De Soto RAC Project Selection Meeting August 4, 2011







DE SOTO RESOURCE ADVISORY COMMITTEE

FY 2011 PROPOSED PROJECTS



County Road Name Distance (miles) Cost Location Project Description

Perry Brooklyn-Janice 3.0 $300,000 T1N, R11W, Sec 8 and 1.5”-2” Hot Mix Asphalt

T1N, R11W, Sec 2 overlay of existing asphalt

roadway

Wayne Camp 8 .5 $23,523 T6N, R9W, Sec 13 Widen Rd. from 18' to 20'

then matt and seal. #7 and

#6 Rock with oil

Wayne Jordan Sumrall 2.1 $23,523 T7N, R5W, Sec 17 Reseal with slag and CRS2

oil

Wayne Old Highway 84 2.1 $23,523 T9N, R7W, Sec 32 and 33 #7 slag and CRS2 oil to

reseal existing asphalt

roadway

Wayne Bunk Butler 1.2 $23,523 T9N, R8W, Sec 20 and 30 Reseal Slag and CRS2 oil



Wayne Battles and Cross Road 80x100x3" (area) $23,523 T6N, R6W, Sec 4 and Build pad (2) in front of

Fire Stations T6N, R5W, Sec 17 Volunteer Fire Depts.

TOTAL $417,615



Title II Balances

County FY 2008 FY 2009 FY 2010 FY 2011 (Projected)

Perry $185,269 $108,930 $169,602 $149,779

Wayne $43,336 $48,245 $38,421 $33,800

Total $228,605 $157,175 $208,023 $183,579

GRAND TOTAL $777,382









Caring for the Land and Serving People



Related docs
Other docs by panniuniu
organization_of_slp_working_files_3-23-10
Views: 1  |  Downloads: 0
Lesson 2 2011 key
Views: 0  |  Downloads: 0
Site Survey
Views: 2  |  Downloads: 0
alt energy project SP11
Views: 1  |  Downloads: 0
Effie Biography
Views: 0  |  Downloads: 0
Download-Organization-application-letter
Views: 0  |  Downloads: 0
TWIN_Nomination_form_2010
Views: 0  |  Downloads: 0
Engineering Change Order Master Log
Views: 2  |  Downloads: 0
360654.f1
Views: 0  |  Downloads: 0
By registering with docstoc.com you agree to our
privacy policy

You are almost ready to download!

You are almost ready to download!