					     AGS/Future Technology Task
          Group (FT-TG)
       (FT-TG Athens meeting)

              Convenor
             Mikio Mukai



2010-05-18                        1
                    Scope of FT-TG
(1)To review the PACT report on Final report of the Human
   interfaces in Multimedia network Era (2001-11-12,
   100AGS63, report to Firenze AGS ) project about what was
   the proposal and what had been done, what are the left over
   issues, changes in environment since proposed
(2)To review the Response to the PACT Report (2003-11-04,
   100AGS111, 112, report to London AGS) about what was
   the proposal and what had been done, what are the left over
   issues, changes in environment since proposed
(3)To ask contributions on the proposal on the possible future
   topics and/or strategy in the field of TC100 related area
(4) To discuss and formulate the possible proposal to TC100
(5) To report and discuss AGS on the possible strategy for the
   future work (at 2010-10 TC100 AGS)
2010-05-18                                                   2
       FT-TG Members registered
•   Eric van Nijhuis
•   John Woodgate
•   Ulrike Haltrich
•   Jean Baronas
•   Junichi Yoshio
•   Shuji Hirakawa
•   Yushi Komachi
•   Shuichi Matsumura
•   Keith Jones
•   Mikio Mukai(Convenor)


2010-05-18                        3
                    How to proceed
1. Discussions and ask contributions vir electric tools and others if any
2. The first F2F meeting
- 2010-05-18(Tu) 9:00-12:00
 - at DIVANIS ACROPOLIS HOTEL, Greek
Collocated with TC100 AGS and AGM meetings
Agenda will be dispatched at the beginning of April 2010
3. The second F2F meeting
- 2010-10-11(M) 9:00-12:00
 - at Seattle, USA
Collocated with IEC Plenary and TC100 Plenary meetings


2010-05-18                                                                  4
  To be reviewed of 100AGS63

• To be reviewed on the PACT report on
  Final report of the Human interfaces
  in Multimedia network Era (2001-11-
  12, 100AGS63, report to Firenze
  AGS ) project about what was the
  proposal and what had been done,
  what are the left over issues,
  changes in environment since
  proposed
2010-05-18                           5
       PACT report of “Human interfaces in
                  multimedia”

PACT/WG recommends that the IEC should:
1) Discuss the eight standardization items discussed later in this
     report at TC100 AGS.
2) Include especially the following two standardization items in its
     scope.
a) Standardization of ontology technologies
b) Standardization of media converting technologies
Out of 8 items;
(iii) Framework of describing attribute information to keep
     interoperability in the real world - Multi-lingual, Ontology

 Technology is on progress.

(*):PACT report: Final report of the project on: Human interfaces in Multimedia network Era (October 31,
     2000) 100AGS63
2010-05-18                                                                                             6
 (a) Technologies for connecting the real world
             with the cyber world

(i) ID providing technology
- Technology to distinguish information corresponding
    to the real world with other information that only
    exists in the cyber world.
 Some parts are in TC100/TA10 issue
    IEC 62227
(ii) Position detection technology
- Indoor position detection technology
 Sensor network (JTC1)
 RFID (JTC1/SC31)
2010-05-18                                               7
       (b) Technology for comprehensively managing
               information in the cyber world



(iii) Framework of describing attribute information to
    keep interoperability in the real world
- Multi-lingual, Ontology
 The work is in progress in W3C.
 SOA(Service Oriented Architecture) in ISO/IEC JTC 1
 Possible application in IEC/TC100 area.
(iv) Framework to reflect information in the real world
- Technology to guarantee that the cyber world reflects
   the information in the real world

2010-05-18                                                8
   (c) Technology for interacting with the cyber
         world based on user information

(v) Privacy protection technology
- Remaining anonymous
      PT 62045-1, -2 Multimedia Security - Guideline for
       privacy protection of equipment and systems in use and
       disused -
       Part 1: General
       Part 2: Receivers
(vi) Searching, filtering, and matching methods
- Route search (optimum in various conditions)

2010-05-18                                                  9
 (d) Media input/output technology between the
         real world and the cyber world

(vii) Media converting technology
- Codec 3D image compression method
 3D TV technology is in progress
- Interoperability among devices (Device independent display method
(viii) Interaction technology
- Easy settlement In balk, Alibi based cf. by location IDs
 Sensor network (JTC1)
 RFID (JTC1/SC31)

- Automatic interaction with devices cf. maintenance of personal
   information, protocols



2010-05-18                                                            10
       To be reviewed of 100AGS111

• To be reviewed on the Response to the
  PACT Report (2003-11-04,
  100AGS111) about what was the
  proposal and what had been done,
  what are the loft over issues,
  changes in environment since
  proposed

2010-05-18                            11
 Response to the PACT Report(AGS 111)
Recommendation 1: New TA on Human Interfaces for multimedia in the cyber world
PACT Taskforce Group (TG) recommends that TC100 should establish a new TA which includes the
     projects;
(1) Generic guideline for users manual, structure and terminology, navigation, wizards (100/AGS/63 text
     from (a))
(2) Standards for local presence detection (100/AGS/63 text from a(ii))
          Sensor network (JTC1)
          RFID (JTC1/SC31)
(3) Technical specifications for privacy protection and data security (100/AGS/63 text from c(v), d(viii))
           PT 62045-1, -2 Multimedia Security - Guideline for privacy protection of equipment and
            systems in use and disused - Part 1: General, Part 2: Receivers
(4) Standard on ontology vocabulary and semantics (100/AGS/63 text from b(iii))
          The work is in progress in W3C.
          SOA(Service Oriented Architecture) in ISO/IEC JTC 1
          Possible application in IEC/TC100 area.
(5) Technical report(s) on identification and classification of
resources (100/AGS/63 text from a(i), b(iv), c(vi))
(6) Standards for generic human interfaces for multiple networks in the
home (OSGi specification overview)
                        Ref.A: ITU-R to interactive between an resources (ref.A)
(7) Mapping application scenarios 6M/162 (Interfacesreceiver's application and the system),
2010-05-18              ITU-R 6M/79 (Content requirements),                                              12
                          Liaison Group JRG1 between ITU-R/SG6/WP6M + ITU-T/SG9
  Response to the PACT Report(AGS 111)

Recommendation 2: Liaisonship
PACT TG recommends that TC100 should take close liaisonship with the
    following groups to carry out the new TA activities:
- ISO/TC159
- W3C
- ZigBee Alliance
- OSGi




2010-05-18                                                         13
  Response to the PACT Report(AGS 111)

Recommendation 3: AGS and National Body activities
In order to realize and support the establishment of the new TA, PACT
    TG recommends that AGS should encourage the discussion of new
    technology, in particular, on Network Human Interface (NHI).
National bodies are requested to propose NPs for the issues (1) through
(7) in Recommendation 1. PACT TG is requested to propose the actual
    plan and structure of the new TA including the projects.




2010-05-18                                                                14
    New technical areas to be considered
•   Smart Grid
•   Environment impact to TC100 or environment aspect
•   Accessibility (is in progress)
•   PC related issue (with multimedia), (Already in TC100 scope)
•   IPTV
•   Mobile identification and payment
•   Cloud computing
•   Battery charger
      – Mobile phone charger
      – Chargers for automobile related
      – ITU-T SG5, liaison statement, l.100 on electric charger, l.100 defines just general profile
      – Chargers for multimedia
      – Wireless charging system
•   3D TV
•   Energy efficiency (TA 12)
      – External power supply (EPS)
      – CENELEC now developing EPS box, attached as mandate
      – TC100 needs battery charging interface, SC48B discussion, will be introduced in AGM



2010-05-18                                                                                            15
                         Major discussions
•   Dr. Komachi                                     •   Mr. Matsumura
     – Suggested to do brain storming for further        – Education is important
          steps                                          – Should have another group to take care
•   Dr. Hirakawa                                    •   Dr. Komachi
     – TC100 should be more strategic to cover           – International cooperation for education about
          future e-book                                       standardization conference
             -> is now on issue                          –     will be announced soon
     – Visibility of TC100 standardization is       •   Mr. Minami
          important                                      – Regarding SG1, SMB responded, will be
     – Needs to educate people so that can                    presented by Jean at AGS
          understand better                              – Relation between TC100 and TC108
•   Ms. Jean Baronas                                     – AGM issue, will be discussed in AGM
     – How to promote from Central Office           •   Mr. Keith Jones
     – Who, How, When, What to promote are               – Mentioned about the external power supply
          important                                           (EPS)
•   Mr. Jon Fairhurst
     – Promotion is Key and it is based on
          applicability
     – Promotion may be communication



2010-05-18                                                                                            16
                   Next Steps
• Report to Athens AGS
• To continue further discussion vir e-mails
• The second FT-TG f2f meeting
   - 2010-10-11(M) 9:00-12:00 at Seattle, USA
   Collocated with IEC Plenary and TC100 Plenary meetings
• Report to IEC TC100 Seattle AGS (2010-10)
• Would like to conclude within one year time frame
  schedule



2010-05-18                                             17
 Attendee list at Athens FT-FG meeting
Members;                          Observers:
Convener:           Mikio Mukai
                                    Tadashi Ezaki
Members: Yushi Komachi
                                    Jon Fairhurst
   Shuji Hirakawa
   Jean Baronas
                                    Megan Hayes
   Ulrike Haltrich                  Hiroyuki Iga
   Keith Jones                      Norimasa Minami
   Shuichi Matsumura                Hironori Sakakihara
   Eric van Nijhuis                 Stephen Wood
   Junichi Yoshio




2010-05-18                                                18

				
DOCUMENT INFO
Shared By:
Categories:
Tags:
Stats:
views:2
posted:12/9/2011
language:
pages:18