09-18_TYP_Projects_Approved_6-25-08_R7-15-08 by panniuniu

VIEWS: 19 PAGES: 127

									       TEN YEAR TRANSPORTATION
          IMPROVEMENT PLAN
               2009 - 2018
                 Projects Only
        APPROVED BY THE NH LEGISLATURE
      AND SIGNED INTO LAW BY THE GOVERNOR


                     PURSUANT TO
RSA 228:99 AND RSA 240 OF THE LAWS OF NEW HAMPSHIRE




         PROJECTS LISTED ALPHABETICALLY




         PREPARED BY THE NEW HAMPSHIRE
         DEPARTMENT OF TRANSPORTATION

                 JUNE 25, 2008
                   HB 1646 – VERSION ADOPTED BY BOTH BODIES

19Mar2008… 1017h

04Jun2008… 2113cofc

                                             2008 SESSION

08-2909

06/09

HOUSE BILL 1646

AN ACT relative to the 10-year transportation improvement plan.

SPONSORS: Rep. Bouchard, Merr 11; Sen. Hassan, Dist 23

COMMITTEE: Public Works and Highways

                                               ANALYSIS

This bill updates the 10-year transportation improvement plan to maintain highways and
bridges in the state.

--------------------------------------------------------------
--------------

Explanation: Matter added to current law appears in bold italics.

Matter removed from current law appears [in brackets and struckthrough.]

Matter which is either (a) all new or (b) repealed and reenacted appears in regular type.
19Mar2008… 1017h

04Jun2008… 2113cofc

08-2909

06/09

                              STATE OF NEW HAMPSHIRE

                       In the Year of Our Lord Two Thousand Eight

AN ACT relative to the 10-year transportation improvement plan.

 Be it Enacted by the Senate and House of Representatives in General Court convened:

1 State 10-Year Transportation Improvement Plan. Amend RSA 240:1 to read as follows:

240:1 Legislative Intent.

I. The plan is predicated on the report submitted by the governor to the legislature dated
[February 16, 2006] January 15, 2008 and on the “State of New Hampshire Ten Year
Transportation Improvement Plan [2007-2016] 2009-2018 Submitted to the Governor,
Pursuant to RSA 228:99 and RSA 240 of the Laws of New Hampshire, by the Governor’s
Advisory Commission on Intermodal Transportation (GACIT)” which was adopted by
GACIT on [December 7, 2005] November 28, 2007 and is intended to serve as the
guideline for transportation projects in the state for the next decade.

II. The general court understands that [the revenue projected for the plan period 2007-
2016 2009-2018 is inadequate to fund all the projects in the plan. Without additional
projects, it is estimated that with revenue increases at $5 million per year, the plan will
take approximately 14 years to complete, excluding consideration of inflation on the cost
of the projects] this plan closely adheres to the estimated funding available for
transportation projects for 2009-2018, returning New Hampshire to a realistic 10-year
plan. The general court further understands that while the plan is reasonably
financially constrained, the last 4 years of the plan are less certain in terms of scope,
future funding, inflation, and priority. In passing this plan, it is the general court’s intent
to review the plan every 2 years, pursuant to RSA 228:99 and RSA 240, [but] and not to
add projects before the review, except for emergencies[, until the funding is adequate to
bring the plan within a projected 10-year completion framework].

2 Plan. Amend RSA 240:3 to read as follows:

240:3 Plan. The legislature hereby adopts the plan known as the “State of New
Hampshire Ten Year Transportation Improvement Plan [2007-2016] 2009-2018
Submitted by the House Public Works and Highways Committee as Part of the
Legislative Process Pursuant to RSA 228:99 and RSA 240 of the Laws of New
Hampshire” and encourages expeditious implementation of the projects shown therein.

3 State 10-Year Transportation Improvement Plan; Bedford Project; Reimbursement.

I. In the year in which the project is funded in the state 10-year transportation
improvement plan, the town of Bedford shall receive 80 percent reimbursement of its cost
of construction or improvements, or both, of route N.H. 101 from federal funds, provided
the following conditions have been met:

(a) The town of Bedford shall demonstrate through an engineering study that the
improvements benefit the safety and capacity of N.H. 101.

(b) The engineering design, environmental evaluation, purchase of right-of-way, and
construction of any improvements is done in accordance with state and federal
requirements that apply to federal aid projects.

II. Reimbursement under paragraph I is contingent on the availability of federal funding
specific to the federal program which the project named Bedford, project number 13953,
falls within.

III. Nothing in this section shall be construed as a guarantee of reimbursement by state or
federal funds. This section allows for reimbursement for such construction or
improvements, or both, based on the costs when such work is done.

4 Effective Date. This act shall take effect 60 days after its passage.
                      New Hampshire’s
          Ten Year Transportation Improvement Plan
                                       INTRODUCTION

        New Hampshire RSA 228:99 and RSA 240 require the New Hampshire Department of
Transportation (NHDOT) to propose a plan for improvements to the State’s transportation system.
The purpose of this legislation is to develop and implement a plan allowing New Hampshire to fully
participate in federally supported transportation improvement projects.

        This document contains the State’s 2009 – 2018 Ten Year Transportation Improvement
Plan, as recommended by the NHDOT, proposed by the Governor’s Advisory Committee on
Intermodal Transportation (GACIT),proposed by the Governor and adopted by the Legislature. The
NHDOT developed this Ten Year Plan in compliance with RSA 228:99 and RSA 240, and the Safe,
Accountable, Flexible, and Efficient Transportation Equity Act – A Legacy for Users (SAFETEA-
LU). In response to these state and federal requirements, the NHDOT has generated a long-term
schedule to develop, maintain, and improve the state’s transportation infrastructure.

        The NHDOT is committed to preserve and improve the transportation system for safe and
efficient movement of people and goods. The variety and scope of the projects included in this
document demonstrate this commitment. These projects include highway and bridge projects, park
and ride projects, rail and transit improvements, aeronautic improvements, and bicycle and
pedestrian projects and initiatives. Collectively, these projects preserve and upgrade the existing
system and take the State a step closer to a more complete and integrated transportation system.

        The United States Congress has continued flexibility in the use of federal funds for
transportation projects and encouraged further development of the intermodal transportation system
serving the state and the nation. The current six-year reauthorization bill, called the Safe,
Accountable, Flexible, and Efficient Transportation Equity Act – A Legacy for Users (SAFETEA-
LU) continues the vision and initiatives of the previous authorizations. As the acronym suggests,
this legislation has a major emphasis on safety. Additionally, the legislation is intended to provide
flexibility, state and local decision-making, and improve project delivery, all in an effort to cost
effectively address the nation’s transportation needs.

         Relative to the State’s Ten Year Transportation Improvement Plan, its projects are in various
stages of development in accordance with direction received from previous Ten Year Plans.
Following its inclusion in the Ten Year Plan, a successful transportation project must meet four
criteria to proceed: a project must be technically feasible, environmentally permittable, affordable,
and have public acceptance.




                                                       1                       2009-2018 Ten Year Plan
                                2009-2018 TEN YEAR PLAN
OVERVIEW

        This 2009-2018 Ten Year Plan proposes substantial reductions in both the number and costs
of projects from the previous 2007-2016 Ten Year Plan to develop a financially constrained plan
aligned more closely to anticipated funding. Previous Ten Year Plans were oversubscribed. More
recently this circumstance was further exacerbated during this current update by several factors
including the exceptionally large increase in construction costs (more than 45% between the years
2005 and 2007), the decision to include inflation to future year of construction, and the projection of
relatively flat transportation revenues. At the beginning of the development of this plan, with
updated cost estimates and projected revenues, it was estimated that the Ten Year Plan (excluding
Turnpike projects) contained approximately $4 billion of highway and bridge project costs with
incoming revenue of approximately $2.1 billion. Given this projected gap, a number of projects
proposed in previous plans have been deferred, canceled, or re-scoped to develop a fiscally
constrained plan that more closely adheres to the financial resources estimated to be available for
transportation projects.

         This 2009-2018 Ten Year Plan contains highway and bridge (excluding turnpike system)
projects totaling an estimated $2.3 billion against currently projected revenue of approximately $2.1
billion. The estimates are based on the Financial Model for the Highway Fund which accounts for
all sources of revenues and expenditures as well as inflation. The plan reflects and prioritizes the
critical need to address the State’s Red List bridges, accelerating the pace of their repair and
replacement and reducing, through increased preservation efforts, the rate at which bridges are
added to the Red List. The plan also reflects a strong emphasis on prioritizing the preservation of
the entire existing transportation infrastructure.

        While the plan is reasonably financially constrained, it does still contain approximately $200
million more in projects than there are anticipated revenues. These projects are in the later four
years of the Ten Year Plan and are consequently inherently less certain in terms of scope, future
funding, inflation, and priority. These projects will require further consideration in future biannual
updates to the Ten Year Plan as these factors are better understood in time. It is currently
anticipated that funding will be raised to address these shortfalls, but the means or amount have not
been determined at this time.

       There are other factors and assumptions upon which the plan is based that will similarly
need to be monitored and reevaluated in future updates with respect to their impact on the Ten Year
Plan. These include the following:


           •   Rate of Inflation: The Ten Year Plan and Financial Model utilize an annual rate of
               inflation for construction cost of 3.2%. This is based on nationwide, long-term
               historical averages generated by FHWA. It was noted previously that recent


                                                        2                       2009-2018 Ten Year Plan
    inflation rates over a period of three years have contributed significantly to the
    present financial situation. While this trend has leveled off recently, and those cost
    impacts have been absorbed and reflected in this Plan, dramatically different
    inflation rates will impact this plan.

•   Federal Funding Levels: Level Federal Funding at the current rate of
    approximately $140 million per year is anticipated. The Federal Aid program makes
    up the most significant portion of the Ten Year Plan. The current enabling Federal
    Transportation Legislation (SAFETEA-LU) expires in 2009. There are projections
    that by 2009 the Federal Highway Trust Fund will be spent down and available
    Federal funding could be reduced by approximately 30%. How future
    reauthorization and appropriations address this funding issue will impact this plan.

•   State Highway Fund: For State Highway Fund revenue (gasoline road toll and
    vehicle registration fees), this Ten Year Plan and the associated Financial Model
    assume a modest growth rate based on historical trends (1996 – 2006) of
    approximately 1.8% per year. Volatile gas prices and other economic factors
    indicate trend toward level or slightly decreasing revenue over the immediate future.
    In addition Department operational costs are projected to increase at recent rates of
    approximately 5% per year going into the future. These rates reflect increases in
    Department personnel and benefits costs, material costs, energy costs, and vendor
    costs.

    Over the past several years (beginning with the 2006 budget) the Department has
    operated under a negative budget, with the shortfalls addressed by spending down
    the Highway Fund Surplus. At the close of fiscal year 2009, the Highway Fund
    Surplus is projected to be drawn down to contain essentially no remaining balance.
    As operating costs continue to exceed anticipated funding, the Highway Fund
    Surplus could be in deficit by approximately $60.1 million in 2010. How this deficit
    is addressed and what programs/activities it affects on the Capital side of the Fund
    will impact this proposed Ten Year Plan.

•   Turnpike Fund: The 2009 – 2018 Ten Year Plan includes approximately $400
    million in priority Turnpike Capital Program and Investments. The Priority Turnpike
    Capital Program investments involve repairing / replacing all in-service Red List
    bridges on the Turnpike System and addressing a number of safety and capacity
    deficiencies. These improvements are facilitated by the toll increase implemented in
    October 2007, which is projected to increase toll revenue by $23 million annually.
    This allows a revenue stream sufficient for procurement of bond issuance(s) to
    accomplish the Priority Turnpike Capital Program improvements. Turnpike Capital
    improvements beyond these identified in the Plan are problematic in terms of funding,
    and will need to be given further consideration in future Ten Year Plans.



                                            3                        2009-2018 Ten Year Plan
The State is financially responsible for spending sufficient funding (as established by
the Turnpike’s Independent Engineer) for preserving the Turnpike infrastructure
through the Renewal and Replacement Program, and to set aside $2 million in a
General Reserve Account for unanticipated Renewal and Replacement costs. For
Fiscal Years 2009 through 2018, the Turnpike System’s proposed Renewal and
Replacement program is budgeted at approximately $8 million per year (previously
$6 million per year) with annual increase to approximately $12 million per year over
10 years in order to maintain the turnpike infrastructure in good working condition in
accordance with Bond covenants. The actual amount funded will be dependent on the
inflation of construction costs. Individual projects brought forward under the
Renewal and Replacement program are generally developed one to two years in
advance of construction.




                                        4                       2009-2018 Ten Year Plan
Contents of This Ten Year Plan Document

         The 2009 – 2018 Ten Year Plan is a listing of proposed projects that are to be funded and
developed between the years 2009 and 2018. The listing’s order is alphabetical by the municipality
where the project is located. A description of the project, the estimated cost by phase, the funding
source, the proposed timeframe to begin a particular phase, the previously proposed timeframe in
the last Ten Year Plan (if applicable), and the project type is included with each listing. The data
presented are for general reference purposes. Detailed information regarding the proposed projects
is available at the NHDOT. The projects reflect previous priorities (as listed in prior Ten Year
Plans), the NHDOT’s and regional planning commissions’ assessment of needs, and projected
available funding over the next ten years.

        Provided with the Ten Year Plan is supplemental information regarding the State’s
transportation system. The information includes a description of the development process of the
Ten Year Plan and the subsequent Statewide Transportation Improvement Program (STIP). The
supplemental informative also includes an explanation regarding funding issues, and issues
involved with the various components of the State’s transportation system including Highway and
Bridges, Bicycles and Pedestrians, Transit, Railroads, and Aeronautics. This section includes both
narrative information and graphical information to identify facilities, conditions and needs of the
transportation network in the respective project category.

        The Governor’s Advisory Commission on Intermodal Transportation (GACIT), after thirty-
three statewide public hearings and subsequent GACIT public meetings adopted a recommended
2009– 2018 Ten Year Plan on November 28, 2007 and subsequently forwarded the Plan to the
Governor. The Governor reviewed and modified the Plan and, on January 15, 2008, submitted the
Plan to the New Hampshire Legislature for final adoption. In March 2008 the House Public Works
and Highways Committee reviewed and forwarded it to the full House. The NH Legislature
approved the Ten Year Transportation Improvement Plan in May 2008, and the Governor signed the
Plan into law on June 25, 2008. An electronic version of the approved 2009-2018 Ten Year
Transportation Improvement Plan and supplemental documentation is available on the NHDOT
website: http://www.nh.gov/dot/bureaus/planning/documents.htm




                                                      5                       2009-2018 Ten Year Plan
                     TEN YEAR TRANSPORTATION IMPROVEMENT PLAN 2009 - 2018

                                                                                                                                                 Previous Previous
Project Name/#        Route/Road:     Location; Scope of Work                                                                           $(M)     Prog. Yr Total$
                                                                                                                                                                     Comments:
ACWORTH               NH 123A         REPLACE BRIDGE OVER BOWERS BROOK - 113/064 [Oct 2005 Flood] (Bridge Rehab = 14540T,                                   Bridge repaired following flood
  14540 #                             FY 2007)                                                                                                              damage. Replacement
     6641                                                                                                                                                   requested by RPC and Town.
                                                                                                                                                            Red List Bridge Priority #41.

                                                  C      2018        L1C0 - BRIDGE PROGRAM - 85% ON/OFF SYSTEM                           1.000   New Project
Highway and Bridge                                                                                                             Total:    1.000
ALEXANDRIA            WASHBURN ROAD   BRIDGE REPLACEMENT OVER PATTEN BROOK - 160/109                                                                        Specific project from Statewide
   14964                                                                                                                                                    program, Municipal managed.
      6610
                                                  C      2014        SAB - STATE AID BRIDGE (State FY), 20% = Town                        .445   New Project
                                                  P      2014        SAB - STATE AID BRIDGE (State FY), 20% = Town                        .090
                                                  R      2014        SAB - STATE AID BRIDGE (State FY), 20% = Town                        .005
Highway and Bridge                                                                                                             Total:     .540
ALSTEAD               NH 123          RECONST FROM LAKE WARREN DAM WEST APPROX 1.6 MILES, INCLUDE BRIDGES: 120/123,                                         Permanent flood repairs,
   14540 M                            107/130 (October 2005 Flood)                                                                                          Emergency Relief Funding.
      6103
                                                  C      2009        ER60 - EMERGENCY RELIEF FUNDS (JUNE & OCT 05)                       4.500   New Project
Highway and Bridge                                                                                                             Total:    4.500
ALTON                 NH 11 / NH 28   INTERSECTION RECONSTRUCTION (ALTON TRAFFIC CIRCLE) DEMO ID NH056 [Sister DEMO ID                                      Earmarked funding, formerly
   14121 A                            NH040 and DEMO ID NH069]                                                                                              part of Barnstead-Alton.
      6507
                                                  C      2009        LY20 - HIGH PRIORITY PROJ SEC 1702                                  1.159   New Project
                                                  C      2009        LZ10 - EQUITY BONUS - EXEMPT LIM                                     .591
                                                  C      2009        NON - OTHER NON PARTICIPATING                                        .130   New Project
                                                  P      2009        HY20 - HIGH PRIORITY PROJ SEC 1702                                   .025
                                                  R      2009        LY20 - HIGH PRIORITY PROJ SEC 1702                                   .025
Highway and Bridge                                                                                                             Total:    1.930
ALTON                 NH 11 / NH 28   INTERSECTION RECONSTRUCTION (ALTON TRAFFIC CIRCLE] PE ONLY, DEMO ID NH040 [Sister
   14121 B                            DEMO ID NH056 and DEMO ID NH069]
      6508
                                                  P      2009        HY10 - HIGH PRIORITY PROJ SEC 1702                                   .025
Highway and Bridge                                                                                                             Total:     .025




                                      Phase:      C = Construction        P = Preliminary Engineering       R = Right of Way                                               Projects Page - 1
June 25, 2008
                                                                                                                                                      Previous Previous
Project Name/#       Route/Road:           Location; Scope of Work                                                                           $(M)     Prog. Yr Total$
                                                                                                                                                                          Comments:
ALTON                PLACES MILL ROAD      BRIDGE REPLACEMENT OVER SUNSET LAKE OUTLET - 098/178                                                                  Specific project from Statewide
   14239                                                                                                                                                         program, Municipal managed.
      5634
                                                       C      2011        SAB - STATE AID BRIDGE (State FY), 20% = Town                        .275   2009
                                                       P      2011        SAB - STATE AID BRIDGE (State FY), 20% = Town                        .055
                                                       R      2011        SAB - STATE AID BRIDGE (State FY), 20% = Town                        .005
Highway and Bridge                                                                                                                  Total:     .335               0.335
AMHERST                                    TOWN HALL BEAUTIFICATION AND SAFETY: ADD GREEN SPACE IMMEDIATELY IN FRONT OF THE                                      Specific project from Statewide
  14832                                    TOWN HALL AND IN FRONT OF THE ADJOINING OLD BURIAL GROUNDS. IMPROVE PEDESTRIAN                                        program. Municipal Managed.
     6230                                  SAFETY AND TO REDUCE PAVED SURFACES WHICH WILL REDUCE STORM WATER RUNOFF (TE
                                           Program) [06-01TE]
                                                        C     2010  L220 - STP - TRANSPORTATION ENHANCEMENT              .245                         TE 2006
                                                       R      2009        L220 - STP - TRANSPORTATION ENHANCEMENT                              .001
Bike / Pedestrian                                                                                                                   Total:     .246
ANDOVER              NH 11 & 4A            BRIDGE REMOVAL NH 11 OVER US 4 & ABANDONED RR - RECONFIGURATION TO AT-GRADE                                           Red list bridge, priority #26
  14169                                    INTERSECTION
     3260
                                                       C      2009        H100 - BRIDGE REPLACEMENT - ON SYSTEM                               2.000   2008
Highway and Bridge                                                                                                                  Total:    2.000               2.008
ANDOVER              MORRILL HILL ROAD     BRIDGE REPLACEMENT OVER ELBOW BROOK (AKA GREAT BROOK) - 127/106                                                       Specific project from Statewide
  14573                                                                                                                                                          program, Municipal managed.
     6152
                                                       C      2011        SAB - STATE AID BRIDGE (State FY), 20% = Town                        .502   New Project
                                                       R      2010        SAB - STATE AID BRIDGE (State FY), 20% = Town                        .005
Highway and Bridge                                                                                                                  Total:     .507
ANDOVER - WILMOT -                         NORTHERN RAIL TRAIL: IMPROVEMENTS: CONSTRUCT LEDGE PACK SURFACE ON NORTHERN                                           Specific project from Statewide
DANBURY                                    RAIL CORRIDOR FROM DANBURY THROUGH WILMOT AND ENDING IN ANDOVER.                                                      program. Municipal Managed.
  14823                                    APPROXIMATELY 8.3 MILES IN LENGTH (TE Program) [06-02TE]
     6231
                                                       C      2010        L220 - STP - TRANSPORTATION ENHANCEMENT                              .224   TE 2006
Bike / Pedestrian                                                                                                                   Total:     .224
ANTRIM               US 202 / NH 31 MAIN   REHABILITATION PHASE 2: CONTINUE EXISTING PROJECT TO RECONSTRUCT SIDEWALKS,                                           Specific project from Statewide
   14828             STREET                SHOULDERS AND DRAINAGE TO IMPROVE THE DOWNTOWN PEDESTRIAN FACILITIES AND                                              program. Municipal Managed.
      6232                                 COMPLETE TRAFFIC CALMING AND PEDESTRIAN FLOW IMPROVEMENTS (TE Program) [06-03TE]
                                                       C      2011        L220 - STP - TRANSPORTATION ENHANCEMENT                              .337   TE 2006
                                                       R      2009        L220 - STP - TRANSPORTATION ENHANCEMENT                              .004
Bike / Pedestrian                                                                                                                   Total:     .341




                                           Phase:      C = Construction        P = Preliminary Engineering       R = Right of Way                                                Projects Page - 2
June 25, 2008
                                                                                                                                                   Previous Previous
Project Name/#       Route/Road:        Location; Scope of Work                                                                           $(M)     Prog. Yr Total$
                                                                                                                                                                       Comments:
ANTRIM               DEPOT STREET       BRIDGE REPLACEMENT OVER RELIEF - 181/071                                                                              Specific project from Statewide
   14940                                                                                                                                                      program, Municipal managed.
      6497
                                                    C      2010        SAB - STATE AID BRIDGE (State FY), 20% = Town                        .235   New Project
                                                    P      2010        SAB - STATE AID BRIDGE (State FY), 20% = Town                        .045
                                                    R      2010        SAB - STATE AID BRIDGE (State FY), 20% = Town                        .005
Highway and Bridge                                                                                                               Total:     .285
ANTRIM               DEPOT ST           BRIDGE REPLACEMENT OVER CONTOOCOOK RIVER OVERFLOW - 183/071                                                           Specific project from Statewide
   14941                                                                                                                                                      program, Municipal managed.
      6496
                                                    C      2010        SAB - STATE AID BRIDGE (State FY), 20% = Town                        .310   New Project
                                                    P      2010        SAB - STATE AID BRIDGE (State FY), 20% = Town                        .060
                                                    R      2010        SAB - STATE AID BRIDGE (State FY), 20% = Town                        .005
Highway and Bridge                                                                                                               Total:     .375
ANTRIM               CRAIG ROAD         BRIDGE REPLACEMENT OVER BROOK - 117/093                                                                               Specific project from Statewide
   14942                                                                                                                                                      program, Municipal managed.
      6495
                                                    C      2013        SAB - STATE AID BRIDGE (State FY), 20% = Town                        .170   New Project
                                                    P      2013        SAB - STATE AID BRIDGE (State FY), 20% = Town                        .045
                                                    R      2013        SAB - STATE AID BRIDGE (State FY), 20% = Town                        .005
Highway and Bridge                                                                                                               Total:     .220
ANTRIM               OLD NORTH BRANCH   BRIDGE REPLACEMENT OVER NORTH BRANCH RIVER - 130/149                                                                  Specific project from Statewide
   14944             ROAD                                                                                                                                     program, Municipal managed.
      6493
                                                    C      2009        SAB - STATE AID BRIDGE (State FY), 20% = Town                        .250   New Project
                                                    P      2009        SAB - STATE AID BRIDGE (State FY), 20% = Town                        .050
                                                    R      2009        SAB - STATE AID BRIDGE (State FY), 20% = Town                        .005
Highway and Bridge                                                                                                               Total:     .305
ASHLAND              HIGHLAND STREET    RECONSTRUCT 3300 FT TO RECLASSIFY AS A CLASS II ROADWAY & RELINQUISH OWNERSHIP TO                                     Specific project from Statewide
   13691                                THE TOWN OF ASHLAND                                                                                                   program.
      3585
                                                    C      2009        BET - BETTERMENT (State FY)                                          .040   New Project
Highway and Bridge                                                                                                               Total:     .040
ASHLAND              RIVER STREET       BRIDGE REHABILITATION OVER SQUAM RIVER - 101/073                                                                      Specific project from Statewide
   14262                                                                                                                                                      program, Municipal managed.
      5686
                                                    C      2010        SAB - STATE AID BRIDGE (State FY), 20% = Town                        .290   2009
                                                    P      2010        SAB - STATE AID BRIDGE (State FY), 20% = Town                        .050
                                                    R      2010        SAB - STATE AID BRIDGE (State FY), 20% = Town                        .005
Highway and Bridge                                                                                                               Total:     .345               0.310

                                        Phase:      C = Construction        P = Preliminary Engineering       R = Right of Way                                               Projects Page - 3
June 25, 2008
                                                                                                                                                 Previous Previous
Project Name/#       Route/Road:      Location; Scope of Work                                                                           $(M)     Prog. Yr Total$
                                                                                                                                                                     Comments:
BARNSTEAD - ALTON    NH 28            INTERSECTION SAFETY IMPROVEMENTS FROM THE ALTON CIRCLE SOUTH APPROXIMATELY 7.0                                        Scope reduction to address
   14121                              MILES TO THE IMPROVED SECTION IN BARNSTEAD [Section 1702 - Designated Project; Demo                                   pavement and problem
      2738                            Id NH040] [Sister Demo Id NH056 & NH069]                                                                              intersections only. RPC
                                                                                                                                                            comment on scope and
                                                                                                                                                            description.

                                                  C      2010        L250 - STP - RURAL AREAS < 5,000k                                   1.250   2009
                                                  C      2015        L240 - STP - SURFACE TRANSP. STATE FLEXIBLE IN ANY AREA             3.750
                                                  P      2009        HY20 - HIGH PRIORITY PROJ SEC 1702                                   .250
                                                  P      2010        H250 - STP - NON URBAN AREAS                                         .025
                                                  R      2009        H250 - STP - NON URBAN AREAS                                         .100
                                                  R      2009        HY10 - HIGH PRIORITY PROJ SEC 1702                                   .115
                                                  R      2009        HY20 - HIGH PRIORITY PROJ SEC 1702                                   .100
                                                  R      2009        L250 - STP - RURAL AREAS < 5,000k                                    .025
                                                  R      2009        LY10 - HIGH PRIORITY PROJ SEC 1702                                   .139
                                                  R      2009        LY20 - HIGH PRIORITY PROJ SEC 1702                                   .012
                                                  R      2009        LY60 - HIGH PRIORITY PROJ SEC 112                                    .309
                                                  R      2011        H250 - STP - NON URBAN AREAS                                         .025
Highway and Bridge                                                                                                             Total:    6.100              10.250
BARTLETT - GORHAM    NH 16            FROM US 302 (BARTLETT) TO THE NORTHERN US 2 INTERSECTION IN GORHAM (THE LIMIT OF THE                                  Specific project from Statewide
   13857                              GORHAM 14204 RESURFACING PROJECT) - UPGRADE GUARDRAIL AND TERMINALS [Fed Aid                                          program.
      3780                            Guardrail Improvement Program]
                                                  C      2010        L050 - NATIONAL HIGHWAY SYSTEM                                      3.200   2008
                                                  P      2009        L050 - NATIONAL HIGHWAY SYSTEM                                       .050
                                                  R      2009        L050 - NATIONAL HIGHWAY SYSTEM                                       .010
Highway and Bridge                                                                                                             Total:    3.260               2.355
BATH                 NH 135           RECONSTRUCT TOP SEVERAL FEET OF 350 LF RETAINING WALL & CONSTRUCT NEW W-BEAM                                          Specific project from Statewide
   14290                              BRIDGE RAIL                                                                                                           program.
      5749
                                                  C      2009        BET - BETTERMENT (State FY)                                          .060   New Project
Highway and Bridge                                                                                                             Total:     .060
BATH                 WEST BATH ROAD   VILLAGE COVERED BRIDGE REHABILITATION OVER AMMONOOSUC RIVER - 137/095                                                 Specific project from Statewide
   14439                                                                                                                                                    program, Municipal managed.
      5933
                                                  C      2010        SAB - STATE AID BRIDGE (State FY), 20% = Town                        .750   2007
                                                  P      2010        SAB - STATE AID BRIDGE (State FY), 20% = Town                        .029
Highway and Bridge                                                                                                             Total:     .779               0.991




                                      Phase:      C = Construction        P = Preliminary Engineering       R = Right of Way                                               Projects Page - 4
June 25, 2008
                                                                                                                                                        Previous Previous
Project Name/#          Route/Road:           Location; Scope of Work                                                                          $(M)     Prog. Yr Total$
                                                                                                                                                                            Comments:
BEDFORD                 US 3                  REPLACE BRIDGE OVER F.E.E.T. - 189/121 & ASSOCIATED APPROACH WORK                                                    Turnpike Priority Capital
   13527                                                                                                                                                           Program, Bridge Red List Priority
      3036                                                                                                                                                         # 63

                                                          C      2013        TPK - TURNPIKE EXPANSION (State FY)                               11.500   2010
                                                          P      2009        TPK - TURNPIKE EXPANSION (State FY)                                 .318
                                                          P      2010        TPK - TURNPIKE EXPANSION (State FY)                                1.100
                                                          R      2011        TPK - TURNPIKE EXPANSION (State FY)                                 .400
Highway and Bridge                                                                                                                    Total:   13.318               5.800
BEDFORD - MANCHESTER - AIRPORT ACCESS ROAD CONSTRUCT US 3, RAMPS H AND J, AND AIRPORT ACCESS ROAD BRIDGE OVER US 3 (Parent =                                       Current construction
LONDONDERRY -                              Bed-Man-Lon-Mer 11512)                                                                                                  sequencing and specific
MERRIMACK                                                                                                                                                          construction contract breakout.
   11512 F
      3794
                                                      C      2009   H050 - NATIONAL HIGHWAY SYSTEM                       4.500
                                                          C      2010        H050 - NATIONAL HIGHWAY SYSTEM                                    10.750   2009
Highway and Bridge                                                                                                                    Total:   15.250              12.100
BEDFORD - MANCHESTER - AIRPORT ACCESS ROAD CONSTRUCT NORTH OF LITTLE COHAS BRIDGE AND FINAL PAVING TO NH 3A (Parent = Bed-                                         Current construction schedule
LONDONDERRY -                              Man-Lon-Mer 11512)                                                                                                      and specific construction
MERRIMACK                                                                                                                                                          contract breakout.
   11512 H
      5670
                                                          C      2012        H050 - NATIONAL HIGHWAY SYSTEM                                     5.000   2009
Highway and Bridge                                                                                                                    Total:    5.000               4.500
BEDFORD - MANCHESTER - AIRPORT ACCESS ROAD WIDEN FE EVERETT TURNPIKE (Parent = Bed-Man-Lon-Mer 11512)                                                              Current construction schedule
LONDONDERRY -                                                                                                                                                      and specific construction
MERRIMACK                                                                                                                                                          contract breakout.
   11512 I
      5671
                                                          C      2011        H050 - NATIONAL HIGHWAY SYSTEM                                    11.800   2009
Highway and Bridge                                                                                                                    Total:   11.800               9.600
BEDFORD - MANCHESTER - AIRPORT ACCESS ROAD EARTHWORK CONTRACT WEST OF THE MERRIMACK RIVER (Parent = Bed-Man-Lon-Mer 11512)                                         Current construction schedule
LONDONDERRY -                                                                                                                                                      and specific construction
MERRIMACK                                                                                                                                                          contract breakout.
   11512 J
      5951
                                                     C    2010   H050 - NATIONAL HIGHWAY SYSTEM                        8.026                            2008
Highway and Bridge                                                                                                                    Total:    8.026              13.700




                                              Phase:      C = Construction        P = Preliminary Engineering      R = Right of Way                                               Projects Page - 5
June 25, 2008
                                                                                                                                                    Previous Previous
Project Name/#          Route/Road:          Location; Scope of Work                                                                       $(M)     Prog. Yr Total$
                                                                                                                                                                        Comments:
BEDFORD - MANCHESTER - AIRPORT ACCESS ROAD SELECTS, FINAL PAVING AND MISCELLANEOUS WEST OF MERRIMACK RIVER (Parent = Bed-                                      Current construction schedule
LONDONDERRY -                              Man-Lon-Mer 11512)                                                                                                  and specific construction
MERRIMACK                                                                                                                                                      contract breakout.
   11512 K
      5952
                                                         C      2013        H050 - NATIONAL HIGHWAY SYSTEM                                 13.727   2010
                                                         C      2013        H100 - BRIDGE REPLACEMENT - ON SYSTEM                            .845
Highway and Bridge                                                                                                                Total:   14.572              10.000
BEDFORD-MANCHESTER-    AIRPORT ACCESS ROAD IMPROVE ACCESS FROM F.E.E.T. TO MANCHESTER AIRPORT AND SURROUNDING AREA,                                            Original overall project for PE
LONDONDERRY-                               PRELIMINARY DESIGN PREPARATION EIS FINAL DESIGN [PE & ROW] [Section 1602 -                                          and ROW.
MERRIMACK                                  Designated Project; Demo Id NH009]
   11512
       194
                                                         P      2009        L050 - NATIONAL HIGHWAY SYSTEM                                   .050
                                                         P      2010        L050 - NATIONAL HIGHWAY SYSTEM                                   .050
                                                         R      2009        L050 - NATIONAL HIGHWAY SYSTEM                                   .050
                                                         R      2010        L050 - NATIONAL HIGHWAY SYSTEM                                   .050
Highway and Bridge                                                                                                                Total:     .200
BELMONT                                      PHASE 2, LAKE WINNISQUAM SCENIC TRAIL: CONSTRUCT HARD PACK GRAVEL SURFACE, 8'                                     Specific project from Statewide
   14829                                     WIDE FROM US 3 IN BELMONT TO JEFFERSON ROAD IN BELMONT (TE Program) [06-06TE]                                     program. Municipal managed.
      6233
                                                         C      2011        L220 - STP - TRANSPORTATION ENHANCEMENT                          .350   TE 2006
                                                         R      2009        L220 - STP - TRANSPORTATION ENHANCEMENT                          .001
Bike / Pedestrian                                                                                                                 Total:     .351
BELMONT - LACONIA      NH 106                RECONSTRUCT FROM 0.4 MILES NORTH OF US 3 / NH 11 BYPASS SOUTHERLY INTO BELMONT                                    Scope reduction to address
                                             SOUTH OF OPECHEE PLAZA                                                                                            pavement and problem
         2787                                                                                                                                                  intersections only.

                                                         C      2017        H050 - NATIONAL HIGHWAY SYSTEM                                  1.500   2014
                                                         P      2011        H050 - NATIONAL HIGHWAY SYSTEM                                   .100
                                                         P      2012        H050 - NATIONAL HIGHWAY SYSTEM                                   .100
                                                         P      2014        H050 - NATIONAL HIGHWAY SYSTEM                                   .800
                                                         R      2012        H050 - NATIONAL HIGHWAY SYSTEM                                   .100
                                                         R      2015        H050 - NATIONAL HIGHWAY SYSTEM                                   .625
Highway and Bridge                                                                                                                Total:    3.225              14.000




                                              Phase:     C = Construction       P = Preliminary Engineering    R = Right of Way                                                Projects Page - 6
June 25, 2008
                                                                                                                                                  Previous Previous
Project Name/#       Route/Road:       Location; Scope of Work                                                                           $(M)     Prog. Yr Total$
                                                                                                                                                                      Comments:
BERLIN               NH 110            PHASE 2 RECONSTRUCTION FROM FIRST AVENUE TO WIGHT STREET (APPROX.0.7 MILES)                                           Turnpike Priority Capital
   12958 B                             [Section 1702 - Designated Project; Demo Id NH043] [Sister Demo Id NH062]                                             Program, Earmark funding.
       3763
                                                   C      2011        LY20 - HIGH PRIORITY PROJ SEC 1702                                  3.800   2009
                                                   R      2009        LY10 - HIGH PRIORITY PROJ SEC 1702                                  1.100
                                                   R      2010        LY10 - HIGH PRIORITY PROJ SEC 1702                                   .800
Highway and Bridge                                                                                                              Total:    5.700               6.450
BETHLEHEM            PROSPECT STREET   BRIDGE REHABILITATION OVER AMMONOOSUC RIVER - 071/137                                                                 Specific project from Statewide
   14228                                                                                                                                                     program, Municipal managed.
      5609
                                                   C      2009        SAB - STATE AID BRIDGE (State FY), 20% = Town                        .185   2009
                                                   P      2009        SAB - STATE AID BRIDGE (State FY), 20% = Town                        .030
                                                   R      2009        SAB - STATE AID BRIDGE (State FY), 20% = Town                        .005
Highway and Bridge                                                                                                              Total:     .220               0.200
BOW                  I-93              REPLACE EXISTING MEDIAN GUARDRAIL WITH CONCRETE BARRIER                                                               Specific project from Statewide
  14938                                                                                                                                                      program.
     6492
                                                   C      2009        TRR - TURNPIKE RENEWAL & REPLACEMENT (State FY)                     2.000   New Project
Highway and Bridge                                                                                                              Total:    2.000
BOW - CONCORD        I-93              WIDEN FROM I-89 TO BETWEEN EXITS 15 AND 16 TO MATCH INTO EXISTING CONCORD                                             Scope reduction, formerly
  13742                                PROJECT 11449 @ EXIT 16; 163/106, 136/160, 135/160, 203/087, 142/116                                                  Federal Aid, funding now split
      2075                                                                                                                                                   between Federal Aid & Turnpike
                                                                                                                                                             Programming. Five Red List
                                                                                                                                                             bridges priority #24, #31, #32,
                                                                                                                                                             #74, #86. Interim deck repairs
                                                                                                                                                             through Turnpike Priority Capital
                                                                                                                                                             Program.

                                                   C      2010        TPK - TURNPIKE EXPANSION (State FY)                                 4.913
                                                   C      2011        TPK - TURNPIKE EXPANSION (State FY)                                 2.369
                                                   C      2012        TPK - TURNPIKE EXPANSION (State FY)                                 2.994
                                                   P      2009        TPK - TURNPIKE EXPANSION (State FY)                                  .500
                                                   P      2013        H010 - INTERSTATE MAINTENANCE                                       1.700
                                                   P      2015        H010 - INTERSTATE MAINTENANCE                                       1.250
                                                   P      2016        L050 - NATIONAL HIGHWAY SYSTEM                                      1.250
                                                   R      2009        L050 - NATIONAL HIGHWAY SYSTEM                                       .025
                                                   R      2010        L050 - NATIONAL HIGHWAY SYSTEM                                       .025
Highway and Bridge                                                                                                              Total:   15.026            138.950




                                       Phase:      C = Construction        P = Preliminary Engineering       R = Right of Way                                               Projects Page - 7
June 25, 2008
                                                                                                                                                        Previous Previous
Project Name/#          Route/Road:       Location; Scope of Work                                                                              $(M)     Prog. Yr Total$
                                                                                                                                                                            Comments:
BRADFORD                WEST ROAD         BRIDGE REPLACEMENT OVER HOYT BROOK - 098/114                                                                             Specific project from Statewide
   14284                                                                                                                                                           program, Municipal managed.
      5723
                                                      C      2010        SAB - STATE AID BRIDGE (State FY), 20% = Town                           .260   2009
                                                      P      2010        SAB - STATE AID BRIDGE (State FY), 20% = Town                           .060
                                                      R      2010        SAB - STATE AID BRIDGE (State FY), 20% = Town                           .005
Highway and Bridge                                                                                                                    Total:     .325               0.275
BRISTOL - BRIDGEWATER   NH 3A             PAVEMENT REHABILITATION & SAFETY WORK BEGINNING AT THE BRISTOL FIRE STATION,                                             Project limits redefined.
    14242                                 PROCEEDING NORTH APPROXIMATELY 5 MILES TO BROOKSTONE TERRACE [Statewide Federal                                          Formerly Bristol-Hebron.
       3560                               Resurfacing Program]                                                                                                     Specific project from Statewide
                                                                                                                                                                   Program.

                                                      C      2009        H240 - STP - STATE FLEXIBLE IN ANY AREA                                2.500   2006
Highway and Bridge                                                                                                                    Total:    2.500
CAMPTON                 BLAIR ROAD        REHAB BRIDGE OVER PEMIGEWASSET RIVER - 117/076                                                                           Specific project from Statewide
  12407                                                                                                                                                            program, Municipal Managed.
      676
                                                      C      2010        SAB - STATE AID BRIDGE (State FY), 20% = Town                           .316   New Project
Highway and Bridge                                                                                                                    Total:     .316
CANAAN                  RIVER ROAD        BRIDGE REPLACEMENT OVER MASCOMA RIVER - 123/126                                                                          Specific project from Statewide
  14446                                                                                                                                                            program, Municipal managed.
     5940
                                                      C      2009        SAB - STATE AID BRIDGE (State FY), 20% = Town                           .600   2010
                                                      P      2009        SAB - STATE AID BRIDGE (State FY), 20% = Town                           .075
Highway and Bridge                                                                                                                    Total:     .675               0.640
CANAAN                  GOOSE POND ROAD   BRIDGE REPLACEMENT OVER GOOSE POND BROOK - 087/092                                                                       Specific project from Statewide
  14952                                                                                                                                                            program, Municipal managed.
     6599
                                                      C      2014        SAB - STATE AID BRIDGE (State FY), 20% = Town                           .320   New Project
                                                      P      2014        SAB - STATE AID BRIDGE (State FY), 20% = Town                           .075
                                                      R      2014        SAB - STATE AID BRIDGE (State FY), 20% = Town                           .005
Highway and Bridge                                                                                                                    Total:     .400
CHESTERFIELD            NH 63             RECONSTRUCTION TO ADDRESS SAFETY, EXISTING ALIGNMENT, AND GUARDRAIL IN THE AREA                                          Scope reduced to original
  13597                                   OF SPOFFORD LAKE                                                                                                         intent to address pavement
      2747                                                                                                                                                         and guardrail. RPC comment
                                                                                                                                                                   on scope and description.

                                                      C      2011        H210 - STP - SAFETY                                                     .400   2010
                                                      P      2009        H210 - STP - SAFETY                                                     .025
                                                      P      2010        H210 - STP - SAFETY                                                     .025
Highway and Bridge                                                                                                                    Total:     .450               2.420

                                          Phase:      C = Construction        P = Preliminary Engineering          R = Right of Way                                               Projects Page - 8
June 25, 2008
                                                                                                                                             Previous Previous
Project Name/#   Route/Road:         Location; Scope of Work                                                                        $(M)     Prog. Yr Total$
                                                                                                                                                                 Comments:
CLAREMONT        CLAREMONT           BRUSH & TREE CLEARING IN ELIGIBLE AREAS                                                                            Address Safety Concerns.
                 MUNICIPAL AIRPORT
        6515
                                                        2012        AIP - AIRPORT IMPROVEMENT PROGRAM                                 .110
Aeronautics                                                                                                                Total:     .110
CLAREMONT        CLAREMONT           CONSTRUCT APRON EXPANSION                                                                                          Address Capacity Concerns.
                 MUNICIPAL AIRPORT
        6518
                                                        2014        AIP - AIRPORT IMPROVEMENT PROGRAM                                 .500
Aeronautics                                                                                                                Total:     .500
CLAREMONT        CLAREMONT           CONSTRUCT ONLY RUNWAY RECONSTRUCTION                                                                               Address Safety Concerns
                 MUNICIPAL AIRPORT
        6663
                                                        2018        AIP - AIRPORT IMPROVEMENT PROGRAM                                2.500
Aeronautics                                                                                                                Total:    2.500
CLAREMONT        CLAREMONT           DESIGN, PERMIT & BID APRON EXPANSION                                                                               Address Capacity Concerns.
                 MUNICIPAL AIRPORT
        6517
                                                        2013        AIP - AIRPORT IMPROVEMENT PROGRAM                                 .158
Aeronautics                                                                                                                Total:     .158
CLAREMONT        CLAREMONT           DESIGN AND CONSTRUCT T-HANGARS                                                                                     Address Capacity Concerns.
                 MUNICIPAL AIRPORT
        6520
                                                        2016        AIP - AIRPORT IMPROVEMENT PROGRAM                                 .158
Aeronautics                                                                                                                Total:     .158
CLAREMONT        CLAREMONT           DESIGN ONLY RUNWAY RECONSTRUCTION                                                                                  Address Safety Concerns
                 MUNICIPAL AIRPORT
        6662
                                                        2017        AIP - AIRPORT IMPROVEMENT PROGRAM                                 .300
Aeronautics                                                                                                                Total:     .300
CLAREMONT        CLAREMONT           PURCHASE SNOW-REMOVAL EQUIPMENT                                                                                    Replace aging equipment.
                 MUNICIPAL AIRPORT
        6519
                                                        2015        AIP - AIRPORT IMPROVEMENT PROGRAM                                 .300
Aeronautics                                                                                                                Total:     .300
CLAREMONT        CLAREMONT           REMOVE SOUTHERN END OF ABANDONED RUNWAY 5-23 PAVEMENT (REPLACE WITH LOAM                                           Address Safety Concerns.
                 MUNICIPAL AIRPORT   AND SEED)
        6516
                                                        2012        AIP - AIRPORT IMPROVEMENT PROGRAM                                 .132
Aeronautics                                                                                                                Total:     .132

                                     Phase:      C = Construction       P = Preliminary Engineering     R = Right of Way                                               Projects Page - 9
June 25, 2008
                                                                                                                                                  Previous Previous
Project Name/#       Route/Road:         Location; Scope of Work                                                                         $(M)     Prog. Yr Total$
                                                                                                                                                                      Comments:
CLAREMONT            CLAREMONT           TAXIWAY "C" EAST EDGE OF CLOSED RUNWAY 5/23 WITH LIGHTING, MARKINGS AND VAULT                                       Priority as identified by airport
                     MUNICIPAL AIRPORT   IMPROVEMENT                                                                                                         sponsor.
        3398
                                                            2009        AIP - AIRPORT IMPROVEMENT PROGRAM                                  .550   2007
Aeronautics                                                                                                                     Total:     .550
CLAREMONT            CLAREMONT           UPGRADE RUNWAY SAFETY AREAS                                                                                         Safety Issue for future airport
                     MUNICIPAL AIRPORT                                                                                                                       upgrade.
        3400
                                                            2011        AIP - AIRPORT IMPROVEMENT PROGRAM                                  .440   2008
Aeronautics                                                                                                                     Total:     .440
CLAREMONT            CLAREMONT           UPDATE AIRPORT MASTER PLAN                                                                                          Revision of Airport role and
                     MUNICIPAL AIRPORT                                                                                                                       needs.
        6514
                                                            2010        AIP - AIRPORT IMPROVEMENT PROGRAM                                  .100
Aeronautics                                                                                                                     Total:     .100
CLAREMONT            NH 12               NORTH STREET INTERSECTION RELOCATION [Section 1702 - Designated Project; Demo Id                                    Earmark funding. Municipal
   13248                                 NH039] [Sister Demo Id NH059]                                                                                       Managed
       739
                                                     C      2012        LY20 - HIGH PRIORITY PROJ SEC 1702                                4.000   2012
                                                     P      2009        HY20 - HIGH PRIORITY PROJ SEC 1702                                 .100
                                                     R      2010        HY20 - HIGH PRIORITY PROJ SEC 1702                                 .200
Highway and Bridge                                                                                                              Total:    4.300               4.550
CLAREMONT            NH 11/ NH 12        RECONSTRUCTION AND UPGRADE OF THE INTERSECTIONS OF MAPLE AVENUE, PLEASANT                                           Earmark funding. Municipal
   14494                                 STREET (DRAPER'S CORNER), AND CHARLESTOWN RD [Section 117 - Designated Project;                                     Managed
      4230                               Demo Id NH030] [Sister Demo Id NH047 & 065]
                                                     C      2010        H660 - GRANTS SUP PLAN HEWY STP, SECTION 117                       .494   2010
                                                     C      2010        HPER - HIGH PRIORITY                                              1.006   2010
                                                     P      2009        H660 - GRANTS SUP PLAN HEWY STP, SECTION 117                       .050
                                                     R      2009        VAR - VARIOUS FEDERAL FUNDING CATEGORIES                           .010
                                                     R      2010        VAR - VARIOUS FEDERAL FUNDING CATEGORIES                           .010
Highway and Bridge                                                                                                              Total:    1.570               1.750




                                         Phase:      C = Construction        P = Preliminary Engineering     R = Right of Way                                               Projects Page - 10
June 25, 2008
                                                                                                                                       Previous Previous
Project Name/#   Route/Road:   Location; Scope of Work                                                                        $(M)     Prog. Yr Total$
                                                                                                                                                           Comments:
COAST            COAST         ADA OPERATIONS                                                                                                     FTA maintains transit services
                                                                                                                                                  with local commitment.
          3070
                                                 2009        FT12 - FTA SECTION 5307 URBAN TRANSIT CAPITAL & PLAN.              .090
                                                 2010        FT12 - FTA SECTION 5307 URBAN TRANSIT CAPITAL & PLAN.              .093
                                                 2011        FT12 - FTA SECTION 5307 URBAN TRANSIT CAPITAL & PLAN.              .096
                                                 2012        FT12 - FTA SECTION 5307 URBAN TRANSIT CAPITAL & PLAN.              .098
                                                 2013        FT12 - FTA SECTION 5307 URBAN TRANSIT CAPITAL & PLAN.              .101
                                                 2014        FT12 - FTA SECTION 5307 URBAN TRANSIT CAPITAL & PLAN.              .104
                                                 2015        FT12 - FTA SECTION 5307 URBAN TRANSIT CAPITAL & PLAN.              .104
                                                 2016        FT12 - FTA SECTION 5307 URBAN TRANSIT CAPITAL & PLAN.              .104
                                                 2017        FT12 - FTA SECTION 5307 URBAN TRANSIT CAPITAL & PLAN.              .104
                                                 2018        FT12 - FTA SECTION 5307 URBAN TRANSIT CAPITAL & PLAN.              .104
Transit                                                                                                              Total:     .998
COAST            COAST         CAPITAL PROGRAM                                                                                                    FTA maintains bus fleet for local
                                                                                                                                                  transit using local matching
          3503                                                                                                                                    funds. Cost reflects current
                                                                                                                                                  information.

                                                 2009        FT12 - FTA SECTION 5307 URBAN TRANSIT CAPITAL & PLAN.              .619
                                                 2010        FT12 - FTA SECTION 5307 URBAN TRANSIT CAPITAL & PLAN.              .155
                                                 2011        FT12 - FTA SECTION 5307 URBAN TRANSIT CAPITAL & PLAN.              .235
                                                 2012        FT12 - FTA SECTION 5307 URBAN TRANSIT CAPITAL & PLAN.              .283
                                                 2013        FT12 - FTA SECTION 5307 URBAN TRANSIT CAPITAL & PLAN.              .981
                                                 2014        FT12 - FTA SECTION 5307 URBAN TRANSIT CAPITAL & PLAN.              .157
                                                 2015        FT12 - FTA SECTION 5307 URBAN TRANSIT CAPITAL & PLAN.              .157
                                                 2016        FT12 - FTA SECTION 5307 URBAN TRANSIT CAPITAL & PLAN.              .157
                                                 2017        FT12 - FTA SECTION 5307 URBAN TRANSIT CAPITAL & PLAN.              .157
                                                 2018        FT12 - FTA SECTION 5307 URBAN TRANSIT CAPITAL & PLAN.              .157
Transit                                                                                                              Total:    3.060




                               Phase:     C = Construction        P = Preliminary Engineering     R = Right of Way                                              Projects Page - 11
June 25, 2008
                                                                                                                                        Previous Previous
Project Name/#   Route/Road:   Location; Scope of Work                                                                         $(M)     Prog. Yr Total$
                                                                                                                                                            Comments:
COAST            COAST         GENERAL & COMPREHENSIVE PLANNING                                                                                    FTA Funding for intermodal
                                                                                                                                                   planning. Cost reflects current
          3069                                                                                                                                     information.

                                                  2009        FT12 - FTA SECTION 5307 URBAN TRANSIT CAPITAL & PLAN.              .046
                                                  2010        FT12 - FTA SECTION 5307 URBAN TRANSIT CAPITAL & PLAN.              .048
                                                  2011        FT12 - FTA SECTION 5307 URBAN TRANSIT CAPITAL & PLAN.              .049
                                                  2012        FT12 - FTA SECTION 5307 URBAN TRANSIT CAPITAL & PLAN.              .051
                                                  2013        FT12 - FTA SECTION 5307 URBAN TRANSIT CAPITAL & PLAN.              .052
                                                  2014        FT12 - FTA SECTION 5307 URBAN TRANSIT CAPITAL & PLAN.              .054
                                                  2015        FT12 - FTA SECTION 5307 URBAN TRANSIT CAPITAL & PLAN.              .054
                                                  2016        FT12 - FTA SECTION 5307 URBAN TRANSIT CAPITAL & PLAN.              .054
Transit                                                                                                               Total:     .408
COAST            COAST         MISC. SUPPORT EQUIPMENT                                                                                             FTA maintains transit services
                                                                                                                                                   using local matching funds.
          3067
                                                  2009        FT12 - FTA SECTION 5307 URBAN TRANSIT CAPITAL & PLAN.              .029
                                                  2010        FT12 - FTA SECTION 5307 URBAN TRANSIT CAPITAL & PLAN.              .030
                                                  2011        FT12 - FTA SECTION 5307 URBAN TRANSIT CAPITAL & PLAN.              .031
                                                  2012        FT12 - FTA SECTION 5307 URBAN TRANSIT CAPITAL & PLAN.              .032
                                                  2013        FT12 - FTA SECTION 5307 URBAN TRANSIT CAPITAL & PLAN.              .033
                                                  2014        FT12 - FTA SECTION 5307 URBAN TRANSIT CAPITAL & PLAN.              .034
                                                  2015        FT12 - FTA SECTION 5307 URBAN TRANSIT CAPITAL & PLAN.              .034
                                                  2016        FT12 - FTA SECTION 5307 URBAN TRANSIT CAPITAL & PLAN.              .034
Transit                                                                                                               Total:     .257
COAST            COAST         MISC. BUS STATION EQUIPMENT                                                                                         FTA maintains transit services
                                                                                                                                                   using local matching funds.
          3068
                                                  2009        FT12 - FTA SECTION 5307 URBAN TRANSIT CAPITAL & PLAN.              .058
                                                  2010        FT12 - FTA SECTION 5307 URBAN TRANSIT CAPITAL & PLAN.              .060
                                                  2011        FT12 - FTA SECTION 5307 URBAN TRANSIT CAPITAL & PLAN.              .061
                                                  2012        FT12 - FTA SECTION 5307 URBAN TRANSIT CAPITAL & PLAN.              .063
                                                  2013        FT12 - FTA SECTION 5307 URBAN TRANSIT CAPITAL & PLAN.              .065
                                                  2014        FT12 - FTA SECTION 5307 URBAN TRANSIT CAPITAL & PLAN.              .067
                                                  2015        FT12 - FTA SECTION 5307 URBAN TRANSIT CAPITAL & PLAN.              .067
                                                  2016        FT12 - FTA SECTION 5307 URBAN TRANSIT CAPITAL & PLAN.              .067
Transit                                                                                                               Total:     .508




                               Phase:      C = Construction        P = Preliminary Engineering     R = Right of Way                                              Projects Page - 12
June 25, 2008
                                                                                                                                            Previous Previous
Project Name/#       Route/Road:   Location; Scope of Work                                                                         $(M)     Prog. Yr Total$
                                                                                                                                                                Comments:
COAST                COAST         OPERATING ASSISTANCE                                                                                                FTA maintains transit services
                                                                                                                                                       using local matching funds.
          567                                                                                                                                          Cost reflects current information.

                                                      2009        FT12 - FTA SECTION 5307 URBAN TRANSIT CAPITAL & PLAN.             1.391
                                                      2010        FT12 - FTA SECTION 5307 URBAN TRANSIT CAPITAL & PLAN.             1.433
                                                      2011        FT12 - FTA SECTION 5307 URBAN TRANSIT CAPITAL & PLAN.             1.476
                                                      2012        FT12 - FTA SECTION 5307 URBAN TRANSIT CAPITAL & PLAN.             1.520
                                                      2013        FT12 - FTA SECTION 5307 URBAN TRANSIT CAPITAL & PLAN.             1.566
                                                      2014        FT12 - FTA SECTION 5307 URBAN TRANSIT CAPITAL & PLAN.             1.613
                                                      2015        FT12 - FTA SECTION 5307 URBAN TRANSIT CAPITAL & PLAN.             1.613
                                                      2016        FT12 - FTA SECTION 5307 URBAN TRANSIT CAPITAL & PLAN.             1.613
                                                      2017        FT12 - FTA SECTION 5307 URBAN TRANSIT CAPITAL & PLAN.             1.613
                                                      2018        FT12 - FTA SECTION 5307 URBAN TRANSIT CAPITAL & PLAN.             1.613
Transit                                                                                                                   Total:   15.451
COAST                COAST         PREVENTIVE MAINTENANCE                                                                                              FTA maintains transit services
                                                                                                                                                       using local matching funds.
          2691
                                                      2009        FT12 - FTA SECTION 5307 URBAN TRANSIT CAPITAL & PLAN.              .338
                                                      2010        FT12 - FTA SECTION 5307 URBAN TRANSIT CAPITAL & PLAN.              .348
                                                      2011        FT12 - FTA SECTION 5307 URBAN TRANSIT CAPITAL & PLAN.              .358
                                                      2012        FT12 - FTA SECTION 5307 URBAN TRANSIT CAPITAL & PLAN.              .369
                                                      2013        FT12 - FTA SECTION 5307 URBAN TRANSIT CAPITAL & PLAN.              .380
                                                      2014        FT12 - FTA SECTION 5307 URBAN TRANSIT CAPITAL & PLAN.              .391
                                                      2015        FT12 - FTA SECTION 5307 URBAN TRANSIT CAPITAL & PLAN.              .391
                                                      2016        FT12 - FTA SECTION 5307 URBAN TRANSIT CAPITAL & PLAN.              .391
                                                      2017        FT12 - FTA SECTION 5307 URBAN TRANSIT CAPITAL & PLAN.              .391
                                                      2018        FT12 - FTA SECTION 5307 URBAN TRANSIT CAPITAL & PLAN.              .391
Transit                                                                                                                   Total:    3.748
COLEBROOK            NH 26         BRIDGE REHABILITATION OVER MOHAWK RIVER - 147/068
  13476
      571
                                              C       2016        H100 - BRIDGE REPLACEMENT - ON SYSTEM                             1.000   2013
                                              P       2012        H100 - BRIDGE REPLACEMENT - ON SYSTEM                              .058
                                              P       2014        H100 - BRIDGE REPLACEMENT - ON SYSTEM                              .058
                                              R       2015        H100 - BRIDGE REPLACEMENT - ON SYSTEM                              .054
Highway and Bridge                                                                                                        Total:    1.169               1.645




                                   Phase:      C = Construction        P = Preliminary Engineering     R = Right of Way                                              Projects Page - 13
June 25, 2008
                                                                                                                                             Previous Previous
Project Name/#   Route/Road:         Location; Scope of Work                                                                        $(M)     Prog. Yr Total$
                                                                                                                                                                 Comments:
CONCORD          CONCORD MUNICIPAL   CONSTRUCTION OF NEW TERMINAL BUILDING                                                                              FAA project.
                 AIRPORT
        4237
                                                        2016        AIP - AIRPORT IMPROVEMENT PROGRAM                                3.000   2014
Aeronautics                                                                                                                Total:    3.000
CONCORD          CONCORD MUNICIPAL   CONSTRUCT PERIMETER FENCING AND GATES - PHASE II                                                                   Address Safety Concerns.
                 AIRPORT
        6524
                                                        2009        AIP - AIRPORT IMPROVEMENT PROGRAM                                 .247
Aeronautics                                                                                                                Total:     .247
CONCORD          CONCORD MUNICIPAL   CONSTRUCT ONLY - TAXIWAY 'A' (SOUTH SECTION)                                                                       Address Safety Concerns.
                 AIRPORT
        6530
                                                        2013        AIP - AIRPORT IMPROVEMENT PROGRAM                                1.390
Aeronautics                                                                                                                Total:    1.390
CONCORD          CONCORD MUNICIPAL   DESIGN ONLY - TAXIWAY 'A' (SOUTH SECTION)                                                                          Address Safety Concerns.
                 AIRPORT
        6529
                                                        2012        AIP - AIRPORT IMPROVEMENT PROGRAM                                 .200
Aeronautics                                                                                                                Total:     .200
CONCORD          CONCORD MUNICIPAL   DRAINAGE/EROSION REPAIRS - R/W 17 & 30 INTERSECTION                                                                Address Safety Concerns
                 AIRPORT
        6664
                                                        2017        AIP - AIRPORT IMPROVEMENT PROGRAM                                1.750
Aeronautics                                                                                                                Total:    1.750
CONCORD          CONCORD MUNICIPAL   ENVIRONMENTAL ASSESSMENT                                                                                           Needed to plan for future
                 AIRPORT                                                                                                                                projects.
        6528
                                                        2011        AIP - AIRPORT IMPROVEMENT PROGRAM                                 .240
Aeronautics                                                                                                                Total:     .240
CONCORD          CONCORD MUNICIPAL   EXPAND ITINTERANT APRON                                                                                            Address Safety Concerns.
                 AIRPORT
        6531
                                                        2014        AIP - AIRPORT IMPROVEMENT PROGRAM                                1.600
Aeronautics                                                                                                                Total:    1.600
CONCORD          CONCORD MUNICIPAL   OBSTRUCTION REMOVAL - PHASE III                                                                                    Address Safety Concerns.
                 AIRPORT
        6526
                                                        2009        AIP - AIRPORT IMPROVEMENT PROGRAM                                 .240
Aeronautics                                                                                                                Total:     .240

                                     Phase:      C = Construction       P = Preliminary Engineering     R = Right of Way                                               Projects Page - 14
June 25, 2008
                                                                                                                                                    Previous Previous
Project Name/#       Route/Road:          Location; Scope of Work                                                                          $(M)     Prog. Yr Total$
                                                                                                                                                                        Comments:
CONCORD              CONCORD MUNICIPAL    PARALLEL TAXIWAY FOR RUNWAY 12/30 - PHASE I                                                                          Safety Issue. New taxiway to
                     AIRPORT                                                                                                                                   prevent taxiing on runway.
        3403
                                                              2012        AIP - AIRPORT IMPROVEMENT PROGRAM                                  .650   2008
Aeronautics                                                                                                                       Total:     .650
CONCORD              CONCORD MUNICIPAL    PROPERTY ACQUISITION RUNWAY 17 RPZ - PHASE V                                                                         Address Safety Concerns.
                     AIRPORT
        6525
                                                              2009        AIP - AIRPORT IMPROVEMENT PROGRAM                                  .700
Aeronautics                                                                                                                       Total:     .700
CONCORD              CONCORD MUNICIPAL    PROPERTY ACQUISITION RUNWAY 17 RPZ - PHASE VI                                                                        Address Safety Concerns.
                     AIRPORT
        6527
                                                              2010        AIP - AIRPORT IMPROVEMENT PROGRAM                                  .700
Aeronautics                                                                                                                       Total:     .700
CONCORD              CONCORD MUNICIPAL    PURCHASE SNOW REMOVAL EQUIPMENT                                                                                      Replace Aging Equipment
                     AIRPORT
        6665
                                                              2018        AIP - AIRPORT IMPROVEMENT PROGRAM                                  .295
Aeronautics                                                                                                                       Total:     .295
CONCORD              CONCORD MUNICIPAL    REHABILITATE TAXIWAY / OLD RUNWAY 3-21                                                                               Priority as identified by airport
                     AIRPORT                                                                                                                                   sponsor. Rehabilitation of old
        3402                                                                                                                                                   runway to a taxiway.

                                                              2015        AIP - AIRPORT IMPROVEMENT PROGRAM                                 2.850   2008
Aeronautics                                                                                                                       Total:    2.850
CONCORD              SEWALLS FALLS ROAD   REPLACE BRIDGE OVER MERRIMACK RIVER - 070/117 [Section 1702 - Designated Project;                                    Earmark Funding (partial). City
  12004                                   Demo Id NH045]                                                                                                       pays 20% match, Red List bridge.
      293
                                                      C       2012        H100 - BRIDGE REPLACEMENT - ON SYSTEM                             6.960   2010
                                                      C       2012        HPER - HIGH PRIORITY                                               .399   2010
                                                      C       2012        HY10 - HIGH PRIORITY PROJ SEC 1702                                 .200
                                                      C       2012        LY10 - HIGH PRIORITY PROJ SEC 1702                                 .401
                                                      P       2009        H100 - BRIDGE REPLACEMENT - ON SYSTEM                              .025
                                                      P       2009        H100 - BRIDGE REPLACEMENT - ON SYSTEM                              .313
                                                      P       2010        H100 - BRIDGE REPLACEMENT - ON SYSTEM                              .025
                                                      R       2009        H100 - BRIDGE REPLACEMENT - ON SYSTEM                              .218
                                                      R       2010        H100 - BRIDGE REPLACEMENT - ON SYSTEM                              .025
Highway and Bridge                                                                                                                Total:    8.565               7.780



                                          Phase:       C = Construction        P = Preliminary Engineering     R = Right of Way                                               Projects Page - 15
June 25, 2008
                                                                                                                                                     Previous Previous
Project Name/#       Route/Road:            Location; Scope of Work                                                                         $(M)     Prog. Yr Total$
                                                                                                                                                                         Comments:
CONCORD              I-393                  CONSTRUCT DRAINAGE AND OVERLAY PAVEMENT FROM NORTH MAIN STREET EAST TO HORSE
  13184 C                                   SHOE POND INTERSECTION
     6205
                                                        C      2009        L010 - INTERSTATE MAINTENANCE                                      .300
Highway and Bridge                                                                                                                 Total:     .300
CONCORD              STORRS STREET          PARK AND RIDE [06-02CM] (CMAQ Project)                                                                              Specific project from Statewide
  14817                                                                                                                                                         program.
     6220
                                                        C      2011        L400 - CONGESTION MITIGATION & AIR QUALITY IMPROVEMENT             .900   New Project
                                                        P      2009        L400 - CONGESTION MITIGATION & AIR QUALITY IMPROVEMENT             .150
                                                        R      2010        L400 - CONGESTION MITIGATION & AIR QUALITY IMPROVEMENT            1.300
Highway and Bridge                                                                                                                 Total:    2.350
CONWAY               NH 16                  CONWAY BYPASS - LANDSCAPE SOUTHERN SEGMENT (Parent = Conway 11339B)                                                 Conway Bypass.
  11339 O
     1215
                                                        C      2016        H050 - NATIONAL HIGHWAY SYSTEM                                     .350   2012
Highway and Bridge                                                                                                                 Total:     .350               0.330
CONWAY               NH 16                  VILLAGE STREETSCAPE PROJECT: REDESIGN WORK INCLUDES SIDEWALK UPGRADES, CROSS                                        Specific project from Statewide
  14821                                     WALKS, UTILITY RELOCATION, LANDSCAPING, LIGHTING, AND GATEWAY MARKERS (TE                                           program. Municipal managed.
     6234                                   Program) [06-11TE]
                                                        C      2009        L220 - STP - TRANSPORTATION ENHANCEMENT                            .386   TE 2006
Bike / Pedestrian                                                                                                                  Total:     .386
CONWAY               NH 16                  BRIDGE REHABILITATION OVER SACO RIVER - 170/071                                                                     Deck plate girder bridge,
  14958                                                                                                                                                         priority #93.
     5552
                                                        C      2015        H050 - NATIONAL HIGHWAY SYSTEM                                    2.850   2012
Highway and Bridge                                                                                                                 Total:    2.850               3.570
DALTON               NH 142 (SCOTTS WEST)   RECONSTRUCT CROSSING & SIGNALS @ NH-VT RR - USDOT AAR #364-690J [Statewide                                          Specific project from Statewide
   11726                                    Railroad-RCS]                                                                                                       program.
       233
                                                        C      2010        H260 - STP - RAIL-HWY PROTECTIVE DEVICES                           .080   2010
                                                        C      2010        H270 - STP - RAIL-HWY CROSS ELIM OF HAZARDS                        .133   2010
                                                        P      2010        H270 - STP - RAIL-HWY CROSS ELIM OF HAZARDS                        .015
Rail                                                                                                                               Total:     .228               0.215
DALTON               NH RTE 142 (SCOTTS     RECONSTRUCT CROSSING & SIGNALS @ NH-VT RR USDOT-AAR #364-688H [Statewide Railroad-                                  Specific project from Statewide
   11727             EAST)                  RCS]                                                                                                                program.
       234
                                                        C      2010        H260 - STP - RAIL-HWY PROTECTIVE DEVICES                           .089   2010
                                                        C      2010        H270 - STP - RAIL-HWY CROSS ELIM OF HAZARDS                        .133   2010
Rail                                                                                                                               Total:     .222               0.211

                                            Phase:      C = Construction        P = Preliminary Engineering     R = Right of Way                                              Projects Page - 16
June 25, 2008
                                                                                                                                                    Previous Previous
Project Name/#       Route/Road:         Location; Scope of Work                                                                           $(M)     Prog. Yr Total$
                                                                                                                                                                        Comments:
DEERING - ANTRIM     WEST DEERING ROAD   BRIDGE REHABILITATION OVER CONTOOCOOK RIVER - 032/101                                                                 Specific project from Statewide
   14237                                                                                                                                                       program, Municipal managed.
      5633
                                                     C      2009        SAB - STATE AID BRIDGE (State FY), 20% = Town                        .470   New Project
Highway and Bridge                                                                                                                Total:     .470               0.470
DERRY                SOUTH AVENUE        BRIDGE REHABILITATION OR REPLACEMENT OVER SHIELD BROOK- 066/092                                                       Specific project from Statewide
   13651                                                                                                                                                       program, Municipal Managed.
      3213
                                                     C      2009        SAB - STATE AID BRIDGE (State FY), 20% = Town                        .270   2008
                                                     P      2009        SAB - STATE AID BRIDGE (State FY), 20% = Town                        .050
                                                     R      2009        SAB - STATE AID BRIDGE (State FY), 20% = Town                        .005
Highway and Bridge                                                                                                                Total:     .325               0.325
DOVER                NH 9                REPLACE BRIDGE OVER B&M RAILROAD - 109/106                                                                            Red List bridge, priority #64
  13042
     2406
                                                     C      2010        H100 - BRIDGE REPLACEMENT - ON SYSTEM                               2.800   2009
                                                     C      2010        H230 - STP - URBANIZED AREAS OVER 200,000                           1.600   2009
                                                     R      2009        H100 - BRIDGE REPLACEMENT - ON SYSTEM                                .120
Highway and Bridge                                                                                                                Total:    4.520               4.100
DOVER                WASHINGTON STREET   BRIDGE REHABILITATION OVER B&M RAILROAD - 120/118                                                                     Municipal bridge, Municipal
  13796                                                                                                                                                        Managed, City pays 20%
      695                                                                                                                                                      match. RPC comment.

                                                     C      2010        Q110 - BRIDGE REPLACEMENT - OFF SYSTEM                               .400   2008
Highway and Bridge                                                                                                                Total:     .400               0.450
DURHAM               US 4                REPLACE BRIDGE OVER BUNKER CREEK - 145/116                                                                            Red List Bridge Priority #57

        4059
                                                     C      2017        H100 - BRIDGE REPLACEMENT - ON SYSTEM                               4.000   New Project
Highway and Bridge                                                                                                                Total:    4.000
DURHAM               US 4 / NH 108       INTERCHANGE IMPROVEMENTS AND RECONFIGURATION INCLUDING THE INSTALLATION OF                                            From Route 4 Safety Study. RPC
                                         TRAFFIC SIGNALS, DEDICATED TURNING LANES, SIGNAGE, ETC. - PHASE 2                                                     request to advance.
        3286
                                                     C      2014        H050 - NATIONAL HIGHWAY SYSTEM                                       .500   2014
                                                     P      2011        H050 - NATIONAL HIGHWAY SYSTEM                                       .020
                                                     P      2013        H050 - NATIONAL HIGHWAY SYSTEM                                       .030
Highway and Bridge                                                                                                                Total:     .550               0.360




                                         Phase:      C = Construction        P = Preliminary Engineering       R = Right of Way                                              Projects Page - 17
June 25, 2008
                                                                                                                                                      Previous Previous
Project Name/#       Route/Road:           Location; Scope of Work                                                                           $(M)     Prog. Yr Total$
                                                                                                                                                                          Comments:
DURHAM               NH155 A / MAIN ST     NH 155A MAIN STREET IMPROVEMENTS - CONSTRUCT SIDEWALKS, MULTI-USE PATHS & BICYCLE                                     Specific project from Statewide
  14405                                    SHOULDERS ALONG NH 155A FOR APPROXIMATELY 1.1 MILES APPROACHING THE UNH                                               program, Municipal managed.
     5642                                  CAMPUS AND DOWNTOWN DURHAM (TE Program) [04-13TE]
                                                       C      2009        L220 - STP - TRANSPORTATION ENHANCEMENT                              .416   2009
Highway and Bridge                                                                                                                  Total:     .416               0.491
DURHAM               WISWALL ROAD          REPLACE BRIDGES #070/072 & 069/072 WITH NEW BRIDGE OVER LAMPREY RIVER - 070/073                                       Specific project from Statewide
  14453                                                                                                                                                          program, Municipal managed.
     5955
                                                       C      2009        FEMA - FEDERAL EMERGENCY MANAGEMENT AGENCY (not FHW                  .472
                                                       C      2009        SAB - STATE AID BRIDGE (State FY), 20% = Town                        .428   2010
                                                       R      2009        SAB - STATE AID BRIDGE (State FY), 20% = Town                        .025
Highway and Bridge                                                                                                                  Total:     .925               1.740
DURHAM - NEWMARKET   NH 108                CONSTRUCT 4' BIKE SHOULDERS FROM OYSTER RIVER BRIDGE TO DAME ROAD AND SANBORN                                         RPC request to advance.
  13080                                    AVE IN NEWMARKET (3.4MI) STP & [98-17TE] (Partial TE Program)
     2296
                                                       C      2011        L200 - STP - AREAS LESS THAN 200,000                                3.800   2010
                                                       P      2009        L220 - STP - TRANSPORTATION ENHANCEMENT                              .100
                                                       P      2010        L220 - STP - TRANSPORTATION ENHANCEMENT                              .100
                                                       P      2011        L220 - STP - TRANSPORTATION ENHANCEMENT                              .050
                                                       R      2009        L220 - STP - TRANSPORTATION ENHANCEMENT                              .038
                                                       R      2009        L220 - STP - TRANSPORTATION ENHANCEMENT                              .063
                                                       R      2010        L220 - STP - TRANSPORTATION ENHANCEMENT                              .100
Bike / Pedestrian                                                                                                                   Total:    4.250               3.400
EATON                POTTER ROAD           BRIDGE REPLACEMENT OVER CONWAY LAKE - 072/137                                                                         Specific project from Statewide
   14168                                                                                                                                                         program, Municipal managed.
      4254
                                                       C      2009        SAB - STATE AID BRIDGE (State FY), 20% = Town                        .530   2008
                                                       R      2009        SAB - STATE AID BRIDGE (State FY), 20% = Town                        .005
Highway and Bridge                                                                                                                  Total:     .535               0.485
ENFIELD              MAIN STREET & NH 4A   BRIDGE REPLACEMENT ON MAIN STREET OVER MASCOMA LAKE - 077/139; NH 4A, REHAB.                                          Red List bridge, priority #52.
   12967                                   PAVEMENT, ADD SHOULDERS, IMPROVE DRAINAGE
        585
                                                       C      2010        H110 - BRIDGE REPLACEMENT - OFF SYSTEM                              7.800   2010
                                                       P      2009        Q110 - BRIDGE REPLACEMENT - OFF SYSTEM                               .100
                                                       P      2009        Q110 - BRIDGE REPLACEMENT - OFF SYSTEM                               .390
                                                       R      2009        H110 - BRIDGE REPLACEMENT - OFF SYSTEM                               .100
                                                       R      2009        Q110 - BRIDGE REPLACEMENT - OFF SYSTEM                               .080
Highway and Bridge                                                                                                                  Total:    8.470               7.200




                                           Phase:      C = Construction        P = Preliminary Engineering       R = Right of Way                                               Projects Page - 18
June 25, 2008
                                                                                                                                                     Previous Previous
Project Name/#       Route/Road:        Location; Scope of Work                                                                             $(M)     Prog. Yr Total$
                                                                                                                                                                         Comments:
ENFIELD              NH 4A              REHABILITATE PAVEMENT, ADD SHOULDERS, AND IMPROVE SIGHT DISTANCE, BEGINNING 1                                           Specific project from Statewide
   13185 B                              MILE SOUTHEAST OF US 4 AT THE LEBANON/ENFIELD TOWN LINE RUNNING SOUTHEAST .9 MILES                                      program.
      2931
                                                     C       2009        BET - BETTERMENT (State FY)                                         1.000   2009
Highway and Bridge                                                                                                                 Total:    1.000               1.000
ENFIELD              SHAKER BOULEVARD   INSTALL TEMPORARY BRIDGE AND REPLACE BRIDGE OVER THE KNOX RIVER - 120/115                                               Specific project from Statewide
   13592                                                                                                                                                        program, Municipal Managed.
      3164
                                                     P       2011        SAB - STATE AID BRIDGE (State FY), 20% = Town                        .050
Highway and Bridge                                                                                                                 Total:     .050
ENFIELD - LEBANON    I-89               REHAB FROM EXIT 15 TO EXIT 17 (Br# 155/117 & 156/117) (4.0 Miles) [4R]                                                  Bridge priority #53 and #54.
   13962
      2761
                                                     C       2011        H010 - INTERSTATE MAINTENANCE                                       8.000   2009
Highway and Bridge                                                                                                                 Total:    8.000               4.630
EPPING - EXETER      NH 101             3 1/2" PAVEMENT OVERLAY FROM EXIT 6 IN EPPING TO SQUAMSCOTT RIVER BRIDGE IN EXETER                                      Specific project from Statewide
   14923                                [Statewide Federal Resurfacing Program]                                                                                 program. Second phase of
      6479                                                                                                                                                      long term improvements.

                                                     C       2009        L200 - STP - AREAS LESS THAN 200,000                                6.000   New Project
Highway and Bridge                                                                                                                 Total:    6.000
EPSOM                NH 107             BRIDGE REPLACEMENT OVER GRIFFIN BROOK - 160/110                                                                         Bridge damaged by April 2007
   15266                                                                                                                                                        floods, priority #30.
      6717
                                                     C       2010        L1C0 - BRIDGE PROGRAM - 85% ON/OFF SYSTEM                            .875   New Project
                                                     R       2009        L1C0 - BRIDGE PROGRAM - 85% ON/OFF SYSTEM                            .050
Highway and Bridge                                                                                                                 Total:     .925
EXETER               EPPING ROAD        IMPLEMENTATION OF ACCESS MANAGEMENT PLAN DEVELOPED BY EXETER TO LIKELY INCLUDE                                          Deferred beyond TYP, RPC
                                        ROW ACQUISITIONS AND DRIVEWAY CONSOLIDATION                                                                             comment pending study.
         3287
                                                     P       2012        H200 - STP - AREAS LESS THAN 200,000                                 .063
Highway and Bridge                                                                                                                 Total:     .063
EXETER               LINCOLN STREET     EXPAND EXISTING PASSENGER RAILROAD STATION PARKING AREA (PROJECT #10025A) FROM
   13871                                78 TO 140 PARKING SPACES (CMAQ Program) [02-13CM]
       3713
                                                     C       2009        L400 - CONGESTION MITIGATION & AIR QUALITY IMPROVEMENT               .125   2006
Rail                                                                                                                               Total:     .125




                                        Phase:        C = Construction        P = Preliminary Engineering       R = Right of Way                                              Projects Page - 19
June 25, 2008
                                                                                                                                                  Previous Previous
Project Name/#          Route/Road:   Location; Scope of Work                                                                            $(M)     Prog. Yr Total$
                                                                                                                                                                      Comments:
EXETER                  PARK STREET   BRIDGE REPLACEMENT OVER B&M RAILROAD - 088/076                                                                         Red List bridge, Municipal
   14090 A                                                                                                                                                   Managed, Awaiting Municipal
       5580                                                                                                                                                  Action; funding 80% Federal,
                                                                                                                                                             10% Town, 10% State.

                                                  C       2015        H110 - BRIDGE REPLACEMENT - OFF SYSTEM                              2.500   2012
                                                  P       2009        H110 - BRIDGE REPLACEMENT - OFF SYSTEM                               .100
                                                  P       2010        H100 - BRIDGE REPLACEMENT - ON SYSTEM                                .150
                                                  P       2011        H100 - BRIDGE REPLACEMENT - ON SYSTEM                                .050
                                                  R       2009        H110 - BRIDGE REPLACEMENT - OFF SYSTEM                               .015
                                                  R       2011        H110 - BRIDGE REPLACEMENT - OFF SYSTEM                               .135
Highway and Bridge                                                                                                              Total:    2.950               3.050
FARMINGTON              NH 153        REPLACE BRIDGE OVER COCHEO RIVER - 096/140                                                                             Red List Bridge Priority #51

        6778
                                                  C       2015        L1C0 - BRIDGE PROGRAM - 85% ON/OFF SYSTEM                           1.800   New Project
Highway and Bridge                                                                                                              Total:    1.800
FRANCONIA - LITTLETON   I-93          RECLAIM & 5 1/2 '' HBP FROM THE FRANCONIA NOTCH TO NORTH OF EXIT 41 (9 Miles) [4R]                                     Design begun. Broken into 2
                                                                                                                                                             contracts.
        3255
                                                  C       2017        H010 - INTERSTATE MAINTENANCE                                      10.000   2015
                                                  C       2018        H010 - INTERSTATE MAINTENANCE                                      10.000   2016
                                                  P       2014        H010 - INTERSTATE MAINTENANCE                                        .222
                                                  P       2016        H010 - INTERSTATE MAINTENANCE                                        .278
Highway and Bridge                                                                                                              Total:   20.500              28.000
FRANKLIN                US 3          UPGRADE AT INTERSECTION OF INDUSTRIAL PARK DRIVE IN FRANKLIN [Section 1702 -                                           Earmarked funding.
   13928 A                            Designated Project; Demo Id NH037] [Sister Demo Id NH057]
      6047
                                                  C       2011        HPER - HIGH PRIORITY                                                 .102   2011
                                                  C       2011        L240 - STP - SURFACE TRANSP. STATE FLEXIBLE IN ANY AREA              .607
                                                  C       2011        LY10 - HIGH PRIORITY PROJ SEC 1702                                   .203
                                                  C       2011        LY10 - HIGH PRIORITY PROJ SEC 1702                                   .112
                                                  C       2011        LY20 - HIGH PRIORITY PROJ SEC 1702                                   .281
                                                  C       2011        LY20 - HIGH PRIORITY PROJ SEC 1702                                  1.505
                                                  P       2009        HY20 - HIGH PRIORITY PROJ SEC 1702                                   .250
                                                  R       2009        LY10 - HIGH PRIORITY PROJ SEC 1702                                   .086
                                                  R       2009        LY20 - HIGH PRIORITY PROJ SEC 1702                                   .214
Highway and Bridge                                                                                                              Total:    3.360               3.500




                                      Phase:       C = Construction        P = Preliminary Engineering       R = Right of Way                                              Projects Page - 20
June 25, 2008
                                                                                                                                             Previous Previous
Project Name/#   Route/Road:         Location; Scope of Work                                                                        $(M)     Prog. Yr Total$
                                                                                                                                                                 Comments:
GILFORD          LACONIA MUNICIPAL   AIRPORT MASTER PLAN UPDATE                                                                                         Needed to Plan for Future
                 AIRPORT                                                                                                                                Projects
        6666
                                                        2017        AIP - AIRPORT IMPROVEMENT PROGRAM                                 .200
Aeronautics                                                                                                                Total:     .200
GILFORD          LACONIA MUNICIPAL   CONSTRUCT SNOW REMOVAL EQUIPMENT BUILDING                                                                          Protects Federal investment of
                 AIRPORT                                                                                                                                snow removal equipment
        3998
                                                 C      2010        AIP - AIRPORT IMPROVEMENT PROGRAM                                 .350   2009
Aeronautics                                                                                                                Total:     .350               0.752
GILFORD          LACONIA MUNICIPAL   CONSTRUCT ONLY TAXIWAY TO SERVE NW QUADRANT                                                                        Address Safety Concerns.
                 AIRPORT
        6533
                                                        2013        AIP - AIRPORT IMPROVEMENT PROGRAM                                1.579
Aeronautics                                                                                                                Total:    1.579
GILFORD          LACONIA MUNICIPAL   CONSTRUCT EMERGENCY ACCESS ROAD                                                                                    Address Safety Concerns.
                 AIRPORT
        6534
                                                        2014        AIP - AIRPORT IMPROVEMENT PROGRAM                                 .720
Aeronautics                                                                                                                Total:     .720
GILFORD          LACONIA MUNICIPAL   DESIGN ONLY TAXIWAY TO SERVE NW QUADRANT                                                                           Priority as identified by airport
                 AIRPORT                                                                                                                                sponsor.
        3672
                                                        2012        AIP - AIRPORT IMPROVEMENT PROGRAM                                 .300   2015
Aeronautics                                                                                                                Total:     .300
GILFORD          LACONIA MUNICIPAL   DESIGN AND INSTALL PERIMETER FENCING - PHASE IV                                                                    Address Safety Concerns.
                 AIRPORT
        6537
                                                        2016        AIP - AIRPORT IMPROVEMENT PROGRAM                                 .650
Aeronautics                                                                                                                Total:     .650
GILFORD          LACONIA MUNICIPAL   DESIGN APRON EXPANSION                                                                                             Address Capacity Concerns
                 AIRPORT
        6667
                                                        2018        AIP - AIRPORT IMPROVEMENT PROGRAM                                 .250
Aeronautics                                                                                                                Total:     .250
GILFORD          LACONIA MUNICIPAL   PURCHASE SNOW REMOVAL EQUIPMENT                                                                                    Equipment required for safe
                 AIRPORT                                                                                                                                winter operations.
        4001
                                                        2011        AIP - AIRPORT IMPROVEMENT PROGRAM                                 .350   2009
Aeronautics                                                                                                                Total:     .350

                                     Phase:      C = Construction       P = Preliminary Engineering     R = Right of Way                                               Projects Page - 21
June 25, 2008
                                                                                                                                                     Previous Previous
Project Name/#       Route/Road:         Location; Scope of Work                                                                            $(M)     Prog. Yr Total$
                                                                                                                                                                         Comments:
GILFORD              LACONIA MUNICIPAL   PURCHASE SNOW-REMOVAL EQUIPMENT                                                                                        Required for safe winter
                     AIRPORT                                                                                                                                    operations.
         6535
                                                             2015        AIP - AIRPORT IMPROVEMENT PROGRAM                                    .315
Aeronautics                                                                                                                        Total:     .315
GILFORD              LACONIA MUNICIPAL   REHABILITATE OBSTRUCTION LIGHTS                                                                                        Required for safe aircraft
                     AIRPORT                                                                                                                                    operations.
         6536
                                                             2015        AIP - AIRPORT IMPROVEMENT PROGRAM                                    .030
Aeronautics                                                                                                                        Total:     .030
GILFORD              LACONIA MUNICIPAL   SECURITY/SAFETY FENCING- PHASE III                                                                                     Safety and Security issue.
                     AIRPORT
         3414
                                                             2009        AIP - AIRPORT IMPROVEMENT PROGRAM                                    .666   2012
Aeronautics                                                                                                                        Total:     .666
GILFORD              ALVAH WILSON ROAD   VILLAGE SIDEWALK PHASE 4: CONSTRUCT SIDEWALK. THIS SIDEWALK WILL CONNECT ALL THE                                       Specific project from Statewide
   14825                                 GILFORD SCHOOLS TO THE EXISTING VILLAGE SIDEWALKS (TE Program) [06-16TE]                                               program. Municipal managed.
      6235
                                                     C       2010        L220 - STP - TRANSPORTATION ENHANCEMENT                              .158   TE 2006
Bike / Pedestrian                                                                                                                  Total:     .158
GORHAM               NH 16               BRIDGE REPLACEMENT OVER PEABODY RIVER - 092/058                                                                        Bridge Red List Priority # 117

         3259
                                                     C       2018        H050 - NATIONAL HIGHWAY SYSTEM                                      2.500   2015
                                                     P       2012        H050 - NATIONAL HIGHWAY SYSTEM                                       .080
                                                     P       2013        H050 - NATIONAL HIGHWAY SYSTEM                                       .220
Highway and Bridge                                                                                                                 Total:    2.800               3.500
GORHAM - SHELBURNE   US 2                CONSTRUCT 5' SHOULDERS, 1.4 MILES WEST OF NH 16 TO A POINT 4 MILES EAST OF GORHAM -                                    Specific project from Statewide
                                         SHELBURNE T/L (EXCLUDING GORHAM MAIN STREET)                                                                           program.
         2905
                                                     C       2009        BET - BETTERMENT (State FY)                                          .110   2007
Highway and Bridge                                                                                                                 Total:     .110               0.110
GRAFTON                                  BRIDGE REPLACEMENT AT TOWN BRIDGE SITE #162/139 (PHASE 1)                                                              Specific project from Statewide
  13373 A                                                                                                                                                       program, Municipal managed.
     6511
                                                     C       2011        SAB - STATE AID BRIDGE (State FY), 20% = Town                        .360   New Project
Highway and Bridge                                                                                                                 Total:     .360




                                         Phase:       C = Construction        P = Preliminary Engineering       R = Right of Way                                               Projects Page - 22
June 25, 2008
                                                                                                                                                        Previous Previous
Project Name/#       Route/Road:             Location; Scope of Work                                                                           $(M)     Prog. Yr Total$
                                                                                                                                                                            Comments:
GRAFTON              DAVIS ROAD              REPLACE BRIDGE OVER SMITH RIVER - 123/104                                                                             Specific project from Statewide
  14627                                                                                                                                                            program, Municipal managed.
     6263
                                                         C      2012        SAB - STATE AID BRIDGE (State FY), 20% = Town                        .744   New Project
                                                         P      2012        SAB - STATE AID BRIDGE (State FY), 20% = Town                        .120
                                                         R      2012        SAB - STATE AID BRIDGE (State FY), 20% = Town                        .010
Highway and Bridge                                                                                                                    Total:     .874
GREENLAND                                    TRUCKSTOP ELECTRIFICATION (CMAQ Program) [06-08CM]                                                                    Specific project from Statewide
  14813                                                                                                                                                            program.
     6222
                                                         C      2010        L400 - CONGESTION MITIGATION & AIR QUALITY IMPROVEMENT               .828   CMAQ 2006
Highway and Bridge                                                                                                                    Total:     .828
HAMPTON              HIGH ST / TOWLE AVE /   PHASE 3 OF NORTH HAMPTON, HAMPTON AND EXETER REGIONAL BIKE LOOP: CONSTRUCT 4'                                         Specific project from Statewide
  13891              WINNACUNNET RD          SHOULDERS AND PAVEMENT MARKINGS FROM US 1 ALONG HIGH STREET, TOWLE AVENUE,                                            program, Municipal managed.
     3729                                    AND WINNACUNNET ROAD TO NH 1A (TE Program) [02-23TE]
                                                         C      2009        L220 - STP - TRANSPORTATION ENHANCEMENT                              .700   2007
Bike / Pedestrian                                                                                                                     Total:     .700               0.701
HAMPTON FALLS -      I-95                    REPLACEMENT OF THE TAYLOR RIVER BRIDGE ON THE BLUE STAR HIGHWAY AND                                                   Red List bridge #34. Previously
HAMPTON                                      REPLACEMENT OR REMOVAL OF THE TAYLOR RIVER DAM IN HAMPTON AT MILE 3.6501                                              studied under Statewide
  13408 B                                                                                                                                                          Culvert Repair. Turnpike Priority
     6048                                                                                                                                                          Capital Program

                                                         C      2009        TPK - TURNPIKE EXPANSION (State FY)                                 9.930   2010
                                                         P      2009        TPK - TURNPIKE EXPANSION (State FY)                                  .200
                                                         R      2009        TPK - TURNPIKE EXPANSION (State FY)                                  .025
Highway and Bridge                                                                                                                    Total:   10.155               3.000
HANCOCK              NH 137                  REHABILITATE BRIDGE OVER MOOSE BROOK - 138/110                                                                        Priority #84, Red List bridge.
  13778
     3543
                                                         C      2009        BET - BETTERMENT (State FY)                                          .775   2009
Highway and Bridge                                                                                                                    Total:     .775               0.700
HAVERHILL            NH 10                   RECONSTRUCT STEEP EMBANKMENT APPROXIMATELY ONE MILE SOUTH OF NH 116                                                   Specific project from Statewide
  14154                                                                                                                                                            program.
     4243
                                                         C      2009        BET - BETTERMENT (State FY)                                          .080
Highway and Bridge                                                                                                                    Total:     .080               0.080




                                             Phase:      C = Construction        P = Preliminary Engineering       R = Right of Way                                               Projects Page - 23
June 25, 2008
                                                                                                                                                Previous Previous
Project Name/#       Route/Road:     Location; Scope of Work                                                                           $(M)     Prog. Yr Total$
                                                                                                                                                                    Comments:
HAVERHILL - BATH     US 302          RECONSTRUCTION FROM JUNCTION @ NH 10 NORTHERLY APPROXIMATELY 1.8 MILES                                                Scope reduction to address
  10436                                                                                                                                                    pavement and problem
       99                                                                                                                                                  intersections only. Further
                                                                                                                                                           addressed by private
                                                                                                                                                           development

                                                C       2013        H200 - STP - AREAS LESS THAN 200,000                                2.500   2010
                                                P       2010        H250 - STP - NON URBAN AREAS                                         .020
                                                P       2011        H250 - STP - NON URBAN AREAS                                         .141
                                                P       2012        H250 - STP - NON URBAN AREAS                                         .020
                                                R       2011        H250 - STP - NON URBAN AREAS                                         .020
                                                R       2011        H250 - STP - NON URBAN AREAS                                         .020
                                                R       2012        H250 - STP - NON URBAN AREAS                                         .010
                                                R       2012        H250 - STP - NON URBAN AREAS                                         .050
Highway and Bridge                                                                                                            Total:    2.781               3.786
HEBRON               BRALEY ROAD     REPLACE BRIDGE OVER COCKERMOUTH RIVER - 097/105                                                                       Specific project from Statewide
   14261                                                                                                                                                   program, Municipal managed.
      5685
                                                C       2009        SAB - STATE AID BRIDGE (State FY), 20% = Town                        .821   2009
Highway and Bridge                                                                                                            Total:     .821               0.635
HEBRON               NH 3A           IMPROVE NORTH SHORE ROAD INTERSECTION PLATFORM                                                                        Specific project from Statewide
   14395                                                                                                                                                   program.
      5925
                                                C       2009        BET - BETTERMENT (State FY)                                          .030   New Project
                                                P       2009        BET - BETTERMENT (State FY)                                          .003
                                                R       2009        BET - BETTERMENT (State FY)                                          .005
Highway and Bridge                                                                                                            Total:     .038
HINSDALE             MONUMENT ROAD   BRIDGE REPLACEMENT OVER ASH BROOK - 085/064                                                                           Specific project from Statewide
   14920                                                                                                                                                   program, Municipal managed.
      6475
                                                C       2013        SAB - STATE AID BRIDGE (State FY), 20% = Town                        .334   New Project
                                                P       2013        SAB - STATE AID BRIDGE (State FY), 20% = Town                        .050
                                                R       2013        SAB - STATE AID BRIDGE (State FY), 20% = Town                        .010
Highway and Bridge                                                                                                            Total:     .394




                                     Phase:      C = Construction        P = Preliminary Engineering       R = Right of Way                                              Projects Page - 24
June 25, 2008
                                                                                                                                                       Previous Previous
Project Name/#       Route/Road:            Location; Scope of Work                                                                           $(M)     Prog. Yr Total$
                                                                                                                                                                           Comments:
HINSDALE, NH -       NH 119                 REPLACE 2 BRIDGES OVER CONNECTICUT RIVER - 041/040 & 042/044, BY CONSTRUCTING A                                       Bridge priority #89 and #90.
BRATTLEBORO, VT                             NEW BRIDGE 043/044 JUST DOWNSTREAM [Section 1602 - Designated Project; Demo Id
   12210                                    NH018]
       591
                                                        C      2014        H100 - BRIDGE REPLACEMENT - ON SYSTEM                              15.000
                                                        C      2015        H100 - BRIDGE REPLACEMENT - ON SYSTEM                              15.380   2011
                                                        C      2015        Q920 - HIGH PRIORITY PROJ SEC 1602                                   .660   2011
                                                        P      2009        H100 - BRIDGE REPLACEMENT - ON SYSTEM                                .025
                                                        P      2010        H100 - BRIDGE REPLACEMENT - ON SYSTEM                                .025
                                                        R      2009        Q920 - HIGH PRIORITY PROJ SEC 1602                                   .305
                                                        R      2010        Q920 - HIGH PRIORITY PROJ SEC 1602                                   .025
Highway and Bridge                                                                                                                   Total:   31.420              20.705
HOLLIS               MAIN STREET, ASH       CONSTRUCT SIDEWALK ON MAIN ST, ASH ST, & BROAD ST (TE Program) [00-40TE]                                              Specific project from Statewide
  13488              STREET, BROAD STREET                                                                                                                         program, Municipal Managed.
       3010
                                                        C      2009        L220 - STP - TRANSPORTATION ENHANCEMENT                              .128   2007
Bike / Pedestrian                                                                                                                    Total:     .128               0.128
HOOKSETT             US 3 / NH 28           WIDEN NORTH OF BENTON ROAD SOUTH 0.411 MILES TO THE INTERSECTION WITH MARTIN'S                                        Earmark funding.
  12537 A                                   FERRY ROAD [Section 117 - Designated Project; Demo Id NH031]
     4107
                                                        C      2009        H660 - GRANTS SUP PLAN HEWY STP, SECTION 117                        2.668   2007
                                                        C      2009        L240 - STP - SURFACE TRANSP. STATE FLEXIBLE IN ANY AREA              .132
Highway and Bridge                                                                                                                   Total:    2.800               2.668
HOOKSETT             HACKETT HILL ROAD      RECONSTRUCTION AT NH 3A AND TURNPIKE RAMP                                                                             Specific project from Statewide
  14950                                                                                                                                                           program.
     6505
                                                        C      2010        SAH - STATE AID HIGHWAY (State FY), 33.3% = Town                    1.000   New Project
                                                        C      2011        SAH - STATE AID HIGHWAY (State FY), 33.3% = Town                    1.000
                                                        C      2012        SAH - STATE AID HIGHWAY (State FY), 33.3% = Town                    1.000
Highway and Bridge                                                                                                                   Total:    3.000
HOPKINTON            NH 127                 REHABILITATE BRIDGE OVER SPILLWAY CHANNEL - 089/114                                                                   Red List bridge, priority #79.
  13799
     3658
                                                        C      2009        BET - BETTERMENT (State FY)                                         1.275   2009
Highway and Bridge                                                                                                                   Total:    1.275               1.208




                                            Phase:      C = Construction        P = Preliminary Engineering       R = Right of Way                                               Projects Page - 25
June 25, 2008
                                                                                                                                                   Previous Previous
Project Name/#         Route/Road:     Location; Scope of Work                                                                            $(M)     Prog. Yr Total$
                                                                                                                                                                       Comments:
HUDSON                 MELENDY ROAD    BRIDGE REHABILITATION OVER HADLEY BROOK - 114/083                                                                      Specific project from Statewide
  13353                                                                                                                                                       program, Municipal Managed.
     2837
                                                   C       2011        SAB - STATE AID BRIDGE (State FY), 20% = Town                        .100   2009
                                                   P       2011        SAB - STATE AID BRIDGE (State FY), 20% = Town                        .015
                                                   R       2011        SAB - STATE AID BRIDGE (State FY), 20% = Town                        .005
Highway and Bridge                                                                                                               Total:     .120               0.100
HUDSON                 COUNTY ROAD     BRIDGE REHABILITATION AND WIDENING OVER SECOND BROOK - 126/083                                                         Specific project from Statewide
  13354                                                                                                                                                       program, Municipal Managed.
     2838
                                                   C       2010        SAB - STATE AID BRIDGE (State FY), 20% = Town                        .125   2008
                                                   P       2010        SAB - STATE AID BRIDGE (State FY), 20% = Town                        .030
                                                   R       2010        SAB - STATE AID BRIDGE (State FY), 20% = Town                        .005
Highway and Bridge                                                                                                               Total:     .160               0.160
JEFFERSON - RANDOLPH   US 2            RECONSTRUCTION, SAFETY IMPROVEMENTS, & SHOULDER WIDENING FROM JEFFERSON-                                               Scope reduction to address
   13602 A                             RANDOLPH T/L EAST APPROX. 2.7 MILES TO DURAND ROAD (Construction Only)                                                 pavement and specific
      4211                                                                                                                                                    problem areas.

                                                   C       2009        H050 - NATIONAL HIGHWAY SYSTEM                                      1.661
                                                   C       2009        Q640 - NATIONAL CORRIDOR PRESERVATION & BORDER CROSSIN              3.089   2007
Highway and Bridge                                                                                                               Total:    4.750               3.089
JEFFERSON - RANDOLPH   US 2            RECONSTRUCTION, SAFETY IMPROVEMENTS & SHOULDER WIDENING FROM NH 115                                                    Scope reduction to address
   13602 B                             INTERSECTION EAST APPROX. 2.3 MILES TO JEFFERSON / RANDOLPH T/L (Construction only)                                    pavement and specific
      6036                                                                                                                                                    problem areas.

                                                   C       2016        H050 - NATIONAL HIGHWAY SYSTEM                                      3.500   2010
Highway and Bridge                                                                                                               Total:    3.500               3.150
KEENE                  WINCHESTER ST   RECONSTRUCTION FROM NH 101 ROUNDABOUT NORTH TO PEARL STREET / ISLAND STREET                                            Formerly considered with
   10309 B                             INCLUDING INTERSECTION AT KEY ROAD                                                                                     overall Keene-Swanzey project.
      1828                                                                                                                                                    In lieu of Keene 12230 West
                                                                                                                                                              Street project. Municipal
                                                                                                                                                              Managed and 20% match.

                                                   C       2014        H200 - STP - AREAS LESS THAN 200,000                                1.800
                                                   C       2015        H200 - STP - AREAS LESS THAN 200,000                                2.200   2013
                                                   P       2013        H200 - STP - AREAS LESS THAN 200,000                                 .238
Highway and Bridge                                                                                                               Total:    4.238               8.700




                                       Phase:       C = Construction        P = Preliminary Engineering       R = Right of Way                                              Projects Page - 26
June 25, 2008
                                                                                                                                                          Previous Previous
Project Name/#       Route/Road:              Location; Scope of Work                                                                            $(M)     Prog. Yr Total$
                                                                                                                                                                              Comments:
KEENE                HARRISON STREET          BRIDGE REPLACEMENT OVER BEAVER BROOK - 141/074                                                                         Specific project from Statewide
   14383                                                                                                                                                             program, Municipal managed.
      5852
                                                          C       2009        SAB - STATE AID BRIDGE (State FY), 20% = Town                        .245   2010
                                                          P       2009        SAB - STATE AID BRIDGE (State FY), 20% = Town                        .065
                                                          R       2009        SAB - STATE AID BRIDGE (State FY), 20% = Town                        .010
Highway and Bridge                                                                                                                      Total:     .320               0.290
KEENE                SPRING STREET            BRIDGE REPLACEMENT OVER BEAVER BROOK - 140/078                                                                         Specific project from Statewide
   14441                                                                                                                                                             program, Municipal managed.
      5937
                                                          C       2011        SAB - STATE AID BRIDGE (State FY), 20% = Town                        .275   2010
                                                          P       2011        SAB - STATE AID BRIDGE (State FY), 20% = Town                        .065
                                                          R       2011        SAB - STATE AID BRIDGE (State FY), 20% = Town                        .010
Highway and Bridge                                                                                                                      Total:     .350               0.325
KEENE                CHESHIRE RAIL TRAIL      IMPROVE EXISTING TRAIL SURFACE AND REPAIR DRAINAGE FROM PITCHER STREET TO                                              Specific project from Statewide
   14834                                      BRADFORD ROAD AND FROM BRADFORD ROAD TO WHITCOMB'S MILL ROAD. ADD A                                                    program.
      6236                                    TRAILHEAD AT WHITCOMB'S MILL ROAD (TE Program) [06-20TE]
                                                          C       2010        L220 - STP - TRANSPORTATION ENHANCEMENT                              .066   TE 2006
Bike / Pedestrian                                                                                                                       Total:     .066
KEENE                NH 9, 10, 12             CONSTRUCT MULTI USE TRAIL BRIDGE OVER NH 9, 10, & 12, 750' SOUTH OF WEST STREET                                        Earmark funding. Municipal
   14891                                      [Section 1702 - Designated Project; Demo Id NH049]                                                                     Managed
      6433
                                                          C       2009        HY10 - HIGH PRIORITY PROJ SEC 1702                                   .154
                                                          C       2009        LY10 - HIGH PRIORITY PROJ SEC 1702                                   .158
                                                          C       2009        LY10 - HIGH PRIORITY PROJ SEC 1702                                   .147   New Project
                                                          C       2009        LY10 - HIGH PRIORITY PROJ SEC 1702                                   .154
Bike / Pedestrian                                                                                                                       Total:     .613
KEENE - SWANZEY      NH 9 / NH 10 / NH 12 /   INTERIM INTERSECTION IMPROVEMENTS AT 'T' INTERSECTION AND CONSTRUCTION OF                                              Incremental/interim
   10309 J           NH 101                   FLOODPLAIN & WETLAND MITIGATION (Parent = Keene-Swanzey 10309)                                                         improvement.
      5705
                                                          C       2017        H050 - NATIONAL HIGHWAY SYSTEM                                      3.000   2009
Highway and Bridge                                                                                                                      Total:    3.000               2.900
KEENE - SWANZEY      NH 12 / 101              CONSTRUCTION OF INTERIM WIDENING WITH REPLACEMENT OF THE ASHUELOT RIVER BRIDGE                                         Incremental/interim
   10309 L                                    (Parent = Keene-Swanzey 10309)                                                                                         improvement.
      5707
                                                          C       2015        L050 - NATIONAL HIGHWAY SYSTEM                                      4.100   2010
Highway and Bridge                                                                                                                      Total:    4.100               3.150




                                              Phase:       C = Construction        P = Preliminary Engineering       R = Right of Way                                              Projects Page - 27
June 25, 2008
                                                                                                                                                     Previous Previous
Project Name/#       Route/Road:         Location; Scope of Work                                                                            $(M)     Prog. Yr Total$
                                                                                                                                                                         Comments:
KEENE - SWANZEY      NH 9/10/12/101      CONSTRUCTION OF MULTI-USE TRAIL BRIDGE OVER NH 12/101 (Parent = Keene-Swanzey                                          Incremental/interim
   10309 P                               10309)                                                                                                                 improvement.
      6189
                                                      C      2010        L050 - NATIONAL HIGHWAY SYSTEM                                      1.750   New Project
Highway and Bridge                                                                                                                 Total:    1.750
KINGSTON             NEW BOSTON RD       BRIDGE REPLACEMENT OVER POWWOW RIVER - 116/113                                                                         Specific project from Statewide
   14973                                                                                                                                                        program. Municipal Managed.
      6688
                                                      C      2014        SAB - STATE AID BRIDGE (State FY), 20% = Town                        .525
                                                      P      2014        SAB - STATE AID BRIDGE (State FY), 20% = Town                        .095
                                                      R      2014        SAB - STATE AID BRIDGE (State FY), 20% = Town                        .005
Highway and Bridge                                                                                                                 Total:     .625
LACONIA                                  PHASE 2, WINNIPESAUKEE OPECHEE WINNISQUAM (WOW) TRIAL: CONSTRUCT 1.0 MILES OF                                          Specific project from Statewide
   14826                                 SHARED USE PATH IN THE RAILROAD CORRIDOR FROM MAIN STREET IN DOWNTOWN LACONIA                                          program. Municipal managed.
      6237                               TO THE BELMONT TOWN LINE (TE Program) [06-22TE]
                                                      C      2011        L220 - STP - TRANSPORTATION ENHANCEMENT                              .390   TE 2006
                                                      R      2009        L220 - STP - TRANSPORTATION ENHANCEMENT                              .001
Bike / Pedestrian                                                                                                                  Total:     .391
LANCASTER            US 2 AND MECHANIC   RECONSTRUCT 300 LF OF SIDEWALK ON US 2 / US 3 AND 900 LF ON MECHANIC STREET                                            Specific project from Statewide
   14836             STREET              INCLUDING INSTALLATION OF 11 DRIVEWAY TIP-DOWNS. WIDEN TO 5' AND OVERLAY 460 LF                                        program. Municipal managed.
      6238                               OF ASPHALT SIDEWALK NEAR SOLDIER'S PARK (TE Program) [06-24TE]
                                                      C      2010        L220 - STP - TRANSPORTATION ENHANCEMENT                              .184   TE 2006
                                                      R      2009        L220 - STP - TRANSPORTATION ENHANCEMENT                              .001
Bike / Pedestrian                                                                                                                  Total:     .185
LANCASTER, NH -      US 2                BRIDGE REHABILITAION AND PAINTING OVER CONNECTICUT RIVER - 111/129 (ROGER'S                                            Red List bridge #105.
GUILDHALL, VT                            RANGER'S BRIDGE #26)

         3524
                                                      C      2017        H1C0 - BRIDGE PROGRAM - 85% ON/OFF SYSTEM                           1.910   2015
Highway and Bridge                                                                                                                 Total:    1.910               1.800
LEBANON              I-89                1" OVERLAY FROM EXIT 17 TO JUST SOUTH OF EXIT 20 (5.5 MILES) INCLUDES SLIP LINING TWIN                                 Bridge priority #55 and #56.
                                         66" PIPES NORTH OF EXIT 17 AND BRIDGE JOINT REHAB [4R]; BRIDGES 158/114 & 159/114
         1900
                                                      C      2012        H010 - INTERSTATE MAINTENANCE                                       6.800   2010
                                                      C      2012        H010 - INTERSTATE MAINTENANCE                                       6.800   2010
                                                      P      2009        H010 - INTERSTATE MAINTENANCE                                        .150
                                                      P      2010        H010 - INTERSTATE MAINTENANCE                                        .200
                                                      P      2011        H010 - INTERSTATE MAINTENANCE                                        .050
Highway and Bridge                                                                                                                 Total:   14.000              12.480



                                         Phase:       C = Construction        P = Preliminary Engineering       R = Right of Way                                              Projects Page - 28
June 25, 2008
                                                                                                                                              Previous Previous
Project Name/#   Route/Road:         Location; Scope of Work                                                                         $(M)     Prog. Yr Total$
                                                                                                                                                                  Comments:
LEBANON          LEBANON MUNICIPAL   AIRPORT SAFETY ENHANCEMENT, MITIGATION                                                                              Mitigate for environmental
                 AIRPORT                                                                                                                                 impacts.
        6541
                                                         2009        AIP - AIRPORT IMPROVEMENT PROGRAM                                 .250
Aeronautics                                                                                                                 Total:     .250
LEBANON          LEBANON MUNICIPAL   AIRPORT MASTER PLAN UPDATE                                                                                          Needed to Plan for Future
                 AIRPORT                                                                                                                                 Projects
        6668
                                                         2017        AIP - AIRPORT IMPROVEMENT PROGRAM                                 .400
Aeronautics                                                                                                                 Total:     .400
LEBANON          LEBANON MUNICIPAL   CONSTRUCT AIRPORT SAFETY ENHANCEMENTS                                                                               Address Safety and
                 AIRPORT                                                                                                                                 environmental concerns.
        6542
                                                         2010        AIP - AIRPORT IMPROVEMENT PROGRAM                                6.300
Aeronautics                                                                                                                 Total:    6.300
LEBANON          LEBANON MUNICIPAL   DESIGN & CONSTRUCT TAXIWAY 'C'                                                                                      Priority as identified by project
                 AIRPORT                                                                                                                                 sponsor.
        2914
                                                         2014        AIP - AIRPORT IMPROVEMENT PROGRAM                                 .625   2010
Aeronautics                                                                                                                 Total:     .625
LEBANON          LEBANON MUNICIPAL   DESIGN & CONSTRUCT MID FIELD APRON                                                                                  Priority as established by project
                 AIRPORT                                                                                                                                 sponsor.
        2915
                                                         2014        AIP - AIRPORT IMPROVEMENT PROGRAM                                 .540   2010
Aeronautics                                                                                                                 Total:     .540
LEBANON          LEBANON MUNICIPAL   DESIGN AND CONSTRUCT APRON (17 AIRPARK ROAD)                                                                        Address Safety Concerns.
                 AIRPORT
        6545
                                                         2016        AIP - AIRPORT IMPROVEMENT PROGRAM                                 .250
Aeronautics                                                                                                                 Total:     .250
LEBANON          LEBANON MUNICIPAL   DESIGN & CONSTRUCT TERMINAL BUILDING IMPROVEMENTS                                                                   Address Capacity Concerns.
                 AIRPORT
        6546
                                                         2016        AIP - AIRPORT IMPROVEMENT PROGRAM                                1.000
Aeronautics                                                                                                                 Total:    1.000
LEBANON          LEBANON MUNICIPAL   EXPAND 'SRE' BUILDING WITH 'ARFF'                                                                                   Priority as established by airport
                 AIRPORT                                                                                                                                 sponsor.
        2913
                                                         2011        AIP - AIRPORT IMPROVEMENT PROGRAM                                 .840   2009
Aeronautics                                                                                                                 Total:     .840

                                     Phase:       C = Construction       P = Preliminary Engineering     R = Right of Way                                               Projects Page - 29
June 25, 2008
                                                                                                                                             Previous Previous
Project Name/#   Route/Road:         Location; Scope of Work                                                                        $(M)     Prog. Yr Total$
                                                                                                                                                                 Comments:
LEBANON          LEBANON MUNICIPAL   ENVIRONMENTAL ASSESSMENT                                                                                           Needed to Plan for Future
                 AIRPORT                                                                                                                                Projects
        6669
                                                        2018        AIP - AIRPORT IMPROVEMENT PROGRAM                                 .500
Aeronautics                                                                                                                Total:     .500
LEBANON          LEBANON MUNICIPAL   PURCHASE SNOW REMOVAL EQUIPMENT                                                                                    Equipment purchase;
                 AIRPORT                                                                                                                                95% Federal funds, 2.5% Sponsor
        3421                                                                                                                                            match

                                                        2012        AIP - AIRPORT IMPROVEMENT PROGRAM                                 .500   2009
                                                        2014        AIP - AIRPORT IMPROVEMENT PROGRAM                                 .500   Additional
                                                                                                                                             Funds
Aeronautics                                                                                                                Total:    1.000
LEBANON          LEBANON MUNICIPAL   PURCHASE AIRCRAFT RESCUE AND FIRE FIGHTING VEHICLE (INDEX B)                                                       Needed to meet Federal
                 AIRPORT                                                                                                                                requiorements.
        6543
                                                        2012        AIP - AIRPORT IMPROVEMENT PROGRAM                                 .500
Aeronautics                                                                                                                Total:     .500
LEBANON          LEBANON MUNICIPAL   RECONSTRUCT EMERGENCY ACCESS ROAD                                                                                  Priority as established by airport
                 AIRPORT                                                                                                                                sponsor.
        2668
                                                        2013        AIP - AIRPORT IMPROVEMENT PROGRAM                                 .200   2010
Aeronautics                                                                                                                Total:     .200
LEBANON          LEBANON MUNICIPAL   REHABILITATE OBSTRUCTION POLES & LIGHTS                                                                            Safety issue. Required by
                 AIRPORT                                                                                                                                Federal regulations.
        2912
                                                        2009        AIP - AIRPORT IMPROVEMENT PROGRAM                                 .600   2009
Aeronautics                                                                                                                Total:     .600
LEBANON          LEBANON MUNICIPAL   RECONSTRUCT TAXIWAY 'B' EAST                                                                                       Priority as established by airport
                 AIRPORT                                                                                                                                sponsor.
        2916
                                                        2013        AIP - AIRPORT IMPROVEMENT PROGRAM                                1.650   2010
Aeronautics                                                                                                                Total:    1.650
LEBANON          LEBANON MUNICIPAL   REHABILITATE RUNWAY 7-25                                                                                           Address Safety Concerns.
                 AIRPORT
        6544
                                                        2015        AIP - AIRPORT IMPROVEMENT PROGRAM                                1.200
Aeronautics                                                                                                                Total:    1.200




                                     Phase:      C = Construction       P = Preliminary Engineering     R = Right of Way                                              Projects Page - 30
June 25, 2008
                                                                                                                                                     Previous Previous
Project Name/#       Route/Road:          Location; Scope of Work                                                                           $(M)     Prog. Yr Total$
                                                                                                                                                                         Comments:
LEBANON              LEBANON MUNICIPAL    TREE REMOVAL - RUNWAY 36 APPROACH                                                                                     Safety issue. Required by
                     AIRPORT                                                                                                                                    Federal regulations.
        3037
                                                             2010        AIP - AIRPORT IMPROVEMENT PROGRAM                                    .100   2010
Aeronautics                                                                                                                        Total:     .100
LEBANON              US 4 (MECHANIC STREET) RECONSTRUCTION FROM HIGH STREET TO I-89 RAMPS INCLUDING REMOVAL OF CONCRETE                                         MUNICIPAL MANAGED, 20%
   10034 A                                  UNDERBASE, INSTALLATION OF SIDEWALKS, AND UPGRADE OF STORM DRAINAGE SYSTEM                                          City matched project.
      1890
                                                      C      2016        H200 - STP - AREAS LESS THAN 200,000                                2.120   2013
                                                      P      2009        H200 - STP - AREAS LESS THAN 200,000                                 .075
                                                      P      2010        H200 - STP - AREAS LESS THAN 200,000                                 .125
                                                      P      2011        H200 - STP - AREAS LESS THAN 200,000                                 .200
                                                      R      2011        H200 - STP - AREAS LESS THAN 200,000                                 .500
Highway and Bridge                                                                                                                 Total:    3.020               3.040
LEBANON              I-89                 RECONSTRUCTION OF THE INTERCHANGE & BRIDGES @ EXIT 20, INCLUDING APPROACHES ON
   11700                                  NH 12A
       222
                                                      C      2009        H010 - INTERSTATE MAINTENANCE                                      15.556   2008
                                                      P      2009        L010 - INTERSTATE MAINTENANCE                                        .025
Highway and Bridge                                                                                                                 Total:   15.581              12.040
LEBANON              NH 12A               BRIDGE REPLACEMENT OVER B&M RAILROAD - 062/117                                                                        Municipal Managed.
   13558 A
      5583
                                                      C      2011        Q120 - BRIDGE REPLACEMENT - ON/OFF SYSTEM                           3.300   2009
Highway and Bridge                                                                                                                 Total:    3.300               3.675
LEBANON              US 4                 BRIDGE REPLACEMENT OVER MASCOMA RIVER - 188/126 NEAR INTERSECTION OF US 4 AND                                         Red List bridge, priority #33.
   13951                                  NH 4A
      1875
                                                      C      2011        H100 - BRIDGE REPLACEMENT - ON SYSTEM                               8.000   2011
                                                      P      2009        H100 - BRIDGE REPLACEMENT - ON SYSTEM                                .113
                                                      P      2010        H100 - BRIDGE REPLACEMENT - ON SYSTEM                                .288
                                                      P      2011        H100 - BRIDGE REPLACEMENT - ON SYSTEM                                .050
                                                      R      2009        H100 - BRIDGE REPLACEMENT - ON SYSTEM                                .075
                                                      R      2010        H100 - BRIDGE REPLACEMENT - ON SYSTEM                                .050
Highway and Bridge                                                                                                                 Total:    8.575              10.000
LEBANON              US 4 & NH 10         BRIDGE REHABILITATION OVER MASCOMA RIVER - 120/115                                                                    Specific project from Statewide
   14552                                                                                                                                                        program, Municipal managed.
      6101
                                                      C      2012        SAB - STATE AID BRIDGE (State FY), 20% = Town                        .540   2011
Highway and Bridge                                                                                                                 Total:     .540               0.450

                                           Phase:     C = Construction        P = Preliminary Engineering       R = Right of Way                                               Projects Page - 31
June 25, 2008
                                                                                                                                              Previous Previous
Project Name/#       Route/Road:   Location; Scope of Work                                                                           $(M)     Prog. Yr Total$
                                                                                                                                                                  Comments:
LEBANON, NH -        I-89          REHABILITATION BRIDGES OVER CONNECTICUT RIVER                                                                         Bridge priorities #91 and #92.
HARTFORD, VT

         2771
                                               C      2017        H010 - INTERSTATE MAINTENANCE                                      10.000   2014
                                               P      2011        H010 - INTERSTATE MAINTENANCE                                        .111
                                               P      2012        H010 - INTERSTATE MAINTENANCE                                        .556
                                               P      2014        H010 - INTERSTATE MAINTENANCE                                        .556
                                               R      2014        H010 - INTERSTATE MAINTENANCE                                        .050
Highway and Bridge                                                                                                          Total:   11.272              20.800
LEBANON, NH -        US 4          REHABILITATE BRIDGE OVER CONNECTICUT RIVER - 058/127                                                                  Red List bridge, priority #6.
HARTFORD, VT
   14957
      2753
                                               C      2010        H100 - BRIDGE REPLACEMENT - ON SYSTEM                               4.250   2014
Highway and Bridge                                                                                                          Total:    4.250               5.250
LEE                  HIGH ST       BRIDGE REPLACEMENT OVER NORTH RIVER - 063/045                                                                         Specific project from Statewide
      14842                                                                                                                                              program, Municipal managed.
         6390
                                               C      2009        SAB - STATE AID BRIDGE (State FY), 20% = Town                        .925   New Project
                                               P      2009        SAB - STATE AID BRIDGE (State FY), 20% = Town                        .075
                                               R      2009        SAB - STATE AID BRIDGE (State FY), 20% = Town                        .010
Highway and Bridge                                                                                                          Total:    1.010
LINCOLN              I-93          COLD PLANE & OVERLAY WITH FABRIC & 2" PAVEMENT FROM US 3 BRIDGE TO WHITEHOUSE
                                   BRIDGE (6 MILES) [4R]
         2784
                                               C      2016        H010 - INTERSTATE MAINTENANCE                                       5.000   2013
                                               P      2010        H010 - INTERSTATE MAINTENANCE                                        .250
                                               P      2011        H010 - INTERSTATE MAINTENANCE                                        .100
                                               P      2012        H010 - INTERSTATE MAINTENANCE                                        .100
                                               P      2013        H010 - INTERSTATE MAINTENANCE                                        .050
Highway and Bridge                                                                                                          Total:    5.500               4.400




                                   Phase:      C = Construction        P = Preliminary Engineering       R = Right of Way                                               Projects Page - 32
June 25, 2008
                                                                                                                                                      Previous Previous
Project Name/#       Route/Road:          Location; Scope of Work                                                                            $(M)     Prog. Yr Total$
                                                                                                                                                                          Comments:
LINCOLN              I-93                 RECLAIM AND OVERLAY FROM EXIT 32 TO EXIT 33 (2 MILES) [4R]

         3254
                                                      C       2013        H010 - INTERSTATE MAINTENANCE                                       5.833   2011
                                                      C       2014        H010 - INTERSTATE MAINTENANCE                                       6.667   2011
                                                      P       2009        H010 - INTERSTATE MAINTENANCE                                        .100
                                                      P       2010        H010 - INTERSTATE MAINTENANCE                                        .100
                                                      P       2011        H010 - INTERSTATE MAINTENANCE                                        .050
Highway and Bridge                                                                                                                  Total:   12.750               9.250
LISBON               US 302               BRIDGE REHABILITATION OVER AMMONOOSUC RIVER - 094/114                                                                  Specific Project from Statewide
    14464                                                                                                                                                        Program changed to
       5555                                                                                                                                                      Betterment Program. Bridge
                                                                                                                                                                 priority #40.

                                                      C       2009        BET - BETTERMENT (State FY)                                         1.500   2009
Highway and Bridge                                                                                                                  Total:    1.500               1.610
LITCHFIELD           ALBUQUERQUE AVENUE   ALBUQUERQUE AVENUE TRAIL COMPLETION: CONSTRUCT 0.85 MILES AND 0.95 MILES OF                                            Specific project from Statewide
    14838                                 PEDESTRIAN BIKEWAY ADJACENT TO ALBUQUERQUE AVENUE (TE Program) [06-26TE]                                               program. Municipal managed.
       6239
                                                      C       2011        L220 - STP - TRANSPORTATION ENHANCEMENT                              .450   TE 2006
                                                      R       2009        L220 - STP - TRANSPORTATION ENHANCEMENT                              .010
Bike / Pedestrian                                                                                                                   Total:     .460
LITTLETON            REDINGTON STREET     BRIDGE REPLACEMENT OVER AMMONOOSUC RIVER - 232/050                                                                     Specific project from Statewide
    14307                                                                                                                                                        program. Municipal Managed.
       5773
                                                      C       2010        H110 - BRIDGE REPLACEMENT - OFF SYSTEM                               .900   2009
                                                      C       2010        SAB - STATE AID BRIDGE (State FY), 20% = Town                        .900   New Project
                                                      P       2009        H110 - BRIDGE REPLACEMENT - OFF SYSTEM                               .088
                                                      R       2009        H110 - BRIDGE REPLACEMENT - OFF SYSTEM                               .013
                                                      R       2009        SAB - STATE AID BRIDGE (State FY), 20% = Town                        .013
Highway and Bridge                                                                                                                  Total:    1.913               2.000
LITTLETON, NH -      I-93                 PAVEMENT REHABILITATION (9 MILES) & BRIDGE REHABILITATION (18 BRIDGES) FROM NORTH                                      Bridge priority #76 and #77.
WATERFORD, VT                             OF EXIT 41 TO VERMONT S/L - 105/135, 104/136 [4R]

         2785
                                                      C       2017        H010 - INTERSTATE MAINTENANCE                                      12.000   2015
                                                      C       2018        H010 - INTERSTATE MAINTENANCE                                      12.000   2016
                                                      P       2014        H010 - INTERSTATE MAINTENANCE                                        .500
Highway and Bridge                                                                                                                  Total:   24.500              33.500




                                          Phase:       C = Construction        P = Preliminary Engineering       R = Right of Way                                              Projects Page - 33
June 25, 2008
                                                                                                                                                          Previous Previous
Project Name/#            Route/Road:          Location; Scope of Work                                                                           $(M)     Prog. Yr Total$
                                                                                                                                                                              Comments:
LONDONDERRY - SALEM       TRANSIT              COMMUTER BUS PREVENTATIVE MAINTENANCE                                                                                 Boston Urbanized Area Funding

          6292
                                                                  2009        FT12 - FTA SECTION 5307 URBAN TRANSIT CAPITAL & PLAN.                .281
                                                                  2010        FT12 - FTA SECTION 5307 URBAN TRANSIT CAPITAL & PLAN.                .281
Transit                                                                                                                                 Total:     .563
LOUDON - BELMONT          NH 106               FROM NHIS MAIN ENTRANCE IN LOUDON NORTH APPROXIMATELY 6 MILES TO CONCORD                                              Specific project from Statewide
   14462                                       STREET IN BELMONT; 1 1/2" INLAY & 1 1/2" OVERLAY, GUARDRAIL & DRAINAGE                                                program.
      5847                                     IMPROVEMENTS [Betterment Resurfacing Program]
                                                           C      2009        BET - BETTERMENT (State FY)                                         3.750   New Project
Highway and Bridge                                                                                                                      Total:    3.750
LYME, NH - THETFORD, VT   EAST THETFORD ROAD   BRIDGE REHABILITATION OVER THE CONNECTICUT RIVER - 053/112                                                            Bridge priority #106.
   14460
      3269
                                                           C      2016        H120 - BRIDGE REPLACEMENT - ON/OFF SYSTEM                           3.350   2014
                                                           P      2012        H120 - BRIDGE REPLACEMENT - ON/OFF SYSTEM                            .100
                                                           P      2012        H120 - BRIDGE REPLACEMENT - ON/OFF SYSTEM                            .100
                                                           P      2013        H120 - BRIDGE REPLACEMENT - ON/OFF SYSTEM                            .100
                                                           P      2014        H120 - BRIDGE REPLACEMENT - ON/OFF SYSTEM                            .150
                                                           R      2012        H120 - BRIDGE REPLACEMENT - ON/OFF SYSTEM                            .010
                                                           R      2012        H120 - BRIDGE REPLACEMENT - ON/OFF SYSTEM                            .005
                                                           R      2013        H120 - BRIDGE REPLACEMENT - ON/OFF SYSTEM                            .015
                                                           R      2014        H120 - BRIDGE REPLACEMENT - ON/OFF SYSTEM                            .020
Highway and Bridge                                                                                                                      Total:    3.850               2.750
LYNDEBOROUGH              GULF ROAD            BRIDGE REPLACEMENT OVER STONY BROOK - 059/106                                                                         Specific project from Statewide
   14251                                                                                                                                                             program, Municipal managed.
      4038
                                                           C      2009        SAB - STATE AID BRIDGE (State FY), 20% = Town                        .500   2009
                                                           P      2009        SAB - STATE AID BRIDGE (State FY), 20% = Town                        .071
                                                           R      2009        SAB - STATE AID BRIDGE (State FY), 20% = Town                        .010
Highway and Bridge                                                                                                                      Total:     .581               0.615
MADISON - CONWAY          NH 16                CONWAY BYPASS SOUTHERN SEGMENT, EARTHWORK PROJECT (Parent = Conway 11339B)                                            RPC comment.
  11339 J
     1210
                                                           C      2015        H050 - NATIONAL HIGHWAY SYSTEM                                     10.000   2008
                                                           C      2016        H050 - NATIONAL HIGHWAY SYSTEM                                      8.753   2008, 2009
Highway and Bridge                                                                                                                      Total:   18.753              15.500




                                               Phase:      C = Construction        P = Preliminary Engineering       R = Right of Way                                              Projects Page - 34
June 25, 2008
                                                                                                                                                 Previous Previous
Project Name/#       Route/Road:       Location; Scope of Work                                                                          $(M)     Prog. Yr Total$
                                                                                                                                                                     Comments:
MADISON - CONWAY     CONWAY BYPASS     CONSTRUCT BRIDGES OVER PEQUAWKET BROOK, NH 113, PUDDING POND & WOODLAND                                              Scope reduction.
  11339 T                              ROAD (Parent = Conway 11339B)
     3659
                                                  C       2016        H050 - NATIONAL HIGHWAY SYSTEM                                    10.000   2010
Highway and Bridge                                                                                                             Total:   10.000              13.100
MADISON - CONWAY     CONWAY BYPASS     SOUTHERN SEGMENT FINAL CONSTRUCTION (Parent = Conway 11339B)                                                         RPC comment.
  11339 U
     3660
                                                  C       2017        H050 - NATIONAL HIGHWAY SYSTEM                                    12.500   2011
                                                  C       2018        H050 - NATIONAL HIGHWAY SYSTEM                                    13.003
Highway and Bridge                                                                                                             Total:   25.503              20.000
MANCHESTER           I-293 / FEE TPK   ROADWAY RECONSTRUCTION AND BRIDGE REHABILITATION BETWEEN NH 101 AND GRANITE                                          Removed from Federal Aid
                                       STREET: 144/066, 146/064, 146/065, 149/063, 153/061                                                                  program. Turnpike Priority
        3294                                                                                                                                                Capital Program, funding only
                                                                                                                                                            for bridge repair. Turnpike
                                                                                                                                                            Prioity Capital Program. Five
                                                                                                                                                            Red List bridge, priority #69,
                                                                                                                                                            #70, #71, #72, and #73.

                                                  C       2011        TPK - TURNPIKE EXPANSION (State FY)                                 .700
                                                  C       2012        TPK - TURNPIKE EXPANSION (State FY)                                4.424
                                                  C       2013        TPK - TURNPIKE EXPANSION (State FY)                               13.880   2013
                                                  C       2014        TPK - TURNPIKE EXPANSION (State FY)                               13.880
                                                  P       2009        TPK - TURNPIKE EXPANSION (State FY)                                1.060
                                                  P       2010        TPK - TURNPIKE EXPANSION (State FY)                                1.639
                                                  P       2011        TPK - TURNPIKE EXPANSION (State FY)                                1.688
                                                  R       2011        TPK - TURNPIKE EXPANSION (State FY)                                1.276
Highway and Bridge                                                                                                             Total:   38.547              11.200




                                       Phase:      C = Construction        P = Preliminary Engineering      R = Right of Way                                              Projects Page - 35
June 25, 2008
                                                                                                                                              Previous Previous
Project Name/#   Route/Road:         Location; Scope of Work                                                                         $(M)     Prog. Yr Total$
                                                                                                                                                                  Comments:
MANCHESTER       TRANSIT AUTHORITY   CAPITAL ASSISTANCE FOR PREVENTIVE MAINTENANCE OF MTA FLEET                                                          Cost reflects latest information.
                                                                                                                                                         20% match by city of
          2496                                                                                                                                           Manchester. FTA, maintains
                                                                                                                                                         transit service bus fleet using
                                                                                                                                                         local match.

                                                        2009        FT12 - FTA SECTION 5307 URBAN TRANSIT CAPITAL & PLAN.              .334
                                                        2010        FT12 - FTA SECTION 5307 URBAN TRANSIT CAPITAL & PLAN.              .351
                                                        2011        FT12 - FTA SECTION 5307 URBAN TRANSIT CAPITAL & PLAN.              .365
                                                        2012        FT12 - FTA SECTION 5307 URBAN TRANSIT CAPITAL & PLAN.              .380
                                                        2013        FT12 - FTA SECTION 5307 URBAN TRANSIT CAPITAL & PLAN.              .395
                                                        2014        FT12 - FTA SECTION 5307 URBAN TRANSIT CAPITAL & PLAN.              .411
                                                        2015        FT12 - FTA SECTION 5307 URBAN TRANSIT CAPITAL & PLAN.              .427
                                                        2016        FT12 - FTA SECTION 5307 URBAN TRANSIT CAPITAL & PLAN.              .444
                                                        2017        FT12 - FTA SECTION 5307 URBAN TRANSIT CAPITAL & PLAN.              .444
                                                        2018        FT12 - FTA SECTION 5307 URBAN TRANSIT CAPITAL & PLAN.              .444
Transit                                                                                                                     Total:    3.994
MANCHESTER       TRANSIT AUTHORITY   CAPITAL PURCHASES                                                                                                   Cost reflects latest information.
                                                                                                                                                         80% Federal funds, 20%
          2690                                                                                                                                           Manchester City match.

                                                        2011        FT12 - FTA SECTION 5307 URBAN TRANSIT CAPITAL & PLAN.              .550
                                                        2012        FT12 - FTA SECTION 5307 URBAN TRANSIT CAPITAL & PLAN.              .575
                                                        2013        FT12 - FTA SECTION 5307 URBAN TRANSIT CAPITAL & PLAN.              .575
                                                        2014        FT12 - FTA SECTION 5307 URBAN TRANSIT CAPITAL & PLAN.              .600
                                                        2015        FT12 - FTA SECTION 5307 URBAN TRANSIT CAPITAL & PLAN.              .600
                                                        2016        FT12 - FTA SECTION 5307 URBAN TRANSIT CAPITAL & PLAN.              .600
                                                        2017        FT12 - FTA SECTION 5307 URBAN TRANSIT CAPITAL & PLAN.              .600
                                                        2018        FT12 - FTA SECTION 5307 URBAN TRANSIT CAPITAL & PLAN.              .600
Transit                                                                                                                     Total:    4.700




                                     Phase:      C = Construction        P = Preliminary Engineering     R = Right of Way                                              Projects Page - 36
June 25, 2008
                                                                                                                                              Previous Previous
Project Name/#   Route/Road:         Location; Scope of Work                                                                         $(M)     Prog. Yr Total$
                                                                                                                                                                  Comments:
MANCHESTER       TRANSIT AUTHORITY   OPERATING ASSISTANCE FOR FIXED ROUTE SERVICE                                                                        Cost reflects latest information.
                                                                                                                                                         50% Match by City of
          602                                                                                                                                            Manchester. FTA, maintains
                                                                                                                                                         transit service utilizing local
                                                                                                                                                         match .

                                                        2009        FT12 - FTA SECTION 5307 URBAN TRANSIT CAPITAL & PLAN.             2.600
                                                        2010        FT12 - FTA SECTION 5307 URBAN TRANSIT CAPITAL & PLAN.             2.700
                                                        2011        FT12 - FTA SECTION 5307 URBAN TRANSIT CAPITAL & PLAN.             2.328
                                                        2012        FT12 - FTA SECTION 5307 URBAN TRANSIT CAPITAL & PLAN.             2.421
                                                        2013        FT12 - FTA SECTION 5307 URBAN TRANSIT CAPITAL & PLAN.             2.518
                                                        2014        FT12 - FTA SECTION 5307 URBAN TRANSIT CAPITAL & PLAN.             2.619
                                                        2015        FT12 - FTA SECTION 5307 URBAN TRANSIT CAPITAL & PLAN.             2.724
                                                        2016        FT12 - FTA SECTION 5307 URBAN TRANSIT CAPITAL & PLAN.             2.833
                                                        2017        FT12 - FTA SECTION 5307 URBAN TRANSIT CAPITAL & PLAN.             2.870
                                                        2018        FT12 - FTA SECTION 5307 URBAN TRANSIT CAPITAL & PLAN.             2.870
Transit                                                                                                                     Total:   26.483
MANCHESTER       TRANSIT AUTHORITY   OPERATING ASSISTANCE FOR ADA PARATRANSIT SERVICE                                                                    Cost reflects latest information.
                                                                                                                                                         20% Match by City of
          5916                                                                                                                                           Manchester. FTA, maintains ADA
                                                                                                                                                         paratransit service using local
                                                                                                                                                         match.

                                                        2009        FT12 - FTA SECTION 5307 URBAN TRANSIT CAPITAL & PLAN.              .245
                                                        2010        FT12 - FTA SECTION 5307 URBAN TRANSIT CAPITAL & PLAN.              .255
                                                        2011        FT12 - FTA SECTION 5307 URBAN TRANSIT CAPITAL & PLAN.              .328
                                                        2012        FT12 - FTA SECTION 5307 URBAN TRANSIT CAPITAL & PLAN.              .341
                                                        2013        FT12 - FTA SECTION 5307 URBAN TRANSIT CAPITAL & PLAN.              .354
                                                        2014        FT12 - FTA SECTION 5307 URBAN TRANSIT CAPITAL & PLAN.              .451
                                                        2015        FT12 - FTA SECTION 5307 URBAN TRANSIT CAPITAL & PLAN.              .469
                                                        2016        FT12 - FTA SECTION 5307 URBAN TRANSIT CAPITAL & PLAN.              .488
Transit                                                                                                                     Total:    2.930
MANCHESTER       TRANSIT AUTHORITY   REPLACEMENT BUSES                                                                                                   Cost reflects latest information.
                                                                                                                                                         20% match by city of
          3062                                                                                                                                           Manchester. FTA, maintains
                                                                                                                                                         fleet replacement of 12-year
                                                                                                                                                         heavy-duty transit buses using
                                                                                                                                                         local match.

                                                        2010        FT12 - FTA SECTION 5307 URBAN TRANSIT CAPITAL & PLAN.              .341
                                                        2013        FT12 - FTA SECTION 5307 URBAN TRANSIT CAPITAL & PLAN.              .422
Transit                                                                                                                     Total:     .763


                                     Phase:      C = Construction        P = Preliminary Engineering     R = Right of Way                                              Projects Page - 37
June 25, 2008
                                                                                                                                              Previous Previous
Project Name/#   Route/Road:         Location; Scope of Work                                                                         $(M)     Prog. Yr Total$
                                                                                                                                                                  Comments:
MANCHESTER       TRANSIT AUTHORITY   REPLACEMENT OF ADA PARATRANSIT VANS                                                                                 Cost reflects latest information.
                                                                                                                                                         20% match by city of
          5917                                                                                                                                           Manchester. FTA, maintains
                                                                                                                                                         fleet replacement of 5-year
                                                                                                                                                         Paratransit vans using local
                                                                                                                                                         match.

                                                        2010        FT12 - FTA SECTION 5307 URBAN TRANSIT CAPITAL & PLAN.              .128
                                                        2011        FT12 - FTA SECTION 5307 URBAN TRANSIT CAPITAL & PLAN.              .190
                                                        2012        FT12 - FTA SECTION 5307 URBAN TRANSIT CAPITAL & PLAN.              .197
                                                        2014        FT12 - FTA SECTION 5307 URBAN TRANSIT CAPITAL & PLAN.              .107
                                                        2015        FT12 - FTA SECTION 5307 URBAN TRANSIT CAPITAL & PLAN.              .222
                                                        2016        FT12 - FTA SECTION 5307 URBAN TRANSIT CAPITAL & PLAN.              .231
Transit                                                                                                                     Total:    1.075
MANCHESTER       TRANSIT AUTHORITY   REPLACEMENT OF TRANSIT SERVICE VEHICLES                                                                             Cost reflects latest information.
                                                                                                                                                         20% match by city of
          5919                                                                                                                                           Manchester

                                                        2011        FT12 - FTA SECTION 5307 URBAN TRANSIT CAPITAL & PLAN.              .033
                                                        2013        FT12 - FTA SECTION 5307 URBAN TRANSIT CAPITAL & PLAN.              .137
Transit                                                                                                                     Total:     .170
MANCHESTER       TRANSIT AUTHORITY   TRANSIT FACILITY IMPROVEMENT / SHOP EQUIPMENT REPLACEMENT                                                           20% match by city of
                                                                                                                                                         Manchester.
          5920
                                                        2010        FT12 - FTA SECTION 5307 URBAN TRANSIT CAPITAL & PLAN.              .059
                                                        2012        FT12 - FTA SECTION 5307 URBAN TRANSIT CAPITAL & PLAN.              .101
                                                        2014        FT12 - FTA SECTION 5307 URBAN TRANSIT CAPITAL & PLAN.              .109
                                                        2016        FT12 - FTA SECTION 5307 URBAN TRANSIT CAPITAL & PLAN.              .118
Transit                                                                                                                     Total:     .388
MANCHESTER       TRANSIT AUTHORITY   TRANSIT OFFICE EQUIPMENT / MIS HARDWARE % SOFTWARE                                                                  20% match by city of
                                                                                                                                                         Manchester. Cost reflects
          5921                                                                                                                                           current information.

                                                        2009        FT12 - FTA SECTION 5307 URBAN TRANSIT CAPITAL & PLAN.              .056
                                                        2011        FT12 - FTA SECTION 5307 URBAN TRANSIT CAPITAL & PLAN.              .097
                                                        2013        FT12 - FTA SECTION 5307 URBAN TRANSIT CAPITAL & PLAN.              .105
                                                        2015        FT12 - FTA SECTION 5307 URBAN TRANSIT CAPITAL & PLAN.              .114
Transit                                                                                                                     Total:     .372




                                     Phase:      C = Construction        P = Preliminary Engineering     R = Right of Way                                              Projects Page - 38
June 25, 2008
                                                                                                                                                   Previous Previous
Project Name/#       Route/Road:        Location; Scope of Work                                                                           $(M)     Prog. Yr Total$
                                                                                                                                                                       Comments:
MANCHESTER                              CONSTRUCT 600 SPACE PARK'N RIDE STRUCTURE (CMAQ Program) [00-13CM]                                                    Specific project from Statewide
  13512                                                                                                                                                       program.
     2968
                                                    C      2016        L400 - CONGESTION MITIGATION & AIR QUALITY IMPROVEMENT              8.500   2016
                                                    P      2012        Q400 - CONGESTION MITIGATION & AIR QUALITY IMPROVEMENT               .009
                                                    P      2013        L400 - CONGESTION MITIGATION & AIR QUALITY IMPROVEMENT               .490
                                                    R      2013        Q400 - CONGESTION MITIGATION & AIR QUALITY IMPROVEMENT               .010
                                                    R      2014        L400 - CONGESTION MITIGATION & AIR QUALITY IMPROVEMENT               .140
                                                    R      2014        NON - OTHER NON PARTICIPATING                                        .250
Highway and Bridge                                                                                                               Total:    9.399               9.380
MANCHESTER           GRANITE STREET     RECONSTRUCT CROSSINGS, ROADWAY APPROACHES AND SIGNALS WITH ASSOCIATED WORK                                            Breakout project from Granite
  14025 B                               OF SPRING ST (845-631L0, KIDDER ST (845-630E), COMMERCIAL ST (854-629K) AND B&M                                       Street bridge project (City) and
     5595                               RAILROAD [Parent = Manch 14025 & Statewide Railroad-RCS]                                                              Statewide program.

                                                    C      2009        H210 - STP - SAFETY                                                  .568   New Project
                                                    C      2009        H260 - STP - RAIL-HWY PROTECTIVE DEVICES                             .050
                                                    C      2009        H270 - STP - RAIL-HWY CROSS ELIM OF HAZARDS                          .050
                                                    C      2009        H280 - STP - HAZARD ELIMINATION PROGRAM                              .568
Rail                                                                                                                             Total:    1.235
MANCHESTER           CENTRAL TPK        REHABILITATE TURNPIKE BRIDGE OVER BLACK BROOK BETWEEN EXITS 6 & 7 - 099/066 & 099/067                                 Design initiated. Cost
  14048                                                                                                                                                       increased to include PE and
     3553                                                                                                                                                     ROW. Tpk Priority Capital
                                                                                                                                                              Program.

                                                    C      2010        TPK - TURNPIKE EXPANSION (State FY)                                 3.500   2007
Highway and Bridge                                                                                                               Total:    3.500               1.236
MANCHESTER           ISLAND POND ROAD   BRIDGE REPLACEMENT OVER I-93 - 166/124 & 166/125 AND SOUND WALL                                                       Advance due to condition of
  14170                                                                                                                                                       bridge. Red List bridges,
     4255                                                                                                                                                     priorities #42 and #43.

                                                    C      2009        H120 - BRIDGE REPLACEMENT - ON/OFF SYSTEM                           6.700   2011
Highway and Bridge                                                                                                               Total:    6.700               2.500
MANCHESTER           ISLAND POND ROAD   BRIDGE REPLACEMENT OVER HOGG BROOK - 169/137                                                                          Specific project from Statewide
  14306                                                                                                                                                       program, Municipal managed.
     5770
                                                    C      2009        SAB - STATE AID BRIDGE (State FY), 20% = Town                        .454   2008
                                                    C      2009        SAB - STATE AID BRIDGE (State FY), 20% = Town                        .025   New Project
Highway and Bridge                                                                                                               Total:     .479               0.425




                                        Phase:      C = Construction        P = Preliminary Engineering       R = Right of Way                                              Projects Page - 39
June 25, 2008
                                                                                                                                                     Previous Previous
Project Name/#          Route/Road:          Location; Scope of Work                                                                        $(M)     Prog. Yr Total$
                                                                                                                                                                         Comments:
MANCHESTER              ROCKINGHAM           IMPROVEMENTS TO DEVELOP FORMER MANCHESTER & PORTSMOUTH BRANCH RAILROAD                                             Specific project from Statewide
  14411                 RECREATIONAL TRAIL   FOR BICYCLES & PEDESTRIAN ACCESS FROM TARRYTOWN RD SOUTH TO LAKE MASSABESIC.                                       program, Municipal managed.
     5649                                    ALSO INCLUDES CONSTRUCTION OF A PEDESTRIAN CULVERT AT PEABODY AVE (TE Program)
                                             [04-32TE]
                                                         C     2009   L220 - STP - TRANSPORTATION ENHANCEMENT               .360                     2009
Bike / Pedestrian                                                                                                                  Total:     .360               0.400
MANCHESTER              I-93                 PAVEMENT REHABILITATION FROM EXIT 7 NORTH 4 MILES TO THE MERRIMACK RIVER BRIDGE;                                   Specific project from Statewide
  14605                                      OVERLAY ROADWAY WITH A "NOVA CHIP" PAVEMENT [Interstate Maintenance & Interstate                                   program.
     6197                                    Pavement Preservation Program]
                                                         C      2009        L010 - INTERSTATE MAINTENANCE                                    2.000
Highway and Bridge                                                                                                                 Total:    2.000
MANCHESTER                                   INCREASED TRANSIT SERVICE (CMAQ Program) [06-12CM]                                                                 Specific project from Statewide
  14812                                                                                                                                                         program.
     6224
                                                         C      2009        L400 - CONGESTION MITIGATION & AIR QUALITY IMPROVEMENT           1.445   CMAQ 2006
Transit                                                                                                                            Total:    1.445
MANCHESTER - HOOKSETT   I-93                 MERRIMACK RIVER BRIDGES IN MANCHESTER NORTH 1 MI TO I-293 IN HOOKSETT; 1.5" TW                                     Red List Bridge, priority #15 and
  14604                                      INLAY, BR DECK REPLACEMENTS AT MERRIMACK RIVER BRIDGES & NH 3A BRIDGES [Interstate                                 #16.
     6196                                    Maintenance & Interstate Pavement Preservation Program]
                                                         C      2010        L010 - INTERSTATE MAINTENANCE                                    5.625   2010
                                                         P      2009        L010 - INTERSTATE MAINTENANCE                                     .050
Highway and Bridge                                                                                                                 Total:    5.675
MANCHESTER -            MANCHESTER - BOSTON EAST RAMP RECONSTRUCTION                                                                                            Priority as established by
LONDONDERRY             REGIONAL AIRPORT                                                                                                                        Manchester Airport.

          4144
                                                                2009        AIP - AIRPORT IMPROVEMENT PROGRAM                                3.867   2008
                                                                2010        AIP - AIRPORT IMPROVEMENT PROGRAM                                1.333   2008
Aeronautics                                                                                                                        Total:    5.200
MANCHESTER -            MANCHESTER - BOSTON IMPROVEMENT RUNWAY 6-24 INSTRUMENT APPROACHES                                                                       Address Safety Concerns.
LONDONDERRY             REGIONAL AIRPORT

          6552
                                                                2010        AIP - AIRPORT IMPROVEMENT PROGRAM                                3.133
Aeronautics                                                                                                                        Total:    3.133




                                             Phase:      C = Construction       P = Preliminary Engineering     R = Right of Way                                              Projects Page - 40
June 25, 2008
                                                                                                                                              Previous Previous
Project Name/#   Route/Road:          Location; Scope of Work                                                                        $(M)     Prog. Yr Total$
                                                                                                                                                                  Comments:
MANCHESTER -     MANCHESTER - BOSTON NORTH TERMINAL APRON / TAXIWAY EXTENSION                                                                            Priority as established by
LONDONDERRY      REGIONAL AIRPORT                                                                                                                        Manchester Airport.

        4247
                                                         2010        AIP - AIRPORT IMPROVEMENT PROGRAM                                1.527   2009
                                                         2011        AIP - AIRPORT IMPROVEMENT PROGRAM                               17.593   Additional
                                                                                                                                              Funds
                                                         2012        AIP - AIRPORT IMPROVEMENT PROGRAM                               17.593   Additional
                                                                                                                                              Funds
Aeronautics                                                                                                                 Total:   36.713
MANCHESTER -     MANCHESTER - BOSTON SOUNDPROOFING PROGRAM                                                                                               Priority as established by
LONDONDERRY      REGIONAL AIRPORT                                                                                                                        Manchester Airport.

        3431
                                                         2009        AIP - AIRPORT IMPROVEMENT PROGRAM                                3.125
Aeronautics                                                                                                                 Total:    3.125
MANCHESTER -     MANCHESTER - BOSTON VARIOUS PRIORITIZED CAPITAL IMPROVEMENT PROJECTS                                                                    Address Safety Concerns.
LONDONDERRY      REGIONAL AIRPORT

        6553
                                                         2013        AIP - AIRPORT IMPROVEMENT PROGRAM                                4.000
                                                         2014        AIP - AIRPORT IMPROVEMENT PROGRAM                                4.000
                                                         2015        AIP - AIRPORT IMPROVEMENT PROGRAM                                4.000
                                                         2016        AIP - AIRPORT IMPROVEMENT PROGRAM                                4.000
                                                         2017        AIP - AIRPORT IMPROVEMENT PROGRAM                                4.000
                                                         2018        AIP - AIRPORT IMPROVEMENT PROGRAM                                4.000
Aeronautics                                                                                                                 Total:   24.000




                                      Phase:      C = Construction       P = Preliminary Engineering     R = Right of Way                                              Projects Page - 41
June 25, 2008
                                                                                                                                                   Previous Previous
Project Name/#       Route/Road:       Location; Scope of Work                                                                            $(M)     Prog. Yr Total$
                                                                                                                                                                       Comments:
MEREDITH             NH 25             RECONSTRUCTION FROM CENTER HARBOR TOWN LINE SOUTH 3.2 MILES TO PLEASANT STREET                                         Scope reduction to address
  10430                                APPROXIMATELY [Section 1702 - Designated Project; Demo Id NH041] [Sister Demo Id NH060                                 pavment and priority
       94                              & NH071]                                                                                                               intersection problems only.

                                                    C      2011        HY10 - HIGH PRIORITY PROJ SEC 1702                                   .200   2010
                                                    C      2011        HY20 - HIGH PRIORITY PROJ SEC 1702                                   .400   2010
                                                    C      2011        L250 - STP - RURAL AREAS < 5,000k                                   2.202   2010
                                                    C      2011        LY10 - HIGH PRIORITY PROJ SEC 1702                                   .198   2010
                                                    C      2011        LY20 - HIGH PRIORITY PROJ SEC 1702                                   .396   2010
                                                    C      2011        LY20 - HIGH PRIORITY PROJ SEC 1702                                  1.604   2010
                                                    P      2009        L250 - STP - RURAL AREAS < 5,000k                                    .350
                                                    R      2009        L250 - STP - RURAL AREAS < 5,000k                                    .125
                                                    R      2009        LY60 - HIGH PRIORITY PROJ SEC 112                                    .110
                                                    R      2010        L250 - STP - RURAL AREAS < 5,000k                                    .625
                                                    R      2010        LY60 - HIGH PRIORITY PROJ SEC 112                                    .065
Highway and Bridge                                                                                                               Total:    6.275              14.400
MERRIMACK            CENTRAL TPK       BRIDGE REHABILITATION (Merrill's Marauders Bridge) & SAFETY WORK ON FEE TPK NB & SB                                    Turnpike Priority Capital
  12105                                OVER SOUHEGAN RIVER - 111/115                                                                                          Program, Red List bridge, priority
      337                                                                                                                                                     #18.

                                                    C      2009        TPK - TURNPIKE EXPANSION (State FY)                                10.700   2008
Highway and Bridge                                                                                                               Total:   10.700               7.501
MERRIMACK            US 3              PARK'N'RIDE, 250 SPACES - INTERMODAL FACILITY NEAR RR FACILITY, FEE Tpk, AND US 3                                      Specific project from statewide
  12259                                (CMAQ Program) [94-40CM]                                                                                               program.
      425
                                                    C      2017        L400 - CONGESTION MITIGATION & AIR QUALITY IMPROVEMENT              1.400   2014
Highway and Bridge                                                                                                               Total:    1.400               1.400
MERRIMACK            MCGAW BRIDGE RD   BRIDGE REPLACEMENT OVER BABOOSIC BROOK - 116/137                                                                       Specific project from Statewide
  13923                                                                                                                                                       program. Municipal Managed.
     3804
                                                    C      2012        SAB - STATE AID BRIDGE (State FY), 20% = Town                        .395   2007
                                                    P      2012        SAB - STATE AID BRIDGE (State FY), 20% = Town                        .060
                                                    R      2012        SAB - STATE AID BRIDGE (State FY), 20% = Town                        .005
Highway and Bridge                                                                                                               Total:     .460               0.390
MERRIMACK            DW HIGHWAY        CONSTRUCT SIDEWALKS ALONG DW HIGHWAY IN TOWN CENTER (WEST SIDE) TO FILL SEVERAL                                        Specific project from Statewide
  14413                                GAPS IN EXISTING SIDEWALK SYS. PROVIDE CROSSWALKS TO IMPROVEMENTS PLANNED FOR                                          program, Municipal managed.
     5651                              THE EAST SIDE (TE Program) [04-36TE]
                                                    C      2009        L220 - STP - TRANSPORTATION ENHANCEMENT                              .306   2009
Bike / Pedestrian                                                                                                                Total:     .306               0.367



                                       Phase:       C = Construction        P = Preliminary Engineering       R = Right of Way                                              Projects Page - 42
June 25, 2008
                                                                                                                                                    Previous Previous
Project Name/#       Route/Road:         Location; Scope of Work                                                                           $(M)     Prog. Yr Total$
                                                                                                                                                                        Comments:
MERRIMACK - NASHUA   MANCHESTER STREET   BRIDGE REPLACEMENT OVER PENNICHUCK RESERVOIR - 120/026                                                                Specific project from Statewide
  13964                                                                                                                                                        program. Municipal Managed.
     3863
                                                    C       2010        SAB - STATE AID BRIDGE (State FY), 20% = Town                       1.580   2007
                                                    P       2010        SAB - STATE AID BRIDGE (State FY), 20% = Town                        .140
                                                    R       2010        SAB - STATE AID BRIDGE (State FY), 20% = Town                        .005
Highway and Bridge                                                                                                                Total:    1.725               0.765
MILAN                BERLIN MUNICIPAL    AIRCRAFT APRON EXPANSION
                     AIRPORT
        3432
                                                            2009        AIP - AIRPORT IMPROVEMENT PROGRAM                                   1.049   2008
Aeronautics                                                                                                                       Total:    1.049
MILAN                BERLIN MUNICIPAL    CONSTRUCT ONLY - PARALLEL TAXIWAY                                                                                     Safety improvement.
                     AIRPORT
        3434
                                                            2013        AIP - AIRPORT IMPROVEMENT PROGRAM                                   1.642   2010
Aeronautics                                                                                                                       Total:    1.642
MILAN                BERLIN MUNICIPAL    DESIGN ONLY - PARALLEL TAXIWAY                                                                                        Address Safety Concerns.
                     AIRPORT
        6554
                                                            2012        AIP - AIRPORT IMPROVEMENT PROGRAM                                    .158
Aeronautics                                                                                                                       Total:     .158
MILAN                BERLIN MUNICIPAL    DESIGN AND INSTALL PERIMETER FENCING                                                                                  Address Safety Concerns.
                     AIRPORT
        6555
                                                            2014        AIP - AIRPORT IMPROVEMENT PROGRAM                                    .150
Aeronautics                                                                                                                       Total:     .150
MILAN                BERLIN MUNICIPAL    PURCHASE SNOW REMOVAL EQUIPMENT                                                                                       Equipment purchase;         95%
                     AIRPORT                                                                                                                                   Federal funds, 2.5% Sponsor
        3435                                                                                                                                                   match.

                                                            2011        AIP - AIRPORT IMPROVEMENT PROGRAM                                    .200   2012
Aeronautics                                                                                                                       Total:     .200
MILAN                BERLIN MUNICIPAL    SNOW REMOVAL EQUIPMENT BUILDING EXPANSION                                                                             Project investment in
                     AIRPORT                                                                                                                                   equipment.
        3438
                                                            2010        AIP - AIRPORT IMPROVEMENT PROGRAM                                    .200   2009
Aeronautics                                                                                                                       Total:     .200




                                         Phase:      C = Construction        P = Preliminary Engineering       R = Right of Way                                              Projects Page - 43
June 25, 2008
                                                                                                                                                      Previous Previous
Project Name/#       Route/Road:        Location; Scope of Work                                                                              $(M)     Prog. Yr Total$
                                                                                                                                                                          Comments:
MILAN                BERLIN MUNICIPAL   VARIOUS PRIORITIZED CAPITAL IMPROVEMENT PROJECTS                                                                         TO BE DETERMINED; 95% Federal
                     AIRPORT                                                                                                                                     funds, 2.5% Sponsor match. FAA
        3439                                                                                                                                                     five year Capital Improvement
                                                                                                                                                                 Program for projects yet to be
                                                                                                                                                                 identified by FAA and airport
                                                                                                                                                                 sponsors.

                                                           2015        AIP - AIRPORT IMPROVEMENT PROGRAM                                       .158
                                                           2016        AIP - AIRPORT IMPROVEMENT PROGRAM                                       .158
                                                           2017        AIP - AIRPORT IMPROVEMENT PROGRAM                                       .300
                                                           2018        AIP - AIRPORT IMPROVEMENT PROGRAM                                       .300
Aeronautics                                                                                                                         Total:     .916
MILFORD              UNION STREET       RECONSTRUCT CROSSING & SIGNALS @ B&M RR USDOT- AAR #844-288R [Statewide Railroad-                                        Specific project from Statewide
                                        RCS]                                                                                                                     program.
        3907
                                                    C      2009        H260 - STP - RAIL-HWY PROTECTIVE DEVICES                                .085   2007
                                                    C      2009        H270 - STP - RAIL-HWY CROSS ELIM OF HAZARDS                             .106   2007
Rail                                                                                                                                Total:     .191               0.180
MILFORD              NH 101A & NH 13    IMPROVEMENTS IN THE AREA KNOWN AS THE "OVAL" TO IMPROVE TRAFFIC FLOW BASED ON                                            Earmarked funding.
   14492                                RESULTS OF ONGOING TRAFFIC STUDIES WITHIN THE TOWN [Section 1702 - Designated
      3278                              Project; Demo Id NH038] [Sister Demo Id NH058]
                                                    C      2011        H240 - STP - STATE FLEXIBLE IN ANY AREA                                1.911
                                                    C      2011        HY20 - HIGH PRIORITY PROJ SEC 1702                                      .089   2011
                                                    C      2011        LY20 - HIGH PRIORITY PROJ SEC 1702                                      .495   2011
                                                    C      2011        LY20 - HIGH PRIORITY PROJ SEC 1702                                     1.505   2011
Highway and Bridge                                                                                                                  Total:    4.000               3.500
MILFORD              NH 101A & NH 13    IMPROVEMENTS IN THE AREA KNOWN AS THE "OVAL" TO IMPROVE TRAFFIC FLOW BASED ON                                            Earmarked funding.
   14492 A                              RESULTS OF ONGOING TRAFFIC STUDIES WITHIN THE TOWN [Section 1702 - Designated
      6164                              Project; Demo Id NH058] [Sister Project - Demo Id NH038]
                                                    C      2011        HY20 - HIGH PRIORITY PROJ SEC 1702                                      .102   Additional
                                                                                                                                                      Funds
                                                    C      2011        LY20 - HIGH PRIORITY PROJ SEC 1702                                      .198   Additional
                                                                                                                                                      Funds
                                                    C      2011        LY20 - HIGH PRIORITY PROJ SEC 1702                                      .500   Additional
                                                                                                                                                      Funds
                                                    C      2011        LY20 - HIGH PRIORITY PROJ SEC 1702                                      .057   Additional
                                                                                                                                                      Funds
Highway and Bridge                                                                                                                  Total:     .857




                                        Phase:      C = Construction        P = Preliminary Engineering          R = Right of Way                                              Projects Page - 44
June 25, 2008
                                                                                                                                             Previous Previous
Project Name/#       Route/Road:    Location; Scope of Work                                                                         $(M)     Prog. Yr Total$
                                                                                                                                                                 Comments:
MILFORD              SOUTH STREET   SOUTH STREET IMPROVEMENT PROJECT: CONSTRUCT THE PHASE 2 PORTION OF THE                                              Specific project from Statewide
   14837                            DOWNTOWN REVITALIZATION PLAN TO IMPROVE OVERALL SAFETY, PHYSICAL / ADA                                              program. Municipal managed.
      6240                          ACCESSIBILITY, FUNCTIONALITY, DESIGN AND GENERAL AESTHETIC OF THE INTERSECTION (TE
                                    Program) [06-28TE]
                                                 C     2010    L220 - STP - TRANSPORTATION ENHANCEMENT                 .550                  TE 2006
                                                R       2009        L220 - STP - TRANSPORTATION ENHANCEMENT                           .001
Bike / Pedestrian                                                                                                          Total:     .551
MILFORD TO NASHUA    NH 101A        ROADWAY IMPROVEMENTS FROM NH 101 TO FEE TPK (7.5 MILES); CONSTRUCTION PROJECTS                                      Scope reduction, intersection
   10136                            TO BE DETERMINED BY CORRIDOR STUDY                                                                                  improvements only.
       730
                                                C       2011        H050 - NATIONAL HIGHWAY SYSTEM                                   3.000   2010
                                                C       2013        H050 - NATIONAL HIGHWAY SYSTEM                                   3.000   2012
                                                P       2009        H050 - NATIONAL HIGHWAY SYSTEM                                    .125
                                                P       2011        H050 - NATIONAL HIGHWAY SYSTEM                                    .250
                                                R       2009        H050 - NATIONAL HIGHWAY SYSTEM                                    .125
                                                R       2011        H050 - NATIONAL HIGHWAY SYSTEM                                    .125
Highway and Bridge                                                                                                         Total:    6.625              13.844
NASHUA               BOIRE FIELD    AIRPORT MASTER PLAN UPDATE                                                                                          Needed to Plan for Future
                                                                                                                                                        Projects
         6671
                                                        2018        AIP - AIRPORT IMPROVEMENT PROGRAM                                 .300
Aeronautics                                                                                                                Total:     .300
NASHUA               BOIRE FIELD    CONSTRUCT ONLY - PARALLEL TAXIWAY RELOCATION                                                                        Address Safety Concerns.

         6560
                                                        2014        AIP - AIRPORT IMPROVEMENT PROGRAM                                5.920
Aeronautics                                                                                                                Total:    5.920
NASHUA               BOIRE FIELD    CONSTRUCT ONLY - REPLACE CONTROL TOWER                                                                              Address Safety Concerns

         6670
                                                        2017        AIP - AIRPORT IMPROVEMENT PROGRAM                                5.000
Aeronautics                                                                                                                Total:    5.000
NASHUA               BOIRE FIELD    DESIGN ONLY - PARALLEL TAXIWAY RELOCATION                                                                           Address Safety Concerns.

         6559
                                                        2013        AIP - AIRPORT IMPROVEMENT PROGRAM                                 .600
Aeronautics                                                                                                                Total:     .600




                                    Phase:       C = Construction       P = Preliminary Engineering     R = Right of Way                                              Projects Page - 45
June 25, 2008
                                                                                                                                                     Previous Previous
Project Name/#       Route/Road:          Location; Scope of Work                                                                           $(M)     Prog. Yr Total$
                                                                                                                                                                         Comments:
NASHUA               BOIRE FIELD          DESIGN ONLY - REPLACE CONTROL TOWER                                                                                   Address Safety Concerns.

        6561
                                                             2016        AIP - AIRPORT IMPROVEMENT PROGRAM                                    .350
Aeronautics                                                                                                                        Total:     .350
NASHUA               BOIRE FIELD          OBSTRUCTION REMOVAL                                                                                                   Address Safety Concerns.

        6558
                                                             2009        AIP - AIRPORT IMPROVEMENT PROGRAM                                    .640
Aeronautics                                                                                                                        Total:     .640
NASHUA               BOIRE FIELD          RUNWAY RECONSTRUCTION & RELOCATION                                                                                    Priortity as identified by sponsor.

        3442
                                                             2009        AIP - AIRPORT IMPROVEMENT PROGRAM                                    .970   2009
                                                             2010        AIP - AIRPORT IMPROVEMENT PROGRAM                                   5.079
                                                             2011        AIP - AIRPORT IMPROVEMENT PROGRAM                                   8.421
Aeronautics                                                                                                                        Total:   14.470
NASHUA               BOIRE FIELD          RECONSTRUCT GRASS APRON TO PAVEMENT                                                                                   Priority as identified by airport
                                                                                                                                                                sponsor.
        3444
                                                             2012        AIP - AIRPORT IMPROVEMENT PROGRAM                                   2.700   2011
Aeronautics                                                                                                                        Total:    2.700
NASHUA               BOIRE FIELD          TERMINAL RAMP RECONSTRUCTION                                                                                          Priority as identified by the
                                                                                                                                                                airport sponsor.
        3985
                                                             2012        AIP - AIRPORT IMPROVEMENT PROGRAM                                   2.610   2012
Aeronautics                                                                                                                        Total:    2.610
NASHUA               EAST HOLLIS STREET   RECONSTRUCTION OF EAST HOLLIS STREET FROM MAIN STREET TO HUDSON TOWN LINE TO                                          MUNICIPAL MANAGED, 20% City
                                          IMPROVE CAPACITY                                                                                                      Match. City Urban Compact
        3536                                                                                                                                                    project.

                                                     C       2016        H200 - STP - AREAS LESS THAN 200,000                                2.120   2013
                                                     P       2009        H200 - STP - AREAS LESS THAN 200,000                                 .040
                                                     P       2010        H200 - STP - AREAS LESS THAN 200,000                                 .040
                                                     P       2011        H200 - STP - AREAS LESS THAN 200,000                                 .040
                                                     R       2013        H200 - STP - AREAS LESS THAN 200,000                                 .040
Highway and Bridge                                                                                                                 Total:    2.280               2.320




                                          Phase:      C = Construction        P = Preliminary Engineering       R = Right of Way                                               Projects Page - 46
June 25, 2008
                                                                                                                                                     Previous Previous
Project Name/#       Route/Road:          Location; Scope of Work                                                                           $(M)     Prog. Yr Total$
                                                                                                                                                                         Comments:
NASHUA               MAIN STREET          RECONSTRUCTION FROM HOLLIS STREET TO ORCHARD AVENUE (1.09 Miles)                                                      MUNICIPAL MANAGED, 20% City
                                                                                                                                                                Match. Urban Compact
          4049                                                                                                                                                  project.

                                                      C      2017        H200 - STP - AREAS LESS THAN 200,000                                2.200   2014
Highway and Bridge                                                                                                                 Total:    2.200               2.200
NASHUA               NASHUA TRANSIT SYSTEM BUS EQUIPMENT                                                                                                        FTA, Maintains modern bus fleet
                                                                                                                                                                using local match.
          607
                                                             2011        FT12 - FTA SECTION 5307 URBAN TRANSIT CAPITAL & PLAN.               1.100
Transit                                                                                                                            Total:    1.100
NASHUA               NASHUA TRANSIT SYSTEM CAPITAL PLANNING PROGRAM                                                                                             FTA. Provides intermodal
                                                                                                                                                                planning using local match.
          608
                                                             2009        FT12 - FTA SECTION 5307 URBAN TRANSIT CAPITAL & PLAN.                .136
                                                             2010        FT12 - FTA SECTION 5307 URBAN TRANSIT CAPITAL & PLAN.                .140
                                                             2011        FT12 - FTA SECTION 5307 URBAN TRANSIT CAPITAL & PLAN.                .145
                                                             2012        FT12 - FTA SECTION 5307 URBAN TRANSIT CAPITAL & PLAN.                .149
                                                             2013        FT12 - FTA SECTION 5307 URBAN TRANSIT CAPITAL & PLAN.                .153
                                                             2014        FT12 - FTA SECTION 5307 URBAN TRANSIT CAPITAL & PLAN.                .158
                                                             2015        FT12 - FTA SECTION 5307 URBAN TRANSIT CAPITAL & PLAN.                .158
                                                             2016        FT12 - FTA SECTION 5307 URBAN TRANSIT CAPITAL & PLAN.                .158
                                                             2017        FT12 - FTA SECTION 5307 URBAN TRANSIT CAPITAL & PLAN.                .158
                                                             2018        FT12 - FTA SECTION 5307 URBAN TRANSIT CAPITAL & PLAN.                .158
Transit                                                                                                                            Total:    1.514
NASHUA               NASHUA TRANSIT SYSTEM CAPITAL EQUIPMENT                                                                                                    FTA. Replaces outdated
                                                                                                                                                                equipment using local match.
          3797
                                                             2009        FT12 - FTA SECTION 5307 URBAN TRANSIT CAPITAL & PLAN.                .062
                                                             2010        FT12 - FTA SECTION 5307 URBAN TRANSIT CAPITAL & PLAN.                .064
                                                             2011        FT12 - FTA SECTION 5307 URBAN TRANSIT CAPITAL & PLAN.                .065
                                                             2012        FT12 - FTA SECTION 5307 URBAN TRANSIT CAPITAL & PLAN.                .069
                                                             2012        FT12 - FTA SECTION 5307 URBAN TRANSIT CAPITAL & PLAN.                .072
                                                             2012        FT12 - FTA SECTION 5307 URBAN TRANSIT CAPITAL & PLAN.                .067
Transit                                                                                                                            Total:     .399




                                           Phase:     C = Construction        P = Preliminary Engineering       R = Right of Way                                              Projects Page - 47
June 25, 2008
                                                                                                                                                    Previous Previous
Project Name/#       Route/Road:           Location; Scope of Work                                                                         $(M)     Prog. Yr Total$
                                                                                                                                                                        Comments:
NASHUA               NASHUA TRANSIT SYSTEM OPERATING ASSISTANCE                                                                                                FTA, Maintains transit service
                                                                                                                                                               using local match.
          609
                                                              2009        FT12 - FTA SECTION 5307 URBAN TRANSIT CAPITAL & PLAN.             1.455
                                                              2010        FT12 - FTA SECTION 5307 URBAN TRANSIT CAPITAL & PLAN.             1.455
                                                              2011        FT12 - FTA SECTION 5307 URBAN TRANSIT CAPITAL & PLAN.             1.455
                                                              2012        FT12 - FTA SECTION 5307 URBAN TRANSIT CAPITAL & PLAN.             1.455
                                                              2013        FT12 - FTA SECTION 5307 URBAN TRANSIT CAPITAL & PLAN.             1.455
                                                              2014        FT12 - FTA SECTION 5307 URBAN TRANSIT CAPITAL & PLAN.             1.455
                                                              2015        FT12 - FTA SECTION 5307 URBAN TRANSIT CAPITAL & PLAN.             1.455
                                                              2016        FT12 - FTA SECTION 5307 URBAN TRANSIT CAPITAL & PLAN.             1.455
                                                              2017        FT12 - FTA SECTION 5307 URBAN TRANSIT CAPITAL & PLAN.             1.455
                                                              2018        FT12 - FTA SECTION 5307 URBAN TRANSIT CAPITAL & PLAN.             1.455
Transit                                                                                                                           Total:   14.551
NASHUA               NASHUA TRANSIT SYSTEM PREVENTIVE MAINTENANCE                                                                                              Maintains transit service using
                                                                                                                                                               local match.
          3799
                                                              2009        FT12 - FTA SECTION 5307 URBAN TRANSIT CAPITAL & PLAN.              .396
                                                              2010        FT12 - FTA SECTION 5307 URBAN TRANSIT CAPITAL & PLAN.              .408
                                                              2011        FT12 - FTA SECTION 5307 URBAN TRANSIT CAPITAL & PLAN.              .420
                                                              2012        FT12 - FTA SECTION 5307 URBAN TRANSIT CAPITAL & PLAN.              .433
                                                              2013        FT12 - FTA SECTION 5307 URBAN TRANSIT CAPITAL & PLAN.              .446
                                                              2014        FT12 - FTA SECTION 5307 URBAN TRANSIT CAPITAL & PLAN.              .459
                                                              2015        FT12 - FTA SECTION 5307 URBAN TRANSIT CAPITAL & PLAN.              .459
                                                              2016        FT12 - FTA SECTION 5307 URBAN TRANSIT CAPITAL & PLAN.              .459
Transit                                                                                                                           Total:    3.481
NASHUA               BROAD STREET PARKWAY SECOND RIVER BRIDGE CROSSING OVER NASHUA RIVER [Section 1602 - Designated Project;                                   Original overall project for PE
   10040 A                                Demo Id NH003] [Sister Demo Projects: 10040A, G, H, J, S, T]                                                         and ROW. Earmark funding
        18                                                                                                                                                     (partial), project being re-
                                                                                                                                                               scoped by City. Municipal
                                                                                                                                                               Managed.

                                                       P      2009        Q920 - HIGH PRIORITY PROJ SEC 1602                                 .010
                                                       P      2010        Q920 - HIGH PRIORITY PROJ SEC 1602                                 .010
                                                       R      2009        Q920 - HIGH PRIORITY PROJ SEC 1602                                 .057
                                                       R      2010        Q920 - HIGH PRIORITY PROJ SEC 1602                                 .010
Highway and Bridge                                                                                                                Total:     .087




                                            Phase:     C = Construction        P = Preliminary Engineering     R = Right of Way                                              Projects Page - 48
June 25, 2008
                                                                                                                                                             Previous Previous
Project Name/#       Route/Road:             Location; Scope of Work                                                                                $(M)     Prog. Yr Total$
                                                                                                                                                                                 Comments:
NASHUA               BALDWIN STREET          RECONSTRUCTION AND EXTENSION FROM AMHERST STREET, OVER B&M RAILROAD AND THE                                                Earmark funding (partial),
   10040 G                                   FUTURE BROAD STREET PARKWAY TO FAIRMOUNT STREET, WITH CONNECTOR TO FUTURE                                                  project being re-scoped by
      2641                                   PARKWAY [Section 1602 - Designated Project; Demo Id NH003] [Sister Demo Projects:                                          City. Municipal Managed, Red
                                             10040A, G, H, J, S, T] (Parent = Nashua 10040A)                                                                            List bridge priority #109.

                                                          C       2011        H240 - STP - STATE FLEXIBLE IN ANY AREA                                4.653   2010
                                                          C       2011        Q920 - HIGH PRIORITY PROJ SEC 1602                                      .032   2010
Highway and Bridge                                                                                                                         Total:    4.685               4.685
NASHUA               BROAD STREET PARKWAY CONSTRUCTION FROM NASHUA RIVER WESTERLY TO BROAD STREET (TO SUBGRADE ONLY)                                                    Earmark funding (partial),
   10040 H                                [Section 1602 - Designated Project; Demo Id NH003] [Sister Demo Projects: 10040A, G, H, J, S,                                 project being re-scoped by
      2642                                T] (Parent = Nashua 10040A)                                                                                                   City. Municipal Managed.

                                                          C       2012        H200 - STP - AREAS LESS THAN 200,000                                    .275   2009
                                                          C       2012        Q920 - HIGH PRIORITY PROJ SEC 1602                                     5.211   2009
Highway and Bridge                                                                                                                         Total:    5.487               5.487
NASHUA               BROAD STREET PARKWAY CONSTRUCTION OF BRIDGE OVER NASHUA RIVER; FAIRMOUNT STREET BRIDGE OVER                                                        Earmark funding (partial),
   10040 I                                PARKWAY (Parent = Nashua 10040A)                                                                                              project being re-scoped by
      2643                                                                                                                                                              City. Municipal Managed.

                                                          C       2012        3610 - CONGESTION RELIEF PROJECTS                                      1.463   2012
                                                          C       2012        H200 - STP - AREAS LESS THAN 200,000                                   9.137   2012
Highway and Bridge                                                                                                                         Total:   10.600              10.600
NASHUA               BROAD STREET PARKWAY CONSTRUCTION FROM WEST HOLLIS STREET TO PINE STREET EXTENSION INCLUDING BRIDGE                                                Earmark funding (partial),
   10040 J                                OVER CANAL [Section 1602 - Designated Project; Demo Id NH003] [Sister Demo Projects:                                          project being re-scoped by
      2647                                10040A, G, H, J, S, T] (Parent = Nashua 10040A)                                                                               City. Municipal Managed.

                                                          C       2011        Q920 - HIGH PRIORITY PROJ SEC 1602                                     5.100   2010
Highway and Bridge                                                                                                                         Total:    5.100               5.100
NASHUA               BROAD STREET PARKWAY BASE COURSES, WEARING COURSES, SIGNING, MARKINGS, RR CROSSING, AND SIGNALS                                                    Earmark funding (partial),
   10040 K                                (Parent = Nashua 10040A)                                                                                                      project being re-scoped by
      2648                                                                                                                                                              City. Municipal Managed.

                                                          C       2014        H200 - STP - AREAS LESS THAN 200,000                                   1.200   2012
Highway and Bridge                                                                                                                         Total:    1.200               1.200
NASHUA               BROAD STREET PARKWAY PROJECT WIDE LANDSCAPING (Parent = Nashua 10040A)                                                                             Earmark funding (partial),
   10040 L                                                                                                                                                              project being re-scoped by
      2649                                                                                                                                                              City. Municipal Managed.

                                                          C       2016        H200 - STP - AREAS LESS THAN 200,000                                    .300   2013
Highway and Bridge                                                                                                                         Total:     .300               0.300




                                              Phase:       C = Construction        P = Preliminary Engineering          R = Right of Way                                              Projects Page - 49
June 25, 2008
                                                                                                                                                        Previous Previous
Project Name/#       Route/Road:            Location; Scope of Work                                                                            $(M)     Prog. Yr Total$
                                                                                                                                                                            Comments:
NASHUA               BROAD STREET PARKWAY DEMOLITION OF "NIMCO" BUILDING [Section 1602 - Designated Project; Demo Id NH003]                                        R-O-W Demolition. High Priority
   10040 S                                [Sister Demo Projects: 10040A, G, H, J, S, T] (Parent = Nashua 10040A)                                                   funding appropriated in 1998.
      3752
                                                         R      2010        Q920 - HIGH PRIORITY PROJ SEC 1602                                   .125   2008
                                                         R      2010        Q920 - HIGH PRIORITY PROJ SEC 1602                                   .125
Highway and Bridge                                                                                                                    Total:     .250
NASHUA               BROAD STREET PARKWAY MILLYARD UTILITY RELOCATION [Section 1602 - Designated Project; Demo Id NH003] [Sister                                   R-O-W Demolition. High Priority
   10040 T                                Demo Projects: 10040A, G, H, J, S, T] (Parent = Nashua 10040A)                                                           funding appropriated in 1998.
      3753
                                                         R      2010        Q920 - HIGH PRIORITY PROJ SEC 1602                                   .600   2009
Highway and Bridge                                                                                                                    Total:     .600
NASHUA               NH 101A                WIDENING BETWEEN CELINA AVENUE INTERSECTION TO AMHERST STREET MALL INTERSECTION                                        Municipal Managed and 20%
   10136 A                                  (1.5 MILES) TO EXPAND FROM EXISTING FIVE LANES TO SEVEN LANES AS RECOMMENDED BY                                        match.
      3593                                  CORRIDOR STUDY (Milford to Nashua 10136)
                                                         C      2012        H200 - STP - AREAS LESS THAN 200,000                                5.500   2010
                                                         P      2009        H050 - NATIONAL HIGHWAY SYSTEM                                       .375
                                                         R      2009        H050 - NATIONAL HIGHWAY SYSTEM                                       .250
Highway and Bridge                                                                                                                    Total:    6.125               6.068
NASHUA               FEE TPK                CONSTRUCT 1000 SPACE PARK'N'RIDE NEAR B&M RR WITH RAIL PLATFORM; FACILITY WILL BE                                      Specific project from Statewide
   13117                                    USED FOR CAR POOL, VANPOOL, & PASSENGER RAIL MODES (CMAQ Program) [98-13CM]                                            program, Municipal Managed.
      2344
                                                         C      2011        H400 - CONGESTION MITIGATION & AIR QUALITY IMPROVEMENT              2.450   2007
                                                         P      2009        H400 - CONGESTION MITIGATION & AIR QUALITY IMPROVEMENT               .200
                                                         R      2009        H400 - CONGESTION MITIGATION & AIR QUALITY IMPROVEMENT              3.850
Highway and Bridge                                                                                                                    Total:    6.500               2.450
NASHUA                                      PURCHASE COMMUTER RAIL EQUIPMENT (CMAQ Program) [00-12CM]                                                              Specific project from Statewide
   13514                                                                                                                                                           program, Municipal Managed.
      2959
                                                         C      2010        L400 - CONGESTION MITIGATION & AIR QUALITY IMPROVEMENT              5.003   2006
                                                         C      2011        L400 - CONGESTION MITIGATION & AIR QUALITY IMPROVEMENT              5.000   2008
                                                         C      2011        L400 - CONGESTION MITIGATION & AIR QUALITY IMPROVEMENT              5.000   2008
Rail                                                                                                                                  Total:   15.003              10.000
NASHUA               D.W. HIGHWAY           BRIDGE REHABILITATION OVER FEET NB ON-RAMP - 137/076 [TRR Program]                                                     Specific project from Statewide
   13716                                                                                                                                                           program.
      3604
                                                         C      2009        TRR - TURNPIKE RENEWAL & REPLACEMENT (State FY)                      .700
Highway and Bridge                                                                                                                    Total:     .700




                                             Phase:      C = Construction        P = Preliminary Engineering       R = Right of Way                                              Projects Page - 50
June 25, 2008
                                                                                                                                                    Previous Previous
Project Name/#       Route/Road:         Location; Scope of Work                                                                           $(M)     Prog. Yr Total$
                                                                                                                                                                        Comments:
NASHUA                                   PROVIDE 3 YEARS OPERATING SUPPORT FOR LOWELL - NASHUA COMMUTER RAIL STARTUP                                           Specific project from Statewide
   13875                                 (CMAQ Program) [02-22CM]                                                                                              program, Municipal managed.
      3698
                                                     P      2011        L400 - CONGESTION MITIGATION & AIR QUALITY IMPROVEMENT              1.750   2008
                                                     P      2012        L400 - CONGESTION MITIGATION & AIR QUALITY IMPROVEMENT              1.750   2009
                                                     P      2013        L400 - CONGESTION MITIGATION & AIR QUALITY IMPROVEMENT              1.750   2010
Rail                                                                                                                              Total:    5.250
NASHUA               NH 130              BROAD STREET RECONSTRUCTION FROM COBURN AVE TO COLISEUM AVE, INCLUDING                                                Municipal Managed and 20%
   13931                                 DUBLIN AVE, TO PROVIDE SHOULDERS / SAFETY IMPROVEMENTS                                                                match.
      3277
                                                     C      2016        L200 - STP - AREAS LESS THAN 200,000                                4.200   2010
                                                     P      2014        L200 - STP - AREAS LESS THAN 200,000                                 .010
                                                     R      2015        L200 - STP - AREAS LESS THAN 200,000                                 .180
Highway and Bridge                                                                                                                Total:    4.390               4.380
NASHUA               VARIOUS             TRAFFIC SIGNALS, EXPAND THE CLOSED LOOP SYSTEM TO INCLUDE THIRTY ADDITIONAL                                           Specific project from Statewide
   14432                                 INTERSECTIONS (CMAQ Program) [04-30CM]                                                                                program, Municipal managed.
      5621
                                                     C      2010        L400 - CONGESTION MITIGATION & AIR QUALITY IMPROVEMENT              2.000   2010
                                                     P      2009        L400 - CONGESTION MITIGATION & AIR QUALITY IMPROVEMENT               .300
Highway and Bridge                                                                                                                Total:    2.300               2.300
NASHUA                                   INCREASED TRANSIT SERVICE (CMAQ Program) [06-13CM]                                                                    Specific project from Statewide
   14815                                                                                                                                                       program. Municipal managed.
      6225
                                                     C      2009        L400 - CONGESTION MITIGATION & AIR QUALITY IMPROVEMENT               .913   CMAQ 2006
Transit                                                                                                                           Total:     .913
NASHUA - HOOKSETT    CENTRAL TURNPIKE    RESURFACING FISCAL YEAR 2009                                                                                          Specific project from Statewide
   14945                                                                                                                                                       program.
      6499
                                                     C      2009        TRR - TURNPIKE RENEWAL & REPLACEMENT (State FY)                     1.600   New Project
Highway and Bridge                                                                                                                Total:    1.600
NEW BOSTON           LYNDEBOROUGH ROAD BRIDGE REPLACEMENT OVER SOUTH BRANCH OF PISCATAQUOG RIVER - 064/056                                                     Specific project from Statewide
  14247                                                                                                                                                        program, Municipal managed.
     5665
                                                     C      2009        SAB - STATE AID BRIDGE (State FY), 20% = Town                        .660   2009
                                                     P      2009        SAB - STATE AID BRIDGE (State FY), 20% = Town                        .090
                                                     R      2009        SAB - STATE AID BRIDGE (State FY), 20% = Town                        .010
Highway and Bridge                                                                                                                Total:     .760               0.700




                                          Phase:     C = Construction        P = Preliminary Engineering       R = Right of Way                                              Projects Page - 51
June 25, 2008
                                                                                                                                                  Previous Previous
Project Name/#       Route/Road:       Location; Scope of Work                                                                           $(M)     Prog. Yr Total$
                                                                                                                                                                      Comments:
NEW BOSTON           GREGG MILL ROAD   BRIDGE REPLACEMENT OVER SOUTH BRANCH PISCATAQUOG RIVER - 132/138                                                      Specific project from Statewide
  14771                                                                                                                                                      program, Municipal managed.
     6343
                                                   C      2012        SAB - STATE AID BRIDGE (State FY), 20% = Town                        .920   New Project
                                                   P      2012        SAB - STATE AID BRIDGE (State FY), 20% = Town                        .110
                                                   R      2012        SAB - STATE AID BRIDGE (State FY), 20% = Town                        .005
Highway and Bridge                                                                                                              Total:    1.035
NEW BOSTON                             MILLPOND FOOTBRIDGE: CONSTRUCT STEEL TRUSS BRIDGE WITH A SPAN OF 110' AND A WIDTH                                     Specific project from Statewide
  14835                                OF 6'. A BOARDWALK WILL BE CONSTRUCTED LEADING UP TO THE BRIDGE (TE Program) [06-                                     program. Municipal managed.
     6242                              34TE]
                                                   C      2010        L220 - STP - TRANSPORTATION ENHANCEMENT                              .126   TE 2006
                                                   R      2009        L220 - STP - TRANSPORTATION ENHANCEMENT                              .001
Bike / Pedestrian                                                                                                               Total:     .127
NEW CASTLE           NH 1B             CONSTRUCT SIDEWALK BETWEEN RESIDENTIAL NEIGHBORHOODS AND THE ELEMENTARY                                               Specific project from Statewide
  14827                                SCHOOL (300 LF) AND BETWEEN THE GREAT COMMON (LIBRARY/PARK/BEACH) AND THE                                             program. Municipal managed.
     6243                              WENTWORTH HOTEL (1,150 LF) (TE Program) [06-35TE]
                                                   C      2010        L220 - STP - TRANSPORTATION ENHANCEMENT                              .104   TE 2006
                                                   R      2009        L220 - STP - TRANSPORTATION ENHANCEMENT                              .005
Bike / Pedestrian                                                                                                               Total:     .109
NEW CASTLE -         NH 1B             BRIDGE PAINTING OVER PISCATAQUA ESTUARY - 031/142 & 241/053                                                           Priority bridges #37 and #38.
PORTSMOUTH

         3525
                                                   C      2014        H120 - BRIDGE REPLACEMENT - ON/OFF SYSTEM                           3.500   2015
Highway and Bridge                                                                                                              Total:    3.500               1.600
NEW CASTLE - RYE     NH 1B             REHABILITATE SINGLE LEAF BASCULE MOVEABLE BRIDGE OVER LITTLE HARBOR - 066/071                                         Red List bridge, priority #65.

         5558
                                                   C      2013        H100 - BRIDGE REPLACEMENT - ON SYSTEM                               4.750   2012
Highway and Bridge                                                                                                              Total:    4.750               4.750
NEW IPSWICH          NH 123 / 124      REPLACE BRIDGE OVER SOUHEGAN RIVER - 157/093                                                                          Red List bridge, priority #29.
  14465
      2757
                                                   C      2012        H100 - BRIDGE REPLACEMENT - ON SYSTEM                               2.500   2010
                                                   R      2010        H100 - BRIDGE REPLACEMENT - ON SYSTEM                                .150
Highway and Bridge                                                                                                              Total:    2.650               1.970




                                       Phase:      C = Construction        P = Preliminary Engineering       R = Right of Way                                               Projects Page - 52
June 25, 2008
                                                                                                                                                   Previous Previous
Project Name/#        Route/Road:    Location; Scope of Work                                                                              $(M)     Prog. Yr Total$
                                                                                                                                                                       Comments:
NEW IPSWICH           TRINIC ROAD    BRIDGE REPLACEMENT OVER FURNACE BROOK - 139/106                                                                          Specific project from Statewide
  14600                                                                                                                                                       program, Municipal managed.
      6191
                                                 C      2009        SAB - STATE AID BRIDGE (State FY), 20% = Town                           .550   New Project
                                                 C      2009        SAB - STATE AID BRIDGE (State FY), 20% = Town                           .030   New Project
                                                 R      2009        SAB - STATE AID BRIDGE (State FY), 20% = Town                           .005
Highway and Bridge                                                                                                               Total:     .585
NEW LONDON            I-89 SB & NB   BRIDGE REHABILITATION OVER KING HILL ROAD - 124/058 & 124/059                                                            Red List bridges, priority #66
                                                                                                                                                              and #67.
         3261
                                                 C      2016        H120 - BRIDGE REPLACEMENT - ON/OFF SYSTEM                              1.850   2014
                                                 P      2011        H120 - BRIDGE REPLACEMENT - ON/OFF SYSTEM                               .300
Highway and Bridge                                                                                                               Total:    2.150               2.400
NEW LONDON - WILMOT   NH 11          LEVEL & 1 1/2" OVERLAY FROM I-89 SB RAMPS IN NEW LONDON EAST APPROX 5.0 MILES TO                                         Specific project from Statewide
  14451                              WILMOT / ANDOVER T/L [Statewide Federal Resurfacing Program]                                                             program.
     5954
                                                 C      2009        H240 - STP - STATE FLEXIBLE IN ANY AREA                                2.900   2009
Highway and Bridge                                                                                                               Total:    2.900               2.289
NEWBURY               NH 103         LAKE SUNAPEE WATERFRONT PEDESTRIAN IMPROVEMENTS: NH 103 SIDEWALK AND LIGHTING                                            Specific project from Statewide
  14819                              IMPROVEMENTS LINKING TOWN AMENITIES (TE Program) [06-38TE]                                                               program. Municipal managed.
     6244
                                                 C      2010        Q220 - STP - TRANSPORTATION ENHANCEMENT                                 .542   TE 2006
Bike / Pedestrian                                                                                                                Total:     .542
NEWBURY               VILLAGE ROAD   BRIDGE REPLACEMENT OVER ANDREW BROOK - 120/078                                                                           Specific project from Statewide
  14916                                                                                                                                                       program, Municipal managed.
     6472
                                                 C      2009        SAB - STATE AID BRIDGE (State FY), 20% = Town                           .585   New Project
                                                 P      2009        SAB - STATE AID BRIDGE (State FY), 20% = Town                           .085
                                                 R      2009        SAB - STATE AID BRIDGE (State FY), 20% = Town                           .005
Highway and Bridge                                                                                                               Total:     .675
NEWBURY               SUTTON ROAD    BRIDGE REPLACEMENT OVER RING BROOK - 138/072                                                                             Specific project from Statewide
  14917                                                                                                                                                       program, Municipal managed.
     6471
                                                 C      2009        SAB - STATE AID BRIDGE (State FY), 20% = Town                           .657   New Project
                                                 P      2009        SAB - STATE AID BRIDGE (State FY), 20% = Town                           .090
                                                 R      2009        SAB - STATE AID BRIDGE (State FY), 20% = Town                           .010
Highway and Bridge                                                                                                               Total:     .757




                                     Phase:      C = Construction        P = Preliminary Engineering          R = Right of Way                                               Projects Page - 53
June 25, 2008
                                                                                                                                                        Previous Previous
Project Name/#       Route/Road:            Location; Scope of Work                                                                            $(M)     Prog. Yr Total$
                                                                                                                                                                            Comments:
NEWINGTON - DOVER    NH 16 / US 4 / SPLDG TPK WIDEN TURNPIKE INCLUDING LITTLE BAY BRIDGES FROM GOSLING ROAD TO DOVER TOLL                                          Removed from Federal Aid
  11238                                       [Section 117 - Designated Project; Demo Id NH036] [Sister Demo Id NH053 & NH070]                                     program to Turnpike program.
     1191                                                                                                                                                          Earmarked federal funding
                                                                                                                                                                   remains. Turnpike Priority
                                                                                                                                                                   Capital Program - funding for
                                                                                                                                                                   Little Bay bridge and
                                                                                                                                                                   Newington interchange
                                                                                                                                                                   construction.

                                                         C      2010        HY20 - HIGH PRIORITY PROJ SEC 1702                                  5.000   Additional
                                                                                                                                                        Funds
                                                         C      2010        LY20 - HIGH PRIORITY PROJ SEC 1702                                 20.000   Additional
                                                                                                                                                        Funds
                                                         C      2011        H660 - GRANTS SUP PLAN HEWY STP, SECTION 117                        5.456   2010
                                                         C      2011        LY60 - HIGH PRIORITY PROJ SEC 112                                   3.125
                                                         C      2012        TPK - TURNPIKE EXPANSION (State FY)                                23.500
                                                         C      2013        TPK - TURNPIKE EXPANSION (State FY)                                35.400
                                                         C      2014        TPK - TURNPIKE EXPANSION (State FY)                                41.600
                                                         C      2015        TPK - TURNPIKE EXPANSION (State FY)                                16.500
                                                         P      2009        TPK - TURNPIKE EXPANSION (State FY)                                 4.732
                                                         P      2010        TPK - TURNPIKE EXPANSION (State FY)                                 5.464
                                                         P      2011        TPK - TURNPIKE EXPANSION (State FY)                                 2.251
                                                         R      2009        TPK - TURNPIKE EXPANSION (State FY)                                 3.308
                                                         R      2010        TPK - TURNPIKE EXPANSION (State FY)                                 2.185
Highway and Bridge                                                                                                                    Total: 168.521              149.956
NEWPORT              PARADISE ROAD          BRIDGE REPLACEMENT OVER SUGAR RIVER - 177/117                                                                          Specific project from Statewide
  14969                                                                                                                                                            program. Municipal Managed.
     6683
                                                         C      2014        SAB - STATE AID BRIDGE (State FY), 20% = Town                        .420
                                                         P      2014        SAB - STATE AID BRIDGE (State FY), 20% = Town                        .100
                                                         R      2014        SAB - STATE AID BRIDGE (State FY), 20% = Town                        .005
Highway and Bridge                                                                                                                    Total:     .525
NORTH HAMPTON        NH 111                 SCHOOL ZONE SIDEWALK IMPROVEMENTS: CONSTRUCT 0.2 MILES OF SIDEWALK ALONG NH                                            Specific project from Statewide
  14820                                     111 CONNECTING ELEMENTARY SCHOOLS WITH THE TOWN AMENITIES (TE Program) [06-42TE]                                       program. Municipal managed.
     6246
                                                         C      2010        33B0 - STP - TRANSPORTATION ENHANCEMENT                              .126   TE 2006
Bike / Pedestrian                                                                                                                     Total:     .126




                                             Phase:      C = Construction        P = Preliminary Engineering       R = Right of Way                                              Projects Page - 54
June 25, 2008
                                                                                                                                                      Previous Previous
Project Name/#       Route/Road:           Location; Scope of Work                                                                           $(M)     Prog. Yr Total$
                                                                                                                                                                          Comments:
NORTHUMBERLAND       BROOKLYN STREET       BRIDGE REPLACEMENT OVER ROARING BROOK - 108/114                                                                       Specific project from Statewide
  14234                                                                                                                                                          program, Municipal managed.
     5630
                                                       C      2009        SAB - STATE AID BRIDGE (State FY), 20% = Town                        .630   2009
                                                       R      2009        SAB - STATE AID BRIDGE (State FY), 20% = Town                        .005
Highway and Bridge                                                                                                                  Total:     .635               0.668
OSSIPEE              NH 16                 INTERSECTION IMPROVEMENTS @ NH 28                                                                                     Scope reduction, address
   10431                                                                                                                                                         pavement and problem
        95                                                                                                                                                       intersections only.

                                                       C      2015        H050 - NATIONAL HIGHWAY SYSTEM                                      3.000   2013
                                                       P      2011        H050 - NATIONAL HIGHWAY SYSTEM                                       .125
                                                       P      2013        H050 - NATIONAL HIGHWAY SYSTEM                                       .188
                                                       R      2013        H050 - NATIONAL HIGHWAY SYSTEM                                       .250
Highway and Bridge                                                                                                                  Total:    3.563               5.758
OSSIPEE              NH 16, NH 25, NH 41   INTERSECTION IMPROVEMENTS IN WEST OSSIPEE AT THE INTERSECTION OF NH 16 AND NH 25                                      Scope reduction.
   13910
      1888
                                                       C      2015        H050 - NATIONAL HIGHWAY SYSTEM                                       .530   2015
                                                       C      2015        H050 - NATIONAL HIGHWAY SYSTEM                                      1.060   2013
                                                       P      2009        H050 - NATIONAL HIGHWAY SYSTEM                                       .065
                                                       P      2010        H050 - NATIONAL HIGHWAY SYSTEM                                       .150
                                                       R      2009        H050 - NATIONAL HIGHWAY SYSTEM                                       .030
                                                       R      2010        Q050 - NATIONAL HIGHWAY SYSTEM                                       .250
Highway and Bridge                                                                                                                  Total:    2.085               2.085
OSSIPEE              NH 16 / NH 25         REPAIR DECK OVER LOVELL RIVER - 152/268                                                                               Specific project from Statewide
   14096                                                                                                                                                         program. Red List bridge
      4151                                                                                                                                                       priority #60.

                                                       C      2009        BET - BETTERMENT (State FY)                                          .100   2007
Highway and Bridge                                                                                                                  Total:     .100               0.100
OSSIPEE              NH 16 / NH 25         REPAIR DECK OVER CHOCORA RIVER - 123/324                                                                              Specific project from Statewide
   14097                                                                                                                                                         program.
      4153
                                                       C      2009        BET - BETTERMENT (State FY)                                          .300   2007
Highway and Bridge                                                                                                                  Total:     .300               0.300




                                           Phase:      C = Construction        P = Preliminary Engineering       R = Right of Way                                              Projects Page - 55
June 25, 2008
                                                                                                                                                Previous Previous
Project Name/#        Route/Road:   Location; Scope of Work                                                                            $(M)     Prog. Yr Total$
                                                                                                                                                                    Comments:
OSSIPEE               NH 16/25      RECONSTRUCT ROADWAY AND REHABILITATE 4 BRIDGES, BEGINNING AT THE LOVELL RIVER                                          Scope reduction, address
   14749                            BRIDGE, RUNNING NORTH 3.22 MILES TO THE CHOCORUA RIVER - 137/299, 137/297, 152/268,                                    bridges and pavement only. 3
      2762                          123/324                                                                                                                redlist bridges, priorities #58,
                                                                                                                                                           #59, and #60

                                                C       2016        H200 - STP - AREAS LESS THAN 200,000                                5.000   2012
                                                P       2010        H100 - BRIDGE REPLACEMENT - ON SYSTEM                                .125
                                                P       2012        H200 - STP - AREAS LESS THAN 200,000                                 .250
                                                R       2011        H100 - BRIDGE REPLACEMENT - ON SYSTEM                                .080
                                                R       2013        H100 - BRIDGE REPLACEMENT - ON SYSTEM                                .188
Highway and Bridge                                                                                                            Total:    5.643              10.350
OSSIPEE - FREEDOM -                 SPUR OF OSSIPEE LAKE TRAIL: CONSTRUCT A 0.3 MILE FACILITY WITH A BIKE/PED UNDERPASS.                                   Specific project from Statewide
EFFINGHAM                           THIS SPUR WILL CONNECT TO 23 MILE OSSIPEE LAKE TRAIL, STATEWIDE BIKE ROUTE SYSTEM AND                                  program. Municipal managed.
    13901                           DOT PROPOSED OSSIPEE MULTI MODAL TRANSPORTATION FACILITY (TE Program) [02-49TE]
       3740
                                                C       2009        L220 - STP - TRANSPORTATION ENHANCEMENT                              .115   2006
Bike / Pedestrian                                                                                                             Total:     .115
PELHAM                NH 111A       IMPROVEMENTS TO TWO INTERSECTIONS: MAIN STREET / NASHUA ROAD AND OLD BRIDGE                                            Earmarked funding.
   14491                            STREET / COMMON STREET [Section 1702 - Designated Project; Demo Id NH055] [14491A is
      4231                          Sister Demo Id NH072]
                                                C       2010        HY20 - HIGH PRIORITY PROJ SEC 1702                                   .150   2010
                                                C       2010        LY20 - HIGH PRIORITY PROJ SEC 1702                                  2.005   2010
                                                C       2010        LY20 - HIGH PRIORITY PROJ SEC 1702                                   .495   Additional
                                                                                                                                                Funds
Highway and Bridge                                                                                                            Total:    2.650               2.500
PELHAM                NH 111A       IMPROVEMENTS TO TWO INTERSECTIONS: MAIN STREET / NASHUA ROAD AND OLD BRIDGE                                            Earmarked funding.
   14491 A                          STREET / COMMON STREET (14491 IS PARENT PROJECT Demo Id NH055]
      6348
                                                C       2010        LY60 - HIGH PRIORITY PROJ SEC 112                                    .938   Additional
                                                                                                                                                Funds
Highway and Bridge                                                                                                            Total:     .938




                                    Phase:       C = Construction        P = Preliminary Engineering       R = Right of Way                                              Projects Page - 56
June 25, 2008
                                                                                                                                                       Previous Previous
Project Name/#       Route/Road:            Location; Scope of Work                                                                           $(M)     Prog. Yr Total$
                                                                                                                                                                           Comments:
PEMBROKE             US 3 / PEMBROKE HILL   INTERSECTION IMPROVEMENT PROJECT [Section 1702 - Designated Project; Demo Id NH042]                                   Earmarked funding.
   14477 A           RD                     [Sister Demo Id NH061]
      6049
                                                        C      2010        HPER - HIGH PRIORITY                                                 .071   2010
                                                        C      2010        HY10 - HIGH PRIORITY PROJ SEC 1702                                   .040
                                                        C      2010        HY20 - HIGH PRIORITY PROJ SEC 1702                                   .085
                                                        C      2010        LY10 - HIGH PRIORITY PROJ SEC 1702                                   .139
                                                        C      2010        LY20 - HIGH PRIORITY PROJ SEC 1702                                  1.750
                                                        P      2009        HY10 - HIGH PRIORITY PROJ SEC 1702                                   .025
                                                        R      2009        HY20 - HIGH PRIORITY PROJ SEC 1702                                   .025
Highway and Bridge                                                                                                                   Total:    2.135               2.450
PETERBOROUGH         US 202                 RECONSTRUCT FROM NH 101 NORTHERLY 2.5 MILES                                                                           Scope reduction, address
                                                                                                                                                                  pavement only. RPC comment
        2760                                                                                                                                                      re: revised description and
                                                                                                                                                                  phasing.

                                                        C      2015        H200 - STP - AREAS LESS THAN 200,000                                1.875   2013
                                                        P      2010        H200 - STP - AREAS LESS THAN 200,000                                 .250
                                                        R      2012        H200 - STP - AREAS LESS THAN 200,000                                 .050
Highway and Bridge                                                                                                                   Total:    2.175               5.750
PETERBOROUGH         US 202 / NH 101        REHABILITATE BRIDGE DECK OVER CONTOCOOK RIVER - 087/077                                                               Red List Bridge Priority #75

        6779
                                                        C      2018        L1C0 - BRIDGE PROGRAM - 85% ON/OFF SYSTEM                           1.000   New Project
Highway and Bridge                                                                                                                   Total:    1.000
PETERBOROUGH         US 202                 RECONSTRUCT 1000' AT MAIN STREET INTERSECTION. ALSO RECONSTRUCT GRANITE BLOCK                                         Specific project from overall
   14772 A                                  WALL ALONG US 202 THAT CONNECTS TO MAIN STREET BRIDGE ABUTMENT (Town-Owned)                                           project (id #2760)
      6501
                                                        C      2010        L200 - STP - AREAS LESS THAN 200,000                                1.000   New Project
                                                        P      2010        L200 - STP - AREAS LESS THAN 200,000                                 .075
Highway and Bridge                                                                                                                   Total:    1.075
PETERBOROUGH         MAIN STREET            REHAB BRIDGE OVER CONTOOCOOK RIVER - 092/089                                                                          Specific project from Statewide
   14933                                                                                                                                                          program, Municipal managed.
      6488
                                                        C      2010        SAB - STATE AID BRIDGE (State FY), 20% = Town                        .700   New Project
                                                        P      2010        SAB - STATE AID BRIDGE (State FY), 20% = Town                        .120
                                                        R      2010        SAB - STATE AID BRIDGE (State FY), 20% = Town                        .005
Highway and Bridge                                                                                                                   Total:     .825




                                            Phase:      C = Construction        P = Preliminary Engineering       R = Right of Way                                              Projects Page - 57
June 25, 2008
                                                                                                                                                      Previous Previous
Project Name/#       Route/Road:          Location; Scope of Work                                                                            $(M)     Prog. Yr Total$
                                                                                                                                                                          Comments:
PETERBOROUGH         UNION STREET         REPLACE BRIDGE OVER NUBANUSIT RIVER - 057/108                                                                          Specific project from Statewide
   14935                                                                                                                                                         program, Municipal managed.
      6489
                                                      C       2013        SAB - STATE AID BRIDGE (State FY), 20% = Town                       1.150   New Project
                                                      P       2013        SAB - STATE AID BRIDGE (State FY), 20% = Town                        .150
                                                      R       2013        SAB - STATE AID BRIDGE (State FY), 20% = Town                        .015
Highway and Bridge                                                                                                                  Total:    1.315
PETERBOROUGH         OLD GREENFIELD ROAD BRIDGE REPLACEMENT OVER BOGLIE BROOK - 126/126                                                                          Specific project from Statewide
   14951                                                                                                                                                         program, Municipal managed.
      6602
                                                      C       2014        SAB - STATE AID BRIDGE (State FY), 20% = Town                        .500   New Project
                                                      P       2014        SAB - STATE AID BRIDGE (State FY), 20% = Town                        .040
Highway and Bridge                                                                                                                  Total:     .540
PITTSFIELD           NH 107               RECLAIM EXISTING ROADWAY - THIS 4410 LF PROJECT WOULD INCLUDE SAME CRUSHED                                             Specific project from Statewide
    12973                                 GRAVEL; FROM OLD NH 28 NORTH TO BARNSTEAD T/L (0.8MI)                                                                  program.
        2132
                                                      C       2009        BET - BETTERMENT (State FY)                                          .150   2008
Highway and Bridge                                                                                                                  Total:     .150               0.150
PITTSFIELD           SHAW RD              BRIDGE REPLACEMENT OVER KELLY BROOK - 089/135                                                                          Specific project from statewide
    14972                                                                                                                                                        program, Municipal Managed.
        6685
                                                      C       2014        SAB - STATE AID BRIDGE (State FY), 20% = Town                        .260   New Project
                                                      P       2014        SAB - STATE AID BRIDGE (State FY), 20% = Town                        .060
                                                      R       2014        SAB - STATE AID BRIDGE (State FY), 20% = Town                        .005
Highway and Bridge                                                                                                                  Total:     .325
PLAISTOW             NH 125               RECONSTRUCT INTERSECTIONS OF DANVILLE ROAD, JESSE GEORGE ROAD & NH 121A, AS                                            Breakout project from Plaistow-
   10044 F                                WELL AS CONSTRUCT JUG HANDLES AT EAST ROAD & OPPOSITE WALTON ROAD (Parent =                                            Kingston project.
      6372                                Plaistow-Kingston 10044B)
                                                      C       2010        L050 - NATIONAL HIGHWAY SYSTEM                                      7.600   New Project
Highway and Bridge                                                                                                                  Total:    7.600
PLAISTOW             NH 125               RECONSTRUCT EAST RD TO OLD RD (Parent = Plaistow-Kingston 10044B)                                                      Breakout project from Plaistow-
   10044 G                                                                                                                                                       Kingston project. RPC
      6371                                                                                                                                                       comment continued priority
                                                                                                                                                                 with phased implementation.

                                                      C       2013        L050 - NATIONAL HIGHWAY SYSTEM                                      3.900   New Project
Highway and Bridge                                                                                                                  Total:    3.900




                                          Phase:       C = Construction        P = Preliminary Engineering       R = Right of Way                                              Projects Page - 58
June 25, 2008
                                                                                                                                                 Previous Previous
Project Name/#        Route/Road:     Location; Scope of Work                                                                           $(M)     Prog. Yr Total$
                                                                                                                                                                     Comments:
PLAISTOW              GARDEN ROAD     BRIDGE REPLACEMENT OVER LITTLE RIVER - 118/053                                                                        Specific project from statewide
   14390                                                                                                                                                    program, Municipal Managed.
      5915
                                                  C      2010        SAB - STATE AID BRIDGE (State FY), 20% = Town                        .454   2010
Highway and Bridge                                                                                                             Total:     .454               0.520
PLAISTOW - KINGSTON   NH 125          RECONSTRUCTION FROM EAST ROAD IN PLAISTOW NORTHERLY APPROX. 6.0 +/- MILE TO NH                                        Original overall project,
   10044 B                            125 & MAIN STREET INTERSECTION IN KINGSTON                                                                            construction now programmed
        24                                                                                                                                                  in specific projects. RPC
                                                                                                                                                            comment continued priority
                                                                                                                                                            with phased implementation.

                                                  P      2009        L240 - STP - SURFACE TRANSP. STATE FLEXIBLE IN ANY AREA              .250
                                                  R      2009        L240 - STP - SURFACE TRANSP. STATE FLEXIBLE IN ANY AREA             1.000
                                                  R      2010        L240 - STP - SURFACE TRANSP. STATE FLEXIBLE IN ANY AREA             1.500
Highway and Bridge                                                                                                             Total:    2.750
PLAISTOW - KINGSTON   NH 125          RECONSTRUCT FROM ROADSTONE DRIVE TO LIMIT OF HUNT RD/NEWTON JET. RD, INCLUDING                                        Breakout project from Plaistow-
   10044 E                            EXT OF KINGSTON ROAD (Parent = Plaistow-Kingston 10044B)                                                              Kingston project. RPC
      3898                                                                                                                                                  comment continued priority
                                                                                                                                                            with phased implementation.

                                                  C      2017        L050 - NATIONAL HIGHWAY SYSTEM                                      8.200   2008
Highway and Bridge                                                                                                             Total:    8.200               2.300
PLAISTOW - KINGSTON   NH 125          RECONSTRUCT SEGMENT BETWEEN OLD COUNTY RD TO ROADSTONE DR & CONSTRUCT                                                 Breakout project from Plaistow-
   10044 H                            LOCAL CONNECTOR RD IN PLAISTOW (Parent = Plaistow-Kingston 10044B)                                                    Kingston project. RPC
      6370                                                                                                                                                  comment continued priority
                                                                                                                                                            with phased implementation.

                                                  C      2015        L050 - NATIONAL HIGHWAY SYSTEM                                      5.300   New Project
Highway and Bridge                                                                                                             Total:    5.300
PLYMOUTH              NH 25 / NH 3A   REHABILITATE BRIDGE DECK OVER BAKER RIVER - 117/143                                                                   Red List Bridge Priority #61

        6780
                                                  C      2015        L1C0 - BRIDGE PROGRAM - 85% ON/OFF SYSTEM                           2.000   New Project
Highway and Bridge                                                                                                             Total:    2.000
PORTSMOUTH            MARKET STREET   RECONSTRUCT CROSSING & SIGNALS @ B&M RR USDOT- AAR #054-125A [Statewide Railroad-                                     Specific project from Statewide
  12575                               RCS]                                                                                                                  program.
      620
                                                  C      2012        H260 - STP - RAIL-HWY PROTECTIVE DEVICES                             .159   2008
                                                  C      2012        H270 - STP - RAIL-HWY CROSS ELIM OF HAZARDS                          .197   2008
                                                  P      2011        33N0 - STP - RAIL-HWY CROSS ELIM OF HAZARDS                          .028
Rail                                                                                                                           Total:     .384               0.336


                                      Phase:      C = Construction        P = Preliminary Engineering       R = Right of Way                                              Projects Page - 59
June 25, 2008
                                                                                                                                                 Previous Previous
Project Name/#       Route/Road:      Location; Scope of Work                                                                           $(M)     Prog. Yr Total$
                                                                                                                                                                     Comments:
PORTSMOUTH           US 1 BYPASS      RECONSTRUCT FROM TRAFFIC CIRCLE NORTH TO SARAH LONG BRIDGE INCLUDING BRIDGES                                          Scope reduction, focus on red
  12900                               227/112, 211/114 & 205/116                                                                                            list bridges, RPC comment
      622                                                                                                                                                   continued priority with phased
                                                                                                                                                            implementation. Three Red List
                                                                                                                                                            bridges; priorities #45, #49, and
                                                                                                                                                            #88.

                                                 C       2012        H100 - BRIDGE REPLACEMENT - ON SYSTEM                               5.500   2010
                                                 P       2009        H100 - BRIDGE REPLACEMENT - ON SYSTEM                                .090
                                                 P       2010        H100 - BRIDGE REPLACEMENT - ON SYSTEM                                .010
                                                 R       2009        H100 - BRIDGE REPLACEMENT - ON SYSTEM                                .250
                                                 R       2010        H100 - BRIDGE REPLACEMENT - ON SYSTEM                                .020
Highway and Bridge                                                                                                             Total:    5.870              12.600
PORTSMOUTH           US 1 BYPASS      RECONSTRUCT FROM SAGAMORE CREEK PROJECT TO TRAFFIC CIRCLE, INCLUDING BRIDGES                                          Scope reduction, focus on red
  13455                               173/071, 183/087, 188/097, 189/100, 192/106                                                                           list bridges. RPC comment
     2759                                                                                                                                                   continued priority with phased
                                                                                                                                                            implementation. Three Red List
                                                                                                                                                            bridges; priorities #44, #46, #47
                                                                                                                                                            and #48.

                                                 C       2011        L200 - STP - AREAS LESS THAN 200,000                                3.125   2013
                                                 C       2013        L200 - STP - AREAS LESS THAN 200,000                                4.125   2014
                                                 P       2009        H200 - STP - AREAS LESS THAN 200,000                                 .500
                                                 P       2010        H200 - STP - AREAS LESS THAN 200,000                                 .200
                                                 R       2009        H200 - STP - AREAS LESS THAN 200,000                                 .050
                                                 R       2010        L200 - STP - AREAS LESS THAN 200,000                                 .400
Highway and Bridge                                                                                                             Total:    8.400              12.000
PORTSMOUTH           WOODBURY AVE /   SIGNAL COORDINATION ALONG WOODBURY AVE FROM I-95 INTERCHANGE TO GOSLING                                               Specific project from Statewide
  13516              MARKET STREET    ROAD (CMAQ Program) [00-21CM]                                                                                         program.
     2961
                                                 C       2009        Q400 - CONGESTION MITIGATION & AIR QUALITY IMPROVEMENT               .085   2006
Highway and Bridge                                                                                                             Total:     .085
PORTSMOUTH           BOW STREET       PISCATAQUA RIVERWALK: CONSTRUCT 400 LF OF PEDESTRIAN FACILITY AND PIER ALONG THE                                      Specific project from Statewide
  13903                               PISCATAQUA RIVER PARALLELING BOW STREET (TE Program) [02-53TE]                                                        program, Municipal managed.
     3742
                                                 C       2010        L220 - STP - TRANSPORTATION ENHANCEMENT                              .625   2007
                                                 C       2010        NON - OTHER NON PARTICIPATING                                        .818
Bike / Pedestrian                                                                                                              Total:    1.443               1.443




                                      Phase:      C = Construction        P = Preliminary Engineering       R = Right of Way                                              Projects Page - 60
June 25, 2008
                                                                                                                                                   Previous Previous
Project Name/#       Route/Road:        Location; Scope of Work                                                                           $(M)     Prog. Yr Total$
                                                                                                                                                                       Comments:
PORTSMOUTH           OCEAN ROAD         RECONSTRUCT & RECLASSIFY AS A CITY STREET. (SAH Funding Capped Per Year; Excess Of                                    Specific project from Statewide
  14193                                 Grand Total [$1,200,000] Will Be 50/50 Match)                                                                         program.
     5576
                                                    C       2009        SAH - STATE AID HIGHWAY (State FY), 33.3% = Town                    .450   2009
                                                    C       2010        SAH - STATE AID HIGHWAY (State FY), 33.3% = Town                    .450   2010
                                                    C       2011        SAH - STATE AID HIGHWAY (State FY), 33.3% = Town                    .150   2011
Highway and Bridge                                                                                                               Total:    1.050               1.740
PORTSMOUTH           I-95               PAINT BRIDGE APPROACHES TO BRIDGE OVER PISCATAQUA RIVER - 258/128                                                     Advanced and phased
  14376                                                                                                                                                       implementations to address
     5560                                                                                                                                                     deteriorating paint conditions
                                                                                                                                                              and bridge preservation.

                                                    C       2010        L1C0 - BRIDGE PROGRAM - 85% ON/OFF SYSTEM                          5.000   2012
                                                    C       2012        L1C0 - BRIDGE PROGRAM - 85% ON/OFF SYSTEM                          6.000   2012
Highway and Bridge                                                                                                               Total:   11.000               7.170
PORTSMOUTH           GRAFTON DRIVE      TRADE PORT MULTI-USE PATH - CONSTRUCT A MULTI USE PATH ALONG GRAFTON DR BETWEEN                                       Specific project from Statewide
  14417                                 NH AVENUE AND PORTSMOUTH TRANSPORTATION CENTER, AND BETWEEN PEASE GOLF                                                program, Municipal managed.
     5655                               COURSE AND AIRPORT RD (TE Program) [04-54TE]
                                                    C       2009        L220 - STP - TRANSPORTATION ENHANCEMENT                             .450   2009
Bike / Pedestrian                                                                                                                Total:     .450               0.515
PORTSMOUTH           NH 1A              BRIDGE REHABILITATION OVER SAGAMORE CREEK - 198/034                                                                   Municipal Managed.
  14493
     6053
                                                    C       2011        H110 - BRIDGE REPLACEMENT - OFF SYSTEM                             3.000   2010
                                                    P       2009        H110 - BRIDGE REPLACEMENT - OFF SYSTEM                              .025
                                                    R       2009        H110 - BRIDGE REPLACEMENT - OFF SYSTEM                              .100
Highway and Bridge                                                                                                               Total:    3.125               3.300
PORTSMOUTH           I-95               BRIDGE REHABILITATION, SHERBURN ROAD OVER I-95 - 144/125 [TRR Program]                                                Specific project from Statewide
  14523                                                                                                                                                       program.
     6073
                                                    C       2009        TRR - TURNPIKE RENEWAL & REPLACEMENT (State FY)                     .885   2009
Highway and Bridge                                                                                                               Total:     .885               0.910
PORTSMOUTH -         PORTSMOUTH         DESIGN AND CONSTRUCT APRON - AREA 3 (ASR REPLACEMENT)                                                                 Address Safety Concerns
NEWINGTON            INTERNATIONAL
                     AIRPORT AT PEASE
         6672
                                                            2017        AIP - AIRPORT IMPROVEMENT PROGRAM                                  3.600
Aeronautics                                                                                                                      Total:    3.600




                                        Phase:       C = Construction        P = Preliminary Engineering      R = Right of Way                                              Projects Page - 61
June 25, 2008
                                                                                                                                                  Previous Previous
Project Name/#        Route/Road:        Location; Scope of Work                                                                         $(M)     Prog. Yr Total$
                                                                                                                                                                      Comments:
PORTSMOUTH -          PORTSMOUTH         DESIGN AND CONSTRUCT APRON - AREA 4 (ASR REPLACEMENT)                                                               Address Safety Concerns
NEWINGTON             INTERNATIONAL
                      AIRPORT AT PEASE
        6674
                                                             2018        AIP - AIRPORT IMPROVEMENT PROGRAM                                5.640
Aeronautics                                                                                                                     Total:    5.640
PORTSMOUTH -          PORTSMOUTH         INSTALL SECURITY FENCE                                                                                              5% Funded by NHDOT. Priorities
NEWINGTON             INTERNATIONAL                                                                                                                          established by Pease
                      AIRPORT AT PEASE                                                                                                                       Interanational Tradeport.
        3457
                                                             2010        AIP - AIRPORT IMPROVEMENT PROGRAM                                 .600   2007
Aeronautics                                                                                                                     Total:     .600
PORTSMOUTH -          PORTSMOUTH         PURCHASE SNOW REMOVAL EQUIPMENT                                                                                     Provide Equipment for Winter
NEWINGTON             INTERNATIONAL                                                                                                                          Operations
                      AIRPORT AT PEASE
        6673
                                                             2018        AIP - AIRPORT IMPROVEMENT PROGRAM                                 .200
Aeronautics                                                                                                                     Total:     .200
PORTSMOUTH, NH -      US 1 BYPASS        REHABILITATE & PAINT BRIDGE OVER PISCATAQUA RIVER - 251/108 (Sarah Mildred Long                                     Red List bridge, priority #25.
KITTERY, ME                              Bridge)

        5559
                                                     C       2012        H100 - BRIDGE REPLACEMENT - ON SYSTEM                            7.500   2012
                                                     C       2013        H100 - BRIDGE REPLACEMENT - ON SYSTEM                            7.500   2012
Highway and Bridge                                                                                                              Total:   15.000              17.490
PORTSMOUTH, NH -      US 1               REHABILITATE BRIDGE OVER PISCATAQUA RIVER - 247/084 (Memorial Bridge) & REPLACE                                     RPC comment continued
KITTERY, ME                              SCOTT AVENUE BRIDGE - 246/083                                                                                       priority. Red List bridge, priority
    13678                                                                                                                                                    #1.
       2756
                                                     C       2009        H100 - BRIDGE REPLACEMENT - ON SYSTEM                           19.185   2010
                                                     C       2010        ME - MAINE'S CONTRIBUTION                                       20.542   2010
Highway and Bridge                                                                                                              Total:   39.727              31.700
PORTSMOUTH-NEWINGTON PORTSMOUTH          DESIGN AND CONSTRUCT RUNWAY 34 END REHABILITATION                                                                   Address Safety Concerns.
                     INTERNATIONAL
     6571            AIRPORT AT PEASE

                                                             2011        AIP - AIRPORT IMPROVEMENT PROGRAM                                3.000
Aeronautics                                                                                                                     Total:    3.000




                                         Phase:       C = Construction       P = Preliminary Engineering     R = Right of Way                                               Projects Page - 62
June 25, 2008
                                                                                                                                               Previous Previous
Project Name/#        Route/Road:       Location; Scope of Work                                                                       $(M)     Prog. Yr Total$
                                                                                                                                                                   Comments:
PORTSMOUTH-NEWINGTON PORTSMOUTH         DESIGN AND CONSTRUCT RUNWAY 16 END REHABILITATION                                                                 Address Safety Concerns.
                     INTERNATIONAL
     6572            AIRPORT AT PEASE

                                                          2012        AIP - AIRPORT IMPROVEMENT PROGRAM                                3.000
Aeronautics                                                                                                                  Total:    3.000
PORTSMOUTH-NEWINGTON PORTSMOUTH         DESIGN AND CONSTRUCT TERMINAL CONNECTOR ROAD FROM PEASE BOULEVARD                                                 Address Access Concerns.
                     INTERNATIONAL
     6573            AIRPORT AT PEASE

                                                          2013        AIP - AIRPORT IMPROVEMENT PROGRAM                                1.254
Aeronautics                                                                                                                  Total:    1.254
PORTSMOUTH-NEWINGTON PORTSMOUTH         DESIGN AND CONSTRUCT TERMINAL ACCESS ROAD (EXETER STREET UPGRADE)                                                 Address Access Concerns.
                     INTERNATIONAL
     6574            AIRPORT AT PEASE

                                                          2014        AIP - AIRPORT IMPROVEMENT PROGRAM                                1.387
Aeronautics                                                                                                                  Total:    1.387
PORTSMOUTH-NEWINGTON PORTSMOUTH         DESIGN AND CONSTRUCT TERMINAL BUILDING EXPANSION                                                                  Address Capacity Concerns.
                     INTERNATIONAL
     6575            AIRPORT AT PEASE

                                                          2016        AIP - AIRPORT IMPROVEMENT PROGRAM                               14.000
Aeronautics                                                                                                                  Total:   14.000
PORTSMOUTH-NEWINGTON PORTSMOUTH         OBSTRUCTION REMOVAL                                                                                               Address Safety Concerns.
                     INTERNATIONAL
     6569            AIRPORT AT PEASE

                                                          2009        AIP - AIRPORT IMPROVEMENT PROGRAM                                 .368
Aeronautics                                                                                                                  Total:     .368
PORTSMOUTH-NEWINGTON PORTSMOUTH         PURCHASE AIRCRAFT NOISE MONITORING EQUIPMENT                                                                      Address aircraft noise
                     INTERNATIONAL                                                                                                                        complaints.
     6567            AIRPORT AT PEASE

                                                          2009        AIP - AIRPORT IMPROVEMENT PROGRAM                                 .110
Aeronautics                                                                                                                  Total:     .110




                                        Phase:     C = Construction       P = Preliminary Engineering     R = Right of Way                                              Projects Page - 63
June 25, 2008
                                                                                                                                                    Previous Previous
Project Name/#        Route/Road:        Location; Scope of Work                                                                           $(M)     Prog. Yr Total$
                                                                                                                                                                        Comments:
PORTSMOUTH-NEWINGTON PORTSMOUTH          PURCHASE SNOW-REMOVAL EQUIPMENT                                                                                       Provide equipment for winter
                     INTERNATIONAL                                                                                                                             operations.
     6568            AIRPORT AT PEASE

                                                            2009        AIP - AIRPORT IMPROVEMENT PROGRAM                                    .526
                                                            2010        AIP - AIRPORT IMPROVEMENT PROGRAM                                    .393
                                                            2015        AIP - AIRPORT IMPROVEMENT PROGRAM                                   1.215
                                                            2016        AIP - AIRPORT IMPROVEMENT PROGRAM                                   1.000
Aeronautics                                                                                                                       Total:    3.134
PORTSMOUTH-NEWINGTON PORTSMOUTH          UPDATE AIRCRAFT NOISE EXPOSURE MAP                                                                                    Address aircraft noise
                     INTERNATIONAL                                                                                                                             complaints.
     6570            AIRPORT AT PEASE

                                                            2010        AIP - AIRPORT IMPROVEMENT PROGRAM                                    .060
Aeronautics                                                                                                                       Total:     .060
RANDOLPH              DURAND ROAD        BRIDGE REPLACEMENT OVER CARLTON BROOK - 140/067                                                                       Specific project from Statewide
   14386                                                                                                                                                       program, Municipal managed.
      5873
                                                    C       2009        SAB - STATE AID BRIDGE (State FY), 20% = Town                        .400   2008
                                                    R       2009        SAB - STATE AID BRIDGE (State FY), 20% = Town                        .005
Highway and Bridge                                                                                                                Total:     .405               0.440
ROCHESTER             SKYHAVEN AIRPORT   CONSTRUCTION ONLY - SOUTH APRON WITH TIEDOWNS                                                                         Address Capacity Concerns.

        6578
                                                            2010        AIP - AIRPORT IMPROVEMENT PROGRAM                                    .950
Aeronautics                                                                                                                       Total:     .950
ROCHESTER             SKYHAVEN AIRPORT   CONSTRUCT ONLY - 500-FT. EXTENSION TO RUNWAY 33 AND RSA EXTENSION                                                     Address Safety Concerns

        6675
                                                            2017        AIP - AIRPORT IMPROVEMENT PROGRAM                                   2.200
Aeronautics                                                                                                                       Total:    2.200
ROCHESTER             SKYHAVEN AIRPORT   DESIGN & RECONSTRUCTION OF RUNWAY 15/33                                                                               95% Federal funds, 5% State
                                                                                                                                                               match. FAA requirement.
        3462                                                                                                                                                   Runway rehabilitation.

                                                            2011        AIP - AIRPORT IMPROVEMENT PROGRAM                                   1.000
Aeronautics                                                                                                                       Total:    1.000




                                         Phase:      C = Construction        P = Preliminary Engineering       R = Right of Way                                              Projects Page - 64
June 25, 2008
                                                                                                                                            Previous Previous
Project Name/#   Route/Road:        Location; Scope of Work                                                                        $(M)     Prog. Yr Total$
                                                                                                                                                                Comments:
ROCHESTER        SKYHAVEN AIRPORT   DESIGN ONLY - SOUTH APRON WITH TIEDOWNS                                                                            Address Capacity Concerns.

        6577
                                                       2009        AIP - AIRPORT IMPROVEMENT PROGRAM                                 .250
Aeronautics                                                                                                               Total:     .250
ROCHESTER        SKYHAVEN AIRPORT   DESIGN ONLY - 500-FT. EXTENSION TO RUNWAY 33 AND RSA EXTENSION                                                     Address Safety Concerns.

        6582
                                                       2016        AIP - AIRPORT IMPROVEMENT PROGRAM                                 .600
Aeronautics                                                                                                               Total:     .600
ROCHESTER        SKYHAVEN AIRPORT   DESIGN ONLY - 500-FT. EXTENSION TO RUNWAY 15 AND RSA EXTENSION                                                     Address Safety Concerns

        6676
                                                       2018        AIP - AIRPORT IMPROVEMENT PROGRAM                                 .400
Aeronautics                                                                                                               Total:     .400
ROCHESTER        SKYHAVEN AIRPORT   OBSTRUCTION REMOVAL                                                                                                Address Safety Concerns.

        6580
                                                       2014        AIP - AIRPORT IMPROVEMENT PROGRAM                                 .050
Aeronautics                                                                                                               Total:     .050
ROCHESTER        SKYHAVEN AIRPORT   PURCHASE SNOW-REMOVAL EQUIPMENT                                                                                    Provide equipment for winter
                                                                                                                                                       operations.
        6579
                                                       2013        AIP - AIRPORT IMPROVEMENT PROGRAM                                 .158
Aeronautics                                                                                                               Total:     .158
ROCHESTER        SKYHAVEN AIRPORT   REHABILITATE EXISTING TIEDOWN APRON                                                                                95% Federal funds, 5% State
                                                                                                                                                       match. FAA requirement.
        4111                                                                                                                                           Safety issue.

                                                       2012        AIP - AIRPORT IMPROVEMENT PROGRAM                                1.200   2016
Aeronautics                                                                                                               Total:    1.200
ROCHESTER        SKYHAVEN AIRPORT   SUPPLEMENTAL ENVIRONMENTAL ASSESSMENT                                                                              Address Safety Concerns.

        6581
                                                       2015        AIP - AIRPORT IMPROVEMENT PROGRAM                                 .158
Aeronautics                                                                                                               Total:     .158




                                    Phase:      C = Construction       P = Preliminary Engineering     R = Right of Way                                              Projects Page - 65
June 25, 2008
                                                                                                                                                Previous Previous
Project Name/#       Route/Road:     Location; Scope of Work                                                                           $(M)     Prog. Yr Total$
                                                                                                                                                                    Comments:
ROCHESTER            SPAULDING TPK   CONSTRUCTION OF 2nd BARREL THROUGH EXIT 13 - PHASE 2 - 139/094                                                        Turnpike Priority Capital
  10620 H                                                                                                                                                  Program, Bridge Red List Priority
     2103                                                                                                                                                  # 19.

                                                 C       2009        TPK - TURNPIKE EXPANSION (State FY)                                4.856   2009
                                                 C       2010        TPK - TURNPIKE EXPANSION (State FY)                               14.567
                                                 C       2011        TPK - TURNPIKE EXPANSION (State FY)                               14.567
Highway and Bridge                                                                                                            Total:   33.990              25.380
ROCHESTER            SPAULDING TPK   CONSTRUCTION OF 2nd BARREL THROUGH EXIT 14 AND EXIT 15 - PHASE 3                                                      Turnpike Priority Capital Program
  10620 I
     2104
                                                 C       2009        TPK - TURNPIKE EXPANSION (State FY)                                5.313
                                                 C       2010        TPK - TURNPIKE EXPANSION (State FY)                               15.938   2010
                                                 C       2011        TPK - TURNPIKE EXPANSION (State FY)                                6.641
Highway and Bridge                                                                                                            Total:   27.892              20.996
ROCHESTER            SPAULDING TPK   CONSTRUCTION OF 2nd BARREL THROUGH EXIT 16 (Chestnut Hill Connector) - PHASE 4                                        Turnpike Priority Capital Program
  10620 J
     2105
                                                 C       2011        TPK - TURNPIKE EXPANSION (State FY)                                4.371   2013
                                                 C       2012        TPK - TURNPIKE EXPANSION (State FY)                               13.113   2012
Highway and Bridge                                                                                                            Total:   17.484              14.500
ROCHESTER            SPAULDING TPK   EXIT 11 & 12 (NH 125) BRIDGE - 157/110, AND 2ND BARREL - PHASE 2                                                      Bridge Red List Priority #20, #21,
  10620 K                                                                                                                                                  #22, and #23.
     3885
                                                 C       2009        TPK - TURNPIKE EXPANSION (State FY)                                1.100   2008
                                                 C       2010        TPK - TURNPIKE EXPANSION (State FY)                               13.531
                                                 C       2011        TPK - TURNPIKE EXPANSION (State FY)                                2.255
Highway and Bridge                                                                                                            Total:   16.886              14.717
ROCHESTER            SPAULDING TPK   CONSTRUCTION OF 2ND BARREL THROUGH EXIT 14 & 15 - PHASE 3, PART B                                                     Turnpike Priority Capital Program
  10620 L
     3973
                                                 C       2010        TPK - TURNPIKE EXPANSION (State FY)                                6.800   Additional
                                                                                                                                                Funds
                                                 C       2011        TPK - TURNPIKE EXPANSION (State FY)                               20.600   2010
                                                 C       2012        TPK - TURNPIKE EXPANSION (State FY)                                8.588   Additional
                                                                                                                                                Funds
Highway and Bridge                                                                                                            Total:   35.988              27.496




                                     Phase:       C = Construction        P = Preliminary Engineering      R = Right of Way                                              Projects Page - 66
June 25, 2008
                                                                                                                                                  Previous Previous
Project Name/#       Route/Road:          Location; Scope of Work                                                                        $(M)     Prog. Yr Total$
                                                                                                                                                                      Comments:
ROCHESTER            SPAULDING TURNPIKE   REHAB BRIDGE OVER BLACKWATER ROAD - 194/149 [TRR Program]                                                          Specific project from Statewide
  13590                                                                                                                                                      program.
     3148
                                                      C      2010        TRR - TURNPIKE RENEWAL & REPLACEMENT (State FY)                   .835   2008
                                                      P      2009        TRR - TURNPIKE RENEWAL & REPLACEMENT (State FY)                   .090
Highway and Bridge                                                                                                              Total:     .925               0.835
ROCHESTER            NH 202A (WALNUT      INTERSECTION IMPROVEMENTS TO IMPROVE SAFETY THROUGH STRAFFORD SQUARE, NORTH                                        Municipal Managed, 20% city
  14350              STREET)              MAIN, & WASHINGTON STREETS                                                                                         match.
     2750
                                                      C      2015        H280 - STP - HAZARD ELIMINATION PROGRAM                          1.200   2015
                                                      R      2012        H280 - STP - HAZARD ELIMINATION PROGRAM                           .525
Highway and Bridge                                                                                                              Total:    1.725               1.225
ROXBURY - SULLIVAN   NH 9                 RECONSTRUCT SHOULDERS & WIDEN FROM EAST SULLIVAN, SOUTH 2.04 MI (Br# 093/061)                                      Scope reduction, address
  10439                                                                                                                                                      pavement and safety
      102                                                                                                                                                    improvement on existing
                                                                                                                                                             alignment. Red List bridge
                                                                                                                                                             priority #50.

                                                      C      2017        H050 - NATIONAL HIGHWAY SYSTEM                                   4.250   2014
                                                      P      2011        H050 - NATIONAL HIGHWAY SYSTEM                                    .025
                                                      P      2012        H050 - NATIONAL HIGHWAY SYSTEM                                    .019
                                                      P      2013        H050 - NATIONAL HIGHWAY SYSTEM                                    .025
                                                      P      2014        H050 - NATIONAL HIGHWAY SYSTEM                                    .025
                                                      R      2011        H050 - NATIONAL HIGHWAY SYSTEM                                    .025
                                                      R      2012        H050 - NATIONAL HIGHWAY SYSTEM                                    .300
                                                      R      2013        H050 - NATIONAL HIGHWAY SYSTEM                                    .025
                                                      R      2014        H050 - NATIONAL HIGHWAY SYSTEM                                    .300
Highway and Bridge                                                                                                              Total:    4.994              14.690
RUMNEY               NH 25                STABILIZE ROADWAY EMBANKMENT ALONG APPROX 720 FT. OF THE BAKER RIVER LOCATED                                       Specific project from Statewide
  14472                                   APPROX 1500 FT NORTH OF THE POLAR CAVES                                                                            program.
     5975
                                                      C      2013        BET - BETTERMENT (State FY)                                       .500   2008
Highway and Bridge                                                                                                              Total:     .500               0.500




                                          Phase:      C = Construction        P = Preliminary Engineering    R = Right of Way                                              Projects Page - 67
June 25, 2008
                                                                                                                                                 Previous Previous
Project Name/#       Route/Road:      Location; Scope of Work                                                                           $(M)     Prog. Yr Total$
                                                                                                                                                                     Comments:
SALEM                NH 28            RECONSTRUCT INTERSECTION, MAIN STREET @ DEPOT STREET, INCLUDING SIGNALS, LEFT TURN                                    RPC comment continued
   12334                              LANES & APPROACHES                                                                                                    priority, 20% Municipal match.
       630
                                                  C      2015        L230 - STP - URBANIZED AREAS OVER 200,000                           2.500   2012
                                                  P      2013        L230 - STP - URBANIZED AREAS OVER 200,000                            .100
                                                  P      2014        L230 - STP - URBANIZED AREAS OVER 200,000                            .150
                                                  P      2014        L230 - STP - URBANIZED AREAS OVER 200,000                            .010
                                                  P      2015        L230 - STP - URBANIZED AREAS OVER 200,000                            .010
                                                  R      2013        L230 - STP - URBANIZED AREAS OVER 200,000                            .150
                                                  R      2014        L230 - STP - URBANIZED AREAS OVER 200,000                            .350
                                                  R      2015        L230 - STP - URBANIZED AREAS OVER 200,000                            .250
Highway and Bridge                                                                                                             Total:    3.520               4.100
SALEM                EMERSON WAY      BRIDGE REPLACEMENT OVER WIDOW HARRIS BROOK - 114/108                                                                  Specific project from Statewide
   14881                                                                                                                                                    program, Municipal managed.
      6416
                                                  C      2009        SAB - STATE AID BRIDGE (State FY), 20% = Town                        .733   New Project
                                                  P      2009        SAB - STATE AID BRIDGE (State FY), 20% = Town                        .126
                                                  R      2009        SAB - STATE AID BRIDGE (State FY), 20% = Town                        .025
Highway and Bridge                                                                                                             Total:     .884
SALEM                HAVERHILL ROAD   BRIDGE REPLACEMENT OVER SPICKET RIVER - 097/181                                                                       Specific project from Statewide
   14883                                                                                                                                                    program, Municipal managed.
      6417
                                                  C      2013        SAB - STATE AID BRIDGE (State FY), 20% = Town                        .663   New Project
                                                  P      2013        SAB - STATE AID BRIDGE (State FY), 20% = Town                        .095
                                                  R      2013        SAB - STATE AID BRIDGE (State FY), 20% = Town                        .010
Highway and Bridge                                                                                                             Total:     .768
SALEM - DERRY        TRANSIT          PREVENTATIVE MAINTENANCE

          2985
                                                         2009        FT12 - FTA SECTION 5307 URBAN TRANSIT CAPITAL & PLAN.                .080
                                                         2010        FT12 - FTA SECTION 5307 URBAN TRANSIT CAPITAL & PLAN.                .080
Transit                                                                                                                        Total:     .160
SALEM - MANCHESTER   TRANSIT          CAPITAL BUS AND FACILITY IMPROVEMENTS                                                                                 Boston Urbanized Area Funding

          2903
                                                         2009        FT12 - FTA SECTION 5307 URBAN TRANSIT CAPITAL & PLAN.                .192
                                                         2010        FT12 - FTA SECTION 5307 URBAN TRANSIT CAPITAL & PLAN.                .192
Transit                                                                                                                        Total:     .384




                                      Phase:      C = Construction        P = Preliminary Engineering       R = Right of Way                                              Projects Page - 68
June 25, 2008
                                                                                                                                             Previous Previous
Project Name/#        Route/Road:   Location; Scope of Work                                                                         $(M)     Prog. Yr Total$
                                                                                                                                                                 Comments:
SALEM TO MANCHESTER   I-93          PROGRAMMATIC MITIGATION (CTAP, NHDES Land Protection Program) (PE & ROW Only)                                       I-93 widening. Costs reflect PE
   10418                                                                                                                                                and ROW needs necessary to
        66                                                                                                                                              go forward with construction..

                                                P       2009        L050 - NATIONAL HIGHWAY SYSTEM                                    .728
                                                R       2009        L050 - NATIONAL HIGHWAY SYSTEM                                   1.250
Highway and Bridge                                                                                                         Total:    1.978
SALEM TO MANCHESTER   I-93          ENVIRONMENTAL IMPACT STUDY AND FINAL DESIGN FROM MASS S/L IN SALEM TO I-293 IN                                      Overall, corridor project overall
   10418 C                          MANCHESTER (PE & ROW Only) [Section 1602 - Designated Project; Demo Id NH014] [Sister                               for PE & ROW, construction
        69                          Demo Id NH029 & NH051/NH076 & NH052/NH068]                                                                          broken out to individual
                                                                                                                                                        projects.

                                                P       2009        L010 - INTERSTATE MAINTENANCE                                    5.975
                                                P       2010        L010 - INTERSTATE MAINTENANCE                                    4.500
                                                P       2011        L010 - INTERSTATE MAINTENANCE                                    3.400
                                                R       2009        L010 - INTERSTATE MAINTENANCE                                    8.000
                                                R       2009        L010 - INTERSTATE MAINTENANCE                                    2.670
                                                R       2010        L010 - INTERSTATE MAINTENANCE                                    6.000
                                                R       2010        LY60 - HIGH PRIORITY PROJ SEC 112                                 .004
Highway and Bridge                                                                                                         Total:   30.549
SALEM TO MANCHESTER   I-93          CONSTRUCTION OF WETLAND MITIGATION SITES IN ANTICIPATION OF WETLAND IMPACTS                                         Reflects current construction
   10418 F                          ASSOCIATED WITH FUTURE IMPROVEMENTS TO I-93 FROM SALEM TO MANCHESTER.                                               sequencing and costs. GARVEE
      1800                          INCLUDES: LONDONDERRY L-8, L-8 EXTENSION, L-12 SITES; & LONDONDERRY ADVANCE                                         bonding to facilitate
                                    MITIGATION / WETLAND CREATION [Section 115 - Designated Project NH026] [Sister Demo Id                              construction program.
                                    NH044 & NH063 & NH075]
                                                 C    2012   H170 - SECTION 115 DESIGNATED PROJECTS: Man, Bed, Dub, Ch   .500                2012
                                                C       2012        HPER - HIGH PRIORITY                                              .091   2012
Highway and Bridge                                                                                                         Total:     .591               4.500
SALEM TO MANCHESTER   I-93          PARK & RIDE @ EXIT 3 (Windham) (CMAQ Program) [Part of 04-33CM]                                                     Reflects current construction
   10418 H                                                                                                                                              sequencing and costs. GARVEE
      3138                                                                                                                                              bonding to facilitate
                                                                                                                                                        construction program.

                                                C       2012        HPER - HIGH PRIORITY                                             3.867   2010
                                                C       2012        L400 - CONGESTION MITIGATION & AIR QUALITY IMPROVEMENT           4.464   2010
Highway and Bridge                                                                                                         Total:    8.330               4.270




                                    Phase:       C = Construction        P = Preliminary Engineering    R = Right of Way                                              Projects Page - 69
June 25, 2008
                                                                                                                                              Previous Previous
Project Name/#        Route/Road:   Location; Scope of Work                                                                          $(M)     Prog. Yr Total$
                                                                                                                                                                  Comments:
SALEM TO MANCHESTER   I-93          WATER QUALITY STUDY [Section 1702 - Designated Project; Demo Id NH054]                                               Earmark funds.
   10418 W
      6052
                                                 P      2009        L010 - INTERSTATE MAINTENANCE                                      .875
                                                 P      2009        LY20 - HIGH PRIORITY PROJ SEC 1702                                1.250
                                                 P      2010        L010 - INTERSTATE MAINTENANCE                                     1.875
                                                 P      2011        L010 - INTERSTATE MAINTENANCE                                     2.250
Highway and Bridge                                                                                                          Total:    6.250
SALEM TO MANCHESTER   I-93          MAINLINE, EXIT 1 TO STA. 1130 & NH38 (Salem) [Partial Garvee Bonded Project] (Parent =                               Reflects current construction
   13933 D                          Salem to Manchester 13933)                                                                                           sequencing and costs. GARVEE
      3818                                                                                                                                               bonding to facilitate
                                                                                                                                                         construction program. Red list
                                                                                                                                                         bridges priorities #4 and #5

                                                 C      2010        L010 - INTERSTATE MAINTENANCE                                    13.680   2009
                                                 C      2010        L050 - NATIONAL HIGHWAY SYSTEM                                    9.120   2009
Highway and Bridge                                                                                                          Total:   22.800              19.800
SALEM TO MANCHESTER   I-93          EXIT 2 INTERCHANGE & NH97 (Salem) (Parent = Salem to Manchester 13933)                                               Reflects current construction
   13933 E                                                                                                                                               sequencing and costs. GARVEE
      3819                                                                                                                                               bonding to facilitate
                                                                                                                                                         construction program. Red list
                                                                                                                                                         bridges priorities #13 and #14.

                                                 C      2011        H010 - INTERSTATE MAINTENANCE                                    16.720   2010
                                                 C      2011        H050 - NATIONAL HIGHWAY SYSTEM                                   25.080   2010
Highway and Bridge                                                                                                          Total:   41.800              12.100
SALEM TO MANCHESTER   I-93          CORRIDOR WIDE CONSTRUCTION RECONSTRUCT & WIDEN MAINLINE SEGMENT I-SEGMENT VII                                        Reflects current construction
   13933 L                          (Windham) (Projects to be broken out) [Section 1702 - Designated Project; Demo Id NH048]                             sequencing and costs. General
      5729                          [Sister Demo Id NH066 & NH074] (Parent = Salem to Manchester 13933)                                                  overall project pending specific
                                                                                                                                                         construction project breakout.
                                                                                                                                                         GARVEE bonding to facilitate
                                                                                                                                                         construction program. Portion
                                                                                                                                                         deferred beyond TYP.

                                                 C      2010        H050 - NATIONAL HIGHWAY SYSTEM                                   48.500
                                                 C      2011        HY10 - HIGH PRIORITY PROJ SEC 1702                                 .380
                                                 C      2011        HY20 - HIGH PRIORITY PROJ SEC 1702                                 .350
                                                 C      2011        LY10 - HIGH PRIORITY PROJ SEC 1702                                 .376
                                                 C      2011        LY20 - HIGH PRIORITY PROJ SEC 1702                                1.750
                                                 C      2011        LY60 - HIGH PRIORITY PROJ SEC 112                                  .625
                                                 C      2012        H010 - INTERSTATE MAINTENANCE                                    21.100
Highway and Bridge                                                                                                          Total:   73.081            164.450


                                    Phase:       C = Construction        P = Preliminary Engineering     R = Right of Way                                              Projects Page - 70
June 25, 2008
                                                                                                                                              Previous Previous
Project Name/#        Route/Road:   Location; Scope of Work                                                                          $(M)     Prog. Yr Total$
                                                                                                                                                                  Comments:
SALEM TO MANCHESTER   I-93          EXIT 5 AREA, INTERCHANGE (Londonderry) (Parent = Salem to Manchester 13933)                                          Reflects current construction
   14633 F                                                                                                                                               sequencing and costs. GARVEE
      6338                                                                                                                                               bonding to facilitate
                                                                                                                                                         construction program. 4 Red list
                                                                                                                                                         bridges priorities #9, #10, #11,
                                                                                                                                                         and #12.

                                                C       2009        H050 - NATIONAL HIGHWAY SYSTEM                                   25.980   New Project
                                                C       2009        L010 - INTERSTATE MAINTENANCE                                    17.320
Highway and Bridge                                                                                                          Total:   43.300
SALEM TO MANCHESTER   I-93          SOUTH ROAD MITIGATION [Londonderry] [Section 1702 - Designated Project NH044] [Sister                                Reflects current construction
   14634 F                          Project - Demo Id NH026, NH063 & NH075]                                                                              sequencing and costs. GARVEE
      6157                                                                                                                                               bonding to facilitate
                                                                                                                                                         construction program.
                                                                                                                                                         Earmarked funds

                                                C       2012        HPER - HIGH PRIORITY                                               .403   Additional
                                                                                                                                              Funds
                                                C       2012        HY10 - HIGH PRIORITY PROJ SEC 1702                                 .300
                                                C       2012        LY10 - HIGH PRIORITY PROJ SEC 1702                                 .297
Highway and Bridge                                                                                                          Total:    1.000
SALEM TO MANCHESTER   I-93          SOUTH ROAD MITIGATION [Londonderry] [Section 1702 - Designated Project NH063] [Sister                                Reflects current construction
   14634 G                          Project - Demo Id NH026 & NH044 & NH075]                                                                             sequencing and costs. GARVEE
      6176                                                                                                                                               bonding to facilitate
                                                                                                                                                         construction program.
                                                                                                                                                         Earmarked funds

                                                C       2012        HY20 - HIGH PRIORITY PROJ SEC 1702                                 .500   Additional
                                                                                                                                              Funds
                                                C       2012        LY20 - HIGH PRIORITY PROJ SEC 1702                                2.005
                                                C       2012        LY20 - HIGH PRIORITY PROJ SEC 1702                                 .495
Highway and Bridge                                                                                                          Total:    3.000
SALEM TO MANCHESTER   I-93          SOUTH ROAD MITIGATION [Londonderry] [Section 1702 - Designated Project NH075] [Sister                                Reflects current construction
   14634 H                          Project - Demo Id NH026 & NH044 & NH063]                                                                             sequencing and costs. GARVEE
      6470                                                                                                                                               bonding to facilitate
                                                                                                                                                         construction program.
                                                                                                                                                         Earmarked funds

                                                C       2012        LY60 - HIGH PRIORITY PROJ SEC 112                                 2.500   Additional
                                                                                                                                              Funds
Highway and Bridge                                                                                                          Total:    2.500




                                    Phase:       C = Construction        P = Preliminary Engineering     R = Right of Way                                              Projects Page - 71
June 25, 2008
                                                                                                                                                         Previous Previous
Project Name/#         Route/Road:            Location; Scope of Work                                                                           $(M)     Prog. Yr Total$
                                                                                                                                                                             Comments:
SALEM TO MANCHESTER    I-93                   "DEBT SERVICE PROJECT" FOR: RECONSTRUCTION & WIDENING FROM S/L TO MANCHESTER                                          GARVEE Bond debt service,
   14800 *                                    [Garvee Bonded Projects - 2005 NH Legislature Approved]                                                               approximately $24 million
      4110                                                                                                                                                          annually through 2022.

                                                          C      2013        L050 - NATIONAL HIGHWAY SYSTEM                                     24.000
                                                          C      2014        L050 - NATIONAL HIGHWAY SYSTEM                                     24.000
                                                          C      2015        L050 - NATIONAL HIGHWAY SYSTEM                                     24.000
                                                          C      2016        L050 - NATIONAL HIGHWAY SYSTEM                                     24.000
                                                          C      2017        L050 - NATIONAL HIGHWAY SYSTEM                                     24.000
                                                          C      2018        L050 - NATIONAL HIGHWAY SYSTEM                                     24.000
Highway and Bridge                                                                                                                     Total: 144.000
SALISBURY              MOUNTAIN ROAD          BRIDGE REHABILITATION OVER BLACKWATER RIVER - 095/135                                                                 Specific project from Statewide
   14626 A                                                                                                                                                          program, Municipal managed.
       6394
                                                          C      2009        SAB - STATE AID BRIDGE (State FY), 20% = Town                       1.600   New Project
                                                          P      2009        SAB - STATE AID BRIDGE (State FY), 20% = Town                        .040
                                                          R      2009        SAB - STATE AID BRIDGE (State FY), 20% = Town                        .010
Highway and Bridge                                                                                                                     Total:    1.650
SANBORNTON             UPPER BAY ROAD         RECONSTRUCTION                                                                                                        Specific project from Statewide
   14443                                                                                                                                                            program, Municipal managed.
      5938
                                                          C      2009        SAH - STATE AID HIGHWAY (State FY), 33.3% = Town                     .300   2009
                                                          C      2010        SAH - STATE AID HIGHWAY (State FY), 33.3% = Town                     .300   2010
Highway and Bridge                                                                                                                     Total:     .600               1.050
SEABROOK - ROCHESTER   EASTERN TURNPIKE       RESURFACING FISCAL YEAR 2009                                                                                          Specific project from Statewide
   14946                                                                                                                                                            program.
      6500
                                                          C      2009        TRR - TURNPIKE RENEWAL & REPLACEMENT (State FY)                     1.600   New Project
Highway and Bridge                                                                                                                     Total:    1.600
SEABROOK TO            BLUE STAR TPK (I-95)   ITS DEPLOYMENT; ITS INITIATIVE ALLOWING FOR DEPLOYMENT OF CHANGEABLE MESSAGE                                          Specific project from Statewide
PORTSMOUTH                                    BOARDS, HIGHWAY ADVISORY RADIO TO IMPROVE MOTORIST SAFETY AND AWARENESS                                               program.
   11151 E                                    (CMAQ Program) [04-31CM]
      3550
                                                          C      2009        L400 - CONGESTION MITIGATION & AIR QUALITY IMPROVEMENT              2.000   2006
Highway and Bridge                                                                                                                     Total:    2.000
SEABROOK TO            BLUE STAR TPK (I-95)   ITS DEPLOYMENT; ITS INITIATIVE ALLOWING FOR DEPLOYMENT OF CHANGEABLE MESSAGE
PORTSMOUTH                                    BOARDS, HIGHWAY ADVISORY RADIO TO IMPROVE MOTORIST SAFETY AND AWARENESS
   11151 F                                    (Turnpike Match to 11151E)
      5721
                                                          C      2009        TPK - TURNPIKE EXPANSION (State FY)                                  .400   2006
Highway and Bridge                                                                                                                     Total:     .400

                                              Phase:      C = Construction        P = Preliminary Engineering       R = Right of Way                                              Projects Page - 72
June 25, 2008
                                                                                                                                                    Previous Previous
Project Name/#       Route/Road:      Location; Scope of Work                                                                              $(M)     Prog. Yr Total$
                                                                                                                                                                        Comments:
SOMERSWORTH, NH -    NH 9             REHAB BRIDGE OVER SALMON FALLS RIVER - 101/114                                                                           Municipal Managed.
BERWICK, ME
   12228
       417
                                                  C      2010        ME - MAINE'S CONTRIBUTION                                               .368   2010
                                                  C      2010        Q240 - STP - STATE FLEXIBLE IN ANY AREA                                 .368   2010
Highway and Bridge                                                                                                                Total:     .735               0.750
SOUTHWEST                             SOUTHWEST REGIONAL WELCOME CENTER (Location To Be Determined)                                                            Alternative means of
                                                                                                                                                               addressing, capital budget,
        3282                                                                                                                                                   deferred beyond TYP.

                                                  P      2011        H200 - STP - AREAS LESS THAN 200,000                                    .200
Highway and Bridge                                                                                                                Total:     .200
STATEWIDE            ADMINISTRATION   ANNUAL TRAINING PROGRAM (Annual Project)                                                                                 Program Funding for
   12563 *                                                                                                                                                     Departmental Training.
       451
                                                  P      2009        L400 - CONGESTION MITIGATION & AIR QUALITY IMPROVEMENT                  .200
                                                  P      2010        L240 - STP - SURFACE TRANSP. STATE FLEXIBLE IN ANY AREA                 .200
                                                  P      2011        L240 - STP - SURFACE TRANSP. STATE FLEXIBLE IN ANY AREA                 .200
                                                  P      2012        L240 - STP - SURFACE TRANSP. STATE FLEXIBLE IN ANY AREA                 .200
                                                  P      2013        L240 - STP - SURFACE TRANSP. STATE FLEXIBLE IN ANY AREA                 .200
                                                  P      2014        L240 - STP - SURFACE TRANSP. STATE FLEXIBLE IN ANY AREA                 .200
                                                  P      2015        L240 - STP - SURFACE TRANSP. STATE FLEXIBLE IN ANY AREA                 .200
                                                  P      2016        L240 - STP - SURFACE TRANSP. STATE FLEXIBLE IN ANY AREA                 .200
                                                  P      2017        L240 - STP - SURFACE TRANSP. STATE FLEXIBLE IN ANY AREA                 .200
                                                  P      2018        L240 - STP - SURFACE TRANSP. STATE FLEXIBLE IN ANY AREA                 .200
Highway and Bridge                                                                                                                Total:    2.000




                                      Phase:      C = Construction        P = Preliminary Engineering          R = Right of Way                                              Projects Page - 73
June 25, 2008
                                                                                                                                                 Previous Previous
Project Name/#       Route/Road:      Location; Scope of Work                                                                           $(M)     Prog. Yr Total$
                                                                                                                                                                     Comments:
STATEWIDE            ADMINISTRATION   ESTABLISHMENT OF SUMMER LANDSCAPING YOUTH PROGRAM TO PERFORM MAINTENANCE &                                            Program Funding for Summer
   12500 *                            OTHER RELATED WORK STATEWIDE [Annual Project]                                                                         Landscaping Youth Program.
      1766
                                                 C       2009        L240 - STP - SURFACE TRANSP. STATE FLEXIBLE IN ANY AREA              .057
                                                 C       2010        L240 - STP - SURFACE TRANSP. STATE FLEXIBLE IN ANY AREA              .057
                                                 C       2011        L240 - STP - SURFACE TRANSP. STATE FLEXIBLE IN ANY AREA              .057
                                                 C       2012        L240 - STP - SURFACE TRANSP. STATE FLEXIBLE IN ANY AREA              .057
                                                 C       2013        L240 - STP - SURFACE TRANSP. STATE FLEXIBLE IN ANY AREA              .057
                                                 C       2014        L240 - STP - SURFACE TRANSP. STATE FLEXIBLE IN ANY AREA              .057
                                                 C       2015        L240 - STP - SURFACE TRANSP. STATE FLEXIBLE IN ANY AREA              .057
                                                 C       2016        L240 - STP - SURFACE TRANSP. STATE FLEXIBLE IN ANY AREA              .057
                                                 C       2017        L240 - STP - SURFACE TRANSP. STATE FLEXIBLE IN ANY AREA              .057
                                                 C       2018        L240 - STP - SURFACE TRANSP. STATE FLEXIBLE IN ANY AREA              .057
Highway and Bridge                                                                                                             Total:     .570               0.360
STATEWIDE SPECIAL    ADMINISTRATION   IN HOUSE ADMINISTRATION OF THE FHWA SUPPORTIVE SERVICES PROGRAM: "DBE"                                                Federal specified funding for
   10336 *                            COMPLIANCE MONITORING (Annual Program)                                                                                disadvantaged business
        45                                                                                                                                                  enterprises.

                                                 P       2009        Q480 - DBE - SUPPORTIVE SERVICES                                     .090
                                                 P       2010        Q480 - DBE - SUPPORTIVE SERVICES                                     .090
                                                 P       2011        Q480 - DBE - SUPPORTIVE SERVICES                                     .090
                                                 P       2012        Q480 - DBE - SUPPORTIVE SERVICES                                     .090
                                                 P       2013        Q480 - DBE - SUPPORTIVE SERVICES                                     .090
                                                 P       2014        Q480 - DBE - SUPPORTIVE SERVICES                                     .090
                                                 P       2015        Q480 - DBE - SUPPORTIVE SERVICES                                     .090
                                                 P       2016        Q480 - DBE - SUPPORTIVE SERVICES                                     .090
                                                 P       2017        Q480 - DBE - SUPPORTIVE SERVICES                                     .090
                                                 P       2018        Q480 - DBE - SUPPORTIVE SERVICES                                     .090
Highway and Bridge                                                                                                             Total:     .900




                                      Phase:      C = Construction        P = Preliminary Engineering       R = Right of Way                                              Projects Page - 74
June 25, 2008
                                                                                                                                                    Previous Previous
Project Name/#       Route/Road:      Location; Scope of Work                                                                              $(M)     Prog. Yr Total$
                                                                                                                                                                        Comments:
STATEWIDE-TRAC       ADMINISTRATION   IMPLEMENT AND PARTICIPATE IN AASHTO TRAC PROGRAM IN LOCAL HIGH SCHOOLS TO                                                Program Funding for 'Education
   13668                              ENCOURAGE STUDENTS TO EXPLORE OPPORTUNITIES IN TRANSPORTATION CAREERS (Annual                                            Outreach' Working with Local
      3512                            Program)                                                                                                                 High Schools.

                                                 P       2009        H240 - STP - STATE FLEXIBLE IN ANY AREA                                 .021
                                                 P       2010        H240 - STP - STATE FLEXIBLE IN ANY AREA                                 .021
                                                 P       2011        H240 - STP - STATE FLEXIBLE IN ANY AREA                                 .021
                                                 P       2012        H240 - STP - STATE FLEXIBLE IN ANY AREA                                 .021
                                                 P       2013        H240 - STP - STATE FLEXIBLE IN ANY AREA                                 .021
                                                 P       2014        H240 - STP - STATE FLEXIBLE IN ANY AREA                                 .021
                                                 P       2015        H240 - STP - STATE FLEXIBLE IN ANY AREA                                 .021
                                                 P       2016        H240 - STP - STATE FLEXIBLE IN ANY AREA                                 .021
Highway and Bridge                                                                                                                Total:     .166
STATEWIDE            AIRPORTS         INSTALL INSTRUMENT LANDING SYSTEM IN THE NORTH COUNTRY                                                                   Address Safety Concerns.

        6584
                                                         2009        AIP - AIRPORT IMPROVEMENT PROGRAM                                      1.500
Aeronautics                                                                                                                       Total:    1.500
STATEWIDE            AIRPORTS         PAVEMENT MAINTENANCE                                                                                                     Performed in accordance with
                                                                                                                                                               Pavement Management
        3472                                                                                                                                                   System.

                                                         2009        AIP - AIRPORT IMPROVEMENT PROGRAM                                       .100
                                                         2010        AIP - AIRPORT IMPROVEMENT PROGRAM                                       .100
                                                         2011        AIP - AIRPORT IMPROVEMENT PROGRAM                                       .100
                                                         2012        AIP - AIRPORT IMPROVEMENT PROGRAM                                       .100
                                                         2013        AIP - AIRPORT IMPROVEMENT PROGRAM                                       .100
                                                         2014        AIP - AIRPORT IMPROVEMENT PROGRAM                                       .100
                                                         2015        AIP - AIRPORT IMPROVEMENT PROGRAM                                       .100
                                                         2016        AIP - AIRPORT IMPROVEMENT PROGRAM                                       .100
Aeronautics                                                                                                                       Total:     .800




                                      Phase:      C = Construction        P = Preliminary Engineering          R = Right of Way                                              Projects Page - 75
June 25, 2008
                                                                                                                                           Previous Previous
Project Name/#       Route/Road:   Location; Scope of Work                                                                        $(M)     Prog. Yr Total$
                                                                                                                                                               Comments:
STATEWIDE            AIRPORTS      STATE AIRPORT SYSTEM PLANNING                                                                                      Planning document; 5% State
                                                                                                                                                      match. Allows for updated
        3473                                                                                                                                          management of the dynamic
                                                                                                                                                      system of NH Open to the
                                                                                                                                                      Public Airports.

                                                      2009        AIP - AIRPORT IMPROVEMENT PROGRAM                                 .150
                                                      2010        AIP - AIRPORT IMPROVEMENT PROGRAM                                 .150
                                                      2011        AIP - AIRPORT IMPROVEMENT PROGRAM                                 .150
                                                      2012        AIP - AIRPORT IMPROVEMENT PROGRAM                                 .150
                                                      2013        AIP - AIRPORT IMPROVEMENT PROGRAM                                 .150
                                                      2014        AIP - AIRPORT IMPROVEMENT PROGRAM                                 .150
                                                      2015        AIP - AIRPORT IMPROVEMENT PROGRAM                                 .150
                                                      2016        AIP - AIRPORT IMPROVEMENT PROGRAM                                 .150
                                                      2017        AIP - AIRPORT IMPROVEMENT PROGRAM                                 .300
                                                      2018        AIP - AIRPORT IMPROVEMENT PROGRAM                                 .300
Aeronautics                                                                                                              Total:    1.800
STATEWIDE            BETTERMENT    BRIDGE REHABILITATION, PRESERVATION & IMPROVEMENT PROJECTS                                                         Small State System Projects.
   BET-BRPI
      4212
                                              C       2009        BET - BETTERMENT (State FY)                                       .300
                                              C       2010        BET - BETTERMENT (State FY)                                       .300
                                              C       2011        BET - BETTERMENT (State FY)                                       .300
                                              C       2012        BET - BETTERMENT (State FY)                                       .300
                                              C       2013        BET - BETTERMENT (State FY)                                       .300
                                              C       2014        BET - BETTERMENT (State FY)                                       .300
                                              C       2015        BET - BETTERMENT (State FY)                                       .300
                                              C       2016        BET - BETTERMENT (State FY)                                       .300
                                              C       2017        BET - BETTERMENT (State FY)                                       .300
                                              C       2018        BET - BETTERMENT (State FY)                                       .300
Highway and Bridge                                                                                                       Total:    3.000               3.000




                                   Phase:      C = Construction        P = Preliminary Engineering    R = Right of Way                                              Projects Page - 76
June 25, 2008
                                                                                                                                               Previous Previous
Project Name/#        Route/Road:   Location; Scope of Work                                                                           $(M)     Prog. Yr Total$
                                                                                                                                                                   Comments:
STATEWIDE DISTRICTS   BETTERMENT    DISTRICTS FORCE ACCOUNT WORK @ VARIOUS LOCATIONS (Annual Project)                                                     Force Account Through District
   BET-FA *                                                                                                                                               Staff
       789
                                                C      2009        BET - BETTERMENT (State FY)                                          .600
                                                C      2010        BET - BETTERMENT (State FY)                                          .600
                                                C      2011        BET - BETTERMENT (State FY)                                          .600
                                                C      2012        BET - BETTERMENT (State FY)                                          .600
                                                C      2013        BET - BETTERMENT (State FY)                                          .600
                                                C      2014        BET - BETTERMENT (State FY)                                          .600
                                                C      2015        BET - BETTERMENT (State FY)                                          .600
                                                C      2016        BET - BETTERMENT (State FY)                                          .600
                                                C      2017        BET - BETTERMENT (State FY)                                          .600
                                                C      2018        BET - BETTERMENT (State FY)                                          .600
Highway and Bridge                                                                                                           Total:    6.000               5.878
STATEWIDE             BETTERMENT    HAZARDOUS INTERSECTION AND ROADWAY IMPROVEMENTS (Annual Project) [Id 3639]                                            Small State System Projects.
   BET-HIRI *
      3639
                                                C      2009        BET - BETTERMENT (State FY)                                          .500
                                                C      2010        BET - BETTERMENT (State FY)                                          .500
                                                C      2011        BET - BETTERMENT (State FY)                                          .500
                                                C      2012        BET - BETTERMENT (State FY)                                          .500
                                                C      2013        BET - BETTERMENT (State FY)                                          .500
                                                C      2014        BET - BETTERMENT (State FY)                                          .500
                                                C      2015        BET - BETTERMENT (State FY)                                          .500
                                                C      2016        BET - BETTERMENT (State FY)                                          .500
                                                C      2017        BET - BETTERMENT (State FY)                                          .500
                                                C      2018        BET - BETTERMENT (State FY)                                          .500
Highway and Bridge                                                                                                           Total:    5.000               5.000
STATEWIDE             ENG & ROW     CORRIDOR STUDIES (Long Range Transportation Plan)                                                                     Implement strategic inter-
                                                                                                                                                          regional corridor studies.
        6781
                                                P      2009        H550 - "STEA03" - STATE PLAN'N & RSRCH-PART 1 "PLAN'N"              2.000
                                                P      2010        H550 - "STEA03" - STATE PLAN'N & RSRCH-PART 1 "PLAN'N"              2.000
                                                P      2011        H550 - "STEA03" - STATE PLAN'N & RSRCH-PART 1 "PLAN'N"              1.500
                                                P      2012        H550 - "STEA03" - STATE PLAN'N & RSRCH-PART 1 "PLAN'N"              1.500
                                                P      2013        H550 - "STEA03" - STATE PLAN'N & RSRCH-PART 1 "PLAN'N"              1.500
Highway and Bridge                                                                                                           Total:    8.500




                                    Phase:      C = Construction        P = Preliminary Engineering       R = Right of Way                                              Projects Page - 77
June 25, 2008
                                                                                                                                             Previous Previous
Project Name/#       Route/Road:   Location; Scope of Work                                                                          $(M)     Prog. Yr Total$
                                                                                                                                                                 Comments:
STATEWIDE M & R      ENG & ROW     EQUIPMENT SERVICE & CALIBRATION AGREEMENTS AND PROJECT RELATED CONSUMABLES                                           Means of Servicing
ACTIVITIES                         (Annual Project)                                                                                                     Sophisticated Electronic Lab &
   13921 *                                                                                                                                              Materials Equipment used on
      3801                                                                                                                                              Federal Aid Highway & Bridge
                                                                                                                                                        Projects

                                              C      2009        L200 - STP - AREAS LESS THAN 200,000                                 .050
                                              C      2010        L200 - STP - AREAS LESS THAN 200,000                                 .050
                                              C      2011        L200 - STP - AREAS LESS THAN 200,000                                 .050
                                              C      2012        L200 - STP - AREAS LESS THAN 200,000                                 .050
                                              C      2013        L200 - STP - AREAS LESS THAN 200,000                                 .050
                                              C      2014        L200 - STP - AREAS LESS THAN 200,000                                 .050
                                              C      2015        L200 - STP - AREAS LESS THAN 200,000                                 .050
                                              C      2016        L200 - STP - AREAS LESS THAN 200,000                                 .050
                                              C      2017        L200 - STP - AREAS LESS THAN 200,000                                 .050
                                              C      2018        L200 - STP - AREAS LESS THAN 200,000                                 .050
                                              P      2009        L200 - STP - AREAS LESS THAN 200,000                                 .045
                                              P      2010        L200 - STP - AREAS LESS THAN 200,000                                 .045
                                              P      2011        L200 - STP - AREAS LESS THAN 200,000                                 .045
                                              P      2012        L200 - STP - AREAS LESS THAN 200,000                                 .045
                                              P      2013        L200 - STP - AREAS LESS THAN 200,000                                 .045
                                              P      2014        L200 - STP - AREAS LESS THAN 200,000                                 .045
                                              P      2015        L200 - STP - AREAS LESS THAN 200,000                                 .045
                                              P      2016        L200 - STP - AREAS LESS THAN 200,000                                 .045
                                              P      2017        L200 - STP - AREAS LESS THAN 200,000                                 .045
                                              P      2018        L200 - STP - AREAS LESS THAN 200,000                                 .045
Highway and Bridge                                                                                                         Total:     .950               0.900
STATEWIDE SPECIAL    ENG & ROW     GEODETIC ADVISOR, COOPERATIVE AGREEMENT BETWEEN US DEPT of COMMERCE NATIONAL
   10909 B                         OCEAN SERVICES & NHDOT (Annual Project)
      1684
                                              P      2009        L240 - STP - SURFACE TRANSP. STATE FLEXIBLE IN ANY AREA              .042
                                              P      2010        L240 - STP - SURFACE TRANSP. STATE FLEXIBLE IN ANY AREA              .044
                                              P      2011        L240 - STP - SURFACE TRANSP. STATE FLEXIBLE IN ANY AREA              .047
Highway and Bridge                                                                                                         Total:     .133




                                   Phase:     C = Construction        P = Preliminary Engineering       R = Right of Way                                              Projects Page - 78
June 25, 2008
                                                                                                                                                 Previous Previous
Project Name/#       Route/Road:   Location; Scope of Work                                                                              $(M)     Prog. Yr Total$
                                                                                                                                                                     Comments:
STATEWIDE SPECIAL    ENG & ROW     GEODETIC ADVISOR, COOPERATIVE AGREEMENT BETWEEN US DEPT of COMMERCE NATIONAL                                             For Funding Shared (MA & NH)
   10909 *                         OCEAN SERVICES & NHDOT (Annual Project)                                                                                  USGS Geodectic Survey Advisor
      2683                                                                                                                                                  Position & Coordination

                                               P      2012        L240 - STP - SURFACE TRANSP. STATE FLEXIBLE IN ANY AREA                 .049
                                               P      2013        L240 - STP - SURFACE TRANSP. STATE FLEXIBLE IN ANY AREA                 .051
                                               P      2014        L240 - STP - SURFACE TRANSP. STATE FLEXIBLE IN ANY AREA                 .054
                                               P      2015        L240 - STP - SURFACE TRANSP. STATE FLEXIBLE IN ANY AREA                 .057
                                               P      2016        L240 - STP - SURFACE TRANSP. STATE FLEXIBLE IN ANY AREA                 .060
                                               P      2017        L240 - STP - SURFACE TRANSP. STATE FLEXIBLE IN ANY AREA                 .062
                                               P      2018        L240 - STP - SURFACE TRANSP. STATE FLEXIBLE IN ANY AREA                 .066
Highway and Bridge                                                                                                             Total:     .399
STATEWIDE            ENG & ROW     MOVEABLE BRIDGE INSPECTION                                                                                               Consultant Services to Provide
                                                                                                                                                            Periodic Specialized Inspection
        3570                                                                                                                                                Needs.

                                               P      2010        H240 - STP - STATE FLEXIBLE IN ANY AREA                                 .150   2010
Highway and Bridge                                                                                                             Total:     .150
STATEWIDE            ENG & ROW     POST-CONSTRUCTION ENVIRONMENTAL REMEDIAL ACTION AND/OR MONITORING OF                                                     Extended Post Construction
   11848                           ENVIRONMENTAL MITIGATION MEASURES                                                                                        Monitoring / Inspection to Fulfill
      1526                                                                                                                                                  Environmental Commitments.

                                               P      2009        L240 - STP - SURFACE TRANSP. STATE FLEXIBLE IN ANY AREA                 .020
                                               P      2015        L240 - STP - SURFACE TRANSP. STATE FLEXIBLE IN ANY AREA                 .020
Highway and Bridge                                                                                                             Total:     .040
STATEWIDE P.E.       ENG & ROW     PRELIMINARY ENGINEERING (Annual Funding)                                                                                 Available PE funding as
                                                                                                                                                            required for specific projects for
        3531                                                                                                                                                which the scope of work (and
                                                                                                                                                            the depth of engineering) is yet
                                                                                                                                                            to be defined.

                                               P      2012        VAR - VARIOUS FEDERAL FUNDING CATEGORIES                               5.000
                                               P      2013        VAR - VARIOUS FEDERAL FUNDING CATEGORIES                               5.250
                                               P      2014        VAR - VARIOUS FEDERAL FUNDING CATEGORIES                               8.375
                                               P      2015        VAR - VARIOUS FEDERAL FUNDING CATEGORIES                               7.750
                                               P      2016        VAR - VARIOUS FEDERAL FUNDING CATEGORIES                               7.750
                                               P      2017        VAR - VARIOUS FEDERAL FUNDING CATEGORIES                               9.400
                                               P      2018        VAR - VARIOUS FEDERAL FUNDING CATEGORIES                               9.400
Highway and Bridge                                                                                                             Total:   52.925




                                   Phase:      C = Construction        P = Preliminary Engineering          R = Right of Way                                               Projects Page - 79
June 25, 2008
                                                                                                                                              Previous Previous
Project Name/#        Route/Road:   Location; Scope of Work                                                                          $(M)     Prog. Yr Total$
                                                                                                                                                                  Comments:
STATEWIDE - SPR       ENG & ROW     POOLED FUND STUDY - LONG TERM MAINT OF LOAD & RESISTANCE FACTORS
   14798
      6373
                                                P      2009        Q560 - "STEA" - STATE PLAN'N & RSRCH-PART 2 "RSRCH"                 .020
Highway and Bridge                                                                                                          Total:     .020
STATEWIDE             ENG & ROW     PROJECT PROVIDES PAINT INSPECTION AND CONSULTING SERVICES AS NEEDED FOR ALL
   14936                            BRIDGE RELATED CONTRACTS ON A STATEWIDE BASIS
      6490
                                                P      2009        H120 - BRIDGE REPLACEMENT - ON/OFF SYSTEM                           .350
                                                P      2010        H120 - BRIDGE REPLACEMENT - ON/OFF SYSTEM                           .250
                                                P      2011        H120 - BRIDGE REPLACEMENT - ON/OFF SYSTEM                           .025
Highway and Bridge                                                                                                          Total:     .625
STATEWIDE R.O.W.      ENG & ROW     RIGHT OF WAY ACQUISITIONS (Annual Funding)                                                                           Available ROW funding as
                                                                                                                                                         required for specific projects for
        3532                                                                                                                                             which the scope of work (and
                                                                                                                                                         the amount of ROW) is yet to be
                                                                                                                                                         defined.

                                                R      2011        VAR - VARIOUS FEDERAL FUNDING CATEGORIES                          16.250
                                                R      2012        VAR - VARIOUS FEDERAL FUNDING CATEGORIES                          13.750
                                                R      2013        VAR - VARIOUS FEDERAL FUNDING CATEGORIES                          10.500
                                                R      2014        VAR - VARIOUS FEDERAL FUNDING CATEGORIES                           9.750
                                                R      2015        VAR - VARIOUS FEDERAL FUNDING CATEGORIES                          10.500
                                                R      2016        VAR - VARIOUS FEDERAL FUNDING CATEGORIES                          12.500
                                                R      2017        VAR - VARIOUS FEDERAL FUNDING CATEGORIES                          11.500
                                                R      2018        VAR - VARIOUS FEDERAL FUNDING CATEGORIES                          12.500
Highway and Bridge                                                                                                          Total:   97.250
STATEWIDE MISC P.E.   ENG & ROW     SET ASIDE FUNDS FOR UNANTICIPATED P.E. INCREASES                                                                     Generic Preliminary Engineering
                                                                                                                                                         placeholder funds for specific
         992                                                                                                                                             federal funding categories
                                                                                                                                                         during the STIP years (2007,
                                                                                                                                                         2008, 2009, 2010) to reduce
                                                                                                                                                         paperwork involved with the
                                                                                                                                                         federal STIP process.

                                                P      2009        VAR - VARIOUS FEDERAL FUNDING CATEGORIES                            .625
                                                P      2010        VAR - VARIOUS FEDERAL FUNDING CATEGORIES                            .625
Highway and Bridge                                                                                                          Total:    1.250




                                    Phase:      C = Construction        P = Preliminary Engineering      R = Right of Way                                              Projects Page - 80
June 25, 2008
                                                                                                                                                 Previous Previous
Project Name/#          Route/Road:       Location; Scope of Work                                                                       $(M)     Prog. Yr Total$
                                                                                                                                                                     Comments:
STATEWIDE MISC R.O.W.   ENG & ROW         SET ASIDE FUNDS FOR UNANTICIPATED R.O.W. INCREASES                                                                Generic Preliminary Engineering
                                                                                                                                                            placeholder funds for specific
        1001                                                                                                                                                federal funding categories
                                                                                                                                                            during the STIP years (2007,
                                                                                                                                                            2008, 2009, 2010) to reduce
                                                                                                                                                            paperwork involved with the
                                                                                                                                                            federal STIP process.

                                                      R      2009        VAR - VARIOUS FEDERAL FUNDING CATEGORIES                         .625
                                                      R      2010        VAR - VARIOUS FEDERAL FUNDING CATEGORIES                         .625
Highway and Bridge                                                                                                             Total:    1.250
STATEWIDE               ENG & ROW         UNDERWATER BRIDGE INSPECTION (Annual Project)                                                                     Consultant services for
   114-UBI                                                                                                                                                  underwater bridge inspections.
       186
                                                      P      2009        H120 - BRIDGE REPLACEMENT - ON/OFF SYSTEM                        .030
                                                      P      2010        H120 - BRIDGE REPLACEMENT - ON/OFF SYSTEM                        .030
                                                      P      2011        H120 - BRIDGE REPLACEMENT - ON/OFF SYSTEM                        .030
                                                      P      2012        H120 - BRIDGE REPLACEMENT - ON/OFF SYSTEM                        .030
                                                      P      2013        H120 - BRIDGE REPLACEMENT - ON/OFF SYSTEM                        .030
                                                      P      2014        H120 - BRIDGE REPLACEMENT - ON/OFF SYSTEM                        .030
                                                      P      2015        H120 - BRIDGE REPLACEMENT - ON/OFF SYSTEM                        .030
                                                      P      2016        H120 - BRIDGE REPLACEMENT - ON/OFF SYSTEM                        .030
                                                      P      2017        H120 - BRIDGE REPLACEMENT - ON/OFF SYSTEM                        .030
                                                      P      2018        H120 - BRIDGE REPLACEMENT - ON/OFF SYSTEM                        .030
Highway and Bridge                                                                                                             Total:     .300
STATEWIDE               FOREST HIGHWAYS   TO ENHANCE NATIONAL BENEFITS BY PROVIDING CONSTRUCTION & MAINTENANCE OF
   19A-EFH *                              FOREST HIGHWAYS (Annual Project)
       444
                                                      C      2009        4150 - FOREST HIGHWAYS                                           .700
                                                      C      2010        4150 - FOREST HIGHWAYS                                           .700
                                                      C      2011        4150 - FOREST HIGHWAYS                                           .700
                                                      C      2012        4150 - FOREST HIGHWAYS                                           .700
                                                      C      2013        4150 - FOREST HIGHWAYS                                           .700
                                                      C      2014        4150 - FOREST HIGHWAYS                                           .700
                                                      C      2015        4150 - FOREST HIGHWAYS                                           .700
                                                      C      2016        4150 - FOREST HIGHWAYS                                           .700
                                                      C      2017        4150 - FOREST HIGHWAYS                                           .700
                                                      C      2018        4150 - FOREST HIGHWAYS                                           .700
Highway and Bridge                                                                                                             Total:    7.000               5.462




                                          Phase:      C = Construction       P = Preliminary Engineering    R = Right of Way                                              Projects Page - 81
June 25, 2008
                                                                                                                                        Previous Previous
Project Name/#      Route/Road:   Location; Scope of Work                                                                      $(M)     Prog. Yr Total$
                                                                                                                                                            Comments:
STATEWIDE           LOW VOLUME    RECREATIONAL TRAILS FUND ACT- PROJECTS SELECTED ANNUALLY                                                         Specified Funding for
   P8903 *          CORRIDORS                                                                                                                      Recreational Trail Program
      2570                                                                                                                                         Administered by DRED.

                                             C       2009        L940 - RECREATIONAL TRAILS                                      .775
                                             C       2010        L940 - RECREATIONAL TRAILS                                      .775
                                             C       2011        L940 - RECREATIONAL TRAILS                                      .775
                                             C       2012        L940 - RECREATIONAL TRAILS                                      .775
                                             C       2013        L940 - RECREATIONAL TRAILS                                      .775
                                             C       2014        L940 - RECREATIONAL TRAILS                                      .775
                                             C       2015        L940 - RECREATIONAL TRAILS                                      .775
                                             C       2016        L940 - RECREATIONAL TRAILS                                      .775
                                             C       2017        L940 - RECREATIONAL TRAILS                                      .775
                                             C       2018        L940 - RECREATIONAL TRAILS                                      .775
                                             P       2009        L940 - RECREATIONAL TRAILS                                      .005
                                             P       2010        L940 - RECREATIONAL TRAILS                                      .005
                                             P       2011        L940 - RECREATIONAL TRAILS                                      .005
                                             P       2012        L940 - RECREATIONAL TRAILS                                      .005
                                             P       2013        L940 - RECREATIONAL TRAILS                                      .005
                                             P       2014        L940 - RECREATIONAL TRAILS                                      .005
                                             P       2015        L940 - RECREATIONAL TRAILS                                      .005
                                             P       2016        L940 - RECREATIONAL TRAILS                                      .005
                                             P       2017        L940 - RECREATIONAL TRAILS                                      .005
                                             P       2018        L940 - RECREATIONAL TRAILS                                      .005
                                             R       2009        L940 - RECREATIONAL TRAILS                                      .001
                                             R       2010        L940 - RECREATIONAL TRAILS                                      .001
                                             R       2011        L940 - RECREATIONAL TRAILS                                      .001
                                             R       2012        L940 - RECREATIONAL TRAILS                                      .001
                                             R       2013        L940 - RECREATIONAL TRAILS                                      .001
                                             R       2014        L940 - RECREATIONAL TRAILS                                      .001
                                             R       2015        L940 - RECREATIONAL TRAILS                                      .001
                                             R       2016        L940 - RECREATIONAL TRAILS                                      .001
                                             R       2017        L940 - RECREATIONAL TRAILS                                      .001
                                             R       2018        L940 - RECREATIONAL TRAILS                                      .001
Bike / Pedestrian                                                                                                     Total:    7.810               7.810




                                  Phase:      C = Construction       P = Preliminary Engineering   R = Right of Way                                              Projects Page - 82
June 25, 2008
                                                                                                                                          Previous Previous
Project Name/#       Route/Road:     Location; Scope of Work                                                                     $(M)     Prog. Yr Total$
                                                                                                                                                              Comments:
STATEWIDE            MISCELLANEOUS   ANNUAL STATEWIDE PROGRAM FOR THE EXPANDED WILD FLOWER ESTABLISHMENT PROGRAM                                     Annual Statewide Wild Flower
   13763 *                           FOR USE IN PLANTING NATIVE WILD FLOWERS (License Plate Program)                                                 Program
      4229
                                                C      2009        NON - OTHER NON PARTICIPATING                                   .037
                                                C      2010        NON - OTHER NON PARTICIPATING                                   .037
                                                C      2011        NON - OTHER NON PARTICIPATING                                   .037
                                                C      2012        NON - OTHER NON PARTICIPATING                                   .037
                                                C      2013        NON - OTHER NON PARTICIPATING                                   .037
                                                C      2014        NON - OTHER NON PARTICIPATING                                   .037
                                                C      2015        NON - OTHER NON PARTICIPATING                                   .037
                                                C      2016        NON - OTHER NON PARTICIPATING                                   .037
                                                C      2017        NON - OTHER NON PARTICIPATING                                   .037
                                                C      2018        NON - OTHER NON PARTICIPATING                                   .037
                                                P      2009        NON - OTHER NON PARTICIPATING                                   .003
                                                P      2010        NON - OTHER NON PARTICIPATING                                   .003
                                                P      2011        NON - OTHER NON PARTICIPATING                                   .003
                                                P      2012        NON - OTHER NON PARTICIPATING                                   .003
                                                P      2013        NON - OTHER NON PARTICIPATING                                   .003
                                                P      2014        NON - OTHER NON PARTICIPATING                                   .003
                                                P      2015        NON - OTHER NON PARTICIPATING                                   .003
                                                P      2016        NON - OTHER NON PARTICIPATING                                   .003
                                                P      2017        NON - OTHER NON PARTICIPATING                                   .003
                                                P      2018        NON - OTHER NON PARTICIPATING                                   .003
Highway and Bridge                                                                                                      Total:     .400               0.400




                                     Phase:     C = Construction       P = Preliminary Engineering   R = Right of Way                                              Projects Page - 83
June 25, 2008
                                                                                                                                                Previous Previous
Project Name/#       Route/Road:     Location; Scope of Work                                                                           $(M)     Prog. Yr Total$
                                                                                                                                                                    Comments:
STATEWIDE            MISCELLANEOUS   MAINTENANCE AND UPGRADES FOR REST AREAS                                                                               $0.3 million annual program.
   14899
      6127
                                                 C      2009        L240 - STP - SURFACE TRANSP. STATE FLEXIBLE IN ANY AREA              .300
                                                 C      2010        L240 - STP - SURFACE TRANSP. STATE FLEXIBLE IN ANY AREA              .300
                                                 C      2011        L240 - STP - SURFACE TRANSP. STATE FLEXIBLE IN ANY AREA              .300
                                                 C      2012        L240 - STP - SURFACE TRANSP. STATE FLEXIBLE IN ANY AREA              .300
                                                 C      2013        L240 - STP - SURFACE TRANSP. STATE FLEXIBLE IN ANY AREA              .300
                                                 C      2014        L240 - STP - SURFACE TRANSP. STATE FLEXIBLE IN ANY AREA              .300
                                                 C      2015        L240 - STP - SURFACE TRANSP. STATE FLEXIBLE IN ANY AREA              .300
                                                 C      2016        L240 - STP - SURFACE TRANSP. STATE FLEXIBLE IN ANY AREA              .300
                                                 C      2017        L240 - STP - SURFACE TRANSP. STATE FLEXIBLE IN ANY AREA              .300
                                                 C      2018        L240 - STP - SURFACE TRANSP. STATE FLEXIBLE IN ANY AREA              .300
                                                 P      2009        L240 - STP - SURFACE TRANSP. STATE FLEXIBLE IN ANY AREA              .025
                                                 P      2010        L240 - STP - SURFACE TRANSP. STATE FLEXIBLE IN ANY AREA              .025
                                                 P      2011        L240 - STP - SURFACE TRANSP. STATE FLEXIBLE IN ANY AREA              .025
                                                 P      2012        L240 - STP - SURFACE TRANSP. STATE FLEXIBLE IN ANY AREA              .025
                                                 P      2013        L240 - STP - SURFACE TRANSP. STATE FLEXIBLE IN ANY AREA              .025
                                                 P      2014        L240 - STP - SURFACE TRANSP. STATE FLEXIBLE IN ANY AREA              .025
                                                 P      2015        L240 - STP - SURFACE TRANSP. STATE FLEXIBLE IN ANY AREA              .025
                                                 P      2016        L240 - STP - SURFACE TRANSP. STATE FLEXIBLE IN ANY AREA              .025
                                                 P      2017        L240 - STP - SURFACE TRANSP. STATE FLEXIBLE IN ANY AREA              .025
                                                 P      2018        L240 - STP - SURFACE TRANSP. STATE FLEXIBLE IN ANY AREA              .025
Highway and Bridge                                                                                                            Total:    3.250               6.000
STATEWIDE            MUNICIPAL       CMAQ PROJECTS MUST BE IN NON-ATTAIN AREAS (Annual Project)                                                            Specific CMAQ Projects
   320-ONA                                                                                                                                                 Occupy the Vacant FY's &
       446                                                                                                                                                 Below Normal FY Funding

                                                 C      2013        L400 - CONGESTION MITIGATION & AIR QUALITY IMPROVEMENT              1.950
                                                 C      2014        L400 - CONGESTION MITIGATION & AIR QUALITY IMPROVEMENT              8.600
                                                 C      2015        L400 - CONGESTION MITIGATION & AIR QUALITY IMPROVEMENT             10.000
                                                 C      2016        L400 - CONGESTION MITIGATION & AIR QUALITY IMPROVEMENT              1.500
                                                 C      2017        L400 - CONGESTION MITIGATION & AIR QUALITY IMPROVEMENT              8.600
                                                 C      2018        L400 - CONGESTION MITIGATION & AIR QUALITY IMPROVEMENT             10.000
Highway and Bridge                                                                                                            Total:   40.650              10.471




                                     Phase:      C = Construction        P = Preliminary Engineering       R = Right of Way                                              Projects Page - 84
June 25, 2008
                                                                                                                                            Previous Previous
Project Name/#       Route/Road:   Location; Scope of Work                                                                         $(M)     Prog. Yr Total$
                                                                                                                                                                Comments:
STATEWIDE            MUNICIPAL     MUNICIPAL OWNED BRIDGE REHABILITATION & REPLACEMENT PROJECTS (Federal, State,                                       Special Municipal Projects
   117-MO                          Local Funds) (Annual Project)                                                                                       Occupy the Vacant FYs &
       221                                                                                                                                             Below Normal FY Funding.

                                               C      2013        H110 - BRIDGE REPLACEMENT - OFF SYSTEM                             .250
                                               C      2014        H110 - BRIDGE REPLACEMENT - OFF SYSTEM                            4.250
                                               C      2015        H110 - BRIDGE REPLACEMENT - OFF SYSTEM                            4.250
                                               C      2016        H110 - BRIDGE REPLACEMENT - OFF SYSTEM                            4.250
                                               C      2017        H110 - BRIDGE REPLACEMENT - OFF SYSTEM                            4.250
                                               C      2018        H110 - BRIDGE REPLACEMENT - OFF SYSTEM                            4.250
Highway and Bridge                                                                                                        Total:   21.500              12.235
STATEWIDE            MUNICIPAL     MUNICIPAL URBAN PROJECTS - COMPACT AREAS [Annual Project]                                                           Specific Projects occupy
   MUPCA                                                                                                                                               vacant FY's & below normal FY
       450                                                                                                                                             funding.

                                               C      2015        H230 - STP - URBANIZED AREAS OVER 200,000                         1.200
                                               C      2016        H230 - STP - URBANIZED AREAS OVER 200,000                         2.000
                                               C      2017        H230 - STP - URBANIZED AREAS OVER 200,000                         6.600
                                               C      2018        H230 - STP - URBANIZED AREAS OVER 200,000                         6.600
Highway and Bridge                                                                                                        Total:   16.400              14.300
STATEWIDE            MUNICIPAL     SAFE ROUTES TO SCHOOL PROGRAM                                                                                       New Federal program under
   14932                                                                                                                                               SAFETEA-LU.
      3965
                                               C      2009        HU10 - SAFE ROUTES TO SCHOOL PROG - NON INFR                       .825
                                               C      2009        LU10 - SAFE ROUTES TO SCHOOL PROG                                  .075
                                               C      2010        HU30 - SAFE ROUTES TO SCHOOL PROG EITHER                           .825
                                               C      2010        HU30 - SAFE ROUTES TO SCHOOL PROG EITHER                           .075
                                               P      2009        LU20 - SAFE ROUTES TO SCHOOL PROG INFR                             .125
                                               P      2009        LU20 - SAFE ROUTES TO SCHOOL PROG INFR                             .175
                                               R      2009        LU10 - SAFE ROUTES TO SCHOOL PROG                                  .050
Highway and Bridge                                                                                                        Total:    2.150




                                   Phase:      C = Construction        P = Preliminary Engineering     R = Right of Way                                              Projects Page - 85
June 25, 2008
                                                                                                                                              Previous Previous
Project Name/#       Route/Road:   Location; Scope of Work                                                                           $(M)     Prog. Yr Total$
                                                                                                                                                                  Comments:
STATEWIDE            MUNICIPAL     STATE AID BRIDGE PROJECTS                                                                                             Specific Projects Occupy the
   SABP                                                                                                                                                  Vacant FY's & Below Normal FY
      4216                                                                                                                                               Funding. State program
                                                                                                                                                         mandated by RSA 234 to assist
                                                                                                                                                         municipalities with bridge
                                                                                                                                                         needs. Uses 20% local match /
                                                                                                                                                         80% state funds.

                                               C      2010        SAB - STATE AID BRIDGE (State FY), 20% = Town                        .529
                                               C      2011        SAB - STATE AID BRIDGE (State FY), 20% = Town                       5.788
                                               C      2012        SAB - STATE AID BRIDGE (State FY), 20% = Town                       4.393
                                               C      2013        SAB - STATE AID BRIDGE (State FY), 20% = Town                       4.620
                                               C      2014        SAB - STATE AID BRIDGE (State FY), 20% = Town                       5.350
                                               C      2015        SAB - STATE AID BRIDGE (State FY), 20% = Town                       8.000
                                               C      2016        SAB - STATE AID BRIDGE (State FY), 20% = Town                       8.000
                                               C      2017        SAB - STATE AID BRIDGE (State FY), 20% = Town                       8.000
                                               C      2018        SAB - STATE AID BRIDGE (State FY), 20% = Town                       8.000
Highway and Bridge                                                                                                          Total:   52.680              47.229
STATEWIDE            MUNICIPAL     STATE AID HIGHWAY PROJECTS                                                                                            Specific Projects Occupy the
   SAHP                                                                                                                                                  Vacant FY's & Below Normal FY
      4217                                                                                                                                               Funding. State program
                                                                                                                                                         mandated by RSA 235: 10-:21
                                                                                                                                                         for constructing or
                                                                                                                                                         reconstructing Class I, II, III
                                                                                                                                                         highways when requested by
                                                                                                                                                         municipalities. Uses 1/3 local
                                                                                                                                                         match / 2/3 state funds.

                                               C      2009        SAH - STATE AID HIGHWAY (State FY), 33.3% = Town                    1.577
                                               C      2010        SAH - STATE AID HIGHWAY (State FY), 33.3% = Town                     .787
                                               C      2011        SAH - STATE AID HIGHWAY (State FY), 33.3% = Town                    1.387
                                               C      2012        SAH - STATE AID HIGHWAY (State FY), 33.3% = Town                    1.537
                                               C      2013        SAH - STATE AID HIGHWAY (State FY), 33.3% = Town                    2.537
                                               C      2014        SAH - STATE AID HIGHWAY (State FY), 33.3% = Town                    2.537
                                               C      2015        SAH - STATE AID HIGHWAY (State FY), 33.3% = Town                    2.537
                                               C      2016        SAH - STATE AID HIGHWAY (State FY), 33.3% = Town                    2.537
                                               C      2017        SAH - STATE AID HIGHWAY (State FY), 33.3% = Town                    2.537
                                               C      2018        SAH - STATE AID HIGHWAY (State FY), 33.3% = Town                    2.537
Highway and Bridge                                                                                                          Total:   20.513              19.241




                                   Phase:      C = Construction        P = Preliminary Engineering       R = Right of Way                                              Projects Page - 86
June 25, 2008
                                                                                                                                          Previous Previous
Project Name/#       Route/Road:   Location; Scope of Work                                                                       $(M)     Prog. Yr Total$
                                                                                                                                                              Comments:
STATEWIDE SPECIAL    MUNICIPAL     TECHNICAL ASSISTANCE PROGRAM TO RURAL COMMUNITIES AND ORGANIZATIONS                                               Federal specified funding for
   10344 *                         THROUGH-OUT THE STATE - (LTAP) (Annual Project)                                                                   providing technical assistance
        58                                                                                                                                           on transportation issues to
                                                                                                                                                     municipalities. Funding
                                                                                                                                                     increases to reflect SAFETEA-LU
                                                                                                                                                     legislation.

                                              P       2009        Q890 - TRANSPORTATION ASST. 50%                                  .300
                                              P       2010        Q890 - TRANSPORTATION ASST. 50%                                  .300
                                              P       2011        Q890 - TRANSPORTATION ASST. 50%                                  .300
                                              P       2012        Q890 - TRANSPORTATION ASST. 50%                                  .300
                                              P       2013        Q890 - TRANSPORTATION ASST. 50%                                  .300
                                              P       2014        Q890 - TRANSPORTATION ASST. 50%                                  .300
                                              P       2015        Q890 - TRANSPORTATION ASST. 50%                                  .300
                                              P       2016        Q890 - TRANSPORTATION ASST. 50%                                  .300
                                              P       2017        Q890 - TRANSPORTATION ASST. 50%                                  .300
                                              P       2018        Q890 - TRANSPORTATION ASST. 50%                                  .300
Highway and Bridge                                                                                                      Total:    3.000
STATEWIDE            MUNICIPAL     TRANSPORTATION ENHANCEMENT PROJECTS (Annual Project)                                                              TE program, $4 million annually.
   33B-TE
      3747
                                              C       2012        L220 - STP - TRANSPORTATION ENHANCEMENT                         2.000
                                              C       2013        L220 - STP - TRANSPORTATION ENHANCEMENT                         4.000
                                              C       2014        L220 - STP - TRANSPORTATION ENHANCEMENT                         4.000
                                              C       2015        L220 - STP - TRANSPORTATION ENHANCEMENT                         3.400
                                              C       2016        L220 - STP - TRANSPORTATION ENHANCEMENT                         4.000
                                              C       2017        L220 - STP - TRANSPORTATION ENHANCEMENT                         4.000
                                              C       2018        L220 - STP - TRANSPORTATION ENHANCEMENT                         4.000
Highway and Bridge                                                                                                      Total:   25.400              23.235




                                   Phase:      C = Construction       P = Preliminary Engineering    R = Right of Way                                              Projects Page - 87
June 25, 2008
                                                                                                                                        Previous Previous
Project Name/#       Route/Road:   Location; Scope of Work                                                                     $(M)     Prog. Yr Total$
                                                                                                                                                            Comments:
STATEWIDE - TCSP     MUNICIPAL     TRANSPORTATION COMMUNITY AND SYSTEM PRESERVATION GRANTS AND SECTION 115                                         Placeholder for Federal
   TCSP                            GRANTS AWARDED TO COMMUNITIES THROUGH CONGRESSIONAL EARMARKS (Annual                                            "Earmarked" funds (funds in
      3787                         Project)                                                                                                        addition to the regular federal
                                                                                                                                                   formula funded program) that
                                                                                                                                                   may be forthcoming through
                                                                                                                                                   the efforts of the NH
                                                                                                                                                   Congressional Delegation.

                                              C      2009        Q680 - TRANSPORTATION & COMMUNITY & SYSTEM PRESERVATIO          .500
                                              C      2010        Q680 - TRANSPORTATION & COMMUNITY & SYSTEM PRESERVATIO          .500
                                              C      2011        Q680 - TRANSPORTATION & COMMUNITY & SYSTEM PRESERVATIO          .500
                                              C      2012        Q680 - TRANSPORTATION & COMMUNITY & SYSTEM PRESERVATIO          .500
                                              C      2013        Q680 - TRANSPORTATION & COMMUNITY & SYSTEM PRESERVATIO          .500
                                              C      2014        Q680 - TRANSPORTATION & COMMUNITY & SYSTEM PRESERVATIO          .500
                                              C      2015        Q680 - TRANSPORTATION & COMMUNITY & SYSTEM PRESERVATIO          .500
                                              C      2016        Q680 - TRANSPORTATION & COMMUNITY & SYSTEM PRESERVATIO          .500
                                              C      2017        Q680 - TRANSPORTATION & COMMUNITY & SYSTEM PRESERVATIO          .500
                                              C      2018        Q680 - TRANSPORTATION & COMMUNITY & SYSTEM PRESERVATIO          .500
                                              P      2009        Q680 - TRANSPORTATION & COMMUNITY & SYSTEM PRESERVATIO          .500
                                              P      2010        Q680 - TRANSPORTATION & COMMUNITY & SYSTEM PRESERVATIO          .500
                                              P      2011        Q680 - TRANSPORTATION & COMMUNITY & SYSTEM PRESERVATIO          .500
                                              P      2012        Q680 - TRANSPORTATION & COMMUNITY & SYSTEM PRESERVATIO          .500
                                              P      2013        Q680 - TRANSPORTATION & COMMUNITY & SYSTEM PRESERVATIO          .500
                                              P      2014        Q680 - TRANSPORTATION & COMMUNITY & SYSTEM PRESERVATIO          .500
                                              P      2015        Q680 - TRANSPORTATION & COMMUNITY & SYSTEM PRESERVATIO          .500
                                              P      2016        Q680 - TRANSPORTATION & COMMUNITY & SYSTEM PRESERVATIO          .500
                                              P      2017        Q680 - TRANSPORTATION & COMMUNITY & SYSTEM PRESERVATIO          .500
                                              P      2018        Q680 - TRANSPORTATION & COMMUNITY & SYSTEM PRESERVATIO          .500
                                              R      2009        Q680 - TRANSPORTATION & COMMUNITY & SYSTEM PRESERVATIO          .100
                                              R      2010        Q680 - TRANSPORTATION & COMMUNITY & SYSTEM PRESERVATIO          .100
                                              R      2011        Q680 - TRANSPORTATION & COMMUNITY & SYSTEM PRESERVATIO          .100
                                              R      2012        Q680 - TRANSPORTATION & COMMUNITY & SYSTEM PRESERVATIO          .100
                                              R      2013        Q680 - TRANSPORTATION & COMMUNITY & SYSTEM PRESERVATIO          .100
                                              R      2014        Q680 - TRANSPORTATION & COMMUNITY & SYSTEM PRESERVATIO          .100
                                              R      2015        Q680 - TRANSPORTATION & COMMUNITY & SYSTEM PRESERVATIO          .100
                                              R      2016        Q680 - TRANSPORTATION & COMMUNITY & SYSTEM PRESERVATIO          .100
                                              R      2017        Q680 - TRANSPORTATION & COMMUNITY & SYSTEM PRESERVATIO          .100
                                              R      2018        Q680 - TRANSPORTATION & COMMUNITY & SYSTEM PRESERVATIO          .100
Highway and Bridge                                                                                                    Total:   11.000              11.000




                                   Phase:     C = Construction       P = Preliminary Engineering   R = Right of Way                                              Projects Page - 88
June 25, 2008
                                                                                                                                        Previous Previous
Project Name/#       Route/Road:   Location; Scope of Work                                                                     $(M)     Prog. Yr Total$
                                                                                                                                                            Comments:
STATEWIDE            PAVEMENT      INTERSTATE MAINTENANCE & INTERSTATE PAVEMENT PRESERVATION PROGRAM (Annual                                       Interstate paving program
   IPPP                            Program)                                                                                                        increase from $2 million to $6
      3927                                                                                                                                         million annually for preservation
                                                                                                                                                   needs.

                                              C      2011        H010 - INTERSTATE MAINTENANCE                                  6.000
                                              C      2012        H010 - INTERSTATE MAINTENANCE                                  6.000
                                              C      2013        H010 - INTERSTATE MAINTENANCE                                  6.000
                                              C      2014        H010 - INTERSTATE MAINTENANCE                                  6.000
                                              C      2015        H010 - INTERSTATE MAINTENANCE                                  6.000
                                              C      2016        H010 - INTERSTATE MAINTENANCE                                  6.000
                                              C      2017        H010 - INTERSTATE MAINTENANCE                                  6.000
                                              C      2018        H010 - INTERSTATE MAINTENANCE                                  6.000
                                              P      2011        H010 - INTERSTATE MAINTENANCE                                   .020
                                              P      2012        H010 - INTERSTATE MAINTENANCE                                   .020
                                              P      2013        H010 - INTERSTATE MAINTENANCE                                   .020
                                              P      2014        H010 - INTERSTATE MAINTENANCE                                   .020
                                              P      2015        Q010 - INTERSTATE MAINTENANCE                                   .020
                                              P      2016        H010 - INTERSTATE MAINTENANCE                                   .020
                                              P      2017        H010 - INTERSTATE MAINTENANCE                                   .020
                                              P      2018        H010 - INTERSTATE MAINTENANCE                                   .020
Highway and Bridge                                                                                                    Total:   48.160              15.854




                                   Phase:     C = Construction       P = Preliminary Engineering   R = Right of Way                                              Projects Page - 89
June 25, 2008
                                                                                                                                               Previous Previous
Project Name/#       Route/Road:   Location; Scope of Work                                                                           $(M)      Prog. Yr Total$
                                                                                                                                                                   Comments:
STATEWIDE            PAVEMENT      PAVEMENT RESURFACING, REHABILITATION & CRACKSEAL PROGRAM & RELATED WORK                                                Federal Resurfacing program,
   33D-PRR                         (Annual Federal Resurfacing Program)                                                                                   increase from $10 million to $16
       452                                                                                                                                                million annually for preservation
                                                                                                                                                          needs.

                                              C      2009        H240 - STP - STATE FLEXIBLE IN ANY AREA                               3.500
                                              C      2010        H240 - STP - STATE FLEXIBLE IN ANY AREA                              16.000
                                              C      2011        H240 - STP - STATE FLEXIBLE IN ANY AREA                              16.000
                                              C      2012        H240 - STP - STATE FLEXIBLE IN ANY AREA                              16.000
                                              C      2013        H240 - STP - STATE FLEXIBLE IN ANY AREA                              16.000
                                              C      2014        H240 - STP - STATE FLEXIBLE IN ANY AREA                              16.000
                                              C      2015        H240 - STP - STATE FLEXIBLE IN ANY AREA                              16.000
                                              C      2016        H240 - STP - STATE FLEXIBLE IN ANY AREA                              16.000
                                              C      2017        H240 - STP - STATE FLEXIBLE IN ANY AREA                              16.000
                                              C      2018        H240 - STP - STATE FLEXIBLE IN ANY AREA                              16.000
                                              P      2010        H240 - STP - STATE FLEXIBLE IN ANY AREA                                .150
                                              P      2011        H240 - STP - STATE FLEXIBLE IN ANY AREA                                .150
                                              P      2012        H240 - STP - STATE FLEXIBLE IN ANY AREA                                .150
                                              P      2013        H240 - STP - STATE FLEXIBLE IN ANY AREA                                .150
                                              P      2014        H240 - STP - STATE FLEXIBLE IN ANY AREA                                .150
                                              P      2015        H240 - STP - STATE FLEXIBLE IN ANY AREA                                .150
                                              P      2016        H240 - STP - STATE FLEXIBLE IN ANY AREA                                .150
                                              P      2017        H240 - STP - STATE FLEXIBLE IN ANY AREA                                .150
                                              P      2018        H240 - STP - STATE FLEXIBLE IN ANY AREA                                .150
                                              R      2010        H240 - STP - STATE FLEXIBLE IN ANY AREA                                .025
                                              R      2011        H240 - STP - STATE FLEXIBLE IN ANY AREA                                .025
                                              R      2012        H240 - STP - STATE FLEXIBLE IN ANY AREA                                .025
                                              R      2013        H240 - STP - STATE FLEXIBLE IN ANY AREA                                .025
                                              R      2014        H240 - STP - STATE FLEXIBLE IN ANY AREA                                .025
                                              R      2015        H240 - STP - STATE FLEXIBLE IN ANY AREA                                .025
                                              R      2016        H240 - STP - STATE FLEXIBLE IN ANY AREA                                .025
                                              R      2017        H240 - STP - STATE FLEXIBLE IN ANY AREA                                .025
                                              R      2018        H240 - STP - STATE FLEXIBLE IN ANY AREA                                .025
Highway and Bridge                                                                                                            Total: 149.075              80.375




                                   Phase:     C = Construction        P = Preliminary Engineering          R = Right of Way                                             Projects Page - 90
June 25, 2008
                                                                                                                                           Previous Previous
Project Name/#        Route/Road:   Location; Scope of Work                                                                       $(M)     Prog. Yr Total$
                                                                                                                                                               Comments:
STATEWIDE DISTRICTS   PAVEMENT      RESURFACE @ VARIOUS LOCATIONS (Annual Advertised Projects)                                                        Yearly paving by contract from
   BET-RES *                                                                                                                                          Statewide Betterment
       581                                                                                                                                            Resurfacing Program.

                                                C      2009        BET - BETTERMENT (State FY)                                    12.000
                                                C      2010        BET - BETTERMENT (State FY)                                    12.000
                                                C      2011        BET - BETTERMENT (State FY)                                    12.000
                                                C      2012        BET - BETTERMENT (State FY)                                    12.000
                                                C      2013        BET - BETTERMENT (State FY)                                    12.000
                                                C      2014        BET - BETTERMENT (State FY)                                    12.000
                                                C      2015        BET - BETTERMENT (State FY)                                    12.000
                                                C      2016        BET - BETTERMENT (State FY)                                    12.000
                                                C      2017        BET - BETTERMENT (State FY)                                    12.000
                                                C      2018        BET - BETTERMENT (State FY)                                    12.000
Highway and Bridge                                                                                                       Total: 120.000             120.000
STATEWIDE DISTRICTS   PAVEMENT      ROADWAY LEVELING @ VARIOUS LOCATIONS FOR NEXT FISCAL YEAR RESURFACING (Annual                                     Force Account Through District
   BET-RL *                         Project)                                                                                                          Staff. Yearly pavement leveling.
       792
                                                C      2009        BET - BETTERMENT (State FY)                                     1.800
                                                C      2010        BET - BETTERMENT (State FY)                                     1.800
                                                C      2011        BET - BETTERMENT (State FY)                                     1.200
                                                C      2012        BET - BETTERMENT (State FY)                                     1.200
                                                C      2013        BET - BETTERMENT (State FY)                                     1.200
                                                C      2014        BET - BETTERMENT (State FY)                                     1.200
                                                C      2015        BET - BETTERMENT (State FY)                                     1.200
                                                C      2016        BET - BETTERMENT (State FY)                                     1.200
                                                C      2017        BET - BETTERMENT (State FY)                                     1.200
                                                C      2018        BET - BETTERMENT (State FY)                                     1.200
Highway and Bridge                                                                                                       Total:   13.200              12.000




                                    Phase:      C = Construction        P = Preliminary Engineering   R = Right of Way                                              Projects Page - 91
June 25, 2008
                                                                                                                                                       Previous Previous
Project Name/#       Route/Road:         Location; Scope of Work                                                                              $(M)     Prog. Yr Total$
                                                                                                                                                                           Comments:
STATEWIDE            PAVEMENT             SECONDARY SYSTEM RECLAMATION / REHAB WITH VARIOUS PAVEMENT TREATMENTS                                                   Proposed secondary road
   SSRR                                                                                                                                                           rehabilitation program, $3
      4148                                                                                                                                                        million annually for preservation
                                                                                                                                                                  needs.

                                                     C      2009        Q240 - STP - STATE FLEXIBLE IN ANY AREA                                3.000
                                                     C      2010        Q240 - STP - STATE FLEXIBLE IN ANY AREA                                3.000
                                                     C      2011        Q240 - STP - STATE FLEXIBLE IN ANY AREA                                3.000
                                                     C      2012        Q240 - STP - STATE FLEXIBLE IN ANY AREA                                3.000
                                                     C      2013        Q240 - STP - STATE FLEXIBLE IN ANY AREA                                3.000
                                                     C      2014        Q240 - STP - STATE FLEXIBLE IN ANY AREA                                3.000
                                                     C      2015        Q240 - STP - STATE FLEXIBLE IN ANY AREA                                3.000
                                                     C      2016        Q240 - STP - STATE FLEXIBLE IN ANY AREA                                3.000
                                                     C      2017        Q240 - STP - STATE FLEXIBLE IN ANY AREA                                3.000
                                                     C      2018        Q240 - STP - STATE FLEXIBLE IN ANY AREA                                3.000
Highway and Bridge                                                                                                                   Total:   30.000
STATEWIDE METRO      PLANNING & RESEARCH MANCHESTER METROPOLITAN PLANNING ORGANIZATION, ANTICIPATED FUNDS FOR UNIFIED                                             Annual program. Cost increase
PLANNING                                 PLANNING WORK PROGRAMS                                                                                                   reflects anticipated federal
   085-MP-1                                                                                                                                                       revenues.
       667
                                                     P      2009        H450 - "STEA03" - METROPOLITAN PLANNING                                 .448
                                                     P      2010        H450 - "STEA03" - METROPOLITAN PLANNING                                 .448
                                                     P      2011        H450 - "STEA03" - METROPOLITAN PLANNING                                 .448
                                                     P      2012        H450 - "STEA03" - METROPOLITAN PLANNING                                 .448
                                                     P      2013        H450 - "STEA03" - METROPOLITAN PLANNING                                 .448
                                                     P      2014        H450 - "STEA03" - METROPOLITAN PLANNING                                 .448
                                                     P      2015        H450 - "STEA03" - METROPOLITAN PLANNING                                 .448
                                                     P      2016        H450 - "STEA03" - METROPOLITAN PLANNING                                 .448
                                                     P      2017        H450 - "STEA03" - METROPOLITAN PLANNING                                 .448
                                                     P      2018        H450 - "STEA03" - METROPOLITAN PLANNING                                 .448
Highway and Bridge                                                                                                                   Total:    4.484




                                          Phase:     C = Construction        P = Preliminary Engineering          R = Right of Way                                              Projects Page - 92
June 25, 2008
                                                                                                                                                 Previous Previous
Project Name/#       Route/Road:          Location; Scope of Work                                                                       $(M)     Prog. Yr Total$
                                                                                                                                                                     Comments:
STATEWIDE METRO      PLANNING & RESEARCH NASHUA METROPOLITAN PLANNING ORGANIZATION, ANTICIPATED FUNDS FOR UNIFIED                                           Annual program. Cost increase
PLANNING                                 PLANNING WORK PROGRAMS                                                                                             reflects anticipated federal
   085-MP-2                                                                                                                                                 revenues.
       809
                                                     P      2009        H450 - "STEA03" - METROPOLITAN PLANNING                           .356
                                                     P      2010        H450 - "STEA03" - METROPOLITAN PLANNING                           .356
                                                     P      2011        H450 - "STEA03" - METROPOLITAN PLANNING                           .356
                                                     P      2012        H450 - "STEA03" - METROPOLITAN PLANNING                           .356
                                                     P      2013        H450 - "STEA03" - METROPOLITAN PLANNING                           .356
                                                     P      2014        H450 - "STEA03" - METROPOLITAN PLANNING                           .356
                                                     P      2015        H450 - "STEA03" - METROPOLITAN PLANNING                           .356
                                                     P      2016        H450 - "STEA03" - METROPOLITAN PLANNING                           .356
                                                     P      2017        H450 - "STEA03" - METROPOLITAN PLANNING                           .356
                                                     P      2018        H450 - "STEA03" - METROPOLITAN PLANNING                           .356
Highway and Bridge                                                                                                             Total:    3.559
STATEWIDE - SPR      PLANNING & RESEARCH NEW ENGLAND TRANSPORTATION CONSORTIUM POOLED FUND STUDY (SPR-003(089)) (Annual                                     From SPR #2 - Specified Funding
   14389                                 Project)                                                                                                           for Research Activities
      2879
                                                     P      2009        L560 - "SAFETEA-LU" - STATE PLANNING & RESEARCH-MANDATORY         .100
                                                     P      2010        L560 - "SAFETEA-LU" - STATE PLANNING & RESEARCH-MANDATORY         .100
                                                     P      2011        L560 - "SAFETEA-LU" - STATE PLANNING & RESEARCH-MANDATORY         .100
                                                     P      2012        L560 - "SAFETEA-LU" - STATE PLANNING & RESEARCH-MANDATORY         .100
                                                     P      2013        L560 - "SAFETEA-LU" - STATE PLANNING & RESEARCH-MANDATORY         .100
                                                     P      2014        L560 - "SAFETEA-LU" - STATE PLANNING & RESEARCH-MANDATORY         .100
                                                     P      2015        L560 - "SAFETEA-LU" - STATE PLANNING & RESEARCH-MANDATORY         .100
                                                     P      2016        L560 - "SAFETEA-LU" - STATE PLANNING & RESEARCH-MANDATORY         .100
                                                     P      2017        L560 - "SAFETEA-LU" - STATE PLANNING & RESEARCH-MANDATORY         .100
                                                     P      2018        L560 - "SAFETEA-LU" - STATE PLANNING & RESEARCH-MANDATORY         .100
Highway and Bridge                                                                                                             Total:    1.000
STATEWIDE - SPR      PLANNING & RESEARCH POOLED - FUND STUDY: DEVELOPMENT OF PERFORMANCE PROPERTIES OF TERNARY MIXES
   14750
      6319
                                                     P      2009        L560 - "SAFETEA-LU" - STATE PLANNING & RESEARCH-MANDATORY         .015
                                                     P      2010        L560 - "SAFETEA-LU" - STATE PLANNING & RESEARCH-MANDATORY         .015
Highway and Bridge                                                                                                             Total:     .030




                                          Phase:     C = Construction       P = Preliminary Engineering     R = Right of Way                                              Projects Page - 93
June 25, 2008
                                                                                                                                                     Previous Previous
Project Name/#       Route/Road:          Location; Scope of Work                                                                           $(M)     Prog. Yr Total$
                                                                                                                                                                         Comments:
STATEWIDE SPR #1     PLANNING & RESEARCH STATE PLANNING & RESEARCH - PART #1 "PLANNING"                                                                         Federal specified funding for
                                                                                                                                                                data gathering, long range
         665                                                                                                                                                    planning, special studies. Cost
                                                                                                                                                                reflects anticipated federal
                                                                                                                                                                funding.

                                                      P      2009        H550 - "STEA03" - STATE PLAN'N & RSRCH-PART 1 "PLAN'N"              2.875
                                                      P      2010        H550 - "STEA03" - STATE PLAN'N & RSRCH-PART 1 "PLAN'N"              2.875
                                                      P      2011        H550 - "STEA03" - STATE PLAN'N & RSRCH-PART 1 "PLAN'N"              2.875
                                                      P      2012        H550 - "STEA03" - STATE PLAN'N & RSRCH-PART 1 "PLAN'N"              2.875
                                                      P      2013        H550 - "STEA03" - STATE PLAN'N & RSRCH-PART 1 "PLAN'N"              2.875
                                                      P      2014        H550 - "STEA03" - STATE PLAN'N & RSRCH-PART 1 "PLAN'N"              2.875
                                                      P      2015        H550 - "STEA03" - STATE PLAN'N & RSRCH-PART 1 "PLAN'N"              2.875
                                                      P      2016        H550 - "STEA03" - STATE PLAN'N & RSRCH-PART 1 "PLAN'N"              2.875
                                                      P      2017        H550 - "STEA03" - STATE PLAN'N & RSRCH-PART 1 "PLAN'N"              2.875
                                                      P      2018        H550 - "STEA03" - STATE PLAN'N & RSRCH-PART 1 "PLAN'N"              2.875
Highway and Bridge                                                                                                                 Total:   28.750
STATEWIDE SPR #2     PLANNING & RESEARCH STATE PLANNING & RESEARCH - PART #2 "RESEARCH"                                                                         Federal specified funding for
                                                                                                                                                                research activities involving
         666                                                                                                                                                    construction materials and
                                                                                                                                                                processes.

                                                      P      2009        H560 - "STEA03" - STATE PLAN'N & RSRCH-PART 2 "RSRCH"                .301
                                                      P      2010        H560 - "STEA03" - STATE PLAN'N & RSRCH-PART 2 "RSRCH"                .301
                                                      P      2011        H560 - "STEA03" - STATE PLAN'N & RSRCH-PART 2 "RSRCH"                .301
                                                      P      2012        H560 - "STEA03" - STATE PLAN'N & RSRCH-PART 2 "RSRCH"                .301
                                                      P      2013        H560 - "STEA03" - STATE PLAN'N & RSRCH-PART 2 "RSRCH"                .301
                                                      P      2014        H560 - "STEA03" - STATE PLAN'N & RSRCH-PART 2 "RSRCH"                .301
                                                      P      2015        H560 - "STEA03" - STATE PLAN'N & RSRCH-PART 2 "RSRCH"                .301
                                                      P      2016        H560 - "STEA03" - STATE PLAN'N & RSRCH-PART 2 "RSRCH"                .301
                                                      P      2017        H560 - "STEA03" - STATE PLAN'N & RSRCH-PART 2 "RSRCH"                .301
                                                      P      2018        H560 - "STEA03" - STATE PLAN'N & RSRCH-PART 2 "RSRCH"                .301
Highway and Bridge                                                                                                                 Total:    3.008




                                           Phase:     C = Construction        P = Preliminary Engineering       R = Right of Way                                              Projects Page - 94
June 25, 2008
                                                                                                                                                 Previous Previous
Project Name/#       Route/Road:         Location; Scope of Work                                                                        $(M)     Prog. Yr Total$
                                                                                                                                                                     Comments:
STATEWIDE METRO      PLANNING & RESEARCH SEACOAST METROPOLITAN PLANNING ORGANIZATION, ANTICIPATED FUNDS FOR UNIFIED                                         Annual program. Cost increase
PLANNING                                 PLANNING WORK PROGRAMS                                                                                             reflects anticipated federal
   085-MP-4                                                                                                                                                 revenues.
       810
                                                     P      2009        H450 - "STEA03" - METROPOLITAN PLANNING                           .407
                                                     P      2010        H450 - "STEA03" - METROPOLITAN PLANNING                           .407
                                                     P      2011        H450 - "STEA03" - METROPOLITAN PLANNING                           .407
                                                     P      2012        H450 - "STEA03" - METROPOLITAN PLANNING                           .407
                                                     P      2013        H450 - "STEA03" - METROPOLITAN PLANNING                           .407
                                                     P      2014        H450 - "STEA03" - METROPOLITAN PLANNING                           .407
                                                     P      2015        H450 - "STEA03" - METROPOLITAN PLANNING                           .407
                                                     P      2016        H450 - "STEA03" - METROPOLITAN PLANNING                           .407
                                                     P      2017        H450 - "STEA03" - METROPOLITAN PLANNING                           .407
                                                     P      2018        H450 - "STEA03" - METROPOLITAN PLANNING                           .407
Highway and Bridge                                                                                                             Total:    4.067
STATEWIDE METRO      PLANNING & RESEARCH SALEM - PLAISTOW - WINDHAM METROPOLITAN PLANNING ORGANIZATION, ANTICIPATED                                         Annual program. Cost increase
PLANNING                                 FUNDS FOR UNIFIED PLANNING WORK PROGRAMS                                                                           reflects anticipated federal
   085-MP-3                                                                                                                                                 revenues.
       811
                                                     P      2009        H450 - "STEA03" - METROPOLITAN PLANNING                           .148
                                                     P      2010        H450 - "STEA03" - METROPOLITAN PLANNING                           .148
                                                     P      2011        H450 - "STEA03" - METROPOLITAN PLANNING                           .148
                                                     P      2012        H450 - "STEA03" - METROPOLITAN PLANNING                           .148
                                                     P      2013        H450 - "STEA03" - METROPOLITAN PLANNING                           .148
                                                     P      2014        H450 - "STEA03" - METROPOLITAN PLANNING                           .148
                                                     P      2015        H450 - "STEA03" - METROPOLITAN PLANNING                           .148
                                                     P      2016        H450 - "STEA03" - METROPOLITAN PLANNING                           .148
                                                     P      2017        H450 - "STEA03" - METROPOLITAN PLANNING                           .148
                                                     P      2018        H450 - "STEA03" - METROPOLITAN PLANNING                           .148
Highway and Bridge                                                                                                             Total:    1.483




                                          Phase:     C = Construction       P = Preliminary Engineering     R = Right of Way                                              Projects Page - 95
June 25, 2008
                                                                                                                                               Previous Previous
Project Name/#       Route/Road:    Location; Scope of Work                                                                           $(M)     Prog. Yr Total$
                                                                                                                                                                   Comments:
STATEWIDE            PRESERVATION   BRIDGE REHABILITATION, PAINTING, PRESERVATION & IMPROVEMENT PROJECTS (Federal                                         Proposed bridge preservation
   BRPPI                            Program)                                                                                                              program $8 million annually for
      6601                                                                                                                                                preservation needs.

                                                C      2009        L1C0 - BRIDGE PROGRAM - 85% ON/OFF SYSTEM                           8.000
                                                C      2010        L1C0 - BRIDGE PROGRAM - 85% ON/OFF SYSTEM                           4.000
                                                C      2011        L1C0 - BRIDGE PROGRAM - 85% ON/OFF SYSTEM                           8.000
                                                C      2012        L1C0 - BRIDGE PROGRAM - 85% ON/OFF SYSTEM                           4.000
                                                C      2013        L1C0 - BRIDGE PROGRAM - 85% ON/OFF SYSTEM                           8.000
                                                C      2014        L1C0 - BRIDGE PROGRAM - 85% ON/OFF SYSTEM                           8.000
                                                C      2015        L1C0 - BRIDGE PROGRAM - 85% ON/OFF SYSTEM                           8.000
                                                C      2016        L1C0 - BRIDGE PROGRAM - 85% ON/OFF SYSTEM                           8.000
                                                C      2017        L1C0 - BRIDGE PROGRAM - 85% ON/OFF SYSTEM                           8.000
                                                C      2018        L1C0 - BRIDGE PROGRAM - 85% ON/OFF SYSTEM                           8.000
Highway and Bridge                                                                                                           Total:   72.000
STATEWIDE            PRESERVATION   CULVERT REPLACEMENT/REHABILITATION & DRAINAGE REPAIRS (Annual Project)                                                Proposed culvert replacement
   CRDR                                                                                                                                                   program $1 million annually for
      4157                                                                                                                                                preservation needs.

                                                C      2009        L240 - STP - SURFACE TRANSP. STATE FLEXIBLE IN ANY AREA             1.000
                                                C      2010        L240 - STP - SURFACE TRANSP. STATE FLEXIBLE IN ANY AREA             1.000
                                                C      2011        L240 - STP - SURFACE TRANSP. STATE FLEXIBLE IN ANY AREA             1.000
                                                C      2012        L240 - STP - SURFACE TRANSP. STATE FLEXIBLE IN ANY AREA             1.000
                                                C      2013        L240 - STP - SURFACE TRANSP. STATE FLEXIBLE IN ANY AREA             1.000
                                                C      2014        L240 - STP - SURFACE TRANSP. STATE FLEXIBLE IN ANY AREA             1.000
                                                C      2015        L240 - STP - SURFACE TRANSP. STATE FLEXIBLE IN ANY AREA             1.000
                                                C      2016        L240 - STP - SURFACE TRANSP. STATE FLEXIBLE IN ANY AREA             1.000
                                                C      2017        L240 - STP - SURFACE TRANSP. STATE FLEXIBLE IN ANY AREA             1.000
                                                C      2018        L240 - STP - SURFACE TRANSP. STATE FLEXIBLE IN ANY AREA             1.000
Highway and Bridge                                                                                                           Total:   10.000




                                    Phase:      C = Construction        P = Preliminary Engineering       R = Right of Way                                              Projects Page - 96
June 25, 2008
                                                                                                                                           Previous Previous
Project Name/#       Route/Road:    Location; Scope of Work                                                                       $(M)     Prog. Yr Total$
                                                                                                                                                               Comments:
STATEWIDE            PRESERVATION   GUARDRAIL REPLACEMENT [Federal Aid Guardrail Improvement Program] (Annual Project)                                Guardrail Replacement
   33P-GR                                                                                                                                             program, increase from $1
       785                                                                                                                                            million to $2 million annually for
                                                                                                                                                      preservation needs.

                                                C      2011        H280 - STP - HAZARD ELIMINATION PROGRAM                         2.000
                                                C      2012        H280 - STP - HAZARD ELIMINATION PROGRAM                         2.000
                                                C      2013        H280 - STP - HAZARD ELIMINATION PROGRAM                         2.000
                                                C      2014        H280 - STP - HAZARD ELIMINATION PROGRAM                         2.000
                                                C      2015        H280 - STP - HAZARD ELIMINATION PROGRAM                         2.000
                                                C      2016        H280 - STP - HAZARD ELIMINATION PROGRAM                         2.000
                                                C      2017        H280 - STP - HAZARD ELIMINATION PROGRAM                         2.000
                                                C      2018        H280 - STP - HAZARD ELIMINATION PROGRAM                         2.000
                                                P      2011        H280 - STP - HAZARD ELIMINATION PROGRAM                          .200
                                                P      2012        H280 - STP - HAZARD ELIMINATION PROGRAM                          .200
                                                P      2013        H280 - STP - HAZARD ELIMINATION PROGRAM                          .200
                                                P      2014        H280 - STP - HAZARD ELIMINATION PROGRAM                          .200
                                                P      2015        H280 - STP - HAZARD ELIMINATION PROGRAM                          .200
                                                P      2016        H280 - STP - HAZARD ELIMINATION PROGRAM                          .200
                                                P      2017        H280 - STP - HAZARD ELIMINATION PROGRAM                          .200
                                                P      2018        H280 - STP - HAZARD ELIMINATION PROGRAM                          .200
Highway and Bridge                                                                                                       Total:   17.600               6.967
STATEWIDE            PRESERVATION   HIGHWAY SAFTEY IMPROVEMENT PROGRAM                                                                                Federal specified funding for
   HSIP                                                                                                                                               safety projects in accordance
      6767                                                                                                                                            with the Highway Safety
                                                                                                                                                      Improvement Program.

                                                C      2009        LS30 - HWY SAFETY PROG                                          2.500
                                                C      2010        LS30 - HWY SAFETY PROG                                          2.500
                                                C      2011        LS30 - HWY SAFETY PROG                                          2.500
                                                C      2012        LS30 - HWY SAFETY PROG                                          2.500
                                                C      2013        LS30 - HWY SAFETY PROG                                          2.500
                                                C      2014        LS30 - HWY SAFETY PROG                                          2.500
                                                C      2015        LS30 - HWY SAFETY PROG                                          2.500
                                                C      2016        LS30 - HWY SAFETY PROG                                          2.500
                                                C      2017        LS30 - HWY SAFETY PROG                                          2.500
                                                C      2018        LS30 - HWY SAFETY PROG                                          2.500
Highway and Bridge                                                                                                       Total:   25.000




                                    Phase:      C = Construction       P = Preliminary Engineering    R = Right of Way                                               Projects Page - 97
June 25, 2008
                                                                                                                                        Previous Previous
Project Name/#   Route/Road:   Location; Scope of Work                                                                         $(M)     Prog. Yr Total$
                                                                                                                                                            Comments:
STATEWIDE        RAIL          REMOVE EXISTING PROTECTIVE DEVICES & RELOCATE @ CROSSINGS (Annual Project)                                          Force Account with Railroad.
   RR-REPD                                                                                                                                         To improve safety of railroad
       637                                                                                                                                         crossings.

                                           C      2009        H260 - STP - RAIL-HWY PROTECTIVE DEVICES                           .150
                                           C      2010        H260 - STP - RAIL-HWY PROTECTIVE DEVICES                           .150
                                           C      2011        H260 - STP - RAIL-HWY PROTECTIVE DEVICES                           .150
                                           C      2012        H260 - STP - RAIL-HWY PROTECTIVE DEVICES                           .150
                                           C      2013        H260 - STP - RAIL-HWY PROTECTIVE DEVICES                           .150
                                           C      2014        H260 - STP - RAIL-HWY PROTECTIVE DEVICES                           .150
                                           C      2015        H260 - STP - RAIL-HWY PROTECTIVE DEVICES                           .150
                                           C      2016        H260 - STP - RAIL-HWY PROTECTIVE DEVICES                           .150
                                           C      2017        H260 - STP - RAIL-HWY PROTECTIVE DEVICES                           .150
                                           C      2018        H260 - STP - RAIL-HWY PROTECTIVE DEVICES                           .150
                                           P      2009        H260 - STP - RAIL-HWY PROTECTIVE DEVICES                           .020
                                           P      2010        H260 - STP - RAIL-HWY PROTECTIVE DEVICES                           .020
                                           P      2011        H260 - STP - RAIL-HWY PROTECTIVE DEVICES                           .020
                                           P      2012        H260 - STP - RAIL-HWY PROTECTIVE DEVICES                           .020
                                           P      2013        H260 - STP - RAIL-HWY PROTECTIVE DEVICES                           .020
                                           P      2014        H260 - STP - RAIL-HWY PROTECTIVE DEVICES                           .020
                                           P      2015        H260 - STP - RAIL-HWY PROTECTIVE DEVICES                           .020
                                           P      2016        H260 - STP - RAIL-HWY PROTECTIVE DEVICES                           .020
                                           P      2017        H260 - STP - RAIL-HWY PROTECTIVE DEVICES                           .020
                                           P      2018        H260 - STP - RAIL-HWY PROTECTIVE DEVICES                           .020
                                           R      2009        H260 - STP - RAIL-HWY PROTECTIVE DEVICES                           .010
                                           R      2010        H260 - STP - RAIL-HWY PROTECTIVE DEVICES                           .010
                                           R      2011        H260 - STP - RAIL-HWY PROTECTIVE DEVICES                           .010
                                           R      2012        H260 - STP - RAIL-HWY PROTECTIVE DEVICES                           .010
                                           R      2013        H260 - STP - RAIL-HWY PROTECTIVE DEVICES                           .010
                                           R      2014        H260 - STP - RAIL-HWY PROTECTIVE DEVICES                           .010
                                           R      2015        H260 - STP - RAIL-HWY PROTECTIVE DEVICES                           .010
                                           R      2016        H260 - STP - RAIL-HWY PROTECTIVE DEVICES                           .010
                                           R      2017        H260 - STP - RAIL-HWY PROTECTIVE DEVICES                           .010
                                           R      2018        H260 - STP - RAIL-HWY PROTECTIVE DEVICES                           .010
Rail                                                                                                                  Total:    1.800               1.800




                               Phase:      C = Construction        P = Preliminary Engineering     R = Right of Way                                              Projects Page - 98
June 25, 2008
                                                                                                                               Previous Previous
Project Name/#   Route/Road:   Location; Scope of Work                                                                $(M)     Prog. Yr Total$
                                                                                                                                                   Comments:
STATEWIDE        RAIL          RECONSTRUCTION OF CROSSINGS, SIGNALS, & RELATED WORK (Annual Project)                                      Force Account with Railroad to
   RR-RCS                                                                                                                                 improve safety of railroad
      1147                                                                                                                                crossings. Specific Projects
                                                                                                                                          Occupy the Vacant FY's &
                                                                                                                                          Below Normal FY Funding.

                                           C      2010        H260 - STP - RAIL-HWY PROTECTIVE DEVICES                  .282
                                           C      2010        H270 - STP - RAIL-HWY CROSS ELIM OF HAZARDS               .282
                                           C      2011        H260 - STP - RAIL-HWY PROTECTIVE DEVICES                  .400
                                           C      2011        H270 - STP - RAIL-HWY CROSS ELIM OF HAZARDS               .400
                                           C      2012        H260 - STP - RAIL-HWY PROTECTIVE DEVICES                  .400
                                           C      2012        H270 - STP - RAIL-HWY CROSS ELIM OF HAZARDS               .400
                                           C      2013        H260 - STP - RAIL-HWY PROTECTIVE DEVICES                  .400
                                           C      2013        H270 - STP - RAIL-HWY CROSS ELIM OF HAZARDS               .400
                                           C      2014        H260 - STP - RAIL-HWY PROTECTIVE DEVICES                  .400
                                           C      2014        H270 - STP - RAIL-HWY CROSS ELIM OF HAZARDS               .400
                                           C      2015        H260 - STP - RAIL-HWY PROTECTIVE DEVICES                  .400
                                           C      2015        H270 - STP - RAIL-HWY CROSS ELIM OF HAZARDS               .400
                                           C      2016        H260 - STP - RAIL-HWY PROTECTIVE DEVICES                  .400
                                           C      2016        H270 - STP - RAIL-HWY CROSS ELIM OF HAZARDS               .400
                                           C      2017        H260 - STP - RAIL-HWY PROTECTIVE DEVICES                  .400
                                           C      2017        H270 - STP - RAIL-HWY CROSS ELIM OF HAZARDS               .400
                                           C      2018        H260 - STP - RAIL-HWY PROTECTIVE DEVICES                  .400
                                           C      2018        H270 - STP - RAIL-HWY CROSS ELIM OF HAZARDS               .400
                                           P      2010        H270 - STP - RAIL-HWY CROSS ELIM OF HAZARDS               .030
                                           P      2011        H270 - STP - RAIL-HWY CROSS ELIM OF HAZARDS               .030
                                           P      2012        H270 - STP - RAIL-HWY CROSS ELIM OF HAZARDS               .030
                                           P      2013        H270 - STP - RAIL-HWY CROSS ELIM OF HAZARDS               .030
                                           P      2014        H270 - STP - RAIL-HWY CROSS ELIM OF HAZARDS               .030
                                           P      2015        H270 - STP - RAIL-HWY CROSS ELIM OF HAZARDS               .030
                                           P      2016        H270 - STP - RAIL-HWY CROSS ELIM OF HAZARDS               .030
                                           P      2017        H270 - STP - RAIL-HWY CROSS ELIM OF HAZARDS               .030
                                           P      2018        H270 - STP - RAIL-HWY CROSS ELIM OF HAZARDS               .030
                                           R      2010        H270 - STP - RAIL-HWY CROSS ELIM OF HAZARDS               .010
                                           R      2011        H270 - STP - RAIL-HWY CROSS ELIM OF HAZARDS               .010
                                           R      2012        H270 - STP - RAIL-HWY CROSS ELIM OF HAZARDS               .010
                                           R      2013        H270 - STP - RAIL-HWY CROSS ELIM OF HAZARDS               .010
                                           R      2014        H270 - STP - RAIL-HWY CROSS ELIM OF HAZARDS               .010
                                           R      2015        H270 - STP - RAIL-HWY CROSS ELIM OF HAZARDS               .010
                                           R      2016        H270 - STP - RAIL-HWY CROSS ELIM OF HAZARDS               .010
                                           R      2017        H270 - STP - RAIL-HWY CROSS ELIM OF HAZARDS               .010

                               Phase:      C = Construction        P = Preliminary Engineering     R = Right of Way                                     Projects Page - 99
June 25, 2008
                                                                                                                                       Previous Previous
Project Name/#   Route/Road:   Location; Scope of Work                                                                        $(M)     Prog. Yr Total$
                                                                                                                                                           Comments:
                                          R      2018        H270 - STP - RAIL-HWY CROSS ELIM OF HAZARDS                        .010
Rail                                                                                                                 Total:    7.323               5.643
STATEWIDE        RAIL          REVOLVING LOAN FUND FOR SHORTLINE RAILROADS                                                                        Proceeds from repayment of
                                                                                                                                                  outstanding loans to eligible
       3493                                                                                                                                       railroads. Discrete
                                                                                                                                                  improvements in infrastructure
                                                                                                                                                  or equipment. Self funded
                                                                                                                                                  through repayment of loans.

                                          R      2009        RAIL - RAILROAD                                                    .400
                                          R      2011        RAIL - RAILROAD                                                    .400
                                          R      2013        RAIL - RAILROAD                                                    .400
                                          R      2015        RAIL - RAILROAD                                                    .400
Rail                                                                                                                 Total:    1.600
STATEWIDE        RAIL          SPECIAL RAILROAD FUND                                                                                              Maintenance on State-Owned
                                                                                                                                                  Railroads. Fund to repair State-
       3494                                                                                                                                       owned Railroad lines. Funded
                                                                                                                                                  by Railroad operators.

                                          C      2009        RAIL - RAILROAD                                                    .300
                                          C      2010        RAIL - RAILROAD                                                    .300
                                          C      2011        RAIL - RAILROAD                                                    .400
                                          C      2012        RAIL - RAILROAD                                                    .400
                                          C      2013        RAIL - RAILROAD                                                    .400
                                          C      2014        RAIL - RAILROAD                                                    .400
                                          C      2015        RAIL - RAILROAD                                                    .400
                                          C      2016        RAIL - RAILROAD                                                    .400
                                          C      2017        RAIL - RAILROAD                                                    .400
                                          C      2018        RAIL - RAILROAD                                                    .400
Rail                                                                                                                 Total:    3.800               3.600




                               Phase:     C = Construction       P = Preliminary Engineering      R = Right of Way                                             Projects Page - 100
June 25, 2008
                                                                                                                                          Previous Previous
Project Name/#       Route/Road:     Location; Scope of Work                                                                     $(M)     Prog. Yr Total$
                                                                                                                                                              Comments:
STATEWIDE            SCENIC BYWAYS   CORRIDOR MANAGEMENT, PLANNING, AND DEVELOPMENT OF FACILITIES, TO ENHANCE                                        Federal specified funding for
   332-SB                            SCENIC QUALITIES OF NEW HAMPSHIRE (Annual Project)                                                              Highways designated as scenic
      1155                                                                                                                                           byways.

                                                C      2009        Q970 - SCENIC BYWAYS PROGRAM                                    .100
                                                C      2010        Q970 - SCENIC BYWAYS PROGRAM                                    .100
                                                C      2011        Q970 - SCENIC BYWAYS PROGRAM                                    .100
                                                C      2012        Q970 - SCENIC BYWAYS PROGRAM                                    .100
                                                C      2013        Q970 - SCENIC BYWAYS PROGRAM                                    .100
                                                C      2014        Q970 - SCENIC BYWAYS PROGRAM                                    .100
                                                C      2015        Q970 - SCENIC BYWAYS PROGRAM                                    .100
                                                C      2016        Q970 - SCENIC BYWAYS PROGRAM                                    .100
                                                C      2017        Q970 - SCENIC BYWAYS PROGRAM                                    .100
                                                C      2018        Q970 - SCENIC BYWAYS PROGRAM                                    .100
                                                P      2009        Q970 - SCENIC BYWAYS PROGRAM                                    .100
                                                P      2010        Q970 - SCENIC BYWAYS PROGRAM                                    .100
                                                P      2011        Q970 - SCENIC BYWAYS PROGRAM                                    .100
                                                P      2012        Q970 - SCENIC BYWAYS PROGRAM                                    .100
                                                P      2013        Q970 - SCENIC BYWAYS PROGRAM                                    .100
                                                P      2014        Q970 - SCENIC BYWAYS PROGRAM                                    .100
                                                P      2015        Q970 - SCENIC BYWAYS PROGRAM                                    .100
                                                P      2016        Q970 - SCENIC BYWAYS PROGRAM                                    .100
                                                P      2017        Q970 - SCENIC BYWAYS PROGRAM                                    .100
                                                P      2018        Q970 - SCENIC BYWAYS PROGRAM                                    .100
                                                R      2009        Q970 - SCENIC BYWAYS PROGRAM                                    .100
                                                R      2010        Q970 - SCENIC BYWAYS PROGRAM                                    .100
                                                R      2011        Q970 - SCENIC BYWAYS PROGRAM                                    .100
                                                R      2012        Q970 - SCENIC BYWAYS PROGRAM                                    .100
                                                R      2013        Q970 - SCENIC BYWAYS PROGRAM                                    .100
                                                R      2014        Q970 - SCENIC BYWAYS PROGRAM                                    .100
                                                R      2015        Q970 - SCENIC BYWAYS PROGRAM                                    .100
                                                R      2016        Q970 - SCENIC BYWAYS PROGRAM                                    .100
                                                R      2017        Q970 - SCENIC BYWAYS PROGRAM                                    .100
                                                R      2018        Q970 - SCENIC BYWAYS PROGRAM                                    .100
Highway and Bridge                                                                                                      Total:    3.000               3.000




                                     Phase:     C = Construction       P = Preliminary Engineering   R = Right of Way                                             Projects Page - 101
June 25, 2008
                                                                                                                                                    Previous Previous
Project Name/#         Route/Road:   Location; Scope of Work                                                                               $(M)     Prog. Yr Total$
                                                                                                                                                                        Comments:
STATEWIDE CONSULTANT   TRAFFIC       INSPECTION OF SIGN STRUCTURES ON ALL STATE MAINTAINED HIGHWAYS                                                            Sign frame structures require in
                                                                                                                                                               depth inspection every 5 years
        2681                                                                                                                                                   to assure structural capacity for
                                                                                                                                                               safety purposes.

                                                 P       2010        H240 - STP - STATE FLEXIBLE IN ANY AREA                                 .200
                                                 P       2015        H240 - STP - STATE FLEXIBLE IN ANY AREA                                 .200
Highway and Bridge                                                                                                                Total:     .400
STATEWIDE              TRAFFIC       INTERSECTION / SIGNAL UPGRADES @ VARIOUS LOCATIONS (Bureau of Traffic)[Id 3833]                                           Small State System Signal
   BET-ISU                                                                                                                                                     Improvement Project.
      3833
                                                 C       2009        BET - BETTERMENT (State FY)                                             .120
                                                 C       2010        BET - BETTERMENT (State FY)                                             .120
Highway and Bridge                                                                                                                Total:     .240               0.339
STATEWIDE              TRAFFIC       PAVEMENT MARKING (Annual Project)                                                                                         Annual pavement striping
   12223 *                                                                                                                                                     program funding.
      1146
                                                 C       2009        Q240 - STP - STATE FLEXIBLE IN ANY AREA                                3.100
                                                 C       2010        Q240 - STP - STATE FLEXIBLE IN ANY AREA                                3.100
                                                 C       2011        Q240 - STP - STATE FLEXIBLE IN ANY AREA                                3.100
                                                 C       2012        Q240 - STP - STATE FLEXIBLE IN ANY AREA                                3.100
                                                 C       2013        Q240 - STP - STATE FLEXIBLE IN ANY AREA                                3.100
                                                 C       2014        Q240 - STP - STATE FLEXIBLE IN ANY AREA                                3.100
                                                 C       2015        Q240 - STP - STATE FLEXIBLE IN ANY AREA                                3.100
                                                 C       2016        Q240 - STP - STATE FLEXIBLE IN ANY AREA                                3.100
                                                 C       2017        Q240 - STP - STATE FLEXIBLE IN ANY AREA                                3.100
                                                 C       2018        Q240 - STP - STATE FLEXIBLE IN ANY AREA                                3.100
Highway and Bridge                                                                                                                Total:   31.000              23.300




                                     Phase:       C = Construction        P = Preliminary Engineering          R = Right of Way                                             Projects Page - 102
June 25, 2008
                                                                                                                                                 Previous Previous
Project Name/#       Route/Road:   Location; Scope of Work                                                                              $(M)     Prog. Yr Total$
                                                                                                                                                                     Comments:
STATEWIDE            TRAFFIC       TRANSPORTATION SYSTEMS MANAGEMENT & OPERATIONS (ITS, CARS-511)                                                           Engineering for ITS and CARS-
                                                                                                                                                            511 projects
        4227
                                               P      2009        H240 - STP - STATE FLEXIBLE IN ANY AREA                                 .250
                                               P      2010        H240 - STP - STATE FLEXIBLE IN ANY AREA                                 .250
                                               P      2011        H240 - STP - STATE FLEXIBLE IN ANY AREA                                 .250
                                               P      2012        H240 - STP - STATE FLEXIBLE IN ANY AREA                                 .250
                                               P      2013        H240 - STP - STATE FLEXIBLE IN ANY AREA                                 .250
                                               P      2014        H240 - STP - STATE FLEXIBLE IN ANY AREA                                 .250
                                               P      2015        H240 - STP - STATE FLEXIBLE IN ANY AREA                                 .250
                                               P      2016        H240 - STP - STATE FLEXIBLE IN ANY AREA                                 .250
                                               P      2017        H240 - STP - STATE FLEXIBLE IN ANY AREA                                 .250
                                               P      2018        H240 - STP - STATE FLEXIBLE IN ANY AREA                                 .250
Highway and Bridge                                                                                                             Total:    2.500
STATEWIDE            TRAFFIC       UPDATE SIGNING ON STATE SYSTEM (Annual Project)                                                                          Specific Projects Occupy the
   USSS *                                                                                                                                                   Vacant FY's & Below Normal FY
      2735                                                                                                                                                  Funding.

                                               C      2009        H240 - STP - STATE FLEXIBLE IN ANY AREA                                 .270
                                               C      2010        H240 - STP - STATE FLEXIBLE IN ANY AREA                                 .550
                                               C      2011        H240 - STP - STATE FLEXIBLE IN ANY AREA                                 .550
                                               C      2012        H240 - STP - STATE FLEXIBLE IN ANY AREA                                 .550
                                               C      2013        H240 - STP - STATE FLEXIBLE IN ANY AREA                                 .550
                                               C      2014        H240 - STP - STATE FLEXIBLE IN ANY AREA                                 .550
                                               C      2015        H240 - STP - STATE FLEXIBLE IN ANY AREA                                 .550
                                               C      2016        H240 - STP - STATE FLEXIBLE IN ANY AREA                                 .550
                                               C      2017        H240 - STP - STATE FLEXIBLE IN ANY AREA                                 .550
                                               C      2018        H240 - STP - STATE FLEXIBLE IN ANY AREA                                 .550
                                               P      2010        H240 - STP - STATE FLEXIBLE IN ANY AREA                                 .010
                                               P      2011        H240 - STP - STATE FLEXIBLE IN ANY AREA                                 .010
                                               P      2012        H240 - STP - STATE FLEXIBLE IN ANY AREA                                 .010
                                               P      2013        H240 - STP - STATE FLEXIBLE IN ANY AREA                                 .010
                                               P      2014        H240 - STP - STATE FLEXIBLE IN ANY AREA                                 .010
                                               P      2015        H240 - STP - STATE FLEXIBLE IN ANY AREA                                 .010
                                               P      2016        H240 - STP - STATE FLEXIBLE IN ANY AREA                                 .010
                                               P      2017        H240 - STP - STATE FLEXIBLE IN ANY AREA                                 .010
                                               P      2018        H240 - STP - STATE FLEXIBLE IN ANY AREA                                 .010
Highway and Bridge                                                                                                             Total:    5.310               3.840




                                   Phase:      C = Construction        P = Preliminary Engineering          R = Right of Way                                             Projects Page - 103
June 25, 2008
                                                                                                                                          Previous Previous
Project Name/#   Route/Road:   Location; Scope of Work                                                                           $(M)     Prog. Yr Total$
                                                                                                                                                              Comments:
STATEWIDE        TRANSIT       CAPITAL ASSISTANCE TO PUBLIC TRANSIT AND TRANSPORTATION FOR ELDERLY & DISABLED                                        Funds Transferred to FTA to
                                                                                                                                                     Support Coordinated
          5973                                                                                                                                       Transportation Services

                                           C      2009        H200 - STP - AREAS LESS THAN 200,000                                1.000
                                           C      2010        H200 - STP - AREAS LESS THAN 200,000                                1.000
                                           C      2011        H200 - STP - AREAS LESS THAN 200,000                                1.000
                                           C      2012        H200 - STP - AREAS LESS THAN 200,000                                1.000
                                           C      2013        H200 - STP - AREAS LESS THAN 200,000                                1.000
                                           C      2014        H200 - STP - AREAS LESS THAN 200,000                                1.000
                                           C      2015        H200 - STP - AREAS LESS THAN 200,000                                1.000
                                           C      2016        H200 - STP - AREAS LESS THAN 200,000                                1.000
                                           C      2017        H200 - STP - AREAS LESS THAN 200,000                                1.000
                                           C      2018        H200 - STP - AREAS LESS THAN 200,000                                1.000
Transit                                                                                                                 Total:   10.000              10.000
STATEWIDE        TRANSIT       ELDERLY AND PERSONS WITH DISABILITIES TRANSPORTATION PROGRAM                                                          Replaces deficient vehicles
                                                                                                                                                     serving elderly and disabled
          3505                                                                                                                                       people. Uses local match.
                                                                                                                                                     Cost decrease reflects
                                                                                                                                                     anticipated federal revenue.

                                                  2009        FT14 - FTA SECTION 5310 DISABILITIES PROGRAM                         .600
                                                  2010        FT14 - FTA SECTION 5310 DISABILITIES PROGRAM                         .600
                                                  2011        FT14 - FTA SECTION 5310 DISABILITIES PROGRAM                         .600
                                                  2012        FT14 - FTA SECTION 5310 DISABILITIES PROGRAM                         .600
                                                  2013        FT14 - FTA SECTION 5310 DISABILITIES PROGRAM                         .600
                                                  2014        FT14 - FTA SECTION 5310 DISABILITIES PROGRAM                         .600
                                                  2015        FT14 - FTA SECTION 5310 DISABILITIES PROGRAM                         .600
                                                  2016        FT14 - FTA SECTION 5310 DISABILITIES PROGRAM                         .600
                                                  2017        FT14 - FTA SECTION 5310 DISABILITIES PROGRAM                         .600
                                                  2018        FT14 - FTA SECTION 5310 DISABILITIES PROGRAM                         .600
Transit                                                                                                                 Total:    6.000
STATEWIDE        TRANSIT       JOB ACCESS & REVERSE COMMUTE

          6290
                                                  2009        FT21 - FTA SECTION 5316 - JARC PROGRAM                               .700
                                                  2010        FT21 - FTA SECTION 5316 - JARC PROGRAM                               .700
Transit                                                                                                                 Total:    1.400




                               Phase:      C = Construction        P = Preliminary Engineering       R = Right of Way                                             Projects Page - 104
June 25, 2008
                                                                                                                                             Previous Previous
Project Name/#       Route/Road:   Location; Scope of Work                                                                          $(M)     Prog. Yr Total$
                                                                                                                                                                 Comments:
STATEWIDE            TRANSIT       NEW FREEDOMS INITIATIVE

          6291
                                                      2009        FT22 - FTA SECTION 5317 - NEW FREEDOM PROGRAM                       .680
                                                      2010        FT22 - FTA SECTION 5317 - NEW FREEDOM PROGRAM                       .680
Transit                                                                                                                    Total:    1.360
STATEWIDE            TRANSIT       RURAL PUBLIC TRANSIT                                                                                                 Continues transit service in 6
                                                                                                                                                        communities outside urbanized
          3506                                                                                                                                          areas. Uses local match. Cost
                                                                                                                                                        decrease reflects anticipated
                                                                                                                                                        federal revenue.

                                                      2009        FT18 - FTA SECTION 5311 RURAL TRANSIT OPERATING                    3.500
                                                      2010        FT18 - FTA SECTION 5311 RURAL TRANSIT OPERATING                    3.500
                                                      2011        FT18 - FTA SECTION 5311 RURAL TRANSIT OPERATING                    3.500
                                                      2012        FT18 - FTA SECTION 5311 RURAL TRANSIT OPERATING                    3.500
                                                      2013        FT18 - FTA SECTION 5311 RURAL TRANSIT OPERATING                    3.500
                                                      2014        FT18 - FTA SECTION 5311 RURAL TRANSIT OPERATING                    3.500
                                                      2015        FT18 - FTA SECTION 5311 RURAL TRANSIT OPERATING                    3.500
                                                      2016        FT18 - FTA SECTION 5311 RURAL TRANSIT OPERATING                    3.500
                                                      2017        FT18 - FTA SECTION 5311 RURAL TRANSIT OPERATING                    3.500
                                                      2018        FT18 - FTA SECTION 5311 RURAL TRANSIT OPERATING                    3.500
Transit                                                                                                                    Total:   35.000
STATEWIDE            TURNPIKES     ANALYSIS AND SUPPORT SERVICES FOR THE DEPARTMENT'S ELECTRONIC TOLL COLLECTION
   14565                           SYSTEM
      6142
                                               P      2009        TPK - TURNPIKE EXPANSION (State FY)                                 .100
Highway and Bridge                                                                                                         Total:     .100
STATEWIDE            TURNPIKES     ETC ANALYSIS & SUPPORT SERVICES FOR ANY CHANGES OR ENHANCEMENTS TO E-ZPASS
   14565 A
      6209
                                               P      2009        TPK - TURNPIKE EXPANSION (State FY)                                 .100
Highway and Bridge                                                                                                         Total:     .100
STATEWIDE            TURNPIKES     MAJOR SIGN REPLACEMENT [TRR Program]                                                                                 From Statewide Turnpike
   14501                                                                                                                                                Renewal and Replacement
      6069                                                                                                                                              program.

                                               C      2009        TRR - TURNPIKE RENEWAL & REPLACEMENT (State FY)                     .400
Highway and Bridge                                                                                                         Total:     .400               0.600




                                   Phase:      C = Construction        P = Preliminary Engineering      R = Right of Way                                             Projects Page - 105
June 25, 2008
                                                                                                                                                Previous Previous
Project Name/#        Route/Road:    Location; Scope of Work                                                                           $(M)     Prog. Yr Total$
                                                                                                                                                                    Comments:
STATEWIDE             TURNPIKES      PROJECTS TO BE DETERMINED ON TURNPIKE SYSTEM (Annual Project)                                                         Turnpike funding for routine
                                                                                                                                                           preservation work on Turnpike
        4042                                                                                                                                               System as required by bond
                                                                                                                                                           covenants.

                                                 C      2009        TRR - TURNPIKE RENEWAL & REPLACEMENT (State FY)                     1.515
                                                 C      2010        TRR - TURNPIKE RENEWAL & REPLACEMENT (State FY)                     7.765
                                                 C      2011        TRR - TURNPIKE RENEWAL & REPLACEMENT (State FY)                     8.800
                                                 C      2012        TRR - TURNPIKE RENEWAL & REPLACEMENT (State FY)                     9.200
                                                 C      2013        TRR - TURNPIKE RENEWAL & REPLACEMENT (State FY)                     9.800
                                                 C      2014        TRR - TURNPIKE RENEWAL & REPLACEMENT (State FY)                    10.500
                                                 C      2015        TRR - TURNPIKE RENEWAL & REPLACEMENT (State FY)                    10.800
                                                 C      2016        TRR - TURNPIKE RENEWAL & REPLACEMENT (State FY)                    11.600
                                                 C      2017        TRR - TURNPIKE RENEWAL & REPLACEMENT (State FY)                    11.500
                                                 C      2018        TRR - TURNPIKE RENEWAL & REPLACEMENT (State FY)                    11.850
Highway and Bridge                                                                                                            Total:   93.330              52.864
STEWARTSTOWN          NH 145         REPLACE BRIDGE OVER BISHOP BROOK - 121/114                                                                            Red List Bridge Priority #39

        6782
                                                 C      2016        L1C0 - BRIDGE PROGRAM - 85% ON/OFF SYSTEM                           1.800   New Project
Highway and Bridge                                                                                                            Total:    1.800
STODDARD - ANTRIM -   NH 9           CORRIDOR PROTECTION, ACQUIRE CONTROLLED ACCESS R.O.W. FROM JUST EAST OF NH 123                                        Scope reduction, construction
HILLSBOROUGH                         TO WESTERLY END OF HILLSBOROUGH BYPASS TO IMPROVE ROADWAY GEOMETRICS AND                                              deferred from TYP; ROW for
                                     ALIGNMENT (APPROX. 10 MILES)                                                                                          control of access only remains
        3272                                                                                                                                               per original intent, RPC
                                                                                                                                                           recommendation.

                                                 P      2010        H050 - NATIONAL HIGHWAY SYSTEM                                       .125
                                                 P      2011        H050 - NATIONAL HIGHWAY SYSTEM                                       .250
                                                 R      2015        H050 - NATIONAL HIGHWAY SYSTEM                                      1.000
                                                 R      2017        H050 - NATIONAL HIGHWAY SYSTEM                                      1.000
Highway and Bridge                                                                                                            Total:    2.375
STRAFFORD             HUCKINS ROAD   BRIDGE REPLACEMENT - 125/090                                                                                          Specific project from Statewide
   14790                                                                                                                                                   program, Municipal managed.
      6360
                                                 C      2012        SAB - STATE AID BRIDGE (State FY), 20% = Town                        .364   New Project
                                                 P      2012        SAB - STATE AID BRIDGE (State FY), 20% = Town                        .055
                                                 R      2012        SAB - STATE AID BRIDGE (State FY), 20% = Town                        .005
Highway and Bridge                                                                                                            Total:     .424




                                     Phase:      C = Construction        P = Preliminary Engineering       R = Right of Way                                             Projects Page - 106
June 25, 2008
                                                                                                                                                 Previous Previous
Project Name/#        Route/Road:       Location; Scope of Work                                                                         $(M)     Prog. Yr Total$
                                                                                                                                                                     Comments:
SUTTON - NEW LONDON   I-89              RECLAIM AND 5-1/2" HBP FROM EXIT 10 TO EXIT 11 (4 MILES) [4R]

        3256
                                                     C      2015        H010 - INTERSTATE MAINTENANCE                                   11.340   2013
                                                     P      2011        H010 - INTERSTATE MAINTENANCE                                     .111
                                                     P      2012        H010 - INTERSTATE MAINTENANCE                                     .222
Highway and Bridge                                                                                                             Total:   11.673              12.590
SWANZEY               DILLANT-HOPKINS   AIRPORT MASTER PLAN UPDATE                                                                                          Planning document.
                      AIRPORT
        6590
                                                            2015        AIP - AIRPORT IMPROVEMENT PROGRAM                                 .158
Aeronautics                                                                                                                    Total:     .158
SWANZEY               DILLANT-HOPKINS   CONSTRUCTION ONLY - RECONSTRUCTION OF RUNWAY 2-20                                                                   Address Safety Concerns.
                      AIRPORT
        6589
                                                            2014        AIP - AIRPORT IMPROVEMENT PROGRAM                                2.200
Aeronautics                                                                                                                    Total:    2.200
SWANZEY               DILLANT-HOPKINS   CONSTRUCT ONLY - NEW PARALLEL TAXIWAY 'B' TO RUNWAY 2-20                                                            Address Safety Concerns
                      AIRPORT
        6677
                                                            2017        AIP - AIRPORT IMPROVEMENT PROGRAM                                3.500
Aeronautics                                                                                                                    Total:    3.500
SWANZEY               DILLANT-HOPKINS   DESIGN ONLY - RECONSTRUCTION OF RUNWAY 2-20                                                                         Address Safety Concerns.
                      AIRPORT
        6587
                                                            2013        AIP - AIRPORT IMPROVEMENT PROGRAM                                 .250
Aeronautics                                                                                                                    Total:     .250
SWANZEY               DILLANT-HOPKINS   DESIGN ONLY - NEW PARALLEL TAXIWAY 'B' TO RUNWAY 2-20                                                               Address Safety Concerns.
                      AIRPORT
        6593
                                                            2016        AIP - AIRPORT IMPROVEMENT PROGRAM                                 .526
Aeronautics                                                                                                                    Total:     .526
SWANZEY               DILLANT-HOPKINS   DESIGN ONLY - APRON EXPANSION                                                                                       Address Capacity Concerns
                      AIRPORT
        6678
                                                            2018        AIP - AIRPORT IMPROVEMENT PROGRAM                                 .400
Aeronautics                                                                                                                    Total:     .400




                                        Phase:       C = Construction       P = Preliminary Engineering     R = Right of Way                                             Projects Page - 107
June 25, 2008
                                                                                                                                           Previous Previous
Project Name/#   Route/Road:       Location; Scope of Work                                                                        $(M)     Prog. Yr Total$
                                                                                                                                                               Comments:
SWANZEY          DILLANT-HOPKINS   ENVIRONMENTAL ASSESSMENT                                                                                           Evaluate environmental
                 AIRPORT                                                                                                                              impacts associated with prop
        6592
                                                      2016        AIP - AIRPORT IMPROVEMENT PROGRAM                                 .158
Aeronautics                                                                                                              Total:     .158
SWANZEY          DILLANT-HOPKINS   INSTALL PERIMETER FENCING                                                                                          Safety and Security issue.
                 AIRPORT
        3480
                                                      2015        AIP - AIRPORT IMPROVEMENT PROGRAM                                 .250   2012
Aeronautics                                                                                                              Total:     .250
SWANZEY          DILLANT-HOPKINS   OBSTRUCTION REMOVAL, UTILITY RELOCATION, & HAZARD BEACON REHABILITATION                                            Safety Issue. Removal of trees in
                 AIRPORT                                                                                                                              the approach surface.
        3978
                                                      2010        AIP - AIRPORT IMPROVEMENT PROGRAM                                 .650   2007
Aeronautics                                                                                                              Total:     .650
SWANZEY          DILLANT-HOPKINS   PURCHASE SNOW-REMOVAL EQUIPMENT                                                                                    Provide equipment for winter
                 AIRPORT                                                                                                                              operations.
        6591
                                                      2016        AIP - AIRPORT IMPROVEMENT PROGRAM                                 .250
Aeronautics                                                                                                              Total:     .250
SWANZEY          DILLANT-HOPKINS   RUNWAY 14/32 RECONSTRUCTION                                                                                        Safety Issue. Planned
                 AIRPORT                                                                                                                              rehabilitation based on
        3479                                                                                                                                          Pavement Management
                                                                                                                                                      System.

                                               C      2011        AIP - AIRPORT IMPROVEMENT PROGRAM                                1.500   2010
                                               P      2010        AIP - AIRPORT IMPROVEMENT PROGRAM                                 .150
Aeronautics                                                                                                              Total:    1.650               1.250
SWANZEY          DILLANT-HOPKINS   REHABILITATE HAZARD BEACONS                                                                                        Address Safety Concerns.
                 AIRPORT
        6588
                                                      2013        AIP - AIRPORT IMPROVEMENT PROGRAM                                 .100
Aeronautics                                                                                                              Total:     .100
SWANZEY          DILLANT-HOPKINS   TERMINAL APRON EXPANSION                                                                                           Priority as identified by airport
                 AIRPORT                                                                                                                              sponsor.
        3482
                                                      2009        AIP - AIRPORT IMPROVEMENT PROGRAM                                1.300   2014
Aeronautics                                                                                                              Total:    1.300




                                   Phase:      C = Construction       P = Preliminary Engineering     R = Right of Way                                             Projects Page - 108
June 25, 2008
                                                                                                                                                    Previous Previous
Project Name/#        Route/Road:        Location; Scope of Work                                                                           $(M)     Prog. Yr Total$
                                                                                                                                                                        Comments:
SWANZEY               DILLANT-HOPKINS    TERMINAL APRON RECONSTRUCTION                                                                                         Priority as identified by airport
                      AIRPORT                                                                                                                                  sponsor.
         3483
                                                            2012        AIP - AIRPORT IMPROVEMENT PROGRAM                                   1.100   2013
Aeronautics                                                                                                                       Total:    1.100
SWANZEY               COBBLE HILL ROAD   BRIDGE REPLACEMENT OVER CALIFORNIA BROOK - 082/115                                                                    Specific project from Statewide
  14918                                                                                                                                                        program, Municipal managed.
     6474
                                                     C      2013        SAB - STATE AID BRIDGE (State FY), 20% = Town                        .448   New Project
                                                     P      2013        SAB - STATE AID BRIDGE (State FY), 20% = Town                        .050
                                                     R      2013        SAB - STATE AID BRIDGE (State FY), 20% = Town                        .005
Highway and Bridge                                                                                                                Total:     .503
TAMWORTH              NH 113             PAVED SHOULDERS ON ROUTE 113 - CONSTRUCT 4' PAVED SHOULDERS ON BOTH SIDES OF                                          Specific project from Statewide
   14423                                 NH113 STARTING IN TAMWORTH AT THE FOUR CORNERS TO PROJECT S-2487 (0.6 MILES),                                         program, Municipal managed.
      5661                               CONTINUING AT THE SOUTH END OF PROJECT S-2487 TO JUST SOUTH OF SOUTHEN ENTRANCE
                                         TO THE TAMWORTH ELEMENTARY SCHOOL (800') (TE Program) [04-63TE]
                                                     C      2009  L220 - STP - TRANSPORTATION ENHANCEMENT              .080                         2009
Bike / Pedestrian                                                                                                                 Total:     .080               0.096
TAMWORTH              NH 113             CONSTRUCT 4' PAVED SHOULDERS ON BOTH SIDES STARTING 10' SOUTH OF THE SOUTHERLY                                        Specific project from Statewide
   14833                                 ENTRANCE TO THE TAMWORTH ELEMENTARY SCHOOL AND GOING 1,212 LF TO THE NORTH                                            program. Municipal managed.
      6248                               END OF THE BRIDGE OVER THE BEARCAMP RIVER (TE Program) [06-53TE]
                                                     C      2010        L220 - STP - TRANSPORTATION ENHANCEMENT                              .037   TE 2006
Bike / Pedestrian                                                                                                                 Total:     .037
TEMPLE                PUTNAM ROAD        BRIDGE REPLACEMENTS - 116/139 & 117/138                                                                               Specific project from Statewide
   14937                                                                                                                                                       program, Municipal managed.
      6491
                                                     C      2013        SAB - STATE AID BRIDGE (State FY), 20% = Town                        .245   New Project
                                                     P      2013        SAB - STATE AID BRIDGE (State FY), 20% = Town                        .050
                                                     R      2013        SAB - STATE AID BRIDGE (State FY), 20% = Town                        .005
Highway and Bridge                                                                                                                Total:     .300
TILTON - NORTHFIELD                      MODIFICATIONS TO THE WINNIPESAUKEE RIVER TRAIL PHASE 2: CONSTRUCT A STEEL ARCH                                        Specific project from Statewide
    14839                                BRIDGE OVER THE WINNIPESAUKEE RIVER SUITABLE FOR PEDESTRIANS AND BICYCLES WHICH IS                                    program. Municipal managed.
       6249                              ADA COMPLIANT. THE NEW BRIDGE WOULD BE BUILT UPSTREAM (TE Program) [06-55TE]
                                                     C      2011        L220 - STP - TRANSPORTATION ENHANCEMENT                              .240   TE 2006
Bike / Pedestrian                                                                                                                 Total:     .240




                                         Phase:      C = Construction        P = Preliminary Engineering       R = Right of Way                                              Projects Page - 109
June 25, 2008
                                                                                                                                                   Previous Previous
Project Name/#          Route/Road:     Location; Scope of Work                                                                           $(M)     Prog. Yr Total$
                                                                                                                                                                       Comments:
UNITY                   STAGE ROAD      BRIDGE REPLACEMENT OVER LITTLE SUGAR RIVER - 037/074                                                                  Specific project from Statewide
   14248                                                                                                                                                      program, Municipal managed.
      5666
                                                    C      2009        SAB - STATE AID BRIDGE (State FY), 20% = Town                        .410   2009
                                                    P      2009        SAB - STATE AID BRIDGE (State FY), 20% = Town                        .068
                                                    R      2009        SAB - STATE AID BRIDGE (State FY), 20% = Town                        .015
Highway and Bridge                                                                                                               Total:     .493               0.470
WAKEFIELD                               SANBORNVILLE / PAUL SCHOOL SIDEWALK PROJECT: CONSTRUCT 3,740 LF OF 5' WIDE                                            Specific project from Statewide
  14824                                 PEDESTRIAN / BICYCLE WAYS THAT LINK THE ELEMENTARY / MIDDLE SCHOOL WITH THE                                           program. RPC comment.
     6250                               ADJACENT NEIGHBORHOODS AND TOWN CENTER (TE Program) [06-57TE]                                                         Municipal managed.

                                                    C      2010        L220 - STP - TRANSPORTATION ENHANCEMENT                              .180   TE 2006
                                                    R      2009        L220 - STP - TRANSPORTATION ENHANCEMENT                              .001
Bike / Pedestrian                                                                                                                Total:     .181
WAKEFIELD               NH 16           INTERSECTION IMPROVEMENTS AT GOVENORS ROAD (Bet HIRI)                                                                 Specific project from Statewide
  14871                                                                                                                                                       program.
     6408
                                                    C      2009        BET - BETTERMENT (State FY)                                          .570   New Project
Highway and Bridge                                                                                                               Total:     .570
WALPOLE - CHARLESTOWN NH 12             RECONSTRUCTION FROM MAIN STREET IN WALPOLE TO NH 12A IN CHARLESTOWN, REMOVE                                           Project name modification,
  14747                                 CONCRETE BASE, ADD SHOULDERS AND IMPROVE DRAINAGE                                                                     formerly Charlestown in
     1891                                                                                                                                                     previous TYP with construction
                                                                                                                                                              programmed for 2010 and 2013.

                                                    C      2010        H250 - STP - NON URBAN AREAS                                        2.650   2010
                                                    C      2013        H250 - STP - NON URBAN AREAS                                        5.850   2013
                                                    P      2009        H250 - STP - NON URBAN AREAS                                         .050
                                                    P      2010        H250 - STP - NON URBAN AREAS                                         .188
                                                    P      2012        H250 - STP - NON URBAN AREAS                                         .250
                                                    R      2010        H250 - STP - NON URBAN AREAS                                         .240
                                                    R      2011        H250 - STP - NON URBAN AREAS                                         .240
Highway and Bridge                                                                                                               Total:    9.468               9.000
WALPOLE, NH - BELLOWS   BRIDGE STREET   VILAS BRIDGE REHABILITATION OVER CONNECTICUT RIVER - 062/052                                                          Redlist bridge priority #36.
FALLS, VT
   12905
       1877
                                                    C      2015        H100 - BRIDGE REPLACEMENT - ON SYSTEM                               2.600   2011
                                                    P      2013        H100 - BRIDGE REPLACEMENT - ON SYSTEM                                .070
                                                    P      2014        H100 - BRIDGE REPLACEMENT - ON SYSTEM                                .100
                                                    R      2013        H100 - BRIDGE REPLACEMENT - ON SYSTEM                                .005
Highway and Bridge                                                                                                               Total:    2.775               2.865

                                        Phase:      C = Construction        P = Preliminary Engineering       R = Right of Way                                             Projects Page - 110
June 25, 2008
                                                                                                                                                  Previous Previous
Project Name/#       Route/Road:      Location; Scope of Work                                                                            $(M)     Prog. Yr Total$
                                                                                                                                                                      Comments:
WARNER               I-89             1" OVERLAY FROM EXIT 8 TO EXIT 9 (4 MILES) [4R]

        3258
                                                   C      2014        H010 - INTERSTATE MAINTENANCE                                       8.000   2012
                                                   P      2010        H010 - INTERSTATE MAINTENANCE                                        .100
                                                   P      2011        H010 - INTERSTATE MAINTENANCE                                        .100
                                                   P      2012        H010 - INTERSTATE MAINTENANCE                                        .050
Highway and Bridge                                                                                                              Total:    8.250               9.250
WARNER - SUTTON      I-89             RECLAIM AND 6-1/2" HBP FROM EXIT 9 TO EXIT 10 (Br# 243/166 & 244/167) (7 MILES) [4R]                                   Two Red List bridge, priority #27
                                                                                                                                                             and #28.
        3253
                                                   C      2013        H010 - INTERSTATE MAINTENANCE                                       5.000
                                                   C      2016        H010 - INTERSTATE MAINTENANCE                                      11.000   2013
                                                   P      2010        H010 - INTERSTATE MAINTENANCE                                        .200
Highway and Bridge                                                                                                              Total:   16.200              16.400
WASHINGTON           HALF MOON POND   BRIDGE REPLACEMENT OVER HALF MOON POND OUTLET - 131/083                                                                Specific project from Statewide
  14346              ROAD                                                                                                                                    program, Municipal managed.
     5808
                                                   C      2009        SAB - STATE AID BRIDGE (State FY), 20% = Town                        .552   2010
                                                   R      2009        SAB - STATE AID BRIDGE (State FY), 20% = Town                        .005
Highway and Bridge                                                                                                              Total:     .557               0.250
WEARE                LULL ROAD        BRIDGE REPLACEMENT OVER PEACOCK BROOK - 082/045                                                                        Specific project from Statewide
  14338                                                                                                                                                      program, Municipal managed.
      5799
                                                   C      2010        SAB - STATE AID BRIDGE (State FY), 20% = Town                        .240   2010
Highway and Bridge                                                                                                              Total:     .240               0.240
WEARE                PEASLEE ROAD     BRIDGE REPLACEMENT OVER PISCATAQUOG RIVER - 125/141                                                                    Specific project from Statewide
  14339                                                                                                                                                      program, Municipal managed.
      5794
                                                   C      2009        SAB - STATE AID BRIDGE (State FY), 20% = Town                        .774   2010
                                                   P      2009        SAB - STATE AID BRIDGE (State FY), 20% = Town                        .095
                                                   R      2009        SAB - STATE AID BRIDGE (State FY), 20% = Town                        .015
Highway and Bridge                                                                                                              Total:     .884               0.775
WENTWORTH            EVANS ROAD       REPLACE BRIDGE OVER SOUTH BRANCH BAKER RIVER - 136/053                                                                 Specific project from Statewide
  14516                                                                                                                                                      program, Municipal managed.
     6252
                                                   C      2011        SAB - STATE AID BRIDGE (State FY), 20% = Town                        .700   New Project
                                                   P      2011        SAB - STATE AID BRIDGE (State FY), 20% = Town                        .080
                                                   R      2011        SAB - STATE AID BRIDGE (State FY), 20% = Town                        .005
Highway and Bridge                                                                                                              Total:     .785

                                      Phase:       C = Construction        P = Preliminary Engineering       R = Right of Way                                             Projects Page - 111
June 25, 2008
                                                                                                                                                     Previous Previous
Project Name/#       Route/Road:          Location; Scope of Work                                                                           $(M)     Prog. Yr Total$
                                                                                                                                                                         Comments:
WENTWORTH            SAUNDERS HILL ROAD   REHAB BRIDGE OVER BAKER RIVER - 142/096                                                                               Specific project from Statewide
  14517                                                                                                                                                         program, Municipal managed.
     6253
                                                      C      2012        SAB - STATE AID BRIDGE (State FY), 20% = Town                        .644   New Project
                                                      P      2012        SAB - STATE AID BRIDGE (State FY), 20% = Town                        .055
                                                      R      2012        SAB - STATE AID BRIDGE (State FY), 20% = Town                        .005
Highway and Bridge                                                                                                                 Total:     .704
WENTWORTH            DUFOUR ROAD          REHAB BRIDGE OVER SOUTH BRANCH BAKER RIVER - 162/072                                                                  Specific project from Statewide
  14518                                                                                                                                                         program, Municipal managed.
     6254
                                                      C      2013        SAB - STATE AID BRIDGE (State FY), 20% = Town                        .370   New Project
                                                      P      2013        SAB - STATE AID BRIDGE (State FY), 20% = Town                        .060
                                                      R      2013        SAB - STATE AID BRIDGE (State FY), 20% = Town                        .005
Highway and Bridge                                                                                                                 Total:     .435
WESTMORELAND         NH 63                EXTEND PIPE AND RETAINING WALL TO GAIN ADDITIONAL SHOULDER WIDTH, 0.9 MILES NORTH
  14809                                   OF SOUTH VILLAGE ROAD
     6388
                                                      C      2009        BET - BETTERMENT (State FY)                                          .034   New Project
Highway and Bridge                                                                                                                 Total:     .034
WHITEFIELD           MT. WASHINGTON       CONSTRUCT ONLY - EXTEND RUNWAY 10 BY 500 FEET                                                                         Address Safety Concerns
                     REGIONAL AIRPORT
        6679
                                                             2017        AIP - AIRPORT IMPROVEMENT PROGRAM                                   2.650
Aeronautics                                                                                                                        Total:    2.650
WHITEFIELD           MT. WASHINGTON       CONSTRUCT ONLY - EXTEND TAXIWAY TO RUNWAY 10                                                                          Address Safety Concerns
                     REGIONAL AIRPORT
        6680
                                                             2018        AIP - AIRPORT IMPROVEMENT PROGRAM                                   2.110
Aeronautics                                                                                                                        Total:    2.110
WHITEFIELD           MT. WASHINGTON       DESIGN ONLY - EXTEND RUNWAY 10 BY 500 FEET AND EXTEND PARALLEL TAXIWAY                                                Address Safety Concerns
                     REGIONAL AIRPORT
        6598
                                                             2016        AIP - AIRPORT IMPROVEMENT PROGRAM                                    .421
Aeronautics                                                                                                                        Total:     .421




                                          Phase:      C = Construction        P = Preliminary Engineering       R = Right of Way                                             Projects Page - 112
June 25, 2008
                                                                                                                                            Previous Previous
Project Name/#   Route/Road:        Location; Scope of Work                                                                        $(M)     Prog. Yr Total$
                                                                                                                                                                Comments:
WHITEFIELD       MT. WASHINGTON     ENVIRONMENTAL ASSESSMENT                                                                                           Planning document; 95%
                 REGIONAL AIRPORT                                                                                                                      Federal funds, 2.5% Sponsor
        3487                                                                                                                                           match. Necessary Federal
                                                                                                                                                       Environmental Requirements for
                                                                                                                                                       development PLANNING
                                                                                                                                                       DOCUMENT.

                                                       2011        AIP - AIRPORT IMPROVEMENT PROGRAM                                 .474   2010
Aeronautics                                                                                                               Total:     .474
WHITEFIELD       MT. WASHINGTON     EXTEND RUNWAY 28 BY 500 FEET AND EXTEND PARALLEL TAXIWAY                                                           Address Safety Concerns.
                 REGIONAL AIRPORT
        6596
                                                       2012        AIP - AIRPORT IMPROVEMENT PROGRAM                                 .421
                                                       2013        AIP - AIRPORT IMPROVEMENT PROGRAM                                2.105
                                                       2014        AIP - AIRPORT IMPROVEMENT PROGRAM                                2.632
Aeronautics                                                                                                               Total:    5.158
WHITEFIELD       MT. WASHINGTON     ENVIRONMENTAL ASSESSEMENT                                                                                          Address environmental impacts
                 REGIONAL AIRPORT                                                                                                                      associated with prop
        6597
                                                       2015        AIP - AIRPORT IMPROVEMENT PROGRAM                                 .474
Aeronautics                                                                                                               Total:     .474
WHITEFIELD       MT. WASHINGTON     SNOW REMOVAL EQUIPMENT STORAGE BUILDING                                                                            95% Federal funds, 2.5% Sponsor
                 REGIONAL AIRPORT                                                                                                                      match. Safety Issue.
        4137
                                                       2009        AIP - AIRPORT IMPROVEMENT PROGRAM                                 .158   2009
Aeronautics                                                                                                               Total:     .158
WHITEFIELD       MT. WASHINGTON     T-HANGARS                                                                                                          Address Capacity Concerns.
                 REGIONAL AIRPORT
        6595
                                                       2010        AIP - AIRPORT IMPROVEMENT PROGRAM                                 .158
Aeronautics                                                                                                               Total:     .158




                                    Phase:      C = Construction       P = Preliminary Engineering     R = Right of Way                                             Projects Page - 113
June 25, 2008
                                                                                                                                              Previous Previous
Project Name/#       Route/Road:   Location; Scope of Work                                                                           $(M)     Prog. Yr Total$
                                                                                                                                                                  Comments:
WILTON - MILFORD -   NH 101        SAFETY IMPROVEMENTS @ VARIOUS LOCATIONS FROM WILTON TO WALLACE RD IN BEDFORD                                          Scope reduction, major corridor
AMHERST - BEDFORD                  AS DETERMINED BY CORRIDOR STUDY                                                                                       improvements deferred beyond
   13692                                                                                                                                                 TYP, interim safety
      2739                                                                                                                                               improvements remain, RPC
                                                                                                                                                         recommendations for phasing.

                                               C      2013        H050 - NATIONAL HIGHWAY SYSTEM                                      3.000   2013
                                               C      2018        H050 - NATIONAL HIGHWAY SYSTEM                                      7.000   2016
                                               P      2009        H050 - NATIONAL HIGHWAY SYSTEM                                       .096
                                               P      2010        H050 - NATIONAL HIGHWAY SYSTEM                                       .250
                                               R      2012        H050 - NATIONAL HIGHWAY SYSTEM                                       .080
Highway and Bridge                                                                                                          Total:   10.426              53.721
WINCHESTER           NH 119        REHABILITATE BRIDGE DECK OVER ASHUELOT RIVER - 113/077                                                                Red List Bridge Priority #68

         6783
                                               C      2015        L1C0 - BRIDGE PROGRAM - 85% ON/OFF SYSTEM                           2.500   New Project
Highway and Bridge                                                                                                          Total:    2.500
WINCHESTER           NH 10         BRIDGE REPLACEMENT OVER ASHUELOT RIVER - 152/181                                                                      Red List bridge, priority #35.
   12906
      1873
                                               C      2011        3650 - RURAL ACCESS PROJECTS                                         .493   2011
                                               C      2011        H100 - BRIDGE REPLACEMENT - ON SYSTEM                               3.217   2011
                                               R      2009        3650 - RURAL ACCESS PROJECTS                                         .100
                                               R      2009        3650 - RURAL ACCESS PROJECTS                                         .040
Highway and Bridge                                                                                                          Total:    3.850               3.850
WINDHAM                            REHABILITATE WINDHAM DEPOT AS VISITORS CENTER / MUSEUM / WAY STATION ON SALEM -                                       Specific project from Statewide
   14830                           CONCORD BIKEWAY / RAIL TRAIL: ALSO MAKE IMPROVEMENTS TO PARKING AREAS (TE                                             program.
      6251                         Program) [06-59TE]
                                               C      2010        L220 - STP - TRANSPORTATION ENHANCEMENT                              .200   TE 2006
                                               R      2009        L220 - STP - TRANSPORTATION ENHANCEMENT                              .001
Bike / Pedestrian                                                                                                           Total:     .201
WINDHAM - SALEM      NH 111        LANDSCAPING (Parent = Win-Sal 10075)
   10075 K
      6041
                                               C      2009        H050 - NATIONAL HIGHWAY SYSTEM                                       .200   2008
Highway and Bridge                                                                                                          Total:     .200               0.200
WOLFEBORO            BAY STREET    BRIDGE CONSTRUCTION OVER BROOK - 104/116                                                                              Specific project from statewide
  14032                                                                                                                                                  program, Municipal Managed.
     3967
                                               C      2009        SAB - STATE AID BRIDGE (State FY), 20% = Town                        .426   2006
Highway and Bridge                                                                                                          Total:     .426

                                   Phase:      C = Construction        P = Preliminary Engineering       R = Right of Way                                             Projects Page - 114
June 25, 2008
                                                                                                                                         Previous Previous
Project Name/#       Route/Road:   Location; Scope of Work                                                                      $(M)     Prog. Yr Total$
                                                                                                                                                             Comments:
WOODSTOCK            I-93          NB NON MEDIAN SIDE & SB MEDIAN SIDE ROCK CUT 004R MAINTAIN & REPLACE EXIST                                       Address
  14773                            MECHANICAL ROCK STABILIZATION MEASURES                                                                           preservation/maintenance
     6345                                                                                                                                           needs at Barron Mountain rock
                                                                                                                                                    cut per study recommendations.

                                               C      2009        H010 - INTERSTATE MAINTENANCE                                  2.330   New Project
Highway and Bridge                                                                                                     Total:    2.330




                                   Phase:      C = Construction       P = Preliminary Engineering   R = Right of Way                                             Projects Page - 115
June 25, 2008

								