Òkjrh; çkS|ksfxdh laLFkku xqokgkVh] Phone Nos.: +91-361- 258 2153









Stores & Purchase

xqokgkVh&781 039 +91-361- 258 2156

• T.T. Haokip Indian Institute of Technology

Assistant Registrar (S&P) Guwahati, Fax No. : +91-361- 258 2152









Section

e-mail : lunkip@iitg.ernet.in

Guwahati-781 039, Assam, India. apu@iitg.ernet.in





• To, • Date : 03.11.2011

As per list

• NIQ No.: S&P/50/Math-47/NIQ/2011-12/









NOTICE INVITING QUOTATION FOR SUPPLY OF TABLET PC TO IIT GUWAHATI.

Quotation under single bid system for supply of items as per details at ANNEXURE – I, in

sealed cover, is hereby invited so as to reach the undersigned on or before 25-11-2011.



Presentation of Bid:

01. Address of the firms submitting the quotation and the Officer, to whom the quotation is addressed, must

appear distinctly on the sealed cover. Further, on the outside of the sealed cover, the following are to be written:



QUOTATION FOR SUPPLY AND INSTALLATION OF TABLET PC ETC. AGAINST NIQ NO.

S&P/50/MATH-47/2011-2012 DATED: 03-11-2011 LAST DATE OF SUBMISSION 25-11-2011.



Terms & Conditions:

01. Rates: Rates quoted should be on F.O.R., IIT Guwahati, on Door Delivery basis.

02. Validity: Quoted rates must valid for 120 days.

03. Warranty/Guarantee: the material be quoted with a minimum Warranty/Guarantee period of 24 months after

the date

of delivery and acceptance at final destination.

(4)Delivery:

i) Delivery time: Maximum within 45(forty-five) days from the date of receipt of this purchase.

ii) Safe Delivery of goods: All aspects of safe delivery shall be the exclusive responsibility of the

vendor

iii) Part Delivery: Part shipment will not be allowed

05. Performance Bank Guarantee: In case of equipment worth above Rs. 5 lakhs the successful bidder is to

furnish an unconditional Performance Bank Guarantee valid till 60 days after the warranty period from a

scheduled Bank for 10% of the Purchase Order value within 20 days of placement of order failing which

the contract shall be deemed as terminated.

06. VAT Certificates & TDS: Copy of latest VAT clearance Certificates with the TIN number clearly indicated

therein, will have to accompany the quotation to be submitted. For a vendor within the state of Assam,

appropriate VAT deduction at source will be applicable

07. Dealership Certificate: Dealership certificate (in case of dealers) and standard Technical literature on the

offered products must be enclosed.

08. Rate of AMC: Annual Maintenance Contract rate (after expiry of warranty period) is to be clearly

indicated ( for equipment only). The selected supplier/s is to ensure regular availability of spares.

09. Excise Duty :The Institute is exempted from payment of Central Excise Duty vide GOI Notification No.

10/97-Central Excise, dated 01.03.97 with Regn. No. TU/V/RG-CDE(351)/2006, dated 14.09.2006.

10. Printed conditions of supply of the firm, if any, will not be binding on us.

11. Late and delayed tender: Late and delayed tender will not be considered. In case any unscheduled holiday

occurs on prescribed closing/opening date the next working day shall be the prescribed date of

closing/opening.

12. Ground for Rejection of Quotation: The quotations are liable to be rejected if the fore going conditions are

not complied with. The quotation should be complete in all respects and duly signed wherever required.

Incomplete and unsigned offer will not be accepted.

Contd…P/2

Page-2-



13. Payment: Payment will be maximum within 30 days from the date of successful delivery and acceptance of

goods at IIT Guwahati, generally through A/c payee cheque. In case payment is to be made by DD, the draft

commission will be deducted from the bill amount. Part payment for part delivery will not be allowed.







14. Termination for default: Default is said to have occurred

(a) If the supplier fails to deliver any or all of the services within the time period(s) specified in the purchase

order or any extension thereof granted by IIT.

(b)If the supplier fails to perform any other obligation(s) under the contract

(c ) If the vendor, in either of the above circumstances, does not take remedial steps within a period of 30 days

after receipt of the default notice from IIT (or takes longer period in-spite of what IIT may authorize in

writing), IIT may terminate the contract / purchase order in whole or in part and forfeit the EMD. In addition

to above, IIT may at its discretion also take the following actions: IIT may procure, upon such terms and in

such manner, as it deems appropriate, goods similar to the undelivered items/products and the defaulting

supplier shall be liable to compensate IIT for any extra expenditure involved towards goods and services to

complete the scope of.

15. Applicable Law

(a)The contract shall be governed by the laws and procedures established by Govt. of India, within

the framework of applicable legislation and enactment made from time to time concerning such

commercial dealings/processing.

(b)All disputes are subject to exclusive jurisdiction of Competent Court and Forum in Guwahati, India only.

(c) Any dispute arising out of this purchase shall be referred to the Director IIT Guwahati, and if either of the

parties hereto is dissatisfied with the decision, the dispute shall be referred to the decision of an Arbitrator,

who should be acceptable to both the parties, to be appointed by the Director of the Institute. The decision of

such Arbitrator shall be final and binding on both the parties.

16. The acceptance of the quotation will rest solely with the Director, IITG, who in the interest of the Institute is

not bound to accept the lowest quotation and reserves the right to himself to reject or partially accept any or

all the quotations received without assigning any reasons.





(T.T.Haokip)

Asst. Registrar (Store & Purchase)

.

Annexure – I

Tablet PC Specification

Qty: 03 Nos.



Intel® Core™2 Duo Processor (2.53GHz, 6MB L2

Processor cache, 1066MHz) or higher

Chipset Intel Chipset

RAM 3GB DDR3 1066MHz or higher

Hard Disk 300 GB S-ATA 5400 rpm or higher

DVD Writer Dual Layer DVD Super Multi Writer

Display 14.1" SuperFine WXGA TFT, 1280 x 800 pixels

Intel Graphics Media Accelerator with Microsoft® Direct X® to provide great

Graphics Card performance and extended Battery life.

USB 2.0 x 3, VGA (external display), RJ45 (LAN), RJ11

Connector Interface (modem), HDA-in, HDA-out,Power Adapter DC-in



1.3 Mega Pixels camera, Bluetooth, 56K Modem,1000/100/10Mbps Gigabit

Communication Ethernet, Intel® Wifi Link 5300AGN, Card Reader.



Security BIOS Lock, Hard Disk Lock, Anti-theft Lock Slot, Smartcard support

RealTek ALC269 HD audio codec with dual built-in stereo speakers |HD Audio-

in: External Mic-in, Dual Built-in Stereo Microphone|HD Audioout: Headphone-

Audio out

Enhanced dual pointing devices (touchpad and pointstick) with scroll zone,

Pointing Device Digital eraser pen

Battery Upto 5.5 Hrs ( 6 Cell Li-Ion 5800 mAh) or more

Weight Approx. 1.7 kg

Genuine Microsoft windows 7 Professional with media CD, Support for Redhat

Operating System and Ubuntu Linux

Accessories Carry Case, Power Adapter, USB Optical Scroll mouse,

Warranty 3 Years



Related docs
Other docs by panniuniu
organization_of_slp_working_files_3-23-10
Views: 1  |  Downloads: 0
Lesson 2 2011 key
Views: 0  |  Downloads: 0
Site Survey
Views: 2  |  Downloads: 0
alt energy project SP11
Views: 1  |  Downloads: 0
Effie Biography
Views: 0  |  Downloads: 0
Download-Organization-application-letter
Views: 0  |  Downloads: 0
TWIN_Nomination_form_2010
Views: 0  |  Downloads: 0
Engineering Change Order Master Log
Views: 2  |  Downloads: 0
360654.f1
Views: 0  |  Downloads: 0
By registering with docstoc.com you agree to our
privacy policy

You are almost ready to download!

You are almost ready to download!