ADDENDUM # 1



To: WSFCS STIP Project Package 14 Bidders

Ashley Elementary School and Petree Elementary School





From: Ellis Tusing



CC: Project File



Date: February 15, 2006



Re: Addendum No. 1



Bidder must acknowledge receipt of this Addendum on the Form of Proposal

section in the space provided.



This addendum is issued for the purpose of amending certain requirements of

the Contract Documents, as noted hereinafter, and is hereby made part of and

incorporated in full force as part of the Contract Documents. Unless specifically

noted or specified hereinafter, all work shall comply with the applicable provisions

of the Contract Documents.



Item No. 1: Electrical clarifications SEE BELOW.

BID PACKAGE #14

ADDENDUM NO. 1 ITEMS





ASHLEY ELEMENTARY SCHOOL



Item No. 1: Boiler Room Floor Plan



A. Panel “AES-PP” - Relocate to back wall.



Item No. 2: Main Building Floor Plan



A. Room MC01

1. Panel “AES-CP4” - Relocate to opposite wall.

2. Change the two 20A.125V. quad receptacles to two single locking

20A.250V. receptacles, Hubbell Cat. No. HBL2320. Mount

receptacles on cable tray. Change circuitry to CP4-1,3 and CP4-5,7.



Item No. 3: Building 200



A. Room TC03

(1) From new ground bus bar, extend #4G-3/4” to existing Panel “SDP”

ground bus.

(2) Change duplex quad receptacles to single locking type

20A.250V.,3W. receptacle, Hubbell Cat. No. HBL2320, mounted on

the wall. Change circuitry to 2CP1-19,21.



Item No. 4: Building 300



A. Room TC04

(1) From new ground bus bar, extend #4G-3/4” to existing Panel “PA”

ground bus.

(2) Change duplex quad receptacles to single locking type

20A.250V.,3W. receptacle, Hubbell Cat. No. HBL2320, mounted on the

wall. Change circuitry to 3CP1-16,18.

(3) Panel “AES-3CP1”:

(a) Primary feeder from Panel “PA” to 15 kVA transformer shall

be 3#6,#10G-1”.

(b) Secondary feeder to Panel “AES-3CP1” shall be 3#6,#3N,

#8G-1”.



Item No. 5: A. For all new panelboards, provide 200% neutral bus bar in each panel.

B. Panel “AES-CP4: Single pole circuits nos. 1,3,5 and 7 shall be

changed to 2P.20A,(1,3 and 5,7 ).

C. Panel “AES-2CP1” - Single poles breakers 19,21 shall be replaced with

2P.20A. breaker.

D. Panel “AES-3CP1” - Change single pole breakers nos. 16 and 18 to a

2P.20A. breaker.



Item No. 6: On the H. T. plastic raceways, provide matching coverplates for the duplex

receptacles and stainless steel coverplates for the single printer devices.



Item No. 7: Where a “delta 2-5” is indicated on the Drawings, the only power required is

to the computers and printer, a total of 2 circuits per location.



Item No. 8: General Questions

A .Question: “Panels 2CP1 and 3CP1 are fed from 15 KVA transformers. A

15KVA outputs 42 amps. Should the main on the panels be a 60 amp main and

should it have a 200% neutral?”

Answer: Main breaker for each panel shall be 50A3P. Each panel shall have

200% neutral.



B. Question: Panels CP3 and CP1 are fed from Panel AES-PP with a 200 amp

breaker with 3/0 wire. Should the mains for both these panels be 200 amps not

225 and 150.

Answer: Main breaker for Panel CP1 should be reduced to 175A3P; for Panel

CP3, 150A3P. Mains for each panel may match rating of main breaker.



PETREE ELEMENTARY SCHOOL





Item No. 1: Drawing PEE-1

A. Storage Room - New Panel “PEE-CA” shall be relocated to exterior

wall.



Item No. 2: Drawing PEE-2

A. Electrical Room - Relocate existing feeder to existing Panel “PP1-2.

B. Room MC1 -

(1) Change two 1P.20A.125V. quad receptacles to two single

locking 20A.250V. receptacles, Hubbell Cat. No. HBL2320.

Mount receptacles on cable tray. Change circuitry to CD-1,3

and CD-5,7.

(2) Add new Panel “PES-CD”, 120/208 v. 3-phase, 4-wire, surface

mounted, 60A3P main breaker, 200% neutral, 12 circuit, 8-

20A1P, 2-20A2P. Feed from new Panel “PES-CC”. Provide

60A2P breaker. Feeder circuit shall be 3#6, #3N, #8G-1”.

Install above ceiling and provide two pull boxes.



C. New Panelboards: Provide 200% neutral bus for each panel.

D. Central Electrical Room – Partial Power Riser

Delete new TVSS and associated wiring and breaker.

ITEM NUMBER 3 GENERAL



A. It will be this contractors responsibility to repair any broken raceway

Disturbed during the installation of the new wiring. Assume that all heads

will be locked firmly in place.



B. All Boards will have been moved prior to this contractor coming to

site.

C. Assume that all HellermanTyton electrical boxes and enclosures will

be included in this contract and not furnished or installed prior to this

contractor arriving on site.







END ADDENDA 1


Related docs
Other docs by HC111210144430
????
Views: 0  |  Downloads: 0
UNITED STATES BANKRUPTCY COURT
Views: 0  |  Downloads: 0
Bajar - cibadist
Views: 23  |  Downloads: 0
UBND THA�NH PH�� �A� N��NG
Views: 1  |  Downloads: 0
?DV
Views: 2  |  Downloads: 0
UNITED STATES OF AMERICA
Views: 0  |  Downloads: 0
RE 5100 Final Exam � Question #2
Views: 6  |  Downloads: 0
CTCV Pt Info form
Views: 0  |  Downloads: 0
MEDIA INDICTMENT LIST
Views: 7  |  Downloads: 0
By registering with docstoc.com you agree to our
privacy policy

You are almost ready to download!

You are almost ready to download!