Docstoc

marc

Document Sample
marc Powered By Docstoc
					       HE
Running Procedure
Installation Sequence
           Step 1
           • Drill and Run Casing
           • Run Casing Head with
             Flush Plugs installed
Installation Sequence



                Step 2
                • Install BOP with
                  HE Adapter
Installation Sequence
           Step 3
           • Drill and Run 4-1/2
             Casing
           • Run Casing Hanger w/
             Running Tool
           • Lock in Place
Installation Sequence

             Step 4A
             • Lower Collar
             • Rotate Collar 2 RH
               turns
Installation Sequence

              Step 4B
              • Stab Tubing Head
              • Rotate Collar 2 LH
                turns
Installation Sequence

              Step 4C
              • Rotate 10 RH turns
                or until Fully Made
                up
Installation Sequence




           Step 5A
           • Run Tubing
           • Run In Load Shoulder
             Set Screws
Installation Sequence




           Step 5B
           • Run Tubing Hanger and
             lock with Lock Screws
Installation Sequence




 Interim State      Interim State
 • with Temporary   • with Temporary
   Casing Hanger      Casing Head Cap
   Plug             • Optional
Installation Sequence
           • Complete

				
DOCUMENT INFO
Shared By:
Categories:
Tags:
Stats:
views:24
posted:12/11/2011
language:English
pages:11