Central Campus Dr.
Project: HPER Tunnel Phase 3
Start: 3/15/2009
45
HPER Tunnel Phase 3
CTIHB
Completion: 6/1/2009
During this final phase of the HPER Tunnel construction all
sidewalks intersecting the construction zone and the staging area
54
will be closed to pedestrian traffic. A proposed new sidewalk down
OSH
the north side of Ballif Road will provide access to campus by the
Humanities Building. 49
LNCO
New sidewalk for pedestrians
338
Phase 3 HPER Tunnel
104
97 Dugouts
DGC 104 101
92 Dugouts Tanner
HPR N
94 119
65
Tunnel Staging HPR W Bridge
MBH
93
HPRNAT
91
HPR E
98
Campus Center Dr. KBAC 103
96 RR
95
HPR SW
r.
chi D
apec
C
Mario
305
90
303 350 JHC
HTW 304 VRT-USB
309 105 105 105
Motor Annex Annex Annex