Embed
Email

Distribution

Document Sample

Shared by: panniuniu
Categories
Tags
Stats
views:
0
posted:
12/11/2011
language:
pages:
4
Information

General PartnerInput Sheet

Distribution Data





Reporting Date

(MM/DD/YYYY)





Company name

Contact name

Contact Contact title

Information Contact email



Contact office phone

Contact alternative phone





Describe the scope of the operations to include in the Partner Challenge Study. For example, do you want to include company-wide

operations or only operations from a specific location? Attach a diagram of the operations included in this study, if available.



Project Scope









Describe the facilities to be included in the Partner Challenge Study. Provide the physical boundaries of each location, explaining

boundary points where the facilities in this study interface with other companies, business units, and facilities. Attach a diagram

illustrating boundaries, if available.

Throughput in

Project boundaries at Million cubic

Project Location Description of the location this location feet per day

Boundaries **SAMPLE**

Denver, Colorado Gas distribution system with 40 metering and regulating City Gate to customers 300 MMcf/day

stations with gas pneumatic devices and orifice meters along meters

with both residential and industrial customer delivery systems

and meters.







Specify the economic parameters relevant to your market or corporate planning

requirements. Defaults are provided, but more accurate company values will make study

results more meaningful.

Natural Gas Fuel Value $/Thousand cubic feet

Natural Gas Sales Value $/Thousand cubic feet

Economic Annual Discount Rate %

Parameters Payback Period Estimate Years



Other economic metric

How do you value your avoided methane emissions; at fuel gas value, gas sales value, or

other?





Please describe any other voluntary projects you have done to reduce methane emissions.









Voluntary

Projects









Last Update: February 7, 2011









General Information Page 1 of 4

NATURAL GAS DISTRIBUTION

Please answer the following questions for the operations defined in the Project Scope. Enter data as

thoroughly as possible for one full calendar year, preferably the most recent full calendar year. If a category

does not apply to the scope of your project or your company's operations, enter "NA". Please copy and insert

a new "Distribution" tab for each separate facility.





DISTRIBUTION SYSTEM INFORMATION Input Field



Natural gas composition (Volume percent methane content in natural gas):





GATE STATION COMPONENTS Input Field

Metering and regulating (M&R) gate stations:

→ Number of M&R gate stations with inlets >300 psig (Pounds per square

inch, gauge):

→ Number of M&R gate stations with inlets 100 to 300 psig (Pounds per

square inch, gauge):

→ Number of M&R gate stations with inlets 300 psig (Pounds per

square inch, gauge):

→ Number of Regulator vault gate stations valves, fittings, meters that

are not monitored for gas leaks:

→ Number of Regulator vault gate stations valves, fittings, meters that

are monitored for gas leaks:

Number of Regulator vault gate stations with inlets 100-300 psig (Pounds per

square inch, gauge):

→ Number of Regulator vault gate stations valves, fittings, meters that

are not monitored for gas leaks:

→ Number of Regulator vault gate stations valves, fittings, meters that

are monitored for gas leaks:









Distribution Page 2 of 4

NATURAL GAS DISTRIBUTION

Please answer the following questions for the operations defined in the Project Scope. Enter data as

thoroughly as possible for one full calendar year, preferably the most recent full calendar year. If a category

does not apply to the scope of your project or your company's operations, enter "NA". Please copy and insert

a new "Distribution" tab for each separate facility.





FARM TAP COMPONENTS Input Field

Total number of farm taps:

→ Number of farm taps with valves, connections, open-ended lines that

are not monitored for gas leaks:

→ Number of farm taps with valves, connections, open-ended lines that

are monitored for gas leaks:



BURIED MAIN COMPONENTS Input Field

Total length of all gas distribution buried mains (Miles):

→ Length of protected steel gas distribution buried mains (Miles):

→ Length of unprotected steel gas distribution buried mains (Miles):

→ Length of plastic gas distribution buried mains (Miles):

→ Length of cast iron gas distribution buried mains (Miles):



BURIED SERVICE COMPONENTS Input Field

Total length of all gas distribution buried services (Miles):

→ Length of protected steel gas distribution buried services (Miles):

→ Length of unprotected steel gas distribution buried services (Miles):

→ Length of plastic gas distribution buried services (Miles):

→ Length of copper gas distribution buried services (Miles):



CUSTOMER METER COMPONENTS Input Field

Number of outdoor residential meters:

Number of commercial/industrial meters:



PNEUMATIC DEVICES Input Field

Total number of stations using pneumatic devices (that are powered by

pressurized natural gas) in natural gas distribution:

→ Number of "high-bleed" pneumatic devices (emitting more than 6

cubic feet/hour of gas) in gas distribution:

→ Number of "low-bleed" devices (emitting less than 6 cubic feet/hour

of gas) in gas distribution:



→ Number of pressure regulators that bleed gas to the atmosphere:









Distribution Page 3 of 4

NATURAL GAS DISTRIBUTION

Please answer the following questions for the operations defined in the Project Scope. Enter data as

thoroughly as possible for one full calendar year, preferably the most recent full calendar year. If a category

does not apply to the scope of your project or your company's operations, enter "NA". Please copy and insert

a new "Distribution" tab for each separate facility.



GAS DISTRIBUTION EQUIPMENT Input Field

Provide details of any other methane-emitting equipment not listed in this form.









Distribution Page 4 of 4



Related docs
Other docs by panniuniu
organization_of_slp_working_files_3-23-10
Views: 1  |  Downloads: 0
Lesson 2 2011 key
Views: 0  |  Downloads: 0
Site Survey
Views: 2  |  Downloads: 0
alt energy project SP11
Views: 1  |  Downloads: 0
Effie Biography
Views: 0  |  Downloads: 0
Download-Organization-application-letter
Views: 0  |  Downloads: 0
TWIN_Nomination_form_2010
Views: 0  |  Downloads: 0
Engineering Change Order Master Log
Views: 2  |  Downloads: 0
360654.f1
Views: 0  |  Downloads: 0
By registering with docstoc.com you agree to our
privacy policy

You are almost ready to download!

You are almost ready to download!