Central Campus Dr.

Project: HPER Tunnel Phase 3

Start: 3/15/2009

45

HPER Tunnel Phase 3

CTIHB

Completion: 6/1/2009



During this final phase of the HPER Tunnel construction all

sidewalks intersecting the construction zone and the staging area

54

will be closed to pedestrian traffic. A proposed new sidewalk down

OSH

the north side of Ballif Road will provide access to campus by the

Humanities Building. 49

LNCO

New sidewalk for pedestrians



338









Phase 3 HPER Tunnel

104

97 Dugouts

DGC 104 101

92 Dugouts Tanner

HPR N





94 119

65

Tunnel Staging HPR W Bridge

MBH

93

HPRNAT

91

HPR E

98

Campus Center Dr. KBAC 103

96 RR

95

HPR SW









r.

chi D

apec

C

Mario

305

90

303 350 JHC

HTW 304 VRT-USB

309 105 105 105

Motor Annex Annex Annex



Related docs
Other docs by xiaopangnv
agenda-10-04
Views: 1  |  Downloads: 0
Folkevisen Germand Gladensvend
Views: 2  |  Downloads: 0
Macbeth-Summary-by-toni
Views: 1  |  Downloads: 0
How to Change Settings for the Microphone
Views: 1  |  Downloads: 0
bonn3update8
Views: 1  |  Downloads: 0
Enrol Result_0067AG_17032007_web
Views: 1  |  Downloads: 0
Healing _A Prayer for Healing_
Views: 1  |  Downloads: 0
8900september
Views: 1  |  Downloads: 0
By registering with docstoc.com you agree to our
privacy policy

You are almost ready to download!

You are almost ready to download!