** NEW YORK STATE DEPARTMENT OF TRANSPORTATION **

Friday, August 26, 2011 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) on Draft Program Page 1 of 84

for REGION 10

AGENCY PROJECT DESCRIPTION TOTAL 4-YEAR PROGRAM (FFY)

4-YEAR PHASE Starting October 01, 2010

FUND SOURCES FFY

PIN PROGRAM

FFY FFY FFY FFY

in millions

of dollars 2011 2012 2013 2014

AQ CODE COUNTY TOTAL PROJECT COST



NYSDOT CONSTRUCT THE FIRST SECTION OF A 14.4 MILE SHARED-USE PATH FROM THE NFA 2012 0.600 CONINSP 0.600

WANTAGHSTATE PKWY TO TOBAY BEACH ON THE NORTH SIDE OF OCEAN NFA 2012 5.500 CONST 5.500

000611 PKWY TO PROVIDE MULTIMODAL ACCESS TOWNS OF OYSTERBAY AND

HEMPSTEAD

AQC:C2P NASSAU TPC : $4.6-$7.5 M TOTAL 4YR COST : 6.100 0.000 6.100 0.000 0.000



NYSDOT IMPROVE STRUCTURAL INTEGRITY OF THE ROBERT MOSES CAUSEWAY OVER HBRR 2013 2.319 PRELDES 2.319

FIRE ISLAND INLET BRIDGE TO ENSURE PUBLIC SAFETY TOWN OF ISLIP, NFA 2013 0.600 PRELDES 0.600

001756 SUFFOLK COUNTY (BIN#1058770)

AQC:A19P SUFFOLK TPC : $175-$385 M TOTAL 4YR COST : 2.919 0.000 0.000 2.919 0.000



NYSDOT SPOT BRIDGE REPAIR TO MAINTAIN STRUCTURAL INTEGRITY ON ROBERT NFA 2011 0.808 CONINSP 0.808

MOSES CAUSEWAY OVER FIRE ISLAND INLET BRIDGE IN ISLIP TOWN, SUFFOLK NFA 2011 8.080 CONST 8.080

001764 COUNTY.

AQC:A19S SUFFOLK TPC : $7.5-$12 M TOTAL 4YR COST : 8.888 8.888 0.000 0.000 0.000



NYSDOT CONSTRUCT RECHARGE BASIN TO ELIMINATE A FLOODING PROBLEM ON NY454 NFA 2012 0.429 CONINSP 0.429

BETWEEN LINCOLN AVE AND GRUNDY AVE, ISLIP TOWN, SUFFOLK COUNTY. NFA 2012 4.291 CONST 4.291

003012

AQC:A2P SUFFOLK TPC : $9.5-15.5 M TOTAL 4YR COST : 4.720 0.000 4.720 0.000 0.000



NYSDOT NY454 ITS - WILL INSTALL CLOSED CIRCUIT ITS CAMERAS,REMOTELY CMAQ 2014 0.548 DETLDES 0.548

ACCESSIBLE ITS DEVICES AND SIGNAL INTERFACE SOFTWARE AND HARDWARE NFA 2014 0.137 DETLDES 0.137

003016 ALONG NY454 CORRIDOR TO UPGRADE THE SYSTEM IN TOWN OF ISLIP AND

BROOKHAVEN

AQC:NON SUFFOLK TPC : $15-$25 M TOTAL 4YR COST : 0.685 0.000 0.000 0.000 0.685



NYSDOT NY25 PAVEMENT REPAIRS,SEALING OF CRACKS, RESURFACING, PROV. TURNING HSIP 2012 0.738 CONINSP 0.738

LANES @ INTERSECTIONS INCLUDING CENTER LEFT TURN LANE, MOD. TO NFA 2012 0.084 CONINSP 0.084

004195 TRAFFIC SIGNAL EQUIPMENT & OPERATIONS, REPAIRS TO CURB & SIDEWALK HSIP 2012 7.381 CONST 7.381

BET. : NYC LINE TO GLEN COVE RD TO PROV. FOR SAFETY NFA 2012 0.837 CONST 0.837

NHS 2012 0.992 CONINSP 0.992

NFA 2012 0.253 CONINSP 0.253

NHS 2012 9.921 CONST 9.921

NFA 2012 2.529 CONST 2.529

AQC:A10P NASSAU TPC : $32-$50 M TOTAL 4YR COST : 22.735 0.000 22.735 0.000 0.000

** NEW YORK STATE DEPARTMENT OF TRANSPORTATION **

Friday, August 26, 2011 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) on Draft Program Page 2 of 84

for REGION 10

AGENCY PROJECT DESCRIPTION TOTAL 4-YEAR PROGRAM (FFY)

4-YEAR PHASE Starting October 01, 2010

FUND SOURCES FFY

PIN PROGRAM

FFY FFY FFY FFY

in millions

of dollars 2011 2012 2013 2014

AQ CODE COUNTY TOTAL PROJECT COST



NYSDOT IMPROVE NY110 SOUTHBOUND @ NY25 ,NY25 NY110 TO NEW YORK AVE FOR TO NFA 2012 0.539 CONINSP 0.539

PROVIDE SAFETY IMPROVEMENTS INCLUDING CONSTRUCT ONE-WAY NEW NFA 2012 5.393 CONST 5.393

004218 ROAD TO ALLOW FOR WESTBOUND LEFT TURNS; EASTBOUND LEFT TURNS WILL

BE DIVERTED TO NEW YORK AVE, HUNTINGTON TOWN, SUFFOLK COUNTY.





AQC:D3P SUFFOLK TPC : $7.5-$12 M TOTAL 4YR COST : 5.932 0.000 5.932 0.000 0.000



NYSDOT BRIDGE REHABILITATION OF NY25 OVER I495 AND CR58 IN RIVERHEAD TO IM 2013 0.868 CONINSP 0.868

MAINTAIN STATE OF GOOD REPAIR TOWN OF RIVERHEAD, SUFFOLK NFA 2013 0.096 CONINSP 0.096

004233 COUNTY.BIN#1056219,1056230 IM 2013 8.677 CONST 8.677

NFA 2013 0.965 CONST 0.965

AQC:A19P SUFFOLK TPC : $21-$31 M TOTAL 4YR COST : 10.606 0.000 0.000 10.606 0.000



NYSDOT RESURFACING; REPLACE STEEL MEDIAN BARRIER WITH CONCRETE MEDIAN NFA 2011 4.092 CONINSP 4.092

BARRIER TO MAINTAIN PAVEMENT AND PROVIDE SAFETY IMPROVEMENTS ON NFA 2012 40.919 CONST 40.919

005027 NY135 BETWEEN MERRICK RD AND NY24 IN THE TOWNS OF HEMPSTEAD &

OYSTER BAY, NASSAU COUNTY.

AQC:A10P NASSAU TPC : $40-$60 M TOTAL 4YR COST : 45.011 4.092 40.919 0.000 0.000



NYSDOT RECONSTRUCT NY347 FROM HALLOCK RD TO NICOLLS RD TO IMPROVE SAFETY, NFA 2014 6.408 DETLDES 6.408

OPERATION, AND MOBILITY FOR VEHICLES, PEDESTRIANS, BICYCLISTS AND NFA 2014 5.340 ROWACQU 5.340

005409 TRANSIT USERS IN BROOKHAVEN TOWN, SUFFOLK COUNTY.



AQC:NON SUFFOLK TPC : $40-$60 M TOTAL 4YR COST : 11.748 0.000 0.000 0.000 11.748



NYSDOT RECONSTRUCT NY347 FROM NY111 TO TERRY RD TO IMPROVE SAFETY, NHS 2014 3.318 CONINSP 3.318

OPERATION, AND MOBILITY FOR VEHICLES, PEDESTRIANS, BICYCLISTS AND NFA 2014 3.729 CONINSP 3.729

005420 TRANSIT USERS IN BROOKHAVEN TOWN, SUFFOLK COUNTY. NHS 2014 33.181 CONST 33.181

NFA 2014 37.293 CONST 37.293

AQC:AQC SUFFOLK TPC : $70-$130 M TOTAL 4YR COST : 77.521 0.000 0.000 0.000 77.521



NYSDOT NY347 & NY112 INTERSECTION RECONSTRUCTION TO IMPROVE SAFETY, NFA 2011 0.100 DETLDES 0.100

OPERATION, AND MOBILITY FOR VEHICLES, PEDESTRIANS, BICYCLISTS AND NHS 2013 1.656 CONINSP 1.656

005421 TRANSIT USERS IN BROOKHAVEN TOWN, SUFFOLK COUNTY. NFA 2013 0.424 CONINSP 0.424

NHS 2013 16.565 CONST 16.565

NFA 2013 4.245 CONST 4.245

AQC:NON SUFFOLK TPC : $21-$31 M TOTAL 4YR COST : 22.990 0.100 0.000 22.890 0.000

** NEW YORK STATE DEPARTMENT OF TRANSPORTATION **

Friday, August 26, 2011 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) on Draft Program Page 3 of 84

for REGION 10

AGENCY PROJECT DESCRIPTION TOTAL 4-YEAR PROGRAM (FFY)

4-YEAR PHASE Starting October 01, 2010

FUND SOURCES FFY

PIN PROGRAM

FFY FFY FFY FFY

in millions

of dollars 2011 2012 2013 2014

AQ CODE COUNTY TOTAL PROJECT COST



NYSDOT INSTALL MEDIAN BARRIER ON NY27 FROM ROBERT MOSES CAUSEWAY TO 5TH NFA 2013 0.333 DETLDES 0.333

AVENUE TO PREVENT CROSSING OF CENTER MEDIAN TOWN OF ISLIP, SUFFOLK

005903 COUNTY.

AQC:A9P SUFFOLK TPC : $7.5-$12 M TOTAL 4YR COST : 0.333 0.000 0.000 0.333 0.000



NYSDOT INSTALL MEDIAN BARRIER ALONG I495 AND NY27 EAST OF NY112 TO PREVENT IM 2014 0.167 CONINSP 0.167

CROSSOVERS OF THE CENTER MEDIAN IN THE TOWNS OF BROOKHAVEN, NFA 2014 0.017 CONINSP 0.017

005909 RIVERHEAD & SOUTHAMPTON IN SUFFOLK COUNTY. IM 2014 1.675 CONST 1.675

NFA 2014 0.129 CONST 0.129

NHS 2014 0.396 CONINSP 0.396

NFA 2014 0.044 CONINSP 0.044

NHS 2014 3.958 CONST 3.958

NFA 2014 0.440 CONST 0.440

AQC:A9P SUFFOLK TPC : $6-$9.4 M TOTAL 4YR COST : 6.826 0.000 0.000 0.000 6.826



NYSDOT OPERATIONAL IMPROVEMENTS ON NASSAU EXPRESSWAY(NY878) TOWN OF NFA 2013 2.500 DETLDES 2.500

HEMPSTEAD, NASSAU COUNTY (SCOPE TO BE DETERMINED) NFA 2014 3.328 ROWACQU 3.328

007214

AQC:J1Z NASSAU TPC : $26-$40 M TOTAL 4YR COST : 5.828 0.000 0.000 2.500 3.328



NYSDOT RECONSTRUCT NY110 TO PROVIDE SAFETY IMPROVEMNTS AND INCREASED HSIP 2013 0.376 CONINSP 0.376

CAPACITY FROM I495 NORTH SERVICE ROAD TO ARLINGTON ROAD AND NFA 2013 1.776 CONINSP 1.776

011256 MELVILLE MALL TO ARROWWOOD IN HUNTINGTON TOWN, SUFFOLK COUNTY. HSIP 2013 3.765 CONST 3.765

HIGH ACCIDENT LOCATION DETERMINED AS OF MARCH 2010 NFA 2013 15.981 CONST 15.981

STP FLEX 2013 0.732 CONINSP 0.732

NFA 2013 0.429 CONINSP 0.429

STP FLEX 2013 7.320 CONST 7.320

NFA 2013 1.876 CONST 1.876

AQC:NON SUFFOLK TPC : $26-$40 M TOTAL 4YR COST : 32.255 0.000 0.000 32.255 0.000



NYSDOT I495 HOV ENFORCEMENT CONTRACTExit 48 to 64 SUFFOLKCOUNTY NHS 2011 0.630 OPER 0.630

NFA 2011 0.158 OPER 0.158

022871 NHS 2012 0.650 OPER 0.650

NFA 2012 0.162 OPER 0.162

NHS 2013 0.669 OPER 0.669

NFA 2013 0.167 OPER 0.167

NHS 2014 0.689 OPER 0.689

NFA 2014 0.172 OPER 0.172

AQC:A7P SUFFOLK TPC : $12.5-$19 M TOTAL 4YR COST : 3.297 0.788 0.812 0.836 0.861

** NEW YORK STATE DEPARTMENT OF TRANSPORTATION **

Friday, August 26, 2011 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) on Draft Program Page 4 of 84

for REGION 10

AGENCY PROJECT DESCRIPTION TOTAL 4-YEAR PROGRAM (FFY)

4-YEAR PHASE Starting October 01, 2010

FUND SOURCES FFY

PIN PROGRAM

FFY FFY FFY FFY

in millions

of dollars 2011 2012 2013 2014

AQ CODE COUNTY TOTAL PROJECT COST



NYSDOT PARK & RIDE LOT SECURITY SURVEILLANCE CONTRACT TO PROVIDE FOR NFA 2011 0.250 OPER 0.250

SECURITY FORCES TO SURVEIL THE PARK AND RIDE LOTS IN NASSAU AND NFA 2012 0.250 OPER 0.250

022874 SUFFOLK COUNTIES NFA 2013 0.250 OPER 0.250

NFA 2014 0.250 OPER 0.250

AQC:C1P SUFFOLK TPC : $3.3-$5.6 M TOTAL 4YR COST : 1.000 0.250 0.250 0.250 0.250



NYSDOT TO PROVIDE FOR HIG OCCUPANCY VEHICLE LANE POLICE ENFORCEMENT ON NHS 2011 0.784 OPER 0.784

I495 BETWEEN EXIT 32 TO 48 NASSAU COUNTY NFA 2011 0.196 OPER 0.196

022903 NHS 2012 0.807 OPER 0.807

NFA 2012 0.202 OPER 0.202

NHS 2013 0.832 OPER 0.832

NFA 2013 0.208 OPER 0.208

NHS 2014 0.857 OPER 0.857

NFA 2014 0.214 OPER 0.214

AQC:C1P NASSAU TPC : $12.5-$19 M TOTAL 4YR COST : 4.100 0.980 1.009 1.040 1.071



NYSDOT REPLACE BRIDGE STRUCTURE OF CR19, PATCHOGUE/HOLBROOK RD OVER I495 IM 2013 1.041 CONINSP 1.041

STATE OF GOOD REPAIR IN BROOKHAVEN TOWN,SUFFOLK COUNTY. NFA 2013 0.116 CONINSP 0.116

022934 IM 2013 10.413 CONST 10.413

NFA 2013 1.156 CONST 1.156

AQC:A19P SUFFOLK TPC : $9.5-15.5 M TOTAL 4YR COST : 12.726 0.000 0.000 12.726 0.000



NYSDOT CREATE NEW HIGH OCCUPANCY VEHICLE LANE ACCESS POINT ON I495 IM 2011 0.280 CONINSP 0.280

BETWEEN EXITS 37 & 38 TO ALLOW SAFER INGRESS AND EGRESS. TOWN OF NFA 2011 0.031 CONINSP 0.031

022935 NORTH HEMPSTEAD, NASSAU COUNTY. IM 2011 2.336 CONST 2.336

NFA 2011 0.260 CONST 0.260

AQC:NON NASSAU TPC : $2-$4 M TOTAL 4YR COST : 2.907 2.907 0.000 0.000 0.000



NYSDOT ADD A SUPPLEMENTAL THIRD LANE OF I495 SERVICE ROADS FROM WALT NFA 2012 0.820 CONINSP 0.820

WHITMAN RD TO NY 110, TO IMPROVE THE FUNCTIONAL OPERATIONS NFA 2012 8.202 CONST 8.202

022938 HUNTINGTON TOWN, SUFFOLK COUNTY.

AQC:D1 SUFFOLK TPC : $7.5-$12 M TOTAL 4YR COST : 9.022 0.000 9.022 0.000 0.000



NYSDOT ADDITIONAL WORK NEEDED TO COMPLETE ROSLYN VIADUCT BRIDGE NFA 2012 2.108 CONINSP 2.108

REPLACEMENT STATE OF GOOD REPAIRTOWN OF NORTH HEMPSTEAD, NASSAU NFA 2012 21.079 CONST 21.079

032804 COUNTY

AQC:A6P NASSAU TPC : $21-$31 M TOTAL 4YR COST : 23.187 0.000 23.187 0.000 0.000

** NEW YORK STATE DEPARTMENT OF TRANSPORTATION **

Friday, August 26, 2011 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) on Draft Program Page 5 of 84

for REGION 10

AGENCY PROJECT DESCRIPTION TOTAL 4-YEAR PROGRAM (FFY)

4-YEAR PHASE Starting October 01, 2010

FUND SOURCES FFY

PIN PROGRAM

FFY FFY FFY FFY

in millions

of dollars 2011 2012 2013 2014

AQ CODE COUNTY TOTAL PROJECT COST



NYSDOT SAGTIKOS STATE PKWY/SUNKEN MEADOW STATE PKWY STUDY: SOUTHERN NHS 2013 2.598 SCOPING 2.598

STATE PKWY TO NY25A INCLUDING THE PARALLEL ROADWAY TOWNS OF ISLIP NFA 2013 0.812 SCOPING 0.812

033909 AND SMITHTOWN, SUFFOLK COUNTY NHS 2014 8.744 PRELDES 8.744

NFA 2014 2.208 PRELDES 2.208

AQC:C3P SUFFOLK TPC : $15-$25 M TOTAL 4YR COST : 14.362 0.000 0.000 3.410 10.952



NYSDOT CONSTRUCT FIRST PHASE OF THE INTERMODAL FREIGHT FACILITY ON THE NFA 2011 2.500 DETLDES 2.500

PILGRIM STATE HOSPITAL PROPERTY WHICH MAY INVOLVE HIGHWAY NFA 2013 3.707 CONINSP 3.707

033912 INFRASTRUCTURE IMPROVEMENTS AND/OR RAIL FREIGHT IMPROVEMENTS IN NFA 2013 37.070 CONST 37.070

ISLIP TOWN, SUFFOLK COUNTY.

AQC:NON SUFFOLK TPC : $40-$60 M TOTAL 4YR COST : 43.277 2.500 0.000 40.777 0.000



NYSDOT RECONSTRUCT NORTHERN STATE PARKWAY & NY110 INTERCHANGE AND NFA 2011 1.300 CONINSP 1.300

REPLACE THE NORTHERN STATE PARKWAY BRIDGE OVER NY110 TO PROVIDE NFA 2011 40.400 CONST 40.400

051641 INCREASED SAFETY AND STATE OF GOOD REPAIR IN HUNTINGTON TOWN, NFA 2011 2.362 ROWACQU 2.362

SUFFOLK COUNTY.

NHS 2011 2.090 CONINSP 2.090

NFA 2011 3.420 CONINSP 3.420

NHS 2011 20.897 CONST 20.897

NFA 2011 7.781 CONST 7.781

AQC:NON SUFFOLK TPC : $70-$130 M TOTAL 4YR COST : 78.250 78.250 0.000 0.000 0.000



NYSDOT CONSTRUCT 13.5 MILE LONG - 4 METER WIDE SHARED USE BIKEPATH WHICH NFA 2011 0.240 ROWACQU 0.240

INCLUDES RE-TIMING OF SIGNALS, SIGNING, PAVEMENT MARKING, GUIDE RAIL,

051723 CONCRETE BARRIER INSTALL/RELOC & BIKE LOCKER INSTALLATIONS Town of

Hempstead, Nassau County

AQC:C2P NASSAU TPC : $21-$31 M TOTAL 4YR COST : 0.240 0.240 0.000 0.000 0.000



NYSDOT PROVIDE SAFETY IMPROVEMENTS TO RAMPS ON WANTAGH STATE PARKWAY NFA 2011 0.660 PRELDES 0.660

AT INTERCHANGE WITH OLD COUNTRY ROAD SCOPE TO BE DETERMINED TOWN NFA 2014 0.454 CONINSP 0.454

051735 OF NORTH HEMPSTEAD NFA 2014 4.540 CONST 4.540

AQC:A6P NASSAU TPC : $4.6-$7.5 M TOTAL 4YR COST : 5.654 0.660 0.000 0.000 4.994



NYSDOT MEADOWBROOK STATE PKWY/SOUTHERN STATE PKWY INTERCHANGE NFA 2012 1.000 DETLDES 1.000

RECONSTRUCTION TO ELIMINATE TRAFFIC BACKUP -- CONSTRUCT A WIDER

052323 RAMP FROM W/B SOUTHERN STATE PAKWY TO N/B MEADOWBROOK STATE

PKWY INCLUDING WIDER BRIDGES AT MEADOWBROOK ROAD & NORTH

JERUSALEM,HEMPSTEAD

AQC:D3 NASSAU TPC : $26-$40 M TOTAL 4YR COST : 1.000 0.000 1.000 0.000 0.000

** NEW YORK STATE DEPARTMENT OF TRANSPORTATION **

Friday, August 26, 2011 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) on Draft Program Page 6 of 84

for REGION 10

AGENCY PROJECT DESCRIPTION TOTAL 4-YEAR PROGRAM (FFY)

4-YEAR PHASE Starting October 01, 2010

FUND SOURCES FFY

PIN PROGRAM

FFY FFY FFY FFY

in millions

of dollars 2011 2012 2013 2014

AQ CODE COUNTY TOTAL PROJECT COST



NYSDOT EXTEND THE MULTI-USE BIKEPATH 6 MILES FROM BETHPAGE ST PK TO I495 & NFA 2011 0.929 CONINSP 0.929

THEN FOLLOWING I495 & NY135 ROW TO SYOSSET RR STATION; INCLUDES PED NFA 2011 9.287 CONST 9.287

053457 IMPVTS @ STREET CROSSINGS, REPLANTING OF ERODED AREAS, PARKING &

SIGNING, TOWN OF OYSTER BAY, NASSAU CO.

AQC:C2P NASSAU TPC : $9.5-15.5 M TOTAL 4YR COST : 10.216 10.216 0.000 0.000 0.000



NYSDOT UPGRADE LIGHTING CABLE ON VARIOUS STATE PARKWAYS AS A SAFETY STP LG URBAN 2014 1.097 DETLDES 1.097

IMPROVEMENT IN NASSAU AND SUFFOLK COUNTIES NFA 2014 0.274 DETLDES 0.274

053466

AQC:A18P MULTI TPC : $15-$25 M TOTAL 4YR COST : 1.371 0.000 0.000 0.000 1.371



NYSDOT REHABILITATE THE HECKSCHER STATE PARKWAY BRIDGE OVER NY27, STATE HBRR 2012 0.594 CONINSP 0.594

OF GOOD REPAIR ISLIP TOWN, SUFFOLK COUNTY. NFA 2012 0.148 CONINSP 0.148

053472 HBRR 2012 5.940 CONST 5.940

NFA 2012 1.485 CONST 1.485

AQC:A19P MULTI TPC : $7.5-$12 M TOTAL 4YR COST : 8.167 0.000 8.167 0.000 0.000



SUFFOLK CO. INTERSECTION REALIGNMENT OF CR 3, PINELAWN ROAD/WELLWOOD ROAD NFA 2012 1.300 CONINSP 1.300

WITH CONKLIN STREET AND LONG ISLAND AVENUE, TO IMPROVE SAFETY AND NFA 2012 11.700 CONST 11.700

075656 TRAFFIC CONGESTION, IN THE TOWN OF BABYLON. ACT NO.600



AQC:D1P SUFFOLK TPC : $15-$25 M TOTAL 4YR COST : 13.000 0.000 13.000 0.000 0.000



SUFFOLK CO. IMPROVE CR 39 FROM NY 27 TO NY 27A, SUFFOLK COUNTY: HPP 2011 0.300 CONINSP 0.300

RECONSTRUCTION FROM NORTH SEA ROAD WEST TO NY27A,CR39 (NORTH NFA 2011 0.075 CONINSP 0.075

075736 HIGHWAY) TO INCLUDE 4 LANE SECTION WITH FULL SHOULDERSTO REDUCE HPP 2011 2.700 CONST 2.700

THE TRAFFIC CONGESTION.(HPP#3232 ,NY 576) NFA 0.675 CONST 0.675

2011

NHS 2011 0.060 CONINSP 0.060

NFA 2011 0.015 CONINSP 0.015

NHS 2011 0.540 CONST 0.540

NFA 2011 0.135 CONST 0.135

STP LG URBAN 2011 0.320 CONINSP 0.320

NFA 2011 0.080 CONINSP 0.080

STP LG URBAN 2011 0.480 CONST 0.480

NFA 2011 0.120 CONST 0.120

STP LG URBAN 2011 0.001 DETLDES 0.001

AQC:NON SUFFOLK TPC : $4.6-$7.5 M TOTAL 4YR COST : 5.501 5.501 0.000 0.000 0.000

** NEW YORK STATE DEPARTMENT OF TRANSPORTATION **

Friday, August 26, 2011 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) on Draft Program Page 7 of 84

for REGION 10

AGENCY PROJECT DESCRIPTION TOTAL 4-YEAR PROGRAM (FFY)

4-YEAR PHASE Starting October 01, 2010

FUND SOURCES FFY

PIN PROGRAM

FFY FFY FFY FFY

in millions

of dollars 2011 2012 2013 2014

AQ CODE COUNTY TOTAL PROJECT COST



LOCAL EXTENSION OF WEST AVENUE TO BEACH AVENUE TO PROVIDE A DIRECT HPP 2011 1.435 CONST 1.435

ACCESS TO FERRIES, LIRR & WATERFRONT, ACT #294. VILLAGE OF PATCHOGUE NFA 2011 0.359 CONST 0.359

075739

AQC:C2P SUFFOLK TPC : $1.2-$2.5 M TOTAL 4YR COST : 1.794 1.794 0.000 0.000 0.000



LOCAL CONGESTION MITIGATION PROJECT, TOWN OF BROOKHAVEN. ACT NO. 748 . HPP 2011 2.512 CONST 2.512

EMERGENCY VEHICLE PREEMPTION SYSTEM FOR EXISTING TRAFFIC SIGNALS NFA 2011 0.628 CONST 0.628

075743 .TEA-21 SECTION 1600

AQC:A7P SUFFOLK TPC : $2-$4 M TOTAL 4YR COST : 3.140 3.140 0.000 0.000 0.000



SUFFOLK CO. CONSTRUCT 11 MILES OF PEDESTRIAN/BICYCLE TRAIL ALONG THE ABANDONED HPP 2011 0.359 DETLDES 0.359

PORT JEFFERSON-WADING RIVER RAILROAD CORRIDOR NFA 2011 0.090 DETLDES 0.090

075816 SECTION 1602 #1257, NY-139, NY 267 HPP 2012 0.500 CONINSP 0.500

NFA 2012 0.125 CONINSP 0.125

HPP 2012 5.970 CONST 5.970

NFA 2012 1.492 CONST 1.492

AQC:C14 SUFFOLK TPC : $7.5-$12 M TOTAL 4YR COST : 8.536 0.449 8.087 0.000 0.000



LOCAL CONSTRUCT TWO-WAY BIKEWAY ON RIVER ROAD FROM VICTORY AVENUE TO HPP 2011 0.112 CONINSP 0.112

MORICHES-MIDDLE ISLAND ROAD,INCLUDING ,NEW PAVEMENT MARKING NFA 2011 0.028 CONINSP 0.028

075827 DELINEATING BIKEWAY ALONG THE SIDE OF RIVER ROAD, NEW BIKE WAY HPP 2011 1.126 CONST 1.126

SIGNS ON RIVER ROAD & ADJOINING ROADWAYS,(TEA-21) NFA 0.281 CONST 0.281

2011

AQC:A7 SUFFOLK TPC : $1.2-$2.5 M TOTAL 4YR COST : 1.547 1.547 0.000 0.000 0.000



LOCAL IMPROVE CR80, MONTAUK HIGHWAY, FROM NY112 TO CR101 IN THE TOWN OF HPP 2011 0.149 CONINSP 0.149

BROOKHAVEN. 05 APPROPRIATION SEC 117.NY232 NFA 2011 0.037 CONINSP 0.037

075850 HPP 2011 0.843 CONST 0.843

NFA 2011 0.149 CONST 0.149

AQC:A2P SUFFOLK TPC : $0.6-$1.5 M TOTAL 4YR COST : 1.178 1.178 0.000 0.000 0.000



LOCAL RECONSTRUCT OLD NICHOLS ROAD FROM MORICHES ROAD TO SMITHTOWN HPP 2011 0.296 CONINSP 0.296

BOULEVARD IN THE TOWN OF SMITHTOWN. REPLACE CURBS, SIDEWALKS, NFA 2011 0.074 CONINSP 0.074

075877 DRAINAGE & ADA COMPLIANT RAMPS AS NEEDED FOR PED. SAFETY,REPAIR HPP 2011 1.927 CONST 1.927

DETERIORATED ROAD IN NISSEQUOQUE RIVER WATERSHED IN SMITHTOWN. NFA CONST

2011 0.482 0.482

NY243

HPP 2011 0.200 DETLDES 0.200

NFA 2011 0.050 DETLDES 0.050

AQC:A10 SUFFOLK TPC : $2-$4 M TOTAL 4YR COST : 3.029 3.029 0.000 0.000 0.000

** NEW YORK STATE DEPARTMENT OF TRANSPORTATION **

Friday, August 26, 2011 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) on Draft Program Page 8 of 84

for REGION 10

AGENCY PROJECT DESCRIPTION TOTAL 4-YEAR PROGRAM (FFY)

4-YEAR PHASE Starting October 01, 2010

FUND SOURCES FFY

PIN PROGRAM

FFY FFY FFY FFY

in millions

of dollars 2011 2012 2013 2014

AQ CODE COUNTY TOTAL PROJECT COST



LOCAL ENHANCE AND BEAUTIFY LIGHTING, INSTALL BIKE RACKS AND PLANT STREET HPP 2011 0.043 CONINSP 0.043

TREES ON NY 27/SUNRISE HIGHWAY FROM THE QUEENS LINE TO THE LYNBROOK NFA 2011 0.011 CONINSP 0.011

075886 BORDER IN THE VILLAGE OF VALLEY STREAM.HPP#1686, NY 427 HPP 2011 0.918 CONST 0.918

NFA 2011 0.230 CONST 0.230

AQC:A18 NASSAU TPC : $1.2-$2.5 M TOTAL 4YR COST : 1.202 1.202 0.000 0.000 0.000



LOCAL RELOCATE OAK BEACH ROAD NORTHWARD TO RESULT IN A HIGHWAY HPP 2011 0.456 CONINSP 0.456

INTERCHANGE AT OCEAN PARKWAY THAT MEETS MODERN DESIGN NFA 2011 0.140 CONINSP 0.140

075887 STANDARDS, IN THE TOWN OF BABYLON.HPP# 690,HPP-1441, HPP#4611 HPP 2011 4.076 CONST 4.076

NFA 2011 1.019 CONST 1.019

HPP 2011 0.001 DETLDES 0.001

HPP 2011 0.491 PRELDES 0.491

NFA 2011 0.200 PRELDES 0.200

AQC:D4 SUFFOLK TPC : $6-$9.4 M TOTAL 4YR COST : 6.383 6.383 0.000 0.000 0.000



LOCAL REHAB. OF VARIOUS VILLAGE STREETS WITHIN THE VILLAGE OF HPP 2011 0.117 CONINSP 0.117

PATCHOGUE.RESURFACING TOTAL OF 2.5 MILES ON VARIOUS VILLAGE ROADS. NFA 2011 0.029 CONINSP 0.029

075888 RESURFACING, EXIST. DRAINAGE SYSTEMS WILL BE REHAB.TO PREVENT HPP 2011 0.975 CONST 0.975

FLOODING, DAMAGED CURB & SIDEWALK WILL BE REPAIRED.NY628, HPP#3600 NFA 2011 0.244 CONST 0.244

HPP 2011 0.078 DETLDES 0.078

NFA 2011 0.020 DETLDES 0.020

HPP 2011 0.021 PRELDES 0.021

NFA 2011 0.005 PRELDES 0.005

AQC:A10 SUFFOLK TPC : $1.2-$2.5 M TOTAL 4YR COST : 1.489 1.489 0.000 0.000 0.000



LOCAL VILLAGE OF PATCHOGUE MAIN STREET PEDESTRIAN SAFETY IMPROVEMENTS HPP 2011 0.048 CONINSP 0.048

INCLUDING CROSSWALKS LIGHTING AND ADA COMPLIANT CURB RAMPS. NFA 2011 0.012 CONINSP 0.012

075889 HPP#2445 HPP 2011 0.394 CONST 0.394

NFA 2011 0.098 CONST 0.098

HPP 2011 0.009 DETLDES 0.009

NFA 2011 0.002 DETLDES 0.002

AQC:C2 SUFFOLK TPC : $0.6-$1.5 M TOTAL 4YR COST : 0.563 0.563 0.000 0.000 0.000

** NEW YORK STATE DEPARTMENT OF TRANSPORTATION **

Friday, August 26, 2011 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) on Draft Program Page 9 of 84

for REGION 10

AGENCY PROJECT DESCRIPTION TOTAL 4-YEAR PROGRAM (FFY)

4-YEAR PHASE Starting October 01, 2010

FUND SOURCES FFY

PIN PROGRAM

FFY FFY FFY FFY

in millions

of dollars 2011 2012 2013 2014

AQ CODE COUNTY TOTAL PROJECT COST



LOCAL REPLACED INCOSISTANT AND UNATTRACTIVE SIGNAGE WITH NEW SIGNAGE TO HPP 2011 0.009 CONINSP 0.009

AVOID DETERMINETAL EFFECT TO RESIDENTS AND VISITORS ALONG NY25, CR48 NFA 2011 0.002 CONINSP 0.002

075890 AND SOUND AVE BETWEEN LAUREL TO ORIENT POINT IN THE TOWN HPP 2011 0.171 CONST 0.171

OFSOUTHOLD TOWN, SUFFOLK COUNTY.HPP#741 NFA 2011 0.043 CONST 0.043

HPP 2011 0.010 OPER 0.010

NFA 2011 0.002 OPER 0.002

AQC:C13 SUFFOLK TPC : < $0.75 M TOTAL 4YR COST : 0.237 0.237 0.000 0.000 0.000



LOCAL THE VILLAGE OF HEMPSTEAD IS REPAIRING DAMAGED AND MIS-ALIGNED HPP 2011 0.141 CONINSP 0.141

SIDEWALKS AND CURB AND INSTALLING LIGHTING TO PROVIDE A PEDESTRIAN NFA 2011 0.035 CONINSP 0.035

075895 FRIENDLY ENVIRONMENT& RESURFACE MAIN STREET.(HPP#1396,NY 269) HPP 2011 1.180 CONST 1.180

NFA 2011 0.295 CONST 0.295

AQC:C2 NASSAU TPC : $1.2-$2.5 M TOTAL 4YR COST : 1.651 1.651 0.000 0.000 0.000



LOCAL IMPROVE DETERIORATED PAVEMENT, DRAINAGE TO PREVENT FLOODING, HPP 2011 0.080 CONINSP 0.080

REPLACED DETERIORATED SIDE WALKS FOR PEDESTRIAN SAFETY & IMPROVE NFA 2011 0.020 CONINSP 0.020

075899 TRAFFIC SIGNAL OPERATION ON EAST GATE & WEST GATE AVENUES FROM HPP 2011 0.669 CONST 0.669

STRONG AVE. TO DELAWARE AVE IN VILLAGE OF LINDENHURST.(NY282) NFA 2011 0.167 CONST 0.167



AQC:A10 SUFFOLK TPC : $0.6-$1.5 M TOTAL 4YR COST : 0.936 0.936 0.000 0.000 0.000



LOCAL REHABILITATION OF DETERIORATED PAVEMENT, DRAINGAGE TO PREVENT HPP 2011 0.061 CONINSP 0.061

FLLODING, SIDE WALKS & CURBS FOR PEDESRIAN SAFETY IN NORTH QUEENS NFA 2011 0.015 CONINSP 0.015

075900 AVE FROM GRAND AVE TO FRANK ST AND FROM GRAND AVE FROM NORTH HPP 2011 0.505 CONST 0.505

RAILROAD TO FRANK STREET IN LINDENHURST VILLAGE.(NY 287,HPP#280 NFA 2011 0.126 CONST 0.126



AQC:A10 SUFFOLK TPC : $0.6-$1.5 M TOTAL 4YR COST : 0.707 0.707 0.000 0.000 0.000



LOCAL REHABILITATION & RECONSTRUCTION OF DETERIORATED SIDE WALKS, HPP 2011 0.082 CONINSP 0.082

PAVEMENT, DRAINAGE,CURBS TO REGAINS THE INTERGRETY OF ROADWAY IN NFA 2011 0.021 CONINSP 0.021

075901 EAST AND WEST JOHN STREETS FROM NEW YORK AVE TO CENTER AVENUE IN HPP 2011 0.685 CONST 0.685

VILLAGE OF LINDENHURST.(NY 344,HPP#876) NFA 0.171 CONST 0.171

2011

HPP 2011 0.034 DETLDES 0.034

NFA 2011 0.009 DETLDES 0.009

AQC:A10 SUFFOLK TPC : $0.6-$1.5 M TOTAL 4YR COST : 1.002 1.002 0.000 0.000 0.000

** NEW YORK STATE DEPARTMENT OF TRANSPORTATION **

Friday, August 26, 2011 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) on Draft Program Page 10 of 84

for REGION 10

AGENCY PROJECT DESCRIPTION TOTAL 4-YEAR PROGRAM (FFY)

4-YEAR PHASE Starting October 01, 2010

FUND SOURCES FFY

PIN PROGRAM

FFY FFY FFY FFY

in millions

of dollars 2011 2012 2013 2014

AQ CODE COUNTY TOTAL PROJECT COST



LOCAL THE TOWN OF SMITHTOWN IS INSTALLING TRAFFIC SIGNAL PREEMPTION HPP 2011 0.008 CONINSP 0.008

DEVICES ON TRAFFIC SIGNALS THROUGHOUT THE TOWN. THESE DEVICES WILL NFA 2011 0.002 CONINSP 0.002

075904 AUTOMATICALLY CHANGE TRAFFIC SIGNALS TO GREEN FOR EMERGENCY HPP 2011 0.352 CONST 0.352

VEHICLE DURING EMERGENCIES. SAFETEA-LU# 3676 NFA 2011 0.088 CONST 0.088

AQC:A7 SUFFOLK TPC : < $0.75 M TOTAL 4YR COST : 0.450 0.450 0.000 0.000 0.000



LOCAL REHABILITATE PAVEMENT, DRAINAGE SYSTEM A, CURB & SIDEWALK TO AVID HPP 2011 0.032 CONINSP 0.032

FLOODING PROBLEM AND PEDESTRIAN SAFETY ON CHURCH STREET BETWEEN NFA 2011 0.008 CONINSP 0.008

075905 NY25A AND KOHR RD IN SMITHTOWN.(HPP#3590,NY622,HPP#2286, NY 490) HPP 2011 0.336 CONST 0.336

NFA 2011 0.084 CONST 0.084

HPP 2011 0.080 DETLDES 0.080

NFA 2011 0.020 DETLDES 0.020

HPP 2011 0.032 SCOPING 0.032

NFA 2011 0.008 SCOPING 0.008

AQC:A10 SUFFOLK TPC : < $0.75 M TOTAL 4YR COST : 0.600 0.600 0.000 0.000 0.000



LOCAL REHABILITATION OF DETERIORATED PAVEMENT,CURBS AND SIDEWALKS FOR HPP 2011 0.236 CONINSP 0.236

RIDERS, PEDESTRIAN SAFETY ON WEST NECK ROAD FROM THE NFA 2011 0.059 CONINSP 0.059

075913 HUNTINGTON-LLOYD HARBOR BOUNDARY TO THE END OF THE VILLAGE IN THE HPP 2011 1.967 CONST 1.967

VILLAGE OF LLOYD HARBOR.HPP # 1675 NFA 2011 0.492 CONST 0.492

HPP 2011 0.197 DETLDES 0.197

NFA 2011 0.049 DETLDES 0.049

AQC:A10 SUFFOLK TPC : $2-$4 M TOTAL 4YR COST : 3.000 3.000 0.000 0.000 0.000



NASSAU CO. REHABILITATION OF BROOKSIDE AVENUE FROM FOREST AVE TO GREENWICH STP LG URBAN 2012 0.400 CONINSP 0.400

STREET IN ROOSEVELT INCLUDES RESURFACING OF DETERIORATED NFA 2012 0.100 CONINSP 0.100

075919 PAVEMENT,DRAINAGE, NEW CURBS, SIDEWALK, DRAINAGE AS WELL AS STP LG URBAN 2012 3.600 CONST 3.600

INTERSECTION TURNING RADII MPROVEMENTS TO IMPROVE DRIVER SAFETY NFA 2012 0.900 CONST 0.900



AQC:D1P NASSAU TPC : $4.6-$7.5 M TOTAL 4YR COST : 5.000 0.000 5.000 0.000 0.000

** NEW YORK STATE DEPARTMENT OF TRANSPORTATION **

Friday, August 26, 2011 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) on Draft Program Page 11 of 84

for REGION 10

AGENCY PROJECT DESCRIPTION TOTAL 4-YEAR PROGRAM (FFY)

4-YEAR PHASE Starting October 01, 2010

FUND SOURCES FFY

PIN PROGRAM

FFY FFY FFY FFY

in millions

of dollars 2011 2012 2013 2014

AQ CODE COUNTY TOTAL PROJECT COST



LOCAL RECONSTRUCTION OF BROOKSITE DRIVE FROM NY 25/25A TO RT. 347, HPP 2011 0.048 CONINSP 0.048

RESURFACE DETERIORATED PAVEMENT, REPAIR DRAINAGE SYSTEM PREVENT NFA 2011 0.012 CONINSP 0.012

075928 FLOODING .REPAIR DAMAGED CURBS & SIDEWALKS FOR PEDESTRAIN AND HPP 2011 0.400 CONST 0.400

TRAFFIC SAFETY(NY619 NFA 2011 0.100 CONST 0.100

HPP 2011 0.088 DETLDES 0.088

NFA 2011 0.022 DETLDES 0.022

HPP 2011 0.040 PRELDES 0.040

NFA 2011 0.010 PRELDES 0.010

AQC:A10 SUFFOLK TPC : $0.6-$1.5 M TOTAL 4YR COST : 0.720 0.720 0.000 0.000 0.000



LOCAL HERB HILL/GARVIES POINT ROAD RECONSTRUCTION PROJECT INCLUDING STP LG URBAN 2011 1.497 DETLDES 1.497

PAVING, DRAINAGE AND SIDEWALKS. THIS PROJECT WILL GO FROM THE NFA 2011 0.374 DETLDES 0.374

075934 GLENCOVE CONNECTOR (075745) TO THE PROPOSED FERRY TERMINAL. THIS 1.2 TCSP 2011 0.534 DETLDES 0.534

MILE SECTION ABUTTING GLEN COVE CREEK IS AN ACCESS ROAD NFA 0.133 DETLDES 0.133

2011

AQC:A10P NASSAU TPC : $7.5-$12 M TOTAL 4YR COST : 2.538 2.538 0.000 0.000 0.000



LOCAL REPLACE OCEAN BEACH FERRY TERMINAL , FIRE ISLAND NATIONAL SEASHORE FBD 2011 0.249 CONINSP 0.249

WITH NEW SUB & SUPERSTRUCTURE. NEW DECK WILL HOUSE STORAGE NFA 2011 0.062 CONINSP 0.062

075950 FACILITIES, PUBLIC RESTROOMS, BOARD ROOM & POLICE BARRACKS. ELEVATE FBD 2011 2.339 CONST 2.339

STRUCTURE TO RELIEVE MAJOR FLOODING PROBLEM. NFA 2011 0.585 CONST 0.585

FBD 2011 0.160 DETLDES 0.160

NFA 2011 0.040 DETLDES 0.040

FBD 2011 0.060 PRELDES 0.060

NFA 2011 0.015 PRELDES 0.015

AQC:B8 SUFFOLK TPC : $3.3-$5.6 M TOTAL 4YR COST : 3.510 3.510 0.000 0.000 0.000



SUFFOLK CO. DESIGN AND CONSTRUCTION OF NEW COMPRESSED NATURAL GAS FUELING CMAQ 2011 0.400 DETLDES 0.400

STATIONS & ACCESSORY FACILITIES THAT WILL FACILITATE THE CONVERSION NFA 2011 0.100 DETLDES 0.100

075961 OF SUFFOLK COUNTY FLEET VEHICLES TO "GREEN" LESS POLLUTING VEHICLES NFA 2014 2.000 CONST 2.000

AND COUNTY EMPLOYEE CNG FUEL TRAINING PROGRAM.





AQC:K01P SUFFOLK TPC : $2-$4 M TOTAL 4YR COST : 2.500 0.500 0.000 0.000 2.000



NASSAU CO. NASSAU COUNTY INCIDENT MANAGEMENT SYSTEM PHASE 2. MAXIMIZES THE CMAQ 2011 0.144 CONINSP 0.144

EFFICIENCY OF TRAFFIC FLOW ALONG MAJOR ARTERIES BY INSTALLING AN NFA 2011 0.036 CONINSP 0.036

075963 INCIDENT MANAGEMENT SYSTEM (VIDEO CAMERAS). (FORMERLY PIN: 0T1938) CMAQ 2011 1.296 CONST 1.296

NFA 2011 0.324 CONST 0.324

AQC:A6P NASSAU TPC : $1.2-$2.5 M TOTAL 4YR COST : 1.800 1.800 0.000 0.000 0.000

** NEW YORK STATE DEPARTMENT OF TRANSPORTATION **

Friday, August 26, 2011 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) on Draft Program Page 12 of 84

for REGION 10

AGENCY PROJECT DESCRIPTION TOTAL 4-YEAR PROGRAM (FFY)

4-YEAR PHASE Starting October 01, 2010

FUND SOURCES FFY

PIN PROGRAM

FFY FFY FFY FFY

in millions

of dollars 2011 2012 2013 2014

AQ CODE COUNTY TOTAL PROJECT COST



LOCAL VILLAGE OF NEW HYDE PARK WILL INSTALL A PLANTED MEDIAN AREA FOR .5 HPP 2011 0.160 CONINSP 0.160

MILE AS WELL AS RECONSTRUCT EXISTING SIDEWALKS WITH BRICK PAVERS, NFA 2011 0.040 CONINSP 0.040

075973 INSTALL SIDEWALK LIGHTING AND BENCHES AND TREE PLANTING FOR HPP 2011 1.440 CONST 1.440

PEDESTRIAN SAFETY. NY398 NFA 2011 0.360 CONST 0.360

NFA 2011 0.450 DETLDES 0.450

AQC:C11 NASSAU TPC : $2-$4 M TOTAL 4YR COST : 2.450 2.450 0.000 0.000 0.000



LOCAL TOWN OF HEMPSTEAD REVITALIZE GENERAL BUSINESS DISTRICT IN THE VLG. TCSP 2011 0.133 CONST 0.133

OF CEDARHURST TO UPGRADE A DETERIORATED MAJOR REGIONAL SHOPPING NFA 2011 0.063 CONST 0.063

075976 HUB. THE PROJECT INCLUDES ADDITIONAL STREET LIGHTING,REFURBISH

SIDEWALKS, REHAB.DRAINAGE, BRICK CROSS WALKS WAYS PED. & SIGN





AQC:A10 NASSAU TPC : < $0.75 M TOTAL 4YR COST : 0.196 0.196 0.000 0.000 0.000



LOCAL MASONRY AND LIGHTING IMPROVEMENTS TO PEDESTRIAN SIDEWALKS ALONG TCSP 2011 0.043 CONINSP 0.043

HEMPSTEAD AVE. BETWEEN LAKEVIEW AVE AND OCEAN AVENUE IN THE NFA 2011 0.010 CONINSP 0.010

075977 VILLAGE OF MALVERNE, NASSAU COUNTY (FORMERLY PIN: 0T2399). THIS TCSP 2011 0.313 CONST 0.313

PROJECT WILL INCREASE PEDESTRIAN/BICYCLE ACTIVITY IN AN ATTRACTIVE, NFA CONST

2011 0.078 0.078

SAFER, AND ADA COMPLIANT ENVIRONMENT.

AQC:A18 NASSAU TPC : < $0.75 M TOTAL 4YR COST : 0.444 0.444 0.000 0.000 0.000



SUFFOLK CO. BRIDGE REPLACEMENT OF CR 46 (WILLIAM FLOYD PARKWAY) OVER NARROW STP LG URBAN 2011 0.800 PRELDES 0.800

BAY,DUE TO STRUCTURAL DEFICIENCIES AND IMPROVE ALIGNMENT, IN THE NFA 2011 0.200 PRELDES 0.200

075978 TOWN OF BROOKHAVEN. BIN 3300770. STP LG URBAN 2012 0.800 SCOPING 0.800

NFA 2012 0.200 SCOPING 0.200

HBRR 2014 6.000 DETLDES 6.000

NFA 2014 1.500 DETLDES 1.500

AQC:J1Z SUFFOLK TPC : $7.5-$12 M TOTAL 4YR COST : 9.500 1.000 1.000 0.000 7.500



SUFFOLK CO. CR16, HORSEBLOCK ROAD/LIRR BRIDGE REPLACEMENT DUE TO STRUCTURAL STP LG URBAN 2011 0.680 PRELDES 0.680

DEFICIENCIES, IN THE TOWN OF BROOKHAVEN. BIN 3300800. NFA 2011 0.170 PRELDES 0.170

075979 HBRR 2014 1.018 CONINSP 1.018

NFA 2014 0.254 CONINSP 0.254

HBRR 2014 10.182 CONST 10.182

NFA 2014 2.545 CONST 2.545

AQC:A19P SUFFOLK TPC : $21-$31 M TOTAL 4YR COST : 14.849 0.850 0.000 0.000 13.999

** NEW YORK STATE DEPARTMENT OF TRANSPORTATION **

Friday, August 26, 2011 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) on Draft Program Page 13 of 84

for REGION 10

AGENCY PROJECT DESCRIPTION TOTAL 4-YEAR PROGRAM (FFY)

4-YEAR PHASE Starting October 01, 2010

FUND SOURCES FFY

PIN PROGRAM

FFY FFY FFY FFY

in millions

of dollars 2011 2012 2013 2014

AQ CODE COUNTY TOTAL PROJECT COST



NASSAU CO. CONSTRUCT ACCESS ROAD AND EXIT LANES FOR CENTER FOR ADVANCED HPP 2011 0.179 CONINSP 0.179

MEDICINE OF LIJ HOSPITAL ON LAKEVILLE ROAD. SAFETEA-LU #2575, NY 525. NFA 2011 0.045 CONINSP 0.045

075980 THE PRIMARY ACCESS ROAD TO THE FACILITY ON THE WESTSIDE OF LAKEVILLE HPP 2011 1.433 CONST 1.433

ROAD WILL ENLARGED WITH EXTRA LANE. NFA 2011 0.358 CONST 0.358

HPP 2011 0.159 DETLDES 0.159

NFA 2011 0.040 DETLDES 0.040

HPP 2011 0.020 PRELDES 0.020

NFA 2011 0.005 PRELDES 0.005

AQC:J1Z NASSAU TPC : $2-$4 M TOTAL 4YR COST : 2.239 2.239 0.000 0.000 0.000



NASSAU CO. NASSAU COUNTY RESURFACING 2011. REHABILITAE EXISTING ROAD STP LG URBAN 2011 3.000 CONST 3.000

PAVEMENTS IN ORDER TO PROVIDE FOR BETTER AND SAFTER SURFACES NFA 2011 0.750 CONST 0.750

075981

AQC:A10P NASSAU TPC : $3.3-$5.6 M TOTAL 4YR COST : 3.750 3.750 0.000 0.000 0.000



LOCAL THE TOWN OF BROOKHAVEN IS RESURFACING VARIOUS ROADWAYS IN MASTIC HPP 2011 0.027 CONINSP 0.027

BEACH. THESE ROADS HAVE DETERIORATED TO THE POINT THAT PAVEMENT NFA 2011 0.007 CONINSP 0.007

075982 RESURFACING IS NECESSARY TO MAINTAIN THE CURRENT TRANSPORTATION HPP 2011 0.248 CONST 0.248

SYSTEM.HPP#3601,NY 629 NFA 0.062 CONST 0.062

2011

AQC:A10 SUFFOLK TPC : < $0.75 M TOTAL 4YR COST : 0.344 0.344 0.000 0.000 0.000



LOCAL THE TOWN OF BROOKHAVEN IS RESURFACING TOTAL 2.8 MILES IN OLD TOWN HPP 2011 0.029 CONINSP 0.029

RD. FROM RTE 347 TO SLATTERY RD.THESE ROADS ARE DETERIORATED TO THE NFA 2011 0.007 CONINSP 0.007

075983 POINT THAT PAVEMENT RESURFACING IS NECESSARY TO MAINTAIN THE HPP 2011 0.261 CONST 0.261

CURRENT TRANSPORTATION SYSTEM, NY623 NFA 2011 0.065 CONST 0.065



AQC:A10 SUFFOLK TPC : < $0.75 M TOTAL 4YR COST : 0.362 0.362 0.000 0.000 0.000



LOCAL THE TOWN OF BROOKHAVEN IS RESURFACING 3.33 MILES OF ROADWAYS IN THE HPP 2011 0.034 CONINSP 0.034

HAMLET OF MEDFORD. THESE ROADS ARE DETERIORATED TO THE POINT THAT NFA 2011 0.009 CONINSP 0.009

075984 PAVEMENT IMPROVEMENT IS NECESSARY TO MAINTAIN THE CURRENT HPP 2011 0.310 CONST 0.310

TRANSPORTATION SYSTEM. NY626 NFA 2011 0.077 CONST 0.077

AQC:A10 SUFFOLK TPC : < $0.75 M TOTAL 4YR COST : 0.430 0.430 0.000 0.000 0.000

** NEW YORK STATE DEPARTMENT OF TRANSPORTATION **

Friday, August 26, 2011 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) on Draft Program Page 14 of 84

for REGION 10

AGENCY PROJECT DESCRIPTION TOTAL 4-YEAR PROGRAM (FFY)

4-YEAR PHASE Starting October 01, 2010

FUND SOURCES FFY

PIN PROGRAM

FFY FFY FFY FFY

in millions

of dollars 2011 2012 2013 2014

AQ CODE COUNTY TOTAL PROJECT COST



LOCAL THE TOWN OF BROOKHAVEN IN HAMLET OF GORDON HEIGHT INSTALLING SIDE HPP 2011 0.029 CONINSP 0.029

WALKS, CURBS WHERE DOES NOT EXIST AND DRAINGAGE SYSTEM TO NFA 2011 0.008 CONINSP 0.008

075985 PREVENT WATER FILTERATION ON SIDE WALKS AND CURBS. NY 627 HPP 2011 0.266 CONST 0.266

NFA 2011 0.067 CONST 0.067

AQC:C2 SUFFOLK TPC : < $0.75 M TOTAL 4YR COST : 0.370 0.370 0.000 0.000 0.000



LOCAL GLEN COVE FERRY TERMINAL & BOAT BASIN PHASE 2 - THE CONSTRUCTION OF FBD 2011 0.195 CONINSP 0.195

A FERRY TERMINAL BUILDING. NFA 2011 0.744 CONINSP 0.744

075986 FBD 2011 1.755 CONST 1.755

NFA 2011 0.439 CONST 0.439

AQC:B10 NASSAU TPC : $2-$4 M TOTAL 4YR COST : 3.133 3.133 0.000 0.000 0.000



SUFFOLK CO. INTERSECTION RECONSTRUCTION AT CR3, PINELAWN ROAD/RULAND HPP 2011 1.776 ROWACQU 1.776

ROAD/COLONIAL SPRINGS ROAD INCLUDING ADDING A LANE EACH DIRECTION NFA 2011 0.444 ROWACQU 0.444

075987 ON COLONIAL SPRING RD. APPROXIMATELY 3,500 FEET FROM THE STP LG URBAN 2012 1.025 CONINSP 1.025

INTERSECTION TO LITTLE EAST NECK ROAD, IN THE TOWN OF HUNTINGTON NFA CONINSP

2012 0.256 0.256

ACT600

STP LG URBAN 2012 9.225 CONST 9.225

NFA 2012 2.306 CONST 2.306

AQC:D1P SUFFOLK TPC : $12.5-$19 M TOTAL 4YR COST : 15.032 2.220 12.812 0.000 0.000



LOCAL HOFSTRA UNIVERSITY IS RESURFACE AND UPGRADE THE PARKING LOTS, TCSP 2011 0.580 CONST 0.580

INSTALL SIGNAGE , PUT NEW SIDE WALKS TO ENHANCE PEDESTRIAN FLOW NFA 2011 0.145 CONST 0.145

075988 THROUGHOUT CAMPUS & PROMOTE SAFETY & BUILD PEDESTRIAN BRIDGE

UNIFYING HOFSTRA UNIVERSITYS CAMPUS ON THE NORTH & SOUTH SIDE

AQC:A10 NASSAU TPC : $0.6-$1.5 M TOTAL 4YR COST : 0.725 0.725 0.000 0.000 0.000



LOCAL HOFSTRA UNIVERSITY SAFE AND SUSTANINABLE PROJECTS- PURCHASES CNG TCSP 2011 0.184 CONST 0.184

SHUTTLE BUSES FOR SOUTH AND NORTH CAMPUS. (SPLIT FROM NFA 2011 0.046 CONST 0.046

075989 PIN#075988)TCSP08NY001UNIFYING HOFSTRA UNIVERSITYS CAMPUS ON THE

NORTH & SOUTH SIDE

AQC:A10 NASSAU TPC : $0.6-$1.5 M TOTAL 4YR COST : 0.230 0.230 0.000 0.000 0.000

** NEW YORK STATE DEPARTMENT OF TRANSPORTATION **

Friday, August 26, 2011 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) on Draft Program Page 15 of 84

for REGION 10

AGENCY PROJECT DESCRIPTION TOTAL 4-YEAR PROGRAM (FFY)

4-YEAR PHASE Starting October 01, 2010

FUND SOURCES FFY

PIN PROGRAM

FFY FFY FFY FFY

in millions

of dollars 2011 2012 2013 2014

AQ CODE COUNTY TOTAL PROJECT COST



NYSDOT LONG ISLAND COMMUTER CHOICE: CONTINUE TRAVEL DEMAND MANAGEMENT CMAQ 2011 2.000 OPER 2.000

CONSULTANT PROGRAM TO REDUCE TRAVEL DEMAND IN NASSAU AND NFA 2011 0.500 OPER 0.500

080395 SUFFOLK COUNTY CMAQ 2012 2.000 OPER 2.000

NFA 2012 0.500 OPER 0.500

CMAQ 2013 2.000 OPER 2.000

NFA 2013 0.500 OPER 0.500

CMAQ 2014 2.000 OPER 2.000

NFA 2014 0.500 OPER 0.500

AQC:NON MULTI TPC : $21-$31 M TOTAL 4YR COST : 10.000 2.500 2.500 2.500 2.500



NYSDOT PROVIDE ACCESS SIGNS ON LOCAL ROADS TO NY25 IN THE TOWN OF OYSTER NFA 2012 0.322 CONINSP 0.322

BAY, I495 IN THE TOWN OF ISLIP, NSP IN THE TOWN OF HUNTINGTON AND NY27 NFA 2012 3.225 CONST 3.225

080429 IN THE TOWNS OF BABYLON, BROOKHAVEN & SOUTHAMPTON , NASSAU &

SUFFOLK COUNTIES.

AQC:C13P MULTI TPC : $3.3-$5.6 M TOTAL 4YR COST : 3.547 0.000 3.547 0.000 0.000



NYSDOT PROVIDE SAFETY IMPROVEMENTS AT INTERCHANGES (LOCATIONS NFA 2011 0.215 PRELDES 0.215

TO-BE-DETERMINED) ON VARIOUS STATE HIGHWAYS & PARKWAYS IN NASSAU NFA 2012 0.506 CONINSP 0.506

080434 & SUFFOLK COUNTIES. NFA 2012 5.058 CONST 5.058

AQC:A6P MULTI TPC : $4.6-$7.5 M TOTAL 4YR COST : 5.779 0.215 5.564 0.000 0.000



NYSDOT BRIDGE PARAPET REPLACEMENTS TO UPGRADE NON STANDARD PAPRAPET AND HBRR 2013 0.609 CONINSP 0.609

APPROACH GUIDERAIL AND INSTALLATION OF PEDESTRIAN FENCING NFA 2013 0.450 CONINSP 0.450

080495 (LOCATIONS TO BE DETERMINED) ON VARIOUS STATE HIGHWAYS & PKWYS IN HBRR 2013 6.090 CONST 6.090

THE TOWNS OF HEMPSTEAD, N. HEMPSTEAD & OYSTER BAY, NASSAU COUNTY NFA 2013 4.501 CONST 4.501



AQC:A19P MULTI TPC : $9.5-15.5 M TOTAL 4YR COST : 11.650 0.000 0.000 11.650 0.000



NYSDOT INCIDENT MANAGEMENT--HELP VEHICLES ON THE LONG ISLAND EXPRESSWAY CMAQ 2011 2.400 OPER 2.400

AND PARKWAYS TO REDUCE THE HIGHWAY CONGESTION. NASSAU AND NFA 2011 0.600 OPER 0.600

080556 SUFFOLK COUNTY CMAQ 2013 2.400 OPER 2.400

NFA 2013 0.600 OPER 0.600

AQC:A6P MULTI TPC : $9.5-15.5 M TOTAL 4YR COST : 6.000 3.000 0.000 3.000 0.000

** NEW YORK STATE DEPARTMENT OF TRANSPORTATION **

Friday, August 26, 2011 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) on Draft Program Page 16 of 84

for REGION 10

AGENCY PROJECT DESCRIPTION TOTAL 4-YEAR PROGRAM (FFY)

4-YEAR PHASE Starting October 01, 2010

FUND SOURCES FFY

PIN PROGRAM

FFY FFY FFY FFY

in millions

of dollars 2011 2012 2013 2014

AQ CODE COUNTY TOTAL PROJECT COST



NASSAU CO. IMP. OF PRG TO REDUCE THE # OF SOV ON THE RD DURING COMM. HRS. ACT AS NFA 2011 0.160 MISC 0.160

AN INFORM. RESOURCE FOR LOC GOVTS AND PVT INDUSTRIES INT. IN EST.

080634 CAR/VANPOOLING, PREF PARKING, GUAR. RIDE HOME PGMS, FLEXTIME, ENC.

EMP. USE OF PUB TRANSIT & THE ADOPT OF IRC SECT.132. THIS PROJECT

ATTEMPTS TO PROMOTE ALTERNATIVES TO SOV USE THROUGH

EMPLOYER/EMPLOYEE PROMOTIONAL CAMPAIGNS FOCUSED TOWARD LARGE

EMPLOYERS (ORGANIZATIONS WITH OVER 500 EMPLOYEES) THROUGHOUT

NASSAU COUNTY.



AQC:C1P NASSAU TPC : $1.2-$2.5 M TOTAL 4YR COST : 0.160 0.160 0.000 0.000 0.000



NYSDOT SUFFOLK EXPRESS COMMUTER BUS SERVICE ALONG THE LONG ISLAND STP FLEX 2011 0.752 OPER 0.752

EXPRESSWAY I495 FROM CENTERAL SUFFOLK COUNTY TO THE HAUPPAUGE NFA 2011 0.300 OPER 0.300

080659 INDUSTRIAL PARK AND NY 110 CORRIDOR STP FLEX 2012 0.752 OPER 0.752

NFA 2012 0.188 OPER 0.188

STP FLEX 2013 0.752 OPER 0.752

NFA 2013 0.188 OPER 0.188

STP FLEX 2014 0.806 OPER 0.806

NFA 2014 0.200 OPER 0.200

AQC:B1P SUFFOLK TPC : $4.6-$7.5 M TOTAL 4YR COST : 3.938 1.052 0.940 0.940 1.006



NYSDOT INTELLIGENT TRANSPORTATION SERVICE PERSONAL SERVICE CONSULTANT NHS 2011 4.000 OPER 4.000

CONTRACT TO PROVIDE SUPPORT STAFF TO INFORM OPERATIONS NFA 2011 1.000 OPER 1.000

080665 NHS 2012 3.200 OPER 3.200

NFA 2012 0.800 OPER 0.800

NHS 2013 4.000 OPER 4.000

NFA 2013 1.000 OPER 1.000

NHS 2014 4.000 OPER 4.000

NFA 2014 1.000 OPER 1.000

AQC:A6P MULTI TPC : $26-$40 M TOTAL 4YR COST : 19.000 5.000 4.000 5.000 5.000



NYSDOT ANNUAL PROGRAM TO PROVIDE STAFF TO OPERATE THE INFORM CONTROL NHS 2011 1.440 OPER 1.440

CENTER IN HAUPPAUGUE, SUFFOLK COUNTY NFA 2011 0.360 OPER 0.360

080676 CMAQ 2014 2.800 OPER 2.800

NFA 2014 0.700 OPER 0.700

AQC:A7P MULTI TPC : $21-$31 M TOTAL 4YR COST : 5.300 1.800 0.000 0.000 3.500

** NEW YORK STATE DEPARTMENT OF TRANSPORTATION **

Friday, August 26, 2011 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) on Draft Program Page 17 of 84

for REGION 10

AGENCY PROJECT DESCRIPTION TOTAL 4-YEAR PROGRAM (FFY)

4-YEAR PHASE Starting October 01, 2010

FUND SOURCES FFY

PIN PROGRAM

FFY FFY FFY FFY

in millions

of dollars 2011 2012 2013 2014

AQ CODE COUNTY TOTAL PROJECT COST



NYSDOT PROVIDE MAINTENANCE TO COMMUNICATION EQUIPMENT INCL. ALL NHS 2012 2.000 OPER 2.000

COMPUTERIZED TRAFFIC MANAGEMENT SYSTEMS, VIDEO SURVEILLANCE & NFA 2012 0.500 OPER 0.500

080720 DETECTORS, VARIABLE MESSAGE SIGNS, CLOSED CIRCUIT TELEVISIONS, NHS 2013 1.200 OPER 1.200

HIGHWAY ADVISORY RADIO & RELATED EQUIP. TO MAINT. STATE OF GOOD NFA 2013 0.300 OPER 0.300

REPAIR

NHS 2014 1.200 OPER 1.200

NFA 2014 0.300 OPER 0.300

AQC:A10P MULTI TPC : $9.5-15.5 M TOTAL 4YR COST : 5.500 0.000 2.500 1.500 1.500



NYSDOT PROVIDE ENGINEERING SERVICES & CONSTRUCTION SUPPORT FOR THE INFORM NHS 2011 2.000 PRELDES 2.000

SYSTEM NFA 2011 0.500 PRELDES 0.500

080730 NHS 2012 2.000 PRELDES 2.000

NFA 2012 0.500 PRELDES 0.500

NHS 2013 2.000 PRELDES 2.000

NFA 2013 0.500 PRELDES 0.500

NHS 2014 2.200 PRELDES 2.200

NFA 2014 0.550 PRELDES 0.550

AQC:A7P MULTI TPC : $26-$40 M TOTAL 4YR COST : 10.250 2.500 2.500 2.500 2.750



NYSDOT TRAFFIC ENGINEERING AND SAFETY STUDIES, VARIOUS LOCATIONS HSIP 2012 1.827 SCOPING 1.827

THROUGHOUT NASSAU AND SUFFOLK COUNTIES. NFA 2012 0.203 SCOPING 0.203

080732

AQC:C3 MULTI TPC : $2-$4 M TOTAL 4YR COST : 2.030 0.000 2.030 0.000 0.000



NYSDOT TRAFFIC SIGNAL TIMING AND ARTERIAL OPTIMIZATION VARIOUS STATE CMAQ 2011 1.200 OPER 1.200

HIGHWAYS IN NASSAU COUNTY NFA 2011 0.300 OPER 0.300

080768 CMAQ 2013 1.200 OPER 1.200

NFA 2013 0.300 OPER 0.300

AQC:A7P NASSAU TPC : $3.3-$5.6 M TOTAL 4YR COST : 3.000 1.500 0.000 1.500 0.000



NYSDOT SIGNAL TIMING UPGRADE AND ARTERIAL OPTIMIZATION VARIOUS STATE CMAQ 2011 1.200 OPER 1.200

HIGHWAYS IN SUFFOLK COUNTY NFA 2011 0.300 OPER 0.300

080769 CMAQ 2013 1.200 OPER 1.200

NFA 2013 0.300 OPER 0.300

AQC:A7P SUFFOLK TPC : $3.3-$5.6 M TOTAL 4YR COST : 3.000 1.500 0.000 1.500 0.000

** NEW YORK STATE DEPARTMENT OF TRANSPORTATION **

Friday, August 26, 2011 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) on Draft Program Page 18 of 84

for REGION 10

AGENCY PROJECT DESCRIPTION TOTAL 4-YEAR PROGRAM (FFY)

4-YEAR PHASE Starting October 01, 2010

FUND SOURCES FFY

PIN PROGRAM

FFY FFY FFY FFY

in millions

of dollars 2011 2012 2013 2014

AQ CODE COUNTY TOTAL PROJECT COST



NYSDOT DEDICATED STATE POLICE SERVICES TO HELP LANE CLOSURES DURING NFA 2011 0.400 MISC 0.400

MAINTENANCE OPERATIONS ON VARIOUS STATE PARKWAYS IN NASSAU AND NFA 2012 0.400 MISC 0.400

080787 SUFFOLK COUNTIES NFA 2013 0.400 MISC 0.400

NFA 2014 0.400 MISC 0.400

AQC:A2P MULTI TPC : $2-$4 M TOTAL 4YR COST : 1.600 0.400 0.400 0.400 0.400



NYSDOT CONSTRUCT REMAINING SECTIONS OF RECREATIONAL TRAIL ALONG THE NFA 2012 0.084 CONINSP 0.084

UNDEVELOPED NY25A BYPASS ROW - PHASE 2 POSSUM LANE TO NY112 AND NFA 2012 0.833 CONST 0.833

080797 NY25A TO GNARLED HOLLOW RD IN BROOKHAVEN TOWN, SUFFOLK COUNTY.





AQC:C2P SUFFOLK TPC : $0.6-$1.5 M TOTAL 4YR COST : 0.917 0.000 0.917 0.000 0.000



NYSDOT CORRECT PRIORITY HIGHWAY FLOODING LOCATIONS AND REPLACE CATCH STP FLEX 2011 0.759 CONINSP 0.759

BASINS WITHIN ESTUARY WATERSHED AREAS WITH VORTEX TYPE BASINS ON NFA 2011 0.190 CONINSP 0.190

080810 VARIOUS STATE HIGHWAYS IN NASSAU & SUFFOLK COUNTIES. STP FLEX 2011 7.589 CONST 7.589

NFA 2011 1.900 CONST 1.900

AQC:A2P MULTI TPC : $9.5-15.5 M TOTAL 4YR COST : 10.438 10.438 0.000 0.000 0.000



NYSDOT BRIDGE PARAPET REPLACEMENTS TO MAINTAIN STATE OF GOOD REPAIR IN THE NFA 2012 1.246 CONINSP 1.246

TOWNS OF BABYLON, HEMPSTEAD & ISLIP, NASSAU & SUFFOLK COUNTIES. NFA 2012 12.460 CONST 12.460

080812

AQC:A19P MULTI TPC : $12.5-$19 M TOTAL 4YR COST : 13.706 0.000 13.706 0.000 0.000



NYSDOT PROVIDE MAINTENANCE TO COMMUNICATION EQUIPMENT INCLUD. ALL NHS 2012 5.600 OPER 5.600

COMPUTERIZED TRAFFIC MANAGEMENT SYSTEMS, VIDEO SURVEILLANCE & NFA 2012 1.400 OPER 1.400

080814 DETECTORS, VARIABLE MESSAGE SIGNS, HIGHWAY ADVISORY RADIO & NHS 2013 5.600 OPER 5.600

RELATED EQUIP. TO MAINT. STATE OF GOOD REPAIR IN NASSAU AND SUFFOLK NFA 2013 1.400 OPER 1.400

CO.

AQC:A6P MULTI TPC : $26-$40 M TOTAL 4YR COST : 14.000 0.000 7.000 7.000 0.000



NYSDOT CORRECT PRIORITY HIGHWAY FLOODING LOCATIONS AND REPLACE CATCH STP FLEX 2012 0.430 CONINSP 0.430

BASINS WITHIN ESTUARY WATERSHED AREAS WITH VORTEX TYPE BASINS ON NFA 2012 0.107 CONINSP 0.107

080821 VARIOUS STATE HIGHWAYS IN NASSAU & SUFFOLK COUNTIES. STP FLEX 2012 4.300 CONST 4.300

NFA 2012 1.075 CONST 1.075

AQC:A2P MULTI TPC : $6-$9.4 M TOTAL 4YR COST : 5.912 0.000 5.912 0.000 0.000

** NEW YORK STATE DEPARTMENT OF TRANSPORTATION **

Friday, August 26, 2011 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) on Draft Program Page 19 of 84

for REGION 10

AGENCY PROJECT DESCRIPTION TOTAL 4-YEAR PROGRAM (FFY)

4-YEAR PHASE Starting October 01, 2010

FUND SOURCES FFY

PIN PROGRAM

FFY FFY FFY FFY

in millions

of dollars 2011 2012 2013 2014

AQ CODE COUNTY TOTAL PROJECT COST



NYSDOT INTERSECTION SAFETY IMPROVEMENTS TO EXTEND ACCELERATION AND CMAQ 2011 0.209 PRELDES 0.209

DECELERATION LANES NORTHERN STATE PARKWAY AT NY135, SOUTHERN NFA 2011 0.052 PRELDES 0.052

080823 STATE PARKWAY AT EAGLE AVENUE, NSP AT WILLIS AVENUE, SUNKEN CMAQ 2013 0.172 CONINSP 0.172

MEADOW PARKWAY AT NORTHERN STATE PARKWAY, NSP AT SO OYSTER BAY NFA CONINSP

2013 0.043 0.043

RD

CMAQ 2013 1.720 CONST 1.720

NFA 2013 0.430 CONST 0.430

HSIP 2013 0.270 CONINSP 0.270

NFA 2013 0.068 CONINSP 0.068

HSIP 2013 2.700 CONST 2.700

NFA 2013 0.300 CONST 0.300

AQC:D2P MULTI TPC : $4.6-$7.5 M TOTAL 4YR COST : 5.964 0.261 0.000 5.703 0.000



NYSDOT REIMBURSEMENTS FOR NASSAU POLICE FOR CONSTRUCTION AND NFA 2011 0.650 MISC 0.650

MAINTENANCE OPERATIONS NFA 2012 0.650 MISC 0.650

080825 NFA 2013 0.650 MISC 0.650

NFA 2014 0.650 MISC 0.650

AQC:A2S NASSAU TPC : $3.3-$5.6 M TOTAL 4YR COST : 2.600 0.650 0.650 0.650 0.650



NYSDOT REIMBURSEMENT FOR SUFFOLK COUNTY POLICE WORK FOR CONSTRUCTION NFA 2011 0.650 MISC 0.650

AND MAINTENANCE OPERATIONS NFA 2012 0.650 MISC 0.650

080826 NFA 2013 0.650 MISC 0.650

NFA 2014 0.650 MISC 0.650

AQC:A2S SUFFOLK TPC : $3.3-$5.6 M TOTAL 4YR COST : 2.600 0.650 0.650 0.650 0.650



NYSDOT RESTORE THE STRUCTURAL INTEGRITY OF DRAINAGE BASINS AND PIPES, AND NFA 2011 0.743 PRELDES 0.743

CONTROL FLOODING AT 8 LOCATIONS ON VARIOUS STATE ROADWAYS IN THE STP FLEX 2014 0.441 CONINSP 0.441

080838 TOWNS OF BABYLON, HUNTINGTON & ISLIP IN SUFFOLK COUNTY. NFA 2014 0.110 CONINSP 0.110

STP FLEX 2014 4.407 CONST 4.407

NFA 2014 1.102 CONST 1.102

AQC:C11P MULTI TPC : $6-$9.4 M TOTAL 4YR COST : 6.803 0.743 0.000 0.000 6.060



NYSDOT PROVIDE LANDSCAPE RESTORATION & MAINTAIN EXISTING LANDSCAPE AREAS, NFA 2011 0.238 CONINSP 0.238

TRIM OR REMOVE TREES THAT IMPEDE VISIBILITY ON VARIOUS STATE NFA 2011 1.983 CONST 1.983

080847 HIGHWAYS IN NASSAU & SUFFOLK COUNTIES. LOCATIONS TO BE DETERMINED.



AQC:C11S MULTI TPC : $2-$4 M TOTAL 4YR COST : 2.221 2.221 0.000 0.000 0.000

** NEW YORK STATE DEPARTMENT OF TRANSPORTATION **

Friday, August 26, 2011 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) on Draft Program Page 20 of 84

for REGION 10

AGENCY PROJECT DESCRIPTION TOTAL 4-YEAR PROGRAM (FFY)

4-YEAR PHASE Starting October 01, 2010

FUND SOURCES FFY

PIN PROGRAM

FFY FFY FFY FFY

in millions

of dollars 2011 2012 2013 2014

AQ CODE COUNTY TOTAL PROJECT COST



NYSDOT REPAIR AND REPLACE GUIDERAIL SECTIONS ON SOUTHERN STATE PARKWAY NFA 2011 1.040 CONINSP 1.040

AND OCEAN PARKWAY TO MAINTAIN A STATE OF GOOD REPAIR IN THE TOWNS NFA 2011 10.400 CONST 10.400

080852 OF BABYLON, HEMPSTEAD, ISLIP & OYSTER BAY - NASSAU & SUFFOLK

COUNTIES.

AQC:A9P NASSAU TPC : $9.5-15.5 M TOTAL 4YR COST : 11.440 11.440 0.000 0.000 0.000



NYSDOT DRAINAGE IMPROVEMENT BLOCK - CORRECT DEBILITATED DRAINAGE STP LG URBAN 2011 0.199 CONINSP 0.199

SYSTEMS OR INDIVIDUAL BASINS, RESTORE STRUCTURAL INTEGRITY OF NFA 2011 0.050 CONINSP 0.050

080857 DRAINAGE STRUCTURES/PIPES, CONTROL FLOODING ON ROUTES 24, 102 AND 25 STP LG URBAN 2011 1.616 CONST 1.616

IN HEMPSTEAD & N. HEMPSTEAD TOWNS IN NASSAU COUNTY. NFA 0.404 CONST 0.404

2011

AQC:A2P NASSAU TPC : $2-$4 M TOTAL 4YR COST : 2.269 2.269 0.000 0.000 0.000



NYSDOT DRAINAGE IMPROVEMENT BLOCK - CORRECT DEBILITATED DRAINAGE STP LG URBAN 2011 0.068 CONINSP 0.068

SYSTEMS OR INDIVIDUAL BASINS, RESTORE STRUCTURAL INTEGRITY OF NFA 2011 0.340 CONINSP 0.340

080858 DRAINAGE STRUCTURES/PIPES, CONTROL FLOODING ON ROUTES 25 AND 908K IN STP LG URBAN 2011 0.675 CONST 0.675

SUFFOLK COUNTY NFA 2011 3.537 CONST 3.537

AQC:A2P SUFFOLK TPC : $4.6-$7.5 M TOTAL 4YR COST : 4.620 4.620 0.000 0.000 0.000



NYSDOT REPAIR DETERIORATED STEEL GIRDER, INCREASE STRUCTURAL CONDITION, IM 2011 0.594 CONINSP 0.594

REMOVAL STRUCTURE FLAGS AND INCREASE THEIR RATINGS ON 16 BRIDGES IN NFA 2011 1.192 CONINSP 1.192

080860 NASSAU AND SUFFOLK COUNTIES. IM 2011 5.374 CONST 5.374

NFA 2011 11.929 CONST 11.929

AQC:C19P MULTI TPC : $15-$25 M TOTAL 4YR COST : 19.089 19.089 0.000 0.000 0.000



NYSDOT REPLACE PANELS OF OVERHEAD SIGNS WITH NEWER MORE RETRO REFLECTIVE NFA 2012 1.180 CONINSP 1.180

SIGNS TO MAINTAIN STATE OF GOOD REPAIR ON FEDERAL AID HIGHWAYS IN NFA 2012 11.800 CONST 11.800

080861 NASSAU AND SUFFOLK COUNTIES.

AQC:C13P MULTI TPC : $9.5-15.5 M TOTAL 4YR COST : 12.980 0.000 12.980 0.000 0.000



NYSDOT REHABILITATION AND REPAIR 10 CONCRETE ARCH BRIDGES TO MAINTAIN NFA 2011 0.700 CONINSP 0.700

STRUCTURAL INTEGRITY IN BABYLON TOWN, HEMPSTEAD TOWN, HUNTINGTON NFA 2011 7.000 CONST 7.000

080863 TOWN & OYSTER BAY TOWN IN NASSAU & SUFFOLK COUNTIES.





AQC:A19Z MULTI TPC : $7.5-$12 M TOTAL 4YR COST : 7.700 7.700 0.000 0.000 0.000

** NEW YORK STATE DEPARTMENT OF TRANSPORTATION **

Friday, August 26, 2011 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) on Draft Program Page 21 of 84

for REGION 10

AGENCY PROJECT DESCRIPTION TOTAL 4-YEAR PROGRAM (FFY)

4-YEAR PHASE Starting October 01, 2010

FUND SOURCES FFY

PIN PROGRAM

FFY FFY FFY FFY

in millions

of dollars 2011 2012 2013 2014

AQ CODE COUNTY TOTAL PROJECT COST



NYSDOT PREVENTATIVE MAINTENANCE BRIDGE REPAIRS TO MAINTAIN STRUCTURAL HBRR 2012 0.207 CONINSP 0.207

INTEGRITY IN NASSAU & SUFFOLK COUNTIES. (FORMERLY PIN: 0T1465) NFA 2012 0.052 CONINSP 0.052

080865 HBRR 2012 1.721 CONST 1.721

NFA 2012 0.431 CONST 0.431

AQC:A19P MULTI TPC : $2-$4 M TOTAL 4YR COST : 2.411 0.000 2.411 0.000 0.000



NYSDOT REHABILITATE 15 RECHARGE BASINS TO MAINTAIN STATE OF GOOD REPAIR ON NFA 2011 0.253 CONINSP 0.253

VARIOUS STATE HIGHWAYS IN BABYLON TOWN & HUNTINGTON TOWN IN NFA 2011 2.112 CONST 2.112

080866 SUFFOLK COUNTY.

AQC:A2S MULTI TPC : $2-$4 M TOTAL 4YR COST : 2.365 2.365 0.000 0.000 0.000



NYSDOT CLEAN CULVERTS FILLED WITH DEBRIS, REPAIR DAMAGED OR IN-NEED NFA 2011 0.238 CONINSP 0.238

CULVERTS TO PREVENT HIGHWAY FLOODING ON VARIOUS STATE HIGHWAYS IN NFA 2011 1.984 CONST 1.984

080870 NASSAU & SUFFOLK COUNTIES.

AQC:A6S MULTI TPC : $2-$4 M TOTAL 4YR COST : 2.222 2.222 0.000 0.000 0.000



NYSDOT REMOVAL OR PAINT OVER OF GRAF, REPAIR NOISE WALLS WHERE WOOD &/OR NFA 2011 0.322 CONINSP 0.322

PLASTIC PLANKING HAS WARPED, MAINTAIN THE 7 PARK & RIDE LOTS ALONG NFA 2011 3.219 CONST 3.219

080872 I495, ALL NYS BIKEWAYS, REST AREAS, PUBLIC TELEPHONE AREAS ALONG

PARKWAYS & BUS SHELTERS ON NYS RIGHT-OF-WAY NAS&SUF CO.

AQC:C8S MULTI TPC : $3.3-$5.6 M TOTAL 4YR COST : 3.541 3.541 0.000 0.000 0.000



NYSDOT IMPROVE DEBILITATED DRAINAGE SYSTEMS AND ISOLATED FLOODING AREAS; NFA 2011 0.638 DETLDES 0.638

CONTROL FLOODING TO PROMOTE SAFER TRAFFIC MOVEMENT; IMPROVE NFA 2011 0.051 SCOPING 0.051

080874 QUALITY OF HIGHWAY RUNOFF TO ADJACENT SURFACE WATERS IN THE TOWNS NFA 2013 1.150 ROWACQU 1.150

OF E. HAMPTON, RIVERHEAD, SOUTHAMPTON & SOUTHOLD, SUFFOLK CO. NFA CONINSP

2014 0.681 0.681

NFA 2014 6.809 CONST 6.809

AQC:A2P SUFFOLK TPC : $7.5-$12 M TOTAL 4YR COST : 9.329 0.689 0.000 1.150 7.490



NYSDOT RESPOND TO EMERGENCIES THAT ARE BEYOND THE CAPABILITIES OF NYS NFA 2011 0.249 CONINSP 0.249

MAINTENANCE FORCES TO ENSURE THE SAFETY OF THE PUBLIC ON VARIOUS NFA 2011 2.077 CONST 2.077

080875 STATE HIGHWAYS IN NASSAU & SUFFOLK COUNTIES.

AQC:A2S MULTI TPC : $2-$4 M TOTAL 4YR COST : 2.326 2.326 0.000 0.000 0.000

** NEW YORK STATE DEPARTMENT OF TRANSPORTATION **

Friday, August 26, 2011 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) on Draft Program Page 22 of 84

for REGION 10

AGENCY PROJECT DESCRIPTION TOTAL 4-YEAR PROGRAM (FFY)

4-YEAR PHASE Starting October 01, 2010

FUND SOURCES FFY

PIN PROGRAM

FFY FFY FFY FFY

in millions

of dollars 2011 2012 2013 2014

AQ CODE COUNTY TOTAL PROJECT COST



NYSDOT PROVIDE BRIDGE REPAIRS ON AN AS-NEEDED OR EMERGENCY BASIS ON NFA 2011 0.258 CONINSP 0.258

VARIOUS STATE HIGHWAYS IN NASSAU & SUFFOLK COUNTIES. NFA 2011 2.147 CONST 2.147

080876

AQC:A19S MULTI TPC : $2-$4 M TOTAL 4YR COST : 2.405 2.405 0.000 0.000 0.000



NYSDOT PROVIDE FOR AMERICANS WITH DISABILITES ACT REQUIREMENTS, INCLUDING NFA 2012 0.267 CONINSP 0.267

ADDITIONAL SIGNING, PAVEMENT MARKINGS, REPAIR DRAINAGE GRATES NFA 2012 2.223 CONST 2.223

080877 ALONG EXISTING ON STREET BIKEPATHS CONST OR REHAB PEDESTRIAN

FACILITIES IN NASSAU & SUFFOLK COUNTIES.

AQC:C2P MULTI TPC : $2-$4 M TOTAL 4YR COST : 2.490 0.000 2.490 0.000 0.000



NYSDOT INSTALLATION AND REPLACEMENT OF DETERIORATED PAVEMENT MARKINGS NFA 2011 0.496 CONINSP 0.496

& PLOWABLE REFLECTIVE MARKERS ON VARIOUS STATE HIGHWAYS & NFA 2011 4.958 CONST 4.958

080878 PARKWAYS IN NASSAU & SUFFOLK COUNTIES.

AQC:A10P MULTI TPC : $4.6-$7.5 M TOTAL 4YR COST : 5.454 5.454 0.000 0.000 0.000



NYSDOT BRIDGE PARAPET RECONSTRUCTION TO UPGRADE NON STANDARD PARAPET, NFA 2011 0.505 CONINSP 0.505

TOWN OF HEMPSTEAD, NASSAU COUNTY. BIN # 1057651, 1057652, 1058550, 1058560, NFA 2011 5.050 CONST 5.050

080879 1059651 & 1059652.

AQC:A19S MULTI TPC : $4.6-$7.5 M TOTAL 4YR COST : 5.555 5.555 0.000 0.000 0.000



NYSDOT BRIDGE PARAPET RECONSTRUCTION TO UPGRADE NON STANDARD PARAPET IN NFA 2011 0.278 DETLDES 0.278

THE TOWNS OF HEMPSTEAD, OYSTER BAY & SMITHTOWN, NASSAU & SUFFOLK NFA 2012 0.523 CONINSP 0.523

080880 COUNTIES. BIN # 1058260, 1059080, 1059189, 1059440 & 5059069. NFA 2012 5.228 CONST 5.228



AQC:A10S MULTI TPC : $4.6-$7.5 M TOTAL 4YR COST : 6.029 0.278 5.751 0.000 0.000



NYSDOT CLEAN BASINS FILLED W/ DEBRIS, REPAIR, REPLACE OR PROVIDE MISSING STP FLEX 2011 0.100 CONINSP 0.100

COLLARS, REPAIR BASIN WALLS, CLEAN CLOGGED PIPES, REPAIR OR REPLACE NFA 2011 0.025 CONINSP 0.025

080881 GRATES, REPLACE BASINS, PROVIDE NEW BASINS, CONNECT ISOLATED BASINS STP FLEX 2011 0.830 CONST 0.830

TO DRAINAGE SYSTEM NAS/SUF CO. TO PREVENT FLOODING NFA 2011 0.211 CONST 0.211



AQC:A10P MULTI TPC : $2-$4 M TOTAL 4YR COST : 1.166 1.166 0.000 0.000 0.000

** NEW YORK STATE DEPARTMENT OF TRANSPORTATION **

Friday, August 26, 2011 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) on Draft Program Page 23 of 84

for REGION 10

AGENCY PROJECT DESCRIPTION TOTAL 4-YEAR PROGRAM (FFY)

4-YEAR PHASE Starting October 01, 2010

FUND SOURCES FFY

PIN PROGRAM

FFY FFY FFY FFY

in millions

of dollars 2011 2012 2013 2014

AQ CODE COUNTY TOTAL PROJECT COST



NYSDOT RESPOND TO EMERGENCIES AND NEEDED REPAIRS THAT ARE BEYOND THE NFA 2011 0.120 CONINSP 0.120

CAPABILITIES OF NYS MAINTENANCE FORCES TO ENSURE THE SAFETY OF THE NFA 2011 1.000 CONST 1.000

080882 PUBLIC ON VARIOUS STATE HIGHWAYS IN NASSAU & SUFFOLK COUNTIES.

(FORMERLY PIN: 0T2011)

AQC:C14P NASSAU TPC : $2-$4 M TOTAL 4YR COST : 1.120 1.120 0.000 0.000 0.000



NYSDOT FUNDING FOR NEW BUS SERVICE TO REDUCE VMT AND IMPROVE AIR QUALITY CMAQ 2012 1.000 OPER 1.000

TO BE DEVELOPED BY PUBLIC TRANSIT OPERATORS NFA 2012 0.250 OPER 0.250

080883 CMAQ 2013 1.000 OPER 1.000

NFA 2013 0.250 OPER 0.250

CMAQ 2014 1.000 OPER 1.000

NFA 2014 0.250 OPER 0.250

AQC:C1P MULTI TPC : $7.5-$12 M TOTAL 4YR COST : 3.750 0.000 1.250 1.250 1.250



NYSDOT REPLACE OR UPGRADE SIGNALS AND/OR APPURTENANCES & INSTALL NEW NFA 2011 0.316 CONINSP 0.316

SIGNALS TO MAINTAIN STATE OF GOOD REPAIR ON VARIOUS STATE HIGHWAYS NFA 2011 3.162 CONST 3.162

080884 IN NASSAU & SUFFOLK COUNTIES (FORMERLY PIN: 0T1517)

AQC:D2P MULTI TPC : $3.3-$5.6 M TOTAL 4YR COST : 3.478 3.478 0.000 0.000 0.000



NYSDOT PROVIDE EMERGENCY SAFETY & PAVEMENT IMPROVEMENTS REPAIRS ON AN NFA 2011 0.400 CONINSP 0.400

AS-NEEDED-BASIS ON VARIOUS STATE HIGHWAYS IN NASSAU & SUFFOLK NFA 2011 4.000 CONST 4.000

080885 COUNTIES.

AQC:A10P MULTI TPC : $3.3-$5.6 M TOTAL 4YR COST : 4.400 4.400 0.000 0.000 0.000



NYSDOT SIGN REPAIRS & INSTALLATIONS TO MAINTAIN STATE OF GOOD REPAIR ON STP FLEX 2011 0.202 CONINSP 0.202

VARIOUS STATE HIGHWAYS & PARKWAYS IN NASSAU & SUFFOLK NFA 2011 0.050 CONINSP 0.050

080886 COUNTIES(FORMERLY PIN: 0T1700) STP FLEX 2011 1.687 CONST 1.687

NFA 2011 0.422 CONST 0.422

AQC:C13P MULTI TPC : $2-$4 M TOTAL 4YR COST : 2.361 2.361 0.000 0.000 0.000



NYSDOT ROUT & SEAL ASPHALT PAVEMENT CRACKS AND JOINT OVERLAY REPAIR ON STP FLEX 2011 0.192 CONINSP 0.192

NY27 FROM NY106 TO MSP, NY27 MSP TO WSP, I495 EX 52 TO EX 57, SSP NY135 TO NFA 2011 0.169 CONINSP 0.169

080888 SGSP TO MAINTAIN PAVEMENT. TOWNS OF OYSTER BAY, HEMPSTEAD, STP FLEX 2011 1.603 CONST 1.603

BABYLON, HUNTINGTON, ISLIP AND SMITHTOWN,NASSAU & SUFFOLK COUNTIES NFA 2011 1.688 CONST 1.688



AQC:A10P MULTI TPC : $4.6-$7.5 M TOTAL 4YR COST : 3.652 3.652 0.000 0.000 0.000

** NEW YORK STATE DEPARTMENT OF TRANSPORTATION **

Friday, August 26, 2011 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) on Draft Program Page 24 of 84

for REGION 10

AGENCY PROJECT DESCRIPTION TOTAL 4-YEAR PROGRAM (FFY)

4-YEAR PHASE Starting October 01, 2010

FUND SOURCES FFY

PIN PROGRAM

FFY FFY FFY FFY

in millions

of dollars 2011 2012 2013 2014

AQ CODE COUNTY TOTAL PROJECT COST



NYSDOT REHABILITATE RECHARGE BASINS INCLUDING SLOPE STABILIZATION, HEAD NFA 2011 0.149 DETLDES 0.149

WALL REPAIR, ET AL(LOCATIONS TO-BE-DETERMINED) TO MAINTAIN STATE OF NFA 2012 0.258 CONINSP 0.258

080889 GOOD REPAIR ON VARIOUS STATE HIGHWAYS IN NASSAU & SUFFOLK COUNTIES. NFA 2012 2.151 CONST 2.151



AQC:A2P MULTI TPC : $2-$4 M TOTAL 4YR COST : 2.558 0.149 2.409 0.000 0.000



NYSDOT REHABILITATE RECHARGE BASINS INCLUDING SLOPE STABILIZATION, HEAD NFA 2012 0.152 DETLDES 0.152

WALL REPAIR, ET AL(LOCATIONS TO-BE-DETERMINED) TO MAINTAIN STATE OF NFA 2013 0.265 CONINSP 0.265

080891 GOOD REPAIR ON VARIOUS STATE HIGHWAYS IN NASSAU & SUFFOLK COUNTIES. NFA 2013 2.206 CONST 2.206



AQC:A2P MULTI TPC : $2-$4 M TOTAL 4YR COST : 2.623 0.000 0.152 2.471 0.000



NYSDOT BRIDGE CLEANING CONTRACT ON VARIOUS STATE HIGHWAYS TO MAINTAIN HBRR 2011 0.101 CONINSP 0.101

STRUCTURAL INTEGRITY IN NASSAU & SUFFOLK COUNTIES. 0T1713 NFA 2011 0.025 CONINSP 0.025

080892 HBRR 2011 0.843 CONST 0.843

NFA 2011 0.211 CONST 0.211

NFA 2011 0.056 DETLDES 0.056

AQC:A19P MULTI TPC : $1.2-$2.5 M TOTAL 4YR COST : 1.236 1.236 0.000 0.000 0.000



NYSDOT CORRECT PRIORITY HIGHWAY FOODING LOCATIONS, PROVIDE STORMWATER NFA 2013 0.160 DETLDES 0.160

RUN-OFF IMPROVEMENTS INCLUDING 1 LOC IN TOWN OF RIVERHEAD FOR

080894 SAFETEA-LU EARMARK & OTHER LOC NAS & SUF.

AQC:C11P MULTI TPC : $6-$9.4 M TOTAL 4YR COST : 0.160 0.000 0.000 0.160 0.000



NYSDOT CLEAN BASINS FILLED W/DEBRIS, REPAIR, REPLACE OR PROVIDE MISSING NFA 2011 0.090 DETLDES 0.090

COLLARS, REPAIR BASIN WALLS, CLEAN CLOGGED PIPES, REPAIR OR REPLACE STP FLEX 2012 0.103 CONINSP 0.103

080895 BROKEN PIPES, REPLACE GRATES, REPLACE BASINS, PROVIDE CONNECT NFA 2012 0.026 CONINSP 0.026

ISOLATED BASINS TO DRAINAGE SYSTEM TO PREVENT HIGHWAY FLOODING

STP FLEX 2012 0.860 CONST 0.860

NASSAU AND SUFFOLK COUNTY

NFA 2012 0.215 CONST 0.215

AQC:A10P MULTI TPC : $1.2-$2.5 M TOTAL 4YR COST : 1.294 0.090 1.204 0.000 0.000



NYSDOT CONSULTANT CONTRACT TO PROVIDETRAFFIC SIGNAL & MISC DESIGN NFA 2011 0.300 DETLDES 0.300

TASKS.TRAFFIC SIGNAL & MISC. DESIGN TASKS CONULTANT CONTRACT NFA 2012 0.300 DETLDES 0.300

080896 (LOCATIONS TO BE DETEREMINED) AT VARIOUS HIGHWAYS AND PARKWAYS IN NFA 2013 0.300 DETLDES 0.300

NASSAU & SUFFOLK COUNTIES. NFA DETLDES

2014 0.300 0.300

0T2398

AQC:A7P MULTI TPC : $1.2-$2.5 M TOTAL 4YR COST : 1.200 0.300 0.300 0.300 0.300

** NEW YORK STATE DEPARTMENT OF TRANSPORTATION **

Friday, August 26, 2011 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) on Draft Program Page 25 of 84

for REGION 10

AGENCY PROJECT DESCRIPTION TOTAL 4-YEAR PROGRAM (FFY)

4-YEAR PHASE Starting October 01, 2010

FUND SOURCES FFY

PIN PROGRAM

FFY FFY FFY FFY

in millions

of dollars 2011 2012 2013 2014

AQ CODE COUNTY TOTAL PROJECT COST



NYSDOT INSTALLATION AND REPLACEMENT OF DETERIORATED PAVEMENT MARKINGS NFA 2011 0.449 DETLDES 0.449

& PLOWABLE REFLECTIVE MARKERS ON VARIOUS STATE HIGHWAYS & STP FLEX 2012 0.422 CONINSP 0.422

080898 PARKWAYS IN NASSAU & SUFFOLK COUNTIES. NFA 2012 0.406 CONINSP 0.406

STP FLEX 2012 4.216 CONST 4.216

NFA 2012 4.066 CONST 4.066

AQC:A10P MULTI TPC : $7.5-$12 M TOTAL 4YR COST : 9.559 0.449 9.110 0.000 0.000



NASSAU CO. THE COUNTY HAS INITIATED AN ALTERNATIVES ANALYSIS TO EXAMINE FTA 5309 2011 0.990 SCOPING 0.990

OPPORTUNITIES FOR INTRODUCING TRANSIT IMPROVEMENTS AND IDENTIFY NFA 2011 0.247 SCOPING 0.247

082498 LAND USE STRATEGIES TO PROMOTE ECONOMIC DEVELOPMENT, AND IMPROVE HPP 2011 5.771 SCOPING 5.771

ACCESS, REGIONAL CONNECTIVITY AND MOBILITY IN THE NASSAU HUB. NFA 1.443 SCOPING 1.443

2011



AQC:C3P NASSAU TPC : $7.5-$12 M TOTAL 4YR COST : 8.451 8.451 0.000 0.000 0.000



MTA-LI BUS / PURCHASE 48 REPLACEMENT CNG 40' BUSES INSPECTION SERVICES & SPARE CMAQ 2011 4.500 MISC 4.500

NASSAU PARTS - TO MAINTAIN OPERATING EFFICIENCY, CAPACITY, AND THE NFA 2011 1.126 MISC 1.126

082565 CONTINUED USE OF ALTERNATIVE FUEL FTA 5307 2011 1.200 MISC 1.200

NFA 2011 0.300 MISC 0.300

CMAQ 2013 1.500 MISC 1.500

NFA 2013 0.376 MISC 0.376

FTA 5307 2013 0.368 MISC 0.368

NFA 2013 0.092 MISC 0.092

AQC:B10P NASSAU TPC : $15-$25 M TOTAL 4YR COST : 9.462 7.126 0.000 2.336 0.000



MTA-LI BUS / ENGINEERING/DESIGN SERVICES - TO PROVIDE GENERAL ENGINEERING NEEDS FTA 5307 2011 0.240 MISC 0.240

NASSAU TO SUPPORT THE CAPITAL PROGRAM NFA 2011 0.060 MISC 0.060

082572 FTA 5307 2012 0.240 MISC 0.240

NFA 2012 0.060 MISC 0.060

FTA 5307 2013 0.240 MISC 0.240

NFA 2013 0.060 MISC 0.060

AQC:C7P NASSAU TPC : $2-$4 M TOTAL 4YR COST : 0.900 0.300 0.300 0.300 0.000



MTA-LI BUS / ITS CUSTOMER INFORMATION & VEHICLE LOCATION/MONITORING SYSTEM - TO FTA 5307 2011 6.720 MISC 6.720

NASSAU INSTALL A NEW CUSTOMER INFORMATION SYSTEM AND UPGRADE THE NFA 2011 1.680 MISC 1.680

082577 VEHICLE LOCATION AND MONITORING SYSTEMS FTA 5307 2012 3.200 MISC 3.200

NFA 2012 0.800 MISC 0.800

AQC:B6P NASSAU TPC : $9.5-15.5 M TOTAL 4YR COST : 12.400 8.400 4.000 0.000 0.000

** NEW YORK STATE DEPARTMENT OF TRANSPORTATION **

Friday, August 26, 2011 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) on Draft Program Page 26 of 84

for REGION 10

AGENCY PROJECT DESCRIPTION TOTAL 4-YEAR PROGRAM (FFY)

4-YEAR PHASE Starting October 01, 2010

FUND SOURCES FFY

PIN PROGRAM

FFY FFY FFY FFY

in millions

of dollars 2011 2012 2013 2014

AQ CODE COUNTY TOTAL PROJECT COST



MTA-LI BUS / PURCHASE NEW/REPLACEMENT SERVICE SUPPORT EQUIPMENT, AND VEHICLES FTA 5307 2011 0.720 MISC 0.720

NASSAU THAT ARE BEYOND THEIR USEFUL LIVES NFA 2011 0.180 MISC 0.180

082582 FTA 5307 2012 0.720 MISC 0.720

NFA 2012 0.180 MISC 0.180

FTA 5307 2013 1.072 MISC 1.072

NFA 2013 0.268 MISC 0.268

FTA 5307 2014 0.400 MISC 0.400

NFA 2014 0.100 MISC 0.100

AQC:B1P NASSAU TPC : $3.3-$5.6 M TOTAL 4YR COST : 3.640 0.900 0.900 1.340 0.500



MTA-LI BUS / FACILITY CAPITAL REPLACEMENT/IMPROVEMENT - TO MAINTAIN THE FTA 5307 2011 1.600 MISC 1.600

NASSAU FACILITIES IN A STATE OF GOOD REPAIR NFA 2011 0.400 MISC 0.400

082584 FTA 5307 2012 1.280 MISC 1.280

NFA 2012 0.320 MISC 0.320

FTA 5307 2013 1.000 MISC 1.000

NFA 2013 0.250 MISC 0.250

FTA 5307 2014 0.400 MISC 0.400

NFA 2014 0.100 MISC 0.100

AQC:B8P NASSAU TPC : $9.5-15.5 M TOTAL 4YR COST : 5.350 2.000 1.600 1.250 0.500



MTA-LI BUS / PREVENTIVE MAINTENANCE - TO MAINTAIN THE OPERATION IN A STATE OF FTA 5307 2011 6.000 MISC 6.000

NASSAU GOOD REPAIR NFA 2011 1.500 MISC 1.500

082588 FTA 5307 2012 6.124 MISC 6.124

NFA 2012 1.531 MISC 1.531

FTA 5307 2013 6.000 MISC 6.000

NFA 2013 1.500 MISC 1.500

FTA 5307 2014 6.000 MISC 6.000

NFA 2014 1.500 MISC 1.500

AQC:B1P NASSAU TPC : $40-$60 M TOTAL 4YR COST : 30.155 7.500 7.655 7.500 7.500



MTA-LI BUS / MITCHEL FIELD CNG FACILITY MODIFICATIONS - TO REPLACE CNG OPERATING FTA 5308 2011 5.810 MISC 5.810

NASSAU SYSTEMS THAT HAVE REACHED THE END OF THEIR USEFUL LIFE NFA 2011 1.190 MISC 1.190

082593

AQC:B8P NASSAU TPC : $6-$9.4 M TOTAL 4YR COST : 7.000 7.000 0.000 0.000 0.000

** NEW YORK STATE DEPARTMENT OF TRANSPORTATION **

Friday, August 26, 2011 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) on Draft Program Page 27 of 84

for REGION 10

AGENCY PROJECT DESCRIPTION TOTAL 4-YEAR PROGRAM (FFY)

4-YEAR PHASE Starting October 01, 2010

FUND SOURCES FFY

PIN PROGRAM

FFY FFY FFY FFY

in millions

of dollars 2011 2012 2013 2014

AQ CODE COUNTY TOTAL PROJECT COST



MTA-LI BUS / PURCHASE 40 CNG 40' BUSES, INSPECTION SERVICES & SPARE PARTS - 37 REPL/3 CMAQ 2012 8.000 MISC 8.000

NASSAU EXP - TO MAINTAIN OPERATING EFFICIENCY, CAPACITY, AND THE CONTINUED NFA 2012 2.000 MISC 2.000

082594 USE OF ALTERNATIVE FUEL FTA 5307 2012 0.380 MISC 0.380

NFA 2012 0.092 MISC 0.092

FTA 5309 2013 5.920 MISC 5.920

NFA 2013 1.480 MISC 1.480

AQC:B10Z NASSAU TPC : $15-$25 M TOTAL 4YR COST : 17.872 0.000 10.472 7.400 0.000



MTA-LI BUS / PURCHASE 80 CNG 40' REPLACEMENT BUSES, INSPECTION SERVICES & SPARE CMAQ 2014 5.000 MISC 5.000

NASSAU PARTS - TO MAINTAIN OPERATING EFFICIENCY, CAPACITY, AND THE NFA 2014 1.250 MISC 1.250

082595 CONTINUED USE OF ALTERNATIVE FUEL FTA 5307 2014 3.944 MISC 3.944

NFA 2014 0.986 MISC 0.986

FTA 5309 2014 1.600 MISC 1.600

NFA 2014 0.400 MISC 0.400

AQC:B10P NASSAU TPC : $32-$50 M TOTAL 4YR COST : 13.180 0.000 0.000 0.000 13.180



MTA-LI BUS / PURCHASE 63 REPLACEMENT PARATRANSIT VEHICLES -TO MAINTAIN FTA 5307 2013 4.104 MISC 4.104

NASSAU OPERATING EFFICIENCY, AND CAPACITY NFA 2013 1.026 MISC 1.026

082596

AQC:B10P NASSAU TPC : $4.6-$7.5 M TOTAL 4YR COST : 5.130 0.000 0.000 5.130 0.000



MTA-LI BUS / PURCHASE 33 PARATRANSIT VEHICLES -30 REPL/3 EXP - TO MAINTAIN FTA 5307 2014 2.040 MISC 2.040

NASSAU OPERATING EFFICIENCY, AND CAPACITY NFA 2014 0.510 MISC 0.510

082597

AQC:B10P NASSAU TPC : $3.3-$5.6 M TOTAL 4YR COST : 2.550 0.000 0.000 0.000 2.550



SUFFOLK CO. PURCHASE OF AN ELECTRONIC FARE COLLECTION SYSTEM FOR BUSES UTILIZED FTA 5307 2012 1.800 MISC 1.800

TRANSIT ON THE FIXED BUS ROUTES THROUGHOUT SUFFOLK COUNTY AND OEPRATED NFA 2012 0.600 MISC 0.600

082600 TO UPGRADE FARE COLLECTION BOX CAPABILITIES FTA 5307 2013 0.560 MISC 0.560

NFA 2013 0.140 MISC 0.140

AQC:B5P SUFFOLK TPC : $2-$4 M TOTAL 4YR COST : 3.100 0.000 2.400 0.700 0.000

** NEW YORK STATE DEPARTMENT OF TRANSPORTATION **

Friday, August 26, 2011 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) on Draft Program Page 28 of 84

for REGION 10

AGENCY PROJECT DESCRIPTION TOTAL 4-YEAR PROGRAM (FFY)

4-YEAR PHASE Starting October 01, 2010

FUND SOURCES FFY

PIN PROGRAM

FFY FFY FFY FFY

in millions

of dollars 2011 2012 2013 2014

AQ CODE COUNTY TOTAL PROJECT COST



SUFFOLK CO. PURCHASE OF DUAL-MODE HYBRID-ELECTRIC TRANSIT BUSES FOR FTA 5307 2011 5.500 MISC 5.500

TRANSIT REPLACEMENT PURPOSES TO BE UTILIZED ON FIXED BUS ROUTES THROUGHOUT NFA 2011 1.376 MISC 1.376

082602 SUFFOLK COUNTY. NY-03-0448 FTA 5307 2012 4.000 MISC 4.000

NFA 2012 1.000 MISC 1.000

FTA 5307 2013 5.500 MISC 5.500

NFA 2013 1.375 MISC 1.375

FTA 5307 2014 5.600 MISC 5.600

NFA 2014 1.400 MISC 1.400

AQC:B10P SUFFOLK TPC : $32-$50 M TOTAL 4YR COST : 25.751 6.876 5.000 6.875 7.000



SUFFOLK CO. PURCHASE PARATRANSIT VEHICLES FOR COMPLEMENTARY SERVICES ADA FTA 5307 2011 0.480 MISC 0.480

TRANSIT WHICH ARE OPERATED IN CONJUCTION WITH THE FIXED BUS ROUTE NFA 2011 0.120 MISC 0.120

082603 OPERATIONS. PRE FY 11NY 90-X648 FTA 5307 2012 0.480 MISC 0.480

NFA 2012 0.120 MISC 0.120

FTA 5307 2013 0.640 MISC 0.640

NFA 2013 0.160 MISC 0.160

FTA 5307 2014 0.800 MISC 0.800

NFA 2014 0.200 MISC 0.200

AQC:B10P SUFFOLK TPC : $4.6-$7.5 M TOTAL 4YR COST : 3.000 0.600 0.600 0.800 1.000



SUFFOLK CO. PREVENTIVE MAINTENANCE FOR SUFFOLK COUNTY TRANSIT BUSES AND FTA 5307 2011 0.720 MISC 0.720

TRANSIT PARATRANSIT VANS. NY-90-X648 NFA 2011 0.180 MISC 0.180

082604 FTA 5307 2012 0.720 MISC 0.720

NFA 2012 0.180 MISC 0.180

FTA 5307 2013 0.800 MISC 0.800

NFA 2013 0.200 MISC 0.200

FTA 5307 2014 0.800 MISC 0.800

NFA 2014 0.200 MISC 0.200

AQC:B3P SUFFOLK TPC : $4.6-$7.5 M TOTAL 4YR COST : 3.800 0.900 0.900 1.000 1.000



SUFFOLK CO. PURCHASE AND INSTALL BUS SHELTERS AT VARIOUS LOCATIONS THROUGHOUT FTA 5307 2011 0.160 MISC 0.160

TRANSIT SUFFOLK COUNTY TO IMPORVE SYSTEM VISIBILITY AND CUSTOMER COMFORT NFA 2011 0.040 MISC 0.040

082606 AND CONVINIENCE. NY-90-X602 FTA 5307 2012 0.160 MISC 0.160

NFA 2012 0.040 MISC 0.040

FTA 5307 2013 0.160 MISC 0.160

NFA 2013 0.040 MISC 0.040

FTA 5307 2014 0.160 MISC 0.160

NFA 2014 0.040 MISC 0.040

AQC:B7P SUFFOLK TPC : $1.2-$2.5 M TOTAL 4YR COST : 0.800 0.200 0.200 0.200 0.200

** NEW YORK STATE DEPARTMENT OF TRANSPORTATION **

Friday, August 26, 2011 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) on Draft Program Page 29 of 84

for REGION 10

AGENCY PROJECT DESCRIPTION TOTAL 4-YEAR PROGRAM (FFY)

4-YEAR PHASE Starting October 01, 2010

FUND SOURCES FFY

PIN PROGRAM

FFY FFY FFY FFY

in millions

of dollars 2011 2012 2013 2014

AQ CODE COUNTY TOTAL PROJECT COST



SUFFOLK CO. COMPLEMENTARY SERVICE -ADA WHICH IS PROVIDED IN CONJUCTION WITH FTA 5307 2011 0.240 MISC 0.240

TRANSIT THE FIXED BUS ROUTE OPERATIONS. NY-90X-648 NFA 2011 0.060 MISC 0.060

082621 FTA 5307 2012 0.240 MISC 0.240

NFA 2012 0.060 MISC 0.060

FTA 5307 2013 0.240 MISC 0.240

NFA 2013 0.060 MISC 0.060

FTA 5307 2014 0.240 MISC 0.240

NFA 2014 0.060 MISC 0.060

AQC:B1P SUFFOLK TPC : $1.2-$2.5 M TOTAL 4YR COST : 1.200 0.300 0.300 0.300 0.300



SUFFOLK CO. CONTINGENCIES FOR SUFFOLKCOUNTY SECTION 5307 GRANT APPLICATIONS. FTA 5307 2011 0.177 MISC 0.177

TRANSIT PRE FFY11 NY-90X-648, FOR FFY2012 EARMARK# E2010-BUSP-151 NFA 2011 0.044 MISC 0.044

082629 FTA 5307 2012 0.179 MISC 0.179

NFA 2012 0.045 MISC 0.045

FTA 5307 2013 0.176 MISC 0.176

NFA 2013 0.044 MISC 0.044

FTA 5307 2014 0.234 MISC 0.234

NFA 2014 0.058 MISC 0.058

AQC:B1 SUFFOLK TPC : $1.2-$2.5 M TOTAL 4YR COST : 0.957 0.221 0.224 0.220 0.292



SUFFOLK CO. PROJECT ADMINISTRATION FOR SUFFOLK COUNTY SECTION 5307 GRANT FTA 5307 2011 0.240 MISC 0.240

TRANSIT APPLICATIONS.PRE FFY11 GRANT# NY-90X-648, NFA 2011 0.060 MISC 0.060

082630 FTA 5307 2012 0.269 MISC 0.269

NFA 2012 0.067 MISC 0.067

FTA 5307 2013 0.270 MISC 0.270

NFA 2013 0.068 MISC 0.068

FTA 5307 2014 0.320 MISC 0.320

NFA 2014 0.080 MISC 0.080

AQC:B1 SUFFOLK TPC : $2-$4 M TOTAL 4YR COST : 1.374 0.300 0.336 0.338 0.400



SUFFOLK CO. COMPRESSED NATURAL GAS (CNG) FLEET VEHICLE PROGRAM- REPLACE CMAQ 2011 1.800 MISC 1.800

APPROXIMATELY 60 COUNTY HEAVY, LIGHT DUTY TRUCKS AND OTHER FLEET NFA 2011 0.450 MISC 0.450

082633 VEHICLES WITH CNG POWERED VEHICLES OR ENGINES AS PART OF THE

SUFFOLK COUNTY GREEN VEHICLE INITIATIVE.

AQC:C14P SUFFOLK TPC : $2-$4 M TOTAL 4YR COST : 2.250 2.250 0.000 0.000 0.000

** NEW YORK STATE DEPARTMENT OF TRANSPORTATION **

Friday, August 26, 2011 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) on Draft Program Page 30 of 84

for REGION 10

AGENCY PROJECT DESCRIPTION TOTAL 4-YEAR PROGRAM (FFY)

4-YEAR PHASE Starting October 01, 2010

FUND SOURCES FFY

PIN PROGRAM

FFY FFY FFY FFY

in millions

of dollars 2011 2012 2013 2014

AQ CODE COUNTY TOTAL PROJECT COST



SUFFOLK CO. HYBRID ELECTRIC-REPLACE 45 COUNTY FLEET VEHICLES WITH ELECTRIC CMAQ 2011 1.100 MISC 1.100

HYBRID VEHICLES AS PART OF THE SUFFOLK COUNTY GREEN VEHICLE NFA 2011 0.275 MISC 0.275

082635 INITIATIVE

AQC:C14P SUFFOLK TPC : $1.2-$2.5 M TOTAL 4YR COST : 1.375 1.375 0.000 0.000 0.000



SUFFOLK CO. COMPRESSED NATUAL GAS (CNG) FLEET VEHICLE - REPLACE 6 COUNTY HEAVY CMAQ 2012 1.250 MISC 1.250

DIESEL TRUCKS WITH CNG TRUCKS AS PART OF THE SUFFOLK COUNTY GREEN NFA 2012 0.313 MISC 0.313

082636 VEHICLE INITIATIVE

AQC:C14P SUFFOLK TPC : $1.2-$2.5 M TOTAL 4YR COST : 1.563 0.000 1.563 0.000 0.000



SUFFOLK CO. COMPRESSED NATURAL GAS (CNG) ENGINE REPLACEMENT- RE-ENGINE 22 CMAQ 2012 1.250 MISC 1.250

COUNTY HEAVY DIESEL TRUCKS WITH CNG ENGINES AS PART OF THE SUFFOLK NFA 2012 0.313 MISC 0.313

082637 COUNTY GREEN VEHICLE INITIATIVE

AQC:K01P SUFFOLK TPC : $1.2-$2.5 M TOTAL 4YR COST : 1.563 0.000 1.563 0.000 0.000



SUFFOLK CO. HYBRID ELECTRIC-REPLACE 52 COUNTY FLEET VEHICLESWITH ELECTRIC CMAQ 2012 1.250 MISC 1.250

HYBRID VEHICLES AS PART OF THE SUFFOLK COUNTY GREEN VEHICLE NFA 2012 0.313 MISC 0.313

082638 INITIATIVE

AQC:C14P SUFFOLK TPC : $1.2-$2.5 M TOTAL 4YR COST : 1.563 0.000 1.563 0.000 0.000



SUFFOLK CO. COMPRESSED NATURAL GAS (CNG) FLEET VEHICLE - REPLACE 6 COUNTY CMAQ 2013 1.250 MISC 1.250

HEAVY DIESEL TRUCKS WITH CNG TRUCKS AS PART OF THE SUFFOLK COUNTY NFA 2013 0.313 MISC 0.313

082639 GREEN INITIATIVE

AQC:C14P SUFFOLK TPC : $1.2-$2.5 M TOTAL 4YR COST : 1.563 0.000 0.000 1.563 0.000



SUFFOLK CO. COMPRESSED NATURAL GAS (CNG) ENGINE REPLACEMENT- RE-ENGINE 22 CMAQ 2013 1.250 MISC 1.250

COUNTY HEAVY DIESEL TRUCKS WITH CNG ENGINES AS PART OF THE SUFFOLK NFA 2013 0.313 MISC 0.313

082640 COUNTY GREEN VEHICLE INITIATIVE

AQC:K01P SUFFOLK TPC : $1.2-$2.5 M TOTAL 4YR COST : 1.563 0.000 0.000 1.563 0.000



SUFFOLK CO. HYBRID ELECTRIC-REPLACE 52 COUNTY FLEET VEHICLES WITH ELECTRIC CMAQ 2013 1.250 MISC 1.250

HYBRID VEHICLES AS PART OF THE SUFFOLK COUNTY GREEN INITIATIVE NFA 2013 0.313 MISC 0.313

082641

AQC:K01P SYSTEM-WIDE TPC : $1.2-$2.5 M TOTAL 4YR COST : 1.563 0.000 0.000 1.563 0.000

** NEW YORK STATE DEPARTMENT OF TRANSPORTATION **

Friday, August 26, 2011 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) on Draft Program Page 31 of 84

for REGION 10

AGENCY PROJECT DESCRIPTION TOTAL 4-YEAR PROGRAM (FFY)

4-YEAR PHASE Starting October 01, 2010

FUND SOURCES FFY

PIN PROGRAM

FFY FFY FFY FFY

in millions

of dollars 2011 2012 2013 2014

AQ CODE COUNTY TOTAL PROJECT COST



SUFFOLK CO. COMPRESSED NATURAL GAS (CNG) FLEET VEHICLE-REPLACE 6 COUNTY HEAVY CMAQ 2014 1.350 MISC 1.350

DIESEL TRUCKS WITH CNG TRUCKS AS PART OF THE SUFFOLK COUNTY GREEN NFA 2014 0.338 MISC 0.338

082642 VEHICLE INITIATIVE.

AQC:C14P SUFFOLK TPC : $1.2-$2.5 M TOTAL 4YR COST : 1.688 0.000 0.000 0.000 1.688



SUFFOLK CO. COMPRESSED NATURAL GAS (CNG) ENGINE REPLACEMENT - RE-ENGINE 24 CMAQ 2014 1.350 MISC 1.350

COUNTY HEAVY DIESELTRUCKS WITH CNG ENGINES AS PART OF THE SUFFOLK NFA 2014 0.338 MISC 0.338

082643 COUNTY GREEN VEHICLE INITIATIVE

AQC:C14P SUFFOLK TPC : $1.2-$2.5 M TOTAL 4YR COST : 1.688 0.000 0.000 0.000 1.688



SUFFOLK CO. HYBRID ELECTRIC-REPLACE 56 COUNTY HEAVY DIESEL TRUCKS WITH CNG CMAQ 2014 1.350 MISC 1.350

ENGINES AS PART OF THE SUFFOLK COUNTY GREEN VEHICLE INITIATIVE NFA 2014 0.338 MISC 0.338

082644

AQC:C14P SUFFOLK TPC : $1.2-$2.5 M TOTAL 4YR COST : 1.688 0.000 0.000 0.000 1.688



LOCAL SUFFOLK COUNTY UNITED VETERANS (SUFFOLK) – PROVIDE FLEXIBLE FTA 5317 2011 0.286 MISC 0.286

TRANSPORTATION SERVICE HAVING TWO SERVICE ROUTES WESTERN AND NFA 2011 0.292 MISC 0.292

082648 EASTERN WILL COVER APPROXIMATELY 70 MILES ROUND TRIPS FOR BOTH

ROUTES TO AND MEETS THE MOBILITY NEEDS OF PEOPLE WITH DISABILITIES





AQC:B1P SUFFOLK TPC : $0.6-$1.5 M TOTAL 4YR COST : 0.578 0.578 0.000 0.000 0.000



NYSERDA NY02 PACKAGED DELIVERY DEMO. PROJECT : USPS ACQUIRE AND DEPLOY FIVE HPP 2012 0.716 MISC 0.716

NEW ADVANCED TECHNOLOGY (HYBRID ELECTRICAL) VEHICLES FOR THE

082649 PURPOSE OF DEMONSTRATION OF GREEN VEHICLE INITIATIVE. (REDUCTION IN

EMISSIONS AND FOSSIL FUEL)OMNIBUS APPROPRIATION ACT 09,





AQC:K1P MULTI TPC : $2-$4 M TOTAL 4YR COST : 0.716 0.000 0.716 0.000 0.000



LONG BEACH REPLACE FOUR ADA PARATRANSIT BUS FTA 5307 2011 0.148 MISC 0.148

NFA 2011 0.035 MISC 0.035

082700

AQC:B10P NASSAU TPC : < $0.75 M TOTAL 4YR COST : 0.183 0.183 0.000 0.000 0.000

** NEW YORK STATE DEPARTMENT OF TRANSPORTATION **

Friday, August 26, 2011 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) on Draft Program Page 32 of 84

for REGION 10

AGENCY PROJECT DESCRIPTION TOTAL 4-YEAR PROGRAM (FFY)

4-YEAR PHASE Starting October 01, 2010

FUND SOURCES FFY

PIN PROGRAM

FFY FFY FFY FFY

in millions

of dollars 2011 2012 2013 2014

AQ CODE COUNTY TOTAL PROJECT COST



LONG BEACH PURCHASE MISCELLANEOUS EQUIPMENT,SUPPLIES AND MATERIALS FOR THE FTA 5307 2012 0.010 MISC 0.010

TRANSIT SYSTEM. NFA 2012 0.003 MISC 0.003

082707

AQC:B4 NASSAU TPC : < $0.75 M TOTAL 4YR COST : 0.013 0.000 0.013 0.000 0.000



LONG BEACH PURCHASE AND INSTALL A SECURITY AND SURVEILLANCE SYSTEM IN THE CITY FTA 5307 2011 0.016 MISC 0.016

OF BUS GARAGE. NFA 2011 0.004 MISC 0.004

082711

AQC:B4P NASSAU TPC : < $0.75 M TOTAL 4YR COST : 0.020 0.020 0.000 0.000 0.000



LONG BEACH PURCHASE ONE REPLACEMENT SUPERVISORY VEHICLE FOR THE TRANSIT FTA 5307 2011 0.026 MISC 0.026

SYSTEM. NFA 2011 0.006 MISC 0.006

082712

AQC:B2P NASSAU TPC : < $0.75 M TOTAL 4YR COST : 0.032 0.032 0.000 0.000 0.000



LONG BEACH PURCHASE NEW BUS SHELTER FTA 5307 2014 0.170 MISC 0.170

NFA 2014 0.042 MISC 0.042

082714

AQC:B8P NASSAU TPC : < $0.75 M TOTAL 4YR COST : 0.212 0.000 0.000 0.000 0.212



LONG BEACH ITS CUSTOMER REAL TIME INFORMATION & VEHICLE LOCATION/MONITORING FTA 5307 2012 0.208 MISC 0.208

SYSTEM AT BUS STOPS NFA 2012 0.052 MISC 0.052

082715

AQC:B6P NASSAU TPC : < $0.75 M TOTAL 4YR COST : 0.260 0.000 0.260 0.000 0.000



LONG BEACH PURCHASE 2 NEW HYBRID ELECTRIC 35 FEET BUSES.REPLACEMENT OF OLD FTA 5307 2011 0.960 MISC 0.960

DIESEL BUSES WITH NEW HYBRID BUSES WHICH ARE MORE ENVIROMENTLY NFA 2011 0.240 MISC 0.240

082716 FRIENDLY AND GET MORE MPG

AQC:B10 NASSAU TPC : $0.6-$1.5 M TOTAL 4YR COST : 1.200 1.200 0.000 0.000 0.000



LONG BEACH PURCHASE ADA ROUTING & LOCATION COMMUNICATION EQUIPMENT FTA 5307 2011 0.128 MISC 0.128

SOFTWARE FOR PARATRANSIT BUS TO LOCATE ADDRESS OF DISABLE NFA 2011 0.032 MISC 0.032

082717 PASSENGER.

AQC:B4P NASSAU TPC : < $0.75 M TOTAL 4YR COST : 0.160 0.160 0.000 0.000 0.000

** NEW YORK STATE DEPARTMENT OF TRANSPORTATION **

Friday, August 26, 2011 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) on Draft Program Page 33 of 84

for REGION 10

AGENCY PROJECT DESCRIPTION TOTAL 4-YEAR PROGRAM (FFY)

4-YEAR PHASE Starting October 01, 2010

FUND SOURCES FFY

PIN PROGRAM

FFY FFY FFY FFY

in millions

of dollars 2011 2012 2013 2014

AQ CODE COUNTY TOTAL PROJECT COST



LONG BEACH RENOVATE BUS GARAGE INCLUDING WIDENING GARAGE DOORS AND FTA 5307 2012 0.080 MISC 0.080

EXPANSION OF OFFICE AND STORAGE SPACE NFA 2012 0.020 MISC 0.020

082719

AQC:B4P NASSAU TPC : < $0.75 M TOTAL 4YR COST : 0.100 0.000 0.100 0.000 0.000



HART PURCHASE AND INSTALLATION OF OPERATING OR MAINTENANCE EQUIPMENT FTA 5307 2011 0.062 MISC 0.062

TO BE LOCATED WITHIN THE TRANSIT FACILITY AND WITH NO SIGNIFICANT NFA 2011 0.016 MISC 0.016

082808 IMPACTS OFF THE SITE.. ADDITIONAL FUNDING REQUIRED FOR THIS IS ONGOING

PROJECT UNDER GRANT #NY-90X-581

AQC:B1P SUFFOLK TPC : < $0.75 M TOTAL 4YR COST : 0.078 0.078 0.000 0.000 0.000



HART REPLACE AND/OR REHABILITATE EXISTING EQUIPMENT AND FACILITIES FTA 5307 2011 0.006 MISC 0.006

LOCATED AT THE HART BUS STORAGE BUILDING BECAUSE ELEMENTS HAVE NFA 2011 0.002 MISC 0.002

082809 REACHED THE END OF THEIR USEFUL LIFE. ADDITIONAL FUNDING REQUIRED

FOR PROJECT STARTED IN GRANT #NY-90-581

AQC:B8P SUFFOLK TPC : $1.2-$2.5 M TOTAL 4YR COST : 0.008 0.008 0.000 0.000 0.000



HART CONTINGENCIES/PROGRAM RESERVE TO AUGMENT CAPITAL PROJECTS FTA 5307 2011 0.032 MISC 0.032

STARTED IN GRANT #NY-90-581 THAT MAY REQUIRE ADDITIONAL FUNDING TO NFA 2011 0.008 MISC 0.008

082811 COMPLETE.

AQC:B1P SUFFOLK TPC : < $0.75 M TOTAL 4YR COST : 0.040 0.040 0.000 0.000 0.000



HART HUNTINGTON AREA RAPID TRANSIT WILL PURCHASE 9 30FOOT HYBRID BUSES FTA 5307 2011 0.864 MISC 0.864

TO REPLACE EXISTING 9 DIESEL BUSES IN THEIR FLEET. (2 IN 2011 AND 7 IN 2012) NFA 2011 0.216 MISC 0.216

082813 FTA 5307 2012 3.400 MISC 3.400

NFA 2012 0.864 MISC 0.864

AQC:B10P SUFFOLK TPC : $4.6-$7.5 M TOTAL 4YR COST : 5.344 1.080 4.264 0.000 0.000



HART HUNTINGTON AREA RAPID TRANSIT WILL PURCHASE TWO REPLACEMENT FTA 5307 2011 0.044 MISC 0.044

GASOLINE-ELECTRIC HYBRID VEHICLES FOR SUPERVISORY AND SUPPORT NFA 2011 0.011 MISC 0.011

082814 PURPOSES

AQC:B2P SUFFOLK TPC : < $0.75 M TOTAL 4YR COST : 0.055 0.055 0.000 0.000 0.000

** NEW YORK STATE DEPARTMENT OF TRANSPORTATION **

Friday, August 26, 2011 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) on Draft Program Page 34 of 84

for REGION 10

AGENCY PROJECT DESCRIPTION TOTAL 4-YEAR PROGRAM (FFY)

4-YEAR PHASE Starting October 01, 2010

FUND SOURCES FFY

PIN PROGRAM

FFY FFY FFY FFY

in millions

of dollars 2011 2012 2013 2014

AQ CODE COUNTY TOTAL PROJECT COST



HART HUNTINGTON AREA RAPID TRANSIT WILL PURCHASE PARA TRANSIT VANS TO FTA 5307 2011 0.156 MISC 0.156

REPLACE EXISTING VANS IN THEIR FLEET. NFA 2011 0.040 MISC 0.040

082815 FTA 5307 2012 0.358 MISC 0.358

NFA 2012 0.089 MISC 0.089

FTA 5307 2014 0.253 MISC 0.253

NFA 2014 0.063 MISC 0.063

AQC:B10P SUFFOLK TPC : $0.6-$1.5 M TOTAL 4YR COST : 0.959 0.196 0.447 0.000 0.316



LOCAL PURCHASE OF TWO ALTERNATIVE FUEL (CNG) BUSES, VILLAGE OF EAST FTA 5309 2011 0.380 MISC 0.380

ROCKAWAY IN TOWN OF HEMPSTEAD. NFA 2011 0.089 MISC 0.089

082902

AQC:B10 NASSAU TPC : < $0.75 M TOTAL 4YR COST : 0.469 0.469 0.000 0.000 0.000



LOCAL PROJECT INDEPENDENCE (NASSAU) – MOBILITY MANAGEMENT SERVICES, FTA 5317 2011 0.854 MISC 0.854

MEDICALTRANSPORTATION, AND TRANSPORTATION TO GROCERY SHOPPING NFA 2011 0.447 MISC 0.447

082903 SERVICES TARGETING THE DISABLED ELDERLY POPULATION IN THE TOWN OF

NORTH HEMPSTEAD.

AQC:C1P NASSAU TPC : $2-$4 M TOTAL 4YR COST : 1.301 1.301 0.000 0.000 0.000



NYSDOT UPGRADE TRAFFIC SIGNAL SYSTEM /RAILROAD GRADE CROSSING WARNING STP RAIL 2011 0.100 CONST 0.100

SYSTEM AT SOUTH HAVEN RD IN BROOKVILLE. NASSAU COUNTY NFA 2011 0.025 CONST 0.025

093292

AQC:A1S SUFFOLK TPC : < $0.75 M TOTAL 4YR COST : 0.125 0.125 0.000 0.000 0.000



NYSDOT UPGRADE TRAFFIC SIGNAL SYSTEM/ RAILROAD GRADE CROSSING WARNING STP RAIL 2011 0.125 CONST 0.125

SYSTEM AT EAST GATE DRIVE IN TOWN OF HUNTINGTON, SUFFOLK COUNTY NFA 2011 0.031 CONST 0.031

093426

AQC:A1S SUFFOLK TPC : < $0.75 M TOTAL 4YR COST : 0.156 0.156 0.000 0.000 0.000



NYSDOT UPGRADE TRAFFIC SIGNAL SYSYTEM/ RAILROAD GRADE CROSSING AT STP RAIL 2011 0.125 CONST 0.125

WAVERLY AVENUE IN THE TOWN OF BROOKHAVEN, SUFFOLK COUNTY NFA 2011 0.031 CONST 0.031

093427

AQC:A1S SUFFOLK TPC : < $0.75 M TOTAL 4YR COST : 0.156 0.156 0.000 0.000 0.000

** NEW YORK STATE DEPARTMENT OF TRANSPORTATION **

Friday, August 26, 2011 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) on Draft Program Page 35 of 84

for REGION 10

AGENCY PROJECT DESCRIPTION TOTAL 4-YEAR PROGRAM (FFY)

4-YEAR PHASE Starting October 01, 2010

FUND SOURCES FFY

PIN PROGRAM

FFY FFY FFY FFY

in millions

of dollars 2011 2012 2013 2014

AQ CODE COUNTY TOTAL PROJECT COST



NYSDOT UPGRADE TRAFFIC SIGNAL SYSTEM / RAILROAD GRADE CROSSING WARNING STP RAIL 2011 0.100 CONST 0.100

SYSTEM IN NASSAU AND SUFFOLK COUNTIES NFA 2011 0.025 CONST 0.025

093428

AQC:A1S MULTI TPC : < $0.75 M TOTAL 4YR COST : 0.125 0.125 0.000 0.000 0.000



NYSDOT UPGRADE TRAFFIC SIGNAL SYSTEM / RAILROAD GRADE CROSSING WARNING STP RAIL 2012 0.951 CONST 0.951

SYSTEM IN NASSAU AND SUFFOLK COUNTIES- FFY12 NFA 2012 0.238 CONST 0.238

093429

AQC:A1S MULTI TPC : $0.6-$1.5 M TOTAL 4YR COST : 1.189 0.000 1.189 0.000 0.000



NYSDOT UPGRADE TRAFFIC SIGNAL CROSSING SYSTEM / RAILROAD GRADE CROSSING STP RAIL 2013 1.110 CONST 1.110

WARNING SYSTEM IN NASSAU AND SUFFOLK COUNTIES -FFY13 NFA 2013 0.278 CONST 0.278

093430

AQC:A1S MULTI TPC : $1.2-$2.5 M TOTAL 4YR COST : 1.388 0.000 0.000 1.388 0.000



NYSDOT UPGRADE TRAFFIC SIGNAL SYSTEM/ RAILROAD GRADE CROSSING WARNING STP RAIL 2014 1.121 DETLDES 1.121

SYSTEM IN NASSAU AND SUFFOLK COUNTIES- FFY 14 NFA 2014 0.280 DETLDES 0.280

093431

AQC:A1S MULTI TPC : $1.2-$2.5 M TOTAL 4YR COST : 1.401 0.000 0.000 0.000 1.401



NYSDOT STATE BRIDGE INSPECTIONS AS REQUIRED BY FHWA ON STATE HIGHWAYS TO HBRR 2011 0.480 DETLDES 0.480

MAINTAIN THE SAFETY OF THE STRUCTURES FOR PUBLIC USE. IN NASSAU AND NFA 2011 0.120 DETLDES 0.120

0B1001 SUFFOLK COUNTIES

AQC:A19P MULTI TPC : < $0.75 M TOTAL 4YR COST : 0.600 0.600 0.000 0.000 0.000



NYSDOT STATE FORCES BRIDGE INSPECTION IN SUFFOLK AND NASSAU COUNTY ON HBRR 2011 0.560 DETLDES 0.560

STATE HIGHWAYS 1/1/2012 - 12/31/3013 NFA 2011 0.140 DETLDES 0.140

0B1101

AQC:A19P MULTI TPC : $0.6-$1.5 M TOTAL 4YR COST : 0.700 0.700 0.000 0.000 0.000



NYSDOT BIENNIAL CONSULTANT BRIDGE INSPECTIONS AS REQUIRED BY FHWA TO HBRR 2011 2.880 DETLDES 2.880

MAINTAIN THE SAFETY OF THE STRUCTURES FOR PUBLIC USENASSAU AND NFA 2011 0.720 DETLDES 0.720

0B1102 SUFFOLK COUNTY

AQC:A2S MULTI TPC : $3.3-$5.6 M TOTAL 4YR COST : 3.600 3.600 0.000 0.000 0.000

** NEW YORK STATE DEPARTMENT OF TRANSPORTATION **

Friday, August 26, 2011 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) on Draft Program Page 36 of 84

for REGION 10

AGENCY PROJECT DESCRIPTION TOTAL 4-YEAR PROGRAM (FFY)

4-YEAR PHASE Starting October 01, 2010

FUND SOURCES FFY

PIN PROGRAM

FFY FFY FFY FFY

in millions

of dollars 2011 2012 2013 2014

AQ CODE COUNTY TOTAL PROJECT COST



NYSDOT NYSDOT REGION 10 : UNDERWATER INSPECTIONS FOR BRIDGES TO MAINTAIN HBRR 2011 1.400 DETLDES 1.400

THE SAFETY OF THE STRUCTURES FOR PUBLIC USE IN NASSAU AND SUFFOLK NFA 2011 0.350 DETLDES 0.350

0B1103 COUNTIES

AQC:A2S MULTI TPC : $1.2-$2.5 M TOTAL 4YR COST : 1.750 1.750 0.000 0.000 0.000



NYSDOT BRIDGE INSPECTION FOR SCOUR MONITORING IN NASSAU AND SUFFOLK HBRR 2012 0.480 DETLDES 0.480

COUNTY NFA 2012 0.120 DETLDES 0.120

0B1104

AQC:A19S MULTI TPC : < $0.75 M TOTAL 4YR COST : 0.600 0.000 0.600 0.000 0.000



NYSDOT STATE BRIDGE INSPECTIONS AS REQUIRED BY FHWA ON STATE HIGHWAYS TO HBRR 2012 0.560 DETLDES 0.560

MAINTAIN THE SAFETY OF THE STRUCTURES FOR PUBLIC USE. IN NASSAU AND NFA 2012 0.140 DETLDES 0.140

0B1201 SUFFOLK COUNTIES

AQC:A2S MULTI TPC : $0.6-$1.5 M TOTAL 4YR COST : 0.700 0.000 0.700 0.000 0.000



NYSDOT STATE BRIDGE INSPECTIONS AS REQUIRED BY FHWA ON STATE HIGHWAYS TO HBRR 2013 0.560 DETLDES 0.560

MAINTAIN THE SAFETY OF THE STRUCTURES FOR PUBLIC USE. IN NASSAU AND NFA 2013 0.140 DETLDES 0.140

0B1301 SUFFOLK COUNTIES

AQC:A2S MULTI TPC : $0.6-$1.5 M TOTAL 4YR COST : 0.700 0.000 0.000 0.700 0.000



NYSDOT BIENNIAL CONSULTANT BRIDGE INSPECTIONS AS REQUIRED BY FHWA TO HBRR 2013 2.880 DETLDES 2.880

MAINTAIN THE SAFETY OF THE STRUCTURES FOR PUBLIC USENASSAU AND NFA 2013 0.720 DETLDES 0.720

0B1302 SUFFOLK COUNTY

AQC:A2S MULTI TPC : $3.3-$5.6 M TOTAL 4YR COST : 3.600 0.000 0.000 3.600 0.000



NYSDOT NYSDOT REGION 10 : UNDERWATER INSPECTIONS FOR BRIDGES TO MAINTAIN HBRR 2013 1.400 DETLDES 1.400

THE SAFETY OF THE STRUCTURES FOR PUBLIC USE IN NASSAU AND SUFFOLK NFA 2013 0.350 DETLDES 0.350

0B1303 COUNTIES

AQC:A2S MULTI TPC : $1.2-$2.5 M TOTAL 4YR COST : 1.750 0.000 0.000 1.750 0.000



NYSDOT BRIDGE INSPECTION FOR SCOUR MONITORING IN NASSAU AND SUFFOLK HBRR 2014 0.480 DETLDES 0.480

COUNTY NFA 2014 0.120 DETLDES 0.120

0b1304

AQC:A19S MULTI TPC : < $0.75 M TOTAL 4YR COST : 0.600 0.000 0.000 0.000 0.600

** NEW YORK STATE DEPARTMENT OF TRANSPORTATION **

Friday, August 26, 2011 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) on Draft Program Page 37 of 84

for REGION 10

AGENCY PROJECT DESCRIPTION TOTAL 4-YEAR PROGRAM (FFY)

4-YEAR PHASE Starting October 01, 2010

FUND SOURCES FFY

PIN PROGRAM

FFY FFY FFY FFY

in millions

of dollars 2011 2012 2013 2014

AQ CODE COUNTY TOTAL PROJECT COST



NYSDOT STATE BRIDGE INSPECTIONS AS REQUIRED BY FHWA ON STATE HIGHWAYS TO HBRR 2014 0.560 DETLDES 0.560

MAINTAIN THE SAFETY OF THE STRUCTURES FOR PUBLIC USE. IN NASSAU AND NFA 2014 0.140 DETLDES 0.140

0B1401 SUFFOLK COUNTIES

AQC:A2S MULTI TPC : $0.6-$1.5 M TOTAL 4YR COST : 0.700 0.000 0.000 0.000 0.700



NYSDOT PURCHASE TRAFFIC SIGNAL EQUIPMENT NASSAU AND SUFFOLK COUNTY NFA 2011 0.650 CONST 0.650

NFA 2012 0.650 CONST 0.650

0SIP00 NFA 2013 0.650 OPER 0.650

NFA 2014 0.650 OPER 0.650

AQC:D2P MULTI TPC : $3.3-$5.6 M TOTAL 4YR COST : 2.600 0.650 0.650 0.650 0.650



NYSDOT CONCRETE PAVEMENT REPAIR INCLUDING JOINT SEALING, DIAMOND GRINDING STP FLEX 2011 0.202 CONINSP 0.202

ET AL ON NY27 BETWEEN PHYLLIS DR AND CR21 TO MAINTAIN STATE OF GOOD NFA 2011 0.050 CONINSP 0.050

0T1376 REPAIR, TOWN OF BROOKHAVEN, SUFFOLK COUNTY STP FLEX 2011 1.687 CONST 1.687

NFA 2011 0.422 CONST 0.422

AQC:A10P MULTI TPC : $2-$4 M TOTAL 4YR COST : 2.361 2.361 0.000 0.000 0.000



NYSDOT BRIDGE PAINTING, CLEANING, RUST REMOVAL & DISPOSAL (LOCATIONS HBRR 2011 0.217 DETLDES 0.217

TO-BE-DETERMINED) TO MAINTAIN STRUCTURAL INTEGRITY ON VARIOUS NFA 2011 0.055 DETLDES 0.055

0T1460 STATE HIGHWAYS & PARKWAYS IN NASSAU & SUFFOLK COUNTIES. HBRR 2012 0.213 CONINSP 0.213

NFA 2012 0.053 CONINSP 0.053

HBRR 2012 2.103 CONST 2.103

NFA 2012 0.526 CONST 0.526

AQC:A19P MULTI TPC : $3.3-$5.6 M TOTAL 4YR COST : 3.167 0.272 2.895 0.000 0.000



NYSDOT PREVENTATIVE MAINTENANCE BRIDGE REPAIRS TO MAINTAIN STRUCTURAL NFA 2011 0.192 DETLDES 0.192

INTEGRITY (LOCATIONS TO-BE-DETERMINED) ON VARIOUS STATE HIGHWAYS & NFA 2013 0.351 CONINSP 0.351

0T1467 PARKWAYS IN NASSAU & SUFFOLK COUNTIES. NFA 2013 3.512 CONST 3.512

AQC:A19P MULTI TPC : $3.3-$5.6 M TOTAL 4YR COST : 4.055 0.192 0.000 3.863 0.000



NYSDOT PREVENTATIVE MAINTENANCE BRIDGE REPAIRS TO MAINTAIN STRUCTURAL NFA 2012 0.837 DETLDES 0.837

INTEGRITY (LOCATIONS TO-BE-DETERMINED) ON VARIOUS STATE HIGHWAYS & NFA 2014 1.113 CONINSP 1.113

0T1468 PARKWAYS IN NASSAU & SUFFOLK COUNTIES. NFA 2014 11.133 CONST 11.133

AQC:A19P MULTI TPC : $12.5-$19 M TOTAL 4YR COST : 13.083 0.000 0.837 0.000 12.246

** NEW YORK STATE DEPARTMENT OF TRANSPORTATION **

Friday, August 26, 2011 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) on Draft Program Page 38 of 84

for REGION 10

AGENCY PROJECT DESCRIPTION TOTAL 4-YEAR PROGRAM (FFY)

4-YEAR PHASE Starting October 01, 2010

FUND SOURCES FFY

PIN PROGRAM

FFY FFY FFY FFY

in millions

of dollars 2011 2012 2013 2014

AQ CODE COUNTY TOTAL PROJECT COST



NYSDOT PREVENTATIVE MAINTENANCE BRIDGE REPAIRS TO MAINTAIN STRUCTURAL NFA 2013 1.501 DETLDES 1.501

INTEGRITY (LOCATIONS TO-BE-DETERMINED) ON VARIOUS STATE HIGHWAYS &

0T1469 PARKWAYS IN NASSAU & SUFFOLK COUNTIES.

AQC:A19P MULTI TPC : $12.5-$19 M TOTAL 4YR COST : 1.501 0.000 0.000 1.501 0.000



NYSDOT BRIDGE IMPROVEMENTS (LOCATIONS TO-BE-DETERMINED) TO MAINTAIN NFA 2013 1.179 PRELDES 1.179

STRUCTURAL INTEGRITY ON VARIOUS STATE HIGHWAYS & PARKWAYS IN

0T1472 NASSAU & SUFFOLK COUNTIES

AQC:A19P MULTI TPC : $15-$25 M TOTAL 4YR COST : 1.179 0.000 0.000 1.179 0.000



NYSDOT TRAFFIC SIGNAL REQUIREMENTS CONTRACT 042006 NFA 2013 0.316 CONINSP 0.316

NFA 2013 3.610 CONST 3.610

0T1517

AQC:D2P MULTI TPC : $3.3-$5.6 M TOTAL 4YR COST : 3.926 0.000 0.000 3.926 0.000



NYSDOT BLOCKOUT FOR FUTURE PAVEMENT REHABILITATION PROJECTS (LOCATIONS NFA 2013 0.591 DETLDES 0.591

TO-BE-DETERMINED) ON VARIOUS STATE HIGHWAYS & PARKWAYS IN NASSAU

0T1535 & SUFFOLK COUNTIES.

AQC:A10P MULTI TPC : $9.5-15.5 M TOTAL 4YR COST : 0.591 0.000 0.000 0.591 0.000



NYSDOT BLOCKOUT FOR FUTURE PAVEMENT REHABILITATION PROJECTS TO MAINTAIN NFA 2011 0.607 DETLDES 0.607

STATE OF GOOD REPAIR(LOCATIONS TO-BE-DETERMINED) ON VARIOUS STATE

0T1537 HIGHWAYS & PARKWAYS IN NASSAU & SUFFOLK COUNTIES.





AQC:A10P MULTI TPC : $12.5-$19 M TOTAL 4YR COST : 0.607 0.607 0.000 0.000 0.000



NYSDOT SAFETY IMPROVEMENTS TO ADRESS A A PRIORITY INVESTIGATION LOCATION NFA 2013 0.804 DETLDES 0.804

(TO-BE-DETERMINED) ON VARIOUS STATE HIGHWAYS & PARKWAYS IN NASSAU

0T1543 & SUFFOLK COUNTIES.

AQC:A6P MULTI TPC : $12.5-$19 M TOTAL 4YR COST : 0.804 0.000 0.000 0.804 0.000



NYSDOT SAFETY IMPROVEMENTS TO ADRESS A A PRIORITY INVESTIGATION LOCATION NFA 2013 1.174 ROWACQU 1.174

(TO-BE-DETERMINED) ON VARIOUS STATE HIGHWAYS & PARKWAYS IN NASSAU NFA 2014 0.218 DETLDES 0.218

0T1544 & SUFFOLK COUNTIES.

AQC:A6P MULTI TPC : $7.5-$12 M TOTAL 4YR COST : 1.392 0.000 0.000 1.174 0.218

** NEW YORK STATE DEPARTMENT OF TRANSPORTATION **

Friday, August 26, 2011 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) on Draft Program Page 39 of 84

for REGION 10

AGENCY PROJECT DESCRIPTION TOTAL 4-YEAR PROGRAM (FFY)

4-YEAR PHASE Starting October 01, 2010

FUND SOURCES FFY

PIN PROGRAM

FFY FFY FFY FFY

in millions

of dollars 2011 2012 2013 2014

AQ CODE COUNTY TOTAL PROJECT COST



NYSDOT SAFETY IMPROVEMENTS TO ADRESS A A PRIORITY INVESTIGATION LOCATION NFA 2014 0.217 DETLDES 0.217

(TO-BE-DETERMINED) ON VARIOUS STATE HIGHWAYS & PARKWAYS IN NASSAU NFA 2014 1.174 ROWACQU 1.174

0T1545 & SUFFOLK COUNTIES.

AQC:A6P MULTI TPC : $7.5-$12 M TOTAL 4YR COST : 1.391 0.000 0.000 0.000 1.391



NYSDOT REHABILITATE RECHARGE BASINS INCLUDING SLOPE STABILIZATION, HEAD NFA 2011 0.149 DETLDES 0.149

WALL REPAIR, ET AL(LOCATIONS TO-BE-DETERMINED) ON VARIOUS STATE NFA 2012 0.258 CONINSP 0.258

0T1584 HIGHWAYS IN NASSAU & SUFFOLK COUNTIES. NFA 2012 2.151 CONST 2.151

AQC:A2P MULTI TPC : $2-$4 M TOTAL 4YR COST : 2.558 0.149 2.409 0.000 0.000



NYSDOT BLOCKOUT OF FUNDS FOR FUTURE SAFETY PROJECTS ON VARIOUS STATE NFA 2012 0.282 DETLDES 0.282

HIGHWAYS & PARKWAYS IN NASSAU & SUFFOLK COUNTIES. THE PROJECT HSIP 2014 0.298 CONINSP 0.298

0T1594 DEVELOPMENT WILL OCCUR BASED OFF OF THE STRATEGIC HIGHWAY SAFETY NFA 2014 0.033 CONINSP 0.033

PLAN (LOCATIONS TO-BE-DETERMINED) HSIP 2014 2.975 CONST 2.975

NFA 2014 0.331 CONST 0.331

AQC:A6P MULTI TPC : $3.3-$5.6 M TOTAL 4YR COST : 3.919 0.000 0.282 0.000 3.637



NYSDOT BLOCKOUT OF FUNDS FOR FUTURE SAFETY PROJECTS ON VARIOUS STATE HSIP 2013 1.929 DETLDES 1.929

HIGHWAYS & PARKWAYS IN NASSAU & SUFFOLK COUNTIES. THE PROJECT NFA 2013 0.214 DETLDES 0.214

0T1595 DEVELOPMENT WILL OCCUR BASED OFF OF THE STRATEGIC HIGHWAY SAFETY

PLAN (LOCATIONS TO-BE-DETERMINED)

AQC:A6P MULTI TPC : $15-$25 M TOTAL 4YR COST : 2.143 0.000 0.000 2.143 0.000



NYSDOT SAFETY IMPROVEMENT PROJECT SCOPE TO-BE-DETERMINED BASED ON STUDY NFA 2014 0.943 DETLDES 0.943

OF NY25 FROM ROUND SWAMP RD TO NY454, TOWNS OF HUNTINGTON AND

0T1651 SMITHTOWN, SUFFOLK COUNTY

AQC:A6P SUFFOLK TPC : $9.5-15.5 M TOTAL 4YR COST : 0.943 0.000 0.000 0.000 0.943



NYSDOT CONCRETE PAVEMENT REPAIR INCLUDING JOINT SEALING, DIAMOND GRINDING IM 2011 0.101 DETLDES 0.101

ETC ON I495 TO MAINTAIN STATE OF GOOD REPAIR AT VARIOUS LOCATIONS IN NFA 2011 0.011 DETLDES 0.011

0T1679 NASSAU & SUFFOLK COUNTIES. IM 2012 0.232 CONINSP 0.232

NFA 2012 0.026 CONINSP 0.026

IM 2012 1.937 CONST 1.937

NFA 2012 0.215 CONST 0.215

AQC:A10P MULTI TPC : $2-$4 M TOTAL 4YR COST : 2.522 0.112 2.410 0.000 0.000

** NEW YORK STATE DEPARTMENT OF TRANSPORTATION **

Friday, August 26, 2011 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) on Draft Program Page 40 of 84

for REGION 10

AGENCY PROJECT DESCRIPTION TOTAL 4-YEAR PROGRAM (FFY)

4-YEAR PHASE Starting October 01, 2010

FUND SOURCES FFY

PIN PROGRAM

FFY FFY FFY FFY

in millions

of dollars 2011 2012 2013 2014

AQ CODE COUNTY TOTAL PROJECT COST



NYSDOT MILLING, CONCRETE & ASPHALT PAVEMENT REPAIRS, SINGLE COURSE NFA 2011 0.278 DETLDES 0.278

OVERLAY ON I495 (LOCATIONS TO-BE-DETERMINED) TO MAINTAIN STATE OF IM 2012 0.484 CONINSP 0.484

0T1684 GOOD REPAIR IN NASSAU & SUFFOLK COUNTIES NFA 2012 0.185 CONINSP 0.185

IM 2012 4.836 CONST 4.836

NFA 2012 1.844 CONST 1.844

AQC:A10P MULTI TPC : $6-$9.4 M TOTAL 4YR COST : 7.627 0.278 7.349 0.000 0.000



NYSDOT CONCRETE PAVEMENT REPAIR INCLUDING JOINT SEALING, DIAMOND GRINDING NFA 2012 0.113 DETLDES 0.113

ET AL(LOCATIONS TO-BE-DETERMINED) TO MAINTAIN STATE OF GOOD REPAIR STP LG URBAN 2013 0.212 CONINSP 0.212

0T1686 ON VARIOUS STATE HIGHWAYS & PARKWAYS IN NASSAU & SUFFOLK COUNTIES. NFA 2013 0.053 CONINSP 0.053

STP LG URBAN 2013 1.764 CONST 1.764

NFA 2013 0.441 CONST 0.441

AQC:A10P MULTI TPC : $2-$4 M TOTAL 4YR COST : 2.583 0.000 0.113 2.470 0.000



NYSDOT REHABILITATE RECHARGE BASINS INCLUDING SLOPE STABILIZATION, HEAD NFA 2013 0.184 DETLDES 0.184

WALL REPAIR, ET AL(LOCATIONS TO-BE-DETERMINED) TO MAINTAIN STATE OF NFA 2014 0.272 CONINSP 0.272

0T1689 GOOD REPAIRON VARIOUS STATE HIGHWAYS & PARKWAYS IN NASSAU & NFA 2014 2.720 CONST 2.720

SUFFOLK COUNTIES.

AQC:A2P MULTI TPC : $2-$4 M TOTAL 4YR COST : 3.176 0.000 0.000 0.184 2.992



NYSDOT MILLING, CONCRETE & ASPHALT PAVEMENT REPAIRS, SINGLE COURSE NFA 2012 0.282 DETLDES 0.282

OVERLAY ON I495 (LOCATIONS TO-BE-DETERMINED) TO MAINTAIN STATE OF STP LG URBAN 2013 0.088 CONINSP 0.088

0T1691 GOOD REPAIR IN NASSAU & SUFFOLK COUNTIES NFA 2013 0.462 CONINSP 0.462

STP LG URBAN 2013 0.882 CONST 0.882

NFA 2013 4.628 CONST 4.628

AQC:A10P MULTI TPC : $6-$9.4 M TOTAL 4YR COST : 6.342 0.000 0.282 6.060 0.000



NYSDOT REMOVAL OR PAINT OVER OF GRAFITTI, REPAIR NOISE WALLS, MAINTAIN THE 7 NFA 2011 0.180 DETLDES 0.180

PARK & RIDE LOTS ALONG I495, ALL NYS BIKEWAYS, REST AREAS, PUBLIC NFA 2013 0.333 CONINSP 0.333

0T1694 TELEPHONE AREAS ALONG PARKWAYS & BUS SHELTERS ON NYS NFA 2013 3.333 CONST 3.333

RIGHT-OF-WAY TO MAINTAIN STATE OF GOOD REPAIR NASSAU AND SUFFOLK





AQC:C8P MULTI TPC : $3.3-$5.6 M TOTAL 4YR COST : 3.846 0.180 0.000 3.666 0.000

** NEW YORK STATE DEPARTMENT OF TRANSPORTATION **

Friday, August 26, 2011 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) on Draft Program Page 41 of 84

for REGION 10

AGENCY PROJECT DESCRIPTION TOTAL 4-YEAR PROGRAM (FFY)

4-YEAR PHASE Starting October 01, 2010

FUND SOURCES FFY

PIN PROGRAM

FFY FFY FFY FFY

in millions

of dollars 2011 2012 2013 2014

AQ CODE COUNTY TOTAL PROJECT COST



NYSDOT RESPOND TO EMERGENCIES THAT ARE BEYOND THE CAPABILITIES OF NYS NFA 2011 0.180 DETLDES 0.180

MAINTENANCE FORCES TO ENSURE THE SAFETY OF THE PUBLIC ON VARIOUS NFA 2013 0.258 CONINSP 0.258

0T1697 STATE HIGHWAYS & PARKWAYS IN NASSAU & SUFFOLK COUNTIES. NFA 2013 2.152 CONST 2.152



AQC:A2P MULTI TPC : $2-$4 M TOTAL 4YR COST : 2.590 0.180 0.000 2.410 0.000



NYSDOT REPLACE OR UPGRADE SIGNALS AND/OR APPURTENANCES & INSTALL NEW NFA 2011 0.135 DETLDES 0.135

SIGNALS TO MAINTAIN STATE OF GOOD REPAIR OR SAFETY IMPROVEMENT ON STP FLEX 2012 0.290 CONINSP 0.290

0T1699 VARIOUS STATE HIGHWAYS IN NASSAU & SUFFOLK COUNTIES NFA 2012 0.072 CONINSP 0.072

STP FLEX 2012 2.903 CONST 2.903

NFA 2012 0.726 CONST 0.726

AQC:D2P MULTI TPC : $3.3-$5.6 M TOTAL 4YR COST : 4.126 0.135 3.991 0.000 0.000



NYSDOT INSTALLATION AND REPLACEMENT OF DETERIORATED PAVEMENT MARKINGS NFA 2012 0.250 DETLDES 0.250

& PLOWABLE REFLECTIVE MARKERS ON VARIOUS STATE HIGHWAYS & STP LG URBAN 2013 0.430 CONINSP 0.430

0T1701 PARKWAYS IN NASSAU & SUFFOLK COUNTIES. NFA 2013 0.107 CONINSP 0.107

STP LG URBAN 2013 4.300 CONST 4.300

NFA 2013 1.075 CONST 1.075

AQC:A10P MULTI TPC : $4.6-$7.5 M TOTAL 4YR COST : 6.162 0.000 0.250 5.912 0.000



NYSDOT REPLACE OR UPGRADE SIGNALS AND/OR APPURTENANCES & INSTALL NEW NFA 2012 0.293 DETLDES 0.293

SIGNALS TO MAINTAIN STATE OF GOOD REPAIR OR SAFETY IMPROVEMENT ON STP FLEX 2013 0.264 CONINSP 0.264

0T1702 VARIOUS STATE HIGHWAYS IN NASSAU & SUFFOLK COUNTIES NFA 2013 0.066 CONINSP 0.066

STP FLEX 2013 2.644 CONST 2.644

NFA 2013 0.661 CONST 0.661

AQC:D2P MULTI TPC : $3.3-$5.6 M TOTAL 4YR COST : 3.928 0.000 0.293 3.635 0.000



NYSDOT CORRECT PRIORITY HIGHWAY FOODING LOCATIONS, PROVIDE STORMWATER NFA 2013 0.160 DETLDES 0.160

RUN-OFF IMPROVEMENTS INCLUDING 1 LOC IN TOWN OF RIVERHEAD FOR

0T1706 SAFETEA-LU EARMARK & OTHER LOC NAS & SUF.

AQC:C11P MULTI TPC : $6-$9.4 M TOTAL 4YR COST : 0.160 0.000 0.000 0.160 0.000



NYSDOT CORRECT PRIORITY HIGHWAY FLOODING LOCATIONS AND REPLACE CATCH STP LG URBAN 2013 0.077 DETLDES 0.077

BASINS WITHIN ESTUARY WATERSHED AREAS WITH VORTEX TYPE BASINS IN NFA 2013 0.018 DETLDES 0.018

0T1707 NASSAU & SUFFOLK COUNTIES. (LOCATIONS TO BE DETERMINED)

AQC:C11P MULTI TPC : $6-$9.4 M TOTAL 4YR COST : 0.095 0.000 0.000 0.095 0.000

** NEW YORK STATE DEPARTMENT OF TRANSPORTATION **

Friday, August 26, 2011 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) on Draft Program Page 42 of 84

for REGION 10

AGENCY PROJECT DESCRIPTION TOTAL 4-YEAR PROGRAM (FFY)

4-YEAR PHASE Starting October 01, 2010

FUND SOURCES FFY

PIN PROGRAM

FFY FFY FFY FFY

in millions

of dollars 2011 2012 2013 2014

AQ CODE COUNTY TOTAL PROJECT COST



NYSDOT BRIDGE PAINTING, CLEANING, RUST REMOVAL & DISPOSAL (LOCATIONS NFA 2012 0.265 DETLDES 0.265

TO-BE-DETERMINED) TO MAINTAIN STRUCTURAL INTEGRITY ON VARIOUS HBRR 2014 0.529 CONINSP 0.529

0T1714 STATE HIGHWAYS & PARKWAYS IN NASSAU & SUFFOLK COUNTIES. NFA 2014 0.132 CONINSP 0.132

HBRR 2014 5.289 CONST 5.289

NFA 2014 1.322 CONST 1.322

AQC:A19P MULTI TPC : $7.5-$12 M TOTAL 4YR COST : 7.537 0.000 0.265 0.000 7.272



NYSDOT REHABILITE SIDEWALK & CURB RAMPS (LOCATIONS TO-BE-DETERMINED) ON NFA 2011 0.180 DETLDES 0.180

VARIOUS STATE ROADS TO MAINTAIN STATE OF GOOD REPAIR IN NASSAU & NFA 2013 0.322 CONINSP 0.322

0T1718 SUFFOLK COUNTIES. NFA 2013 3.225 CONST 3.225

.

AQC:A6P MULTI TPC : $3.3-$5.6 M TOTAL 4YR COST : 3.727 0.180 0.000 3.547 0.000



NYSDOT PROVIDE LANDSCAPE RESTORATION & MAINTAIN EXISTING LANDSCAPE AREAS, NFA 2013 0.189 DETLDES 0.189

TRIM OR REMOVE TREES THAT IMPEDE VISIBILITY (LOCATIONS

0T1722 TO-BE-DETERMINED) ON VARIOUS STATE HIGHWAYS & PARKWAYS IN NASSAU

& SUFFOLK COUNTIES.

AQC:C11P MULTI TPC : $3.3-$5.6 M TOTAL 4YR COST : 0.189 0.000 0.000 0.189 0.000



NYSDOT SIDEWALK CONSTRUCTION: CONNECT FRAGMENTENTED SIDEWALKS ON STATE STP FLEX 2012 0.151 DETLDES 0.151

HIGHWAYS AND LINK SIDEWALKS WITH OTHER MODES OF TRANSPORTATION NFA 2012 0.038 DETLDES 0.038

0T1733 AS REQUIRED BY AMERICANS WITH DISABILITIES ACT. NASSAU AND SUFFOLK STP FLEX 2014 0.091 CONINSP 0.091

COUNTY NFA 2014 0.023 CONINSP 0.023

STP FLEX 2014 0.911 CONST 0.911

NFA 2014 0.228 CONST 0.228

AQC:A6P MULTI TPC : $1.2-$2.5 M TOTAL 4YR COST : 1.442 0.000 0.189 0.000 1.253



NYSDOT MILLING, CONCRETE & ASPHALT PAVEMENT REPAIRS, SINGLE COURSE NFA 2013 0.271 DETLDES 0.271

OVERLAY ON I495 (LOCATIONS TO-BE-DETERMINED) TO MAINTAIN STATE OF STP FLEX 2014 0.544 CONINSP 0.544

0T1765 GOOD REPAIR IN NASSAU & SUFFOLK COUNTIES NFA 2014 0.136 CONINSP 0.136

STP FLEX 2014 5.447 CONST 5.447

NFA 2014 1.362 CONST 1.362

AQC:A10P MULTI TPC : $6-$9.4 M TOTAL 4YR COST : 7.760 0.000 0.000 0.271 7.489



NYSDOT MILLING, CONCRETE & ASPHALT PAVEMENT REPAIRS, SINGLE COURSE NFA 2013 0.482 DETLDES 0.482

OVERLAY ON I495 (LOCATIONS TO-BE-DETERMINED) TO MAINTAIN STATE OF

0T1766 GOOD REPAIR IN NASSAU & SUFFOLK COUNTIES

AQC:A19P MULTI TPC : $9.5-15.5 M TOTAL 4YR COST : 0.482 0.000 0.000 0.482 0.000

** NEW YORK STATE DEPARTMENT OF TRANSPORTATION **

Friday, August 26, 2011 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) on Draft Program Page 43 of 84

for REGION 10

AGENCY PROJECT DESCRIPTION TOTAL 4-YEAR PROGRAM (FFY)

4-YEAR PHASE Starting October 01, 2010

FUND SOURCES FFY

PIN PROGRAM

FFY FFY FFY FFY

in millions

of dollars 2011 2012 2013 2014

AQ CODE COUNTY TOTAL PROJECT COST



NYSDOT SIGN REPAIRS & INSTALLATIONS TO MAINTAIN STATE OF GOOD REPAIR ON NFA 2012 0.100 DETLDES 0.100

VARIOUS STATE HIGHWAYS & PARKWAYS IN NASSAU & SUFFOLK COUNTIES STP FLEX 2013 0.212 CONINSP 0.212

0T1768 NFA 2013 0.053 CONINSP 0.053

STP FLEX 2013 1.764 CONST 1.764

NFA 2013 0.441 CONST 0.441

AQC:C13P MULTI TPC : $2-$4 M TOTAL 4YR COST : 2.570 0.000 0.100 2.470 0.000



NYSDOT INSTALLATION AND REPLACEMENT OF DETERIORATED PAVEMENT MARKINGS NFA 2013 0.314 DETLDES 0.314

& PLOWABLE REFLECTIVE MARKERS ON VARIOUS STATE HIGHWAYS & STP FLEX 2014 0.441 CONINSP 0.441

0T1769 PARKWAYS IN NASSAU & SUFFOLK COUNTIES. NFA 2014 0.650 CONINSP 0.650

STP FLEX 2014 4.407 CONST 4.407

NFA 2014 6.500 CONST 6.500

AQC:A10P MULTI TPC : $9.5-15.5 M TOTAL 4YR COST : 12.312 0.000 0.000 0.314 11.998



NYSDOT BRIDGE CLEANING (LOCATIONS TO-BE-DETERMINED) TO MAINTAIN NFA 2013 0.049 DETLDES 0.049

STRUCTURAL INTEGRITY ON VARIOUS STATE HIGHWAYS & PARKWAYS IN STP FLEX 2013 0.112 CONINSP 0.112

0T1770 NASSAU & SUFFOLK COUNTIES. NFA 2013 0.028 CONINSP 0.028

STP FLEX 2013 0.937 CONST 0.937

NFA 2013 0.235 CONST 0.235

AQC:A19P MULTI TPC : $1.2-$2.5 M TOTAL 4YR COST : 1.361 0.000 0.000 1.361 0.000



NYSDOT PROVIDE SAFETY & PAVEMENT IMPROVEMENTS AND EMERGENCY REPAIRS ON NFA 2012 0.245 DETLDES 0.245

AN AS-NEEDED-BASIS AS AN EMERGENCY RESPONSE ON VARIOUS STATE NFA 2013 0.468 CONINSP 0.468

0T1771 HIGHWAYS & PARKWAYS IN NASSAU & SUFFOLK COUNTIES. NFA 2013 4.684 CONST 4.684

AQC:A10P MULTI TPC : $4.6-$7.5 M TOTAL 4YR COST : 5.397 0.000 0.245 5.152 0.000



NYSDOT ROUT & SEAL ASPHALT PAVEMENT CRACKS AND JOINT OVERLAY REPAIR TO NFA 2012 0.184 DETLDES 0.184

MAINTAIN STATE OF GOOD REPAIR (LOCATIONS TO-BE-DETERMINED) ON STP FLEX 2013 0.106 CONINSP 0.106

0T1773 VARIOUS STATE HIGHWAYS & PARKWAYS IN NASSAU & SUFFOLK COUNTIES NFA 2013 0.158 CONINSP 0.158

STP FLEX 2013 0.882 CONST 0.882

NFA 2013 1.324 CONST 1.324

AQC:A10P MULTI TPC : $2-$4 M TOTAL 4YR COST : 2.654 0.000 0.184 2.470 0.000

** NEW YORK STATE DEPARTMENT OF TRANSPORTATION **

Friday, August 26, 2011 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) on Draft Program Page 44 of 84

for REGION 10

AGENCY PROJECT DESCRIPTION TOTAL 4-YEAR PROGRAM (FFY)

4-YEAR PHASE Starting October 01, 2010

FUND SOURCES FFY

PIN PROGRAM

FFY FFY FFY FFY

in millions

of dollars 2011 2012 2013 2014

AQ CODE COUNTY TOTAL PROJECT COST



NYSDOT CONCRETE PAVEMENT REPAIR INCLUDING JOINT SEALING, DIAMOND GRINDING NFA 2013 0.115 DETLDES 0.115

ET AL TO MAINTAIN STATE OF GOOD REPAIR (LOCATIONS TO-BE-DETERMINED) STP LG URBAN 2014 0.212 CONINSP 0.212

0T1774 ON VARIOUS STATE HIGHWAYS & PARKWAYS IN NASSAU & SUFFOLK COUNTIES. NFA 2014 0.053 CONINSP 0.053

STP LG URBAN 2014 1.764 CONST 1.764

NFA 2014 0.441 CONST 0.441

AQC:A10P MULTI TPC : $2-$4 M TOTAL 4YR COST : 2.585 0.000 0.000 0.115 2.470



NYSDOT REHABILITATE RECHARGE BASINS INCLUDING SLOPE STABILIZATION, HEAD NFA 2013 0.157 DETLDES 0.157

WALL REPAIR, ET AL TO MAINTAIN STATE OF GOOD REPAIR (LOCATIONS

0T1775 TO-BE-DETERMINED) ON VARIOUS STATE HIGHWAYS & PARKWAYS IN NASSAU

& SUFFOLK COUNTIES.

AQC:A2P MULTI TPC : $2-$4 M TOTAL 4YR COST : 0.157 0.000 0.000 0.157 0.000



NYSDOT CLEAN BASINS FILLED W/DEBRIS, REPAIR, REPLACE OR PROVIDE MISSING NFA 2012 0.774 DETLDES 0.774

COLLARS, REPAIR BASIN WALLS,REPAIR OR REPLACE BROKEN PIPES, REPLACE STP FLEX 2013 0.088 CONINSP 0.088

0T1776 GRATES, REPLACE BASINS, PROVIDE CONNECT ISOLATED BASINS TO NFA 2013 0.690 CONINSP 0.690

DRAINAGE SYSTEM TO PREVENT HIGHWAY FLOODING IN NASSAU &SUFFOLK STP FLEX 2013 0.881 CONST 0.881

NFA 2013 6.900 CONST 6.900

AQC:A10P MULTI TPC : $7.5-$12 M TOTAL 4YR COST : 9.333 0.000 0.774 8.559 0.000



NYSDOT ENVIRONMENTAL INITIATIVES CONTRACT -WILL PROVIDE STORMWATER NFA 2013 0.198 DETLDES 0.198

RUNOFF IMPROVEMENTS, IMPROVE ACCESS TO FISHING AREAS, RESTORE

0T1777 WETLAND AREAS AND CLEAN DRIANAGE ON VARIOUS STATE HIGHWAYS

NASSAU AND SUFFOLK COUNTY

AQC:C11P MULTI TPC : < $0.75 M TOTAL 4YR COST : 0.198 0.000 0.000 0.198 0.000



NYSDOT PREVENTATIVE MAINTENANCE BRIDGE REPAIRS TO MAINTAIN STRUCTURAL NFA 2013 0.318 DETLDES 0.318

INTEGRITY (LOCATIONS TO-BE-DETERMINED) ON VARIOUS STATE HIGHWAYS &

0T1778 PARKWAYS IN NASSAU & SUFFOLK COUNTIES.

AQC:A19P MULTI TPC : $3.3-$5.6 M TOTAL 4YR COST : 0.318 0.000 0.000 0.318 0.000



NYSDOT BRIDGE PAINTING, CLEANING, RUST REMOVAL & DISPOSAL TO MAINTAIN STP LG URBAN 2013 0.277 DETLDES 0.277

STRUCTURAL INTEGRITY (LOCATIONS TO-BE-DETERMINED) ON VARIOUS STATE NFA 2013 0.340 DETLDES 0.340

0T1779 HIGHWAYS & PARKWAYS IN NASSAU & SUFFOLK COUNTIES.

AQC:A19P MULTI TPC : $9.5-15.5 M TOTAL 4YR COST : 0.617 0.000 0.000 0.617 0.000

** NEW YORK STATE DEPARTMENT OF TRANSPORTATION **

Friday, August 26, 2011 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) on Draft Program Page 45 of 84

for REGION 10

AGENCY PROJECT DESCRIPTION TOTAL 4-YEAR PROGRAM (FFY)

4-YEAR PHASE Starting October 01, 2010

FUND SOURCES FFY

PIN PROGRAM

FFY FFY FFY FFY

in millions

of dollars 2011 2012 2013 2014

AQ CODE COUNTY TOTAL PROJECT COST



NYSDOT REMOVAL OR PAINT OVER OF GRAFITTI, REPAIR NOISE WALLS, MAINTAIN THE 7 NFA 2013 0.189 DETLDES 0.189

PARK & RIDE LOTS ALONG I495, ALL NYS BIKEWAYS, REST AREAS, PUBLIC

0T1781 TELEPHONE AREAS ALONG PARKWAYS & BUS SHELTERS ON NYS

RIGHT-OF-WAY TO MAINTAIN STATE OF GOOD REPAIR NASSAU & SUFFOLK

AQC:C8P MULTI TPC : $3.3-$5.6 M TOTAL 4YR COST : 0.189 0.000 0.000 0.189 0.000



NYSDOT INSTALLATION AND REPLACEMENT OF DETERIORATED PAVEMENT MARKINGS NFA 2013 0.405 DETLDES 0.405

& PLOWABLE REFLECTIVE MARKERS ON VARIOUS STATE HIGHWAYS &

0T1782 PARKWAYS IN NASSAU & SUFFOLK COUNTIES.

AQC:A10P MULTI TPC : $6-$9.4 M TOTAL 4YR COST : 0.405 0.000 0.000 0.405 0.000



NYSDOT ROUT & SEAL ASPHALT PAVEMENT CRACKS AND JOINT OVERLAY REPAIR TO NFA 2013 0.160 DETLDES 0.160

MAINTAIN STATE OF GOOD REPAIR (LOCATIONS TO-BE-DETERMINED) ON NFA 2013 0.160 DETLDES 0.160

0T1784 VARIOUS STATE HIGHWAYS & PARKWAYS IN NASSAU & SUFFOLK COUNTIES STP FLEX 2014 0.106 CONINSP 0.106

NFA 2014 0.027 CONINSP 0.027

STP FLEX 2014 0.883 CONST 0.883

NFA 2014 0.227 CONST 0.227

AQC:A10P NASSAU TPC : $1.2-$2.5 M TOTAL 4YR COST : 1.563 0.000 0.000 0.320 1.243



NYSDOT CONCRETE PAVEMENT REPAIR INCLUDING JOINT SEALING, DIAMOND GRINDING NFA 2014 0.117 DETLDES 0.117

ET AL TO MAINTAIN STATE OF GOOD REPAIR (LOCATIONS TO-BE-DETERMINED)

0T1785 ON VARIOUS STATE HIGHWAYS & PARKWAYS IN NASSAU & SUFFOLK COUNTIES.





AQC:A10P MULTI TPC : $2-$4 M TOTAL 4YR COST : 0.117 0.000 0.000 0.000 0.117



NYSDOT CLEAN BASINS FILLED W/DEBRIS, REPAIR, REPLACE OR PROVIDE MISSING NFA 2013 0.776 DETLDES 0.776

COLLARS, REPAIR OR REPLACE BROKEN PIPES, REPLACE GRATES, REPLACE STP FLEX 2014 0.088 CONINSP 0.088

0T1787 BASINS, PROVIDE CONNECT ISOLATED BASINS TO DRAINAGE SYSTEM TO NFA 2014 0.023 CONINSP 0.023

PREVENT HIGHWAY FLOODING IN NASSAU & SUFFOLK STP FLEX 2014 0.881 CONST 0.881

NFA 2014 0.227 CONST 0.227

AQC:A10P MULTI TPC : $1.2-$2.5 M TOTAL 4YR COST : 1.995 0.000 0.000 0.776 1.219



NYSDOT REPLACE OR UPGRADE SIGNALS AND/OR APPURTENANCES & INSTALL NEW NFA 2013 0.285 DETLDES 0.285

SIGNALS TO MAINTAIN STATE OF GOOD REPAIR OR SAFETY IMPROVEMENT ON STP LG URBAN 2014 0.264 CONINSP 0.264

0T1788 VARIOUS STATE HIGHWAYS IN NASSAU & SUFFOLK COUNTIES NFA 2014 0.068 CONINSP 0.068

STP LG URBAN 2014 2.645 CONST 2.645

NFA 2014 0.681 CONST 0.681

AQC:D2P MULTI TPC : $3.3-$5.6 M TOTAL 4YR COST : 3.943 0.000 0.000 0.285 3.658

** NEW YORK STATE DEPARTMENT OF TRANSPORTATION **

Friday, August 26, 2011 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) on Draft Program Page 46 of 84

for REGION 10

AGENCY PROJECT DESCRIPTION TOTAL 4-YEAR PROGRAM (FFY)

4-YEAR PHASE Starting October 01, 2010

FUND SOURCES FFY

PIN PROGRAM

FFY FFY FFY FFY

in millions

of dollars 2011 2012 2013 2014

AQ CODE COUNTY TOTAL PROJECT COST



NYSDOT RESPOND TO EMERGENCIES THAT ARE BEYOND THE CAPABILITIES OF NYS NFA 2013 0.160 DETLDES 0.160

MAINTENANCE FORCES TO ENSURE THE SAFETY OF THE PUBLIC (LOCATIONS

0T1789 TO-BE-DETERMINED) ON VARIOUS STATE HIGHWAYS & PARKWAYS IN NASSAU

& SUFFOLK COUNTIES.

AQC:D2P MULTI TPC : $2-$4 M TOTAL 4YR COST : 0.160 0.000 0.000 0.160 0.000



NYSDOT NY135 NORTHBOUND TO NY25 EASTBOUND RAMP IMPROVEMENTS (SCOPE TO BE NFA 2014 0.160 DETLDES 0.160

DETERMINED) TO MAINTAIN STATE OF GOOD REPAIR TOWN OF OYSTER BAY,

0T1792 NASSAU COUNTY

AQC:A19P NASSAU TPC : $1.2-$2.5 M TOTAL 4YR COST : 0.160 0.000 0.000 0.000 0.160



NYSDOT ROUT & SEAL ASPHALT PAVEMENT CRACKS AND JOINT OVERLAY REPAIR TO NFA 2014 0.192 DETLDES 0.192

MAINTAIN STATE OF GOOD REPAIR (LOCATIONS TO-BE-DETERMINED) ON

0T1860 VARIOUS STATE HIGHWAYS & PARKWAYS IN NASSAU & SUFFOLK COUNTIES

AQC:A10S MULTI TPC : $2-$4 M TOTAL 4YR COST : 0.192 0.000 0.000 0.000 0.192



NYSDOT ROUT & SEAL ASPHALT PAVEMENT CRACKS AND JOINT OVERLAY REPAIR TO NFA 2014 0.198 DETLDES 0.198

MAINTAIN STATE OF GOOD REPAIR (LOCATIONS TO-BE-DETERMINED) ON

0T1861 VARIOUS STATE HIGHWAYS & PARKWAYS IN NASSAU & SUFFOLK COUNTIES

AQC:A10S MULTI TPC : $2-$4 M TOTAL 4YR COST : 0.198 0.000 0.000 0.000 0.198



NYSDOT MILLING, CONCRETE & ASPHALT PAVEMENT REPAIRS, SINGLE COURSE NFA 2014 0.292 DETLDES 0.292

OVERLAY ON I495 (LOCATIONS TO-BE-DETERMINED) TO MAINTAIN STATE OF

0T1866 GOOD REPAIR IN NASSAU & SUFFOLK COUNTIES

AQC:A10S MULTI TPC : $7.5-$12 M TOTAL 4YR COST : 0.292 0.000 0.000 0.000 0.292



NYSDOT MILLING, CONCRETE & ASPHALT PAVEMENT REPAIRS, SINGLE COURSE NFA 2014 0.301 DETLDES 0.301

OVERLAY ON I495 (LOCATIONS TO-BE-DETERMINED) TO MAINTAIN STATE OF

0T1867 GOOD REPAIR IN NASSAU & SUFFOLK COUNTIES

AQC:A10S MULTI TPC : $0.6-$1.5 M TOTAL 4YR COST : 0.301 0.000 0.000 0.000 0.301



NYSDOT INSTALLATION AND REPLACEMENT OF DETERIORATED PAVEMENT MARKINGS NFA 2014 0.486 DETLDES 0.486

& PLOWABLE REFLECTIVE MARKERS ON VARIOUS STATE HIGHWAYS &

0T1869 PARKWAYS IN NASSAU & SUFFOLK COUNTIES.

AQC:A10S MULTI TPC : $1.2-$2.5 M TOTAL 4YR COST : 0.486 0.000 0.000 0.000 0.486

** NEW YORK STATE DEPARTMENT OF TRANSPORTATION **

Friday, August 26, 2011 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) on Draft Program Page 47 of 84

for REGION 10

AGENCY PROJECT DESCRIPTION TOTAL 4-YEAR PROGRAM (FFY)

4-YEAR PHASE Starting October 01, 2010

FUND SOURCES FFY

PIN PROGRAM

FFY FFY FFY FFY

in millions

of dollars 2011 2012 2013 2014

AQ CODE COUNTY TOTAL PROJECT COST



NYSDOT CLEAN BASINS FILLED W/DEBRIS, REPAIR, REPLACE OR PROVIDE MISSING NFA 2014 0.093 DETLDES 0.093

COLLARS, REPAIR BASIN WALLS, CLEAN CLOGGED PIPES, REPAIR OR REPLACE

0T1872 BROKEN PIPES, PROVIDE CONNECT ISOLATED BASINS TO DRAINAGE SYSTEM

TO PREVENT HIGHWAY FLOODING IN NASSAU&SUFFOLK CO.





AQC:A2S MULTI TPC : $7.5-$12 M TOTAL 4YR COST : 0.093 0.000 0.000 0.000 0.093



NYSDOT BRIDGE PAINTING, CLEANING, RUST REMOVAL & DISPOSAL (LOCATIONS NFA 2014 0.268 DETLDES 0.268

TO-BE-DETERMINED) TO MAINTAIN STRUCTURAL INTEGRITY ON VARIOUS

0T1878 STATE HIGHWAYS & PARKWAYS IN NASSAU & SUFFOLK COUNTIES.

AQC:A19S MULTI TPC : $7.5-$12 M TOTAL 4YR COST : 0.268 0.000 0.000 0.000 0.268



NYSDOT REHABILITATE RECHARGE BASINS INCLUDING SLOPE STABILIZATION, HEAD NFA 2014 0.157 DETLDES 0.157

WALL REPAIR, ET AL TO MAINTAIN STATE OF GOOD REPAIR(LOCATIONS

0T1882 TO-BE-DETERMINED) ON VARIOUS STATE HIGHWAYS & PARKWAYS IN NASSAU

& SUFFOLK COUNTIES.

AQC:A2S MULTI TPC : $2-$4 M TOTAL 4YR COST : 0.157 0.000 0.000 0.000 0.157



NYSDOT REPLACE OR UPGRADE SIGNALS AND/OR APPURTENANCES & INSTALL NEW NFA 2014 0.140 DETLDES 0.140

SIGNALS TO MAINTAIN STATE OF GOOD REPAIR OR SAFETY IMPROVEMENT ON

0T1885 VARIOUS STATE HIGHWAYS IN NASSAU & SUFFOLK COUNTIES

AQC:D2S MULTI TPC : $3.3-$5.6 M TOTAL 4YR COST : 0.140 0.000 0.000 0.000 0.140



NYSDOT PREVENTATIVE MAINTENANCE BRIDGE REPAIRS TO MAINTAIN STRUCTURAL NFA 2014 0.325 DETLDES 0.325

INTEGRITY (LOCATIONS TO-BE-DETERMINED) ON VARIOUS STATE HIGHWAYS &

0T1888 PARKWAYS IN NASSAU & SUFFOLK COUNTIES.

AQC:A19S MULTI TPC : $3.3-$5.6 M TOTAL 4YR COST : 0.325 0.000 0.000 0.000 0.325



NYSDOT SIGN REPAIRS & INSTALLATIONS TO MAINTAIN STATE OF GOOD REPAIR OR NFA 2014 0.120 DETLDES 0.120

SAFETY IMPROVEMENT ON VARIOUS STATE HIGHWAYS & PARKWAYS IN

0T1891 NASSAU & SUFFOLK COUNTIES

AQC:A7P MULTI TPC : $2-$4 M TOTAL 4YR COST : 0.120 0.000 0.000 0.000 0.120

** NEW YORK STATE DEPARTMENT OF TRANSPORTATION **

Friday, August 26, 2011 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) on Draft Program Page 48 of 84

for REGION 10

AGENCY PROJECT DESCRIPTION TOTAL 4-YEAR PROGRAM (FFY)

4-YEAR PHASE Starting October 01, 2010

FUND SOURCES FFY

PIN PROGRAM

FFY FFY FFY FFY

in millions

of dollars 2011 2012 2013 2014

AQ CODE COUNTY TOTAL PROJECT COST



NYSDOT REMOVAL OR PAINT OVER OF GRAFITTI, REPAIR NOISE WALLS, MAINTAIN THE 7 NFA 2014 0.198 DETLDES 0.198

PARK & RIDE LOTS ALONG I495, ALL NYS BIKEWAYS, REST AREAS, PUBLIC

0T1896 TELEPHONE AREAS ALONG PARKWAYS & BUS SHELTERS ON NYS

RIGHT-OF-WAY TO MAINTAIN STATE OF GOOD REPAIR NASSAU AND SUFFOLK





AQC:C8S MULTI TPC : $4.6-$7.5 M TOTAL 4YR COST : 0.198 0.000 0.000 0.000 0.198



NYSDOT PROVIDE LANDSCAPE RESTORATION & MAINTAIN EXISTING LANDSCAPE AREAS, NFA 2014 0.192 DETLDES 0.192

TRIM OR REMOVE TREES THAT IMPEDE VISIBILITY (LOCATIONS

0T1897 TO-BE-DETERMINED) ON VARIOUS STATE HIGHWAYS & PARKWAYS IN NASSAU

& SUFFOLK COUNTIES.

AQC:C11S MULTI TPC : $3.3-$5.6 M TOTAL 4YR COST : 0.192 0.000 0.000 0.000 0.192



NYSDOT LOCAL SAFE STREETS AND TRAFFIC CALMING BLOCK OUT LOCATIONS TO BE STP FLEX 2011 0.016 CONINSP 0.016

DETERMINED NASSAU AND SUFFOLK COUNTY NFA 2011 0.004 CONINSP 0.004

0T1902 STP FLEX 2011 0.135 CONST 0.135

NFA 2011 0.034 CONST 0.034

AQC:A7P MULTI TPC : $1.2-$2.5 M TOTAL 4YR COST : 0.189 0.189 0.000 0.000 0.000



NYSDOT LOCAL SAFE STREETS AND TRAFFIC CALMING BLOCK OUT LOCATIONS TO BE STP FLEX 2012 0.095 CONINSP 0.095

DETERMINED NASSAU AND SUFFOLK COUNTY NFA 2012 0.024 CONINSP 0.024

0T1903 STP FLEX 2012 0.857 CONST 0.857

NFA 2012 0.214 CONST 0.214

AQC:A7P MULTI TPC : $1.2-$2.5 M TOTAL 4YR COST : 1.190 0.000 1.190 0.000 0.000



NYSDOT LOCAL SAFE STREETS AND TRAFFIC CALMING BLOCK OUT LOCATIONS TO BE STP FLEX 2013 0.048 CONINSP 0.048

DETERMINED NASSAU AND SUFFOLK COUNTY NFA 2013 0.012 CONINSP 0.012

0T1904 STP FLEX 2013 0.431 CONST 0.431

NFA 2013 0.108 CONST 0.108

AQC:A7P MULTI TPC : $1.2-$2.5 M TOTAL 4YR COST : 0.599 0.000 0.000 0.599 0.000



NYSDOT LOCAL SAFE STREETS AND TRAFFIC CALMING BLOCK OUT LOCATIONS TO BE STP FLEX 2014 0.110 CONINSP 0.110

DETERMINED NASSAU AND SUFFOLK COUNTY NFA 2014 0.027 CONINSP 0.027

0T1905 STP FLEX 2014 1.100 CONST 1.100

NFA 2014 0.275 CONST 0.275

AQC:A7P MULTI TPC : $1.2-$2.5 M TOTAL 4YR COST : 1.512 0.000 0.000 0.000 1.512

** NEW YORK STATE DEPARTMENT OF TRANSPORTATION **

Friday, August 26, 2011 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) on Draft Program Page 49 of 84

for REGION 10

AGENCY PROJECT DESCRIPTION TOTAL 4-YEAR PROGRAM (FFY)

4-YEAR PHASE Starting October 01, 2010

FUND SOURCES FFY

PIN PROGRAM

FFY FFY FFY FFY

in millions

of dollars 2011 2012 2013 2014

AQ CODE COUNTY TOTAL PROJECT COST



NASSAU CO. NASSAU COUNTY TRAFFIC SIGNAL SYSTEM OPERATION PHASE 4. THIS PROJECT STP LG URBAN 2012 0.950 OPER 0.950

WILL ENSURE THAT THE SYSTEM THAT WAS EXPANDED OPERATES AS NFA 2012 0.238 OPER 0.238

0T1929 EFFICIENTLY AS POSSIBLE STP LG URBAN 2013 0.700 OPER 0.700

NFA 2013 0.175 OPER 0.175

AQC:A7P NASSAU TPC : $1.2-$2.5 M TOTAL 4YR COST : 2.063 0.000 1.188 0.875 0.000



NASSAU CO. THE MONEY FOR THIS PROJECT WAS MOVED INTO A NC HIGHWAYS NFA 2011 0.100 CONINSP 0.100

RESURFACING PROJECT IN 2011. NFA 2011 1.200 CONST 1.200

0T1933

AQC:A10P NASSAU TPC : $1.2-$2.5 M TOTAL 4YR COST : 1.300 1.300 0.000 0.000 0.000



NASSAU CO. NASSAU COUNTY INCIDENT MANAGEMENT SYSTEM PHASE 3. MAXIMIZES THE CMAQ 2011 0.144 CONINSP 0.144

EFFICIENCY OF TRAFFIC FLOW ALONG MAJOR ARTERIES BY INSTALLING AN NFA 2011 0.036 CONINSP 0.036

0T1939 INCIDENT MANAGEMENT SYSTEM (VIDEO CAMERAS). CMAQ 2011 1.296 CONST 1.296

NFA 2011 0.324 CONST 0.324

AQC:A6P NASSAU TPC : $1.2-$2.5 M TOTAL 4YR COST : 1.800 1.800 0.000 0.000 0.000



NYSDOT PROVIDE FOR AMERICANS WITH DISABILITEIS ACT REQUIREMENTS INCLUDING NFA 2012 0.179 DETLDES 0.179

ADDITIONAL SIGNING, PAVEMENT MARKINGS, REPAIR DRAINAGE GRATES NFA 2014 0.276 CONINSP 0.276

0T1953 ALONG EXISTING ON STREET BIKEPATHS. CONST OR REHAB PEDESTRIAN NFA 2014 2.300 CONST 2.300

FACILITIES IN NASSAU & SUFFOLK COUNTIES.

AQC:C2P MULTI TPC : $2-$4 M TOTAL 4YR COST : 2.755 0.000 0.179 0.000 2.576



LOCAL RECONSTRUCT PAVEMENT, INSTALL CURBS, SIDEWALK AND DRAINAGE ON HPP 2011 0.298 DETLDES 0.298

TOWN LINE RD BETWEEN NY25 AND CLAY PITTS RD TO IMPROVE PEDESTRIAN NFA 2011 0.074 DETLDES 0.074

0T1994 SAFETY AND PREVENT FLOODING.NY224 SECTION 117 NFA 2011 0.140 CONINSP 0.140

NFA 2011 1.060 CONST 1.060

AQC:A10P SUFFOLK TPC : $1.2-$2.5 M TOTAL 4YR COST : 1.572 1.572 0.000 0.000 0.000



LOCAL REHABILITATE WEST SHORE RD BETWEEN CREEK ROAD AND WENDOVER DR IN HPP 2011 0.546 CONST 0.546

HUNTINGTON TOWN INCLUDING REPLACEMENT OF BULKHEADS AND NEW NFA 2011 1.375 CONST 1.375

0T1999 DRAINAGE. (NY225 SECTION 117) HPP 2011 0.248 DETLDES 0.248

NFA 2011 0.062 DETLDES 0.062

HPP 2011 0.198 SCOPING 0.198

NFA 2011 0.049 SCOPING 0.049

AQC:A10P SUFFOLK TPC : $2-$4 M TOTAL 4YR COST : 2.478 2.478 0.000 0.000 0.000

** NEW YORK STATE DEPARTMENT OF TRANSPORTATION **

Friday, August 26, 2011 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) on Draft Program Page 50 of 84

for REGION 10

AGENCY PROJECT DESCRIPTION TOTAL 4-YEAR PROGRAM (FFY)

4-YEAR PHASE Starting October 01, 2010

FUND SOURCES FFY

PIN PROGRAM

FFY FFY FFY FFY

in millions

of dollars 2011 2012 2013 2014

AQ CODE COUNTY TOTAL PROJECT COST



LOCAL STREET SCAPE ENHANCEMENTS ALONG NY27 IN VILLAGE OF FREEPORT. (NY225 HPP 2011 0.400 CONST 0.400

SECTION 117) NFA 2011 1.479 CONST 1.479

0T2024 NFA 2011 0.094 MISC 0.094

AQC:C2 NASSAU TPC : $1.2-$2.5 M TOTAL 4YR COST : 1.973 1.973 0.000 0.000 0.000



LOCAL RECONSTRUCTION OF 3.9 MILES OF EXISTING ROADWAYS WITHIN THE VILLAGE HPP 2011 0.800 CONST 0.800

OF ROCKVILLE CENTRE. STRUCTURAL REHABILITATION OF EXISTINGROADS NFA 2011 1.600 CONST 1.600

0T2026 TO MEET ANTICIPATED TRAFFIC VOLUME INCREASES OVER THE NEXT SEVERAL NFA 2011 0.100 CONINSP 0.100

DECADES. HPP#869

AQC:A6P NASSAU TPC : $2-$4 M TOTAL 4YR COST : 2.500 2.500 0.000 0.000 0.000



LOCAL UNGRADE & REPAVE NORTH SIDE OF MINEOLA LONG ISLAND RAIL ROAD HPP 2011 0.072 CONST 0.072

STATION BETWEEN MINEOLA BOULEVARD AND THIRD AVENUE IN THE VILLAGE NFA 2011 0.100 CONST 0.100

0T2027 OF MINEOLA.IN ORDER TO ATTAIN ADA ACCESIBLE DESIGN COMPLIANCE WITH HPP 2011 0.038 DETLDES 0.038

TITLE III HPP#714 NFA 2011 0.015 DETLDES 0.015

HPP 2011 0.010 SCOPING 0.010

NFA 2011 0.010 SCOPING 0.010

NFA 2011 0.005 CONINSP 0.005

AQC:C14 NASSAU TPC : < $0.75 M TOTAL 4YR COST : 0.250 0.250 0.000 0.000 0.000



NYSDOT REPAIR AND REPLACE GUIDERAIL SECTIONS (LOCATIONS TO-BE-DETERMINED) NFA 2012 0.180 DETLDES 0.180

AS SAFETY IMPROVEMENT ON VARIOUS STATE HIGHWAYS & PARKWAYS IN NFA 2014 1.102 CONINSP 1.102

0T2033 NASSAU & SUFFOLK COUNTIES. NFA 2014 11.019 CONST 11.019

AQC:A9P MULTI TPC : $9.5-15.5 M TOTAL 4YR COST : 12.301 0.000 0.180 0.000 12.121



NYSDOT REPAIR AND REPLACE GUIDERAIL SECTIONS (LOCATIONS TO-BE-DETERMINED) NFA 2013 0.184 DETLDES 0.184

AS SAFETY IMPROVEMENT ON VARIOUS STATE HIGHWAYS & PARKWAYS IN

0T2034 NASSAU & SUFFOLK COUNTIES.

AQC:A9P MULTI TPC : $9.5-15.5 M TOTAL 4YR COST : 0.184 0.000 0.000 0.184 0.000



NYSDOT REPAIR AND REPLACE GUIDERAIL SECTIONS (LOCATIONS TO-BE-DETERMINED) NFA 2013 0.189 DETLDES 0.189

AS SAFETY IMPROVEMENT ON VARIOUS STATE HIGHWAYS & PARKWAYS IN

0T2035 NASSAU & SUFFOLK COUNTIES.

AQC:A9P MULTI TPC : $3.3-$5.6 M TOTAL 4YR COST : 0.189 0.000 0.000 0.189 0.000

** NEW YORK STATE DEPARTMENT OF TRANSPORTATION **

Friday, August 26, 2011 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) on Draft Program Page 51 of 84

for REGION 10

AGENCY PROJECT DESCRIPTION TOTAL 4-YEAR PROGRAM (FFY)

4-YEAR PHASE Starting October 01, 2010

FUND SOURCES FFY

PIN PROGRAM

FFY FFY FFY FFY

in millions

of dollars 2011 2012 2013 2014

AQ CODE COUNTY TOTAL PROJECT COST



NYSDOT REPAIR AND REPLACE GUIDERAIL SECTIONS (LOCATIONS TO-BE-DETERMINED) NFA 2014 0.194 DETLDES 0.194

AS SAFETY IMPROVEMENT ON VARIOUS STATE HIGHWAYS & PARKWAYS IN

0T2036 NASSAU & SUFFOLK COUNTIES.

AQC:A9P MULTI TPC : $3.3-$5.6 M TOTAL 4YR COST : 0.194 0.000 0.000 0.000 0.194



NYSDOT REPAIR AND REPLACE GUIDERAIL SECTIONS (LOCATIONS TO-BE-DETERMINED) NFA 2014 0.194 DETLDES 0.194

AS SAFETY IMPROVEMENT ON VARIOUS STATE HIGHWAYS & PARKWAYS IN

0T2037 NASSAU & SUFFOLK COUNTIES.

AQC:A9P MULTI TPC : $3.3-$5.6 M TOTAL 4YR COST : 0.194 0.000 0.000 0.000 0.194



NYSDOT RESPOND TO EMERGENCIES AND NEEDED REPAIRS THAT ARE BEYOND THE NFA 2011 0.113 DETLDES 0.113

CAPABILITIES OF NYS MAINTENANCE FORCES TO ENSURE THE SAFETY OF THE NFA 2012 0.320 CONINSP 0.320

0T2051 PUBLIC ON VARIOUS STATE HIGHWAYS & PARKWAYS IN NASSAU & SUFFOLK NFA 2012 3.196 CONST 3.196

COUNTIES.

AQC:C14P NASSAU TPC : $3.3-$5.6 M TOTAL 4YR COST : 3.629 0.113 3.516 0.000 0.000



NYSDOT RESPOND TO EMERGENCIES AND NEEDED REPAIRS THAT ARE BEYOND THE NFA 2012 0.113 DETLDES 0.113

CAPABILITIES OF NYS MAINTENANCE FORCES TO ENSURE THE SAFETY OF THE NFA 2013 0.265 CONINSP 0.265

0T2052 PUBLIC (LOCATIONS TO BE DETERMINED) ON VARIOUS STATE HIGHWAYS & NFA 2013 2.206 CONST 2.206

PARKWAYS IN NASSAU & SUFFOLK COUNTIES.

AQC:C14P NASSAU TPC : $2-$4 M TOTAL 4YR COST : 2.584 0.000 0.113 2.471 0.000



NYSDOT RESPOND TO EMERGENCIES AND NEEDED REPAIRS THAT ARE BEYOND THE NFA 2013 0.118 DETLDES 0.118

CAPABILITIES OF NYS MAINTENANCE FORCES TO ENSURE THE SAFETY OF THE NFA 2014 0.273 CONINSP 0.273

0T2053 PUBLIC (LOCATIONS TO BE DETERMINED) ON VARIOUS STATE HIGHWAYS & NFA 2014 2.272 CONST 2.272

PARKWAYS IN NASSAU & SUFFOLK COUNTIES.

AQC:C14P NASSAU TPC : $2-$4 M TOTAL 4YR COST : 2.663 0.000 0.000 0.118 2.545



NYSDOT RESPOND TO EMERGENCIES AND NEEDED REPAIRS THAT ARE BEYOND THE NFA 2014 0.118 DETLDES 0.118

CAPABILITIES OF NYS MAINTENANCE FORCES TO ENSURE THE SAFETY OF THE

0T2054 PUBLIC (LOCATIONS TO-BE-DETERMINED) ON VARIOUS STATE HIGHWAYS &

PARKWAYS IN NASSAU & SUFFOLK COUNTIES.

AQC:A10S MULTI TPC : $2-$4 M TOTAL 4YR COST : 0.118 0.000 0.000 0.000 0.118

** NEW YORK STATE DEPARTMENT OF TRANSPORTATION **

Friday, August 26, 2011 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) on Draft Program Page 52 of 84

for REGION 10

AGENCY PROJECT DESCRIPTION TOTAL 4-YEAR PROGRAM (FFY)

4-YEAR PHASE Starting October 01, 2010

FUND SOURCES FFY

PIN PROGRAM

FFY FFY FFY FFY

in millions

of dollars 2011 2012 2013 2014

AQ CODE COUNTY TOTAL PROJECT COST



NYSDOT CLEAN CULVERTS FILLED WITH DEBRIS, REPAIR DAMAGED OR IN-NEED NFA 2012 0.174 DETLDES 0.174

CULVERTS TO MAINTAIN STATE OF GOOD REPAIR ON VARIOUS STATE NFA 2013 0.265 CONINSP 0.265

0T2074 HIGHWAYS & PARKWAYS IN NASSAU & SUFFOLK COUNTIES. LOCATIONS TO BE NFA 2013 2.206 CONST 2.206

DETERMINED.

AQC:A6P MULTI TPC : $2-$4 M TOTAL 4YR COST : 2.645 0.000 0.174 2.471 0.000



NYSDOT PREVENTIVE MAINTENANCE CULVERT CLEAN/REPAIR/REPLACE CONTRACT NFA 2012 0.174 DETLDES 0.174

NFA 2013 0.265 CONINSP 0.265

0T2075 NFA 2013 2.206 CONST 2.206

AQC:A6P MULTI TPC : $2-$4 M TOTAL 4YR COST : 2.645 0.000 0.174 2.471 0.000



NYSDOT CLEAN CULVERTS FILLED WITH DEBRIS, REPAIR DAMAGED OR IN-NEED NFA 2013 0.471 DETLDES 0.471

CULVERTS TO MAINTAIN STATE OF GOOD REPAIR ON VARIOUS STATE NFA 2014 0.552 CONINSP 0.552

0T2076 HIGHWAYS & PARKWAYS IN NASSAU & SUFFOLK COUNTIES. LOCATIONS TO BE NFA 2014 5.520 CONST 5.520

DETERMINED.

AQC:A6P MULTI TPC : $6-$9.4 M TOTAL 4YR COST : 6.543 0.000 0.000 0.471 6.072



NYSDOT CLEAN CULVERTS FILLED WITH DEBRIS, REPAIR DAMAGED OR IN-NEED NFA 2014 0.509 DETLDES 0.509

CULVERTS TO MAINTAIN STATE OF GOOD REPAIR ON VARIOUS STATE

0T2077 HIGHWAYS & PARKWAYS IN NASSAU & SUFFOLK COUNTIES. LOCATIONS TO BE

DETERMINED.

AQC:A6P MULTI TPC : $3.3-$5.6 M TOTAL 4YR COST : 0.509 0.000 0.000 0.000 0.509



NYSDOT CLEAN CULVERTS FILLED WITH DEBRIS, REPAIR DAMAGED OR IN-NEED NFA 2014 0.182 DETLDES 0.182

CULVERTS TO MAINTAIN STATE OF GOOD REPAIR ON VARIOUS STATE

0T2078 HIGHWAYS & PARKWAYS IN NASSAU & SUFFOLK COUNTIES. LOCATIONS TO BE

DETERMINED.

AQC:A6S MULTI TPC : $2-$4 M TOTAL 4YR COST : 0.182 0.000 0.000 0.000 0.182



LOCAL ELEVATE AND CONSTRUCT DRAINAGE IMPROVEMENTS TO BEACH ROAD, HPP 2011 0.300 DETLDES 0.300

CANAL ROAD,&SEA BREEZE ROAD IN MASSAPEQUA, THE TOWN OF OYSTER BAY NFA 2011 0.075 DETLDES 0.075

0T2148 WANTS TO IMPROVE VEHICULAR &PEDESTRIAN TRAFFIC FLOW IN AN HPP 2012 0.167 CONINSP 0.167

EXISITNG RESIDENTIAL LOCATION EXPERIENCING CHRONIC FLOODING. NY404 NFA 2012 0.042 CONINSP 0.042

HPP 2012 1.932 CONST 1.932

NFA 2012 0.483 CONST 0.483

AQC:A2P NASSAU TPC : $2-$4 M TOTAL 4YR COST : 2.999 0.375 2.624 0.000 0.000

** NEW YORK STATE DEPARTMENT OF TRANSPORTATION **

Friday, August 26, 2011 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) on Draft Program Page 53 of 84

for REGION 10

AGENCY PROJECT DESCRIPTION TOTAL 4-YEAR PROGRAM (FFY)

4-YEAR PHASE Starting October 01, 2010

FUND SOURCES FFY

PIN PROGRAM

FFY FFY FFY FFY

in millions

of dollars 2011 2012 2013 2014

AQ CODE COUNTY TOTAL PROJECT COST



LOCAL THE TOWN OF SMITHTOWN IS RESURFACING DETERIORATED PAVEMENT. THE HPP 2011 0.048 CONINSP 0.048

DRAINGAGE SYSTEM WILL BE REHABILITATED TO PREVENT FLOODING, NFA 2011 0.012 CONINSP 0.012

0T2150 REPLACED DAMAGED CURBS ,SIDEWALKS WILL BE REPAIRED, NEW HPP 2011 0.560 CONST 0.560

CURBS,SIDEWALKS & GUIDERAIL INSTALLATION FOR SAFETY, NY 624 NFA 2011 0.140 CONST 0.140

HPP 2011 0.088 DETLDES 0.088

NFA 2011 0.022 DETLDES 0.022

HPP 2011 0.040 PRELDES 0.040

NFA 2011 0.010 PRELDES 0.010

AQC:A10P SUFFOLK TPC : $0.6-$1.5 M TOTAL 4YR COST : 0.920 0.920 0.000 0.000 0.000



NYSDOT PROVIDE BRIDGE REPAIRS ON AN AS-NEEDED OR EMERGENCY BASIS AS AN NFA 2012 0.226 DETLDES 0.226

EMERGENCY RESPONSE ON VARIOUS STATE HIGHWAYS & PARKWAYS IN NFA 2013 0.267 CONINSP 0.267

0T2168 NASSAU & SUFFOLK COUNTIES. NFA 2013 2.223 CONST 2.223

AQC:A19P MULTI TPC : $2-$4 M TOTAL 4YR COST : 2.716 0.000 0.226 2.490 0.000



NYSDOT PROVIDE BRIDGE REPAIRS ON AN AS-NEEDED OR EMERGENCY BASIS AS AN NFA 2013 0.200 DETLDES 0.200

EMERGENCY RESPONSE ON VARIOUS STATE HIGHWAYS & PARKWAYS IN

0T2169 NASSAU & SUFFOLK COUNTIES.

AQC:A19P MULTI TPC : $3.3-$5.6 M TOTAL 4YR COST : 0.200 0.000 0.000 0.200 0.000



NYSDOT PROVIDE SAFETY&PAVEMENT IMPROVEMENTS AND EMERGENCY REPAIRS ON NFA 2014 0.243 DETLDES 0.243

AN AS-NEEDED-BASIS AS AN EMERGENCY REPSONSE ON VARIOUS STATE

0T2173 HIGHWAYS & PARKWAYS IN NASSAU & SUFFOLK COUNTIES

AQC:A2P MULTI TPC : $6-$9.4 M TOTAL 4YR COST : 0.243 0.000 0.000 0.000 0.243



NYSDOT PROVIDE STORMWATER RUN-OFF IMPROVEMENTS, IMPROVE ACCESS TO NFA 2012 0.184 DETLDES 0.184

FISHING AREAS, RESTORE WETLAND AREAS, CLEAN DRAINAGE STRUCTURES @ NFA 2014 0.273 CONINSP 0.273

0T2181 ENVIRONMENTALLY SENSITIVE LOCATIONS ON VARIOUS STATE HIGHWAYS IN NFA 2014 2.272 CONST 2.272

NASSAU AND SUFFOLK COUNTIES

AQC:C11P MULTI TPC : $2-$4 M TOTAL 4YR COST : 2.729 0.000 0.184 0.000 2.545



NYSDOT ENVIRONMENTAL INITIATIVE- WILL PROVIDE STORMWATER RUN-OFF NFA 2014 0.189 DETLDES 0.189

IMPROVEMENTS, IMPROVE ACCES TO FISHING AREAS, RESTORE WETLAND

0T2182 AREAS AND CLEAN DRAINAGE STRUCTURES. LOCATIONS TO BE DETERMINED.

NASSAU AND SUFFOLK COUNTY

AQC:C11P MULTI TPC : $2-$4 M TOTAL 4YR COST : 0.189 0.000 0.000 0.000 0.189

** NEW YORK STATE DEPARTMENT OF TRANSPORTATION **

Friday, August 26, 2011 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) on Draft Program Page 54 of 84

for REGION 10

AGENCY PROJECT DESCRIPTION TOTAL 4-YEAR PROGRAM (FFY)

4-YEAR PHASE Starting October 01, 2010

FUND SOURCES FFY

PIN PROGRAM

FFY FFY FFY FFY

in millions

of dollars 2011 2012 2013 2014

AQ CODE COUNTY TOTAL PROJECT COST



NYSDOT ENVIRONMENTAL INITIATIVE- WILL PROVIDE STORMWATER RUN-OFF NFA 2014 0.189 DETLDES 0.189

IMPROVEMENTS, IMPROVE ACCES TO FISHING AREAS, RESTORE WETLAND

0T2183 AREAS AND CLEAN DRAINAGE STRUCTURES. LOCATIONS TO BE DETERMINED.

NASSAU AND SUFFOLK COUNTY

AQC:C11P MULTI TPC : $2-$4 M TOTAL 4YR COST : 0.189 0.000 0.000 0.000 0.189



NYSDOT ENVIRONMENTAL INITIATIVE- WILL PROVIDE STORMWATER RUN-OFF NFA 2014 0.194 DETLDES 0.194

IMPROVEMENTS, IMPROVE ACCES TO FISHING AREAS, RESTORE WETLAND

0T2184 AREAS AND CLEAN DRAINAGE STRUCTURES. LOCATIONS TO BE DETERMINED.

NASSAU AND SUFFOLK COUNTY

AQC:C11S MULTI TPC : $3.3-$5.6 M TOTAL 4YR COST : 0.194 0.000 0.000 0.000 0.194



NYSDOT OVERHEAD SIGN REPAIR CONTRACT (LOCATIONS TO-BE-DETERMINED) TO NFA 2013 0.184 DETLDES 0.184

MAINTAIN STRUCTURAL INTEGRITY ON VARIOUS STATE HIGHWAYS & NFA 2014 0.420 CONINSP 0.420

0T2190 PARKWAYS IN NASSAU & SUFFOLK COUNTIES. NFA 2014 4.200 CONST 4.200

AQC:A6P MULTI TPC : $4.6-$7.5 M TOTAL 4YR COST : 4.804 0.000 0.000 0.184 4.620



NYSDOT RECONSTRUCT SIGNALS AND/OR APPURTENANCES & INSTALL NEW SIGNALS AS NFA 2013 0.187 DETLDES 0.187

A SAFETY IMPROVEMENT OR MAINTAIN STATE OF GOOD REAPIR ON VARIOUS STP FLEX 2014 0.272 CONINSP 0.272

0T2191 STATE HIGHWAYS IN NASSAU & SUFFOLK COUNTIES NFA 2014 0.068 CONINSP 0.068

STP FLEX 2014 2.724 CONST 2.724

NFA 2014 0.681 CONST 0.681

AQC:D2P MULTI TPC : $3.3-$5.6 M TOTAL 4YR COST : 3.932 0.000 0.000 0.187 3.745



NYSDOT RECONSTRUCT SIGNALS AND/OR APPURTENANCES & INSTALL NEW SIGNALS AS NFA 2014 0.192 DETLDES 0.192

A SAFETY IMPROVEMENT OR MAINTAIN STATE OF GOOD REAPIR ON VARIOUS

0T2192 STATE HIGHWAYS IN NASSAU & SUFFOLK COUNTIES

AQC:D2S MULTI TPC : $3.3-$5.6 M TOTAL 4YR COST : 0.192 0.000 0.000 0.000 0.192



NYSDOT RECONSTRUCT SIGNALS AND/OR APPURTENANCES & INSTALL NEW SIGNALS AS NFA 2014 0.187 DETLDES 0.187

A SAFETY IMPROVEMENT OR MAINTAIN STATE OF GOOD REAPIR ON VARIOUS

0T2194 STATE HIGHWAYS IN NASSAU & SUFFOLK COUNTIES

AQC:D2S MULTI TPC : $3.3-$5.6 M TOTAL 4YR COST : 0.187 0.000 0.000 0.000 0.187

** NEW YORK STATE DEPARTMENT OF TRANSPORTATION **

Friday, August 26, 2011 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) on Draft Program Page 55 of 84

for REGION 10

AGENCY PROJECT DESCRIPTION TOTAL 4-YEAR PROGRAM (FFY)

4-YEAR PHASE Starting October 01, 2010

FUND SOURCES FFY

PIN PROGRAM

FFY FFY FFY FFY

in millions

of dollars 2011 2012 2013 2014

AQ CODE COUNTY TOTAL PROJECT COST



NYSDOT REPLACE GUIDESIGN PANELS THAT ARE WORN, DAMAGED OR DEFICIENT TO NFA 2013 0.182 DETLDES 0.182

MAINTAIN STATE OF GOOD REPAIR ON VARIOUS STATE HIGHWAYS & NFA 2014 0.136 CONINSP 0.136

0T2204 PARKWAYS IN NASSAU AND SUFFOLK COUNTIES NFA 2014 1.135 CONST 1.135

AQC:C13P MULTI TPC : $1.2-$2.5 M TOTAL 4YR COST : 1.453 0.000 0.000 0.182 1.271



NYSDOT REPLACE GUIDESIGN PANELS THAT ARE WORN, DAMAGED OR DEFICIENT TO NFA 2014 0.738 DETLDES 0.738

MAINTAIN STATE OF GOOD REPAIR ON VARIOUS STATE HIGHWAYS &

0T2205 PARKWAYS IN NASSAU AND SUFFOLK COUNTIES

AQC:C13S MULTI TPC : $7.5-$12 M TOTAL 4YR COST : 0.738 0.000 0.000 0.000 0.738



NYSDOT REPLACE GUIDESIGN PANELS THAT ARE WORN, DAMAGED OR DEFICIENT TO NFA 2014 0.140 CONINSP 0.140

MAINTAIN STATE OF GOOD REPAIR ON VARIOUS STATE HIGHWAYS &

0T2207 PARKWAYS IN NASSAU AND SUFFOLK COUNTIES

AQC:C13S MULTI TPC : $1.2-$2.5 M TOTAL 4YR COST : 0.140 0.000 0.000 0.000 0.140



NYSDOT PROVIDE FOR AMERICANS WITH DISABILITEIS ACT REQUIREMENTS INCLUDING NFA 2012 0.182 DETLDES 0.182

ADDITIONAL SIGNING, PAVEMENT MARKINGS, REPAIR DRAINAGE GRATES HPP 2013 0.223 CONINSP 0.223

0T2219 ALONG EXISTING ON STREET BIKEPATHS. CONST OR REHAB PEDESTRIAN NFA 2013 0.056 CONINSP 0.056

FACILITIES IN NASSAU & SUFFOLK COUNTIES. HPP#2951,NY554" HPP 2013 2.112 CONST 2.112

NFA 2013 0.528 CONST 0.528

STP FLEX 2013 0.189 CONINSP 0.189

NFA 2013 0.047 CONINSP 0.047

STP FLEX 2013 1.887 CONST 1.887

NFA 2013 0.471 CONST 0.471

AQC:C2P MULTI TPC : $4.6-$7.5 M TOTAL 4YR COST : 5.695 0.000 0.182 5.513 0.000



NYSDOT PROVIDE FOR AMERICANS WITH DISABILITEIS ACT REQUIREMENTS INCLUDING NFA 2014 0.192 DETLDES 0.192

ADDITIONAL SIGNING, PAVEMENT MARKINGS, REPAIR DRAINAGE GRATES

0T2220 ALONG EXISTING ON STREET BIKEPATHS. CONST OR REHAB PEDESTRIAN

FACILITIES IN NASSAU & SUFFOLK COUNTIES.

AQC:C2P MULTI TPC : $2-$4 M TOTAL 4YR COST : 0.192 0.000 0.000 0.000 0.192



SUFFOLK CO. CLOSED LOOP SIGNAL SYSTEM, PH6. UPDATE AND INTERCONNECT THE CMAQ 2011 0.100 CONINSP 0.100

TRAFFIC SIGNAL SYSTEM ON VARIOUS COUNTY ROADS SO THEY CAN BE NFA 2011 0.025 CONINSP 0.025

0T2252 CONTROLLED & OPTIMIZED BY THE COUNTYS COMPUTERIZED CONTROL CMAQ 2011 0.900 CONST 0.900

SYSTEM ON CR012, CR017, CR047, CR093, CR80,CR16 NFA CONST

2011 0.225 0.225

AQC:A6P SUFFOLK TPC : $2-$4 M TOTAL 4YR COST : 1.250 1.250 0.000 0.000 0.000

** NEW YORK STATE DEPARTMENT OF TRANSPORTATION **

Friday, August 26, 2011 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) on Draft Program Page 56 of 84

for REGION 10

AGENCY PROJECT DESCRIPTION TOTAL 4-YEAR PROGRAM (FFY)

4-YEAR PHASE Starting October 01, 2010

FUND SOURCES FFY

PIN PROGRAM

FFY FFY FFY FFY

in millions

of dollars 2011 2012 2013 2014

AQ CODE COUNTY TOTAL PROJECT COST



SUFFOLK CO. CLOSED LOOP SIGNAL SYSTEM, PH7. UPDATE AND INTERCONNECT THE CMAQ 2012 0.800 CONST 0.800

TRAFFIC SIGNAL SYSTEM ON VARIOUS COUNTY ROADS SO THEY CAN BE NFA 2012 0.200 CONST 0.200

0T2253 CONTROLLED & OPTIMIZED BY THE COUNTYS COMPUTERIZED CONTROL

SYSTEM ON CR004, CR013, CR058,CR67, CR083, CR096, CR97, CR057, CR111.

AQC:NON SUFFOLK TPC : $0.6-$1.5 M TOTAL 4YR COST : 1.000 0.000 1.000 0.000 0.000



NASSAU CO. OLD COUNTRY ROAD TRAFFIC SIGNAL HEAD REPLACEMENT TO REPLACE THE NFA 2011 2.875 CONST 2.875

EXISTING LENSES WITH 12" SIGNAL HEAD

0T2256

AQC:A6P NASSAU TPC : $2-$4 M TOTAL 4YR COST : 2.875 2.875 0.000 0.000 0.000



NASSAU CO. PURPOSE OF THIS PROJECT IS TO REPLACE EXISING 8 INCH TRAFFIC SIGNAL STP LG URBAN 2013 6.200 CONST 6.200

INDICATORS WITH NEW 12 INCH LED SIGNAL DISPLAYS WHICH WILL IMPROVE NFA 2013 1.550 CONST 1.550

0T2257 MOTORISTS VISABILTY OF THE SIGNAL, REDUCE ACCIDENTS, AND REDUCE

ENERTY CONSUMPTION AND MAINTENANCE COSTS. LOCATIONS INCLUDE ALL

TRAFFIC SIGNALS ON MERRICK ROAD FROM THE QUEENS BORDER TO THE

SUFFOLK BORDER.



AQC:A6P NASSAU TPC : $6-$9.4 M TOTAL 4YR COST : 7.750 0.000 0.000 7.750 0.000



NASSAU CO. 2011 NASSAU COUNTY PAVEMENT MARKING TO MAINTAIN PAVEMENT NFA 2011 0.200 CONINSP 0.200

DELINEATION AT INTERSECTIONS. INCLUDING STOP BARS,CROSSWALKS AND NFA 2011 0.800 CONST 0.800

0T2258 ROAD MARKING PHASE 5

AQC:A10P NASSAU TPC : $0.6-$1.5 M TOTAL 4YR COST : 1.000 1.000 0.000 0.000 0.000



NASSAU CO. 2012 NASSAU COUNTY PAVEMENT MARKING TO MAINTAIN PAVEMENT STP LG URBAN 2012 1.000 CONST 1.000

MARKING TO MAINTAIN PAVEMENT DELINEATION AT INTERSECTIONS. NFA 2012 0.250 CONST 0.250

0T2259 INCLUDING STOP BARS,CROSSWALKS AND ROAD MARKING PHASE 6

AQC:A10P NASSAU TPC : $0.6-$1.5 M TOTAL 4YR COST : 1.250 0.000 1.250 0.000 0.000



NASSAU CO. NASSSAU COUNTY TRAFFIC SIGNAL EXPANSION, PH 6: VARIOUS INTERSECTIONS CMAQ 2011 2.200 CONST 2.200

ON ROSLYN RD, MAIN ST, OLD NORTHERN BLVD, BRYANT ST, & W SHORE RD. NFA 2011 0.550 CONST 0.550

0T2260 UPDATE THE SIGNALS SO THEY CAN BE CONTROLLED & OPTIMIZED BY THE

COUNTYS COMPUTERIZED CONTROL SYSTEM.

AQC:NON NASSAU TPC : $2-$4 M TOTAL 4YR COST : 2.750 2.750 0.000 0.000 0.000

** NEW YORK STATE DEPARTMENT OF TRANSPORTATION **

Friday, August 26, 2011 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) on Draft Program Page 57 of 84

for REGION 10

AGENCY PROJECT DESCRIPTION TOTAL 4-YEAR PROGRAM (FFY)

4-YEAR PHASE Starting October 01, 2010

FUND SOURCES FFY

PIN PROGRAM

FFY FFY FFY FFY

in millions

of dollars 2011 2012 2013 2014

AQ CODE COUNTY TOTAL PROJECT COST



NASSAU CO. NASSAU COUNTY TRAFFIC SIGNAL TIMING IMPROVEMENTS PHASE 3. MAXIMIZE CMAQ 2012 0.200 DETLDES 0.200

THE EFFICIENCY OF THE COUNTY'S EXISTING ROADWAY SYSTEM BY NFA 2012 0.050 DETLDES 0.050

0T2261 PROMOTING SAFE,EFFICIENT TRAFFIC FLOW VIA IMPROVED TRAFFIC SIGNAL.





AQC:A7P NASSAU TPC : < $0.75 M TOTAL 4YR COST : 0.250 0.000 0.250 0.000 0.000



NASSAU CO. NASSAU COUNTY INCIDENT MANAGEMENT SYSTEM PHASE 4. MAXIMIZE THE CMAQ 2012 0.112 CONINSP 0.112

EFFICIENCY OF THE TRAFFIC FLOW ALONG MAJOR ARTRIES BY INSTALLING AN NFA 2012 0.028 CONINSP 0.028

0T2262 INCIDENT MANAGEMENT SYSTEM (VIDEO CAMERAS) CMAQ 2012 1.008 CONST 1.008

NFA 2012 0.252 CONST 0.252

AQC:A6P NASSAU TPC : $1.2-$2.5 M TOTAL 4YR COST : 1.400 0.000 1.400 0.000 0.000



NASSAU CO. NASSAU COUNTY RESURFACING 2012. REHABILITATE EXISTING ROAD STP LG URBAN 2011 0.399 CONINSP 0.399

PAVEMENTS IN ORDER TO PROVIDE FOR BETTER AND SAFER SURFACES. NFA 2011 0.100 CONINSP 0.100

0T2264 STP LG URBAN 2011 3.592 CONST 3.592

NFA 2011 0.898 CONST 0.898

STP LG URBAN 2012 4.250 CONST 4.250

NFA 2012 1.063 CONST 1.063

AQC:A10P NASSAU TPC : $9.5-15.5 M TOTAL 4YR COST : 10.302 4.989 5.313 0.000 0.000



NASSAU CO. PURPOSE OF THIS PROJECT IS TO REPLACE EXISING 8 INCH TRAFFIC SIGNAL STP LG URBAN 2012 3.200 CONST 3.200

INDICATORS WITH NEW 12 INCH LED SIGNAL DISPLAYS TO IMPROVE MOTORISTS NFA 2012 0.800 CONST 0.800

0T2266 VISABILTY , REDUCE ACCIDENTS, ENERGY SAVINGS & MAINTENANCE COSTS

ON OLD COUNTRY ROAD FROM APEX RD TO ROUND SWAMP RD





AQC:A6P NASSAU TPC : $3.3-$5.6 M TOTAL 4YR COST : 4.000 0.000 4.000 0.000 0.000



SUFFOLK CO. SUFFOLK COUNTY 2011 PAVEMENT MAINTENANCE PROGRAM. PROJECT WILL STP LG URBAN 2011 0.440 CONINSP 0.440

PROVIDE FUNDING TO RESURFACE (IMPROVE RIDING SURFACE) AND REPAIR NFA 2011 0.110 CONINSP 0.110

0T2271 DAMAGED DRAINAGE STRUCTURES ON COUNTY ROADS. STP LG URBAN 2011 2.860 CONST 2.860

NFA 2011 0.715 CONST 0.715

AQC:A10P SUFFOLK TPC : $3.3-$5.6 M TOTAL 4YR COST : 4.125 4.125 0.000 0.000 0.000



NYSDOT REPLACE IN-NEED OR DAMAGED CULVERTS (LOCATIONS TO BE DETERMINED) NFA 2013 1.346 DETLDES 1.346

TO MAINTAIN STATE OF GOOD REPAIR ON VARIOUS STATE HIGHWAYS & NFA 2013 1.139 ROWACQU 1.139

0T2274 PARKWAYS IN NASSAU & SUFFOLK COUNTIES.

AQC:A6P MULTI TPC : $9.5-15.5 M TOTAL 4YR COST : 2.485 0.000 0.000 2.485 0.000

** NEW YORK STATE DEPARTMENT OF TRANSPORTATION **

Friday, August 26, 2011 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) on Draft Program Page 58 of 84

for REGION 10

AGENCY PROJECT DESCRIPTION TOTAL 4-YEAR PROGRAM (FFY)

4-YEAR PHASE Starting October 01, 2010

FUND SOURCES FFY

PIN PROGRAM

FFY FFY FFY FFY

in millions

of dollars 2011 2012 2013 2014

AQ CODE COUNTY TOTAL PROJECT COST



NASSAU CO. PURPOSE OF THIS PROJECT IS TO REPLACE TRAFFIC SIGNAL INDICATORS WITH CMAQ 2012 0.270 CONINSP 0.270

NEW LED INDICATORS IN ORDER TO REDUCE ENERGY COSTS, IMPROVE NFA 2012 0.067 CONINSP 0.067

0T2276 VISABILITY AND DECREASE MAINTENANCE COSTS. BY USING LED SIGNAL CMAQ 2012 2.680 CONST 2.680

INDICATORS, LESS ENERGY IS UTILIZED TO OPERATE THE SIGNAL RESULTING IN NFA 2012 0.600 CONST 0.600

DECREASED AIR POLLUTION.

.



AQC:A6P NASSAU TPC : $3.3-$5.6 M TOTAL 4YR COST : 3.617 0.000 3.617 0.000 0.000



NASSAU CO. PURPOSE OF THIS PROJECT IS TO REPLACE TRAFFIC SIGNAL INDICATORS WITH CMAQ 2013 0.270 CONINSP 0.270

NEW LED INDICATORS IN ORDER TO REDUCE ENERGY COSTS, IMPROVE NFA 2013 0.067 CONINSP 0.067

0T2277 VISABILITY AND DECREASE MAINTENANCE COSTS. BY USING LED SIGNAL CMAQ 2013 2.430 CONST 2.430

INDICATORS, LESS ENERGY IS UTILIZED TO OPERATE THE SIGNAL. NFA 2013 0.607 CONST 0.607



AQC:A6P NASSAU TPC : $2-$4 M TOTAL 4YR COST : 3.374 0.000 0.000 3.374 0.000



NYSDOT BICYCLE AND PEDESTRIAN SAFETY IMPROVEMENTS, TO IMPROVE SAFETY MAIN HPP 2013 0.120 CONINSP 0.120

STREET, RIVERHEAD HPP#2951, NY 554 NFA 2013 0.030 CONINSP 0.030

0T2296 HPP 2013 1.080 CONST 1.080

NFA 2013 0.270 CONST 0.270

AQC:A2 SUFFOLK TPC : $1.2-$2.5 M TOTAL 4YR COST : 1.500 0.000 0.000 1.500 0.000



LOCAL THE TOWN OF BROOKHAVEN IS RESURFACING TOTAL OF 1.8 MILES , CLOVER HPP 2011 0.019 CONINSP 0.019

LANE FROM BAY AVE. TO BAY RD. THESE ROADS ARE DETERIORATED TO THE NFA 2011 0.005 CONINSP 0.005

0T2300 POINT THAT PAVEMENT RESURFACING IS NECESSARY TO MAINTAIN THE HPP 2011 0.167 CONST 0.167

CURRENT TRANSPORTATION SYSTEM,

NFA 2011 0.042 CONST 0.042

NY 620

AQC:A10 SUFFOLK TPC : < $0.75 M TOTAL 4YR COST : 0.233 0.233 0.000 0.000 0.000



LOCAL THE TOWN OF BROOKHAVEN IS RESURFACING DARE RD. FROM OLD TOWN RD. HPP 2011 0.031 CONINSP 0.031

TO RTE 25.THESE ROADS ARE DETERIORATED TO THE POINT THAT PAVEMENT NFA 2011 0.008 CONINSP 0.008

0T2301 RESURFACING IS NECESSARY TO MAINTAIN THE CURRENT TRANSPORTATION HPP 2011 0.272 CONST 0.272

SYSTEM.NY621 NFA 2011 0.068 CONST 0.068

AQC:A10 SUFFOLK TPC : < $0.75 M TOTAL 4YR COST : 0.379 0.379 0.000 0.000 0.000

** NEW YORK STATE DEPARTMENT OF TRANSPORTATION **

Friday, August 26, 2011 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) on Draft Program Page 59 of 84

for REGION 10

AGENCY PROJECT DESCRIPTION TOTAL 4-YEAR PROGRAM (FFY)

4-YEAR PHASE Starting October 01, 2010

FUND SOURCES FFY

PIN PROGRAM

FFY FFY FFY FFY

in millions

of dollars 2011 2012 2013 2014

AQ CODE COUNTY TOTAL PROJECT COST



LOCAL THE TOWN OF BROOKHAVEN IS RESURFACING 1.2 MILES FROM PIPE STAVE HPP 2011 0.017 CONINSP 0.017

HOLLOW RD. FROM HARBOR BEACH RD TO OLD COUNTRY ROAD.THESE ROADS NFA 2011 0.004 CONINSP 0.004

0T2303 ARE DETERIORATED TO THE POINT THAT PAVEMENT RESURFACING IS HPP 2011 0.155 CONST 0.155

NECESSARY TO MAINTAIN THE CURRENT TRANSPORTATION SYSTEM NFA 2011 0.039 CONST 0.039

AQC:A10 SUFFOLK TPC : < $0.75 M TOTAL 4YR COST : 0.215 0.215 0.000 0.000 0.000



NYSDOT OPERATIONAL IMPROVEMENTS ON NASSAU EXPRESSWAY(NY878) (SCOPE TO BE NFA 2014 2.500 DETLDES 2.500

DETERMINED) TOWN OF HEMPSTEAD, NASSAU COUNTY

0T2307

AQC:J1Z NASSAU TPC : $32-$50 M TOTAL 4YR COST : 2.500 0.000 0.000 0.000 2.500



LIRR SCOPE: DESIGN AND CONSTRUCT A NEW HIGHWAY BRIDGE TO CARRY HBRR 2013 10.000 CONST 10.000

VEHICULAR TRAFFIC OVER THE LONG ISLAND RAIL ROAD PORT WASHINGTON NFA 2013 2.500 CONST 2.500

0T2308 BRANCH RIGHT OF WAY. THE AGING COLONIAL ROAD BRIDGE WILL BE

REMOVED AND DEMOLISHED TO INCREASE SAFETY OF TRAVELERS





AQC:A19P NASSAU TPC : $9.5-15.5 M TOTAL 4YR COST : 12.500 0.000 0.000 12.500 0.000



NYSDOT BRIDGE REPAIRS ON CARLLS STRIAGHT PATH AND HALF HOLLOW RD OVER I495 IM 2012 0.425 CONINSP 0.425

TO MAINTAIN STRUCTURAL INTEGRITY IN HUNTINGTON TOWN, SUFFOLK NFA 2012 0.127 CONINSP 0.127

0T2318 COUNTY. IM 2012 4.251 CONST 4.251

BIN#1049350,1049350 NFA 2012 1.200 CONST 1.200

AQC:A19 SUFFOLK TPC : $6-$9.4 M TOTAL 4YR COST : 6.003 0.000 6.003 0.000 0.000



NYSDOT PAVEMENT MATERIALS & EQUIPMENT PURCHASE FOR MAINTENANCE NASSAU NFA 2013 1.200 MISC 1.200

AND SUFFOLK COUNTY

0T2321

AQC:A10S MULTI TPC : $0.6-$1.5 M TOTAL 4YR COST : 1.200 0.000 0.000 1.200 0.000



NYSDOT PAVEMENT MATERIALS & EQUIPMENT PURCHASE FOR MAINTENANCE NASSAU NFA 2014 1.200 MISC 1.200

AND SUFFOLK COUNTY

0T2322

AQC:A10S MULTI TPC : $0.6-$1.5 M TOTAL 4YR COST : 1.200 0.000 0.000 0.000 1.200

** NEW YORK STATE DEPARTMENT OF TRANSPORTATION **

Friday, August 26, 2011 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) on Draft Program Page 60 of 84

for REGION 10

AGENCY PROJECT DESCRIPTION TOTAL 4-YEAR PROGRAM (FFY)

4-YEAR PHASE Starting October 01, 2010

FUND SOURCES FFY

PIN PROGRAM

FFY FFY FFY FFY

in millions

of dollars 2011 2012 2013 2014

AQ CODE COUNTY TOTAL PROJECT COST



NYSDOT REHABILITATE BRIDGES CARRYING I495 TO MAINTAIN STRUCTURAL INTEGRITY IM 2013 0.991 DETLDES 0.991

(LOCATIONS TO BE DETERMINED) IN NASSAU & SUFFOLK COUNTIES. NFA 2013 0.110 DETLDES 0.110

0T2328

AQC:A19P MULTI TPC : $12.5-$19 M TOTAL 4YR COST : 1.101 0.000 0.000 1.101 0.000



NYSDOT REHABILITATE BRIDGES CARRYING I495 TO MAINTAIN STRUCTURAL INTEGRITY IM 2013 0.991 DETLDES 0.991

(LOCATIONS TO BE DETERMINED) IN NASSAU & SUFFOLK COUNTIES. NFA 2013 0.110 DETLDES 0.110

0T2329

AQC:A19P MULTI TPC : $12.5-$19 M TOTAL 4YR COST : 1.101 0.000 0.000 1.101 0.000



NYSDOT SMART TRANSPORTATION INITIATIVE PROJECT TO IMPROVE PEDESTRIAN AND NFA 2014 0.931 DETLDES 0.931

BICYCLE SAFETY (LOCATIONS TO BE DETERMINED) ON VARIOUS STATE ROADS

0T2330 IN NASSAU & SUFFOLK COUNTIES.

AQC:A7P MULTI TPC : $7.5-$12 M TOTAL 4YR COST : 0.931 0.000 0.000 0.000 0.931



LOCAL WOODBINE AVE REHAB BETWEEN 5TH AVE & BEACH AVE, VILLAGE OF HPP 2011 0.054 CONINSP 0.054

NORTHPORT. RECONSTRUCTION OF ROADWAY & SHOULDER SECTIONS, NFA 2011 0.013 CONINSP 0.013

0T2358 INSTALLATION OF RETAINING WALL & GUIDERAIL FOR PEDESTRIAN AND HPP 2011 0.451 CONST 0.451

TRAFFIC SAFETY.HPP#656 ,NY321 NFA 2011 0.113 CONST 0.113

HPP 2011 0.045 DETLDES 0.045

NFA 2011 0.011 DETLDES 0.011

AQC:A10 SUFFOLK TPC : $0.6-$1.5 M TOTAL 4YR COST : 0.687 0.687 0.000 0.000 0.000



LOCAL INSTALLATION OF GUIDERAIL & RETAINING WALL ALONG WOODBINE AVENUE HPP 2011 0.007 CONINSP 0.007

AT INTERSECTION OF 5TH AVE,RECONSTRUCT DETERIORATED ROADWAY, NFA 2011 0.002 CONINSP 0.002

0T2359 SHOULDER SECTION INCLUDING CURBS AT WOODBINE &BEACH AVENUE TO HPP 2011 0.056 CONST 0.056

INCREASE SAFETY IN THE VILLAGE OF NORTHPORT.HPP#3232 ,NY 576 NFA 2011 0.014 CONST 0.014

HPP 2011 0.006 DETLDES 0.006

NFA 2011 0.001 DETLDES 0.001

AQC:C2 SUFFOLK TPC : < $0.75 M TOTAL 4YR COST : 0.086 0.086 0.000 0.000 0.000



SUFFOLK CO. CONSTRUCT THE OCKERS SURFACE WATER TRANSPORTATION CENTER ON THE STP ENHANCE 2011 0.000 CONINSP 0.000

LONG ISLAND MARITIME MUSEUM GROUNDS AT CHARLES DOMINY COUNTY NFA 2011 0.046 CONINSP 0.046

0T2366 PARK IN WEST SAYVILLE TO PROVIDE PUBLIC EDUCATION ON SURFACE WATER STP ENHANCE 2011 0.458 CONST 0.458

TRANSPORATION , MAINTAINED PROPERLY LANDMARK VESSELS ON SITE. NFA 2011 0.115 CONST 0.115



AQC:C13 SUFFOLK TPC : $0.6-$1.5 M TOTAL 4YR COST : 0.619 0.619 0.000 0.000 0.000

** NEW YORK STATE DEPARTMENT OF TRANSPORTATION **

Friday, August 26, 2011 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) on Draft Program Page 61 of 84

for REGION 10

AGENCY PROJECT DESCRIPTION TOTAL 4-YEAR PROGRAM (FFY)

4-YEAR PHASE Starting October 01, 2010

FUND SOURCES FFY

PIN PROGRAM

FFY FFY FFY FFY

in millions

of dollars 2011 2012 2013 2014

AQ CODE COUNTY TOTAL PROJECT COST



NASSAU CO. IMPROVE ACCESS ROAD & EXIT LANES FOR CENTER FOR ADVANCED MEDICINE HPP 2011 0.551 CONINSP 0.551

& NORTH SHORE-LONG ISLAND JEWISH HOSPITAL ON LAKEVILLE ROAD. THE NFA 2011 0.138 CONINSP 0.138

0T2367 PRIMARY ACCESS RD. TO THE FACILITY ON THE WESTSIDE OF LAKEVILLE RD. HPP 2011 4.415 CONST 4.415

WILL BE ENLARGED TO ACCOMODATE EXTRA TRAFFIC. NY345,587 NFA 2011 1.104 CONST 1.104

HPP 2011 0.512 DETLDES 0.512

NFA 2011 0.128 DETLDES 0.128

AQC:J1Z NASSAU TPC : $6-$9.4 M TOTAL 4YR COST : 6.848 6.848 0.000 0.000 0.000



NYSDOT REPLACE IN-NEED OR DAMAGED CULVERTS (LOCATIONS TO BE DETERMINED) NFA 2012 0.756 DETLDES 0.756

TO MAINTAIN STATE OF GOOD REPAIR ON VARIOUS STATE HIGHWAYS &

0T2375 PARKWAYS IN NASSAU & SUFFOLK COUNTIES.

AQC:A6P MULTI TPC : $7.5-$12 M TOTAL 4YR COST : 0.756 0.000 0.756 0.000 0.000



NYSDOT IMPROVE SIDEWALK CURB RAMPS, CROSSWALKS AND PEDESTRIAN CROSSING NFA 2012 1.035 DETLDES 1.035

SIGNALS TO COMPLY WITH THE AMERICANS WITH DISABILITIES ACT

0T2376 (LOCATIONS TO-BE-DETERMINED) ON VARIOUS STATE ROADS IN NASSAU &

SUFFOLK COUNTIES.

AQC:C2P MULTI TPC : $6-$9.4 M TOTAL 4YR COST : 1.035 0.000 1.035 0.000 0.000



NYSDOT REHABILITATE OR REPLACE THE SOUND BARRIERS THAT ARE ALONG THE I495 NFA 2013 3.184 PRELDES 3.184

CORRIDOR WHICH ARE NEARING THE END OF THEIR USEFUL SERVICE LIFE TO

0T2377 MAINTAIN STATE OF GOOD REPAIR NASSAU AND SUFFOLK COUNTIES





AQC:C13S MULTI TPC : $2-$4 M TOTAL 4YR COST : 3.184 0.000 0.000 3.184 0.000



NYSDOT IMPROVE SIDEWALK CURB RAMPS, CROSSWALKS AND PEDESTRIAN CROSSING NFA 2014 0.874 DETLDES 0.874

SIGNALS TO COMPLY WITH THE AMERICANS WITH DISABILITIES ACT

0T2380 (LOCATIONS TO-BE-DETERMINED) ON VARIOUS STATE ROADS IN NASSAU &

SUFFOLK COUNTIES.

AQC:C2ZW MULTI TPC : $6-$9.4 M TOTAL 4YR COST : 0.874 0.000 0.000 0.000 0.874



NYSDOT IMPROVE SIDEWALK CURB RAMPS, CROSSWALKS AND PEDESTRIAN CROSSING NFA 2013 2.122 ROWACQU 2.122

SIGNALS TO COMPLY WITH THE AMERICANS WITH DISABILITIES ACT NFA 2014 1.592 DETLDES 1.592

0T2381 (LOCATIONS TO-BE-DETERMINED) ON VARIOUS STATE ROADS IN NASSAU &

SUFFOLK COUNTIES.

AQC:C2P MULTI TPC : $7.5-$12 M TOTAL 4YR COST : 3.714 0.000 0.000 2.122 1.592

** NEW YORK STATE DEPARTMENT OF TRANSPORTATION **

Friday, August 26, 2011 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) on Draft Program Page 62 of 84

for REGION 10

AGENCY PROJECT DESCRIPTION TOTAL 4-YEAR PROGRAM (FFY)

4-YEAR PHASE Starting October 01, 2010

FUND SOURCES FFY

PIN PROGRAM

FFY FFY FFY FFY

in millions

of dollars 2011 2012 2013 2014

AQ CODE COUNTY TOTAL PROJECT COST



LOCAL IMPROVE HOSPITAL ROAD BRIDGE BETWEEN CR 99 AND CR 101, HPP 2011 0.324 CONINSP 0.324

PATCHOGUE.DESIGN OF BRIDGE WIDENING & CONST.OF APPROACH ROADS TO NFA 2011 0.081 CONINSP 0.081

0T2384 ALLEVIATE TRAFFIC CONGESTION INCLUDING ADDING LEFT TURN HPP 2011 3.244 CONST 3.244

LANE,TRAFFIC SIGNAL,BIKE LANE,LANDSCAPING ETC.EARMARK# 1240,NY739 NFA 2011 0.811 CONST 0.811

HPP 2011 0.560 DETLDES 0.560

NFA 2011 0.340 DETLDES 0.340

NFA 2011 0.500 PRELDES 0.500

AQC:D3 SUFFOLK TPC : $4.6-$7.5 M TOTAL 4YR COST : 5.860 5.860 0.000 0.000 0.000



SUFFOLK CO. REHABILITATION OF CR11, PULASKI ROAD FROM LARKFIELD ROAD TO NY25A STP LG URBAN 2011 0.780 CONINSP 0.780

(APPROXIMATELY 3.5 MILES). PROJECT WOULD RESURFACE ROADWAY AND NFA 2011 0.195 CONINSP 0.195

0T2392 IMPROVE DRAINAGE WHICH WILL IMPROVE USEFUL LIFE OF ROADWAY. STP LG URBAN 2011 4.720 CONST 4.720

NFA 2011 1.180 CONST 1.180

AQC:D2P SUFFOLK TPC : $6-$9.4 M TOTAL 4YR COST : 6.875 6.875 0.000 0.000 0.000



NYSDOT REMEDIATE HIGHWAY RUNOFF ON NASSAU EXPRESSWAY TO PREVENT NFA 2011 0.500 DETLDES 0.500

HIGHWAY FLOODING IN TOWN OF HEMPSTEAD, NASSAU COUNTY NFA 2013 0.523 CONINSP 0.523

0T2394 NFA 2013 5.228 CONST 5.228

AQC:A2P NASSAU TPC : $6-$9.4 M TOTAL 4YR COST : 6.251 0.500 0.000 5.751 0.000



NYSDOT INSTALL BRIDGE FENCING ALONG BRIDGE PARAPETS THAT HAVE PEDESTRIAN NFA 2011 0.250 DETLDES 0.250

ACCESS AS A SAFETY MEASURE ON VARIOUS STATE HIGHWAYS IN NASSAU AND NFA 2012 0.418 CONINSP 0.418

0T2395 SUFFOLK COUNTIES NFA 2012 4.183 CONST 4.183

AQC:A10P MULTI TPC : $4.6-$7.5 M TOTAL 4YR COST : 4.851 0.250 4.601 0.000 0.000



NYSDOT PIL & HSI SAFETY STUDIES.PIL & HSI SAFETY STUDIES-MULTIPLE HIGHWAY HSIP 2011 0.540 DETLDES 0.540

SAFETY INVESTIGATION (HSI) STUDIES IN NASSAU & SUFFOLK COUNTY.THE NFA 2011 0.060 DETLDES 0.060

0T2396 PROJECT DEVELOPMENT WILL OCCUR BASED OFF OF THE STRATEGIC HIGHWAY HSIP 2012 0.540 DETLDES 0.540

SAFETY PLAN WITH THE LOCATIONS TO BE DETERMINED. NFA 2012 0.060 DETLDES 0.060

HSIP 2013 0.540 DETLDES 0.540

NFA 2013 0.060 DETLDES 0.060

HSIP 2014 0.540 DETLDES 0.540

NFA 2014 0.060 DETLDES 0.060

AQC:A6P MULTI TPC : $3.3-$5.6 M TOTAL 4YR COST : 2.400 0.600 0.600 0.600 0.600

** NEW YORK STATE DEPARTMENT OF TRANSPORTATION **

Friday, August 26, 2011 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) on Draft Program Page 63 of 84

for REGION 10

AGENCY PROJECT DESCRIPTION TOTAL 4-YEAR PROGRAM (FFY)

4-YEAR PHASE Starting October 01, 2010

FUND SOURCES FFY

PIN PROGRAM

FFY FFY FFY FFY

in millions

of dollars 2011 2012 2013 2014

AQ CODE COUNTY TOTAL PROJECT COST



NYSDOT COLLECTION & WARRANT STUDY TASKS - PERFORM TRAFFIC DATA NFA 2011 0.350 DETLDES 0.350

COLLECTION, SAFETY STUDIES AND OTHER TRAFFIC AND SAFETY TASKS ON NFA 2012 0.350 DETLDES 0.350

0T2397 VARIOUS HIGHWAYS & PARKWAYS IN NASSAU & SUFFOLK COUNTIES. NFA 2013 0.350 DETLDES 0.350

LOCATIONS TO BE DETERMINED NFA 2014 0.350 DETLDES 0.350

AQC:A7P MULTI TPC : $1.2-$2.5 M TOTAL 4YR COST : 1.400 0.350 0.350 0.350 0.350



NASSAU CO. OCEAN AVE. AT MERRICK ROAD INTERSECTION IMPROVEMENTS, NASSAU CMAQ 2012 2.400 CONST 2.400

COUNTY. INSTALLATION OF A DEDICATED LEFT TURN LANE TO ALLEVIATE NFA 2012 0.600 CONST 0.600

0T2403 TRAFFIC CONGESTION.

AQC:D1P NASSAU TPC : $2-$4 M TOTAL 4YR COST : 3.000 0.000 3.000 0.000 0.000



SUFFOLK CO. PROCUREMENT OF INTELLIGENT TRANSPORTATION SYSTEMS (ITS) EQUIPMENT CMAQ 2012 1.200 DETLDES 1.200

FOR THE SUFFOLK COUNTY HIGHWAY SYSTEM (SCOPE TO BE DETERMINED). NFA 2012 0.300 DETLDES 0.300

0T2404 PROJECT IS INTENDED TO IDENTIFY ROADWAYS WITH SIGNIFICANT INCIDENT CMAQ 2013 1.200 CONST 1.200

RELATED CONGESTION & RECOMMEND ITS IMPROVEMENT NFA 2013 0.300 CONST 0.300



AQC:J1Z SUFFOLK TPC : $2-$4 M TOTAL 4YR COST : 3.000 0.000 1.500 1.500 0.000



SUFFOLK CO. CR46 (WILLIAM FLOYD PARKWAY) I-495 TO NEW MORICHES RD. PROJECT WILL STP LG URBAN 2012 8.000 CONST 8.000

RECONSTRUCT CR 46/NEW MORICHES INTERSECTION &REHABILITATE CR46/LIRR NFA 2012 2.000 CONST 2.000

0T2405 BRIDGE TO EXTEND LIFE, IN THE TOWN OF BROOKHAVEN. IT ALSO IMPROVE

SAFTEY & CONGESTION AT INTERSECTION BIN 3300789

AQC:A10P SUFFOLK TPC : $7.5-$12 M TOTAL 4YR COST : 10.000 0.000 10.000 0.000 0.000



NASSAU CO. NASSAU COUNTY BRIDGE REHABILITATION; PAINTING AND MINOR HBRR 2014 4.000 CONST 4.000

REHABILITATION OF CHARLES LINDBERGH OVER THE MEADOWBROOK NFA 2014 1.000 CONST 1.000

0T2406 PARKWAY AND SANTINI BRIDGE OVER THE MEADOWBROOK PARKWAY

AQC:A19P NASSAU TPC : $4.6-$7.5 M TOTAL 4YR COST : 5.000 0.000 0.000 0.000 5.000



SUFFOLK CO. SUFFOLK COUNTY 2012 PAVEMENT MAINTENANCE PROGRAM. PROJECT WILL STP LG URBAN 2012 2.500 CONST 2.500

PROVIDE FUNDING TO RESURFACE (IMPROVE RIDING SURFACE) AND REPAIR NFA 2012 0.625 CONST 0.625

0T2407 DAMAGED DRAINAGE STRUCTURES ON COUNTY ROADS.

AQC:A10P SUFFOLK TPC : $2-$4 M TOTAL 4YR COST : 3.125 0.000 3.125 0.000 0.000

** NEW YORK STATE DEPARTMENT OF TRANSPORTATION **

Friday, August 26, 2011 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) on Draft Program Page 64 of 84

for REGION 10

AGENCY PROJECT DESCRIPTION TOTAL 4-YEAR PROGRAM (FFY)

4-YEAR PHASE Starting October 01, 2010

FUND SOURCES FFY

PIN PROGRAM

FFY FFY FFY FFY

in millions

of dollars 2011 2012 2013 2014

AQ CODE COUNTY TOTAL PROJECT COST



NASSAU CO. NASSAU COUNTY SIGNAL COMMUNICATIONS EXPANSION PHASE 1. PROVIDE CMAQ 2013 1.200 CONST 1.200

OPERATION AND MAINTENANCE OF ANCILLARY EQUIPMENT RELATED TO THE NFA 2013 0.300 CONST 0.300

0T2409 SYSTEM AND SIGNAL CONTROL.

AQC:J1Z NASSAU TPC : $1.2-$2.5 M TOTAL 4YR COST : 1.500 0.000 0.000 1.500 0.000



NASSAU CO. NASSAU COUNTY SIGNAL EXPANSION PHASE 8.UPDATE EXISTING SIGNAL CMAQ 2014 5.000 OPER 5.000

AND CONSTRUCT NEW SIGNAL SYSTEMS AT VARIOUS LOCATIONS WITHIN NFA 2014 1.250 OPER 1.250

0T2414 NASSAU COUNTY

AQC:NON NASSAU TPC : $6-$9.4 M TOTAL 4YR COST : 6.250 0.000 0.000 0.000 6.250



NASSAU CO. PURPOSE OF THIS PROJECT IS TO INSTALL VMS SIGNS AT VARIOUS LOCATIONS CMAQ 2014 4.200 OPER 4.200

IN NASSAU COUNTY TO INFORM MOTORISTS OF INFORMATION RELATED TO NFA 2014 1.050 OPER 1.050

0T2415 TRAFFIC CONGESTION AND/OR CLOSURES.

AQC:J1Z NASSAU TPC : $4.6-$7.5 M TOTAL 4YR COST : 5.250 0.000 0.000 0.000 5.250



NASSAU CO. PURPOSE OF THIS PROJECT IS TO EXPAND THE COUNTY'S EXISTING FIBER OPTIC CMAQ 2014 5.500 OPER 5.500

NETWORK IN ORDER TO PROVIDE COMMUNICATIONS TO ADDITOINAL TRAFFIC NFA 2014 1.375 OPER 1.375

0T2416 SIGNALS, WHICH WILL ALLOW US TO OPTIMIZE SIGNAL TIMING AND REDUCE

VEHICULAR CONGESTION.

AQC:J1Z NASSAU TPC : $6-$9.4 M TOTAL 4YR COST : 6.875 0.000 0.000 0.000 6.875



SUFFOLK CO. PHASE II OF SUFFOLK COUNTY INTELLIGENT TRANSPORTATION SYSTEMS (ITS) CMAQ 2014 1.800 OPER 1.800

PROGRAM. THIS PROJECT WILL CONTINUE INSTALLMENT OF ITS EQUIPMENT NFA 2014 0.450 OPER 0.450

0T2417 TO ADDRESS CONGESTION ON COUNTY ROADWAYS FROM ROADWAY

INCIDENTS.

AQC:J1Z SUFFOLK TPC : $2-$4 M TOTAL 4YR COST : 2.250 0.000 0.000 0.000 2.250



SUFFOLK CO. CLOSED LOOP SIGNAL SYSTEM. UPDATE AND INTERCONNECT THE TRAFFIC CMAQ 2013 1.600 CONST 1.600

SIGNAL SYSTEM ON VARIOUS COUNTY ROADS SO THEY CAN BE CONTROLLED & NFA 2013 0.400 CONST 0.400

0T2418 OPTIMIZED BY THE COUNTYS COMPUTERIZED CONTROL SYSTEM (LOCATIONS

TO BE DETERMINED).

AQC:NON SUFFOLK TPC : $1.2-$2.5 M TOTAL 4YR COST : 2.000 0.000 0.000 2.000 0.000



SUFFOLK CO. CLOSED LOOP SIGNAL SYSTEM. UPDATE AND INTERCONNECT THE TRAFFIC CMAQ 2014 1.600 CONST 1.600

SIGNAL SYSTEM ON VARIOUS COUNTY ROADS SO THEY CAN BE CONTROLLED & NFA 2014 0.400 CONST 0.400

0T2419 OPTIMIZED BY THE COUNTYS COMPUTERIZED CONTROL SYSTEM. LOCATIONS

TO BE DETERMINED.

AQC:NON SUFFOLK TPC : $1.2-$2.5 M TOTAL 4YR COST : 2.000 0.000 0.000 0.000 2.000

** NEW YORK STATE DEPARTMENT OF TRANSPORTATION **

Friday, August 26, 2011 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) on Draft Program Page 65 of 84

for REGION 10

AGENCY PROJECT DESCRIPTION TOTAL 4-YEAR PROGRAM (FFY)

4-YEAR PHASE Starting October 01, 2010

FUND SOURCES FFY

PIN PROGRAM

FFY FFY FFY FFY

in millions

of dollars 2011 2012 2013 2014

AQ CODE COUNTY TOTAL PROJECT COST



SUFFOLK CO. CR97 RECONSTRUCT (NICOLLS RD) BETWEEN I495 AND NY25, TO ADDRESS NFA 2011 1.000 PRELDES 1.000

SAFETY AND CONGESTION CONCERNS AROUND THE ENTRANCES OF SUFFOLK NHS 2012 1.200 DETLDES 1.200

0T2425 COUNTY COMMUNITY COLLEGE, TOWN OF BROOKHAVEN. PROJECT SCOPING NFA 2012 0.300 DETLDES 0.300

HAS NOT STARTED. (SCOPE TBD).

AQC:J1Z SUFFOLK TPC : $12.5-$19 M TOTAL 4YR COST : 2.500 1.000 1.500 0.000 0.000



NASSAU CO. NASSAU COUNTY RESURFACING VARIOUS COUNTY ROADS. REHABILITATE STP LG URBAN 2013 4.200 CONST 4.200

EXISTING ROAD PAVEMENTS IN ORDER TO PROVIDE FOR BETTER AND SAFER NFA 2013 1.050 CONST 1.050

0T2428 SURFACES.

AQC:A10P NASSAU TPC : $4.6-$7.5 M TOTAL 4YR COST : 5.250 0.000 0.000 5.250 0.000



NASSAU CO. PURPOSE OF THIS PROJECT IS TO REPLACE OLDER FADED OR MISSING STP LG URBAN 2013 0.800 CONST 0.800

ROADWAY PAVEMENT MARKINGS.LOCATIONS TO BE DETERMINED NFA 2013 0.200 CONST 0.200

0T2429

AQC:A10S NASSAU TPC : $0.6-$1.5 M TOTAL 4YR COST : 1.000 0.000 0.000 1.000 0.000



SUFFOLK CO. SAFETY AND DRAINAGE IMPROVEMENTS TO VARIOUS SUFFOLK COUNTY ROADS STP LG URBAN 2013 1.215 CONINSP 1.215

FOR THE PURPOSE OF IMPROVING ROADWAY DRAINAGE PROBLEMS AND NFA 2013 0.304 CONINSP 0.304

0T2431 OVERALL HIGHWAY SAFETY (SCOPE AND LOCATIONS TO BE DETERMINED) STP LG URBAN 2013 10.935 CONST 10.935

NFA 2013 2.734 CONST 2.734

AQC:A2P SUFFOLK TPC : $12.5-$19 M TOTAL 4YR COST : 15.188 0.000 0.000 15.188 0.000



NASSAU CO. NASSAU COUNTY RESURFACING VARIOUS COUNTY ROADS. REHABILITATE STP LG URBAN 2014 5.300 CONST 5.300

EXISTING ROAD PAVEMENTS IN ORDER TO PROVIDE FOR BETTER AND SAFER NFA 2014 1.325 CONST 1.325

0T2432 SURFACES.

AQC:A10P NASSAU TPC : $6-$9.4 M TOTAL 4YR COST : 6.625 0.000 0.000 0.000 6.625



NASSAU CO. PURPOSE OF THIS PROJECT IS TO REPLACE OLDER FADED OR MISSING STP LG URBAN 2014 1.800 CONST 1.800

ROADWAY PAVEMENT MARKINGS.LOCATIONS TO BE DETERMINED) NFA 2014 0.450 CONST 0.450

0T2433

AQC:A10S NASSAU TPC : $2-$4 M TOTAL 4YR COST : 2.250 0.000 0.000 0.000 2.250



NASSAU CO. THIS PROJECT PROVIDES DAY-TO-DAY OPERATIONS OF THE COUNTY'S TRAFFIC STP LG URBAN 2014 2.700 CONST 2.700

MANAGEMEN CENTER IN WESTBURY AND INCLUDES MONITORING OF TRAFFIC NFA 2014 0.675 CONST 0.675

0T2434 VIDEO AND THE ADJUSTMENT OF SIGNAL TIMINGS AS NEEDED.

AQC:A7P NASSAU TPC : $2-$4 M TOTAL 4YR COST : 3.375 0.000 0.000 0.000 3.375

** NEW YORK STATE DEPARTMENT OF TRANSPORTATION **

Friday, August 26, 2011 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) on Draft Program Page 66 of 84

for REGION 10

AGENCY PROJECT DESCRIPTION TOTAL 4-YEAR PROGRAM (FFY)

4-YEAR PHASE Starting October 01, 2010

FUND SOURCES FFY

PIN PROGRAM

FFY FFY FFY FFY

in millions

of dollars 2011 2012 2013 2014

AQ CODE COUNTY TOTAL PROJECT COST



SUFFOLK CO. SUFFOLK COUNTY BRIDGE PAINTING PROGRAM. THIS PROJECT PROVIDES HBRR 2014 0.500 CONST 0.500

FUNDING FOR THE CYCLICAL CLEANING AND REPAINTING OF STEEL BRIDGES NFA 2014 0.125 CONST 0.125

0T2438 AND COMPONENTS TO EXTEND USEFUL (LOCATIONS TO BE DETERMINED).





AQC:A19S SUFFOLK TPC : $0.6-$1.5 M TOTAL 4YR COST : 0.625 0.000 0.000 0.000 0.625



LOCAL BAYSHORE FERRY TERMINAL BULKHEAD REHAB - REHAB 120 FEET OF FBD 2011 0.020 CONINSP 0.020

DETERIORATED BULKHEAD NFA 2011 0.010 CONINSP 0.010

0T2440 FBD 2011 0.240 CONST 0.240

NFA 2011 0.060 CONST 0.060

NFA 2011 0.010 MISC 0.010

AQC:A2P SUFFOLK TPC : < $0.75 M TOTAL 4YR COST : 0.340 0.340 0.000 0.000 0.000



NYSDOT Bridge rehabilitation #2 of Robert Moses Causeway over Fire Island Inlet in Islip Town, Suffolk NFA 2011 0.406 DETLDES 0.406

County

0T2444

AQC:A19P SUFFOLK TPC : < $0.75 M TOTAL 4YR COST : 0.406 0.406 0.000 0.000 0.000



SUFFOLK CO. CR16 (HORSEBLOCK RD) - PECONIC AVE TO I495 PAVEMENT REHABILITATION TO STP LG URBAN 2014 0.880 CONINSP 0.880

EXTEND THE ROADWAY'S USEFUL LIFE, TOWN OF BROOKHAVEN, SUFFOLK NFA 2014 0.220 CONINSP 0.220

0T2446 COUNTY .SCOPE TO BE DETERMINED. STP LG URBAN 2014 7.920 CONST 7.920

NFA 2014 1.980 CONST 1.980

AQC:J1Z SUFFOLK TPC : $9.5-15.5 M TOTAL 4YR COST : 11.000 0.000 0.000 0.000 11.000



LOCAL 2009 RECREATION TRAILS PROGRAM: DAVID OVERTON TRAIL IN CORAM, NY REC TRAILS 2011 0.320 CONST 0.320

(SUFFOLK COUNTY) FOR GRANT FUNDING FOR A NON-MOTORIZED PATH ALONG NFA 2011 0.080 CONST 0.080

0T2448 AN EXISTING UNUSED ROADWAY RIGHT-OF-WAY.

AQC:C2P SUFFOLK TPC : < $0.75 M TOTAL 4YR COST : 0.400 0.400 0.000 0.000 0.000



NYSDOT DRAINAGE BASIN RECONSTRUCTION TO PREVENT HIGHWAY FLOODING ON NFA 2012 0.160 DETLDES 0.160

VARIOUS STATE HIGHWAYS IN NASSAU AND SUFFOLK COUNTIES. NHS 2013 0.373 CONINSP 0.373

0T2449 NFA 2013 0.093 CONINSP 0.093

NHS 2013 3.727 CONST 3.727

NFA 2013 0.932 CONST 0.932

AQC:A2Z MULTI TPC : $4.6-$7.5 M TOTAL 4YR COST : 5.285 0.000 0.160 5.125 0.000

** NEW YORK STATE DEPARTMENT OF TRANSPORTATION **

Friday, August 26, 2011 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) on Draft Program Page 67 of 84

for REGION 10

AGENCY PROJECT DESCRIPTION TOTAL 4-YEAR PROGRAM (FFY)

4-YEAR PHASE Starting October 01, 2010

FUND SOURCES FFY

PIN PROGRAM

FFY FFY FFY FFY

in millions

of dollars 2011 2012 2013 2014

AQ CODE COUNTY TOTAL PROJECT COST



LOCAL ROAD REPAIR AND MAINTENANCE IN THE TOWN OF SOUTHAMPTON. BRIDGE HPP 2011 0.500 CONST 0.500

LANE-FUNCTIONALLY OBSOLETE BRIDGE RECONSTRUCTION AT SAGAPONACK NFA 2011 0.254 CONST 0.254

0T2451 POND.NY745 HPP#3636 NFA 2011 0.090 CONINSP 0.090

AQC:A19P SUFFOLK TPC : $0.6-$1.5 M TOTAL 4YR COST : 0.844 0.844 0.000 0.000 0.000



SUFFOLK CO. INSTALL SPLIT BARRIER ON NY27 IN THE VICINITY OF THE NY27A INTERSECTION NFA 2011 0.005 DETLDES 0.005

IN OAKDALE TO ALLOW EGRESS SHOULD THE ROADWAY BE CLOSED DUE TO AN NHS 2011 0.020 CONINSP 0.020

0T2452 INCIDENT IN EITHER DIRECTION AND TO ALLOW FOR EMERGENCY VEHICLES TO NFA 2011 0.005 CONINSP 0.005

GET TO AND FROM THE INCIDENT. TOWN OF ISLIP

NHS 2011 0.180 CONST 0.180

NFA 2011 0.145 CONST 0.145

AQC:A9P SUFFOLK TPC : < $0.75 M TOTAL 4YR COST : 0.355 0.355 0.000 0.000 0.000



LOCAL THE STRAIGHT PATH RECONFIGURATION STRETCHES FROM MOUNT AVENUE ON STP FLEX 2013 0.112 CONINSP 0.112

THE SOUTH TO NICOLLS ROAD ON THE NORTH FOR TRAFFIC CALMING & NFA 2013 0.028 CONINSP 0.028

0T2453 PEDESTRIAN ENHANCEMENT. A CENTRAL PLANTED MEDIAN INTERRUPTED FOR STP FLEX 2013 0.374 CONST 0.374

LEFT TURN LANES IN WYANDANCH, BABYLO NFA 2013 0.553 CONST 0.553

AQC:A6P SUFFOLK TPC : $0.6-$1.5 M TOTAL 4YR COST : 1.067 0.000 0.000 1.067 0.000



LOCAL ENHANCE TRAFFIC SAFETY AT VARIOUS INTERSECTION, HEMPSTEAD STP FLEX 2013 0.233 CONST 0.233

AVE,LAKEVIEW AVE,ATLANTIC AVE AND UNION AVE BY INSTALLING SPEED NFA 2013 0.058 CONST 0.058

0T2454 LIMIT SIGNS, VISAUL CROSSWALKS AND RESIDENTIAL SCALE ORNAMENTAL

LIGHTING AND STREET TREES, VILLAGE OF LYNBROOK IN TOWM OF

HEMPSTEAD

AQC:A6P NASSAU TPC : < $0.75 M TOTAL 4YR COST : 0.291 0.000 0.000 0.291 0.000



NYSDOT VILLAGE OF SOUTHAMPTON PROPOSES IMPROVEMENTS IN SAFETY AND STP FLEX 2011 0.046 CONINSP 0.046

TRAFFIC CALMING BY PROVIDING LEFT TURN SIGNALS AT FIVE NFA 2011 0.011 CONINSP 0.011

0t2455 INTERSECTIONS AND BULB-OUT AT ONE INTERSECTION. DESIGNATED 3.3 MILES STP FLEX 2011 0.392 CONST 0.392

OF ROAD AS CLASS 3 BIKE ROUTE. NFA 2011 0.100 CONST 0.100

AQC:C2P SUFFOLK TPC : < $0.75 M TOTAL 4YR COST : 0.549 0.549 0.000 0.000 0.000



LOCAL THE PROJECT PROPOSES TO REDUCE THE TRAVEL SPEEDS TO PROVIDE SAFER NFA 2011 0.035 DETLDES 0.035

CONDITIONS FOR BICYCLISTS ON GRANNY RD BETWEEN NY112 AND MILL RD IN STP FLEX 2011 0.016 CONINSP 0.016

0T2456 THE TOWN OF BROOKHAVEN, SUFFOLK COUNTY NFA 2011 0.004 CONINSP 0.004

STP FLEX 2011 0.131 CONST 0.131

NFA 2011 0.033 CONST 0.033

AQC:C2Z SUFFOLK TPC : < $0.75 M TOTAL 4YR COST : 0.219 0.219 0.000 0.000 0.000

** NEW YORK STATE DEPARTMENT OF TRANSPORTATION **

Friday, August 26, 2011 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) on Draft Program Page 68 of 84

for REGION 10

AGENCY PROJECT DESCRIPTION TOTAL 4-YEAR PROGRAM (FFY)

4-YEAR PHASE Starting October 01, 2010

FUND SOURCES FFY

PIN PROGRAM

FFY FFY FFY FFY

in millions

of dollars 2011 2012 2013 2014

AQ CODE COUNTY TOTAL PROJECT COST



LOCAL THE PROJECT PROPOSES TO REDUCE THE TRAVEL SPEEDS ON HOLBROOK RD NFA 2011 0.060 DETLDES 0.060

BETWEEN NY25 AND CR16 AND MAKE ADA COMPLIANT CONTINUOUS STP FLEX 2011 0.048 CONINSP 0.048

0T2457 SIDEWALKS AS WELL AS AN ON STREET BICYCLE LANE. TOWN OF NFA 2011 0.012 CONINSP 0.012

BROOKHAVEN, SUFFOLK COUNTY STP FLEX 2011 0.400 CONST 0.400

NFA 2011 0.100 CONST 0.100

AQC:C2Z SUFFOLK TPC : $0.6-$1.5 M TOTAL 4YR COST : 0.620 0.620 0.000 0.000 0.000



LOCAL VILLAGE OF ROCKVILLE CENTER PROPOSED RESTORATION OF MAPLE AVE TCSP 2011 0.047 CONINSP 0.047

INCLUDES DRIVEWAY APRON, ROADWAY SURFACING, CURBING, HANDICAP NFA 2011 0.012 CONINSP 0.012

0T2458 RAMPS, DRAINAGE STRUCTURE, TREE PITS ETC... TCSP 2011 0.424 CONST 0.424

NFA 2011 0.106 CONST 0.106

AQC:A10Z NASSAU TPC : < $0.75 M TOTAL 4YR COST : 0.589 0.589 0.000 0.000 0.000



LOCAL CANAL ROAD TRAFFIC CALMING (ROSE LANE TO CR83) BY REDUCING TRAFFIC NFA 2011 0.036 DETLDES 0.036

SPEED BY REDUCE TRAVEL LANE.PROVIDE LEFT TURN LANES AT VARIOUS STP FLEX 2012 0.024 CONINSP 0.024

0T2459 INTERSECTION TO REDUCE LEFT TURN ACCIDENTS TO IMPROVE MOTORIST NFA 2012 0.006 CONINSP 0.006

SAFETY IN TOWN OF BROOKHAVEN STP FLEX 2012 0.224 CONST 0.224

NFA 2012 0.056 CONST 0.056

AQC:C2P SUFFOLK TPC : < $0.75 M TOTAL 4YR COST : 0.346 0.036 0.310 0.000 0.000



LIRR EAST SIDE ACCESS CONSTRUCTION: NEW TUNNELS BTWN SUNNYSIDE YARD IN CMAQ 2011 2.300 MISC 2.300

QUEENS & THE LOWER LEVEL OF THE EXISTING 63 ST TUNNEL UNDER EAST NFA 2011 0.575 MISC 0.575

G609/01/AA RIVER, NEW TUNNELS UNDER PARK AVE IN MANHATTAN TO GRAND CENTRAL FTA 5309 2011 246.863 MISC 246.863

TERMINAL; ROLLING STOCK, REAL ESTATE AND PROFL SERVICES NFA 2011 340.907 MISC 340.907

CMAQ 2012 2.300 MISC 2.300

NFA 2012 0.575 MISC 0.575

FTA 5309 2012 430.000 MISC 430.000

NFA 2012 592.660 MISC 592.660

FTA 5309 2013 215.000 MISC 215.000

NFA 2013 296.905 MISC 296.905

FTA 5309 2014 215.000 MISC 215.000

NFA 2014 296.905 MISC 296.905

AQC:NON MULTI TPC : $4.3-9.2 B TOTAL 4YR COST : 2639.990 590.645 1025.535 511.905 511.905



LIRR REDUNDANT ADA ELEVATOR FOR EAST SIDE ACCESS CONCOURSE FTA 5317 2011 2.240 MISC 2.240

(NYC) - CONSTRUCTION OF AN ADA ELEVATOR TO PROVIDE GREATER NFA 2011 0.560 MISC 0.560

G614/01/07 ACCESSIBILITY BETWEEN THE NEW LIRR CONCOURSE AND GTC AS PART OF

MTA’S EAST SIDE ACCESS PROJECT.

AQC:B8P NEW YORK TPC : $2-$4 M TOTAL 4YR COST : 2.800 2.800 0.000 0.000 0.000

** NEW YORK STATE DEPARTMENT OF TRANSPORTATION **

Friday, August 26, 2011 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) on Draft Program Page 69 of 84

for REGION 10

AGENCY PROJECT DESCRIPTION TOTAL 4-YEAR PROGRAM (FFY)

4-YEAR PHASE Starting October 01, 2010

FUND SOURCES FFY

PIN PROGRAM

FFY FFY FFY FFY

in millions

of dollars 2011 2012 2013 2014

AQ CODE COUNTY TOTAL PROJECT COST



LIRR M-9 PROCUREMENT-84 CARS - PURCHASE 84 NEW M-9 ELECTRIC CARS TO BEGIN NFA 2011 355.900 MISC 355.900

THE REPLACEMENT OF THE AGING M-3 FLEET. THE NEW M-9 CARS WILL BUILD

L601/01/MA UPON THE SUCCESS OF THE M-7 FLEET AND WILL BE OPERATED THROUGHOUT

LIRR ELECTRIC TERRITORY.

AQC:B10P SYSTEM-WIDE TPC : $300-$650 M TOTAL 4YR COST : 355.900 355.900 0.000 0.000 0.000



LIRR SPECIFICATION DEVELOPMENT-ALT DIESEL EQUIPMENT NEW DIESEL POWERED NFA 2011 2.800 MISC 2.800

ROLLING STOCK TO OPERATE EXCLUSIVELY IN NON-ELECTRIFIED TERRITORY

L601/01/MB AND PROVIDE SCOOT SERVICE TO ELECTRIC TERMINAL STATIONS. THIS FLEET

WOULD SUPPLEMENT THE EXISTING DIESEL FLEET.





AQC:B10P SYSTEM-WIDE TPC : $2-$4 M TOTAL 4YR COST : 2.800 2.800 0.000 0.000 0.000



LIRR ALTERNATIVE DIESEL EQUIPMENT - PROCUREMENT OF NEW DIESEL-POWERED NFA 2013 78.000 MISC 78.000

ROLLING STOCK TO OPERATE EXCLUSIVELY IN NON-ELECTRIFIED TERRITORY

L601/01/MD AND PROVIDE SCOOT SERVICE TO ELECTRIC TERMINAL STATIONS. THIS NEW

FLEET WOULD SUPPLEMENT THE EXISTING DIESEL FLEET





AQC:NON SYSTEM-WIDE TPC : $70-$130 M TOTAL 4YR COST : 78.000 0.000 0.000 78.000 0.000



LIRR REPLACE MASSAPEQUA STATION PLATFORM - REPLACEMENT OF PLATFORM FTA 5309 2013 14.640 MISC 14.640

WHICH DATES FROM 1953. REHABILITATION EFFORT WILL ALSO REPLACE NFA 2013 3.660 MISC 3.660

L602/04/UB ELEVATOR, ESCALATOR, PLATFORM WAITING ROOMS, LIGHTING, SIGNAGE,

PLATFORM CANOPIES, AND OTHER ELEMENTS.

AQC:B8P NASSAU TPC : $15-$25 M TOTAL 4YR COST : 18.300 0.000 0.000 18.300 0.000



LIRR REPLACE WANTAGH STATION PLATFORM - REPLACEMENT OF PLATFORM WHICH FTA 5307 2012 15.280 MISC 15.280

DATES FROM 1968. REHABILITATION EFFORT WILL ALSO REPLACE ESCALATOR, NFA 2012 3.820 MISC 3.820

L602/04/UC PLATFORM WAITING ROOMS, LIGHTING, SIGNAGE, PLATFORM CANOPIES, NEW

ELEVATOR, MAKING STATION WHEELCHAIR ACCESSIBLE.

AQC:B8P NASSAU TPC : $15-$25 M TOTAL 4YR COST : 19.100 0.000 19.100 0.000 0.000



LIRR ESA/GCT SUPPORT - FUND ELEVATOR CONSTRUCTION AND OTHER STATION FTA 5307 2014 12.400 MISC 12.400

INFRASTRUCTURE REQUIRED FOR STATION OPERATIONS AT THE LIRR’S NEW NFA 2014 3.100 MISC 3.100

L602/04/UE STATION AT GRAND CENTRAL TERMINAL.

AQC:B5P NEW YORK TPC : $12.5-$19 M TOTAL 4YR COST : 15.500 0.000 0.000 0.000 15.500

** NEW YORK STATE DEPARTMENT OF TRANSPORTATION **

Friday, August 26, 2011 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) on Draft Program Page 70 of 84

for REGION 10

AGENCY PROJECT DESCRIPTION TOTAL 4-YEAR PROGRAM (FFY)

4-YEAR PHASE Starting October 01, 2010

FUND SOURCES FFY

PIN PROGRAM

FFY FFY FFY FFY

in millions

of dollars 2011 2012 2013 2014

AQ CODE COUNTY TOTAL PROJECT COST



LIRR METS/WILLETS PT STATION - TRACK & SIGNAL IMPROVEMENTS TO FACILITATE NFA 2013 1.000 MISC 1.000

OPERATIONS AT CENTER PLATFORM CURRENTLY NOT UTILIZED, NEW FTA 5309 2014 4.190 MISC 4.190

L602/04/UF ELEVATORS FOR WHEELCHAIR ACCESS, NEW TACTILE-WARNING STRIPS, NFA 2014 1.010 MISC 1.010

PLATFORM/CANOPY EXTENSIONS, NEW PLATFORM SHELTERS.





AQC:B8P QUEENS TPC : $4.6-$7.5 M TOTAL 4YR COST : 6.200 0.000 0.000 1.000 5.200



LIRR ELEVATOR REPLACEMENT PROGRAM - REPLACES ONE ELEVATOR AT FTA 5307 2012 3.600 MISC 3.600

ROCKVILLE CENTRE AND ONE AT WOODSIDE. THE WOODSIDE ELEVATOR NFA 2012 0.900 MISC 0.900

L602/04/UH CONNECTS THE STREET LEVEL, THE LIRR AND THE NYCT AREAS OF THE

STATION COMPLEX.

AQC:B8P MULTI TPC : $4.6-$7.5 M TOTAL 4YR COST : 4.500 0.000 4.500 0.000 0.000



LIRR SMART CARD IMPROVEMENTS - PERFORM PILOT STUDIES AND ANALYSIS IN NFA 2011 2.000 MISC 2.000

PREPARATION FOR NEXT GENERATION OF MTA FARE MEDIA. FUTURE USE OF FTA 5309 2012 6.400 MISC 6.400

L602/04/UK CONTACTLESS CARDS EQUIPPED WITH SMART CHIPS CAN BE USED TO PAY FOR NFA 2012 1.600 MISC 1.600

VARIOUS LIRR & TRANSIT

AQC:K2P SYSTEM-WIDE TPC : $7.5-$12 M TOTAL 4YR COST : 10.000 2.000 8.000 0.000 0.000



LIRR INTERMODAL FACILITY DEVELOPMENT - DESIGN AND CONSTRUCT A NEW NFA 2012 6.500 MISC 6.500

INTERMODAL FACILITY AT A SUBURBAN LOCATION IN ELECTRIC TERRITORY, FTA 5309 2013 23.740 MISC 23.740

L602/05/U1 WHOSE SITE IS YET TO BE IDENTIFIED. NFA 2013 19.760 MISC 19.760

AQC:NON SYSTEM-WIDE TPC : $40-$60 M TOTAL 4YR COST : 50.000 0.000 6.500 43.500 0.000



LIRR PENN STATION HVAC - REPLACING THE HVAC SYSTEM ENSURES RELIABLE NFA 2013 9.900 MISC 9.900

CLIMATE CONTROL FOR LIRR PORTION OF THE STATION

L602/06/VL

AQC:B8P NEW YORK TPC : $9.5-15.5 M TOTAL 4YR COST : 9.900 0.000 0.000 9.900 0.000



LIRR 2010 ANNUAL TRACK PROGRAM PROVIDES FOR THE LIFE CYCLE REPLACEMENT FTA 5307 2011 21.450 MISC 21.450

OF TRACK COMPONENTS IN SELECTED SEGMENTS OF THE RIGHT OF WAY FTA 5309 2011 1.510 MISC 1.510

L603/01/TA

AQC:B9P SYSTEM-WIDE TPC : $50-$85 M TOTAL 4YR COST : 22.960 22.960 0.000 0.000 0.000



LIRR 2011 ANNUAL TRACK PROGRAM PROVIDES FOR THE LIFE CYCLE REPLACEMENT FTA 5307 2011 14.560 MISC 14.560

OF TRACK COMPONENTS IN SELECTED SEGMENTS OF THE RIGHT OF WAY FTA 5309 2011 40.540 MISC 40.540

L603/01/TB

AQC:B9P SYSTEM-WIDE TPC : $50-$85 M TOTAL 4YR COST : 55.100 55.100 0.000 0.000 0.000

** NEW YORK STATE DEPARTMENT OF TRANSPORTATION **

Friday, August 26, 2011 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) on Draft Program Page 71 of 84

for REGION 10

AGENCY PROJECT DESCRIPTION TOTAL 4-YEAR PROGRAM (FFY)

4-YEAR PHASE Starting October 01, 2010

FUND SOURCES FFY

PIN PROGRAM

FFY FFY FFY FFY

in millions

of dollars 2011 2012 2013 2014

AQ CODE COUNTY TOTAL PROJECT COST



LIRR 2012 ANNUAL TRACK PROGRAM PROVIDES FOR THE LIFE CYCLE REPLACEMENT FTA 5309 2012 47.600 MISC 47.600

OF TRACK COMPONENTS IN SELECTED SEGMENTS OF THE RIGHT OF WAY NFA 2012 11.900 MISC 11.900

L603/01/TC

AQC:B9P SYSTEM-WIDE TPC : $50-$85 M TOTAL 4YR COST : 59.500 0.000 59.500 0.000 0.000



LIRR 2013 ANNUAL TRACK PROGRAM PROVIDES FOR THE LIFE CYCLE REPLACEMENT FTA 5307 2013 7.600 MISC 7.600

OF TRACK COMPONENTS IN SELECTED SEGMENTS OF THE RIGHT OF WAY. NFA 2013 1.900 MISC 1.900

L603/01/TD FTA 5309 2013 40.000 MISC 40.000

NFA 2013 10.000 MISC 10.000

AQC:B9P SYSTEM-WIDE TPC : $50-$85 M TOTAL 4YR COST : 59.500 0.000 0.000 59.500 0.000



LIRR 2014 ANNUAL TRACK PROGRAM PROVIDES FOR THE LIFE CYCLE REPLACEMENT FTA 5307 2014 45.680 MISC 45.680

OF TRACK COMPONENTS IN SELECTED SEGMENTS OF THE RIGHT OF WAY NFA 2014 11.420 MISC 11.420

L603/01/TE

AQC:B9P SYSTEM-WIDE TPC : $50-$85 M TOTAL 4YR COST : 57.100 0.000 0.000 0.000 57.100



LIRR THE TRACK CONSTRUCTION EQUIPMENT PROGRAM PROVIDES FOR THE TRACK FTA 5307 2011 4.800 MISC 4.800

CONSTRUCTION EQUIPMENT - REPLACES CONSTRUCTION EQUIPMENT THAT HAS FTA 5309 2012 1.360 MISC 1.360

L603/01/TF REACHED THE END OF ITS USEFUL LIFE AND PURCHASE NEW EQUIPMENT TO NFA 2012 0.340 MISC 0.340

EXPAND THE EQUIPMENT INVENTORY. FTA 5309 2013 0.400 MISC 0.400

NFA 2013 0.100 MISC 0.100

AQC:B9P SYSTEM-WIDE TPC : $6-$9.4 M TOTAL 4YR COST : 7.000 4.800 1.700 0.500 0.000



LIRR ATLANTIC BRANCH 1/2 TIES - REPLACES THE EXISTING WOOD HALF-TIES AND FTA 5307 2012 18.310 MISC 18.310

CONCRETE TRACK STRUCTURE IN THE TUNNEL BETWEEN EAST NEW YORK AND NFA 2012 4.577 MISC 4.577

L603/01/TG JAMAICA FTA 5309 2012 11.690 MISC 11.690

NFA 2012 2.922 MISC 2.922

AQC:B9P SYSTEM-WIDE TPC : $32-$50 M TOTAL 4YR COST : 37.499 0.000 37.499 0.000 0.000



LIRR MERRICK/BELLMORE DIRECT FIXATION - REPLACE THE TRACK TO VIADUCT FTA 5307 2012 28.640 MISC 28.640

FIXATION SYSTEM IN THE VICINITY OF MERRICK & BELLMORE STATIONS ON NFA 2012 7.160 MISC 7.160

L603/01/TH THE BABYLON BRANCH.

AQC:B9P NASSAU TPC : $32-$50 M TOTAL 4YR COST : 35.800 0.000 35.800 0.000 0.000

** NEW YORK STATE DEPARTMENT OF TRANSPORTATION **

Friday, August 26, 2011 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) on Draft Program Page 72 of 84

for REGION 10

AGENCY PROJECT DESCRIPTION TOTAL 4-YEAR PROGRAM (FFY)

4-YEAR PHASE Starting October 01, 2010

FUND SOURCES FFY

PIN PROGRAM

FFY FFY FFY FFY

in millions

of dollars 2011 2012 2013 2014

AQ CODE COUNTY TOTAL PROJECT COST



LIRR RIGHT OF WAY CULVERTS - REHABILITATE CULVERTS ADDRESSING NFA 2011 0.500 MISC 0.500

SIGNIFICANT DEFICIENCIES AND DETERIORATION NFA 2012 0.500 MISC 0.500

L603/01/TJ NFA 2013 0.500 MISC 0.500

NFA 2014 0.500 MISC 0.500

AQC:B9P SYSTEM-WIDE TPC : $2-$4 M TOTAL 4YR COST : 2.000 0.500 0.500 0.500 0.500



LIRR RIGHT OF WAY DRAINAGE CONTROL - IMPROVE RIGHT OF WAY AND TRACK NFA 2011 0.700 MISC 0.700

DRAINAGE IN AN EFFORT TO PREVENT TRACK DETERIORATION AND THE NEED NFA 2012 0.700 MISC 0.700

L603/01/TK FOR ASSOCIATED INCREASES IN MAINTENANCE NFA 2013 0.700 MISC 0.700

NFA 2014 0.700 MISC 0.700

AQC:B9P SYSTEM-WIDE TPC : $3.3-$5.6 M TOTAL 4YR COST : 2.800 0.700 0.700 0.700 0.700



LIRR SCOPE: INSTALL SECURITY FENCE ALONG THE RIGHT OF WAY. PURPOSE: TO FTA 5309 2011 3.200 MISC 3.200

ENHANCE SAFETY AND SECURITY AND PREVENT UNAUTHORIZED ENTRY INTO FTA 5307 2012 1.280 MISC 1.280

L603/01/TL THE RIGHT OF WAY.THIS IS PART OF ONGOING PROGRAM TO FENCE ENTIRE NFA 2012 0.320 MISC 0.320

SYSTEM FTA 5307 2013 1.280 MISC 1.280

NFA 2013 0.320 MISC 0.320

FTA 5307 2014 1.280 MISC 1.280

NFA 2014 0.320 MISC 0.320

AQC:B9P SYSTEM-WIDE TPC : $7.5-$12 M TOTAL 4YR COST : 8.000 3.200 1.600 1.600 1.600



LIRR ROW TRACK STABILITY/RETAINING WALLS WILL INCLUDE EXTENDING, NFA 2011 0.200 MISC 0.200

REPLACING/UPGRADING EXISTING RETAINING WALLS, REPLACING EXISTING NFA 2012 0.200 MISC 0.200

L603/01/TN DETERIORATED WOOD RAILROAD TIE WALLS, BACKFILLING STRUCTURES, NFA 2013 0.200 MISC 0.200

SURFACING EXISTING TRACK AND REPLACING TRACK SHOULDERS NFA 0.200 MISC 0.200

2014

AQC:B9P SYSTEM-WIDE TPC : $0.6-$1.5 M TOTAL 4YR COST : 0.800 0.200 0.200 0.200 0.200



LIRR JAMAICA CAPACITY IMPROVEMENTS - PH I - DESIGN AND CONSTRUCT A NEW NFA 2011 40.000 MISC 40.000

PLATFORM AT JAMAICA STATION AND ASSOCIATED TRACK, SWITCH & SIGNAL FTA 5307 2012 40.930 MISC 40.930

L603/04/TU INFRASTRUCTURE FOR FUTURE FLATBUSH-JAMAICA SCOOT SERVICE NFA 2012 32.950 MISC 32.950

FTA 5307 2013 51.100 MISC 51.100

NFA 2013 31.100 MISC 31.100

FTA 5307 2014 54.360 MISC 54.360

NFA 2014 27.402 MISC 27.402

FTA 5309 2014 89.390 MISC 89.390

NFA 2014 32.760 MISC 32.760

AQC:NON QUEENS TPC : $300-$650 M TOTAL 4YR COST : 399.992 40.000 73.880 82.200 203.912

** NEW YORK STATE DEPARTMENT OF TRANSPORTATION **

Friday, August 26, 2011 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) on Draft Program Page 73 of 84

for REGION 10

AGENCY PROJECT DESCRIPTION TOTAL 4-YEAR PROGRAM (FFY)

4-YEAR PHASE Starting October 01, 2010

FUND SOURCES FFY

PIN PROGRAM

FFY FFY FFY FFY

in millions

of dollars 2011 2012 2013 2014

AQ CODE COUNTY TOTAL PROJECT COST



LIRR MASSAPEQUA POCKET TRACK - DESIGN AND CONSTRUCT A NEW MASSAPEQUA CMAQ 2012 8.500 MISC 8.500

POCKET TRACK, TO FACILITATE ADDITIONAL MID-BRANCH TRAIN STARTS ON NFA 2012 2.600 MISC 2.600

L603/04/TV THE BABYLON BRANCH CMAQ 2013 8.500 MISC 8.500

AQC:NON NASSAU TPC : $15-$25 M TOTAL 4YR COST : 19.600 0.000 11.100 8.500 0.000



LIRR GREAT NECK POCKET TRACK EXTENSION - EXTEND THE EXISTING GREAT NECK NFA 2011 26.100 MISC 26.100

POCKET TRACK LOCATED EAST OF GREAT NECK STATION ON THE PORT

L603/04/TW WASHINGTON BRANCH TO FACILITATE ADDITIONAL SERVICE TO GREAT NECK &

QUEENS STATIONS

AQC:NON NASSAU TPC : $21-$31 M TOTAL 4YR COST : 26.100 26.100 0.000 0.000 0.000



LIRR SECOND TRACK FARMINGDALE TO RONKONKOMA - PHASE 1 - DESIGN A NFA 2011 6.900 MISC 6.900

FULL-LENGTH DOUBLE TRACK FROM FARMINGDALE TO RONKONKOMA & FTA 5307 2013 10.770 MISC 10.770

L603/04/TX CONSTRUCT PHASE I - CENTRAL ISLIP TO RONKONKOMA NFA 2013 2.692 MISC 2.692

FTA 5309 2013 7.710 MISC 7.710

NFA 2013 1.927 MISC 1.927

AQC:NON SUFFOLK TPC : $26-$40 M TOTAL 4YR COST : 29.999 6.900 0.000 23.099 0.000



LIRR BRIDGE PROGRAM-REHABILITATE SELECTED BRIDGES & VIADUCTS IDENTIFIED FTA 5309 2012 8.000 MISC 8.000

AS PRIORITY FOR REHABILITATION NFA 2012 2.000 MISC 2.000

L604/01/BB FTA 5307 2013 6.400 MISC 6.400

NFA 2013 1.600 MISC 1.600

FTA 5307 2014 5.280 MISC 5.280

NFA 2014 1.320 MISC 1.320

AQC:B9P SYSTEM-WIDE TPC : $21-$31 M TOTAL 4YR COST : 24.600 0.000 10.000 8.000 6.600



LIRR REPLACE COLONIAL ROAD HIGHWAY BRIDGE - REPLACE THE COLONIAL ROAD NFA 2011 10.000 MISC 10.000

HIGHWAY BRIDGE IN GREAT NECK. THIS BRIDGE, CONSTRUCTED IN 1897, HAS

L604/01/BC EXCEEDED ITS USEFUL LIFE AND IS IN NEED OF REPLACEMENT.

AQC:B9P NASSAU TPC : $7.5-$12 M TOTAL 4YR COST : 10.000 10.000 0.000 0.000 0.000



LIRR CONSTRUCT 150TH ST-JAMAICA & BROADWAY/PW - REHABILITATE THE 150TH NFA 2012 29.700 MISC 29.700

ST BRIDGE IN JAMAICA (MAIN LINE AND ATLANTIC BRANCH) AND BROADWAY

L604/01/BD BRIDGE IN QUEENS (PORT WASHINGTON BRANCH), BRINGING THESE BRIDGES

TO A STATE OF GOOD REPAIR.

AQC:B9P QUEENS TPC : $26-$40 M TOTAL 4YR COST : 29.700 0.000 29.700 0.000 0.000

** NEW YORK STATE DEPARTMENT OF TRANSPORTATION **

Friday, August 26, 2011 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) on Draft Program Page 74 of 84

for REGION 10

AGENCY PROJECT DESCRIPTION TOTAL 4-YEAR PROGRAM (FFY)

4-YEAR PHASE Starting October 01, 2010

FUND SOURCES FFY

PIN PROGRAM

FFY FFY FFY FFY

in millions

of dollars 2011 2012 2013 2014

AQ CODE COUNTY TOTAL PROJECT COST



LIRR CONSTRUCT 3 MONTAUK BRANCH BRIDGES - REHABILITATE THE SHINNECOCK FTA 5307 2011 26.200 MISC 26.200

CANAL, MONTAUK HIGHWAY, AND NORTH HIGHWAY BRIDGES TO BRING THESE

L604/01/BE BRIDGES TO A STATE OF GOOD REPAIR.

AQC:B9P SUFFOLK TPC : $21-$31 M TOTAL 4YR COST : 26.200 26.200 0.000 0.000 0.000



LIRR BRIDGE PAINTING PROGRAM - PAINT VARIOUS BRIDGES AND VIADUCTS, BASED FTA 5309 2011 2.000 MISC 2.000

UPON PRIORITIZATION ESTABLISHED BY THE RAILROAD'S ENGINEERING FTA 5307 2012 1.600 MISC 1.600

L604/01/BG DEPARTMENT NFA 2012 0.400 MISC 0.400

NFA 2013 1.200 MISC 1.200

AQC:B9P SYSTEM-WIDE TPC : $4.6-$7.5 M TOTAL 4YR COST : 5.200 2.000 2.000 1.200 0.000



LIRR WOODHAVEN BOULEVARD BRIDGE - REHABILITATION TO EXTEND THE SERVICE NFA 2011 10.200 MISC 10.200

LIFE AND RESTORE ALL COMPONENTS TO A STATE OF GOOD REPAIR

L604/01/BH

AQC:B9P QUEENS TPC : $9.5-15.5 M TOTAL 4YR COST : 10.200 10.200 0.000 0.000 0.000



LIRR EAST RIVER TUNNEL FIRE & LIFE SAFETY - IMPROVE PHYSICAL CONDITIONS, NFA 2013 11.200 MISC 11.200

EGRESS OPPORTUNITIES AND VENTILATION IN THE TUNNELS

L604/02/BP

AQC:B9P SYSTEM-WIDE TPC : $15-$25 M TOTAL 4YR COST : 11.200 0.000 0.000 11.200 0.000



LIRR FIBER OPTIC NETWORK - CONTINUE MULTI-PHASE BUILD OUT OF FIBER OPTIC FTA 5309 2012 8.000 MISC 8.000

NETWORK BY INSTALLING FIBER OPTIC CABLE AND EQUIPMENT AT VARIOUS NFA 2012 2.000 MISC 2.000

L605/01/L1 LOCATIONS THROUGHOUT THE LIRR

AQC:B6P SYSTEM-WIDE TPC : $7.5-$12 M TOTAL 4YR COST : 10.000 0.000 10.000 0.000 0.000



LIRR PBX - WAYSIDE PHONE REPLACEMENT - PHASE I - WILL REPLACE NFA 2011 2.100 MISC 2.100

DETERIORATED OBSOLETE WAYSIDE PHONE SYSTEM & ACCESSORIES PROVIDED NFA 2012 2.100 MISC 2.100

L605/01/L2 IN SUBSTATIONS, YARDS, INTERLOCKINGS AND ALONG THE LIRR RIGHT OF WAY NFA 2013 2.100 MISC 2.100

WITH A MODERN COMMUNICATIONS SYSTEM NFA 2.100 MISC 2.100

2014

AQC:B6P SYSTEM-WIDE TPC : $9.5-15.5 M TOTAL 4YR COST : 8.400 2.100 2.100 2.100 2.100

** NEW YORK STATE DEPARTMENT OF TRANSPORTATION **

Friday, August 26, 2011 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) on Draft Program Page 75 of 84

for REGION 10

AGENCY PROJECT DESCRIPTION TOTAL 4-YEAR PROGRAM (FFY)

4-YEAR PHASE Starting October 01, 2010

FUND SOURCES FFY

PIN PROGRAM

FFY FFY FFY FFY

in millions

of dollars 2011 2012 2013 2014

AQ CODE COUNTY TOTAL PROJECT COST



LIRR REPLACE COMMUNICATION POLE/COPPER PLANT:PURPOSE: THESE POLES FTA 5309 2011 7.000 MISC 7.000

CARRY THE CABLE LINES PROVIDING SERVICE TO THE LONG ISLAND RAIL ROAD

L605/01/L3 COMMUNICATION SYSTEM AND FIBER OPTIC CABLE. LOCATIONS: OYSTER

BAY, CENTRAL AND PORT WASHINGTON BRANCHES AND MAIN LINE.





AQC:B6P SYSTEM-WIDE TPC : $6-$9.4 M TOTAL 4YR COST : 7.000 7.000 0.000 0.000 0.000



LIRR IMPROVED RADIO COVERAGE INITIATIVE - PURCHASE AND INSTALL NEW RADIO NFA 2011 2.000 MISC 2.000

INFRASTRUCTURE TO MIGRATE THE LIRR'S RADIO COMMUNICATIONS SYSTEM NFA 2012 2.000 MISC 2.000

L605/01/L4 FROM CURRENT ANALOG TO MODERN RADIOS USING LESS BANDWITH TO NFA 2013 2.900 MISC 2.900

PROVIDE GREATER CHANNEL CAPACITY AND AVAILABILITY NFA 2014 2.900 MISC 2.900



AQC:B6P SYSTEM-WIDE TPC : $9.5-15.5 M TOTAL 4YR COST : 9.800 2.000 2.000 2.900 2.900



LIRR PENN STATION RADIO RETROFIT/ERT ANTENNA - UPGRADE/REPLACE EXISTING NFA 2011 5.200 MISC 5.200

DETERIORATED RADIO INFRASTURE IN PENN STATION AND THE EAST RIVER

L605/01/L6 TUNNELS, IN ORDER TO IMPROVE COMMUNICATIONS

AQC:B6P NEW YORK TPC : $6-$9.4 M TOTAL 4YR COST : 5.200 5.200 0.000 0.000 0.000



LIRR ATLANTIC AVE TUNNEL CABLE REPLACEMENT - REPLACE THE DETERIORATED FTA 5307 2011 1.700 MISC 1.700

COPPER AND COAXIAL RADIO CABLE WHICH SUPPORTS NUMEROUS FTA 5309 2012 1.360 MISC 1.360

L605/01/L7 COMMUNICATIONS SYSTEMS IN ATLANTIC AVENUE TUNNEL NFA 2012 0.340 MISC 0.340

FTA 5309 2013 1.360 MISC 1.360

NFA 2013 0.340 MISC 0.340

AQC:B6P SYSTEM-WIDE TPC : $4.6-$7.5 M TOTAL 4YR COST : 5.100 1.700 1.700 1.700 0.000



LIRR POSITIVE TRAIN CONTROL:SCOPE: A SYSTEM TO PROVIDE ENFORCEMENT OF NFA 2011 22.300 MISC 22.300

CIVIL SPEED A& TEMPORARY SPEED RESTRICTIONS, POSITIVE STOP AT NFA 2012 155.700 MISC 155.700

L605/02/LA INTERLOCKINGS AND PROTECTION OVER IMPROPERLY ALIGNED SWITCHES, AS NFA 2013 77.200 MISC 77.200

WELL AS PROTECTION OF ROADWAY WORKERS. LOCATION: VARIOUS

AQC:B6P SYSTEM-WIDE TPC : $175-$385 M TOTAL 4YR COST : 255.200 22.300 155.700 77.200 0.000



LIRR SIGNAL NORMAL REPLACEMENT PROGRAM INCLUDES SWITH,BATTERIES FTA 5307 2011 7.500 MISC 7.500

ETC.SCOPE: REPLACE VARIOUS SIGNAL SYSTEM COMPONENTS THAT HAVE FTA 5309 2011 7.500 MISC 7.500

L605/02/LB REACHED AND/OR EXCEEDED THEIR USEFUL LIFE AT LONG BEACH, PORT

JEFFERSON, OYSTER BAY, CENTRAL, MONTAUK AND MAIN LINE BRANCHES.

AQC:B6P SYSTEM-WIDE TPC : $12.5-$19 M TOTAL 4YR COST : 15.000 15.000 0.000 0.000 0.000

** NEW YORK STATE DEPARTMENT OF TRANSPORTATION **

Friday, August 26, 2011 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) on Draft Program Page 76 of 84

for REGION 10

AGENCY PROJECT DESCRIPTION TOTAL 4-YEAR PROGRAM (FFY)

4-YEAR PHASE Starting October 01, 2010

FUND SOURCES FFY

PIN PROGRAM

FFY FFY FFY FFY

in millions

of dollars 2011 2012 2013 2014

AQ CODE COUNTY TOTAL PROJECT COST



LIRR SPEONK - MONTAUK SIGNALIZATION - SIGNALIZE DARK TERRITORY FTA 5307 2011 10.000 MISC 10.000

(UN-SIGNALIZED) ON THE MONTAUK BRANCH BETWEEN SPEONK AND NFA 2011 2.500 MISC 2.500

L605/02/LC MONTAUK. FTA 5309 2011 10.000 MISC 10.000

NFA 2011 27.400 MISC 27.400

AQC:B6P SUFFOLK TPC : $40-$60 M TOTAL 4YR COST : 49.900 49.900 0.000 0.000 0.000



LIRR BABYLON INTERLOCKING RENEWAL - RENEW AND UPGRADE THE SIGNAL NFA 2011 7.700 MISC 7.700

COMPONENTS IN BABYLON INTERLOCKING WHICH HAVE REACHED AND/OR NFA 2012 14.700 MISC 14.700

L605/02/LD EXCEEDED THEIR USEFUL LIVES FTA 5307 2013 43.280 MISC 43.280

NFA 2013 10.820 MISC 10.820

AQC:B6P SUFFOLK TPC : $70-$130 M TOTAL 4YR COST : 76.500 7.700 14.700 54.100 0.000



LIRR SUPERVISORY CONTROL + REMOTE TERMINAL UNITS (RTU) - RENEW AND NFA 2011 1.900 MISC 1.900

UPGRADE EXISTING SUPERVISORY CONTROL SYSTEMS AND ASSOCIATED NFA 2012 1.900 MISC 1.900

L605/02/LE REMOTE TERMINAL UNITS (RTUS) AT DIVIDE TOWER IN HICKSVILLE, WHICH NFA 2013 1.800 MISC 1.800

DISPTACHES TRAINS ON THE MAIN LINE AND PORT JEFFERSON BRANCH NFA 1.800 MISC 1.800

2014

AQC:B6P MULTI TPC : $7.5-$12 M TOTAL 4YR COST : 7.400 1.900 1.900 1.800 1.800



LIRR CENTRALIZED TRAIN CONTROL - ALLOW LIRR TO BEGIN MIGRATION FROM THE NFA 2011 10.000 MISC 10.000

CURRENT SYSTEM OF TERRITORY-BASED CONTROL TOWERS TO A CENTRALIZED NFA 2012 10.000 MISC 10.000

L605/02/LF SYSTEM WHERE TRAIN DISPATCHING AND TRAIN SUPERVISION IS DONE FROM A NFA 2013 10.000 MISC 10.000

SINGLE LOCATION

AQC:B6P SYSTEM-WIDE TPC : $26-$40 M TOTAL 4YR COST : 30.000 10.000 10.000 10.000 0.000



LIRR HILLSIDE FACILITY BLDG REHAB (ROOF) - REPLACE SELECTED ROOFS AND ROOF NFA 2013 6.000 MISC 6.000

COMPONENTS AT THE HILLSIDE FACILITY IN HOLLIS, QUEENS

L606/01/YB

AQC:B8P QUEENS TPC : $4.6-$7.5 M TOTAL 4YR COST : 6.000 0.000 0.000 6.000 0.000



LIRR HILLSIDE MAINTENANCE FACILITY - ADDRESS VARIOUS BUILDING SYSTEMS NFA 2011 2.500 MISC 2.500

AND REPLACE COMPONENTS WHICH HAVE REACHED THE END OF THEIR USEFUL

L606/01/YC LIVES AT THE HILLSIDE FACILITY IN HOLLIS, QUEENS.

AQC:B8P QUEENS TPC : $2-$4 M TOTAL 4YR COST : 2.500 2.500 0.000 0.000 0.000

** NEW YORK STATE DEPARTMENT OF TRANSPORTATION **

Friday, August 26, 2011 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) on Draft Program Page 77 of 84

for REGION 10

AGENCY PROJECT DESCRIPTION TOTAL 4-YEAR PROGRAM (FFY)

4-YEAR PHASE Starting October 01, 2010

FUND SOURCES FFY

PIN PROGRAM

FFY FFY FFY FFY

in millions

of dollars 2011 2012 2013 2014

AQ CODE COUNTY TOTAL PROJECT COST



LIRR DIESEL LOCOMOTIVE SHOP UPGRADE - UNDERTAKE FACILITY IMPROVEMENTS NFA 2012 5.000 MISC 5.000

AND MODERNIZATION AT MORRIS PARK, LOCATED IN RICHMOND HILL, QUEENS,

L606/01/YE WHICH IS USED TO MAINTAIN DIESEL LOCOMOTIVES





AQC:B8P QUEENS TPC : $4.6-$7.5 M TOTAL 4YR COST : 5.000 0.000 5.000 0.000 0.000



LIRR MONTAUK YARD IMPROVEMENTS - IMPROVEMENTS TO THE FIVE TRACK NFA 2011 0.800 MISC 0.800

MONTAUK YARD, USED FOR THE STORAGE, MAINTENANCE AND REPAIR OF FTA 5309 2013 3.000 MISC 3.000

L606/01/YK DIESEL EQUIPMENT INCLUDES LIGHTING, SOUND WALL, WAYSIDE POWER AND NFA 2013 4.600 MISC 4.600

OTHER IMPROVEMENTS.

AQC:B8P SUFFOLK TPC : $7.5-$12 M TOTAL 4YR COST : 8.400 0.800 0.000 7.600 0.000



LIRR EXPAND THE TRAIN STORAGE CAPACITY OF PORT WASHINGTON ELECTRIC NFA 2011 3.000 MISC 3.000

STORAGE YARD IN ORDER TO OPERATE THE EAST SIDE ACCESS SERVICE FTA 5307 2012 7.280 MISC 7.280

L606/01/YL NFA 2012 1.820 MISC 1.820

AQC:NON NASSAU TPC : $9.5-15.5 M TOTAL 4YR COST : 12.100 3.000 9.100 0.000 0.000



LIRR NEW MID SUFFOLK ELECTRIC YARD - DESIGN AND CONSTRUCT A NEW NFA 2011 56.200 MISC 56.200

ELECTRIC STORAGE YARD ON THE MAIN LINE IN SUFFOLK COUNTY NFA 2012 23.000 MISC 23.000

L606/01/YN

AQC:NON SUFFOLK TPC : $70-$130 M TOTAL 4YR COST : 79.200 56.200 23.000 0.000 0.000



LIRR REHABILITATION OF EMPLOYEE FACILITIES - REHABILITATE/REPLACE NFA 2011 2.500 MISC 2.500

SELECTED BUILDING COMPONENTS AT LIRR EMPLOYEE FACILITIES SYTEMWIDE, NFA 2012 2.500 MISC 2.500

L606/04/YT IN AN EFFORT TO MAINTAIN THESE FACILITIES IN A STATE OF GOOD REPAIR NFA 2013 2.500 MISC 2.500

NFA 2014 2.500 MISC 2.500

AQC:B8P SYSTEM-WIDE TPC : $7.5-$12 M TOTAL 4YR COST : 10.000 2.500 2.500 2.500 2.500



LIRR SUBSTATION REPLACEMENTS - REPLACE 6 SUBSTATIONS IN QUEENS AND FTA 5307 2011 22.500 MISC 22.500

NASSAU COUNTIES. THESE TRACTION POWER FACILITIES, SOME OF WHICH DATE NFA 2012 27.500 MISC 27.500

L607/01/AA FROM THE 1940S, HAVE REACHED THE END OF THEIR USEFUL LIFE AND REQUIRE

REPLACEMENT.

AQC:B6P MULTI TPC : $50-$85 M TOTAL 4YR COST : 50.000 22.500 27.500 0.000 0.000

** NEW YORK STATE DEPARTMENT OF TRANSPORTATION **

Friday, August 26, 2011 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) on Draft Program Page 78 of 84

for REGION 10

AGENCY PROJECT DESCRIPTION TOTAL 4-YEAR PROGRAM (FFY)

4-YEAR PHASE Starting October 01, 2010

FUND SOURCES FFY

PIN PROGRAM

FFY FFY FFY FFY

in millions

of dollars 2011 2012 2013 2014

AQ CODE COUNTY TOTAL PROJECT COST



LIRR SUBSTATION BATTERY REPLACEMENT INCLUDES BATTERIES,CHARGER AND FTA 5309 2011 0.800 MISC 0.800

APPLICABLE HARDWARES PART OF NORMAL REPLACEMENT

L607/01/AB CYCLE.GREENLAWN, JAMAICA, MAIN LINE, MINEOLA, PORT JEFFERSON,

SMITHTOWN, WOODSIDE, WANTAGH, RONKONKOMA, SYOSSET, HUNTINGTON,

ETC.

AQC:B6P SYSTEM-WIDE TPC : $0.6-$1.5 M TOTAL 4YR COST : 0.800 0.800 0.000 0.000 0.000



LIRR SIGNAL POWER MOTOR GENERATOR REPLACEMENT - REPLACE SIGNAL POWER FTA 5307 2011 1.800 MISC 1.800

MOTOR GENERATORS AND ASSOCIATED EQUIPMENT AT SUBSTATIONS WHERE

L607/01/AC THE EQUIPMENT HAS EXCEEDED ITS USEFUL LIFE.

AQC:B6P SYSTEM-WIDE TPC : $1.2-$2.5 M TOTAL 4YR COST : 1.800 1.800 0.000 0.000 0.000



LIRR SUBSTATION PILOT WIRE AND RELAY REPLACEMENT - REPLACE THE EXISTING FTA 5309 2011 2.000 MISC 2.000

DC BREAKER PROTECTION AND AUTO RE-CLOSE FOR DC BREAKERS AT

L607/01/AD VARIOUS TRACTION POWER SUBSTATION LOCATIONS

AQC:B6P SYSTEM-WIDE TPC : $1.2-$2.5 M TOTAL 4YR COST : 2.000 2.000 0.000 0.000 0.000



LIRR REPLACE & UPGRADE THE DETERIORATED, AGED THE THIRD RAIL CABLE & FTA 5309 2011 2.500 MISC 2.500

INADEQUATE 2000 MCM DC FEEDER AND JUMPER CABLES AT ATLANTIC

L607/01/AE BRANCH-E AST NEW YORK .PURPOSE: TO ENSURE AN ADEQUATE &

DEPENDABLE SUPPLY OF TRACTION POWER TO MEET POWER DEMANDS

AQC:B6P SYSTEM-WIDE TPC : $2-$4 M TOTAL 4YR COST : 2.500 2.500 0.000 0.000 0.000



LIRR THIRD RAIL SYSTEM - DISCONNECT SWITCHES - REPLACE AND/OR UPGRADE FTA 5307 2011 1.000 MISC 1.000

DETERIORATED, AGED AND INADEQUATE DC FEEDER DISCONNECT SWITCHES

L607/01/AF SYSTEM-WIDE

AQC:B6P SYSTEM-WIDE TPC : $0.6-$1.5 M TOTAL 4YR COST : 1.000 1.000 0.000 0.000 0.000



LIRR THIRD RAIL SYSTEM - PROTECTION BOARD - REPLACE AND UPGRADE FTA 5309 2011 9.200 MISC 9.200

DETERIORATED, AGED, AND INADEQUATE PROTECTION BOARD SYSTEM WIDE

L607/01/AG

AQC:B6P SYSTEM-WIDE TPC : $7.5-$12 M TOTAL 4YR COST : 9.200 9.200 0.000 0.000 0.000



LIRR THIRD RAIL SYSTEM-ALUMINUM RAIL - REPLACE AND/OR UPGRADE WORN, FTA 5309 2011 5.600 MISC 5.600

AGED, AND INADEQUATE CONDUCTOR THIRD RAIL SYSTEMWIDE. NFA 2012 5.300 MISC 5.300

L607/01/AH

AQC:B6P SYSTEM-WIDE TPC : $9.5-15.5 M TOTAL 4YR COST : 10.900 5.600 5.300 0.000 0.000

** NEW YORK STATE DEPARTMENT OF TRANSPORTATION **

Friday, August 26, 2011 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) on Draft Program Page 79 of 84

for REGION 10

AGENCY PROJECT DESCRIPTION TOTAL 4-YEAR PROGRAM (FFY)

4-YEAR PHASE Starting October 01, 2010

FUND SOURCES FFY

PIN PROGRAM

FFY FFY FFY FFY

in millions

of dollars 2011 2012 2013 2014

AQ CODE COUNTY TOTAL PROJECT COST



LIRR ATLANTIC AVENUE TUNNEL LIGHTING - REPLACE AND UPGRADE NFA 2012 0.700 MISC 0.700

DETERIORATED AND INADEQUATE LIGHTING IN THE LIRRS ATLANTIC AVENUE FTA 5307 2014 5.040 MISC 5.040

L607/01/AJ TUNNEL BETWEEN EAST NEW YORK AND FLATBUSH AVENUE NFA 2014 1.260 MISC 1.260

AQC:B9P KINGS TPC : $6-$9.4 M TOTAL 4YR COST : 7.000 0.000 0.700 0.000 6.300



LIRR SIGNAL POWER LINE REPLACEMENT REPLACE IN-KIND THE DETERIORATED 5KV FTA 5309 2011 3.000 MISC 3.000

POWER LINES FOR THE SIGNAL POWER SYSTEM AND ASSOCIATED LINE

L607/01/AK HARDWARE AT VARIOUS LOCATIONS SYSTEMWIDE ALONG THE RAILROAD

RIGHT OF WAY

AQC:B6P SYSTEM-WIDE TPC : $2-$4 M TOTAL 4YR COST : 3.000 3.000 0.000 0.000 0.000



LIRR POWER POLE LINE REPLACEMENT REPLACE DETERIORATED POWER LINE POLES FTA 5307 2011 3.000 MISC 3.000

AND APPLICABLE HARDWARE AT VARIOUS LOCATIONS SYSTEMWIDE ALONG

L607/01/AL THE RAILROAD RIGHT OF WAY

AQC:B6P SYSTEM-WIDE TPC : $2-$4 M TOTAL 4YR COST : 3.000 3.000 0.000 0.000 0.000



LIRR NEW SUBSTATIONS - DESIGN TWO NEW SUBSTATIONS AND CONSTRUCT ONE NFA 2012 5.000 MISC 5.000

NEW SUBSTATION ON THE MAIN LINE IN QUEENS, WEST OF JAMAICA. NFA 2013 17.100 MISC 17.100

L607/01/AM

AQC:B6P QUEENS TPC : $21-$31 M TOTAL 4YR COST : 22.100 0.000 5.000 17.100 0.000



LIRR THIRD RAIL FEEDER CABLE UPGRADE- REPLACE AND UPGRADE THIRD RAIL FTA 5307 2011 2.500 MISC 2.500

FEEDER CABLE IN AREAS WHERE IT IS BEYOND ITS USEFUL LIFE AND IS

L607/01/AN UNDERSIZED TO PROPERLY SUPPORT ELECTRIC FLEET OPERATIONS

AQC:B6P SYSTEM-WIDE TPC : $2-$4 M TOTAL 4YR COST : 2.500 2.500 0.000 0.000 0.000



LIRR NEGATIVE REACTOR UPGRADE - REPLACE AND UPGRADE THIRD RAIL NEGATIVE FTA 5309 2011 4.000 MISC 4.000

REACTORS WHICH ARE BEYOND THEIR USEFUL LIVES AND ARE UNDERSIZED TO

L607/01/AP PROPERLY SUPPORT THE ELECTRIC FLEET

AQC:B6P SYSTEM-WIDE TPC : $3.3-$5.6 M TOTAL 4YR COST : 4.000 4.000 0.000 0.000 0.000



LIRR CHLORDANE REMEDIATION - 20 SUBSTATIONS - ADDRESS CHLORDANE NFA 2012 0.800 MISC 0.800

CONTAMINATION WHICH EXISTS IN SOIL SURROUNDING SELECTED LIRR NFA 2013 7.700 MISC 7.700

L609/04/N3 SUBSTATIONS

AQC:A2P SYSTEM-WIDE TPC : $7.5-$12 M TOTAL 4YR COST : 8.500 0.000 0.800 7.700 0.000

** NEW YORK STATE DEPARTMENT OF TRANSPORTATION **

Friday, August 26, 2011 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) on Draft Program Page 80 of 84

for REGION 10

AGENCY PROJECT DESCRIPTION TOTAL 4-YEAR PROGRAM (FFY)

4-YEAR PHASE Starting October 01, 2010

FUND SOURCES FFY

PIN PROGRAM

FFY FFY FFY FFY

in millions

of dollars 2011 2012 2013 2014

AQ CODE COUNTY TOTAL PROJECT COST



LIRR YAPHANK LANDFILL ENVIRONMENTAL - REMEDIATION AT SITE INCLUDES NFA 2011 8.200 MISC 8.200

INSTALLATION OF AN IMPERMEABLE BARRIER AND ANCILLARY ITEMS

L609/04/N4 (GRADING, SEEDING, ETC.)

AQC:A2P SUFFOLK TPC : $7.5-$12 M TOTAL 4YR COST : 8.200 8.200 0.000 0.000 0.000



LIRR SMITHTOWN VIADUCT REMEDIATION & DRAINAGE - REMEDIATE ELEVATED NFA 2012 0.300 MISC 0.300

LEAD LEVELS IN THE SOIL NEAR THE SMITHTOWN VIADUCT NFA 2013 2.900 MISC 2.900

L609/04/N6

AQC:A2P SUFFOLK TPC : $2-$4 M TOTAL 4YR COST : 3.200 0.000 0.300 2.900 0.000



LIRR PROGRAM ADMINSTRATION - LIRR COSTS ASSOCIATED WITH THE SUPPORT, NFA 2011 26.100 MISC 26.100

ADMINISTRATION AND MANAGEMENT OF THE 2010-2014 CAPITAL PROGRAM FTA 5309 2012 3.800 MISC 3.800

L609/04/NA NFA 2012 23.100 MISC 23.100

NFA 2013 28.000 MISC 28.000

NFA 2014 28.000 MISC 28.000

AQC:B1P SYSTEM-WIDE TPC : $100-$225 M TOTAL 4YR COST : 109.000 26.100 26.900 28.000 28.000



LIRR PROGRAM DEVELOPMENT PROVIDES FUNDS FOR THE LONG ISLAND RAIL ROAD NFA 2012 5.500 MISC 5.500

TO PREPARE PROJECT SCOPES, EXAMINE SYSTEM ASSET NEEDS, AND TO STUDY NFA 2013 1.400 MISC 1.400

L609/04/NB CAPITAL NEEDS IN ORDER TO PREPARE FOR THE NEXT CAPITAL PROGRAM NFA 2014 1.400 MISC 1.400



AQC:B1P SYSTEM-WIDE TPC : $7.5-$12 M TOTAL 4YR COST : 8.300 0.000 5.500 1.400 1.400



LIRR INSURANCE FOR ALL WORK ASSOCIATED WITH THE LIRR CAPITAL PROGRAM NFA 2011 0.200 MISC 0.200

NFA 2012 0.200 MISC 0.200

L609/04/NC NFA 2013 0.200 MISC 0.200

NFA 2014 0.200 MISC 0.200

AQC:B1P SYSTEM-WIDE TPC : $0.6-$1.5 M TOTAL 4YR COST : 0.800 0.200 0.200 0.200 0.200



LIRR INDEPENDENT ENGINEER FUNDS INDEPENDENT ENGINEERING WORK FOR NFA 2011 0.900 MISC 0.900

PROJECTS THROUGHOUT THE CAPITAL PROGRAM NFA 2012 0.900 MISC 0.900

L609/04/ND NFA 2013 0.800 MISC 0.800

NFA 2014 0.800 MISC 0.800

AQC:B1P SYSTEM-WIDE TPC : $3.3-$5.6 M TOTAL 4YR COST : 3.400 0.900 0.900 0.800 0.800

** NEW YORK STATE DEPARTMENT OF TRANSPORTATION **

Friday, August 26, 2011 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) on Draft Program Page 81 of 84

for REGION 10

AGENCY PROJECT DESCRIPTION TOTAL 4-YEAR PROGRAM (FFY)

4-YEAR PHASE Starting October 01, 2010

FUND SOURCES FFY

PIN PROGRAM

FFY FFY FFY FFY

in millions

of dollars 2011 2012 2013 2014

AQ CODE COUNTY TOTAL PROJECT COST



LIRR MENTORING PROGRAM ADMINISTRATION - WILL PROGRESS SELECTED CAPITAL NFA 2011 0.300 MISC 0.300

PROGRAM ELEMENTS FOR INCLUSION IN MTA-WIDE MENTORING NFA 2012 0.300 MISC 0.300

L609/04/NE PROGRAM - INITIATIVE WHICH LOOKS TO EXPAND PARTICIPATION BY SMALL NFA 2013 0.300 MISC 0.300

BUSINESSES SERVING AS CONTRACTORS AND CONSULTANTS FOR MTA. NFA 2014 0.300 MISC 0.300



AQC:C3P SYSTEM-WIDE TPC : $1.2-$2.5 M TOTAL 4YR COST : 1.200 0.300 0.300 0.300 0.300



NYSDOT ELDERLY AND HANDICAPPED VEHICLES - SECTION 5310 VEHICLES FOR ELDERLY FTA 5310 2011 1.030 MISC 1.030

AND HANDICAPPED TRANSPORTATION BY PRIVATE NOT-FOR-PROFIT AGENCIES. NFA 2011 0.257 MISC 0.257

NS5310

AQC:B10P SUFFOLK TPC : $1.2-$2.5 M TOTAL 4YR COST : 1.287 1.287 0.000 0.000 0.000



NYSDOT NYSDOT NHS BLOCK TO COVER COST SUCH AS ORDER ON CONTRACT FOR NHS 2013 5.221 MISC 5.221

IDENTIFIED PROJECTS NFA 2013 1.305 MISC 1.305

NSBLOCK

AQC:J1Z MULTI TPC : $26-$40 M TOTAL 4YR COST : 6.526 0.000 0.000 6.526 0.000



SUFFOLK CO. COUNTYWIDE STRENGTHENING AND IMPROVING COUNTY ROADS ASPHALT NFA 2011 6.000 CONST 6.000

REHABILITATION AND RESURFACING AT VARIOUS LOCATIONS NFA 2012 6.000 CONST 6.000

SC5014 NFA 2013 6.000 CONST 6.000

AQC:A10P SUFFOLK TPC : $15-$25 M TOTAL 4YR COST : 18.000 6.000 6.000 6.000 0.000



SUFFOLK CO. COUNTYWIDE RECONSTRUCTION OF DRAINAGE SYSTEMS ON VARIOUS COUNTY NFA 2011 0.525 CONST 0.525

ROADS. PROJECT IS INTENDED TO PROVIDE FUNDS TO MAINTAIN AND IMPROVE NFA 2012 0.525 CONST 0.525

SC5024 HIGHWAY DRAINAGE SYSTEMS. NFA 2013 0.550 CONST 0.550

AQC:A2Z SUFFOLK TPC : $1.2-$2.5 M TOTAL 4YR COST : 1.600 0.525 0.525 0.550 0.000



SUFFOLK CO. CONSTRUCTION AND REHABILITATION OF HIGHWAY MAINTENANCE FACILITIES NFA 2011 0.363 CONST 0.363

SALT STORAGE BUILDINGS. THIS PROJECT FUNDS THE CONSTRUCTION AND NFA 2013 0.708 CONST 0.708

SC5048 REHABILITATION OF ENVIRONMENTALLY ACCEPTABLE STORAGE FOR SALT NFA 2014 0.690 CONST 0.690

USED FOR ICE AND SNOW CONTROL. LOCATIONS TO BE DETERMINED.





AQC:C14Z SUFFOLK TPC : $2-$4 M TOTAL 4YR COST : 1.761 0.363 0.000 0.708 0.690

** NEW YORK STATE DEPARTMENT OF TRANSPORTATION **

Friday, August 26, 2011 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) on Draft Program Page 82 of 84

for REGION 10

AGENCY PROJECT DESCRIPTION TOTAL 4-YEAR PROGRAM (FFY)

4-YEAR PHASE Starting October 01, 2010

FUND SOURCES FFY

PIN PROGRAM

FFY FFY FFY FFY

in millions

of dollars 2011 2012 2013 2014

AQ CODE COUNTY TOTAL PROJECT COST



SUFFOLK CO. RECONSTRUCTION OF CR11, PULASKI ROAD FROM OLD BRIDGE ROAD TO LONG NFA 2011 1.600 CONINSP 1.600

ISLAND RAILROAD TRACKS, TOWN OF HUNTINGTON. PROJECT WOULD IMPROVE NFA 2011 0.400 CONST 0.400

SC5095 SAFETY AND ROADWAY ALIGNMENT AS WELL AS IMPROVE DRAINAGE AND

PAVEMENT SURFACE.

AQC:D2P SUFFOLK TPC : $2-$4 M TOTAL 4YR COST : 2.000 2.000 0.000 0.000 0.000



SUFFOLK CO. CR17 WHEELER ROAD /CR67 MOTOR PKWY. INTERSECTION IMPROVEMENT BY NFA 2012 0.750 CONINSP 0.750

ADDING TURN LANES TO ALLEVIATE THE CONGESTION. RECONSTRUCT THE NFA 2014 2.000 CONST 2.000

sc5097 SIDE WALKS FOR PEDESTRIAN MOBILITY.

AQC:D1P SUFFOLK TPC : $2-$4 M TOTAL 4YR COST : 2.750 0.000 0.750 0.000 2.000



SUFFOLK CO. CR46 WILLAIM FLOYD PKWY.DRAINAGE AND SHOULDER IMPROVEMENTS TO NFA 2014 2.300 CONST 2.300

CORRECT SAFETY AND DRAINAGE ISSUES FROM VICINITY OF OSTEND CIRCLE

SC5116 TO SMITH POINT BRIDGE IN TOWN OF BROOKHAVEN

AQC:D3P SUFFOLK TPC : $2-$4 M TOTAL 4YR COST : 2.300 0.000 0.000 0.000 2.300



SUFFOLK CO. INTERSECTION IMPROVEMENTS ON COUNTY ROAD 83, NORTH OCEAN AVE IN NFA 2013 0.500 CONST 0.500

THE VICINITY OF MOUNT SINAI-CORAM ROAD BY ADDING ADDTIONAL RIGHT

SC5126 LANES AND EXTENDING EXISTING LEFT TURN LANES.

AQC:D1Z SUFFOLK TPC : < $0.75 M TOTAL 4YR COST : 0.500 0.000 0.000 0.500 0.000



SUFFOLK CO. RECONSTRUCTION OF CR11/DEPOT ROAD/FAIRGROUND AVE INTERSECTION, NFA 2012 0.250 ROWACQU 0.250

TOWN OF HUNTINGTON. PROJECT WOULD RECONSTRUCT INTERSECTION TO NFA 2014 1.200 CONST 1.200

SC5168 IMPROVE SAFETY AND CONGESTION.

AQC:A10Z SUFFOLK TPC : $1.2-$2.5 M TOTAL 4YR COST : 1.450 0.000 0.250 0.000 1.200



SUFFOLK CO. SUFFOLK COUNTY SIGN MANAGEMENT PROGRAM. PROJECT WILL BRING NFA 2011 0.450 CONST 0.450

SUFFOLK COUNTY HIGHWAY ROADWAY SIGNAGE INTO CONFORMANCE WITH NFA 2012 1.000 CONST 1.000

SC5196 FHWA MUTCD REQUIREMENTS. THIS PROJECT WOULD IMPLEMENT AN NFA 2013 1.000 CONST 1.000

ASSESSMENT AND MANAGEMENT SYSTEM DESIGNED TO MAINTAIN TRAFFIC NFA CONST

2014 1.000 1.000

SIGN REFLECTIVITY, REVIEW SIGN PLACEMENT COMPLIANCE AND ESTABLISH

AN INVENTORY OF ANY ROADSIDE APPRURTENANCES REQUIRING

MAINTENANCE.



AQC:A6Z SUFFOLK TPC : $3.3-$5.6 M TOTAL 4YR COST : 3.450 0.450 1.000 1.000 1.000

** NEW YORK STATE DEPARTMENT OF TRANSPORTATION **

Friday, August 26, 2011 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) on Draft Program Page 83 of 84

for REGION 10

AGENCY PROJECT DESCRIPTION TOTAL 4-YEAR PROGRAM (FFY)

4-YEAR PHASE Starting October 01, 2010

FUND SOURCES FFY

PIN PROGRAM

FFY FFY FFY FFY

in millions

of dollars 2011 2012 2013 2014

AQ CODE COUNTY TOTAL PROJECT COST



SUFFOLK CO. RECONSTRUCTION OF CULVERTS REPAIR AND MAINTENANCE IN SUFFOLK NFA 2011 0.900 CONST 0.900

COUNTY. THIS PROJECT PROVIDES FUNDING FOR ON-GOING REAPIR AND NFA 2012 0.900 CONST 0.900

SC5371 MAINTENANCE OF COUNTY OWNED CULVERTS WHICH ARE IN A STATE OF NFA 2013 1.030 CONST 1.030

DISREPAIR. NFA 2014 1.850 CONST 1.850

AQC:A10Z SUFFOLK TPC : $4.6-$7.5 M TOTAL 4YR COST : 4.680 0.900 0.900 1.030 1.850



SUFFOLK CO. PHASE I - CR97 INTERSECTIONS IMPROVEMENTS @HAMMOND ROAD,MARK TREE NFA 2011 0.400 DETLDES 0.400

ROAD.HAWKINS AVE, WIRELESS RD/POND RD, TOWN OF BROOKHAVEN. NFA 2013 4.100 CONST 4.100

SC5512 PHASE II -CR97/NY27 INTERSECTION IMPROVEMENT PROJECT WILL IMPROVE NFA 2014 4.100 CONST 4.100

SAFETY & EASE CONGESTION WITH NEW TURN LANE. TOWN OF BROOKHAVEN







AQC:A10Z SUFFOLK TPC : $7.5-$12 M TOTAL 4YR COST : 8.600 0.400 0.000 4.100 4.100



SUFFOLK CO. PH I RECONSTRUCTION OF CR48 FROM HORTON AVENUE TO MAIN STREET, NFA 2012 5.000 CONST 5.000

TOWN OF SOUTHOLD. PROJECT WOULD REHABILITATE CR48 IMPROVING PAVING NFA 2014 0.750 ROWACQU 0.750

SC5526 SURFACE, DRAINAGE AND ALIGNMENT. NO NEW CAPACITY.

AQC:A10P SUFFOLK TPC : $9.5-15.5 M TOTAL 4YR COST : 5.750 0.000 5.000 0.000 0.750



SUFFOLK CO. CR83 INTERSECTION IMPROVEMENTS AT CR16 AND NY 25. ADD TURN LANES TO NFA 2012 1.500 ROWACQU 1.500

IMPROVE TRAFFIC CONGESTION, TOWN OF BROOKHAVEN.

SC5548

AQC:D1P SUFFOLK TPC : $3.3-$5.6 M TOTAL 4YR COST : 1.500 0.000 1.500 0.000 0.000



SUFFOLK CO. REHABILITATION OF CR59, LONG LANE FROM VICINITY OF THE EAST HAMPTON NFA 2012 2.200 CONST 2.200

VILLAGE LINE TO THE VICINITY OF STEPHENS HANDS PATH, TOWN OF EAST

SC5561 HAMPTON. PROJECT WILL IMPROVE RIDING SURFACE AND SAFETY.



AQC:A3P SUFFOLK TPC : $2-$4 M TOTAL 4YR COST : 2.200 0.000 2.200 0.000 0.000



SUFFOLK CO. SAGTIKOS CORRIDOR- INTERIM BY-PASS CORRIDOR. STUDY TRAFFIC PATTERN NFA 2011 1.300 SCOPING 1.300

ON COMMACK ROAD AND SAGTIKOS PARKWAY, TOWN OF ISLIP

SC5565 ( SCOPE TO BE DETERMINED).

AQC:J1Z SUFFOLK TPC : $1.2-$2.5 M TOTAL 4YR COST : 1.300 1.300 0.000 0.000 0.000

** NEW YORK STATE DEPARTMENT OF TRANSPORTATION **

Friday, August 26, 2011 STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) on Draft Program Page 84 of 84

for REGION 10

AGENCY PROJECT DESCRIPTION TOTAL 4-YEAR PROGRAM (FFY)

4-YEAR PHASE Starting October 01, 2010

FUND SOURCES FFY

PIN PROGRAM

FFY FFY FFY FFY

in millions

of dollars 2011 2012 2013 2014

AQ CODE COUNTY TOTAL PROJECT COST



SUFFOLK CO. ASSESSMENT OF STRUCTRUAL,ELECTRICAL AND MECHANICAL COMPONETS OF NFA 2011 2.300 CONST 2.300

MOVEABLE BRIDGES IN SUFFOLK COUTY FOR THE PURPOSE OF MAINTAINING NFA 2011 0.750 DETLDES 0.750

SC5806 COUNTY BRIDGES IN GOOD WORKING ORDER. NFA 2012 3.500 CONST 3.500

AQC:A19Z SUFFOLK TPC : $6-$9.4 M TOTAL 4YR COST : 6.550 3.050 3.500 0.000 0.000



SUFFOLK CO. CLEANING AND REPAINTING VARIOUS STEEL BRIDGES IN SUFFOLK COUNTY. NFA 2011 1.350 CONST 1.350

NFA 2012 0.750 CONST 0.750

SC5815 NFA 2014 1.840 CONST 1.840

AQC:A19Z SUFFOLK TPC : $3.3-$5.6 M TOTAL 4YR COST : 3.940 1.350 0.750 0.000 1.840



NYSDOT NEW YORK STATE DEPARTMENT OF TRANSPORTATION OZONE ACTION DAYS: CMAQ 2011 0.264 OPER 0.264

NEW YORK STATE DEPARTMENT OF ENVIRONMENTAL CONSERVATION NFA 2011 0.066 OPER 0.066

SOAD01 MONITORS OZONE LEVELS AND FORECASTS AMOUNTS. CMAQ 2012 0.264 OPER 0.264

NFA 2012 0.066 OPER 0.066

CMAQ 2013 0.264 OPER 0.264

NFA 2013 0.066 OPER 0.066

CMAQ 2014 0.264 OPER 0.264

NFA 2014 0.066 OPER 0.066

AQC:NON MULTI TPC : $3.3-$5.6 M TOTAL 4YR COST : 1.320 0.330 0.330 0.330 0.330



LIRR TRANSIT TECHNICAL ASSISTANCE PROGRAM (FORMERLY TRANTECH) CMAQ 2011 0.320 MISC 0.320

NFA 2011 0.080 MISC 0.080

TRANTECH CMAQ 2012 0.320 MISC 0.320

NFA 2012 0.080 MISC 0.080

CMAQ 2013 0.320 MISC 0.320

NFA 2013 0.075 MISC 0.075

CMAQ 2014 0.320 MISC 0.320

NFA 2014 0.080 MISC 0.080

AQC:C1P NASSAU TPC : $2-$4 M TOTAL 4YR COST : 1.595 0.400 0.400 0.395 0.400



Related docs
Other docs by peng xuebo
Rachael Piccione
Views: 1  |  Downloads: 0
JAZZ AND POPULAR MUSIC IN AMERICA
Views: 0  |  Downloads: 0
FALL 2011
Views: 0  |  Downloads: 0
msr_crit_resetjanster_flyg_10_EN
Views: 0  |  Downloads: 0
2009-2010 Uniform Policy
Views: 3  |  Downloads: 0
STAC WG.23 6_E_final
Views: 3  |  Downloads: 0
Gas geben und bremsen mittels Jo
Views: 8  |  Downloads: 0
By registering with docstoc.com you agree to our
privacy policy

You are almost ready to download!

You are almost ready to download!