
NFA 2013 0.268 MISC 0.268
FTA 5307 2014 0.400 MISC 0.400
NFA 2014 0.100 MISC 0.100
AQC:B1P NASSAU TPC : $3.3-$5.6 M TOTAL 4YR COST : 3.640 0.900 0.900 1.340 0.500
MTA-LI BUS / FACILITY CAPITAL REPLACEMENT/IMPROVEMENT - TO MAINTAIN THE FTA 5307 2011 1.600 MISC 1.600
NASSAU FACILITIES IN A STATE OF GOOD REPAIR NFA 2011 0.400 MISC 0.400
082584 FTA 5307 2012 1.280 MISC 1.280
NFA 2012 0.320 MISC 0.320
FTA 5307 2013 1.000 MISC 1.000
NFA 2013 0.250 MISC 0.250
FTA 5307 2014 0.400 MISC 0.400
NFA 2014 0.100 MISC 0.100
AQC:B8P NASSAU TPC : $9.5-15.5 M TOTAL 4YR COST : 5.350 2.000 1.600 1.250 0.500
MTA-LI BUS / PREVENTIVE MAINTENANCE - TO MAINTAIN THE OPERATION IN A STATE OF FTA 5307 2011 6.000 MISC 6.000
NASSAU GOOD REPAIR NFA 2011 1.500 MISC 1.500
082588 FTA 5307 2012 6.124 MISC 6.124
NFA 2012 1.531 MISC 1.531
FTA 5307 2013 6.000 MISC 6.000
NFA 2013 1.500 MISC 1.500
FTA 5307 2014 6.000 MISC 6.000
NFA 2014 1.500 MISC 1.500
AQC:B1P NASSAU TPC : $40-$60 M TOTAL 4YR COST : 30.155 7.500 7.655 7.500 7.500
MTA-LI BUS / MITCHEL FIELD CNG FACILITY MODIFICATIONS - TO REPLACE CNG OPERATING FTA 5308 2011 5.810 MISC 5.810
NASSAU SYSTEMS THAT HAVE REACHED THE END OF THEIR USEFUL LIFE NFA 2011 1.190 MISC 1.190
082593
AQC:B8P NASSAU TPC : $6-$9.4 M TOTAL 4YR COST : 7.000 7.000 0.000 0.000 0.000
** NEW YORK STATE DEPARTMENT OF TRANSPORTATION **
Friday, August 26, 2011 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) on Draft Program Page 27 of 84
for REGION 10
AGENCY PROJECT DESCRIPTION TOTAL 4-YEAR PROGRAM (FFY)
4-YEAR PHASE Starting October 01, 2010
FUND SOURCES FFY
PIN PROGRAM
FFY FFY FFY FFY
in millions
of dollars 2011 2012 2013 2014
AQ CODE COUNTY TOTAL PROJECT COST
MTA-LI BUS / PURCHASE 40 CNG 40' BUSES, INSPECTION SERVICES & SPARE PARTS - 37 REPL/3 CMAQ 2012 8.000 MISC 8.000
NASSAU EXP - TO MAINTAIN OPERATING EFFICIENCY, CAPACITY, AND THE CONTINUED NFA 2012 2.000 MISC 2.000
082594 USE OF ALTERNATIVE FUEL FTA 5307 2012 0.380 MISC 0.380
NFA 2012 0.092 MISC 0.092
FTA 5309 2013 5.920 MISC 5.920
NFA 2013 1.480 MISC 1.480
AQC:B10Z NASSAU TPC : $15-$25 M TOTAL 4YR COST : 17.872 0.000 10.472 7.400 0.000
MTA-LI BUS / PURCHASE 80 CNG 40' REPLACEMENT BUSES, INSPECTION SERVICES & SPARE CMAQ 2014 5.000 MISC 5.000
NASSAU PARTS - TO MAINTAIN OPERATING EFFICIENCY, CAPACITY, AND THE NFA 2014 1.250 MISC 1.250
082595 CONTINUED USE OF ALTERNATIVE FUEL FTA 5307 2014 3.944 MISC 3.944
NFA 2014 0.986 MISC 0.986
FTA 5309 2014 1.600 MISC 1.600
NFA 2014 0.400 MISC 0.400
AQC:B10P NASSAU TPC : $32-$50 M TOTAL 4YR COST : 13.180 0.000 0.000 0.000 13.180
MTA-LI BUS / PURCHASE 63 REPLACEMENT PARATRANSIT VEHICLES -TO MAINTAIN FTA 5307 2013 4.104 MISC 4.104
NASSAU OPERATING EFFICIENCY, AND CAPACITY NFA 2013 1.026 MISC 1.026
082596
AQC:B10P NASSAU TPC : $4.6-$7.5 M TOTAL 4YR COST : 5.130 0.000 0.000 5.130 0.000
MTA-LI BUS / PURCHASE 33 PARATRANSIT VEHICLES -30 REPL/3 EXP - TO MAINTAIN FTA 5307 2014 2.040 MISC 2.040
NASSAU OPERATING EFFICIENCY, AND CAPACITY NFA 2014 0.510 MISC 0.510
082597
AQC:B10P NASSAU TPC : $3.3-$5.6 M TOTAL 4YR COST : 2.550 0.000 0.000 0.000 2.550
SUFFOLK CO. PURCHASE OF AN ELECTRONIC FARE COLLECTION SYSTEM FOR BUSES UTILIZED FTA 5307 2012 1.800 MISC 1.800
TRANSIT ON THE FIXED BUS ROUTES THROUGHOUT SUFFOLK COUNTY AND OEPRATED NFA 2012 0.600 MISC 0.600
082600 TO UPGRADE FARE COLLECTION BOX CAPABILITIES FTA 5307 2013 0.560 MISC 0.560
NFA 2013 0.140 MISC 0.140
AQC:B5P SUFFOLK TPC : $2-$4 M TOTAL 4YR COST : 3.100 0.000 2.400 0.700 0.000
** NEW YORK STATE DEPARTMENT OF TRANSPORTATION **
Friday, August 26, 2011 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) on Draft Program Page 28 of 84
for REGION 10
AGENCY PROJECT DESCRIPTION TOTAL 4-YEAR PROGRAM (FFY)
4-YEAR PHASE Starting October 01, 2010
FUND SOURCES FFY
PIN PROGRAM
FFY FFY FFY FFY
in millions
of dollars 2011 2012 2013 2014
AQ CODE COUNTY TOTAL PROJECT COST
SUFFOLK CO. PURCHASE OF DUAL-MODE HYBRID-ELECTRIC TRANSIT BUSES FOR FTA 5307 2011 5.500 MISC 5.500
TRANSIT REPLACEMENT PURPOSES TO BE UTILIZED ON FIXED BUS ROUTES THROUGHOUT NFA 2011 1.376 MISC 1.376
082602 SUFFOLK COUNTY. NY-03-0448 FTA 5307 2012 4.000 MISC 4.000
NFA 2012 1.000 MISC 1.000
FTA 5307 2013 5.500 MISC 5.500
NFA 2013 1.375 MISC 1.375
FTA 5307 2014 5.600 MISC 5.600
NFA 2014 1.400 MISC 1.400
AQC:B10P SUFFOLK TPC : $32-$50 M TOTAL 4YR COST : 25.751 6.876 5.000 6.875 7.000
SUFFOLK CO. PURCHASE PARATRANSIT VEHICLES FOR COMPLEMENTARY SERVICES ADA FTA 5307 2011 0.480 MISC 0.480
TRANSIT WHICH ARE OPERATED IN CONJUCTION WITH THE FIXED BUS ROUTE NFA 2011 0.120 MISC 0.120
082603 OPERATIONS. PRE FY 11NY 90-X648 FTA 5307 2012 0.480 MISC 0.480
NFA 2012 0.120 MISC 0.120
FTA 5307 2013 0.640 MISC 0.640
NFA 2013 0.160 MISC 0.160
FTA 5307 2014 0.800 MISC 0.800
NFA 2014 0.200 MISC 0.200
AQC:B10P SUFFOLK TPC : $4.6-$7.5 M TOTAL 4YR COST : 3.000 0.600 0.600 0.800 1.000
SUFFOLK CO. PREVENTIVE MAINTENANCE FOR SUFFOLK COUNTY TRANSIT BUSES AND FTA 5307 2011 0.720 MISC 0.720
TRANSIT PARATRANSIT VANS. NY-90-X648 NFA 2011 0.180 MISC 0.180
082604 FTA 5307 2012 0.720 MISC 0.720
NFA 2012 0.180 MISC 0.180
FTA 5307 2013 0.800 MISC 0.800
NFA 2013 0.200 MISC 0.200
FTA 5307 2014 0.800 MISC 0.800
NFA 2014 0.200 MISC 0.200
AQC:B3P SUFFOLK TPC : $4.6-$7.5 M TOTAL 4YR COST : 3.800 0.900 0.900 1.000 1.000
SUFFOLK CO. PURCHASE AND INSTALL BUS SHELTERS AT VARIOUS LOCATIONS THROUGHOUT FTA 5307 2011 0.160 MISC 0.160
TRANSIT SUFFOLK COUNTY TO IMPORVE SYSTEM VISIBILITY AND CUSTOMER COMFORT NFA 2011 0.040 MISC 0.040
082606 AND CONVINIENCE. NY-90-X602 FTA 5307 2012 0.160 MISC 0.160
NFA 2012 0.040 MISC 0.040
FTA 5307 2013 0.160 MISC 0.160
NFA 2013 0.040 MISC 0.040
FTA 5307 2014 0.160 MISC 0.160
NFA 2014 0.040 MISC 0.040
AQC:B7P SUFFOLK TPC : $1.2-$2.5 M TOTAL 4YR COST : 0.800 0.200 0.200 0.200 0.200
** NEW YORK STATE DEPARTMENT OF TRANSPORTATION **
Friday, August 26, 2011 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) on Draft Program Page 29 of 84
for REGION 10
AGENCY PROJECT DESCRIPTION TOTAL 4-YEAR PROGRAM (FFY)
4-YEAR PHASE Starting October 01, 2010
FUND SOURCES FFY
PIN PROGRAM
FFY FFY FFY FFY
in millions
of dollars 2011 2012 2013 2014
AQ CODE COUNTY TOTAL PROJECT COST
SUFFOLK CO. COMPLEMENTARY SERVICE -ADA WHICH IS PROVIDED IN CONJUCTION WITH FTA 5307 2011 0.240 MISC 0.240
TRANSIT THE FIXED BUS ROUTE OPERATIONS. NY-90X-648 NFA 2011 0.060 MISC 0.060
082621 FTA 5307 2012 0.240 MISC 0.240
NFA 2012 0.060 MISC 0.060
FTA 5307 2013 0.240 MISC 0.240
NFA 2013 0.060 MISC 0.060
FTA 5307 2014 0.240 MISC 0.240
NFA 2014 0.060 MISC 0.060
AQC:B1P SUFFOLK TPC : $1.2-$2.5 M TOTAL 4YR COST : 1.200 0.300 0.300 0.300 0.300
SUFFOLK CO. CONTINGENCIES FOR SUFFOLKCOUNTY SECTION 5307 GRANT APPLICATIONS. FTA 5307 2011 0.177 MISC 0.177
TRANSIT PRE FFY11 NY-90X-648, FOR FFY2012 EARMARK# E2010-BUSP-151 NFA 2011 0.044 MISC 0.044
082629 FTA 5307 2012 0.179 MISC 0.179
NFA 2012 0.045 MISC 0.045
FTA 5307 2013 0.176 MISC 0.176
NFA 2013 0.044 MISC 0.044
FTA 5307 2014 0.234 MISC 0.234
NFA 2014 0.058 MISC 0.058
AQC:B1 SUFFOLK TPC : $1.2-$2.5 M TOTAL 4YR COST : 0.957 0.221 0.224 0.220 0.292
SUFFOLK CO. PROJECT ADMINISTRATION FOR SUFFOLK COUNTY SECTION 5307 GRANT FTA 5307 2011 0.240 MISC 0.240
TRANSIT APPLICATIONS.PRE FFY11 GRANT# NY-90X-648, NFA 2011 0.060 MISC 0.060
082630 FTA 5307 2012 0.269 MISC 0.269
NFA 2012 0.067 MISC 0.067
FTA 5307 2013 0.270 MISC 0.270
NFA 2013 0.068 MISC 0.068
FTA 5307 2014 0.320 MISC 0.320
NFA 2014 0.080 MISC 0.080
AQC:B1 SUFFOLK TPC : $2-$4 M TOTAL 4YR COST : 1.374 0.300 0.336 0.338 0.400
SUFFOLK CO. COMPRESSED NATURAL GAS (CNG) FLEET VEHICLE PROGRAM- REPLACE CMAQ 2011 1.800 MISC 1.800
APPROXIMATELY 60 COUNTY HEAVY, LIGHT DUTY TRUCKS AND OTHER FLEET NFA 2011 0.450 MISC 0.450
082633 VEHICLES WITH CNG POWERED VEHICLES OR ENGINES AS PART OF THE
SUFFOLK COUNTY GREEN VEHICLE INITIATIVE.
AQC:C14P SUFFOLK TPC : $2-$4 M TOTAL 4YR COST : 2.250 2.250 0.000 0.000 0.000
** NEW YORK STATE DEPARTMENT OF TRANSPORTATION **
Friday, August 26, 2011 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) on Draft Program Page 30 of 84
for REGION 10
AGENCY PROJECT DESCRIPTION TOTAL 4-YEAR PROGRAM (FFY)
4-YEAR PHASE Starting October 01, 2010
FUND SOURCES FFY
PIN PROGRAM
FFY FFY FFY FFY
in millions
of dollars 2011 2012 2013 2014
AQ CODE COUNTY TOTAL PROJECT COST
SUFFOLK CO. HYBRID ELECTRIC-REPLACE 45 COUNTY FLEET VEHICLES WITH ELECTRIC CMAQ 2011 1.100 MISC 1.100
HYBRID VEHICLES AS PART OF THE SUFFOLK COUNTY GREEN VEHICLE NFA 2011 0.275 MISC 0.275
082635 INITIATIVE
AQC:C14P SUFFOLK TPC : $1.2-$2.5 M TOTAL 4YR COST : 1.375 1.375 0.000 0.000 0.000
SUFFOLK CO. COMPRESSED NATUAL GAS (CNG) FLEET VEHICLE - REPLACE 6 COUNTY HEAVY CMAQ 2012 1.250 MISC 1.250
DIESEL TRUCKS WITH CNG TRUCKS AS PART OF THE SUFFOLK COUNTY GREEN NFA 2012 0.313 MISC 0.313
082636 VEHICLE INITIATIVE
AQC:C14P SUFFOLK TPC : $1.2-$2.5 M TOTAL 4YR COST : 1.563 0.000 1.563 0.000 0.000
SUFFOLK CO. COMPRESSED NATURAL GAS (CNG) ENGINE REPLACEMENT- RE-ENGINE 22 CMAQ 2012 1.250 MISC 1.250
COUNTY HEAVY DIESEL TRUCKS WITH CNG ENGINES AS PART OF THE SUFFOLK NFA 2012 0.313 MISC 0.313
082637 COUNTY GREEN VEHICLE INITIATIVE
AQC:K01P SUFFOLK TPC : $1.2-$2.5 M TOTAL 4YR COST : 1.563 0.000 1.563 0.000 0.000
SUFFOLK CO. HYBRID ELECTRIC-REPLACE 52 COUNTY FLEET VEHICLESWITH ELECTRIC CMAQ 2012 1.250 MISC 1.250
HYBRID VEHICLES AS PART OF THE SUFFOLK COUNTY GREEN VEHICLE NFA 2012 0.313 MISC 0.313
082638 INITIATIVE
AQC:C14P SUFFOLK TPC : $1.2-$2.5 M TOTAL 4YR COST : 1.563 0.000 1.563 0.000 0.000
SUFFOLK CO. COMPRESSED NATURAL GAS (CNG) FLEET VEHICLE - REPLACE 6 COUNTY CMAQ 2013 1.250 MISC 1.250
HEAVY DIESEL TRUCKS WITH CNG TRUCKS AS PART OF THE SUFFOLK COUNTY NFA 2013 0.313 MISC 0.313
082639 GREEN INITIATIVE
AQC:C14P SUFFOLK TPC : $1.2-$2.5 M TOTAL 4YR COST : 1.563 0.000 0.000 1.563 0.000
SUFFOLK CO. COMPRESSED NATURAL GAS (CNG) ENGINE REPLACEMENT- RE-ENGINE 22 CMAQ 2013 1.250 MISC 1.250
COUNTY HEAVY DIESEL TRUCKS WITH CNG ENGINES AS PART OF THE SUFFOLK NFA 2013 0.313 MISC 0.313
082640 COUNTY GREEN VEHICLE INITIATIVE
AQC:K01P SUFFOLK TPC : $1.2-$2.5 M TOTAL 4YR COST : 1.563 0.000 0.000 1.563 0.000
SUFFOLK CO. HYBRID ELECTRIC-REPLACE 52 COUNTY FLEET VEHICLES WITH ELECTRIC CMAQ 2013 1.250 MISC 1.250
HYBRID VEHICLES AS PART OF THE SUFFOLK COUNTY GREEN INITIATIVE NFA 2013 0.313 MISC 0.313
082641
AQC:K01P SYSTEM-WIDE TPC : $1.2-$2.5 M TOTAL 4YR COST : 1.563 0.000 0.000 1.563 0.000
** NEW YORK STATE DEPARTMENT OF TRANSPORTATION **
Friday, August 26, 2011 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) on Draft Program Page 31 of 84
for REGION 10
AGENCY PROJECT DESCRIPTION TOTAL 4-YEAR PROGRAM (FFY)
4-YEAR PHASE Starting October 01, 2010
FUND SOURCES FFY
PIN PROGRAM
FFY FFY FFY FFY
in millions
of dollars 2011 2012 2013 2014
AQ CODE COUNTY TOTAL PROJECT COST
SUFFOLK CO. COMPRESSED NATURAL GAS (CNG) FLEET VEHICLE-REPLACE 6 COUNTY HEAVY CMAQ 2014 1.350 MISC 1.350
DIESEL TRUCKS WITH CNG TRUCKS AS PART OF THE SUFFOLK COUNTY GREEN NFA 2014 0.338 MISC 0.338
082642 VEHICLE INITIATIVE.
AQC:C14P SUFFOLK TPC : $1.2-$2.5 M TOTAL 4YR COST : 1.688 0.000 0.000 0.000 1.688
SUFFOLK CO. COMPRESSED NATURAL GAS (CNG) ENGINE REPLACEMENT - RE-ENGINE 24 CMAQ 2014 1.350 MISC 1.350
COUNTY HEAVY DIESELTRUCKS WITH CNG ENGINES AS PART OF THE SUFFOLK NFA 2014 0.338 MISC 0.338
082643 COUNTY GREEN VEHICLE INITIATIVE
AQC:C14P SUFFOLK TPC : $1.2-$2.5 M TOTAL 4YR COST : 1.688 0.000 0.000 0.000 1.688
SUFFOLK CO. HYBRID ELECTRIC-REPLACE 56 COUNTY HEAVY DIESEL TRUCKS WITH CNG CMAQ 2014 1.350 MISC 1.350
ENGINES AS PART OF THE SUFFOLK COUNTY GREEN VEHICLE INITIATIVE NFA 2014 0.338 MISC 0.338
082644
AQC:C14P SUFFOLK TPC : $1.2-$2.5 M TOTAL 4YR COST : 1.688 0.000 0.000 0.000 1.688
LOCAL SUFFOLK COUNTY UNITED VETERANS (SUFFOLK) – PROVIDE FLEXIBLE FTA 5317 2011 0.286 MISC 0.286
TRANSPORTATION SERVICE HAVING TWO SERVICE ROUTES WESTERN AND NFA 2011 0.292 MISC 0.292
082648 EASTERN WILL COVER APPROXIMATELY 70 MILES ROUND TRIPS FOR BOTH
ROUTES TO AND MEETS THE MOBILITY NEEDS OF PEOPLE WITH DISABILITIES
AQC:B1P SUFFOLK TPC : $0.6-$1.5 M TOTAL 4YR COST : 0.578 0.578 0.000 0.000 0.000
NYSERDA NY02 PACKAGED DELIVERY DEMO. PROJECT : USPS ACQUIRE AND DEPLOY FIVE HPP 2012 0.716 MISC 0.716
NEW ADVANCED TECHNOLOGY (HYBRID ELECTRICAL) VEHICLES FOR THE
082649 PURPOSE OF DEMONSTRATION OF GREEN VEHICLE INITIATIVE. (REDUCTION IN
EMISSIONS AND FOSSIL FUEL)OMNIBUS APPROPRIATION ACT 09,
AQC:K1P MULTI TPC : $2-$4 M TOTAL 4YR COST : 0.716 0.000 0.716 0.000 0.000
LONG BEACH REPLACE FOUR ADA PARATRANSIT BUS FTA 5307 2011 0.148 MISC 0.148
NFA 2011 0.035 MISC 0.035
082700
AQC:B10P NASSAU TPC : < $0.75 M TOTAL 4YR COST : 0.183 0.183 0.000 0.000 0.000
** NEW YORK STATE DEPARTMENT OF TRANSPORTATION **
Friday, August 26, 2011 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) on Draft Program Page 32 of 84
for REGION 10
AGENCY PROJECT DESCRIPTION TOTAL 4-YEAR PROGRAM (FFY)
4-YEAR PHASE Starting October 01, 2010
FUND SOURCES FFY
PIN PROGRAM
FFY FFY FFY FFY
in millions
of dollars 2011 2012 2013 2014
AQ CODE COUNTY TOTAL PROJECT COST
LONG BEACH PURCHASE MISCELLANEOUS EQUIPMENT,SUPPLIES AND MATERIALS FOR THE FTA 5307 2012 0.010 MISC 0.010
TRANSIT SYSTEM. NFA 2012 0.003 MISC 0.003
082707
AQC:B4 NASSAU TPC : < $0.75 M TOTAL 4YR COST : 0.013 0.000 0.013 0.000 0.000
LONG BEACH PURCHASE AND INSTALL A SECURITY AND SURVEILLANCE SYSTEM IN THE CITY FTA 5307 2011 0.016 MISC 0.016
OF BUS GARAGE. NFA 2011 0.004 MISC 0.004
082711
AQC:B4P NASSAU TPC : < $0.75 M TOTAL 4YR COST : 0.020 0.020 0.000 0.000 0.000
LONG BEACH PURCHASE ONE REPLACEMENT SUPERVISORY VEHICLE FOR THE TRANSIT FTA 5307 2011 0.026 MISC 0.026
SYSTEM. NFA 2011 0.006 MISC 0.006
082712
AQC:B2P NASSAU TPC : < $0.75 M TOTAL 4YR COST : 0.032 0.032 0.000 0.000 0.000
LONG BEACH PURCHASE NEW BUS SHELTER FTA 5307 2014 0.170 MISC 0.170
NFA 2014 0.042 MISC 0.042
082714
AQC:B8P NASSAU TPC : < $0.75 M TOTAL 4YR COST : 0.212 0.000 0.000 0.000 0.212
LONG BEACH ITS CUSTOMER REAL TIME INFORMATION & VEHICLE LOCATION/MONITORING FTA 5307 2012 0.208 MISC 0.208
SYSTEM AT BUS STOPS NFA 2012 0.052 MISC 0.052
082715
AQC:B6P NASSAU TPC : < $0.75 M TOTAL 4YR COST : 0.260 0.000 0.260 0.000 0.000
LONG BEACH PURCHASE 2 NEW HYBRID ELECTRIC 35 FEET BUSES.REPLACEMENT OF OLD FTA 5307 2011 0.960 MISC 0.960
DIESEL BUSES WITH NEW HYBRID BUSES WHICH ARE MORE ENVIROMENTLY NFA 2011 0.240 MISC 0.240
082716 FRIENDLY AND GET MORE MPG
AQC:B10 NASSAU TPC : $0.6-$1.5 M TOTAL 4YR COST : 1.200 1.200 0.000 0.000 0.000
LONG BEACH PURCHASE ADA ROUTING & LOCATION COMMUNICATION EQUIPMENT FTA 5307 2011 0.128 MISC 0.128
SOFTWARE FOR PARATRANSIT BUS TO LOCATE ADDRESS OF DISABLE NFA 2011 0.032 MISC 0.032
082717 PASSENGER.
AQC:B4P NASSAU TPC : < $0.75 M TOTAL 4YR COST : 0.160 0.160 0.000 0.000 0.000
** NEW YORK STATE DEPARTMENT OF TRANSPORTATION **
Friday, August 26, 2011 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) on Draft Program Page 33 of 84
for REGION 10
AGENCY PROJECT DESCRIPTION TOTAL 4-YEAR PROGRAM (FFY)
4-YEAR PHASE Starting October 01, 2010
FUND SOURCES FFY
PIN PROGRAM
FFY FFY FFY FFY
in millions
of dollars 2011 2012 2013 2014
AQ CODE COUNTY TOTAL PROJECT COST
LONG BEACH RENOVATE BUS GARAGE INCLUDING WIDENING GARAGE DOORS AND FTA 5307 2012 0.080 MISC 0.080
EXPANSION OF OFFICE AND STORAGE SPACE NFA 2012 0.020 MISC 0.020
082719
AQC:B4P NASSAU TPC : < $0.75 M TOTAL 4YR COST : 0.100 0.000 0.100 0.000 0.000
HART PURCHASE AND INSTALLATION OF OPERATING OR MAINTENANCE EQUIPMENT FTA 5307 2011 0.062 MISC 0.062
TO BE LOCATED WITHIN THE TRANSIT FACILITY AND WITH NO SIGNIFICANT NFA 2011 0.016 MISC 0.016
082808 IMPACTS OFF THE SITE.. ADDITIONAL FUNDING REQUIRED FOR THIS IS ONGOING
PROJECT UNDER GRANT #NY-90X-581
AQC:B1P SUFFOLK TPC : < $0.75 M TOTAL 4YR COST : 0.078 0.078 0.000 0.000 0.000
HART REPLACE AND/OR REHABILITATE EXISTING EQUIPMENT AND FACILITIES FTA 5307 2011 0.006 MISC 0.006
LOCATED AT THE HART BUS STORAGE BUILDING BECAUSE ELEMENTS HAVE NFA 2011 0.002 MISC 0.002
082809 REACHED THE END OF THEIR USEFUL LIFE. ADDITIONAL FUNDING REQUIRED
FOR PROJECT STARTED IN GRANT #NY-90-581
AQC:B8P SUFFOLK TPC : $1.2-$2.5 M TOTAL 4YR COST : 0.008 0.008 0.000 0.000 0.000
HART CONTINGENCIES/PROGRAM RESERVE TO AUGMENT CAPITAL PROJECTS FTA 5307 2011 0.032 MISC 0.032
STARTED IN GRANT #NY-90-581 THAT MAY REQUIRE ADDITIONAL FUNDING TO NFA 2011 0.008 MISC 0.008
082811 COMPLETE.
AQC:B1P SUFFOLK TPC : < $0.75 M TOTAL 4YR COST : 0.040 0.040 0.000 0.000 0.000
HART HUNTINGTON AREA RAPID TRANSIT WILL PURCHASE 9 30FOOT HYBRID BUSES FTA 5307 2011 0.864 MISC 0.864
TO REPLACE EXISTING 9 DIESEL BUSES IN THEIR FLEET. (2 IN 2011 AND 7 IN 2012) NFA 2011 0.216 MISC 0.216
082813 FTA 5307 2012 3.400 MISC 3.400
NFA 2012 0.864 MISC 0.864
AQC:B10P SUFFOLK TPC : $4.6-$7.5 M TOTAL 4YR COST : 5.344 1.080 4.264 0.000 0.000
HART HUNTINGTON AREA RAPID TRANSIT WILL PURCHASE TWO REPLACEMENT FTA 5307 2011 0.044 MISC 0.044
GASOLINE-ELECTRIC HYBRID VEHICLES FOR SUPERVISORY AND SUPPORT NFA 2011 0.011 MISC 0.011
082814 PURPOSES
AQC:B2P SUFFOLK TPC : < $0.75 M TOTAL 4YR COST : 0.055 0.055 0.000 0.000 0.000
** NEW YORK STATE DEPARTMENT OF TRANSPORTATION **
Friday, August 26, 2011 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) on Draft Program Page 34 of 84
for REGION 10
AGENCY PROJECT DESCRIPTION TOTAL 4-YEAR PROGRAM (FFY)
4-YEAR PHASE Starting October 01, 2010
FUND SOURCES FFY
PIN PROGRAM
FFY FFY FFY FFY
in millions
of dollars 2011 2012 2013 2014
AQ CODE COUNTY TOTAL PROJECT COST
HART HUNTINGTON AREA RAPID TRANSIT WILL PURCHASE PARA TRANSIT VANS TO FTA 5307 2011 0.156 MISC 0.156
REPLACE EXISTING VANS IN THEIR FLEET. NFA 2011 0.040 MISC 0.040
082815 FTA 5307 2012 0.358 MISC 0.358
NFA 2012 0.089 MISC 0.089
FTA 5307 2014 0.253 MISC 0.253
NFA 2014 0.063 MISC 0.063
AQC:B10P SUFFOLK TPC : $0.6-$1.5 M TOTAL 4YR COST : 0.959 0.196 0.447 0.000 0.316
LOCAL PURCHASE OF TWO ALTERNATIVE FUEL (CNG) BUSES, VILLAGE OF EAST FTA 5309 2011 0.380 MISC 0.380
ROCKAWAY IN TOWN OF HEMPSTEAD. NFA 2011 0.089 MISC 0.089
082902
AQC:B10 NASSAU TPC : < $0.75 M TOTAL 4YR COST : 0.469 0.469 0.000 0.000 0.000
LOCAL PROJECT INDEPENDENCE (NASSAU) – MOBILITY MANAGEMENT SERVICES, FTA 5317 2011 0.854 MISC 0.854
MEDICALTRANSPORTATION, AND TRANSPORTATION TO GROCERY SHOPPING NFA 2011 0.447 MISC 0.447
082903 SERVICES TARGETING THE DISABLED ELDERLY POPULATION IN THE TOWN OF
NORTH HEMPSTEAD.
AQC:C1P NASSAU TPC : $2-$4 M TOTAL 4YR COST : 1.301 1.301 0.000 0.000 0.000
NYSDOT UPGRADE TRAFFIC SIGNAL SYSTEM /RAILROAD GRADE CROSSING WARNING STP RAIL 2011 0.100 CONST 0.100
SYSTEM AT SOUTH HAVEN RD IN BROOKVILLE. NASSAU COUNTY NFA 2011 0.025 CONST 0.025
093292
AQC:A1S SUFFOLK TPC : < $0.75 M TOTAL 4YR COST : 0.125 0.125 0.000 0.000 0.000
NYSDOT UPGRADE TRAFFIC SIGNAL SYSTEM/ RAILROAD GRADE CROSSING WARNING STP RAIL 2011 0.125 CONST 0.125
SYSTEM AT EAST GATE DRIVE IN TOWN OF HUNTINGTON, SUFFOLK COUNTY NFA 2011 0.031 CONST 0.031
093426
AQC:A1S SUFFOLK TPC : < $0.75 M TOTAL 4YR COST : 0.156 0.156 0.000 0.000 0.000
NYSDOT UPGRADE TRAFFIC SIGNAL SYSYTEM/ RAILROAD GRADE CROSSING AT STP RAIL 2011 0.125 CONST 0.125
WAVERLY AVENUE IN THE TOWN OF BROOKHAVEN, SUFFOLK COUNTY NFA 2011 0.031 CONST 0.031
093427
AQC:A1S SUFFOLK TPC : < $0.75 M TOTAL 4YR COST : 0.156 0.156 0.000 0.000 0.000
** NEW YORK STATE DEPARTMENT OF TRANSPORTATION **
Friday, August 26, 2011 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) on Draft Program Page 35 of 84
for REGION 10
AGENCY PROJECT DESCRIPTION TOTAL 4-YEAR PROGRAM (FFY)
4-YEAR PHASE Starting October 01, 2010
FUND SOURCES FFY
PIN PROGRAM
FFY FFY FFY FFY
in millions
of dollars 2011 2012 2013 2014
AQ CODE COUNTY TOTAL PROJECT COST
NYSDOT UPGRADE TRAFFIC SIGNAL SYSTEM / RAILROAD GRADE CROSSING WARNING STP RAIL 2011 0.100 CONST 0.100
SYSTEM IN NASSAU AND SUFFOLK COUNTIES NFA 2011 0.025 CONST 0.025
093428
AQC:A1S MULTI TPC : < $0.75 M TOTAL 4YR COST : 0.125 0.125 0.000 0.000 0.000
NYSDOT UPGRADE TRAFFIC SIGNAL SYSTEM / RAILROAD GRADE CROSSING WARNING STP RAIL 2012 0.951 CONST 0.951
SYSTEM IN NASSAU AND SUFFOLK COUNTIES- FFY12 NFA 2012 0.238 CONST 0.238
093429
AQC:A1S MULTI TPC : $0.6-$1.5 M TOTAL 4YR COST : 1.189 0.000 1.189 0.000 0.000
NYSDOT UPGRADE TRAFFIC SIGNAL CROSSING SYSTEM / RAILROAD GRADE CROSSING STP RAIL 2013 1.110 CONST 1.110
WARNING SYSTEM IN NASSAU AND SUFFOLK COUNTIES -FFY13 NFA 2013 0.278 CONST 0.278
093430
AQC:A1S MULTI TPC : $1.2-$2.5 M TOTAL 4YR COST : 1.388 0.000 0.000 1.388 0.000
NYSDOT UPGRADE TRAFFIC SIGNAL SYSTEM/ RAILROAD GRADE CROSSING WARNING STP RAIL 2014 1.121 DETLDES 1.121
SYSTEM IN NASSAU AND SUFFOLK COUNTIES- FFY 14 NFA 2014 0.280 DETLDES 0.280
093431
AQC:A1S MULTI TPC : $1.2-$2.5 M TOTAL 4YR COST : 1.401 0.000 0.000 0.000 1.401
NYSDOT STATE BRIDGE INSPECTIONS AS REQUIRED BY FHWA ON STATE HIGHWAYS TO HBRR 2011 0.480 DETLDES 0.480
MAINTAIN THE SAFETY OF THE STRUCTURES FOR PUBLIC USE. IN NASSAU AND NFA 2011 0.120 DETLDES 0.120
0B1001 SUFFOLK COUNTIES
AQC:A19P MULTI TPC : < $0.75 M TOTAL 4YR COST : 0.600 0.600 0.000 0.000 0.000
NYSDOT STATE FORCES BRIDGE INSPECTION IN SUFFOLK AND NASSAU COUNTY ON HBRR 2011 0.560 DETLDES 0.560
STATE HIGHWAYS 1/1/2012 - 12/31/3013 NFA 2011 0.140 DETLDES 0.140
0B1101
AQC:A19P MULTI TPC : $0.6-$1.5 M TOTAL 4YR COST : 0.700 0.700 0.000 0.000 0.000
NYSDOT BIENNIAL CONSULTANT BRIDGE INSPECTIONS AS REQUIRED BY FHWA TO HBRR 2011 2.880 DETLDES 2.880
MAINTAIN THE SAFETY OF THE STRUCTURES FOR PUBLIC USENASSAU AND NFA 2011 0.720 DETLDES 0.720
0B1102 SUFFOLK COUNTY
AQC:A2S MULTI TPC : $3.3-$5.6 M TOTAL 4YR COST : 3.600 3.600 0.000 0.000 0.000
** NEW YORK STATE DEPARTMENT OF TRANSPORTATION **
Friday, August 26, 2011 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) on Draft Program Page 36 of 84
for REGION 10
AGENCY PROJECT DESCRIPTION TOTAL 4-YEAR PROGRAM (FFY)
4-YEAR PHASE Starting October 01, 2010
FUND SOURCES FFY
PIN PROGRAM
FFY FFY FFY FFY
in millions
of dollars 2011 2012 2013 2014
AQ CODE COUNTY TOTAL PROJECT COST
NYSDOT NYSDOT REGION 10 : UNDERWATER INSPECTIONS FOR BRIDGES TO MAINTAIN HBRR 2011 1.400 DETLDES 1.400
THE SAFETY OF THE STRUCTURES FOR PUBLIC USE IN NASSAU AND SUFFOLK NFA 2011 0.350 DETLDES 0.350
0B1103 COUNTIES
AQC:A2S MULTI TPC : $1.2-$2.5 M TOTAL 4YR COST : 1.750 1.750 0.000 0.000 0.000
NYSDOT BRIDGE INSPECTION FOR SCOUR MONITORING IN NASSAU AND SUFFOLK HBRR 2012 0.480 DETLDES 0.480
COUNTY NFA 2012 0.120 DETLDES 0.120
0B1104
AQC:A19S MULTI TPC : < $0.75 M TOTAL 4YR COST : 0.600 0.000 0.600 0.000 0.000
NYSDOT STATE BRIDGE INSPECTIONS AS REQUIRED BY FHWA ON STATE HIGHWAYS TO HBRR 2012 0.560 DETLDES 0.560
MAINTAIN THE SAFETY OF THE STRUCTURES FOR PUBLIC USE. IN NASSAU AND NFA 2012 0.140 DETLDES 0.140
0B1201 SUFFOLK COUNTIES
AQC:A2S MULTI TPC : $0.6-$1.5 M TOTAL 4YR COST : 0.700 0.000 0.700 0.000 0.000
NYSDOT STATE BRIDGE INSPECTIONS AS REQUIRED BY FHWA ON STATE HIGHWAYS TO HBRR 2013 0.560 DETLDES 0.560
MAINTAIN THE SAFETY OF THE STRUCTURES FOR PUBLIC USE. IN NASSAU AND NFA 2013 0.140 DETLDES 0.140
0B1301 SUFFOLK COUNTIES
AQC:A2S MULTI TPC : $0.6-$1.5 M TOTAL 4YR COST : 0.700 0.000 0.000 0.700 0.000
NYSDOT BIENNIAL CONSULTANT BRIDGE INSPECTIONS AS REQUIRED BY FHWA TO HBRR 2013 2.880 DETLDES 2.880
MAINTAIN THE SAFETY OF THE STRUCTURES FOR PUBLIC USENASSAU AND NFA 2013 0.720 DETLDES 0.720
0B1302 SUFFOLK COUNTY
AQC:A2S MULTI TPC : $3.3-$5.6 M TOTAL 4YR COST : 3.600 0.000 0.000 3.600 0.000
NYSDOT NYSDOT REGION 10 : UNDERWATER INSPECTIONS FOR BRIDGES TO MAINTAIN HBRR 2013 1.400 DETLDES 1.400
THE SAFETY OF THE STRUCTURES FOR PUBLIC USE IN NASSAU AND SUFFOLK NFA 2013 0.350 DETLDES 0.350
0B1303 COUNTIES
AQC:A2S MULTI TPC : $1.2-$2.5 M TOTAL 4YR COST : 1.750 0.000 0.000 1.750 0.000
NYSDOT BRIDGE INSPECTION FOR SCOUR MONITORING IN NASSAU AND SUFFOLK HBRR 2014 0.480 DETLDES 0.480
COUNTY NFA 2014 0.120 DETLDES 0.120
0b1304
AQC:A19S MULTI TPC : < $0.75 M TOTAL 4YR COST : 0.600 0.000 0.000 0.000 0.600
** NEW YORK STATE DEPARTMENT OF TRANSPORTATION **
Friday, August 26, 2011 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) on Draft Program Page 37 of 84
for REGION 10
AGENCY PROJECT DESCRIPTION TOTAL 4-YEAR PROGRAM (FFY)
4-YEAR PHASE Starting October 01, 2010
FUND SOURCES FFY
PIN PROGRAM
FFY FFY FFY FFY
in millions
of dollars 2011 2012 2013 2014
AQ CODE COUNTY TOTAL PROJECT COST
NYSDOT STATE BRIDGE INSPECTIONS AS REQUIRED BY FHWA ON STATE HIGHWAYS TO HBRR 2014 0.560 DETLDES 0.560
MAINTAIN THE SAFETY OF THE STRUCTURES FOR PUBLIC USE. IN NASSAU AND NFA 2014 0.140 DETLDES 0.140
0B1401 SUFFOLK COUNTIES
AQC:A2S MULTI TPC : $0.6-$1.5 M TOTAL 4YR COST : 0.700 0.000 0.000 0.000 0.700
NYSDOT PURCHASE TRAFFIC SIGNAL EQUIPMENT NASSAU AND SUFFOLK COUNTY NFA 2011 0.650 CONST 0.650
NFA 2012 0.650 CONST 0.650
0SIP00 NFA 2013 0.650 OPER 0.650
NFA 2014 0.650 OPER 0.650
AQC:D2P MULTI TPC : $3.3-$5.6 M TOTAL 4YR COST : 2.600 0.650 0.650 0.650 0.650
NYSDOT CONCRETE PAVEMENT REPAIR INCLUDING JOINT SEALING, DIAMOND GRINDING STP FLEX 2011 0.202 CONINSP 0.202
ET AL ON NY27 BETWEEN PHYLLIS DR AND CR21 TO MAINTAIN STATE OF GOOD NFA 2011 0.050 CONINSP 0.050
0T1376 REPAIR, TOWN OF BROOKHAVEN, SUFFOLK COUNTY STP FLEX 2011 1.687 CONST 1.687
NFA 2011 0.422 CONST 0.422
AQC:A10P MULTI TPC : $2-$4 M TOTAL 4YR COST : 2.361 2.361 0.000 0.000 0.000
NYSDOT BRIDGE PAINTING, CLEANING, RUST REMOVAL & DISPOSAL (LOCATIONS HBRR 2011 0.217 DETLDES 0.217
TO-BE-DETERMINED) TO MAINTAIN STRUCTURAL INTEGRITY ON VARIOUS NFA 2011 0.055 DETLDES 0.055
0T1460 STATE HIGHWAYS & PARKWAYS IN NASSAU & SUFFOLK COUNTIES. HBRR 2012 0.213 CONINSP 0.213
NFA 2012 0.053 CONINSP 0.053
HBRR 2012 2.103 CONST 2.103
NFA 2012 0.526 CONST 0.526
AQC:A19P MULTI TPC : $3.3-$5.6 M TOTAL 4YR COST : 3.167 0.272 2.895 0.000 0.000
NYSDOT PREVENTATIVE MAINTENANCE BRIDGE REPAIRS TO MAINTAIN STRUCTURAL NFA 2011 0.192 DETLDES 0.192
INTEGRITY (LOCATIONS TO-BE-DETERMINED) ON VARIOUS STATE HIGHWAYS & NFA 2013 0.351 CONINSP 0.351
0T1467 PARKWAYS IN NASSAU & SUFFOLK COUNTIES. NFA 2013 3.512 CONST 3.512
AQC:A19P MULTI TPC : $3.3-$5.6 M TOTAL 4YR COST : 4.055 0.192 0.000 3.863 0.000
NYSDOT PREVENTATIVE MAINTENANCE BRIDGE REPAIRS TO MAINTAIN STRUCTURAL NFA 2012 0.837 DETLDES 0.837
INTEGRITY (LOCATIONS TO-BE-DETERMINED) ON VARIOUS STATE HIGHWAYS & NFA 2014 1.113 CONINSP 1.113
0T1468 PARKWAYS IN NASSAU & SUFFOLK COUNTIES. NFA 2014 11.133 CONST 11.133
AQC:A19P MULTI TPC : $12.5-$19 M TOTAL 4YR COST : 13.083 0.000 0.837 0.000 12.246
** NEW YORK STATE DEPARTMENT OF TRANSPORTATION **
Friday, August 26, 2011 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) on Draft Program Page 38 of 84
for REGION 10
AGENCY PROJECT DESCRIPTION TOTAL 4-YEAR PROGRAM (FFY)
4-YEAR PHASE Starting October 01, 2010
FUND SOURCES FFY
PIN PROGRAM
FFY FFY FFY FFY
in millions
of dollars 2011 2012 2013 2014
AQ CODE COUNTY TOTAL PROJECT COST
NYSDOT PREVENTATIVE MAINTENANCE BRIDGE REPAIRS TO MAINTAIN STRUCTURAL NFA 2013 1.501 DETLDES 1.501
INTEGRITY (LOCATIONS TO-BE-DETERMINED) ON VARIOUS STATE HIGHWAYS &
0T1469 PARKWAYS IN NASSAU & SUFFOLK COUNTIES.
AQC:A19P MULTI TPC : $12.5-$19 M TOTAL 4YR COST : 1.501 0.000 0.000 1.501 0.000
NYSDOT BRIDGE IMPROVEMENTS (LOCATIONS TO-BE-DETERMINED) TO MAINTAIN NFA 2013 1.179 PRELDES 1.179
STRUCTURAL INTEGRITY ON VARIOUS STATE HIGHWAYS & PARKWAYS IN
0T1472 NASSAU & SUFFOLK COUNTIES
AQC:A19P MULTI TPC : $15-$25 M TOTAL 4YR COST : 1.179 0.000 0.000 1.179 0.000
NYSDOT TRAFFIC SIGNAL REQUIREMENTS CONTRACT 042006 NFA 2013 0.316 CONINSP 0.316
NFA 2013 3.610 CONST 3.610
0T1517
AQC:D2P MULTI TPC : $3.3-$5.6 M TOTAL 4YR COST : 3.926 0.000 0.000 3.926 0.000
NYSDOT BLOCKOUT FOR FUTURE PAVEMENT REHABILITATION PROJECTS (LOCATIONS NFA 2013 0.591 DETLDES 0.591
TO-BE-DETERMINED) ON VARIOUS STATE HIGHWAYS & PARKWAYS IN NASSAU
0T1535 & SUFFOLK COUNTIES.
AQC:A10P MULTI TPC : $9.5-15.5 M TOTAL 4YR COST : 0.591 0.000 0.000 0.591 0.000
NYSDOT BLOCKOUT FOR FUTURE PAVEMENT REHABILITATION PROJECTS TO MAINTAIN NFA 2011 0.607 DETLDES 0.607
STATE OF GOOD REPAIR(LOCATIONS TO-BE-DETERMINED) ON VARIOUS STATE
0T1537 HIGHWAYS & PARKWAYS IN NASSAU & SUFFOLK COUNTIES.
AQC:A10P MULTI TPC : $12.5-$19 M TOTAL 4YR COST : 0.607 0.607 0.000 0.000 0.000
NYSDOT SAFETY IMPROVEMENTS TO ADRESS A A PRIORITY INVESTIGATION LOCATION NFA 2013 0.804 DETLDES 0.804
(TO-BE-DETERMINED) ON VARIOUS STATE HIGHWAYS & PARKWAYS IN NASSAU
0T1543 & SUFFOLK COUNTIES.
AQC:A6P MULTI TPC : $12.5-$19 M TOTAL 4YR COST : 0.804 0.000 0.000 0.804 0.000
NYSDOT SAFETY IMPROVEMENTS TO ADRESS A A PRIORITY INVESTIGATION LOCATION NFA 2013 1.174 ROWACQU 1.174
(TO-BE-DETERMINED) ON VARIOUS STATE HIGHWAYS & PARKWAYS IN NASSAU NFA 2014 0.218 DETLDES 0.218
0T1544 & SUFFOLK COUNTIES.
AQC:A6P MULTI TPC : $7.5-$12 M TOTAL 4YR COST : 1.392 0.000 0.000 1.174 0.218
** NEW YORK STATE DEPARTMENT OF TRANSPORTATION **
Friday, August 26, 2011 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) on Draft Program Page 39 of 84
for REGION 10
AGENCY PROJECT DESCRIPTION TOTAL 4-YEAR PROGRAM (FFY)
4-YEAR PHASE Starting October 01, 2010
FUND SOURCES FFY
PIN PROGRAM
FFY FFY FFY FFY
in millions
of dollars 2011 2012 2013 2014
AQ CODE COUNTY TOTAL PROJECT COST
NYSDOT SAFETY IMPROVEMENTS TO ADRESS A A PRIORITY INVESTIGATION LOCATION NFA 2014 0.217 DETLDES 0.217
(TO-BE-DETERMINED) ON VARIOUS STATE HIGHWAYS & PARKWAYS IN NASSAU NFA 2014 1.174 ROWACQU 1.174
0T1545 & SUFFOLK COUNTIES.
AQC:A6P MULTI TPC : $7.5-$12 M TOTAL 4YR COST : 1.391 0.000 0.000 0.000 1.391
NYSDOT REHABILITATE RECHARGE BASINS INCLUDING SLOPE STABILIZATION, HEAD NFA 2011 0.149 DETLDES 0.149
WALL REPAIR, ET AL(LOCATIONS TO-BE-DETERMINED) ON VARIOUS STATE NFA 2012 0.258 CONINSP 0.258
0T1584 HIGHWAYS IN NASSAU & SUFFOLK COUNTIES. NFA 2012 2.151 CONST 2.151
AQC:A2P MULTI TPC : $2-$4 M TOTAL 4YR COST : 2.558 0.149 2.409 0.000 0.000
NYSDOT BLOCKOUT OF FUNDS FOR FUTURE SAFETY PROJECTS ON VARIOUS STATE NFA 2012 0.282 DETLDES 0.282
HIGHWAYS & PARKWAYS IN NASSAU & SUFFOLK COUNTIES. THE PROJECT HSIP 2014 0.298 CONINSP 0.298
0T1594 DEVELOPMENT WILL OCCUR BASED OFF OF THE STRATEGIC HIGHWAY SAFETY NFA 2014 0.033 CONINSP 0.033
PLAN (LOCATIONS TO-BE-DETERMINED) HSIP 2014 2.975 CONST 2.975
NFA 2014 0.331 CONST 0.331
AQC:A6P MULTI TPC : $3.3-$5.6 M TOTAL 4YR COST : 3.919 0.000 0.282 0.000 3.637
NYSDOT BLOCKOUT OF FUNDS FOR FUTURE SAFETY PROJECTS ON VARIOUS STATE HSIP 2013 1.929 DETLDES 1.929
HIGHWAYS & PARKWAYS IN NASSAU & SUFFOLK COUNTIES. THE PROJECT NFA 2013 0.214 DETLDES 0.214
0T1595 DEVELOPMENT WILL OCCUR BASED OFF OF THE STRATEGIC HIGHWAY SAFETY
PLAN (LOCATIONS TO-BE-DETERMINED)
AQC:A6P MULTI TPC : $15-$25 M TOTAL 4YR COST : 2.143 0.000 0.000 2.143 0.000
NYSDOT SAFETY IMPROVEMENT PROJECT SCOPE TO-BE-DETERMINED BASED ON STUDY NFA 2014 0.943 DETLDES 0.943
OF NY25 FROM ROUND SWAMP RD TO NY454, TOWNS OF HUNTINGTON AND
0T1651 SMITHTOWN, SUFFOLK COUNTY
AQC:A6P SUFFOLK TPC : $9.5-15.5 M TOTAL 4YR COST : 0.943 0.000 0.000 0.000 0.943
NYSDOT CONCRETE PAVEMENT REPAIR INCLUDING JOINT SEALING, DIAMOND GRINDING IM 2011 0.101 DETLDES 0.101
ETC ON I495 TO MAINTAIN STATE OF GOOD REPAIR AT VARIOUS LOCATIONS IN NFA 2011 0.011 DETLDES 0.011
0T1679 NASSAU & SUFFOLK COUNTIES. IM 2012 0.232 CONINSP 0.232
NFA 2012 0.026 CONINSP 0.026
IM 2012 1.937 CONST 1.937
NFA 2012 0.215 CONST 0.215
AQC:A10P MULTI TPC : $2-$4 M TOTAL 4YR COST : 2.522 0.112 2.410 0.000 0.000
** NEW YORK STATE DEPARTMENT OF TRANSPORTATION **
Friday, August 26, 2011 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) on Draft Program Page 40 of 84
for REGION 10
AGENCY PROJECT DESCRIPTION TOTAL 4-YEAR PROGRAM (FFY)
4-YEAR PHASE Starting October 01, 2010
FUND SOURCES FFY
PIN PROGRAM
FFY FFY FFY FFY
in millions
of dollars 2011 2012 2013 2014
AQ CODE COUNTY TOTAL PROJECT COST
NYSDOT MILLING, CONCRETE & ASPHALT PAVEMENT REPAIRS, SINGLE COURSE NFA 2011 0.278 DETLDES 0.278
OVERLAY ON I495 (LOCATIONS TO-BE-DETERMINED) TO MAINTAIN STATE OF IM 2012 0.484 CONINSP 0.484
0T1684 GOOD REPAIR IN NASSAU & SUFFOLK COUNTIES NFA 2012 0.185 CONINSP 0.185
IM 2012 4.836 CONST 4.836
NFA 2012 1.844 CONST 1.844
AQC:A10P MULTI TPC : $6-$9.4 M TOTAL 4YR COST : 7.627 0.278 7.349 0.000 0.000
NYSDOT CONCRETE PAVEMENT REPAIR INCLUDING JOINT SEALING, DIAMOND GRINDING NFA 2012 0.113 DETLDES 0.113
ET AL(LOCATIONS TO-BE-DETERMINED) TO MAINTAIN STATE OF GOOD REPAIR STP LG URBAN 2013 0.212 CONINSP 0.212
0T1686 ON VARIOUS STATE HIGHWAYS & PARKWAYS IN NASSAU & SUFFOLK COUNTIES. NFA 2013 0.053 CONINSP 0.053
STP LG URBAN 2013 1.764 CONST 1.764
NFA 2013 0.441 CONST 0.441
AQC:A10P MULTI TPC : $2-$4 M TOTAL 4YR COST : 2.583 0.000 0.113 2.470 0.000
NYSDOT REHABILITATE RECHARGE BASINS INCLUDING SLOPE STABILIZATION, HEAD NFA 2013 0.184 DETLDES 0.184
WALL REPAIR, ET AL(LOCATIONS TO-BE-DETERMINED) TO MAINTAIN STATE OF NFA 2014 0.272 CONINSP 0.272
0T1689 GOOD REPAIRON VARIOUS STATE HIGHWAYS & PARKWAYS IN NASSAU & NFA 2014 2.720 CONST 2.720
SUFFOLK COUNTIES.
AQC:A2P MULTI TPC : $2-$4 M TOTAL 4YR COST : 3.176 0.000 0.000 0.184 2.992
NYSDOT MILLING, CONCRETE & ASPHALT PAVEMENT REPAIRS, SINGLE COURSE NFA 2012 0.282 DETLDES 0.282
OVERLAY ON I495 (LOCATIONS TO-BE-DETERMINED) TO MAINTAIN STATE OF STP LG URBAN 2013 0.088 CONINSP 0.088
0T1691 GOOD REPAIR IN NASSAU & SUFFOLK COUNTIES NFA 2013 0.462 CONINSP 0.462
STP LG URBAN 2013 0.882 CONST 0.882
NFA 2013 4.628 CONST 4.628
AQC:A10P MULTI TPC : $6-$9.4 M TOTAL 4YR COST : 6.342 0.000 0.282 6.060 0.000
NYSDOT REMOVAL OR PAINT OVER OF GRAFITTI, REPAIR NOISE WALLS, MAINTAIN THE 7 NFA 2011 0.180 DETLDES 0.180
PARK & RIDE LOTS ALONG I495, ALL NYS BIKEWAYS, REST AREAS, PUBLIC NFA 2013 0.333 CONINSP 0.333
0T1694 TELEPHONE AREAS ALONG PARKWAYS & BUS SHELTERS ON NYS NFA 2013 3.333 CONST 3.333
RIGHT-OF-WAY TO MAINTAIN STATE OF GOOD REPAIR NASSAU AND SUFFOLK
AQC:C8P MULTI TPC : $3.3-$5.6 M TOTAL 4YR COST : 3.846 0.180 0.000 3.666 0.000
** NEW YORK STATE DEPARTMENT OF TRANSPORTATION **
Friday, August 26, 2011 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) on Draft Program Page 41 of 84
for REGION 10
AGENCY PROJECT DESCRIPTION TOTAL 4-YEAR PROGRAM (FFY)
4-YEAR PHASE Starting October 01, 2010
FUND SOURCES FFY
PIN PROGRAM
FFY FFY FFY FFY
in millions
of dollars 2011 2012 2013 2014
AQ CODE COUNTY TOTAL PROJECT COST
NYSDOT RESPOND TO EMERGENCIES THAT ARE BEYOND THE CAPABILITIES OF NYS NFA 2011 0.180 DETLDES 0.180
MAINTENANCE FORCES TO ENSURE THE SAFETY OF THE PUBLIC ON VARIOUS NFA 2013 0.258 CONINSP 0.258
0T1697 STATE HIGHWAYS & PARKWAYS IN NASSAU & SUFFOLK COUNTIES. NFA 2013 2.152 CONST 2.152
AQC:A2P MULTI TPC : $2-$4 M TOTAL 4YR COST : 2.590 0.180 0.000 2.410 0.000
NYSDOT REPLACE OR UPGRADE SIGNALS AND/OR APPURTENANCES & INSTALL NEW NFA 2011 0.135 DETLDES 0.135
SIGNALS TO MAINTAIN STATE OF GOOD REPAIR OR SAFETY IMPROVEMENT ON STP FLEX 2012 0.290 CONINSP 0.290
0T1699 VARIOUS STATE HIGHWAYS IN NASSAU & SUFFOLK COUNTIES NFA 2012 0.072 CONINSP 0.072
STP FLEX 2012 2.903 CONST 2.903
NFA 2012 0.726 CONST 0.726
AQC:D2P MULTI TPC : $3.3-$5.6 M TOTAL 4YR COST : 4.126 0.135 3.991 0.000 0.000
NYSDOT INSTALLATION AND REPLACEMENT OF DETERIORATED PAVEMENT MARKINGS NFA 2012 0.250 DETLDES 0.250
& PLOWABLE REFLECTIVE MARKERS ON VARIOUS STATE HIGHWAYS & STP LG URBAN 2013 0.430 CONINSP 0.430
0T1701 PARKWAYS IN NASSAU & SUFFOLK COUNTIES. NFA 2013 0.107 CONINSP 0.107
STP LG URBAN 2013 4.300 CONST 4.300
NFA 2013 1.075 CONST 1.075
AQC:A10P MULTI TPC : $4.6-$7.5 M TOTAL 4YR COST : 6.162 0.000 0.250 5.912 0.000
NYSDOT REPLACE OR UPGRADE SIGNALS AND/OR APPURTENANCES & INSTALL NEW NFA 2012 0.293 DETLDES 0.293
SIGNALS TO MAINTAIN STATE OF GOOD REPAIR OR SAFETY IMPROVEMENT ON STP FLEX 2013 0.264 CONINSP 0.264
0T1702 VARIOUS STATE HIGHWAYS IN NASSAU & SUFFOLK COUNTIES NFA 2013 0.066 CONINSP 0.066
STP FLEX 2013 2.644 CONST 2.644
NFA 2013 0.661 CONST 0.661
AQC:D2P MULTI TPC : $3.3-$5.6 M TOTAL 4YR COST : 3.928 0.000 0.293 3.635 0.000
NYSDOT CORRECT PRIORITY HIGHWAY FOODING LOCATIONS, PROVIDE STORMWATER NFA 2013 0.160 DETLDES 0.160
RUN-OFF IMPROVEMENTS INCLUDING 1 LOC IN TOWN OF RIVERHEAD FOR
0T1706 SAFETEA-LU EARMARK & OTHER LOC NAS & SUF.
AQC:C11P MULTI TPC : $6-$9.4 M TOTAL 4YR COST : 0.160 0.000 0.000 0.160 0.000
NYSDOT CORRECT PRIORITY HIGHWAY FLOODING LOCATIONS AND REPLACE CATCH STP LG URBAN 2013 0.077 DETLDES 0.077
BASINS WITHIN ESTUARY WATERSHED AREAS WITH VORTEX TYPE BASINS IN NFA 2013 0.018 DETLDES 0.018
0T1707 NASSAU & SUFFOLK COUNTIES. (LOCATIONS TO BE DETERMINED)
AQC:C11P MULTI TPC : $6-$9.4 M TOTAL 4YR COST : 0.095 0.000 0.000 0.095 0.000
** NEW YORK STATE DEPARTMENT OF TRANSPORTATION **
Friday, August 26, 2011 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) on Draft Program Page 42 of 84
for REGION 10
AGENCY PROJECT DESCRIPTION TOTAL 4-YEAR PROGRAM (FFY)
4-YEAR PHASE Starting October 01, 2010
FUND SOURCES FFY
PIN PROGRAM
FFY FFY FFY FFY
in millions
of dollars 2011 2012 2013 2014
AQ CODE COUNTY TOTAL PROJECT COST
NYSDOT BRIDGE PAINTING, CLEANING, RUST REMOVAL & DISPOSAL (LOCATIONS NFA 2012 0.265 DETLDES 0.265
TO-BE-DETERMINED) TO MAINTAIN STRUCTURAL INTEGRITY ON VARIOUS HBRR 2014 0.529 CONINSP 0.529
0T1714 STATE HIGHWAYS & PARKWAYS IN NASSAU & SUFFOLK COUNTIES. NFA 2014 0.132 CONINSP 0.132
HBRR 2014 5.289 CONST 5.289
NFA 2014 1.322 CONST 1.322
AQC:A19P MULTI TPC : $7.5-$12 M TOTAL 4YR COST : 7.537 0.000 0.265 0.000 7.272
NYSDOT REHABILITE SIDEWALK & CURB RAMPS (LOCATIONS TO-BE-DETERMINED) ON NFA 2011 0.180 DETLDES 0.180
VARIOUS STATE ROADS TO MAINTAIN STATE OF GOOD REPAIR IN NASSAU & NFA 2013 0.322 CONINSP 0.322
0T1718 SUFFOLK COUNTIES. NFA 2013 3.225 CONST 3.225
.
AQC:A6P MULTI TPC : $3.3-$5.6 M TOTAL 4YR COST : 3.727 0.180 0.000 3.547 0.000
NYSDOT PROVIDE LANDSCAPE RESTORATION & MAINTAIN EXISTING LANDSCAPE AREAS, NFA 2013 0.189 DETLDES 0.189
TRIM OR REMOVE TREES THAT IMPEDE VISIBILITY (LOCATIONS
0T1722 TO-BE-DETERMINED) ON VARIOUS STATE HIGHWAYS & PARKWAYS IN NASSAU
& SUFFOLK COUNTIES.
AQC:C11P MULTI TPC : $3.3-$5.6 M TOTAL 4YR COST : 0.189 0.000 0.000 0.189 0.000
NYSDOT SIDEWALK CONSTRUCTION: CONNECT FRAGMENTENTED SIDEWALKS ON STATE STP FLEX 2012 0.151 DETLDES 0.151
HIGHWAYS AND LINK SIDEWALKS WITH OTHER MODES OF TRANSPORTATION NFA 2012 0.038 DETLDES 0.038
0T1733 AS REQUIRED BY AMERICANS WITH DISABILITIES ACT. NASSAU AND SUFFOLK STP FLEX 2014 0.091 CONINSP 0.091
COUNTY NFA 2014 0.023 CONINSP 0.023
STP FLEX 2014 0.911 CONST 0.911
NFA 2014 0.228 CONST 0.228
AQC:A6P MULTI TPC : $1.2-$2.5 M TOTAL 4YR COST : 1.442 0.000 0.189 0.000 1.253
NYSDOT MILLING, CONCRETE & ASPHALT PAVEMENT REPAIRS, SINGLE COURSE NFA 2013 0.271 DETLDES 0.271
OVERLAY ON I495 (LOCATIONS TO-BE-DETERMINED) TO MAINTAIN STATE OF STP FLEX 2014 0.544 CONINSP 0.544
0T1765 GOOD REPAIR IN NASSAU & SUFFOLK COUNTIES NFA 2014 0.136 CONINSP 0.136
STP FLEX 2014 5.447 CONST 5.447
NFA 2014 1.362 CONST 1.362
AQC:A10P MULTI TPC : $6-$9.4 M TOTAL 4YR COST : 7.760 0.000 0.000 0.271 7.489
NYSDOT MILLING, CONCRETE & ASPHALT PAVEMENT REPAIRS, SINGLE COURSE NFA 2013 0.482 DETLDES 0.482
OVERLAY ON I495 (LOCATIONS TO-BE-DETERMINED) TO MAINTAIN STATE OF
0T1766 GOOD REPAIR IN NASSAU & SUFFOLK COUNTIES
AQC:A19P MULTI TPC : $9.5-15.5 M TOTAL 4YR COST : 0.482 0.000 0.000 0.482 0.000
** NEW YORK STATE DEPARTMENT OF TRANSPORTATION **
Friday, August 26, 2011 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) on Draft Program Page 43 of 84
for REGION 10
AGENCY PROJECT DESCRIPTION TOTAL 4-YEAR PROGRAM (FFY)
4-YEAR PHASE Starting October 01, 2010
FUND SOURCES FFY
PIN PROGRAM
FFY FFY FFY FFY
in millions
of dollars 2011 2012 2013 2014
AQ CODE COUNTY TOTAL PROJECT COST
NYSDOT SIGN REPAIRS & INSTALLATIONS TO MAINTAIN STATE OF GOOD REPAIR ON NFA 2012 0.100 DETLDES 0.100
VARIOUS STATE HIGHWAYS & PARKWAYS IN NASSAU & SUFFOLK COUNTIES STP FLEX 2013 0.212 CONINSP 0.212
0T1768 NFA 2013 0.053 CONINSP 0.053
STP FLEX 2013 1.764 CONST 1.764
NFA 2013 0.441 CONST 0.441
AQC:C13P MULTI TPC : $2-$4 M TOTAL 4YR COST : 2.570 0.000 0.100 2.470 0.000
NYSDOT INSTALLATION AND REPLACEMENT OF DETERIORATED PAVEMENT MARKINGS NFA 2013 0.314 DETLDES 0.314
& PLOWABLE REFLECTIVE MARKERS ON VARIOUS STATE HIGHWAYS & STP FLEX 2014 0.441 CONINSP 0.441
0T1769 PARKWAYS IN NASSAU & SUFFOLK COUNTIES. NFA 2014 0.650 CONINSP 0.650
STP FLEX 2014 4.407 CONST 4.407
NFA 2014 6.500 CONST 6.500
AQC:A10P MULTI TPC : $9.5-15.5 M TOTAL 4YR COST : 12.312 0.000 0.000 0.314 11.998
NYSDOT BRIDGE CLEANING (LOCATIONS TO-BE-DETERMINED) TO MAINTAIN NFA 2013 0.049 DETLDES 0.049
STRUCTURAL INTEGRITY ON VARIOUS STATE HIGHWAYS & PARKWAYS IN STP FLEX 2013 0.112 CONINSP 0.112
0T1770 NASSAU & SUFFOLK COUNTIES. NFA 2013 0.028 CONINSP 0.028
STP FLEX 2013 0.937 CONST 0.937
NFA 2013 0.235 CONST 0.235
AQC:A19P MULTI TPC : $1.2-$2.5 M TOTAL 4YR COST : 1.361 0.000 0.000 1.361 0.000
NYSDOT PROVIDE SAFETY & PAVEMENT IMPROVEMENTS AND EMERGENCY REPAIRS ON NFA 2012 0.245 DETLDES 0.245
AN AS-NEEDED-BASIS AS AN EMERGENCY RESPONSE ON VARIOUS STATE NFA 2013 0.468 CONINSP 0.468
0T1771 HIGHWAYS & PARKWAYS IN NASSAU & SUFFOLK COUNTIES. NFA 2013 4.684 CONST 4.684
AQC:A10P MULTI TPC : $4.6-$7.5 M TOTAL 4YR COST : 5.397 0.000 0.245 5.152 0.000
NYSDOT ROUT & SEAL ASPHALT PAVEMENT CRACKS AND JOINT OVERLAY REPAIR TO NFA 2012 0.184 DETLDES 0.184
MAINTAIN STATE OF GOOD REPAIR (LOCATIONS TO-BE-DETERMINED) ON STP FLEX 2013 0.106 CONINSP 0.106
0T1773 VARIOUS STATE HIGHWAYS & PARKWAYS IN NASSAU & SUFFOLK COUNTIES NFA 2013 0.158 CONINSP 0.158
STP FLEX 2013 0.882 CONST 0.882
NFA 2013 1.324 CONST 1.324
AQC:A10P MULTI TPC : $2-$4 M TOTAL 4YR COST : 2.654 0.000 0.184 2.470 0.000
** NEW YORK STATE DEPARTMENT OF TRANSPORTATION **
Friday, August 26, 2011 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) on Draft Program Page 44 of 84
for REGION 10
AGENCY PROJECT DESCRIPTION TOTAL 4-YEAR PROGRAM (FFY)
4-YEAR PHASE Starting October 01, 2010
FUND SOURCES FFY
PIN PROGRAM
FFY FFY FFY FFY
in millions
of dollars 2011 2012 2013 2014
AQ CODE COUNTY TOTAL PROJECT COST
NYSDOT CONCRETE PAVEMENT REPAIR INCLUDING JOINT SEALING, DIAMOND GRINDING NFA 2013 0.115 DETLDES 0.115
ET AL TO MAINTAIN STATE OF GOOD REPAIR (LOCATIONS TO-BE-DETERMINED) STP LG URBAN 2014 0.212 CONINSP 0.212
0T1774 ON VARIOUS STATE HIGHWAYS & PARKWAYS IN NASSAU & SUFFOLK COUNTIES. NFA 2014 0.053 CONINSP 0.053
STP LG URBAN 2014 1.764 CONST 1.764
NFA 2014 0.441 CONST 0.441
AQC:A10P MULTI TPC : $2-$4 M TOTAL 4YR COST : 2.585 0.000 0.000 0.115 2.470
NYSDOT REHABILITATE RECHARGE BASINS INCLUDING SLOPE STABILIZATION, HEAD NFA 2013 0.157 DETLDES 0.157
WALL REPAIR, ET AL TO MAINTAIN STATE OF GOOD REPAIR (LOCATIONS
0T1775 TO-BE-DETERMINED) ON VARIOUS STATE HIGHWAYS & PARKWAYS IN NASSAU
& SUFFOLK COUNTIES.
AQC:A2P MULTI TPC : $2-$4 M TOTAL 4YR COST : 0.157 0.000 0.000 0.157 0.000
NYSDOT CLEAN BASINS FILLED W/DEBRIS, REPAIR, REPLACE OR PROVIDE MISSING NFA 2012 0.774 DETLDES 0.774
COLLARS, REPAIR BASIN WALLS,REPAIR OR REPLACE BROKEN PIPES, REPLACE STP FLEX 2013 0.088 CONINSP 0.088
0T1776 GRATES, REPLACE BASINS, PROVIDE CONNECT ISOLATED BASINS TO NFA 2013 0.690 CONINSP 0.690
DRAINAGE SYSTEM TO PREVENT HIGHWAY FLOODING IN NASSAU &SUFFOLK STP FLEX 2013 0.881 CONST 0.881
NFA 2013 6.900 CONST 6.900
AQC:A10P MULTI TPC : $7.5-$12 M TOTAL 4YR COST : 9.333 0.000 0.774 8.559 0.000
NYSDOT ENVIRONMENTAL INITIATIVES CONTRACT -WILL PROVIDE STORMWATER NFA 2013 0.198 DETLDES 0.198
RUNOFF IMPROVEMENTS, IMPROVE ACCESS TO FISHING AREAS, RESTORE
0T1777 WETLAND AREAS AND CLEAN DRIANAGE ON VARIOUS STATE HIGHWAYS
NASSAU AND SUFFOLK COUNTY
AQC:C11P MULTI TPC : < $0.75 M TOTAL 4YR COST : 0.198 0.000 0.000 0.198 0.000
NYSDOT PREVENTATIVE MAINTENANCE BRIDGE REPAIRS TO MAINTAIN STRUCTURAL NFA 2013 0.318 DETLDES 0.318
INTEGRITY (LOCATIONS TO-BE-DETERMINED) ON VARIOUS STATE HIGHWAYS &
0T1778 PARKWAYS IN NASSAU & SUFFOLK COUNTIES.
AQC:A19P MULTI TPC : $3.3-$5.6 M TOTAL 4YR COST : 0.318 0.000 0.000 0.318 0.000
NYSDOT BRIDGE PAINTING, CLEANING, RUST REMOVAL & DISPOSAL TO MAINTAIN STP LG URBAN 2013 0.277 DETLDES 0.277
STRUCTURAL INTEGRITY (LOCATIONS TO-BE-DETERMINED) ON VARIOUS STATE NFA 2013 0.340 DETLDES 0.340
0T1779 HIGHWAYS & PARKWAYS IN NASSAU & SUFFOLK COUNTIES.
AQC:A19P MULTI TPC : $9.5-15.5 M TOTAL 4YR COST : 0.617 0.000 0.000 0.617 0.000
** NEW YORK STATE DEPARTMENT OF TRANSPORTATION **
Friday, August 26, 2011 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) on Draft Program Page 45 of 84
for REGION 10
AGENCY PROJECT DESCRIPTION TOTAL 4-YEAR PROGRAM (FFY)
4-YEAR PHASE Starting October 01, 2010
FUND SOURCES FFY
PIN PROGRAM
FFY FFY FFY FFY
in millions
of dollars 2011 2012 2013 2014
AQ CODE COUNTY TOTAL PROJECT COST
NYSDOT REMOVAL OR PAINT OVER OF GRAFITTI, REPAIR NOISE WALLS, MAINTAIN THE 7 NFA 2013 0.189 DETLDES 0.189
PARK & RIDE LOTS ALONG I495, ALL NYS BIKEWAYS, REST AREAS, PUBLIC
0T1781 TELEPHONE AREAS ALONG PARKWAYS & BUS SHELTERS ON NYS
RIGHT-OF-WAY TO MAINTAIN STATE OF GOOD REPAIR NASSAU & SUFFOLK
AQC:C8P MULTI TPC : $3.3-$5.6 M TOTAL 4YR COST : 0.189 0.000 0.000 0.189 0.000
NYSDOT INSTALLATION AND REPLACEMENT OF DETERIORATED PAVEMENT MARKINGS NFA 2013 0.405 DETLDES 0.405
& PLOWABLE REFLECTIVE MARKERS ON VARIOUS STATE HIGHWAYS &
0T1782 PARKWAYS IN NASSAU & SUFFOLK COUNTIES.
AQC:A10P MULTI TPC : $6-$9.4 M TOTAL 4YR COST : 0.405 0.000 0.000 0.405 0.000
NYSDOT ROUT & SEAL ASPHALT PAVEMENT CRACKS AND JOINT OVERLAY REPAIR TO NFA 2013 0.160 DETLDES 0.160
MAINTAIN STATE OF GOOD REPAIR (LOCATIONS TO-BE-DETERMINED) ON NFA 2013 0.160 DETLDES 0.160
0T1784 VARIOUS STATE HIGHWAYS & PARKWAYS IN NASSAU & SUFFOLK COUNTIES STP FLEX 2014 0.106 CONINSP 0.106
NFA 2014 0.027 CONINSP 0.027
STP FLEX 2014 0.883 CONST 0.883
NFA 2014 0.227 CONST 0.227
AQC:A10P NASSAU TPC : $1.2-$2.5 M TOTAL 4YR COST : 1.563 0.000 0.000 0.320 1.243
NYSDOT CONCRETE PAVEMENT REPAIR INCLUDING JOINT SEALING, DIAMOND GRINDING NFA 2014 0.117 DETLDES 0.117
ET AL TO MAINTAIN STATE OF GOOD REPAIR (LOCATIONS TO-BE-DETERMINED)
0T1785 ON VARIOUS STATE HIGHWAYS & PARKWAYS IN NASSAU & SUFFOLK COUNTIES.
AQC:A10P MULTI TPC : $2-$4 M TOTAL 4YR COST : 0.117 0.000 0.000 0.000 0.117
NYSDOT CLEAN BASINS FILLED W/DEBRIS, REPAIR, REPLACE OR PROVIDE MISSING NFA 2013 0.776 DETLDES 0.776
COLLARS, REPAIR OR REPLACE BROKEN PIPES, REPLACE GRATES, REPLACE STP FLEX 2014 0.088 CONINSP 0.088
0T1787 BASINS, PROVIDE CONNECT ISOLATED BASINS TO DRAINAGE SYSTEM TO NFA 2014 0.023 CONINSP 0.023
PREVENT HIGHWAY FLOODING IN NASSAU & SUFFOLK STP FLEX 2014 0.881 CONST 0.881
NFA 2014 0.227 CONST 0.227
AQC:A10P MULTI TPC : $1.2-$2.5 M TOTAL 4YR COST : 1.995 0.000 0.000 0.776 1.219
NYSDOT REPLACE OR UPGRADE SIGNALS AND/OR APPURTENANCES & INSTALL NEW NFA 2013 0.285 DETLDES 0.285
SIGNALS TO MAINTAIN STATE OF GOOD REPAIR OR SAFETY IMPROVEMENT ON STP LG URBAN 2014 0.264 CONINSP 0.264
0T1788 VARIOUS STATE HIGHWAYS IN NASSAU & SUFFOLK COUNTIES NFA 2014 0.068 CONINSP 0.068
STP LG URBAN 2014 2.645 CONST 2.645
NFA 2014 0.681 CONST 0.681
AQC:D2P MULTI TPC : $3.3-$5.6 M TOTAL 4YR COST : 3.943 0.000 0.000 0.285 3.658
** NEW YORK STATE DEPARTMENT OF TRANSPORTATION **
Friday, August 26, 2011 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) on Draft Program Page 46 of 84
for REGION 10
AGENCY PROJECT DESCRIPTION TOTAL 4-YEAR PROGRAM (FFY)
4-YEAR PHASE Starting October 01, 2010
FUND SOURCES FFY
PIN PROGRAM
FFY FFY FFY FFY
in millions
of dollars 2011 2012 2013 2014
AQ CODE COUNTY TOTAL PROJECT COST
NYSDOT RESPOND TO EMERGENCIES THAT ARE BEYOND THE CAPABILITIES OF NYS NFA 2013 0.160 DETLDES 0.160
MAINTENANCE FORCES TO ENSURE THE SAFETY OF THE PUBLIC (LOCATIONS
0T1789 TO-BE-DETERMINED) ON VARIOUS STATE HIGHWAYS & PARKWAYS IN NASSAU
& SUFFOLK COUNTIES.
AQC:D2P MULTI TPC : $2-$4 M TOTAL 4YR COST : 0.160 0.000 0.000 0.160 0.000
NYSDOT NY135 NORTHBOUND TO NY25 EASTBOUND RAMP IMPROVEMENTS (SCOPE TO BE NFA 2014 0.160 DETLDES 0.160
DETERMINED) TO MAINTAIN STATE OF GOOD REPAIR TOWN OF OYSTER BAY,
0T1792 NASSAU COUNTY
AQC:A19P NASSAU TPC : $1.2-$2.5 M TOTAL 4YR COST : 0.160 0.000 0.000 0.000 0.160
NYSDOT ROUT & SEAL ASPHALT PAVEMENT CRACKS AND JOINT OVERLAY REPAIR TO NFA 2014 0.192 DETLDES 0.192
MAINTAIN STATE OF GOOD REPAIR (LOCATIONS TO-BE-DETERMINED) ON
0T1860 VARIOUS STATE HIGHWAYS & PARKWAYS IN NASSAU & SUFFOLK COUNTIES
AQC:A10S MULTI TPC : $2-$4 M TOTAL 4YR COST : 0.192 0.000 0.000 0.000 0.192
NYSDOT ROUT & SEAL ASPHALT PAVEMENT CRACKS AND JOINT OVERLAY REPAIR TO NFA 2014 0.198 DETLDES 0.198
MAINTAIN STATE OF GOOD REPAIR (LOCATIONS TO-BE-DETERMINED) ON
0T1861 VARIOUS STATE HIGHWAYS & PARKWAYS IN NASSAU & SUFFOLK COUNTIES
AQC:A10S MULTI TPC : $2-$4 M TOTAL 4YR COST : 0.198 0.000 0.000 0.000 0.198
NYSDOT MILLING, CONCRETE & ASPHALT PAVEMENT REPAIRS, SINGLE COURSE NFA 2014 0.292 DETLDES 0.292
OVERLAY ON I495 (LOCATIONS TO-BE-DETERMINED) TO MAINTAIN STATE OF
0T1866 GOOD REPAIR IN NASSAU & SUFFOLK COUNTIES
AQC:A10S MULTI TPC : $7.5-$12 M TOTAL 4YR COST : 0.292 0.000 0.000 0.000 0.292
NYSDOT MILLING, CONCRETE & ASPHALT PAVEMENT REPAIRS, SINGLE COURSE NFA 2014 0.301 DETLDES 0.301
OVERLAY ON I495 (LOCATIONS TO-BE-DETERMINED) TO MAINTAIN STATE OF
0T1867 GOOD REPAIR IN NASSAU & SUFFOLK COUNTIES
AQC:A10S MULTI TPC : $0.6-$1.5 M TOTAL 4YR COST : 0.301 0.000 0.000 0.000 0.301
NYSDOT INSTALLATION AND REPLACEMENT OF DETERIORATED PAVEMENT MARKINGS NFA 2014 0.486 DETLDES 0.486
& PLOWABLE REFLECTIVE MARKERS ON VARIOUS STATE HIGHWAYS &
0T1869 PARKWAYS IN NASSAU & SUFFOLK COUNTIES.
AQC:A10S MULTI TPC : $1.2-$2.5 M TOTAL 4YR COST : 0.486 0.000 0.000 0.000 0.486
** NEW YORK STATE DEPARTMENT OF TRANSPORTATION **
Friday, August 26, 2011 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) on Draft Program Page 47 of 84
for REGION 10
AGENCY PROJECT DESCRIPTION TOTAL 4-YEAR PROGRAM (FFY)
4-YEAR PHASE Starting October 01, 2010
FUND SOURCES FFY
PIN PROGRAM
FFY FFY FFY FFY
in millions
of dollars 2011 2012 2013 2014
AQ CODE COUNTY TOTAL PROJECT COST
NYSDOT CLEAN BASINS FILLED W/DEBRIS, REPAIR, REPLACE OR PROVIDE MISSING NFA 2014 0.093 DETLDES 0.093
COLLARS, REPAIR BASIN WALLS, CLEAN CLOGGED PIPES, REPAIR OR REPLACE
0T1872 BROKEN PIPES, PROVIDE CONNECT ISOLATED BASINS TO DRAINAGE SYSTEM
TO PREVENT HIGHWAY FLOODING IN NASSAU&SUFFOLK CO.
AQC:A2S MULTI TPC : $7.5-$12 M TOTAL 4YR COST : 0.093 0.000 0.000 0.000 0.093
NYSDOT BRIDGE PAINTING, CLEANING, RUST REMOVAL & DISPOSAL (LOCATIONS NFA 2014 0.268 DETLDES 0.268
TO-BE-DETERMINED) TO MAINTAIN STRUCTURAL INTEGRITY ON VARIOUS
0T1878 STATE HIGHWAYS & PARKWAYS IN NASSAU & SUFFOLK COUNTIES.
AQC:A19S MULTI TPC : $7.5-$12 M TOTAL 4YR COST : 0.268 0.000 0.000 0.000 0.268
NYSDOT REHABILITATE RECHARGE BASINS INCLUDING SLOPE STABILIZATION, HEAD NFA 2014 0.157 DETLDES 0.157
WALL REPAIR, ET AL TO MAINTAIN STATE OF GOOD REPAIR(LOCATIONS
0T1882 TO-BE-DETERMINED) ON VARIOUS STATE HIGHWAYS & PARKWAYS IN NASSAU
& SUFFOLK COUNTIES.
AQC:A2S MULTI TPC : $2-$4 M TOTAL 4YR COST : 0.157 0.000 0.000 0.000 0.157
NYSDOT REPLACE OR UPGRADE SIGNALS AND/OR APPURTENANCES & INSTALL NEW NFA 2014 0.140 DETLDES 0.140
SIGNALS TO MAINTAIN STATE OF GOOD REPAIR OR SAFETY IMPROVEMENT ON
0T1885 VARIOUS STATE HIGHWAYS IN NASSAU & SUFFOLK COUNTIES
AQC:D2S MULTI TPC : $3.3-$5.6 M TOTAL 4YR COST : 0.140 0.000 0.000 0.000 0.140
NYSDOT PREVENTATIVE MAINTENANCE BRIDGE REPAIRS TO MAINTAIN STRUCTURAL NFA 2014 0.325 DETLDES 0.325
INTEGRITY (LOCATIONS TO-BE-DETERMINED) ON VARIOUS STATE HIGHWAYS &
0T1888 PARKWAYS IN NASSAU & SUFFOLK COUNTIES.
AQC:A19S MULTI TPC : $3.3-$5.6 M TOTAL 4YR COST : 0.325 0.000 0.000 0.000 0.325
NYSDOT SIGN REPAIRS & INSTALLATIONS TO MAINTAIN STATE OF GOOD REPAIR OR NFA 2014 0.120 DETLDES 0.120
SAFETY IMPROVEMENT ON VARIOUS STATE HIGHWAYS & PARKWAYS IN
0T1891 NASSAU & SUFFOLK COUNTIES
AQC:A7P MULTI TPC : $2-$4 M TOTAL 4YR COST : 0.120 0.000 0.000 0.000 0.120
** NEW YORK STATE DEPARTMENT OF TRANSPORTATION **
Friday, August 26, 2011 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) on Draft Program Page 48 of 84
for REGION 10
AGENCY PROJECT DESCRIPTION TOTAL 4-YEAR PROGRAM (FFY)
4-YEAR PHASE Starting October 01, 2010
FUND SOURCES FFY
PIN PROGRAM
FFY FFY FFY FFY
in millions
of dollars 2011 2012 2013 2014
AQ CODE COUNTY TOTAL PROJECT COST
NYSDOT REMOVAL OR PAINT OVER OF GRAFITTI, REPAIR NOISE WALLS, MAINTAIN THE 7 NFA 2014 0.198 DETLDES 0.198
PARK & RIDE LOTS ALONG I495, ALL NYS BIKEWAYS, REST AREAS, PUBLIC
0T1896 TELEPHONE AREAS ALONG PARKWAYS & BUS SHELTERS ON NYS
RIGHT-OF-WAY TO MAINTAIN STATE OF GOOD REPAIR NASSAU AND SUFFOLK
AQC:C8S MULTI TPC : $4.6-$7.5 M TOTAL 4YR COST : 0.198 0.000 0.000 0.000 0.198
NYSDOT PROVIDE LANDSCAPE RESTORATION & MAINTAIN EXISTING LANDSCAPE AREAS, NFA 2014 0.192 DETLDES 0.192
TRIM OR REMOVE TREES THAT IMPEDE VISIBILITY (LOCATIONS
0T1897 TO-BE-DETERMINED) ON VARIOUS STATE HIGHWAYS & PARKWAYS IN NASSAU
& SUFFOLK COUNTIES.
AQC:C11S MULTI TPC : $3.3-$5.6 M TOTAL 4YR COST : 0.192 0.000 0.000 0.000 0.192
NYSDOT LOCAL SAFE STREETS AND TRAFFIC CALMING BLOCK OUT LOCATIONS TO BE STP FLEX 2011 0.016 CONINSP 0.016
DETERMINED NASSAU AND SUFFOLK COUNTY NFA 2011 0.004 CONINSP 0.004
0T1902 STP FLEX 2011 0.135 CONST 0.135
NFA 2011 0.034 CONST 0.034
AQC:A7P MULTI TPC : $1.2-$2.5 M TOTAL 4YR COST : 0.189 0.189 0.000 0.000 0.000
NYSDOT LOCAL SAFE STREETS AND TRAFFIC CALMING BLOCK OUT LOCATIONS TO BE STP FLEX 2012 0.095 CONINSP 0.095
DETERMINED NASSAU AND SUFFOLK COUNTY NFA 2012 0.024 CONINSP 0.024
0T1903 STP FLEX 2012 0.857 CONST 0.857
NFA 2012 0.214 CONST 0.214
AQC:A7P MULTI TPC : $1.2-$2.5 M TOTAL 4YR COST : 1.190 0.000 1.190 0.000 0.000
NYSDOT LOCAL SAFE STREETS AND TRAFFIC CALMING BLOCK OUT LOCATIONS TO BE STP FLEX 2013 0.048 CONINSP 0.048
DETERMINED NASSAU AND SUFFOLK COUNTY NFA 2013 0.012 CONINSP 0.012
0T1904 STP FLEX 2013 0.431 CONST 0.431
NFA 2013 0.108 CONST 0.108
AQC:A7P MULTI TPC : $1.2-$2.5 M TOTAL 4YR COST : 0.599 0.000 0.000 0.599 0.000
NYSDOT LOCAL SAFE STREETS AND TRAFFIC CALMING BLOCK OUT LOCATIONS TO BE STP FLEX 2014 0.110 CONINSP 0.110
DETERMINED NASSAU AND SUFFOLK COUNTY NFA 2014 0.027 CONINSP 0.027
0T1905 STP FLEX 2014 1.100 CONST 1.100
NFA 2014 0.275 CONST 0.275
AQC:A7P MULTI TPC : $1.2-$2.5 M TOTAL 4YR COST : 1.512 0.000 0.000 0.000 1.512
** NEW YORK STATE DEPARTMENT OF TRANSPORTATION **
Friday, August 26, 2011 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) on Draft Program Page 49 of 84
for REGION 10
AGENCY PROJECT DESCRIPTION TOTAL 4-YEAR PROGRAM (FFY)
4-YEAR PHASE Starting October 01, 2010
FUND SOURCES FFY
PIN PROGRAM
FFY FFY FFY FFY
in millions
of dollars 2011 2012 2013 2014
AQ CODE COUNTY TOTAL PROJECT COST
NASSAU CO. NASSAU COUNTY TRAFFIC SIGNAL SYSTEM OPERATION PHASE 4. THIS PROJECT STP LG URBAN 2012 0.950 OPER 0.950
WILL ENSURE THAT THE SYSTEM THAT WAS EXPANDED OPERATES AS NFA 2012 0.238 OPER 0.238
0T1929 EFFICIENTLY AS POSSIBLE STP LG URBAN 2013 0.700 OPER 0.700
NFA 2013 0.175 OPER 0.175
AQC:A7P NASSAU TPC : $1.2-$2.5 M TOTAL 4YR COST : 2.063 0.000 1.188 0.875 0.000
NASSAU CO. THE MONEY FOR THIS PROJECT WAS MOVED INTO A NC HIGHWAYS NFA 2011 0.100 CONINSP 0.100
RESURFACING PROJECT IN 2011. NFA 2011 1.200 CONST 1.200
0T1933
AQC:A10P NASSAU TPC : $1.2-$2.5 M TOTAL 4YR COST : 1.300 1.300 0.000 0.000 0.000
NASSAU CO. NASSAU COUNTY INCIDENT MANAGEMENT SYSTEM PHASE 3. MAXIMIZES THE CMAQ 2011 0.144 CONINSP 0.144
EFFICIENCY OF TRAFFIC FLOW ALONG MAJOR ARTERIES BY INSTALLING AN NFA 2011 0.036 CONINSP 0.036
0T1939 INCIDENT MANAGEMENT SYSTEM (VIDEO CAMERAS). CMAQ 2011 1.296 CONST 1.296
NFA 2011 0.324 CONST 0.324
AQC:A6P NASSAU TPC : $1.2-$2.5 M TOTAL 4YR COST : 1.800 1.800 0.000 0.000 0.000
NYSDOT PROVIDE FOR AMERICANS WITH DISABILITEIS ACT REQUIREMENTS INCLUDING NFA 2012 0.179 DETLDES 0.179
ADDITIONAL SIGNING, PAVEMENT MARKINGS, REPAIR DRAINAGE GRATES NFA 2014 0.276 CONINSP 0.276
0T1953 ALONG EXISTING ON STREET BIKEPATHS. CONST OR REHAB PEDESTRIAN NFA 2014 2.300 CONST 2.300
FACILITIES IN NASSAU & SUFFOLK COUNTIES.
AQC:C2P MULTI TPC : $2-$4 M TOTAL 4YR COST : 2.755 0.000 0.179 0.000 2.576
LOCAL RECONSTRUCT PAVEMENT, INSTALL CURBS, SIDEWALK AND DRAINAGE ON HPP 2011 0.298 DETLDES 0.298
TOWN LINE RD BETWEEN NY25 AND CLAY PITTS RD TO IMPROVE PEDESTRIAN NFA 2011 0.074 DETLDES 0.074
0T1994 SAFETY AND PREVENT FLOODING.NY224 SECTION 117 NFA 2011 0.140 CONINSP 0.140
NFA 2011 1.060 CONST 1.060
AQC:A10P SUFFOLK TPC : $1.2-$2.5 M TOTAL 4YR COST : 1.572 1.572 0.000 0.000 0.000
LOCAL REHABILITATE WEST SHORE RD BETWEEN CREEK ROAD AND WENDOVER DR IN HPP 2011 0.546 CONST 0.546
HUNTINGTON TOWN INCLUDING REPLACEMENT OF BULKHEADS AND NEW NFA 2011 1.375 CONST 1.375
0T1999 DRAINAGE. (NY225 SECTION 117) HPP 2011 0.248 DETLDES 0.248
NFA 2011 0.062 DETLDES 0.062
HPP 2011 0.198 SCOPING 0.198
NFA 2011 0.049 SCOPING 0.049
AQC:A10P SUFFOLK TPC : $2-$4 M TOTAL 4YR COST : 2.478 2.478 0.000 0.000 0.000
** NEW YORK STATE DEPARTMENT OF TRANSPORTATION **
Friday, August 26, 2011 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) on Draft Program Page 50 of 84
for REGION 10
AGENCY PROJECT DESCRIPTION TOTAL 4-YEAR PROGRAM (FFY)
4-YEAR PHASE Starting October 01, 2010
FUND SOURCES FFY
PIN PROGRAM
FFY FFY FFY FFY
in millions
of dollars 2011 2012 2013 2014
AQ CODE COUNTY TOTAL PROJECT COST
LOCAL STREET SCAPE ENHANCEMENTS ALONG NY27 IN VILLAGE OF FREEPORT. (NY225 HPP 2011 0.400 CONST 0.400
SECTION 117) NFA 2011 1.479 CONST 1.479
0T2024 NFA 2011 0.094 MISC 0.094
AQC:C2 NASSAU TPC : $1.2-$2.5 M TOTAL 4YR COST : 1.973 1.973 0.000 0.000 0.000
LOCAL RECONSTRUCTION OF 3.9 MILES OF EXISTING ROADWAYS WITHIN THE VILLAGE HPP 2011 0.800 CONST 0.800
OF ROCKVILLE CENTRE. STRUCTURAL REHABILITATION OF EXISTINGROADS NFA 2011 1.600 CONST 1.600
0T2026 TO MEET ANTICIPATED TRAFFIC VOLUME INCREASES OVER THE NEXT SEVERAL NFA 2011 0.100 CONINSP 0.100
DECADES. HPP#869
AQC:A6P NASSAU TPC : $2-$4 M TOTAL 4YR COST : 2.500 2.500 0.000 0.000 0.000
LOCAL UNGRADE & REPAVE NORTH SIDE OF MINEOLA LONG ISLAND RAIL ROAD HPP 2011 0.072 CONST 0.072
STATION BETWEEN MINEOLA BOULEVARD AND THIRD AVENUE IN THE VILLAGE NFA 2011 0.100 CONST 0.100
0T2027 OF MINEOLA.IN ORDER TO ATTAIN ADA ACCESIBLE DESIGN COMPLIANCE WITH HPP 2011 0.038 DETLDES 0.038
TITLE III HPP#714 NFA 2011 0.015 DETLDES 0.015
HPP 2011 0.010 SCOPING 0.010
NFA 2011 0.010 SCOPING 0.010
NFA 2011 0.005 CONINSP 0.005
AQC:C14 NASSAU TPC : < $0.75 M TOTAL 4YR COST : 0.250 0.250 0.000 0.000 0.000
NYSDOT REPAIR AND REPLACE GUIDERAIL SECTIONS (LOCATIONS TO-BE-DETERMINED) NFA 2012 0.180 DETLDES 0.180
AS SAFETY IMPROVEMENT ON VARIOUS STATE HIGHWAYS & PARKWAYS IN NFA 2014 1.102 CONINSP 1.102
0T2033 NASSAU & SUFFOLK COUNTIES. NFA 2014 11.019 CONST 11.019
AQC:A9P MULTI TPC : $9.5-15.5 M TOTAL 4YR COST : 12.301 0.000 0.180 0.000 12.121
NYSDOT REPAIR AND REPLACE GUIDERAIL SECTIONS (LOCATIONS TO-BE-DETERMINED) NFA 2013 0.184 DETLDES 0.184
AS SAFETY IMPROVEMENT ON VARIOUS STATE HIGHWAYS & PARKWAYS IN
0T2034 NASSAU & SUFFOLK COUNTIES.
AQC:A9P MULTI TPC : $9.5-15.5 M TOTAL 4YR COST : 0.184 0.000 0.000 0.184 0.000
NYSDOT REPAIR AND REPLACE GUIDERAIL SECTIONS (LOCATIONS TO-BE-DETERMINED) NFA 2013 0.189 DETLDES 0.189
AS SAFETY IMPROVEMENT ON VARIOUS STATE HIGHWAYS & PARKWAYS IN
0T2035 NASSAU & SUFFOLK COUNTIES.
AQC:A9P MULTI TPC : $3.3-$5.6 M TOTAL 4YR COST : 0.189 0.000 0.000 0.189 0.000
** NEW YORK STATE DEPARTMENT OF TRANSPORTATION **
Friday, August 26, 2011 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) on Draft Program Page 51 of 84
for REGION 10
AGENCY PROJECT DESCRIPTION TOTAL 4-YEAR PROGRAM (FFY)
4-YEAR PHASE Starting October 01, 2010
FUND SOURCES FFY
PIN PROGRAM
FFY FFY FFY FFY
in millions
of dollars 2011 2012 2013 2014
AQ CODE COUNTY TOTAL PROJECT COST
NYSDOT REPAIR AND REPLACE GUIDERAIL SECTIONS (LOCATIONS TO-BE-DETERMINED) NFA 2014 0.194 DETLDES 0.194
AS SAFETY IMPROVEMENT ON VARIOUS STATE HIGHWAYS & PARKWAYS IN
0T2036 NASSAU & SUFFOLK COUNTIES.
AQC:A9P MULTI TPC : $3.3-$5.6 M TOTAL 4YR COST : 0.194 0.000 0.000 0.000 0.194
NYSDOT REPAIR AND REPLACE GUIDERAIL SECTIONS (LOCATIONS TO-BE-DETERMINED) NFA 2014 0.194 DETLDES 0.194
AS SAFETY IMPROVEMENT ON VARIOUS STATE HIGHWAYS & PARKWAYS IN
0T2037 NASSAU & SUFFOLK COUNTIES.
AQC:A9P MULTI TPC : $3.3-$5.6 M TOTAL 4YR COST : 0.194 0.000 0.000 0.000 0.194
NYSDOT RESPOND TO EMERGENCIES AND NEEDED REPAIRS THAT ARE BEYOND THE NFA 2011 0.113 DETLDES 0.113
CAPABILITIES OF NYS MAINTENANCE FORCES TO ENSURE THE SAFETY OF THE NFA 2012 0.320 CONINSP 0.320
0T2051 PUBLIC ON VARIOUS STATE HIGHWAYS & PARKWAYS IN NASSAU & SUFFOLK NFA 2012 3.196 CONST 3.196
COUNTIES.
AQC:C14P NASSAU TPC : $3.3-$5.6 M TOTAL 4YR COST : 3.629 0.113 3.516 0.000 0.000
NYSDOT RESPOND TO EMERGENCIES AND NEEDED REPAIRS THAT ARE BEYOND THE NFA 2012 0.113 DETLDES 0.113
CAPABILITIES OF NYS MAINTENANCE FORCES TO ENSURE THE SAFETY OF THE NFA 2013 0.265 CONINSP 0.265
0T2052 PUBLIC (LOCATIONS TO BE DETERMINED) ON VARIOUS STATE HIGHWAYS & NFA 2013 2.206 CONST 2.206
PARKWAYS IN NASSAU & SUFFOLK COUNTIES.
AQC:C14P NASSAU TPC : $2-$4 M TOTAL 4YR COST : 2.584 0.000 0.113 2.471 0.000
NYSDOT RESPOND TO EMERGENCIES AND NEEDED REPAIRS THAT ARE BEYOND THE NFA 2013 0.118 DETLDES 0.118
CAPABILITIES OF NYS MAINTENANCE FORCES TO ENSURE THE SAFETY OF THE NFA 2014 0.273 CONINSP 0.273
0T2053 PUBLIC (LOCATIONS TO BE DETERMINED) ON VARIOUS STATE HIGHWAYS & NFA 2014 2.272 CONST 2.272
PARKWAYS IN NASSAU & SUFFOLK COUNTIES.
AQC:C14P NASSAU TPC : $2-$4 M TOTAL 4YR COST : 2.663 0.000 0.000 0.118 2.545
NYSDOT RESPOND TO EMERGENCIES AND NEEDED REPAIRS THAT ARE BEYOND THE NFA 2014 0.118 DETLDES 0.118
CAPABILITIES OF NYS MAINTENANCE FORCES TO ENSURE THE SAFETY OF THE
0T2054 PUBLIC (LOCATIONS TO-BE-DETERMINED) ON VARIOUS STATE HIGHWAYS &
PARKWAYS IN NASSAU & SUFFOLK COUNTIES.
AQC:A10S MULTI TPC : $2-$4 M TOTAL 4YR COST : 0.118 0.000 0.000 0.000 0.118
** NEW YORK STATE DEPARTMENT OF TRANSPORTATION **
Friday, August 26, 2011 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) on Draft Program Page 52 of 84
for REGION 10
AGENCY PROJECT DESCRIPTION TOTAL 4-YEAR PROGRAM (FFY)
4-YEAR PHASE Starting October 01, 2010
FUND SOURCES FFY
PIN PROGRAM
FFY FFY FFY FFY
in millions
of dollars 2011 2012 2013 2014
AQ CODE COUNTY TOTAL PROJECT COST
NYSDOT CLEAN CULVERTS FILLED WITH DEBRIS, REPAIR DAMAGED OR IN-NEED NFA 2012 0.174 DETLDES 0.174
CULVERTS TO MAINTAIN STATE OF GOOD REPAIR ON VARIOUS STATE NFA 2013 0.265 CONINSP 0.265
0T2074 HIGHWAYS & PARKWAYS IN NASSAU & SUFFOLK COUNTIES. LOCATIONS TO BE NFA 2013 2.206 CONST 2.206
DETERMINED.
AQC:A6P MULTI TPC : $2-$4 M TOTAL 4YR COST : 2.645 0.000 0.174 2.471 0.000
NYSDOT PREVENTIVE MAINTENANCE CULVERT CLEAN/REPAIR/REPLACE CONTRACT NFA 2012 0.174 DETLDES 0.174
NFA 2013 0.265 CONINSP 0.265
0T2075 NFA 2013 2.206 CONST 2.206
AQC:A6P MULTI TPC : $2-$4 M TOTAL 4YR COST : 2.645 0.000 0.174 2.471 0.000
NYSDOT CLEAN CULVERTS FILLED WITH DEBRIS, REPAIR DAMAGED OR IN-NEED NFA 2013 0.471 DETLDES 0.471
CULVERTS TO MAINTAIN STATE OF GOOD REPAIR ON VARIOUS STATE NFA 2014 0.552 CONINSP 0.552
0T2076 HIGHWAYS & PARKWAYS IN NASSAU & SUFFOLK COUNTIES. LOCATIONS TO BE NFA 2014 5.520 CONST 5.520
DETERMINED.
AQC:A6P MULTI TPC : $6-$9.4 M TOTAL 4YR COST : 6.543 0.000 0.000 0.471 6.072
NYSDOT CLEAN CULVERTS FILLED WITH DEBRIS, REPAIR DAMAGED OR IN-NEED NFA 2014 0.509 DETLDES 0.509
CULVERTS TO MAINTAIN STATE OF GOOD REPAIR ON VARIOUS STATE
0T2077 HIGHWAYS & PARKWAYS IN NASSAU & SUFFOLK COUNTIES. LOCATIONS TO BE
DETERMINED.
AQC:A6P MULTI TPC : $3.3-$5.6 M TOTAL 4YR COST : 0.509 0.000 0.000 0.000 0.509
NYSDOT CLEAN CULVERTS FILLED WITH DEBRIS, REPAIR DAMAGED OR IN-NEED NFA 2014 0.182 DETLDES 0.182
CULVERTS TO MAINTAIN STATE OF GOOD REPAIR ON VARIOUS STATE
0T2078 HIGHWAYS & PARKWAYS IN NASSAU & SUFFOLK COUNTIES. LOCATIONS TO BE
DETERMINED.
AQC:A6S MULTI TPC : $2-$4 M TOTAL 4YR COST : 0.182 0.000 0.000 0.000 0.182
LOCAL ELEVATE AND CONSTRUCT DRAINAGE IMPROVEMENTS TO BEACH ROAD, HPP 2011 0.300 DETLDES 0.300
CANAL ROAD,&SEA BREEZE ROAD IN MASSAPEQUA, THE TOWN OF OYSTER BAY NFA 2011 0.075 DETLDES 0.075
0T2148 WANTS TO IMPROVE VEHICULAR &PEDESTRIAN TRAFFIC FLOW IN AN HPP 2012 0.167 CONINSP 0.167
EXISITNG RESIDENTIAL LOCATION EXPERIENCING CHRONIC FLOODING. NY404 NFA 2012 0.042 CONINSP 0.042
HPP 2012 1.932 CONST 1.932
NFA 2012 0.483 CONST 0.483
AQC:A2P NASSAU TPC : $2-$4 M TOTAL 4YR COST : 2.999 0.375 2.624 0.000 0.000
** NEW YORK STATE DEPARTMENT OF TRANSPORTATION **
Friday, August 26, 2011 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) on Draft Program Page 53 of 84
for REGION 10
AGENCY PROJECT DESCRIPTION TOTAL 4-YEAR PROGRAM (FFY)
4-YEAR PHASE Starting October 01, 2010
FUND SOURCES FFY
PIN PROGRAM
FFY FFY FFY FFY
in millions
of dollars 2011 2012 2013 2014
AQ CODE COUNTY TOTAL PROJECT COST
LOCAL THE TOWN OF SMITHTOWN IS RESURFACING DETERIORATED PAVEMENT. THE HPP 2011 0.048 CONINSP 0.048
DRAINGAGE SYSTEM WILL BE REHABILITATED TO PREVENT FLOODING, NFA 2011 0.012 CONINSP 0.012
0T2150 REPLACED DAMAGED CURBS ,SIDEWALKS WILL BE REPAIRED, NEW HPP 2011 0.560 CONST 0.560
CURBS,SIDEWALKS & GUIDERAIL INSTALLATION FOR SAFETY, NY 624 NFA 2011 0.140 CONST 0.140
HPP 2011 0.088 DETLDES 0.088
NFA 2011 0.022 DETLDES 0.022
HPP 2011 0.040 PRELDES 0.040
NFA 2011 0.010 PRELDES 0.010
AQC:A10P SUFFOLK TPC : $0.6-$1.5 M TOTAL 4YR COST : 0.920 0.920 0.000 0.000 0.000
NYSDOT PROVIDE BRIDGE REPAIRS ON AN AS-NEEDED OR EMERGENCY BASIS AS AN NFA 2012 0.226 DETLDES 0.226
EMERGENCY RESPONSE ON VARIOUS STATE HIGHWAYS & PARKWAYS IN NFA 2013 0.267 CONINSP 0.267
0T2168 NASSAU & SUFFOLK COUNTIES. NFA 2013 2.223 CONST 2.223
AQC:A19P MULTI TPC : $2-$4 M TOTAL 4YR COST : 2.716 0.000 0.226 2.490 0.000
NYSDOT PROVIDE BRIDGE REPAIRS ON AN AS-NEEDED OR EMERGENCY BASIS AS AN NFA 2013 0.200 DETLDES 0.200
EMERGENCY RESPONSE ON VARIOUS STATE HIGHWAYS & PARKWAYS IN
0T2169 NASSAU & SUFFOLK COUNTIES.
AQC:A19P MULTI TPC : $3.3-$5.6 M TOTAL 4YR COST : 0.200 0.000 0.000 0.200 0.000
NYSDOT PROVIDE SAFETY&PAVEMENT IMPROVEMENTS AND EMERGENCY REPAIRS ON NFA 2014 0.243 DETLDES 0.243
AN AS-NEEDED-BASIS AS AN EMERGENCY REPSONSE ON VARIOUS STATE
0T2173 HIGHWAYS & PARKWAYS IN NASSAU & SUFFOLK COUNTIES
AQC:A2P MULTI TPC : $6-$9.4 M TOTAL 4YR COST : 0.243 0.000 0.000 0.000 0.243
NYSDOT PROVIDE STORMWATER RUN-OFF IMPROVEMENTS, IMPROVE ACCESS TO NFA 2012 0.184 DETLDES 0.184
FISHING AREAS, RESTORE WETLAND AREAS, CLEAN DRAINAGE STRUCTURES @ NFA 2014 0.273 CONINSP 0.273
0T2181 ENVIRONMENTALLY SENSITIVE LOCATIONS ON VARIOUS STATE HIGHWAYS IN NFA 2014 2.272 CONST 2.272
NASSAU AND SUFFOLK COUNTIES
AQC:C11P MULTI TPC : $2-$4 M TOTAL 4YR COST : 2.729 0.000 0.184 0.000 2.545
NYSDOT ENVIRONMENTAL INITIATIVE- WILL PROVIDE STORMWATER RUN-OFF NFA 2014 0.189 DETLDES 0.189
IMPROVEMENTS, IMPROVE ACCES TO FISHING AREAS, RESTORE WETLAND
0T2182 AREAS AND CLEAN DRAINAGE STRUCTURES. LOCATIONS TO BE DETERMINED.
NASSAU AND SUFFOLK COUNTY
AQC:C11P MULTI TPC : $2-$4 M TOTAL 4YR COST : 0.189 0.000 0.000 0.000 0.189
** NEW YORK STATE DEPARTMENT OF TRANSPORTATION **
Friday, August 26, 2011 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) on Draft Program Page 54 of 84
for REGION 10
AGENCY PROJECT DESCRIPTION TOTAL 4-YEAR PROGRAM (FFY)
4-YEAR PHASE Starting October 01, 2010
FUND SOURCES FFY
PIN PROGRAM
FFY FFY FFY FFY
in millions
of dollars 2011 2012 2013 2014
AQ CODE COUNTY TOTAL PROJECT COST
NYSDOT ENVIRONMENTAL INITIATIVE- WILL PROVIDE STORMWATER RUN-OFF NFA 2014 0.189 DETLDES 0.189
IMPROVEMENTS, IMPROVE ACCES TO FISHING AREAS, RESTORE WETLAND
0T2183 AREAS AND CLEAN DRAINAGE STRUCTURES. LOCATIONS TO BE DETERMINED.
NASSAU AND SUFFOLK COUNTY
AQC:C11P MULTI TPC : $2-$4 M TOTAL 4YR COST : 0.189 0.000 0.000 0.000 0.189
NYSDOT ENVIRONMENTAL INITIATIVE- WILL PROVIDE STORMWATER RUN-OFF NFA 2014 0.194 DETLDES 0.194
IMPROVEMENTS, IMPROVE ACCES TO FISHING AREAS, RESTORE WETLAND
0T2184 AREAS AND CLEAN DRAINAGE STRUCTURES. LOCATIONS TO BE DETERMINED.
NASSAU AND SUFFOLK COUNTY
AQC:C11S MULTI TPC : $3.3-$5.6 M TOTAL 4YR COST : 0.194 0.000 0.000 0.000 0.194
NYSDOT OVERHEAD SIGN REPAIR CONTRACT (LOCATIONS TO-BE-DETERMINED) TO NFA 2013 0.184 DETLDES 0.184
MAINTAIN STRUCTURAL INTEGRITY ON VARIOUS STATE HIGHWAYS & NFA 2014 0.420 CONINSP 0.420
0T2190 PARKWAYS IN NASSAU & SUFFOLK COUNTIES. NFA 2014 4.200 CONST 4.200
AQC:A6P MULTI TPC : $4.6-$7.5 M TOTAL 4YR COST : 4.804 0.000 0.000 0.184 4.620
NYSDOT RECONSTRUCT SIGNALS AND/OR APPURTENANCES & INSTALL NEW SIGNALS AS NFA 2013 0.187 DETLDES 0.187
A SAFETY IMPROVEMENT OR MAINTAIN STATE OF GOOD REAPIR ON VARIOUS STP FLEX 2014 0.272 CONINSP 0.272
0T2191 STATE HIGHWAYS IN NASSAU & SUFFOLK COUNTIES NFA 2014 0.068 CONINSP 0.068
STP FLEX 2014 2.724 CONST 2.724
NFA 2014 0.681 CONST 0.681
AQC:D2P MULTI TPC : $3.3-$5.6 M TOTAL 4YR COST : 3.932 0.000 0.000 0.187 3.745
NYSDOT RECONSTRUCT SIGNALS AND/OR APPURTENANCES & INSTALL NEW SIGNALS AS NFA 2014 0.192 DETLDES 0.192
A SAFETY IMPROVEMENT OR MAINTAIN STATE OF GOOD REAPIR ON VARIOUS
0T2192 STATE HIGHWAYS IN NASSAU & SUFFOLK COUNTIES
AQC:D2S MULTI TPC : $3.3-$5.6 M TOTAL 4YR COST : 0.192 0.000 0.000 0.000 0.192
NYSDOT RECONSTRUCT SIGNALS AND/OR APPURTENANCES & INSTALL NEW SIGNALS AS NFA 2014 0.187 DETLDES 0.187
A SAFETY IMPROVEMENT OR MAINTAIN STATE OF GOOD REAPIR ON VARIOUS
0T2194 STATE HIGHWAYS IN NASSAU & SUFFOLK COUNTIES
AQC:D2S MULTI TPC : $3.3-$5.6 M TOTAL 4YR COST : 0.187 0.000 0.000 0.000 0.187
** NEW YORK STATE DEPARTMENT OF TRANSPORTATION **
Friday, August 26, 2011 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) on Draft Program Page 55 of 84
for REGION 10
AGENCY PROJECT DESCRIPTION TOTAL 4-YEAR PROGRAM (FFY)
4-YEAR PHASE Starting October 01, 2010
FUND SOURCES FFY
PIN PROGRAM
FFY FFY FFY FFY
in millions
of dollars 2011 2012 2013 2014
AQ CODE COUNTY TOTAL PROJECT COST
NYSDOT REPLACE GUIDESIGN PANELS THAT ARE WORN, DAMAGED OR DEFICIENT TO NFA 2013 0.182 DETLDES 0.182
MAINTAIN STATE OF GOOD REPAIR ON VARIOUS STATE HIGHWAYS & NFA 2014 0.136 CONINSP 0.136
0T2204 PARKWAYS IN NASSAU AND SUFFOLK COUNTIES NFA 2014 1.135 CONST 1.135
AQC:C13P MULTI TPC : $1.2-$2.5 M TOTAL 4YR COST : 1.453 0.000 0.000 0.182 1.271
NYSDOT REPLACE GUIDESIGN PANELS THAT ARE WORN, DAMAGED OR DEFICIENT TO NFA 2014 0.738 DETLDES 0.738
MAINTAIN STATE OF GOOD REPAIR ON VARIOUS STATE HIGHWAYS &
0T2205 PARKWAYS IN NASSAU AND SUFFOLK COUNTIES
AQC:C13S MULTI TPC : $7.5-$12 M TOTAL 4YR COST : 0.738 0.000 0.000 0.000 0.738
NYSDOT REPLACE GUIDESIGN PANELS THAT ARE WORN, DAMAGED OR DEFICIENT TO NFA 2014 0.140 CONINSP 0.140
MAINTAIN STATE OF GOOD REPAIR ON VARIOUS STATE HIGHWAYS &
0T2207 PARKWAYS IN NASSAU AND SUFFOLK COUNTIES
AQC:C13S MULTI TPC : $1.2-$2.5 M TOTAL 4YR COST : 0.140 0.000 0.000 0.000 0.140
NYSDOT PROVIDE FOR AMERICANS WITH DISABILITEIS ACT REQUIREMENTS INCLUDING NFA 2012 0.182 DETLDES 0.182
ADDITIONAL SIGNING, PAVEMENT MARKINGS, REPAIR DRAINAGE GRATES HPP 2013 0.223 CONINSP 0.223
0T2219 ALONG EXISTING ON STREET BIKEPATHS. CONST OR REHAB PEDESTRIAN NFA 2013 0.056 CONINSP 0.056
FACILITIES IN NASSAU & SUFFOLK COUNTIES. HPP#2951,NY554" HPP 2013 2.112 CONST 2.112
NFA 2013 0.528 CONST 0.528
STP FLEX 2013 0.189 CONINSP 0.189
NFA 2013 0.047 CONINSP 0.047
STP FLEX 2013 1.887 CONST 1.887
NFA 2013 0.471 CONST 0.471
AQC:C2P MULTI TPC : $4.6-$7.5 M TOTAL 4YR COST : 5.695 0.000 0.182 5.513 0.000
NYSDOT PROVIDE FOR AMERICANS WITH DISABILITEIS ACT REQUIREMENTS INCLUDING NFA 2014 0.192 DETLDES 0.192
ADDITIONAL SIGNING, PAVEMENT MARKINGS, REPAIR DRAINAGE GRATES
0T2220 ALONG EXISTING ON STREET BIKEPATHS. CONST OR REHAB PEDESTRIAN
FACILITIES IN NASSAU & SUFFOLK COUNTIES.
AQC:C2P MULTI TPC : $2-$4 M TOTAL 4YR COST : 0.192 0.000 0.000 0.000 0.192
SUFFOLK CO. CLOSED LOOP SIGNAL SYSTEM, PH6. UPDATE AND INTERCONNECT THE CMAQ 2011 0.100 CONINSP 0.100
TRAFFIC SIGNAL SYSTEM ON VARIOUS COUNTY ROADS SO THEY CAN BE NFA 2011 0.025 CONINSP 0.025
0T2252 CONTROLLED & OPTIMIZED BY THE COUNTYS COMPUTERIZED CONTROL CMAQ 2011 0.900 CONST 0.900
SYSTEM ON CR012, CR017, CR047, CR093, CR80,CR16 NFA CONST
2011 0.225 0.225
AQC:A6P SUFFOLK TPC : $2-$4 M TOTAL 4YR COST : 1.250 1.250 0.000 0.000 0.000
** NEW YORK STATE DEPARTMENT OF TRANSPORTATION **
Friday, August 26, 2011 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) on Draft Program Page 56 of 84
for REGION 10
AGENCY PROJECT DESCRIPTION TOTAL 4-YEAR PROGRAM (FFY)
4-YEAR PHASE Starting October 01, 2010
FUND SOURCES FFY
PIN PROGRAM
FFY FFY FFY FFY
in millions
of dollars 2011 2012 2013 2014
AQ CODE COUNTY TOTAL PROJECT COST
SUFFOLK CO. CLOSED LOOP SIGNAL SYSTEM, PH7. UPDATE AND INTERCONNECT THE CMAQ 2012 0.800 CONST 0.800
TRAFFIC SIGNAL SYSTEM ON VARIOUS COUNTY ROADS SO THEY CAN BE NFA 2012 0.200 CONST 0.200
0T2253 CONTROLLED & OPTIMIZED BY THE COUNTYS COMPUTERIZED CONTROL
SYSTEM ON CR004, CR013, CR058,CR67, CR083, CR096, CR97, CR057, CR111.
AQC:NON SUFFOLK TPC : $0.6-$1.5 M TOTAL 4YR COST : 1.000 0.000 1.000 0.000 0.000
NASSAU CO. OLD COUNTRY ROAD TRAFFIC SIGNAL HEAD REPLACEMENT TO REPLACE THE NFA 2011 2.875 CONST 2.875
EXISTING LENSES WITH 12" SIGNAL HEAD
0T2256
AQC:A6P NASSAU TPC : $2-$4 M TOTAL 4YR COST : 2.875 2.875 0.000 0.000 0.000
NASSAU CO. PURPOSE OF THIS PROJECT IS TO REPLACE EXISING 8 INCH TRAFFIC SIGNAL STP LG URBAN 2013 6.200 CONST 6.200
INDICATORS WITH NEW 12 INCH LED SIGNAL DISPLAYS WHICH WILL IMPROVE NFA 2013 1.550 CONST 1.550
0T2257 MOTORISTS VISABILTY OF THE SIGNAL, REDUCE ACCIDENTS, AND REDUCE
ENERTY CONSUMPTION AND MAINTENANCE COSTS. LOCATIONS INCLUDE ALL
TRAFFIC SIGNALS ON MERRICK ROAD FROM THE QUEENS BORDER TO THE
SUFFOLK BORDER.
AQC:A6P NASSAU TPC : $6-$9.4 M TOTAL 4YR COST : 7.750 0.000 0.000 7.750 0.000
NASSAU CO. 2011 NASSAU COUNTY PAVEMENT MARKING TO MAINTAIN PAVEMENT NFA 2011 0.200 CONINSP 0.200
DELINEATION AT INTERSECTIONS. INCLUDING STOP BARS,CROSSWALKS AND NFA 2011 0.800 CONST 0.800
0T2258 ROAD MARKING PHASE 5
AQC:A10P NASSAU TPC : $0.6-$1.5 M TOTAL 4YR COST : 1.000 1.000 0.000 0.000 0.000
NASSAU CO. 2012 NASSAU COUNTY PAVEMENT MARKING TO MAINTAIN PAVEMENT STP LG URBAN 2012 1.000 CONST 1.000
MARKING TO MAINTAIN PAVEMENT DELINEATION AT INTERSECTIONS. NFA 2012 0.250 CONST 0.250
0T2259 INCLUDING STOP BARS,CROSSWALKS AND ROAD MARKING PHASE 6
AQC:A10P NASSAU TPC : $0.6-$1.5 M TOTAL 4YR COST : 1.250 0.000 1.250 0.000 0.000
NASSAU CO. NASSSAU COUNTY TRAFFIC SIGNAL EXPANSION, PH 6: VARIOUS INTERSECTIONS CMAQ 2011 2.200 CONST 2.200
ON ROSLYN RD, MAIN ST, OLD NORTHERN BLVD, BRYANT ST, & W SHORE RD. NFA 2011 0.550 CONST 0.550
0T2260 UPDATE THE SIGNALS SO THEY CAN BE CONTROLLED & OPTIMIZED BY THE
COUNTYS COMPUTERIZED CONTROL SYSTEM.
AQC:NON NASSAU TPC : $2-$4 M TOTAL 4YR COST : 2.750 2.750 0.000 0.000 0.000
** NEW YORK STATE DEPARTMENT OF TRANSPORTATION **
Friday, August 26, 2011 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) on Draft Program Page 57 of 84
for REGION 10
AGENCY PROJECT DESCRIPTION TOTAL 4-YEAR PROGRAM (FFY)
4-YEAR PHASE Starting October 01, 2010
FUND SOURCES FFY
PIN PROGRAM
FFY FFY FFY FFY
in millions
of dollars 2011 2012 2013 2014
AQ CODE COUNTY TOTAL PROJECT COST
NASSAU CO. NASSAU COUNTY TRAFFIC SIGNAL TIMING IMPROVEMENTS PHASE 3. MAXIMIZE CMAQ 2012 0.200 DETLDES 0.200
THE EFFICIENCY OF THE COUNTY'S EXISTING ROADWAY SYSTEM BY NFA 2012 0.050 DETLDES 0.050
0T2261 PROMOTING SAFE,EFFICIENT TRAFFIC FLOW VIA IMPROVED TRAFFIC SIGNAL.
AQC:A7P NASSAU TPC : < $0.75 M TOTAL 4YR COST : 0.250 0.000 0.250 0.000 0.000
NASSAU CO. NASSAU COUNTY INCIDENT MANAGEMENT SYSTEM PHASE 4. MAXIMIZE THE CMAQ 2012 0.112 CONINSP 0.112
EFFICIENCY OF THE TRAFFIC FLOW ALONG MAJOR ARTRIES BY INSTALLING AN NFA 2012 0.028 CONINSP 0.028
0T2262 INCIDENT MANAGEMENT SYSTEM (VIDEO CAMERAS) CMAQ 2012 1.008 CONST 1.008
NFA 2012 0.252 CONST 0.252
AQC:A6P NASSAU TPC : $1.2-$2.5 M TOTAL 4YR COST : 1.400 0.000 1.400 0.000 0.000
NASSAU CO. NASSAU COUNTY RESURFACING 2012. REHABILITATE EXISTING ROAD STP LG URBAN 2011 0.399 CONINSP 0.399
PAVEMENTS IN ORDER TO PROVIDE FOR BETTER AND SAFER SURFACES. NFA 2011 0.100 CONINSP 0.100
0T2264 STP LG URBAN 2011 3.592 CONST 3.592
NFA 2011 0.898 CONST 0.898
STP LG URBAN 2012 4.250 CONST 4.250
NFA 2012 1.063 CONST 1.063
AQC:A10P NASSAU TPC : $9.5-15.5 M TOTAL 4YR COST : 10.302 4.989 5.313 0.000 0.000
NASSAU CO. PURPOSE OF THIS PROJECT IS TO REPLACE EXISING 8 INCH TRAFFIC SIGNAL STP LG URBAN 2012 3.200 CONST 3.200
INDICATORS WITH NEW 12 INCH LED SIGNAL DISPLAYS TO IMPROVE MOTORISTS NFA 2012 0.800 CONST 0.800
0T2266 VISABILTY , REDUCE ACCIDENTS, ENERGY SAVINGS & MAINTENANCE COSTS
ON OLD COUNTRY ROAD FROM APEX RD TO ROUND SWAMP RD
AQC:A6P NASSAU TPC : $3.3-$5.6 M TOTAL 4YR COST : 4.000 0.000 4.000 0.000 0.000
SUFFOLK CO. SUFFOLK COUNTY 2011 PAVEMENT MAINTENANCE PROGRAM. PROJECT WILL STP LG URBAN 2011 0.440 CONINSP 0.440
PROVIDE FUNDING TO RESURFACE (IMPROVE RIDING SURFACE) AND REPAIR NFA 2011 0.110 CONINSP 0.110
0T2271 DAMAGED DRAINAGE STRUCTURES ON COUNTY ROADS. STP LG URBAN 2011 2.860 CONST 2.860
NFA 2011 0.715 CONST 0.715
AQC:A10P SUFFOLK TPC : $3.3-$5.6 M TOTAL 4YR COST : 4.125 4.125 0.000 0.000 0.000
NYSDOT REPLACE IN-NEED OR DAMAGED CULVERTS (LOCATIONS TO BE DETERMINED) NFA 2013 1.346 DETLDES 1.346
TO MAINTAIN STATE OF GOOD REPAIR ON VARIOUS STATE HIGHWAYS & NFA 2013 1.139 ROWACQU 1.139
0T2274 PARKWAYS IN NASSAU & SUFFOLK COUNTIES.
AQC:A6P MULTI TPC : $9.5-15.5 M TOTAL 4YR COST : 2.485 0.000 0.000 2.485 0.000
** NEW YORK STATE DEPARTMENT OF TRANSPORTATION **
Friday, August 26, 2011 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) on Draft Program Page 58 of 84
for REGION 10
AGENCY PROJECT DESCRIPTION TOTAL 4-YEAR PROGRAM (FFY)
4-YEAR PHASE Starting October 01, 2010
FUND SOURCES FFY
PIN PROGRAM
FFY FFY FFY FFY
in millions
of dollars 2011 2012 2013 2014
AQ CODE COUNTY TOTAL PROJECT COST
NASSAU CO. PURPOSE OF THIS PROJECT IS TO REPLACE TRAFFIC SIGNAL INDICATORS WITH CMAQ 2012 0.270 CONINSP 0.270
NEW LED INDICATORS IN ORDER TO REDUCE ENERGY COSTS, IMPROVE NFA 2012 0.067 CONINSP 0.067
0T2276 VISABILITY AND DECREASE MAINTENANCE COSTS. BY USING LED SIGNAL CMAQ 2012 2.680 CONST 2.680
INDICATORS, LESS ENERGY IS UTILIZED TO OPERATE THE SIGNAL RESULTING IN NFA 2012 0.600 CONST 0.600
DECREASED AIR POLLUTION.
.
AQC:A6P NASSAU TPC : $3.3-$5.6 M TOTAL 4YR COST : 3.617 0.000 3.617 0.000 0.000
NASSAU CO. PURPOSE OF THIS PROJECT IS TO REPLACE TRAFFIC SIGNAL INDICATORS WITH CMAQ 2013 0.270 CONINSP 0.270
NEW LED INDICATORS IN ORDER TO REDUCE ENERGY COSTS, IMPROVE NFA 2013 0.067 CONINSP 0.067
0T2277 VISABILITY AND DECREASE MAINTENANCE COSTS. BY USING LED SIGNAL CMAQ 2013 2.430 CONST 2.430
INDICATORS, LESS ENERGY IS UTILIZED TO OPERATE THE SIGNAL. NFA 2013 0.607 CONST 0.607
AQC:A6P NASSAU TPC : $2-$4 M TOTAL 4YR COST : 3.374 0.000 0.000 3.374 0.000
NYSDOT BICYCLE AND PEDESTRIAN SAFETY IMPROVEMENTS, TO IMPROVE SAFETY MAIN HPP 2013 0.120 CONINSP 0.120
STREET, RIVERHEAD HPP#2951, NY 554 NFA 2013 0.030 CONINSP 0.030
0T2296 HPP 2013 1.080 CONST 1.080
NFA 2013 0.270 CONST 0.270
AQC:A2 SUFFOLK TPC : $1.2-$2.5 M TOTAL 4YR COST : 1.500 0.000 0.000 1.500 0.000
LOCAL THE TOWN OF BROOKHAVEN IS RESURFACING TOTAL OF 1.8 MILES , CLOVER HPP 2011 0.019 CONINSP 0.019
LANE FROM BAY AVE. TO BAY RD. THESE ROADS ARE DETERIORATED TO THE NFA 2011 0.005 CONINSP 0.005
0T2300 POINT THAT PAVEMENT RESURFACING IS NECESSARY TO MAINTAIN THE HPP 2011 0.167 CONST 0.167
CURRENT TRANSPORTATION SYSTEM,
NFA 2011 0.042 CONST 0.042
NY 620
AQC:A10 SUFFOLK TPC : < $0.75 M TOTAL 4YR COST : 0.233 0.233 0.000 0.000 0.000
LOCAL THE TOWN OF BROOKHAVEN IS RESURFACING DARE RD. FROM OLD TOWN RD. HPP 2011 0.031 CONINSP 0.031
TO RTE 25.THESE ROADS ARE DETERIORATED TO THE POINT THAT PAVEMENT NFA 2011 0.008 CONINSP 0.008
0T2301 RESURFACING IS NECESSARY TO MAINTAIN THE CURRENT TRANSPORTATION HPP 2011 0.272 CONST 0.272
SYSTEM.NY621 NFA 2011 0.068 CONST 0.068
AQC:A10 SUFFOLK TPC : < $0.75 M TOTAL 4YR COST : 0.379 0.379 0.000 0.000 0.000
** NEW YORK STATE DEPARTMENT OF TRANSPORTATION **
Friday, August 26, 2011 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) on Draft Program Page 59 of 84
for REGION 10
AGENCY PROJECT DESCRIPTION TOTAL 4-YEAR PROGRAM (FFY)
4-YEAR PHASE Starting October 01, 2010
FUND SOURCES FFY
PIN PROGRAM
FFY FFY FFY FFY
in millions
of dollars 2011 2012 2013 2014
AQ CODE COUNTY TOTAL PROJECT COST
LOCAL THE TOWN OF BROOKHAVEN IS RESURFACING 1.2 MILES FROM PIPE STAVE HPP 2011 0.017 CONINSP 0.017
HOLLOW RD. FROM HARBOR BEACH RD TO OLD COUNTRY ROAD.THESE ROADS NFA 2011 0.004 CONINSP 0.004
0T2303 ARE DETERIORATED TO THE POINT THAT PAVEMENT RESURFACING IS HPP 2011 0.155 CONST 0.155
NECESSARY TO MAINTAIN THE CURRENT TRANSPORTATION SYSTEM NFA 2011 0.039 CONST 0.039
AQC:A10 SUFFOLK TPC : < $0.75 M TOTAL 4YR COST : 0.215 0.215 0.000 0.000 0.000
NYSDOT OPERATIONAL IMPROVEMENTS ON NASSAU EXPRESSWAY(NY878) (SCOPE TO BE NFA 2014 2.500 DETLDES 2.500
DETERMINED) TOWN OF HEMPSTEAD, NASSAU COUNTY
0T2307
AQC:J1Z NASSAU TPC : $32-$50 M TOTAL 4YR COST : 2.500 0.000 0.000 0.000 2.500
LIRR SCOPE: DESIGN AND CONSTRUCT A NEW HIGHWAY BRIDGE TO CARRY HBRR 2013 10.000 CONST 10.000
VEHICULAR TRAFFIC OVER THE LONG ISLAND RAIL ROAD PORT WASHINGTON NFA 2013 2.500 CONST 2.500
0T2308 BRANCH RIGHT OF WAY. THE AGING COLONIAL ROAD BRIDGE WILL BE
REMOVED AND DEMOLISHED TO INCREASE SAFETY OF TRAVELERS
AQC:A19P NASSAU TPC : $9.5-15.5 M TOTAL 4YR COST : 12.500 0.000 0.000 12.500 0.000
NYSDOT BRIDGE REPAIRS ON CARLLS STRIAGHT PATH AND HALF HOLLOW RD OVER I495 IM 2012 0.425 CONINSP 0.425
TO MAINTAIN STRUCTURAL INTEGRITY IN HUNTINGTON TOWN, SUFFOLK NFA 2012 0.127 CONINSP 0.127
0T2318 COUNTY. IM 2012 4.251 CONST 4.251
BIN#1049350,1049350 NFA 2012 1.200 CONST 1.200
AQC:A19 SUFFOLK TPC : $6-$9.4 M TOTAL 4YR COST : 6.003 0.000 6.003 0.000 0.000
NYSDOT PAVEMENT MATERIALS & EQUIPMENT PURCHASE FOR MAINTENANCE NASSAU NFA 2013 1.200 MISC 1.200
AND SUFFOLK COUNTY
0T2321
AQC:A10S MULTI TPC : $0.6-$1.5 M TOTAL 4YR COST : 1.200 0.000 0.000 1.200 0.000
NYSDOT PAVEMENT MATERIALS & EQUIPMENT PURCHASE FOR MAINTENANCE NASSAU NFA 2014 1.200 MISC 1.200
AND SUFFOLK COUNTY
0T2322
AQC:A10S MULTI TPC : $0.6-$1.5 M TOTAL 4YR COST : 1.200 0.000 0.000 0.000 1.200
** NEW YORK STATE DEPARTMENT OF TRANSPORTATION **
Friday, August 26, 2011 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) on Draft Program Page 60 of 84
for REGION 10
AGENCY PROJECT DESCRIPTION TOTAL 4-YEAR PROGRAM (FFY)
4-YEAR PHASE Starting October 01, 2010
FUND SOURCES FFY
PIN PROGRAM
FFY FFY FFY FFY
in millions
of dollars 2011 2012 2013 2014
AQ CODE COUNTY TOTAL PROJECT COST
NYSDOT REHABILITATE BRIDGES CARRYING I495 TO MAINTAIN STRUCTURAL INTEGRITY IM 2013 0.991 DETLDES 0.991
(LOCATIONS TO BE DETERMINED) IN NASSAU & SUFFOLK COUNTIES. NFA 2013 0.110 DETLDES 0.110
0T2328
AQC:A19P MULTI TPC : $12.5-$19 M TOTAL 4YR COST : 1.101 0.000 0.000 1.101 0.000
NYSDOT REHABILITATE BRIDGES CARRYING I495 TO MAINTAIN STRUCTURAL INTEGRITY IM 2013 0.991 DETLDES 0.991
(LOCATIONS TO BE DETERMINED) IN NASSAU & SUFFOLK COUNTIES. NFA 2013 0.110 DETLDES 0.110
0T2329
AQC:A19P MULTI TPC : $12.5-$19 M TOTAL 4YR COST : 1.101 0.000 0.000 1.101 0.000
NYSDOT SMART TRANSPORTATION INITIATIVE PROJECT TO IMPROVE PEDESTRIAN AND NFA 2014 0.931 DETLDES 0.931
BICYCLE SAFETY (LOCATIONS TO BE DETERMINED) ON VARIOUS STATE ROADS
0T2330 IN NASSAU & SUFFOLK COUNTIES.
AQC:A7P MULTI TPC : $7.5-$12 M TOTAL 4YR COST : 0.931 0.000 0.000 0.000 0.931
LOCAL WOODBINE AVE REHAB BETWEEN 5TH AVE & BEACH AVE, VILLAGE OF HPP 2011 0.054 CONINSP 0.054
NORTHPORT. RECONSTRUCTION OF ROADWAY & SHOULDER SECTIONS, NFA 2011 0.013 CONINSP 0.013
0T2358 INSTALLATION OF RETAINING WALL & GUIDERAIL FOR PEDESTRIAN AND HPP 2011 0.451 CONST 0.451
TRAFFIC SAFETY.HPP#656 ,NY321 NFA 2011 0.113 CONST 0.113
HPP 2011 0.045 DETLDES 0.045
NFA 2011 0.011 DETLDES 0.011
AQC:A10 SUFFOLK TPC : $0.6-$1.5 M TOTAL 4YR COST : 0.687 0.687 0.000 0.000 0.000
LOCAL INSTALLATION OF GUIDERAIL & RETAINING WALL ALONG WOODBINE AVENUE HPP 2011 0.007 CONINSP 0.007
AT INTERSECTION OF 5TH AVE,RECONSTRUCT DETERIORATED ROADWAY, NFA 2011 0.002 CONINSP 0.002
0T2359 SHOULDER SECTION INCLUDING CURBS AT WOODBINE &BEACH AVENUE TO HPP 2011 0.056 CONST 0.056
INCREASE SAFETY IN THE VILLAGE OF NORTHPORT.HPP#3232 ,NY 576 NFA 2011 0.014 CONST 0.014
HPP 2011 0.006 DETLDES 0.006
NFA 2011 0.001 DETLDES 0.001
AQC:C2 SUFFOLK TPC : < $0.75 M TOTAL 4YR COST : 0.086 0.086 0.000 0.000 0.000
SUFFOLK CO. CONSTRUCT THE OCKERS SURFACE WATER TRANSPORTATION CENTER ON THE STP ENHANCE 2011 0.000 CONINSP 0.000
LONG ISLAND MARITIME MUSEUM GROUNDS AT CHARLES DOMINY COUNTY NFA 2011 0.046 CONINSP 0.046
0T2366 PARK IN WEST SAYVILLE TO PROVIDE PUBLIC EDUCATION ON SURFACE WATER STP ENHANCE 2011 0.458 CONST 0.458
TRANSPORATION , MAINTAINED PROPERLY LANDMARK VESSELS ON SITE. NFA 2011 0.115 CONST 0.115
AQC:C13 SUFFOLK TPC : $0.6-$1.5 M TOTAL 4YR COST : 0.619 0.619 0.000 0.000 0.000
** NEW YORK STATE DEPARTMENT OF TRANSPORTATION **
Friday, August 26, 2011 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) on Draft Program Page 61 of 84
for REGION 10
AGENCY PROJECT DESCRIPTION TOTAL 4-YEAR PROGRAM (FFY)
4-YEAR PHASE Starting October 01, 2010
FUND SOURCES FFY
PIN PROGRAM
FFY FFY FFY FFY
in millions
of dollars 2011 2012 2013 2014
AQ CODE COUNTY TOTAL PROJECT COST
NASSAU CO. IMPROVE ACCESS ROAD & EXIT LANES FOR CENTER FOR ADVANCED MEDICINE HPP 2011 0.551 CONINSP 0.551
& NORTH SHORE-LONG ISLAND JEWISH HOSPITAL ON LAKEVILLE ROAD. THE NFA 2011 0.138 CONINSP 0.138
0T2367 PRIMARY ACCESS RD. TO THE FACILITY ON THE WESTSIDE OF LAKEVILLE RD. HPP 2011 4.415 CONST 4.415
WILL BE ENLARGED TO ACCOMODATE EXTRA TRAFFIC. NY345,587 NFA 2011 1.104 CONST 1.104
HPP 2011 0.512 DETLDES 0.512
NFA 2011 0.128 DETLDES 0.128
AQC:J1Z NASSAU TPC : $6-$9.4 M TOTAL 4YR COST : 6.848 6.848 0.000 0.000 0.000
NYSDOT REPLACE IN-NEED OR DAMAGED CULVERTS (LOCATIONS TO BE DETERMINED) NFA 2012 0.756 DETLDES 0.756
TO MAINTAIN STATE OF GOOD REPAIR ON VARIOUS STATE HIGHWAYS &
0T2375 PARKWAYS IN NASSAU & SUFFOLK COUNTIES.
AQC:A6P MULTI TPC : $7.5-$12 M TOTAL 4YR COST : 0.756 0.000 0.756 0.000 0.000
NYSDOT IMPROVE SIDEWALK CURB RAMPS, CROSSWALKS AND PEDESTRIAN CROSSING NFA 2012 1.035 DETLDES 1.035
SIGNALS TO COMPLY WITH THE AMERICANS WITH DISABILITIES ACT
0T2376 (LOCATIONS TO-BE-DETERMINED) ON VARIOUS STATE ROADS IN NASSAU &
SUFFOLK COUNTIES.
AQC:C2P MULTI TPC : $6-$9.4 M TOTAL 4YR COST : 1.035 0.000 1.035 0.000 0.000
NYSDOT REHABILITATE OR REPLACE THE SOUND BARRIERS THAT ARE ALONG THE I495 NFA 2013 3.184 PRELDES 3.184
CORRIDOR WHICH ARE NEARING THE END OF THEIR USEFUL SERVICE LIFE TO
0T2377 MAINTAIN STATE OF GOOD REPAIR NASSAU AND SUFFOLK COUNTIES
AQC:C13S MULTI TPC : $2-$4 M TOTAL 4YR COST : 3.184 0.000 0.000 3.184 0.000
NYSDOT IMPROVE SIDEWALK CURB RAMPS, CROSSWALKS AND PEDESTRIAN CROSSING NFA 2014 0.874 DETLDES 0.874
SIGNALS TO COMPLY WITH THE AMERICANS WITH DISABILITIES ACT
0T2380 (LOCATIONS TO-BE-DETERMINED) ON VARIOUS STATE ROADS IN NASSAU &
SUFFOLK COUNTIES.
AQC:C2ZW MULTI TPC : $6-$9.4 M TOTAL 4YR COST : 0.874 0.000 0.000 0.000 0.874
NYSDOT IMPROVE SIDEWALK CURB RAMPS, CROSSWALKS AND PEDESTRIAN CROSSING NFA 2013 2.122 ROWACQU 2.122
SIGNALS TO COMPLY WITH THE AMERICANS WITH DISABILITIES ACT NFA 2014 1.592 DETLDES 1.592
0T2381 (LOCATIONS TO-BE-DETERMINED) ON VARIOUS STATE ROADS IN NASSAU &
SUFFOLK COUNTIES.
AQC:C2P MULTI TPC : $7.5-$12 M TOTAL 4YR COST : 3.714 0.000 0.000 2.122 1.592
** NEW YORK STATE DEPARTMENT OF TRANSPORTATION **
Friday, August 26, 2011 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) on Draft Program Page 62 of 84
for REGION 10
AGENCY PROJECT DESCRIPTION TOTAL 4-YEAR PROGRAM (FFY)
4-YEAR PHASE Starting October 01, 2010
FUND SOURCES FFY
PIN PROGRAM
FFY FFY FFY FFY
in millions
of dollars 2011 2012 2013 2014
AQ CODE COUNTY TOTAL PROJECT COST
LOCAL IMPROVE HOSPITAL ROAD BRIDGE BETWEEN CR 99 AND CR 101, HPP 2011 0.324 CONINSP 0.324
PATCHOGUE.DESIGN OF BRIDGE WIDENING & CONST.OF APPROACH ROADS TO NFA 2011 0.081 CONINSP 0.081
0T2384 ALLEVIATE TRAFFIC CONGESTION INCLUDING ADDING LEFT TURN HPP 2011 3.244 CONST 3.244
LANE,TRAFFIC SIGNAL,BIKE LANE,LANDSCAPING ETC.EARMARK# 1240,NY739 NFA 2011 0.811 CONST 0.811
HPP 2011 0.560 DETLDES 0.560
NFA 2011 0.340 DETLDES 0.340
NFA 2011 0.500 PRELDES 0.500
AQC:D3 SUFFOLK TPC : $4.6-$7.5 M TOTAL 4YR COST : 5.860 5.860 0.000 0.000 0.000
SUFFOLK CO. REHABILITATION OF CR11, PULASKI ROAD FROM LARKFIELD ROAD TO NY25A STP LG URBAN 2011 0.780 CONINSP 0.780
(APPROXIMATELY 3.5 MILES). PROJECT WOULD RESURFACE ROADWAY AND NFA 2011 0.195 CONINSP 0.195
0T2392 IMPROVE DRAINAGE WHICH WILL IMPROVE USEFUL LIFE OF ROADWAY. STP LG URBAN 2011 4.720 CONST 4.720
NFA 2011 1.180 CONST 1.180
AQC:D2P SUFFOLK TPC : $6-$9.4 M TOTAL 4YR COST : 6.875 6.875 0.000 0.000 0.000
NYSDOT REMEDIATE HIGHWAY RUNOFF ON NASSAU EXPRESSWAY TO PREVENT NFA 2011 0.500 DETLDES 0.500
HIGHWAY FLOODING IN TOWN OF HEMPSTEAD, NASSAU COUNTY NFA 2013 0.523 CONINSP 0.523
0T2394 NFA 2013 5.228 CONST 5.228
AQC:A2P NASSAU TPC : $6-$9.4 M TOTAL 4YR COST : 6.251 0.500 0.000 5.751 0.000
NYSDOT INSTALL BRIDGE FENCING ALONG BRIDGE PARAPETS THAT HAVE PEDESTRIAN NFA 2011 0.250 DETLDES 0.250
ACCESS AS A SAFETY MEASURE ON VARIOUS STATE HIGHWAYS IN NASSAU AND NFA 2012 0.418 CONINSP 0.418
0T2395 SUFFOLK COUNTIES NFA 2012 4.183 CONST 4.183
AQC:A10P MULTI TPC : $4.6-$7.5 M TOTAL 4YR COST : 4.851 0.250 4.601 0.000 0.000
NYSDOT PIL & HSI SAFETY STUDIES.PIL & HSI SAFETY STUDIES-MULTIPLE HIGHWAY HSIP 2011 0.540 DETLDES 0.540
SAFETY INVESTIGATION (HSI) STUDIES IN NASSAU & SUFFOLK COUNTY.THE NFA 2011 0.060 DETLDES 0.060
0T2396 PROJECT DEVELOPMENT WILL OCCUR BASED OFF OF THE STRATEGIC HIGHWAY HSIP 2012 0.540 DETLDES 0.540
SAFETY PLAN WITH THE LOCATIONS TO BE DETERMINED. NFA 2012 0.060 DETLDES 0.060
HSIP 2013 0.540 DETLDES 0.540
NFA 2013 0.060 DETLDES 0.060
HSIP 2014 0.540 DETLDES 0.540
NFA 2014 0.060 DETLDES 0.060
AQC:A6P MULTI TPC : $3.3-$5.6 M TOTAL 4YR COST : 2.400 0.600 0.600 0.600 0.600
** NEW YORK STATE DEPARTMENT OF TRANSPORTATION **
Friday, August 26, 2011 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) on Draft Program Page 63 of 84
for REGION 10
AGENCY PROJECT DESCRIPTION TOTAL 4-YEAR PROGRAM (FFY)
4-YEAR PHASE Starting October 01, 2010
FUND SOURCES FFY
PIN PROGRAM
FFY FFY FFY FFY
in millions
of dollars 2011 2012 2013 2014
AQ CODE COUNTY TOTAL PROJECT COST
NYSDOT COLLECTION & WARRANT STUDY TASKS - PERFORM TRAFFIC DATA NFA 2011 0.350 DETLDES 0.350
COLLECTION, SAFETY STUDIES AND OTHER TRAFFIC AND SAFETY TASKS ON NFA 2012 0.350 DETLDES 0.350
0T2397 VARIOUS HIGHWAYS & PARKWAYS IN NASSAU & SUFFOLK COUNTIES. NFA 2013 0.350 DETLDES 0.350
LOCATIONS TO BE DETERMINED NFA 2014 0.350 DETLDES 0.350
AQC:A7P MULTI TPC : $1.2-$2.5 M TOTAL 4YR COST : 1.400 0.350 0.350 0.350 0.350
NASSAU CO. OCEAN AVE. AT MERRICK ROAD INTERSECTION IMPROVEMENTS, NASSAU CMAQ 2012 2.400 CONST 2.400
COUNTY. INSTALLATION OF A DEDICATED LEFT TURN LANE TO ALLEVIATE NFA 2012 0.600 CONST 0.600
0T2403 TRAFFIC CONGESTION.
AQC:D1P NASSAU TPC : $2-$4 M TOTAL 4YR COST : 3.000 0.000 3.000 0.000 0.000
SUFFOLK CO. PROCUREMENT OF INTELLIGENT TRANSPORTATION SYSTEMS (ITS) EQUIPMENT CMAQ 2012 1.200 DETLDES 1.200
FOR THE SUFFOLK COUNTY HIGHWAY SYSTEM (SCOPE TO BE DETERMINED). NFA 2012 0.300 DETLDES 0.300
0T2404 PROJECT IS INTENDED TO IDENTIFY ROADWAYS WITH SIGNIFICANT INCIDENT CMAQ 2013 1.200 CONST 1.200
RELATED CONGESTION & RECOMMEND ITS IMPROVEMENT NFA 2013 0.300 CONST 0.300
AQC:J1Z SUFFOLK TPC : $2-$4 M TOTAL 4YR COST : 3.000 0.000 1.500 1.500 0.000
SUFFOLK CO. CR46 (WILLIAM FLOYD PARKWAY) I-495 TO NEW MORICHES RD. PROJECT WILL STP LG URBAN 2012 8.000 CONST 8.000
RECONSTRUCT CR 46/NEW MORICHES INTERSECTION &REHABILITATE CR46/LIRR NFA 2012 2.000 CONST 2.000
0T2405 BRIDGE TO EXTEND LIFE, IN THE TOWN OF BROOKHAVEN. IT ALSO IMPROVE
SAFTEY & CONGESTION AT INTERSECTION BIN 3300789
AQC:A10P SUFFOLK TPC : $7.5-$12 M TOTAL 4YR COST : 10.000 0.000 10.000 0.000 0.000
NASSAU CO. NASSAU COUNTY BRIDGE REHABILITATION; PAINTING AND MINOR HBRR 2014 4.000 CONST 4.000
REHABILITATION OF CHARLES LINDBERGH OVER THE MEADOWBROOK NFA 2014 1.000 CONST 1.000
0T2406 PARKWAY AND SANTINI BRIDGE OVER THE MEADOWBROOK PARKWAY
AQC:A19P NASSAU TPC : $4.6-$7.5 M TOTAL 4YR COST : 5.000 0.000 0.000 0.000 5.000
SUFFOLK CO. SUFFOLK COUNTY 2012 PAVEMENT MAINTENANCE PROGRAM. PROJECT WILL STP LG URBAN 2012 2.500 CONST 2.500
PROVIDE FUNDING TO RESURFACE (IMPROVE RIDING SURFACE) AND REPAIR NFA 2012 0.625 CONST 0.625
0T2407 DAMAGED DRAINAGE STRUCTURES ON COUNTY ROADS.
AQC:A10P SUFFOLK TPC : $2-$4 M TOTAL 4YR COST : 3.125 0.000 3.125 0.000 0.000
** NEW YORK STATE DEPARTMENT OF TRANSPORTATION **
Friday, August 26, 2011 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) on Draft Program Page 64 of 84
for REGION 10
AGENCY PROJECT DESCRIPTION TOTAL 4-YEAR PROGRAM (FFY)
4-YEAR PHASE Starting October 01, 2010
FUND SOURCES FFY
PIN PROGRAM
FFY FFY FFY FFY
in millions
of dollars 2011 2012 2013 2014
AQ CODE COUNTY TOTAL PROJECT COST
NASSAU CO. NASSAU COUNTY SIGNAL COMMUNICATIONS EXPANSION PHASE 1. PROVIDE CMAQ 2013 1.200 CONST 1.200
OPERATION AND MAINTENANCE OF ANCILLARY EQUIPMENT RELATED TO THE NFA 2013 0.300 CONST 0.300
0T2409 SYSTEM AND SIGNAL CONTROL.
AQC:J1Z NASSAU TPC : $1.2-$2.5 M TOTAL 4YR COST : 1.500 0.000 0.000 1.500 0.000
NASSAU CO. NASSAU COUNTY SIGNAL EXPANSION PHASE 8.UPDATE EXISTING SIGNAL CMAQ 2014 5.000 OPER 5.000
AND CONSTRUCT NEW SIGNAL SYSTEMS AT VARIOUS LOCATIONS WITHIN NFA 2014 1.250 OPER 1.250
0T2414 NASSAU COUNTY
AQC:NON NASSAU TPC : $6-$9.4 M TOTAL 4YR COST : 6.250 0.000 0.000 0.000 6.250
NASSAU CO. PURPOSE OF THIS PROJECT IS TO INSTALL VMS SIGNS AT VARIOUS LOCATIONS CMAQ 2014 4.200 OPER 4.200
IN NASSAU COUNTY TO INFORM MOTORISTS OF INFORMATION RELATED TO NFA 2014 1.050 OPER 1.050
0T2415 TRAFFIC CONGESTION AND/OR CLOSURES.
AQC:J1Z NASSAU TPC : $4.6-$7.5 M TOTAL 4YR COST : 5.250 0.000 0.000 0.000 5.250
NASSAU CO. PURPOSE OF THIS PROJECT IS TO EXPAND THE COUNTY'S EXISTING FIBER OPTIC CMAQ 2014 5.500 OPER 5.500
NETWORK IN ORDER TO PROVIDE COMMUNICATIONS TO ADDITOINAL TRAFFIC NFA 2014 1.375 OPER 1.375
0T2416 SIGNALS, WHICH WILL ALLOW US TO OPTIMIZE SIGNAL TIMING AND REDUCE
VEHICULAR CONGESTION.
AQC:J1Z NASSAU TPC : $6-$9.4 M TOTAL 4YR COST : 6.875 0.000 0.000 0.000 6.875
SUFFOLK CO. PHASE II OF SUFFOLK COUNTY INTELLIGENT TRANSPORTATION SYSTEMS (ITS) CMAQ 2014 1.800 OPER 1.800
PROGRAM. THIS PROJECT WILL CONTINUE INSTALLMENT OF ITS EQUIPMENT NFA 2014 0.450 OPER 0.450
0T2417 TO ADDRESS CONGESTION ON COUNTY ROADWAYS FROM ROADWAY
INCIDENTS.
AQC:J1Z SUFFOLK TPC : $2-$4 M TOTAL 4YR COST : 2.250 0.000 0.000 0.000 2.250
SUFFOLK CO. CLOSED LOOP SIGNAL SYSTEM. UPDATE AND INTERCONNECT THE TRAFFIC CMAQ 2013 1.600 CONST 1.600
SIGNAL SYSTEM ON VARIOUS COUNTY ROADS SO THEY CAN BE CONTROLLED & NFA 2013 0.400 CONST 0.400
0T2418 OPTIMIZED BY THE COUNTYS COMPUTERIZED CONTROL SYSTEM (LOCATIONS
TO BE DETERMINED).
AQC:NON SUFFOLK TPC : $1.2-$2.5 M TOTAL 4YR COST : 2.000 0.000 0.000 2.000 0.000
SUFFOLK CO. CLOSED LOOP SIGNAL SYSTEM. UPDATE AND INTERCONNECT THE TRAFFIC CMAQ 2014 1.600 CONST 1.600
SIGNAL SYSTEM ON VARIOUS COUNTY ROADS SO THEY CAN BE CONTROLLED & NFA 2014 0.400 CONST 0.400
0T2419 OPTIMIZED BY THE COUNTYS COMPUTERIZED CONTROL SYSTEM. LOCATIONS
TO BE DETERMINED.
AQC:NON SUFFOLK TPC : $1.2-$2.5 M TOTAL 4YR COST : 2.000 0.000 0.000 0.000 2.000
** NEW YORK STATE DEPARTMENT OF TRANSPORTATION **
Friday, August 26, 2011 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) on Draft Program Page 65 of 84
for REGION 10
AGENCY PROJECT DESCRIPTION TOTAL 4-YEAR PROGRAM (FFY)
4-YEAR PHASE Starting October 01, 2010
FUND SOURCES FFY
PIN PROGRAM
FFY FFY FFY FFY
in millions
of dollars 2011 2012 2013 2014
AQ CODE COUNTY TOTAL PROJECT COST
SUFFOLK CO. CR97 RECONSTRUCT (NICOLLS RD) BETWEEN I495 AND NY25, TO ADDRESS NFA 2011 1.000 PRELDES 1.000
SAFETY AND CONGESTION CONCERNS AROUND THE ENTRANCES OF SUFFOLK NHS 2012 1.200 DETLDES 1.200
0T2425 COUNTY COMMUNITY COLLEGE, TOWN OF BROOKHAVEN. PROJECT SCOPING NFA 2012 0.300 DETLDES 0.300
HAS NOT STARTED. (SCOPE TBD).
AQC:J1Z SUFFOLK TPC : $12.5-$19 M TOTAL 4YR COST : 2.500 1.000 1.500 0.000 0.000
NASSAU CO. NASSAU COUNTY RESURFACING VARIOUS COUNTY ROADS. REHABILITATE STP LG URBAN 2013 4.200 CONST 4.200
EXISTING ROAD PAVEMENTS IN ORDER TO PROVIDE FOR BETTER AND SAFER NFA 2013 1.050 CONST 1.050
0T2428 SURFACES.
AQC:A10P NASSAU TPC : $4.6-$7.5 M TOTAL 4YR COST : 5.250 0.000 0.000 5.250 0.000
NASSAU CO. PURPOSE OF THIS PROJECT IS TO REPLACE OLDER FADED OR MISSING STP LG URBAN 2013 0.800 CONST 0.800
ROADWAY PAVEMENT MARKINGS.LOCATIONS TO BE DETERMINED NFA 2013 0.200 CONST 0.200
0T2429
AQC:A10S NASSAU TPC : $0.6-$1.5 M TOTAL 4YR COST : 1.000 0.000 0.000 1.000 0.000
SUFFOLK CO. SAFETY AND DRAINAGE IMPROVEMENTS TO VARIOUS SUFFOLK COUNTY ROADS STP LG URBAN 2013 1.215 CONINSP 1.215
FOR THE PURPOSE OF IMPROVING ROADWAY DRAINAGE PROBLEMS AND NFA 2013 0.304 CONINSP 0.304
0T2431 OVERALL HIGHWAY SAFETY (SCOPE AND LOCATIONS TO BE DETERMINED) STP LG URBAN 2013 10.935 CONST 10.935
NFA 2013 2.734 CONST 2.734
AQC:A2P SUFFOLK TPC : $12.5-$19 M TOTAL 4YR COST : 15.188 0.000 0.000 15.188 0.000
NASSAU CO. NASSAU COUNTY RESURFACING VARIOUS COUNTY ROADS. REHABILITATE STP LG URBAN 2014 5.300 CONST 5.300
EXISTING ROAD PAVEMENTS IN ORDER TO PROVIDE FOR BETTER AND SAFER NFA 2014 1.325 CONST 1.325
0T2432 SURFACES.
AQC:A10P NASSAU TPC : $6-$9.4 M TOTAL 4YR COST : 6.625 0.000 0.000 0.000 6.625
NASSAU CO. PURPOSE OF THIS PROJECT IS TO REPLACE OLDER FADED OR MISSING STP LG URBAN 2014 1.800 CONST 1.800
ROADWAY PAVEMENT MARKINGS.LOCATIONS TO BE DETERMINED) NFA 2014 0.450 CONST 0.450
0T2433
AQC:A10S NASSAU TPC : $2-$4 M TOTAL 4YR COST : 2.250 0.000 0.000 0.000 2.250
NASSAU CO. THIS PROJECT PROVIDES DAY-TO-DAY OPERATIONS OF THE COUNTY'S TRAFFIC STP LG URBAN 2014 2.700 CONST 2.700
MANAGEMEN CENTER IN WESTBURY AND INCLUDES MONITORING OF TRAFFIC NFA 2014 0.675 CONST 0.675
0T2434 VIDEO AND THE ADJUSTMENT OF SIGNAL TIMINGS AS NEEDED.
AQC:A7P NASSAU TPC : $2-$4 M TOTAL 4YR COST : 3.375 0.000 0.000 0.000 3.375
** NEW YORK STATE DEPARTMENT OF TRANSPORTATION **
Friday, August 26, 2011 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) on Draft Program Page 66 of 84
for REGION 10
AGENCY PROJECT DESCRIPTION TOTAL 4-YEAR PROGRAM (FFY)
4-YEAR PHASE Starting October 01, 2010
FUND SOURCES FFY
PIN PROGRAM
FFY FFY FFY FFY
in millions
of dollars 2011 2012 2013 2014
AQ CODE COUNTY TOTAL PROJECT COST
SUFFOLK CO. SUFFOLK COUNTY BRIDGE PAINTING PROGRAM. THIS PROJECT PROVIDES HBRR 2014 0.500 CONST 0.500
FUNDING FOR THE CYCLICAL CLEANING AND REPAINTING OF STEEL BRIDGES NFA 2014 0.125 CONST 0.125
0T2438 AND COMPONENTS TO EXTEND USEFUL (LOCATIONS TO BE DETERMINED).
AQC:A19S SUFFOLK TPC : $0.6-$1.5 M TOTAL 4YR COST : 0.625 0.000 0.000 0.000 0.625
LOCAL BAYSHORE FERRY TERMINAL BULKHEAD REHAB - REHAB 120 FEET OF FBD 2011 0.020 CONINSP 0.020
DETERIORATED BULKHEAD NFA 2011 0.010 CONINSP 0.010
0T2440 FBD 2011 0.240 CONST 0.240
NFA 2011 0.060 CONST 0.060
NFA 2011 0.010 MISC 0.010
AQC:A2P SUFFOLK TPC : < $0.75 M TOTAL 4YR COST : 0.340 0.340 0.000 0.000 0.000
NYSDOT Bridge rehabilitation #2 of Robert Moses Causeway over Fire Island Inlet in Islip Town, Suffolk NFA 2011 0.406 DETLDES 0.406
County
0T2444
AQC:A19P SUFFOLK TPC : < $0.75 M TOTAL 4YR COST : 0.406 0.406 0.000 0.000 0.000
SUFFOLK CO. CR16 (HORSEBLOCK RD) - PECONIC AVE TO I495 PAVEMENT REHABILITATION TO STP LG URBAN 2014 0.880 CONINSP 0.880
EXTEND THE ROADWAY'S USEFUL LIFE, TOWN OF BROOKHAVEN, SUFFOLK NFA 2014 0.220 CONINSP 0.220
0T2446 COUNTY .SCOPE TO BE DETERMINED. STP LG URBAN 2014 7.920 CONST 7.920
NFA 2014 1.980 CONST 1.980
AQC:J1Z SUFFOLK TPC : $9.5-15.5 M TOTAL 4YR COST : 11.000 0.000 0.000 0.000 11.000
LOCAL 2009 RECREATION TRAILS PROGRAM: DAVID OVERTON TRAIL IN CORAM, NY REC TRAILS 2011 0.320 CONST 0.320
(SUFFOLK COUNTY) FOR GRANT FUNDING FOR A NON-MOTORIZED PATH ALONG NFA 2011 0.080 CONST 0.080
0T2448 AN EXISTING UNUSED ROADWAY RIGHT-OF-WAY.
AQC:C2P SUFFOLK TPC : < $0.75 M TOTAL 4YR COST : 0.400 0.400 0.000 0.000 0.000
NYSDOT DRAINAGE BASIN RECONSTRUCTION TO PREVENT HIGHWAY FLOODING ON NFA 2012 0.160 DETLDES 0.160
VARIOUS STATE HIGHWAYS IN NASSAU AND SUFFOLK COUNTIES. NHS 2013 0.373 CONINSP 0.373
0T2449 NFA 2013 0.093 CONINSP 0.093
NHS 2013 3.727 CONST 3.727
NFA 2013 0.932 CONST 0.932
AQC:A2Z MULTI TPC : $4.6-$7.5 M TOTAL 4YR COST : 5.285 0.000 0.160 5.125 0.000
** NEW YORK STATE DEPARTMENT OF TRANSPORTATION **
Friday, August 26, 2011 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) on Draft Program Page 67 of 84
for REGION 10
AGENCY PROJECT DESCRIPTION TOTAL 4-YEAR PROGRAM (FFY)
4-YEAR PHASE Starting October 01, 2010
FUND SOURCES FFY
PIN PROGRAM
FFY FFY FFY FFY
in millions
of dollars 2011 2012 2013 2014
AQ CODE COUNTY TOTAL PROJECT COST
LOCAL ROAD REPAIR AND MAINTENANCE IN THE TOWN OF SOUTHAMPTON. BRIDGE HPP 2011 0.500 CONST 0.500
LANE-FUNCTIONALLY OBSOLETE BRIDGE RECONSTRUCTION AT SAGAPONACK NFA 2011 0.254 CONST 0.254
0T2451 POND.NY745 HPP#3636 NFA 2011 0.090 CONINSP 0.090
AQC:A19P SUFFOLK TPC : $0.6-$1.5 M TOTAL 4YR COST : 0.844 0.844 0.000 0.000 0.000
SUFFOLK CO. INSTALL SPLIT BARRIER ON NY27 IN THE VICINITY OF THE NY27A INTERSECTION NFA 2011 0.005 DETLDES 0.005
IN OAKDALE TO ALLOW EGRESS SHOULD THE ROADWAY BE CLOSED DUE TO AN NHS 2011 0.020 CONINSP 0.020
0T2452 INCIDENT IN EITHER DIRECTION AND TO ALLOW FOR EMERGENCY VEHICLES TO NFA 2011 0.005 CONINSP 0.005
GET TO AND FROM THE INCIDENT. TOWN OF ISLIP
NHS 2011 0.180 CONST 0.180
NFA 2011 0.145 CONST 0.145
AQC:A9P SUFFOLK TPC : < $0.75 M TOTAL 4YR COST : 0.355 0.355 0.000 0.000 0.000
LOCAL THE STRAIGHT PATH RECONFIGURATION STRETCHES FROM MOUNT AVENUE ON STP FLEX 2013 0.112 CONINSP 0.112
THE SOUTH TO NICOLLS ROAD ON THE NORTH FOR TRAFFIC CALMING & NFA 2013 0.028 CONINSP 0.028
0T2453 PEDESTRIAN ENHANCEMENT. A CENTRAL PLANTED MEDIAN INTERRUPTED FOR STP FLEX 2013 0.374 CONST 0.374
LEFT TURN LANES IN WYANDANCH, BABYLO NFA 2013 0.553 CONST 0.553
AQC:A6P SUFFOLK TPC : $0.6-$1.5 M TOTAL 4YR COST : 1.067 0.000 0.000 1.067 0.000
LOCAL ENHANCE TRAFFIC SAFETY AT VARIOUS INTERSECTION, HEMPSTEAD STP FLEX 2013 0.233 CONST 0.233
AVE,LAKEVIEW AVE,ATLANTIC AVE AND UNION AVE BY INSTALLING SPEED NFA 2013 0.058 CONST 0.058
0T2454 LIMIT SIGNS, VISAUL CROSSWALKS AND RESIDENTIAL SCALE ORNAMENTAL
LIGHTING AND STREET TREES, VILLAGE OF LYNBROOK IN TOWM OF
HEMPSTEAD
AQC:A6P NASSAU TPC : < $0.75 M TOTAL 4YR COST : 0.291 0.000 0.000 0.291 0.000
NYSDOT VILLAGE OF SOUTHAMPTON PROPOSES IMPROVEMENTS IN SAFETY AND STP FLEX 2011 0.046 CONINSP 0.046
TRAFFIC CALMING BY PROVIDING LEFT TURN SIGNALS AT FIVE NFA 2011 0.011 CONINSP 0.011
0t2455 INTERSECTIONS AND BULB-OUT AT ONE INTERSECTION. DESIGNATED 3.3 MILES STP FLEX 2011 0.392 CONST 0.392
OF ROAD AS CLASS 3 BIKE ROUTE. NFA 2011 0.100 CONST 0.100
AQC:C2P SUFFOLK TPC : < $0.75 M TOTAL 4YR COST : 0.549 0.549 0.000 0.000 0.000
LOCAL THE PROJECT PROPOSES TO REDUCE THE TRAVEL SPEEDS TO PROVIDE SAFER NFA 2011 0.035 DETLDES 0.035
CONDITIONS FOR BICYCLISTS ON GRANNY RD BETWEEN NY112 AND MILL RD IN STP FLEX 2011 0.016 CONINSP 0.016
0T2456 THE TOWN OF BROOKHAVEN, SUFFOLK COUNTY NFA 2011 0.004 CONINSP 0.004
STP FLEX 2011 0.131 CONST 0.131
NFA 2011 0.033 CONST 0.033
AQC:C2Z SUFFOLK TPC : < $0.75 M TOTAL 4YR COST : 0.219 0.219 0.000 0.000 0.000
** NEW YORK STATE DEPARTMENT OF TRANSPORTATION **
Friday, August 26, 2011 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) on Draft Program Page 68 of 84
for REGION 10
AGENCY PROJECT DESCRIPTION TOTAL 4-YEAR PROGRAM (FFY)
4-YEAR PHASE Starting October 01, 2010
FUND SOURCES FFY
PIN PROGRAM
FFY FFY FFY FFY
in millions
of dollars 2011 2012 2013 2014
AQ CODE COUNTY TOTAL PROJECT COST
LOCAL THE PROJECT PROPOSES TO REDUCE THE TRAVEL SPEEDS ON HOLBROOK RD NFA 2011 0.060 DETLDES 0.060
BETWEEN NY25 AND CR16 AND MAKE ADA COMPLIANT CONTINUOUS STP FLEX 2011 0.048 CONINSP 0.048
0T2457 SIDEWALKS AS WELL AS AN ON STREET BICYCLE LANE. TOWN OF NFA 2011 0.012 CONINSP 0.012
BROOKHAVEN, SUFFOLK COUNTY STP FLEX 2011 0.400 CONST 0.400
NFA 2011 0.100 CONST 0.100
AQC:C2Z SUFFOLK TPC : $0.6-$1.5 M TOTAL 4YR COST : 0.620 0.620 0.000 0.000 0.000
LOCAL VILLAGE OF ROCKVILLE CENTER PROPOSED RESTORATION OF MAPLE AVE TCSP 2011 0.047 CONINSP 0.047
INCLUDES DRIVEWAY APRON, ROADWAY SURFACING, CURBING, HANDICAP NFA 2011 0.012 CONINSP 0.012
0T2458 RAMPS, DRAINAGE STRUCTURE, TREE PITS ETC... TCSP 2011 0.424 CONST 0.424
NFA 2011 0.106 CONST 0.106
AQC:A10Z NASSAU TPC : < $0.75 M TOTAL 4YR COST : 0.589 0.589 0.000 0.000 0.000
LOCAL CANAL ROAD TRAFFIC CALMING (ROSE LANE TO CR83) BY REDUCING TRAFFIC NFA 2011 0.036 DETLDES 0.036
SPEED BY REDUCE TRAVEL LANE.PROVIDE LEFT TURN LANES AT VARIOUS STP FLEX 2012 0.024 CONINSP 0.024
0T2459 INTERSECTION TO REDUCE LEFT TURN ACCIDENTS TO IMPROVE MOTORIST NFA 2012 0.006 CONINSP 0.006
SAFETY IN TOWN OF BROOKHAVEN STP FLEX 2012 0.224 CONST 0.224
NFA 2012 0.056 CONST 0.056
AQC:C2P SUFFOLK TPC : < $0.75 M TOTAL 4YR COST : 0.346 0.036 0.310 0.000 0.000
LIRR EAST SIDE ACCESS CONSTRUCTION: NEW TUNNELS BTWN SUNNYSIDE YARD IN CMAQ 2011 2.300 MISC 2.300
QUEENS & THE LOWER LEVEL OF THE EXISTING 63 ST TUNNEL UNDER EAST NFA 2011 0.575 MISC 0.575
G609/01/AA RIVER, NEW TUNNELS UNDER PARK AVE IN MANHATTAN TO GRAND CENTRAL FTA 5309 2011 246.863 MISC 246.863
TERMINAL; ROLLING STOCK, REAL ESTATE AND PROFL SERVICES NFA 2011 340.907 MISC 340.907
CMAQ 2012 2.300 MISC 2.300
NFA 2012 0.575 MISC 0.575
FTA 5309 2012 430.000 MISC 430.000
NFA 2012 592.660 MISC 592.660
FTA 5309 2013 215.000 MISC 215.000
NFA 2013 296.905 MISC 296.905
FTA 5309 2014 215.000 MISC 215.000
NFA 2014 296.905 MISC 296.905
AQC:NON MULTI TPC : $4.3-9.2 B TOTAL 4YR COST : 2639.990 590.645 1025.535 511.905 511.905
LIRR REDUNDANT ADA ELEVATOR FOR EAST SIDE ACCESS CONCOURSE FTA 5317 2011 2.240 MISC 2.240
(NYC) - CONSTRUCTION OF AN ADA ELEVATOR TO PROVIDE GREATER NFA 2011 0.560 MISC 0.560
G614/01/07 ACCESSIBILITY BETWEEN THE NEW LIRR CONCOURSE AND GTC AS PART OF
MTA’S EAST SIDE ACCESS PROJECT.
AQC:B8P NEW YORK TPC : $2-$4 M TOTAL 4YR COST : 2.800 2.800 0.000 0.000 0.000
** NEW YORK STATE DEPARTMENT OF TRANSPORTATION **
Friday, August 26, 2011 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) on Draft Program Page 69 of 84
for REGION 10
AGENCY PROJECT DESCRIPTION TOTAL 4-YEAR PROGRAM (FFY)
4-YEAR PHASE Starting October 01, 2010
FUND SOURCES FFY
PIN PROGRAM
FFY FFY FFY FFY
in millions
of dollars 2011 2012 2013 2014
AQ CODE COUNTY TOTAL PROJECT COST
LIRR M-9 PROCUREMENT-84 CARS - PURCHASE 84 NEW M-9 ELECTRIC CARS TO BEGIN NFA 2011 355.900 MISC 355.900
THE REPLACEMENT OF THE AGING M-3 FLEET. THE NEW M-9 CARS WILL BUILD
L601/01/MA UPON THE SUCCESS OF THE M-7 FLEET AND WILL BE OPERATED THROUGHOUT
LIRR ELECTRIC TERRITORY.
AQC:B10P SYSTEM-WIDE TPC : $300-$650 M TOTAL 4YR COST : 355.900 355.900 0.000 0.000 0.000
LIRR SPECIFICATION DEVELOPMENT-ALT DIESEL EQUIPMENT NEW DIESEL POWERED NFA 2011 2.800 MISC 2.800
ROLLING STOCK TO OPERATE EXCLUSIVELY IN NON-ELECTRIFIED TERRITORY
L601/01/MB AND PROVIDE SCOOT SERVICE TO ELECTRIC TERMINAL STATIONS. THIS FLEET
WOULD SUPPLEMENT THE EXISTING DIESEL FLEET.
AQC:B10P SYSTEM-WIDE TPC : $2-$4 M TOTAL 4YR COST : 2.800 2.800 0.000 0.000 0.000
LIRR ALTERNATIVE DIESEL EQUIPMENT - PROCUREMENT OF NEW DIESEL-POWERED NFA 2013 78.000 MISC 78.000
ROLLING STOCK TO OPERATE EXCLUSIVELY IN NON-ELECTRIFIED TERRITORY
L601/01/MD AND PROVIDE SCOOT SERVICE TO ELECTRIC TERMINAL STATIONS. THIS NEW
FLEET WOULD SUPPLEMENT THE EXISTING DIESEL FLEET
AQC:NON SYSTEM-WIDE TPC : $70-$130 M TOTAL 4YR COST : 78.000 0.000 0.000 78.000 0.000
LIRR REPLACE MASSAPEQUA STATION PLATFORM - REPLACEMENT OF PLATFORM FTA 5309 2013 14.640 MISC 14.640
WHICH DATES FROM 1953. REHABILITATION EFFORT WILL ALSO REPLACE NFA 2013 3.660 MISC 3.660
L602/04/UB ELEVATOR, ESCALATOR, PLATFORM WAITING ROOMS, LIGHTING, SIGNAGE,
PLATFORM CANOPIES, AND OTHER ELEMENTS.
AQC:B8P NASSAU TPC : $15-$25 M TOTAL 4YR COST : 18.300 0.000 0.000 18.300 0.000
LIRR REPLACE WANTAGH STATION PLATFORM - REPLACEMENT OF PLATFORM WHICH FTA 5307 2012 15.280 MISC 15.280
DATES FROM 1968. REHABILITATION EFFORT WILL ALSO REPLACE ESCALATOR, NFA 2012 3.820 MISC 3.820
L602/04/UC PLATFORM WAITING ROOMS, LIGHTING, SIGNAGE, PLATFORM CANOPIES, NEW
ELEVATOR, MAKING STATION WHEELCHAIR ACCESSIBLE.
AQC:B8P NASSAU TPC : $15-$25 M TOTAL 4YR COST : 19.100 0.000 19.100 0.000 0.000
LIRR ESA/GCT SUPPORT - FUND ELEVATOR CONSTRUCTION AND OTHER STATION FTA 5307 2014 12.400 MISC 12.400
INFRASTRUCTURE REQUIRED FOR STATION OPERATIONS AT THE LIRR’S NEW NFA 2014 3.100 MISC 3.100
L602/04/UE STATION AT GRAND CENTRAL TERMINAL.
AQC:B5P NEW YORK TPC : $12.5-$19 M TOTAL 4YR COST : 15.500 0.000 0.000 0.000 15.500
** NEW YORK STATE DEPARTMENT OF TRANSPORTATION **
Friday, August 26, 2011 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) on Draft Program Page 70 of 84
for REGION 10
AGENCY PROJECT DESCRIPTION TOTAL 4-YEAR PROGRAM (FFY)
4-YEAR PHASE Starting October 01, 2010
FUND SOURCES FFY
PIN PROGRAM
FFY FFY FFY FFY
in millions
of dollars 2011 2012 2013 2014
AQ CODE COUNTY TOTAL PROJECT COST
LIRR METS/WILLETS PT STATION - TRACK & SIGNAL IMPROVEMENTS TO FACILITATE NFA 2013 1.000 MISC 1.000
OPERATIONS AT CENTER PLATFORM CURRENTLY NOT UTILIZED, NEW FTA 5309 2014 4.190 MISC 4.190
L602/04/UF ELEVATORS FOR WHEELCHAIR ACCESS, NEW TACTILE-WARNING STRIPS, NFA 2014 1.010 MISC 1.010
PLATFORM/CANOPY EXTENSIONS, NEW PLATFORM SHELTERS.
AQC:B8P QUEENS TPC : $4.6-$7.5 M TOTAL 4YR COST : 6.200 0.000 0.000 1.000 5.200
LIRR ELEVATOR REPLACEMENT PROGRAM - REPLACES ONE ELEVATOR AT FTA 5307 2012 3.600 MISC 3.600
ROCKVILLE CENTRE AND ONE AT WOODSIDE. THE WOODSIDE ELEVATOR NFA 2012 0.900 MISC 0.900
L602/04/UH CONNECTS THE STREET LEVEL, THE LIRR AND THE NYCT AREAS OF THE
STATION COMPLEX.
AQC:B8P MULTI TPC : $4.6-$7.5 M TOTAL 4YR COST : 4.500 0.000 4.500 0.000 0.000
LIRR SMART CARD IMPROVEMENTS - PERFORM PILOT STUDIES AND ANALYSIS IN NFA 2011 2.000 MISC 2.000
PREPARATION FOR NEXT GENERATION OF MTA FARE MEDIA. FUTURE USE OF FTA 5309 2012 6.400 MISC 6.400
L602/04/UK CONTACTLESS CARDS EQUIPPED WITH SMART CHIPS CAN BE USED TO PAY FOR NFA 2012 1.600 MISC 1.600
VARIOUS LIRR & TRANSIT
AQC:K2P SYSTEM-WIDE TPC : $7.5-$12 M TOTAL 4YR COST : 10.000 2.000 8.000 0.000 0.000
LIRR INTERMODAL FACILITY DEVELOPMENT - DESIGN AND CONSTRUCT A NEW NFA 2012 6.500 MISC 6.500
INTERMODAL FACILITY AT A SUBURBAN LOCATION IN ELECTRIC TERRITORY, FTA 5309 2013 23.740 MISC 23.740
L602/05/U1 WHOSE SITE IS YET TO BE IDENTIFIED. NFA 2013 19.760 MISC 19.760
AQC:NON SYSTEM-WIDE TPC : $40-$60 M TOTAL 4YR COST : 50.000 0.000 6.500 43.500 0.000
LIRR PENN STATION HVAC - REPLACING THE HVAC SYSTEM ENSURES RELIABLE NFA 2013 9.900 MISC 9.900
CLIMATE CONTROL FOR LIRR PORTION OF THE STATION
L602/06/VL
AQC:B8P NEW YORK TPC : $9.5-15.5 M TOTAL 4YR COST : 9.900 0.000 0.000 9.900 0.000
LIRR 2010 ANNUAL TRACK PROGRAM PROVIDES FOR THE LIFE CYCLE REPLACEMENT FTA 5307 2011 21.450 MISC 21.450
OF TRACK COMPONENTS IN SELECTED SEGMENTS OF THE RIGHT OF WAY FTA 5309 2011 1.510 MISC 1.510
L603/01/TA
AQC:B9P SYSTEM-WIDE TPC : $50-$85 M TOTAL 4YR COST : 22.960 22.960 0.000 0.000 0.000
LIRR 2011 ANNUAL TRACK PROGRAM PROVIDES FOR THE LIFE CYCLE REPLACEMENT FTA 5307 2011 14.560 MISC 14.560
OF TRACK COMPONENTS IN SELECTED SEGMENTS OF THE RIGHT OF WAY FTA 5309 2011 40.540 MISC 40.540
L603/01/TB
AQC:B9P SYSTEM-WIDE TPC : $50-$85 M TOTAL 4YR COST : 55.100 55.100 0.000 0.000 0.000
** NEW YORK STATE DEPARTMENT OF TRANSPORTATION **
Friday, August 26, 2011 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) on Draft Program Page 71 of 84
for REGION 10
AGENCY PROJECT DESCRIPTION TOTAL 4-YEAR PROGRAM (FFY)
4-YEAR PHASE Starting October 01, 2010
FUND SOURCES FFY
PIN PROGRAM
FFY FFY FFY FFY
in millions
of dollars 2011 2012 2013 2014
AQ CODE COUNTY TOTAL PROJECT COST
LIRR 2012 ANNUAL TRACK PROGRAM PROVIDES FOR THE LIFE CYCLE REPLACEMENT FTA 5309 2012 47.600 MISC 47.600
OF TRACK COMPONENTS IN SELECTED SEGMENTS OF THE RIGHT OF WAY NFA 2012 11.900 MISC 11.900
L603/01/TC
AQC:B9P SYSTEM-WIDE TPC : $50-$85 M TOTAL 4YR COST : 59.500 0.000 59.500 0.000 0.000
LIRR 2013 ANNUAL TRACK PROGRAM PROVIDES FOR THE LIFE CYCLE REPLACEMENT FTA 5307 2013 7.600 MISC 7.600
OF TRACK COMPONENTS IN SELECTED SEGMENTS OF THE RIGHT OF WAY. NFA 2013 1.900 MISC 1.900
L603/01/TD FTA 5309 2013 40.000 MISC 40.000
NFA 2013 10.000 MISC 10.000
AQC:B9P SYSTEM-WIDE TPC : $50-$85 M TOTAL 4YR COST : 59.500 0.000 0.000 59.500 0.000
LIRR 2014 ANNUAL TRACK PROGRAM PROVIDES FOR THE LIFE CYCLE REPLACEMENT FTA 5307 2014 45.680 MISC 45.680
OF TRACK COMPONENTS IN SELECTED SEGMENTS OF THE RIGHT OF WAY NFA 2014 11.420 MISC 11.420
L603/01/TE
AQC:B9P SYSTEM-WIDE TPC : $50-$85 M TOTAL 4YR COST : 57.100 0.000 0.000 0.000 57.100
LIRR THE TRACK CONSTRUCTION EQUIPMENT PROGRAM PROVIDES FOR THE TRACK FTA 5307 2011 4.800 MISC 4.800
CONSTRUCTION EQUIPMENT - REPLACES CONSTRUCTION EQUIPMENT THAT HAS FTA 5309 2012 1.360 MISC 1.360
L603/01/TF REACHED THE END OF ITS USEFUL LIFE AND PURCHASE NEW EQUIPMENT TO NFA 2012 0.340 MISC 0.340
EXPAND THE EQUIPMENT INVENTORY. FTA 5309 2013 0.400 MISC 0.400
NFA 2013 0.100 MISC 0.100
AQC:B9P SYSTEM-WIDE TPC : $6-$9.4 M TOTAL 4YR COST : 7.000 4.800 1.700 0.500 0.000
LIRR ATLANTIC BRANCH 1/2 TIES - REPLACES THE EXISTING WOOD HALF-TIES AND FTA 5307 2012 18.310 MISC 18.310
CONCRETE TRACK STRUCTURE IN THE TUNNEL BETWEEN EAST NEW YORK AND NFA 2012 4.577 MISC 4.577
L603/01/TG JAMAICA FTA 5309 2012 11.690 MISC 11.690
NFA 2012 2.922 MISC 2.922
AQC:B9P SYSTEM-WIDE TPC : $32-$50 M TOTAL 4YR COST : 37.499 0.000 37.499 0.000 0.000
LIRR MERRICK/BELLMORE DIRECT FIXATION - REPLACE THE TRACK TO VIADUCT FTA 5307 2012 28.640 MISC 28.640
FIXATION SYSTEM IN THE VICINITY OF MERRICK & BELLMORE STATIONS ON NFA 2012 7.160 MISC 7.160
L603/01/TH THE BABYLON BRANCH.
AQC:B9P NASSAU TPC : $32-$50 M TOTAL 4YR COST : 35.800 0.000 35.800 0.000 0.000
** NEW YORK STATE DEPARTMENT OF TRANSPORTATION **
Friday, August 26, 2011 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) on Draft Program Page 72 of 84
for REGION 10
AGENCY PROJECT DESCRIPTION TOTAL 4-YEAR PROGRAM (FFY)
4-YEAR PHASE Starting October 01, 2010
FUND SOURCES FFY
PIN PROGRAM
FFY FFY FFY FFY
in millions
of dollars 2011 2012 2013 2014
AQ CODE COUNTY TOTAL PROJECT COST
LIRR RIGHT OF WAY CULVERTS - REHABILITATE CULVERTS ADDRESSING NFA 2011 0.500 MISC 0.500
SIGNIFICANT DEFICIENCIES AND DETERIORATION NFA 2012 0.500 MISC 0.500
L603/01/TJ NFA 2013 0.500 MISC 0.500
NFA 2014 0.500 MISC 0.500
AQC:B9P SYSTEM-WIDE TPC : $2-$4 M TOTAL 4YR COST : 2.000 0.500 0.500 0.500 0.500
LIRR RIGHT OF WAY DRAINAGE CONTROL - IMPROVE RIGHT OF WAY AND TRACK NFA 2011 0.700 MISC 0.700
DRAINAGE IN AN EFFORT TO PREVENT TRACK DETERIORATION AND THE NEED NFA 2012 0.700 MISC 0.700
L603/01/TK FOR ASSOCIATED INCREASES IN MAINTENANCE NFA 2013 0.700 MISC 0.700
NFA 2014 0.700 MISC 0.700
AQC:B9P SYSTEM-WIDE TPC : $3.3-$5.6 M TOTAL 4YR COST : 2.800 0.700 0.700 0.700 0.700
LIRR SCOPE: INSTALL SECURITY FENCE ALONG THE RIGHT OF WAY. PURPOSE: TO FTA 5309 2011 3.200 MISC 3.200
ENHANCE SAFETY AND SECURITY AND PREVENT UNAUTHORIZED ENTRY INTO FTA 5307 2012 1.280 MISC 1.280
L603/01/TL THE RIGHT OF WAY.THIS IS PART OF ONGOING PROGRAM TO FENCE ENTIRE NFA 2012 0.320 MISC 0.320
SYSTEM FTA 5307 2013 1.280 MISC 1.280
NFA 2013 0.320 MISC 0.320
FTA 5307 2014 1.280 MISC 1.280
NFA 2014 0.320 MISC 0.320
AQC:B9P SYSTEM-WIDE TPC : $7.5-$12 M TOTAL 4YR COST : 8.000 3.200 1.600 1.600 1.600
LIRR ROW TRACK STABILITY/RETAINING WALLS WILL INCLUDE EXTENDING, NFA 2011 0.200 MISC 0.200
REPLACING/UPGRADING EXISTING RETAINING WALLS, REPLACING EXISTING NFA 2012 0.200 MISC 0.200
L603/01/TN DETERIORATED WOOD RAILROAD TIE WALLS, BACKFILLING STRUCTURES, NFA 2013 0.200 MISC 0.200
SURFACING EXISTING TRACK AND REPLACING TRACK SHOULDERS NFA 0.200 MISC 0.200
2014
AQC:B9P SYSTEM-WIDE TPC : $0.6-$1.5 M TOTAL 4YR COST : 0.800 0.200 0.200 0.200 0.200
LIRR JAMAICA CAPACITY IMPROVEMENTS - PH I - DESIGN AND CONSTRUCT A NEW NFA 2011 40.000 MISC 40.000
PLATFORM AT JAMAICA STATION AND ASSOCIATED TRACK, SWITCH & SIGNAL FTA 5307 2012 40.930 MISC 40.930
L603/04/TU INFRASTRUCTURE FOR FUTURE FLATBUSH-JAMAICA SCOOT SERVICE NFA 2012 32.950 MISC 32.950
FTA 5307 2013 51.100 MISC 51.100
NFA 2013 31.100 MISC 31.100
FTA 5307 2014 54.360 MISC 54.360
NFA 2014 27.402 MISC 27.402
FTA 5309 2014 89.390 MISC 89.390
NFA 2014 32.760 MISC 32.760
AQC:NON QUEENS TPC : $300-$650 M TOTAL 4YR COST : 399.992 40.000 73.880 82.200 203.912
** NEW YORK STATE DEPARTMENT OF TRANSPORTATION **
Friday, August 26, 2011 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) on Draft Program Page 73 of 84
for REGION 10
AGENCY PROJECT DESCRIPTION TOTAL 4-YEAR PROGRAM (FFY)
4-YEAR PHASE Starting October 01, 2010
FUND SOURCES FFY
PIN PROGRAM
FFY FFY FFY FFY
in millions
of dollars 2011 2012 2013 2014
AQ CODE COUNTY TOTAL PROJECT COST
LIRR MASSAPEQUA POCKET TRACK - DESIGN AND CONSTRUCT A NEW MASSAPEQUA CMAQ 2012 8.500 MISC 8.500
POCKET TRACK, TO FACILITATE ADDITIONAL MID-BRANCH TRAIN STARTS ON NFA 2012 2.600 MISC 2.600
L603/04/TV THE BABYLON BRANCH CMAQ 2013 8.500 MISC 8.500
AQC:NON NASSAU TPC : $15-$25 M TOTAL 4YR COST : 19.600 0.000 11.100 8.500 0.000
LIRR GREAT NECK POCKET TRACK EXTENSION - EXTEND THE EXISTING GREAT NECK NFA 2011 26.100 MISC 26.100
POCKET TRACK LOCATED EAST OF GREAT NECK STATION ON THE PORT
L603/04/TW WASHINGTON BRANCH TO FACILITATE ADDITIONAL SERVICE TO GREAT NECK &
QUEENS STATIONS
AQC:NON NASSAU TPC : $21-$31 M TOTAL 4YR COST : 26.100 26.100 0.000 0.000 0.000
LIRR SECOND TRACK FARMINGDALE TO RONKONKOMA - PHASE 1 - DESIGN A NFA 2011 6.900 MISC 6.900
FULL-LENGTH DOUBLE TRACK FROM FARMINGDALE TO RONKONKOMA & FTA 5307 2013 10.770 MISC 10.770
L603/04/TX CONSTRUCT PHASE I - CENTRAL ISLIP TO RONKONKOMA NFA 2013 2.692 MISC 2.692
FTA 5309 2013 7.710 MISC 7.710
NFA 2013 1.927 MISC 1.927
AQC:NON SUFFOLK TPC : $26-$40 M TOTAL 4YR COST : 29.999 6.900 0.000 23.099 0.000
LIRR BRIDGE PROGRAM-REHABILITATE SELECTED BRIDGES & VIADUCTS IDENTIFIED FTA 5309 2012 8.000 MISC 8.000
AS PRIORITY FOR REHABILITATION NFA 2012 2.000 MISC 2.000
L604/01/BB FTA 5307 2013 6.400 MISC 6.400
NFA 2013 1.600 MISC 1.600
FTA 5307 2014 5.280 MISC 5.280
NFA 2014 1.320 MISC 1.320
AQC:B9P SYSTEM-WIDE TPC : $21-$31 M TOTAL 4YR COST : 24.600 0.000 10.000 8.000 6.600
LIRR REPLACE COLONIAL ROAD HIGHWAY BRIDGE - REPLACE THE COLONIAL ROAD NFA 2011 10.000 MISC 10.000
HIGHWAY BRIDGE IN GREAT NECK. THIS BRIDGE, CONSTRUCTED IN 1897, HAS
L604/01/BC EXCEEDED ITS USEFUL LIFE AND IS IN NEED OF REPLACEMENT.
AQC:B9P NASSAU TPC : $7.5-$12 M TOTAL 4YR COST : 10.000 10.000 0.000 0.000 0.000
LIRR CONSTRUCT 150TH ST-JAMAICA & BROADWAY/PW - REHABILITATE THE 150TH NFA 2012 29.700 MISC 29.700
ST BRIDGE IN JAMAICA (MAIN LINE AND ATLANTIC BRANCH) AND BROADWAY
L604/01/BD BRIDGE IN QUEENS (PORT WASHINGTON BRANCH), BRINGING THESE BRIDGES
TO A STATE OF GOOD REPAIR.
AQC:B9P QUEENS TPC : $26-$40 M TOTAL 4YR COST : 29.700 0.000 29.700 0.000 0.000
** NEW YORK STATE DEPARTMENT OF TRANSPORTATION **
Friday, August 26, 2011 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) on Draft Program Page 74 of 84
for REGION 10
AGENCY PROJECT DESCRIPTION TOTAL 4-YEAR PROGRAM (FFY)
4-YEAR PHASE Starting October 01, 2010
FUND SOURCES FFY
PIN PROGRAM
FFY FFY FFY FFY
in millions
of dollars 2011 2012 2013 2014
AQ CODE COUNTY TOTAL PROJECT COST
LIRR CONSTRUCT 3 MONTAUK BRANCH BRIDGES - REHABILITATE THE SHINNECOCK FTA 5307 2011 26.200 MISC 26.200
CANAL, MONTAUK HIGHWAY, AND NORTH HIGHWAY BRIDGES TO BRING THESE
L604/01/BE BRIDGES TO A STATE OF GOOD REPAIR.
AQC:B9P SUFFOLK TPC : $21-$31 M TOTAL 4YR COST : 26.200 26.200 0.000 0.000 0.000
LIRR BRIDGE PAINTING PROGRAM - PAINT VARIOUS BRIDGES AND VIADUCTS, BASED FTA 5309 2011 2.000 MISC 2.000
UPON PRIORITIZATION ESTABLISHED BY THE RAILROAD'S ENGINEERING FTA 5307 2012 1.600 MISC 1.600
L604/01/BG DEPARTMENT NFA 2012 0.400 MISC 0.400
NFA 2013 1.200 MISC 1.200
AQC:B9P SYSTEM-WIDE TPC : $4.6-$7.5 M TOTAL 4YR COST : 5.200 2.000 2.000 1.200 0.000
LIRR WOODHAVEN BOULEVARD BRIDGE - REHABILITATION TO EXTEND THE SERVICE NFA 2011 10.200 MISC 10.200
LIFE AND RESTORE ALL COMPONENTS TO A STATE OF GOOD REPAIR
L604/01/BH
AQC:B9P QUEENS TPC : $9.5-15.5 M TOTAL 4YR COST : 10.200 10.200 0.000 0.000 0.000
LIRR EAST RIVER TUNNEL FIRE & LIFE SAFETY - IMPROVE PHYSICAL CONDITIONS, NFA 2013 11.200 MISC 11.200
EGRESS OPPORTUNITIES AND VENTILATION IN THE TUNNELS
L604/02/BP
AQC:B9P SYSTEM-WIDE TPC : $15-$25 M TOTAL 4YR COST : 11.200 0.000 0.000 11.200 0.000
LIRR FIBER OPTIC NETWORK - CONTINUE MULTI-PHASE BUILD OUT OF FIBER OPTIC FTA 5309 2012 8.000 MISC 8.000
NETWORK BY INSTALLING FIBER OPTIC CABLE AND EQUIPMENT AT VARIOUS NFA 2012 2.000 MISC 2.000
L605/01/L1 LOCATIONS THROUGHOUT THE LIRR
AQC:B6P SYSTEM-WIDE TPC : $7.5-$12 M TOTAL 4YR COST : 10.000 0.000 10.000 0.000 0.000
LIRR PBX - WAYSIDE PHONE REPLACEMENT - PHASE I - WILL REPLACE NFA 2011 2.100 MISC 2.100
DETERIORATED OBSOLETE WAYSIDE PHONE SYSTEM & ACCESSORIES PROVIDED NFA 2012 2.100 MISC 2.100
L605/01/L2 IN SUBSTATIONS, YARDS, INTERLOCKINGS AND ALONG THE LIRR RIGHT OF WAY NFA 2013 2.100 MISC 2.100
WITH A MODERN COMMUNICATIONS SYSTEM NFA 2.100 MISC 2.100
2014
AQC:B6P SYSTEM-WIDE TPC : $9.5-15.5 M TOTAL 4YR COST : 8.400 2.100 2.100 2.100 2.100
** NEW YORK STATE DEPARTMENT OF TRANSPORTATION **
Friday, August 26, 2011 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) on Draft Program Page 75 of 84
for REGION 10
AGENCY PROJECT DESCRIPTION TOTAL 4-YEAR PROGRAM (FFY)
4-YEAR PHASE Starting October 01, 2010
FUND SOURCES FFY
PIN PROGRAM
FFY FFY FFY FFY
in millions
of dollars 2011 2012 2013 2014
AQ CODE COUNTY TOTAL PROJECT COST
LIRR REPLACE COMMUNICATION POLE/COPPER PLANT:PURPOSE: THESE POLES FTA 5309 2011 7.000 MISC 7.000
CARRY THE CABLE LINES PROVIDING SERVICE TO THE LONG ISLAND RAIL ROAD
L605/01/L3 COMMUNICATION SYSTEM AND FIBER OPTIC CABLE. LOCATIONS: OYSTER
BAY, CENTRAL AND PORT WASHINGTON BRANCHES AND MAIN LINE.
AQC:B6P SYSTEM-WIDE TPC : $6-$9.4 M TOTAL 4YR COST : 7.000 7.000 0.000 0.000 0.000
LIRR IMPROVED RADIO COVERAGE INITIATIVE - PURCHASE AND INSTALL NEW RADIO NFA 2011 2.000 MISC 2.000
INFRASTRUCTURE TO MIGRATE THE LIRR'S RADIO COMMUNICATIONS SYSTEM NFA 2012 2.000 MISC 2.000
L605/01/L4 FROM CURRENT ANALOG TO MODERN RADIOS USING LESS BANDWITH TO NFA 2013 2.900 MISC 2.900
PROVIDE GREATER CHANNEL CAPACITY AND AVAILABILITY NFA 2014 2.900 MISC 2.900
AQC:B6P SYSTEM-WIDE TPC : $9.5-15.5 M TOTAL 4YR COST : 9.800 2.000 2.000 2.900 2.900
LIRR PENN STATION RADIO RETROFIT/ERT ANTENNA - UPGRADE/REPLACE EXISTING NFA 2011 5.200 MISC 5.200
DETERIORATED RADIO INFRASTURE IN PENN STATION AND THE EAST RIVER
L605/01/L6 TUNNELS, IN ORDER TO IMPROVE COMMUNICATIONS
AQC:B6P NEW YORK TPC : $6-$9.4 M TOTAL 4YR COST : 5.200 5.200 0.000 0.000 0.000
LIRR ATLANTIC AVE TUNNEL CABLE REPLACEMENT - REPLACE THE DETERIORATED FTA 5307 2011 1.700 MISC 1.700
COPPER AND COAXIAL RADIO CABLE WHICH SUPPORTS NUMEROUS FTA 5309 2012 1.360 MISC 1.360
L605/01/L7 COMMUNICATIONS SYSTEMS IN ATLANTIC AVENUE TUNNEL NFA 2012 0.340 MISC 0.340
FTA 5309 2013 1.360 MISC 1.360
NFA 2013 0.340 MISC 0.340
AQC:B6P SYSTEM-WIDE TPC : $4.6-$7.5 M TOTAL 4YR COST : 5.100 1.700 1.700 1.700 0.000
LIRR POSITIVE TRAIN CONTROL:SCOPE: A SYSTEM TO PROVIDE ENFORCEMENT OF NFA 2011 22.300 MISC 22.300
CIVIL SPEED A& TEMPORARY SPEED RESTRICTIONS, POSITIVE STOP AT NFA 2012 155.700 MISC 155.700
L605/02/LA INTERLOCKINGS AND PROTECTION OVER IMPROPERLY ALIGNED SWITCHES, AS NFA 2013 77.200 MISC 77.200
WELL AS PROTECTION OF ROADWAY WORKERS. LOCATION: VARIOUS
AQC:B6P SYSTEM-WIDE TPC : $175-$385 M TOTAL 4YR COST : 255.200 22.300 155.700 77.200 0.000
LIRR SIGNAL NORMAL REPLACEMENT PROGRAM INCLUDES SWITH,BATTERIES FTA 5307 2011 7.500 MISC 7.500
ETC.SCOPE: REPLACE VARIOUS SIGNAL SYSTEM COMPONENTS THAT HAVE FTA 5309 2011 7.500 MISC 7.500
L605/02/LB REACHED AND/OR EXCEEDED THEIR USEFUL LIFE AT LONG BEACH, PORT
JEFFERSON, OYSTER BAY, CENTRAL, MONTAUK AND MAIN LINE BRANCHES.
AQC:B6P SYSTEM-WIDE TPC : $12.5-$19 M TOTAL 4YR COST : 15.000 15.000 0.000 0.000 0.000
** NEW YORK STATE DEPARTMENT OF TRANSPORTATION **
Friday, August 26, 2011 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) on Draft Program Page 76 of 84
for REGION 10
AGENCY PROJECT DESCRIPTION TOTAL 4-YEAR PROGRAM (FFY)
4-YEAR PHASE Starting October 01, 2010
FUND SOURCES FFY
PIN PROGRAM
FFY FFY FFY FFY
in millions
of dollars 2011 2012 2013 2014
AQ CODE COUNTY TOTAL PROJECT COST
LIRR SPEONK - MONTAUK SIGNALIZATION - SIGNALIZE DARK TERRITORY FTA 5307 2011 10.000 MISC 10.000
(UN-SIGNALIZED) ON THE MONTAUK BRANCH BETWEEN SPEONK AND NFA 2011 2.500 MISC 2.500
L605/02/LC MONTAUK. FTA 5309 2011 10.000 MISC 10.000
NFA 2011 27.400 MISC 27.400
AQC:B6P SUFFOLK TPC : $40-$60 M TOTAL 4YR COST : 49.900 49.900 0.000 0.000 0.000
LIRR BABYLON INTERLOCKING RENEWAL - RENEW AND UPGRADE THE SIGNAL NFA 2011 7.700 MISC 7.700
COMPONENTS IN BABYLON INTERLOCKING WHICH HAVE REACHED AND/OR NFA 2012 14.700 MISC 14.700
L605/02/LD EXCEEDED THEIR USEFUL LIVES FTA 5307 2013 43.280 MISC 43.280
NFA 2013 10.820 MISC 10.820
AQC:B6P SUFFOLK TPC : $70-$130 M TOTAL 4YR COST : 76.500 7.700 14.700 54.100 0.000
LIRR SUPERVISORY CONTROL + REMOTE TERMINAL UNITS (RTU) - RENEW AND NFA 2011 1.900 MISC 1.900
UPGRADE EXISTING SUPERVISORY CONTROL SYSTEMS AND ASSOCIATED NFA 2012 1.900 MISC 1.900
L605/02/LE REMOTE TERMINAL UNITS (RTUS) AT DIVIDE TOWER IN HICKSVILLE, WHICH NFA 2013 1.800 MISC 1.800
DISPTACHES TRAINS ON THE MAIN LINE AND PORT JEFFERSON BRANCH NFA 1.800 MISC 1.800
2014
AQC:B6P MULTI TPC : $7.5-$12 M TOTAL 4YR COST : 7.400 1.900 1.900 1.800 1.800
LIRR CENTRALIZED TRAIN CONTROL - ALLOW LIRR TO BEGIN MIGRATION FROM THE NFA 2011 10.000 MISC 10.000
CURRENT SYSTEM OF TERRITORY-BASED CONTROL TOWERS TO A CENTRALIZED NFA 2012 10.000 MISC 10.000
L605/02/LF SYSTEM WHERE TRAIN DISPATCHING AND TRAIN SUPERVISION IS DONE FROM A NFA 2013 10.000 MISC 10.000
SINGLE LOCATION
AQC:B6P SYSTEM-WIDE TPC : $26-$40 M TOTAL 4YR COST : 30.000 10.000 10.000 10.000 0.000
LIRR HILLSIDE FACILITY BLDG REHAB (ROOF) - REPLACE SELECTED ROOFS AND ROOF NFA 2013 6.000 MISC 6.000
COMPONENTS AT THE HILLSIDE FACILITY IN HOLLIS, QUEENS
L606/01/YB
AQC:B8P QUEENS TPC : $4.6-$7.5 M TOTAL 4YR COST : 6.000 0.000 0.000 6.000 0.000
LIRR HILLSIDE MAINTENANCE FACILITY - ADDRESS VARIOUS BUILDING SYSTEMS NFA 2011 2.500 MISC 2.500
AND REPLACE COMPONENTS WHICH HAVE REACHED THE END OF THEIR USEFUL
L606/01/YC LIVES AT THE HILLSIDE FACILITY IN HOLLIS, QUEENS.
AQC:B8P QUEENS TPC : $2-$4 M TOTAL 4YR COST : 2.500 2.500 0.000 0.000 0.000
** NEW YORK STATE DEPARTMENT OF TRANSPORTATION **
Friday, August 26, 2011 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) on Draft Program Page 77 of 84
for REGION 10
AGENCY PROJECT DESCRIPTION TOTAL 4-YEAR PROGRAM (FFY)
4-YEAR PHASE Starting October 01, 2010
FUND SOURCES FFY
PIN PROGRAM
FFY FFY FFY FFY
in millions
of dollars 2011 2012 2013 2014
AQ CODE COUNTY TOTAL PROJECT COST
LIRR DIESEL LOCOMOTIVE SHOP UPGRADE - UNDERTAKE FACILITY IMPROVEMENTS NFA 2012 5.000 MISC 5.000
AND MODERNIZATION AT MORRIS PARK, LOCATED IN RICHMOND HILL, QUEENS,
L606/01/YE WHICH IS USED TO MAINTAIN DIESEL LOCOMOTIVES
AQC:B8P QUEENS TPC : $4.6-$7.5 M TOTAL 4YR COST : 5.000 0.000 5.000 0.000 0.000
LIRR MONTAUK YARD IMPROVEMENTS - IMPROVEMENTS TO THE FIVE TRACK NFA 2011 0.800 MISC 0.800
MONTAUK YARD, USED FOR THE STORAGE, MAINTENANCE AND REPAIR OF FTA 5309 2013 3.000 MISC 3.000
L606/01/YK DIESEL EQUIPMENT INCLUDES LIGHTING, SOUND WALL, WAYSIDE POWER AND NFA 2013 4.600 MISC 4.600
OTHER IMPROVEMENTS.
AQC:B8P SUFFOLK TPC : $7.5-$12 M TOTAL 4YR COST : 8.400 0.800 0.000 7.600 0.000
LIRR EXPAND THE TRAIN STORAGE CAPACITY OF PORT WASHINGTON ELECTRIC NFA 2011 3.000 MISC 3.000
STORAGE YARD IN ORDER TO OPERATE THE EAST SIDE ACCESS SERVICE FTA 5307 2012 7.280 MISC 7.280
L606/01/YL NFA 2012 1.820 MISC 1.820
AQC:NON NASSAU TPC : $9.5-15.5 M TOTAL 4YR COST : 12.100 3.000 9.100 0.000 0.000
LIRR NEW MID SUFFOLK ELECTRIC YARD - DESIGN AND CONSTRUCT A NEW NFA 2011 56.200 MISC 56.200
ELECTRIC STORAGE YARD ON THE MAIN LINE IN SUFFOLK COUNTY NFA 2012 23.000 MISC 23.000
L606/01/YN
AQC:NON SUFFOLK TPC : $70-$130 M TOTAL 4YR COST : 79.200 56.200 23.000 0.000 0.000
LIRR REHABILITATION OF EMPLOYEE FACILITIES - REHABILITATE/REPLACE NFA 2011 2.500 MISC 2.500
SELECTED BUILDING COMPONENTS AT LIRR EMPLOYEE FACILITIES SYTEMWIDE, NFA 2012 2.500 MISC 2.500
L606/04/YT IN AN EFFORT TO MAINTAIN THESE FACILITIES IN A STATE OF GOOD REPAIR NFA 2013 2.500 MISC 2.500
NFA 2014 2.500 MISC 2.500
AQC:B8P SYSTEM-WIDE TPC : $7.5-$12 M TOTAL 4YR COST : 10.000 2.500 2.500 2.500 2.500
LIRR SUBSTATION REPLACEMENTS - REPLACE 6 SUBSTATIONS IN QUEENS AND FTA 5307 2011 22.500 MISC 22.500
NASSAU COUNTIES. THESE TRACTION POWER FACILITIES, SOME OF WHICH DATE NFA 2012 27.500 MISC 27.500
L607/01/AA FROM THE 1940S, HAVE REACHED THE END OF THEIR USEFUL LIFE AND REQUIRE
REPLACEMENT.
AQC:B6P MULTI TPC : $50-$85 M TOTAL 4YR COST : 50.000 22.500 27.500 0.000 0.000
** NEW YORK STATE DEPARTMENT OF TRANSPORTATION **
Friday, August 26, 2011 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) on Draft Program Page 78 of 84
for REGION 10
AGENCY PROJECT DESCRIPTION TOTAL 4-YEAR PROGRAM (FFY)
4-YEAR PHASE Starting October 01, 2010
FUND SOURCES FFY
PIN PROGRAM
FFY FFY FFY FFY
in millions
of dollars 2011 2012 2013 2014
AQ CODE COUNTY TOTAL PROJECT COST
LIRR SUBSTATION BATTERY REPLACEMENT INCLUDES BATTERIES,CHARGER AND FTA 5309 2011 0.800 MISC 0.800
APPLICABLE HARDWARES PART OF NORMAL REPLACEMENT
L607/01/AB CYCLE.GREENLAWN, JAMAICA, MAIN LINE, MINEOLA, PORT JEFFERSON,
SMITHTOWN, WOODSIDE, WANTAGH, RONKONKOMA, SYOSSET, HUNTINGTON,
ETC.
AQC:B6P SYSTEM-WIDE TPC : $0.6-$1.5 M TOTAL 4YR COST : 0.800 0.800 0.000 0.000 0.000
LIRR SIGNAL POWER MOTOR GENERATOR REPLACEMENT - REPLACE SIGNAL POWER FTA 5307 2011 1.800 MISC 1.800
MOTOR GENERATORS AND ASSOCIATED EQUIPMENT AT SUBSTATIONS WHERE
L607/01/AC THE EQUIPMENT HAS EXCEEDED ITS USEFUL LIFE.
AQC:B6P SYSTEM-WIDE TPC : $1.2-$2.5 M TOTAL 4YR COST : 1.800 1.800 0.000 0.000 0.000
LIRR SUBSTATION PILOT WIRE AND RELAY REPLACEMENT - REPLACE THE EXISTING FTA 5309 2011 2.000 MISC 2.000
DC BREAKER PROTECTION AND AUTO RE-CLOSE FOR DC BREAKERS AT
L607/01/AD VARIOUS TRACTION POWER SUBSTATION LOCATIONS
AQC:B6P SYSTEM-WIDE TPC : $1.2-$2.5 M TOTAL 4YR COST : 2.000 2.000 0.000 0.000 0.000
LIRR REPLACE & UPGRADE THE DETERIORATED, AGED THE THIRD RAIL CABLE & FTA 5309 2011 2.500 MISC 2.500
INADEQUATE 2000 MCM DC FEEDER AND JUMPER CABLES AT ATLANTIC
L607/01/AE BRANCH-E AST NEW YORK .PURPOSE: TO ENSURE AN ADEQUATE &
DEPENDABLE SUPPLY OF TRACTION POWER TO MEET POWER DEMANDS
AQC:B6P SYSTEM-WIDE TPC : $2-$4 M TOTAL 4YR COST : 2.500 2.500 0.000 0.000 0.000
LIRR THIRD RAIL SYSTEM - DISCONNECT SWITCHES - REPLACE AND/OR UPGRADE FTA 5307 2011 1.000 MISC 1.000
DETERIORATED, AGED AND INADEQUATE DC FEEDER DISCONNECT SWITCHES
L607/01/AF SYSTEM-WIDE
AQC:B6P SYSTEM-WIDE TPC : $0.6-$1.5 M TOTAL 4YR COST : 1.000 1.000 0.000 0.000 0.000
LIRR THIRD RAIL SYSTEM - PROTECTION BOARD - REPLACE AND UPGRADE FTA 5309 2011 9.200 MISC 9.200
DETERIORATED, AGED, AND INADEQUATE PROTECTION BOARD SYSTEM WIDE
L607/01/AG
AQC:B6P SYSTEM-WIDE TPC : $7.5-$12 M TOTAL 4YR COST : 9.200 9.200 0.000 0.000 0.000
LIRR THIRD RAIL SYSTEM-ALUMINUM RAIL - REPLACE AND/OR UPGRADE WORN, FTA 5309 2011 5.600 MISC 5.600
AGED, AND INADEQUATE CONDUCTOR THIRD RAIL SYSTEMWIDE. NFA 2012 5.300 MISC 5.300
L607/01/AH
AQC:B6P SYSTEM-WIDE TPC : $9.5-15.5 M TOTAL 4YR COST : 10.900 5.600 5.300 0.000 0.000
** NEW YORK STATE DEPARTMENT OF TRANSPORTATION **
Friday, August 26, 2011 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) on Draft Program Page 79 of 84
for REGION 10
AGENCY PROJECT DESCRIPTION TOTAL 4-YEAR PROGRAM (FFY)
4-YEAR PHASE Starting October 01, 2010
FUND SOURCES FFY
PIN PROGRAM
FFY FFY FFY FFY
in millions
of dollars 2011 2012 2013 2014
AQ CODE COUNTY TOTAL PROJECT COST
LIRR ATLANTIC AVENUE TUNNEL LIGHTING - REPLACE AND UPGRADE NFA 2012 0.700 MISC 0.700
DETERIORATED AND INADEQUATE LIGHTING IN THE LIRRS ATLANTIC AVENUE FTA 5307 2014 5.040 MISC 5.040
L607/01/AJ TUNNEL BETWEEN EAST NEW YORK AND FLATBUSH AVENUE NFA 2014 1.260 MISC 1.260
AQC:B9P KINGS TPC : $6-$9.4 M TOTAL 4YR COST : 7.000 0.000 0.700 0.000 6.300
LIRR SIGNAL POWER LINE REPLACEMENT REPLACE IN-KIND THE DETERIORATED 5KV FTA 5309 2011 3.000 MISC 3.000
POWER LINES FOR THE SIGNAL POWER SYSTEM AND ASSOCIATED LINE
L607/01/AK HARDWARE AT VARIOUS LOCATIONS SYSTEMWIDE ALONG THE RAILROAD
RIGHT OF WAY
AQC:B6P SYSTEM-WIDE TPC : $2-$4 M TOTAL 4YR COST : 3.000 3.000 0.000 0.000 0.000
LIRR POWER POLE LINE REPLACEMENT REPLACE DETERIORATED POWER LINE POLES FTA 5307 2011 3.000 MISC 3.000
AND APPLICABLE HARDWARE AT VARIOUS LOCATIONS SYSTEMWIDE ALONG
L607/01/AL THE RAILROAD RIGHT OF WAY
AQC:B6P SYSTEM-WIDE TPC : $2-$4 M TOTAL 4YR COST : 3.000 3.000 0.000 0.000 0.000
LIRR NEW SUBSTATIONS - DESIGN TWO NEW SUBSTATIONS AND CONSTRUCT ONE NFA 2012 5.000 MISC 5.000
NEW SUBSTATION ON THE MAIN LINE IN QUEENS, WEST OF JAMAICA. NFA 2013 17.100 MISC 17.100
L607/01/AM
AQC:B6P QUEENS TPC : $21-$31 M TOTAL 4YR COST : 22.100 0.000 5.000 17.100 0.000
LIRR THIRD RAIL FEEDER CABLE UPGRADE- REPLACE AND UPGRADE THIRD RAIL FTA 5307 2011 2.500 MISC 2.500
FEEDER CABLE IN AREAS WHERE IT IS BEYOND ITS USEFUL LIFE AND IS
L607/01/AN UNDERSIZED TO PROPERLY SUPPORT ELECTRIC FLEET OPERATIONS
AQC:B6P SYSTEM-WIDE TPC : $2-$4 M TOTAL 4YR COST : 2.500 2.500 0.000 0.000 0.000
LIRR NEGATIVE REACTOR UPGRADE - REPLACE AND UPGRADE THIRD RAIL NEGATIVE FTA 5309 2011 4.000 MISC 4.000
REACTORS WHICH ARE BEYOND THEIR USEFUL LIVES AND ARE UNDERSIZED TO
L607/01/AP PROPERLY SUPPORT THE ELECTRIC FLEET
AQC:B6P SYSTEM-WIDE TPC : $3.3-$5.6 M TOTAL 4YR COST : 4.000 4.000 0.000 0.000 0.000
LIRR CHLORDANE REMEDIATION - 20 SUBSTATIONS - ADDRESS CHLORDANE NFA 2012 0.800 MISC 0.800
CONTAMINATION WHICH EXISTS IN SOIL SURROUNDING SELECTED LIRR NFA 2013 7.700 MISC 7.700
L609/04/N3 SUBSTATIONS
AQC:A2P SYSTEM-WIDE TPC : $7.5-$12 M TOTAL 4YR COST : 8.500 0.000 0.800 7.700 0.000
** NEW YORK STATE DEPARTMENT OF TRANSPORTATION **
Friday, August 26, 2011 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) on Draft Program Page 80 of 84
for REGION 10
AGENCY PROJECT DESCRIPTION TOTAL 4-YEAR PROGRAM (FFY)
4-YEAR PHASE Starting October 01, 2010
FUND SOURCES FFY
PIN PROGRAM
FFY FFY FFY FFY
in millions
of dollars 2011 2012 2013 2014
AQ CODE COUNTY TOTAL PROJECT COST
LIRR YAPHANK LANDFILL ENVIRONMENTAL - REMEDIATION AT SITE INCLUDES NFA 2011 8.200 MISC 8.200
INSTALLATION OF AN IMPERMEABLE BARRIER AND ANCILLARY ITEMS
L609/04/N4 (GRADING, SEEDING, ETC.)
AQC:A2P SUFFOLK TPC : $7.5-$12 M TOTAL 4YR COST : 8.200 8.200 0.000 0.000 0.000
LIRR SMITHTOWN VIADUCT REMEDIATION & DRAINAGE - REMEDIATE ELEVATED NFA 2012 0.300 MISC 0.300
LEAD LEVELS IN THE SOIL NEAR THE SMITHTOWN VIADUCT NFA 2013 2.900 MISC 2.900
L609/04/N6
AQC:A2P SUFFOLK TPC : $2-$4 M TOTAL 4YR COST : 3.200 0.000 0.300 2.900 0.000
LIRR PROGRAM ADMINSTRATION - LIRR COSTS ASSOCIATED WITH THE SUPPORT, NFA 2011 26.100 MISC 26.100
ADMINISTRATION AND MANAGEMENT OF THE 2010-2014 CAPITAL PROGRAM FTA 5309 2012 3.800 MISC 3.800
L609/04/NA NFA 2012 23.100 MISC 23.100
NFA 2013 28.000 MISC 28.000
NFA 2014 28.000 MISC 28.000
AQC:B1P SYSTEM-WIDE TPC : $100-$225 M TOTAL 4YR COST : 109.000 26.100 26.900 28.000 28.000
LIRR PROGRAM DEVELOPMENT PROVIDES FUNDS FOR THE LONG ISLAND RAIL ROAD NFA 2012 5.500 MISC 5.500
TO PREPARE PROJECT SCOPES, EXAMINE SYSTEM ASSET NEEDS, AND TO STUDY NFA 2013 1.400 MISC 1.400
L609/04/NB CAPITAL NEEDS IN ORDER TO PREPARE FOR THE NEXT CAPITAL PROGRAM NFA 2014 1.400 MISC 1.400
AQC:B1P SYSTEM-WIDE TPC : $7.5-$12 M TOTAL 4YR COST : 8.300 0.000 5.500 1.400 1.400
LIRR INSURANCE FOR ALL WORK ASSOCIATED WITH THE LIRR CAPITAL PROGRAM NFA 2011 0.200 MISC 0.200
NFA 2012 0.200 MISC 0.200
L609/04/NC NFA 2013 0.200 MISC 0.200
NFA 2014 0.200 MISC 0.200
AQC:B1P SYSTEM-WIDE TPC : $0.6-$1.5 M TOTAL 4YR COST : 0.800 0.200 0.200 0.200 0.200
LIRR INDEPENDENT ENGINEER FUNDS INDEPENDENT ENGINEERING WORK FOR NFA 2011 0.900 MISC 0.900
PROJECTS THROUGHOUT THE CAPITAL PROGRAM NFA 2012 0.900 MISC 0.900
L609/04/ND NFA 2013 0.800 MISC 0.800
NFA 2014 0.800 MISC 0.800
AQC:B1P SYSTEM-WIDE TPC : $3.3-$5.6 M TOTAL 4YR COST : 3.400 0.900 0.900 0.800 0.800
** NEW YORK STATE DEPARTMENT OF TRANSPORTATION **
Friday, August 26, 2011 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) on Draft Program Page 81 of 84
for REGION 10
AGENCY PROJECT DESCRIPTION TOTAL 4-YEAR PROGRAM (FFY)
4-YEAR PHASE Starting October 01, 2010
FUND SOURCES FFY
PIN PROGRAM
FFY FFY FFY FFY
in millions
of dollars 2011 2012 2013 2014
AQ CODE COUNTY TOTAL PROJECT COST
LIRR MENTORING PROGRAM ADMINISTRATION - WILL PROGRESS SELECTED CAPITAL NFA 2011 0.300 MISC 0.300
PROGRAM ELEMENTS FOR INCLUSION IN MTA-WIDE MENTORING NFA 2012 0.300 MISC 0.300
L609/04/NE PROGRAM - INITIATIVE WHICH LOOKS TO EXPAND PARTICIPATION BY SMALL NFA 2013 0.300 MISC 0.300
BUSINESSES SERVING AS CONTRACTORS AND CONSULTANTS FOR MTA. NFA 2014 0.300 MISC 0.300
AQC:C3P SYSTEM-WIDE TPC : $1.2-$2.5 M TOTAL 4YR COST : 1.200 0.300 0.300 0.300 0.300
NYSDOT ELDERLY AND HANDICAPPED VEHICLES - SECTION 5310 VEHICLES FOR ELDERLY FTA 5310 2011 1.030 MISC 1.030
AND HANDICAPPED TRANSPORTATION BY PRIVATE NOT-FOR-PROFIT AGENCIES. NFA 2011 0.257 MISC 0.257
NS5310
AQC:B10P SUFFOLK TPC : $1.2-$2.5 M TOTAL 4YR COST : 1.287 1.287 0.000 0.000 0.000
NYSDOT NYSDOT NHS BLOCK TO COVER COST SUCH AS ORDER ON CONTRACT FOR NHS 2013 5.221 MISC 5.221
IDENTIFIED PROJECTS NFA 2013 1.305 MISC 1.305
NSBLOCK
AQC:J1Z MULTI TPC : $26-$40 M TOTAL 4YR COST : 6.526 0.000 0.000 6.526 0.000
SUFFOLK CO. COUNTYWIDE STRENGTHENING AND IMPROVING COUNTY ROADS ASPHALT NFA 2011 6.000 CONST 6.000
REHABILITATION AND RESURFACING AT VARIOUS LOCATIONS NFA 2012 6.000 CONST 6.000
SC5014 NFA 2013 6.000 CONST 6.000
AQC:A10P SUFFOLK TPC : $15-$25 M TOTAL 4YR COST : 18.000 6.000 6.000 6.000 0.000
SUFFOLK CO. COUNTYWIDE RECONSTRUCTION OF DRAINAGE SYSTEMS ON VARIOUS COUNTY NFA 2011 0.525 CONST 0.525
ROADS. PROJECT IS INTENDED TO PROVIDE FUNDS TO MAINTAIN AND IMPROVE NFA 2012 0.525 CONST 0.525
SC5024 HIGHWAY DRAINAGE SYSTEMS. NFA 2013 0.550 CONST 0.550
AQC:A2Z SUFFOLK TPC : $1.2-$2.5 M TOTAL 4YR COST : 1.600 0.525 0.525 0.550 0.000
SUFFOLK CO. CONSTRUCTION AND REHABILITATION OF HIGHWAY MAINTENANCE FACILITIES NFA 2011 0.363 CONST 0.363
SALT STORAGE BUILDINGS. THIS PROJECT FUNDS THE CONSTRUCTION AND NFA 2013 0.708 CONST 0.708
SC5048 REHABILITATION OF ENVIRONMENTALLY ACCEPTABLE STORAGE FOR SALT NFA 2014 0.690 CONST 0.690
USED FOR ICE AND SNOW CONTROL. LOCATIONS TO BE DETERMINED.
AQC:C14Z SUFFOLK TPC : $2-$4 M TOTAL 4YR COST : 1.761 0.363 0.000 0.708 0.690
** NEW YORK STATE DEPARTMENT OF TRANSPORTATION **
Friday, August 26, 2011 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) on Draft Program Page 82 of 84
for REGION 10
AGENCY PROJECT DESCRIPTION TOTAL 4-YEAR PROGRAM (FFY)
4-YEAR PHASE Starting October 01, 2010
FUND SOURCES FFY
PIN PROGRAM
FFY FFY FFY FFY
in millions
of dollars 2011 2012 2013 2014
AQ CODE COUNTY TOTAL PROJECT COST
SUFFOLK CO. RECONSTRUCTION OF CR11, PULASKI ROAD FROM OLD BRIDGE ROAD TO LONG NFA 2011 1.600 CONINSP 1.600
ISLAND RAILROAD TRACKS, TOWN OF HUNTINGTON. PROJECT WOULD IMPROVE NFA 2011 0.400 CONST 0.400
SC5095 SAFETY AND ROADWAY ALIGNMENT AS WELL AS IMPROVE DRAINAGE AND
PAVEMENT SURFACE.
AQC:D2P SUFFOLK TPC : $2-$4 M TOTAL 4YR COST : 2.000 2.000 0.000 0.000 0.000
SUFFOLK CO. CR17 WHEELER ROAD /CR67 MOTOR PKWY. INTERSECTION IMPROVEMENT BY NFA 2012 0.750 CONINSP 0.750
ADDING TURN LANES TO ALLEVIATE THE CONGESTION. RECONSTRUCT THE NFA 2014 2.000 CONST 2.000
sc5097 SIDE WALKS FOR PEDESTRIAN MOBILITY.
AQC:D1P SUFFOLK TPC : $2-$4 M TOTAL 4YR COST : 2.750 0.000 0.750 0.000 2.000
SUFFOLK CO. CR46 WILLAIM FLOYD PKWY.DRAINAGE AND SHOULDER IMPROVEMENTS TO NFA 2014 2.300 CONST 2.300
CORRECT SAFETY AND DRAINAGE ISSUES FROM VICINITY OF OSTEND CIRCLE
SC5116 TO SMITH POINT BRIDGE IN TOWN OF BROOKHAVEN
AQC:D3P SUFFOLK TPC : $2-$4 M TOTAL 4YR COST : 2.300 0.000 0.000 0.000 2.300
SUFFOLK CO. INTERSECTION IMPROVEMENTS ON COUNTY ROAD 83, NORTH OCEAN AVE IN NFA 2013 0.500 CONST 0.500
THE VICINITY OF MOUNT SINAI-CORAM ROAD BY ADDING ADDTIONAL RIGHT
SC5126 LANES AND EXTENDING EXISTING LEFT TURN LANES.
AQC:D1Z SUFFOLK TPC : < $0.75 M TOTAL 4YR COST : 0.500 0.000 0.000 0.500 0.000
SUFFOLK CO. RECONSTRUCTION OF CR11/DEPOT ROAD/FAIRGROUND AVE INTERSECTION, NFA 2012 0.250 ROWACQU 0.250
TOWN OF HUNTINGTON. PROJECT WOULD RECONSTRUCT INTERSECTION TO NFA 2014 1.200 CONST 1.200
SC5168 IMPROVE SAFETY AND CONGESTION.
AQC:A10Z SUFFOLK TPC : $1.2-$2.5 M TOTAL 4YR COST : 1.450 0.000 0.250 0.000 1.200
SUFFOLK CO. SUFFOLK COUNTY SIGN MANAGEMENT PROGRAM. PROJECT WILL BRING NFA 2011 0.450 CONST 0.450
SUFFOLK COUNTY HIGHWAY ROADWAY SIGNAGE INTO CONFORMANCE WITH NFA 2012 1.000 CONST 1.000
SC5196 FHWA MUTCD REQUIREMENTS. THIS PROJECT WOULD IMPLEMENT AN NFA 2013 1.000 CONST 1.000
ASSESSMENT AND MANAGEMENT SYSTEM DESIGNED TO MAINTAIN TRAFFIC NFA CONST
2014 1.000 1.000
SIGN REFLECTIVITY, REVIEW SIGN PLACEMENT COMPLIANCE AND ESTABLISH
AN INVENTORY OF ANY ROADSIDE APPRURTENANCES REQUIRING
MAINTENANCE.
AQC:A6Z SUFFOLK TPC : $3.3-$5.6 M TOTAL 4YR COST : 3.450 0.450 1.000 1.000 1.000
** NEW YORK STATE DEPARTMENT OF TRANSPORTATION **
Friday, August 26, 2011 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) on Draft Program Page 83 of 84
for REGION 10
AGENCY PROJECT DESCRIPTION TOTAL 4-YEAR PROGRAM (FFY)
4-YEAR PHASE Starting October 01, 2010
FUND SOURCES FFY
PIN PROGRAM
FFY FFY FFY FFY
in millions
of dollars 2011 2012 2013 2014
AQ CODE COUNTY TOTAL PROJECT COST
SUFFOLK CO. RECONSTRUCTION OF CULVERTS REPAIR AND MAINTENANCE IN SUFFOLK NFA 2011 0.900 CONST 0.900
COUNTY. THIS PROJECT PROVIDES FUNDING FOR ON-GOING REAPIR AND NFA 2012 0.900 CONST 0.900
SC5371 MAINTENANCE OF COUNTY OWNED CULVERTS WHICH ARE IN A STATE OF NFA 2013 1.030 CONST 1.030
DISREPAIR. NFA 2014 1.850 CONST 1.850
AQC:A10Z SUFFOLK TPC : $4.6-$7.5 M TOTAL 4YR COST : 4.680 0.900 0.900 1.030 1.850
SUFFOLK CO. PHASE I - CR97 INTERSECTIONS IMPROVEMENTS @HAMMOND ROAD,MARK TREE NFA 2011 0.400 DETLDES 0.400
ROAD.HAWKINS AVE, WIRELESS RD/POND RD, TOWN OF BROOKHAVEN. NFA 2013 4.100 CONST 4.100
SC5512 PHASE II -CR97/NY27 INTERSECTION IMPROVEMENT PROJECT WILL IMPROVE NFA 2014 4.100 CONST 4.100
SAFETY & EASE CONGESTION WITH NEW TURN LANE. TOWN OF BROOKHAVEN
AQC:A10Z SUFFOLK TPC : $7.5-$12 M TOTAL 4YR COST : 8.600 0.400 0.000 4.100 4.100
SUFFOLK CO. PH I RECONSTRUCTION OF CR48 FROM HORTON AVENUE TO MAIN STREET, NFA 2012 5.000 CONST 5.000
TOWN OF SOUTHOLD. PROJECT WOULD REHABILITATE CR48 IMPROVING PAVING NFA 2014 0.750 ROWACQU 0.750
SC5526 SURFACE, DRAINAGE AND ALIGNMENT. NO NEW CAPACITY.
AQC:A10P SUFFOLK TPC : $9.5-15.5 M TOTAL 4YR COST : 5.750 0.000 5.000 0.000 0.750
SUFFOLK CO. CR83 INTERSECTION IMPROVEMENTS AT CR16 AND NY 25. ADD TURN LANES TO NFA 2012 1.500 ROWACQU 1.500
IMPROVE TRAFFIC CONGESTION, TOWN OF BROOKHAVEN.
SC5548
AQC:D1P SUFFOLK TPC : $3.3-$5.6 M TOTAL 4YR COST : 1.500 0.000 1.500 0.000 0.000
SUFFOLK CO. REHABILITATION OF CR59, LONG LANE FROM VICINITY OF THE EAST HAMPTON NFA 2012 2.200 CONST 2.200
VILLAGE LINE TO THE VICINITY OF STEPHENS HANDS PATH, TOWN OF EAST
SC5561 HAMPTON. PROJECT WILL IMPROVE RIDING SURFACE AND SAFETY.
AQC:A3P SUFFOLK TPC : $2-$4 M TOTAL 4YR COST : 2.200 0.000 2.200 0.000 0.000
SUFFOLK CO. SAGTIKOS CORRIDOR- INTERIM BY-PASS CORRIDOR. STUDY TRAFFIC PATTERN NFA 2011 1.300 SCOPING 1.300
ON COMMACK ROAD AND SAGTIKOS PARKWAY, TOWN OF ISLIP
SC5565 ( SCOPE TO BE DETERMINED).
AQC:J1Z SUFFOLK TPC : $1.2-$2.5 M TOTAL 4YR COST : 1.300 1.300 0.000 0.000 0.000
** NEW YORK STATE DEPARTMENT OF TRANSPORTATION **
Friday, August 26, 2011 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) on Draft Program Page 84 of 84
for REGION 10
AGENCY PROJECT DESCRIPTION TOTAL 4-YEAR PROGRAM (FFY)
4-YEAR PHASE Starting October 01, 2010
FUND SOURCES FFY
PIN PROGRAM
FFY FFY FFY FFY
in millions
of dollars 2011 2012 2013 2014
AQ CODE COUNTY TOTAL PROJECT COST
SUFFOLK CO. ASSESSMENT OF STRUCTRUAL,ELECTRICAL AND MECHANICAL COMPONETS OF NFA 2011 2.300 CONST 2.300
MOVEABLE BRIDGES IN SUFFOLK COUTY FOR THE PURPOSE OF MAINTAINING NFA 2011 0.750 DETLDES 0.750
SC5806 COUNTY BRIDGES IN GOOD WORKING ORDER. NFA 2012 3.500 CONST 3.500
AQC:A19Z SUFFOLK TPC : $6-$9.4 M TOTAL 4YR COST : 6.550 3.050 3.500 0.000 0.000
SUFFOLK CO. CLEANING AND REPAINTING VARIOUS STEEL BRIDGES IN SUFFOLK COUNTY. NFA 2011 1.350 CONST 1.350
NFA 2012 0.750 CONST 0.750
SC5815 NFA 2014 1.840 CONST 1.840
AQC:A19Z SUFFOLK TPC : $3.3-$5.6 M TOTAL 4YR COST : 3.940 1.350 0.750 0.000 1.840
NYSDOT NEW YORK STATE DEPARTMENT OF TRANSPORTATION OZONE ACTION DAYS: CMAQ 2011 0.264 OPER 0.264
NEW YORK STATE DEPARTMENT OF ENVIRONMENTAL CONSERVATION NFA 2011 0.066 OPER 0.066
SOAD01 MONITORS OZONE LEVELS AND FORECASTS AMOUNTS. CMAQ 2012 0.264 OPER 0.264
NFA 2012 0.066 OPER 0.066
CMAQ 2013 0.264 OPER 0.264
NFA 2013 0.066 OPER 0.066
CMAQ 2014 0.264 OPER 0.264
NFA 2014 0.066 OPER 0.066
AQC:NON MULTI TPC : $3.3-$5.6 M TOTAL 4YR COST : 1.320 0.330 0.330 0.330 0.330
LIRR TRANSIT TECHNICAL ASSISTANCE PROGRAM (FORMERLY TRANTECH) CMAQ 2011 0.320 MISC 0.320
NFA 2011 0.080 MISC 0.080
TRANTECH CMAQ 2012 0.320 MISC 0.320
NFA 2012 0.080 MISC 0.080
CMAQ 2013 0.320 MISC 0.320
NFA 2013 0.075 MISC 0.075
CMAQ 2014 0.320 MISC 0.320
NFA 2014 0.080 MISC 0.080
AQC:C1P NASSAU TPC : $2-$4 M TOTAL 4YR COST : 1.595 0.400 0.400 0.395 0.400