subsea uk sample projects database

Document Sample
subsea uk sample projects database Powered By Docstoc
					              Project            Location          Region


CLOV                    Angola              Africa


Kizomba                 Angola              Africa




Ichthys LNG             Australia           Australasia

Van Gogh                Australia           Australasia
Vincent                 Australia           Australasia
Espadarte               Brazil              South America
Frade                   Brazil              South America
Marlim Sul              Brazil              South America

Kinnoull                UK                  UKCS
Block                    Operator          Topside Solution   Oil   Gas


17               Total              FPSO                      Y


15               ExxonMobil         TLP/FPSO                  Y




WA-285-P         Inpex              Semi submersible/FPSO            Y

WA-35-L          Apache             FPSO                      Y      Y
WA-271-P         Woodside           FPSO                      Y      Y
Campos Basin     Petrobras          FPSO                      Y
Campos Basin     ChevronTexaco      FPSO                      Y      Y
Campos Basin     Petrobras          Semi submersible/FPSO     Y      Y

16/27a , 16/28   BP                 Subsea tieback            Y
           Reserves   Cost              Subsea      No. Wells   Tree Type
                                      production?

                                          Y            36        Vertical


3500 mmboe             $7.7 billion       Y           106        Vertical




                       $20 billion        Y            50           ?

50 mmboe              $560 million        Y            19       Horizontal
                                          Y            11        Vertical
428 mmboe                                 Y            26       Horizontal
270 mmboe                $3 billion       Y            19       Horizontal
1200 mmboe               $1 billion       Y           145       Vertical /
                                                                Horizontal
50 mmbo                                   Y            3        Horizontal
   Tree        Subsea   Future   Manifolds    Future     Flowlines     Future  Umbilicals
Manufacturer    Trees   Subsea               Manifolds      (km)     Flowlines   (km)
                         Trees                                          (km)
    FMC                   36                    8                        122


Cameron / GE     78       34        7           *           80          *           *
  Oil & Gas


not awarded               50                    *                       *

  Cameron        19                 2                        *                      6
    FMC          11                 2                       18                     14
  Cameron        26                 1                       4.9                     *
    FMC          19                 28                      90                      *
 FMC / Aker     123       22        3                        *                    15.7

  Cameron                 3                     1
 Future    Risers Future         Riser Type      Pipelines Future             Other subsea
Umbilicals   (#) Risers (#)                        (km) Pipelines
  (km)                                                      (km)
   87               18          Flexible / IPB


   49        29       *       SLOR / COR / SCR




    *                 *                                     850

             4                    Flexible
                                  Flexible
            34                    Flexible
            33                    Flexible          41              20 subsea control modules
            132                   Flexible         34.6

   29        1                                              28
Depth (m) Discovered Production Upcoming        Stage        Latest
                                 subsea                       news
                                  work
1100-1400    1998       2014        Y       Development      2011


1350-1480   1998       2005        Y          Expansion      2011




  250       2000       2016        Y       Pre-development   2010

 340-370    2003       2010                   Producing      2010
 350-420    1998       2008                   Producing
750-1500    1988       2000                   Producing      2011
  1128      1986       2009        Y          Expansion      2010
  2600      1987       1994        Y          Expansion      2009

 100-120    2008       2012        Y        Development      2010
Notes


Includes Lirio, Cravo, Violeta, and Orquidea fields; Partners agreed on field development plans in mid-2010, allowing
for drilling to commence in 2012 and first oil to be reached in 2014; Umiblicals contracts awarded to Aker and
Technip in 2010 with delivery scheduled for 2013; Acergy awarded $1.3 billion installation contract in 2010 for work
starting Q4 2012; FMC awarded tree contract B (Kissanje, Dikanza), Kizomba C (Mondo, Saxi, Batuque), Kizomba
Includes Kizomba A (Hungo, Chocalho), Kizomba
Satellites (Clochas, Mavacola, Kakocha, Bavuca), and Marimba subsea development; Phase I of Satellite
development (18 wells) expected to be completed in 2012 with Saipem performing installation in 2011; Subsea
equipment supplied by GE Oil & Gas with umbilicals by Oceaneering, 5 subsea frames from Neptune Deeptech, and
Currently in tendering process with new trees expected to be Q4 2011 and first months as for of Satellite Phase
£2m of valves by Oliver Valvetek; 16final investment decision inawarded in next 15gas forecastpart 2016; 15 new
trees expected to be awarded in next 15 months; Project will involve construction of 850 km of subsea pipeline;
AMEC supported by Aker and JP 2010; Includes Theo field to design umbilicals, flowlines, and risers
Oil production started February Kenny awarded contract

2nd phase of field development (9 new wells + 2nd FPSO) occurred in 2006 with production in 2007; Original FPSO
45% of drilling activities completed by Sept. 2010 with remaining activities expected to be completed over next 18
Module 3 will consist of 22 wells (11 producers and 11 injectors) tied-back to submersible platform, first oil expected
in 2011; Module 4 currently in reservoir analysis phase with drilling and development planning to follow
Subsea tieback to Andrew under development with first production anticipated Q3 2012: Technip awarded €14
million contract in 2010 for umbilicals to be delivered in 2011; SS7 awarded $135 million bundle contract in 2010;
Tie-back point included for future Arundel development
      Discovery               Location          Region   Block


Kentish Knock     Australia              Australasia     WA-365-P
Larsen Deep       Australia              Australasia     WA-404-P
Leviathan         Israel                 Mediterranean   Rachel, Amit
Pegi              Nigeria                Africa          OML 104
Skrugard          Norway                 Europe          7220/4, 7220/5, 7220/6,
                                                         7220/7, 7219/9
Banquo            UK                     UKCS            211/8a

Blackhorse        UK                     UKCS            15/22
Blakeney          UK                     UKCS            21/27b, P1619
Bowmore           UK                     UKCS            15/24a, 15/23c, 15/28a,
                                                         15/29e
Bugle             UK                     UKCS            15/23c, 15/23d
Burgman           UK                     UKCS            28/9
          Operator   Topside Solution   Oil Gas            Reserves       Cost


ChevronTexaco                               Y
Woodside                                    Y
Noble Energy                                Y     16 tcf
ExxonMobil                                  Y
Statoil                                 Y   Y     155-250 mmbo, 2-7 bcm

Valiant                                 Y   Y     15 mmbo, 33 bcf

Nexen                                   Y
Wintershall                             Y         60-100 mmboe
Nippon                                      Y

Nexen                                   Y
EnCore                                  Y   Y
No. Wells Depth (m) Discovered Production Upcoming Latest news
                                           subsea
                                            work
    1       1200       2009                           2009
    1       1243       2010                           2010
    1       1634       2011                           2011
    1        96        2010                           2010
    1       373        2011                           2011

   1      300-310     1987                             2011

   1      130-150     2005                             2011
   1         73       2010                             2010
   2        150       1990                             2009

   2        150       1997                             2010
   2                  2011                             2011
Notes


Discovered in 2009 - exploration activities continue
Will likely be developed as part of Pluto project
Discovery well announced 2011; Appraisal drilling taking place in 2011
discovered Nov. 2011, operator plans to further appraise the find
Major oil discovery in Apr 2011

Development options are still being considered; may be jointly developed with Tybalt and Helena discoveries
through subsea tie-back to local host infrastructure (e.g. Magnus, Don, Thistle, or Penguin), possibly allowing for first
oil as early as 2011 are still being considered
Development options
Discovered Q3 2010
Appraisal drilling in 2009

Minor quantities of hydrocarbons encountered during Bugle North appraisal drilling in 2010, development options
Discovered March 2011, with successful sidetrack well drilled immediately thereafter
still being considered
          Project           Location       Region    Block


Buffalo                Australia       Australasia   WA-260 PA
Challis                Australia       Australasia   AC/L2

Indefatigable (Inde)   UK              UKCS          49/18, 49/19, 49/23, 49/24

Leadon                 UK              UKCS          9/14a, 9/14b
    Operator      Topside Solution   Oil Gas      Reserves   Cost              Subsea
                                                                             production?

Nexen          Fixed platform/FPSO   Y         32 mmboe        $88 million       N
PTTEP          FPSO                  Y         62 mmbo                           Y

Shell          Fixed platform            Y                                       N

Maersk         FPSO                  Y         170 mmboe      $700 million       Y
No. Wells   Manifolds Flowlines Umbilicals Pipelines Other subsea Depth (m)   Discovered
                         (km)     (km)       (km)

   5                      4         2                               255         1996
   9                      *         *                               120         1984

   26                                        22                     25-32       1967

   17                     *                   *                     113         1979
   First      Last    Decom. Date Upcoming   Latest news
Production Production              subsea
                                    work
   1999       2003       2005                   2005
   1989       2010                    Y         2011

  1971      2005                     Y          2010

  2002      2006                     Y          2010
Notes


Decommissioning in 2004-2005 involved well abandonment, removal of FPSO and fixed platform
Production ceased Sept 19, 2010; AGR will provide engineering, project management, and support services in well
abandonment process, expected to take 10 months.
Production ceased from Shell's side of field in July 2005; Decommissioning includes removal of five platforms, 26
wells, five pipelines (22km) and two hose bundles (6km); all wells decommissioned by 2010; platform dismantling
contract Birse and in Dec 2010
Includes awarded Glassel satellites; Has been shut since 2006; Decommissioning plan submitted to DECC July 2010
255   1996   1999   Producing   2009
Productio
n
   Operator   Projects           Region
3D Oil           1       Australia
ADOC             1       UAE
Anadarko         2       GoM

Antrim           1       UKCS
Apache           8       Australia




                         UKCS
                                                                                                               Description
West Seahorse: well being developed using subsea tieback with first oil in 2012
Upper Zakum: Redevelopment calls for 23 artificial islands, water injection facility upgrade, and 21 new pipelines (115 km) by 2015 with many contracts expected to be issued in H1 2011
Caesar-Tonga: first production from 4-well subsea tieback to Constitution pushed back from mid-2011 due to mechanical issues following riser installation in H2 2010
Mondo: comprises tie back of 2 subsea wells to Independence Hub in 2011
Fyne: field will likely be developed through subsea tieback with final decision before Nov 2011
Balnaves: to be developed via FPSO - currently in FEED stage with FID expected in second half 2011 and first oil in 2014
Coniston: project approval expected Q1 2011 with plan for subsea tieback to Van Gogh FPSO and first oil in 2013
East Spar: tie back of East Spar 9 well expected in 2011-2012
Halyard/Spar: will be developed using subsea tieback with project completion in late 2012
Julimar: in FEED stage with plan to develop via subsea tieback and schedule for FID in 2011 and first production by 2016
Macedon: 4-well subsea development featuring 1 manifold, 97 km pipeline and umbilical with first production scheduled for 2013
Reindeer-Devil Creek: pipeline installation commenced in late 2010 with first gas scheduled for end of 2011
Forties/Bacchus: completion of Forties Bravo to Charlie replacement pipeline expected Sept. 2011; construction of Bacchus 3-well subsea tieback underway with production in Q3 2011
Russia/Caspian Sea: 10 projects
Azerbaijan: 3 projects
 BP                               3   Azeri-Chirag-Gunashli (ACG), Shah Deniz, Shafag-Asiman
Kazakhstan: 2 projects
 NCOC (Eni/Exxon/Shell/Total)     1   Kashagan
 Lukoil                           1   Khvalynskoye
Russian Caspian: 1 project
 Lukoil                           1   Yuri Korchagin
Russian Pacific: 2 projects
 ExxonMobil                       1   Sakhalin I (Arkutun Dagi)
 Gazprom                          1   Sakhalin III (Kirinskoye)
Russian Arctic: 2 projects
 Gazprom                          2   Prirazlomnoye, Shtokman
Turkmenistan: 1 project
 Dragon Oil                       2   Dzheitune (Lam), Dzhygalybeg (Zhdanov)

				
DOCUMENT INFO
Shared By:
Categories:
Tags:
Stats:
views:11
posted:12/11/2011
language:
pages:52