FMEA

Document Sample
FMEA Powered By Docstoc
					Failure Modes & Effects Analysis - R12300




    Management FMEA Risks          Severity   Likelihood          Mitigation
                                                           Explicitly stated in PRP,
                                                            add customer need to
Communications between teams          9           3
                                                           communicate, task 1 IE
                                                            with communicating
      Staying within budget           3           1        Scope budget properly
                                                            Specify in constraints
CAD drawings are not consistent       3           3        what the format should
                                                                       be



       Design FMEA Risks           Severity   Likelihood           Mitigation
                                                                 Run theoretical
Experiment doesn’t correlate to                                 calculations then
                                      9           1
theory                                                             compare to
                                                               experimental data
Facility cannot accommodate                                Define experiment size,
                                      3           3
experiment                                                    refer to size metric
Facility cannot accommodate                                 Define room size, refer
                                      3           3
number of students                                            to room size metric
                                                               Test it, fully define
Experiment outright fails             9           1          PRPs, groups need to
                                                                  communicate
Improper interfacing between                               Fully define PRPs, group
                                      3           9
attachments and bases                                       needs to communicate
                                                             Ensure compatibility
DAQ doesn’t interface properly        9           1
                                                                   beforehand
                                                                 Ensure DAQ is
DAQ doesn’t collect data              9           1
                                                            functional beforehand
Not enough diversity for 11                                  Refer to engineering
                                      3           1
unique data sets                                                      metric
Cannot be performed in 75                                  Test to ensure it can be
                                      9           1
minutes                                                        performed in time

				
DOCUMENT INFO
Shared By:
Categories:
Tags:
Stats:
views:15
posted:12/11/2011
language:English
pages:1