Lyondellbasell Site Specific Training Multimedia Program

FINAL Script 6/24/2011







Text/Screen Programmer Photos Audio/Narration

Information Notes &Visuals

1 Section 1 Welcome to the site-specific training

Title slide: Introduction Graphic: program for the Lyondellbasell

Lyondellbasell Site Lyondellbasell Chemical Company located in Morris,

Specific Training Program title logo Illinois.

and logo

appear on

screen

1A. Disk 3-26 In this program we will give you the

Title: Lyondellbasell Photo: information you need to safely work

Site Specific Main Menu Lyondellbasell onsite at the Morris plant.

Training listing of sign at entrance

sections

appears: in We will first give you an overview of

sync with the plant; then we’ll discuss entering the

Add bullet points narration plant; followed by a review of the work

Keep image permits you will need while working at

1. Site Introduction through bullet the plant; next we will discuss Hazard

pts. Communications and finally we will

2. Entering the Plant review other safety concerns you should

be aware of while working at the Morris

3. Work Permits plant.



4.Hazard

Communications



5. Other Concerns



Change Text: Additional training needs may arise

Change image: depending on the specifics of the job

Occasionally, Admin Bldg. you perform while on site. Your

additional training EQ D3-25 supervisor will give instructions as

may be required. needed.

Your supervisor will

inform you as

necessary.

Add: Information in each section of this

Change Text: Highlight training program is presented

Navigation automatically and will be accompanied

How to Navigate this buttons as by a series of control buttons.

training program narrator

explains them.









1

Lyondellbasell Site Specific Training Multimedia Program

FINAL Script 6/24/2011

To navigate the program, press the

BACK button to review a previous

section.

REPLAY to replay the current scene.

FORWARD key to move ahead.



When you reach the end of section, the

checkpoint button will be activated --

allowing you to advance to the

checkpoint quiz section.

1B Generic Bkdg. If you need to exit the program for any

Change text /logo reason, see an instructor. And you will

-You will need to need to come back on another day to

come back another take the program.

day to take the

program.

1C Generic Bkdg. To test your knowledge, at the end of

/logo each section you will see a checkpoint.

Change text: These are short multiple-choice quizzes.

: Checkpoints –

A short multiple You will need to click on the

choice quiz which checkpoint button to begin the quiz.

appears at the end of

each section Please note, you may not skip ahead and

take the checkpoint quizzes. You must

Change text: complete the program in the order it is

Cannot Skip ahead to presented.

check point quizzes



1D Change text: Generic Bkdg. Although the program is narrated, the

/logo quizzes will not be narrated.

No narration on test

and quizzes You must be able to read English, and

as well as understand the information

Must be able to read presented in this program in order to

and understand conduct your work safely while on site.

English

1-F Generic Bkdg. An instructor is available if you need

Change Text: /logo help. Simply raise your hand and he or

she will be glad to assist you.

Raise your hand for

help

Graphic: Clock This program will take approximately

1-G one hour to complete. If you do not

Change Text: successfully complete the program in

one sitting you will have to re-take the





2

Lyondellbasell Site Specific Training Multimedia Program

FINAL Script 6/24/2011

Approximately 1 entire program on another day.

hour to complete

program

Generic You are given 2 attempts to answer each

2 opportunities to bkgd/logo quiz question correctly. If after the

take this program second attempt you give the incorrect

answer it will be recorded as a wrong

Must register by fax answer.

each time

You are allowed 2 opportunities on 2

separate days to take this program.

Your company must register you by fax

each time you take the program.



1-H Graphic: To pass this program you must answer

Change Text: Test/paper with 80% of the question on the checkpoint

You must answer a 80% on it quizzes correctly.

80% of the question

on the checkpoint PAUSE

quizzes correctly.

Now you are ready to begin, good luck!



Exmo12-68 The Morris plant is located on route 6

2A Change Text: Section 1- Photo: of 3 between Minooka and Morris, Illinois.

Lyondellbasell –Site Rivers

Introduction

continued document If you need written directions, they are

holder hand available in the document holder near

getting the front door of the Three Rivers Safety

directions Center or from your supervisor.

2B. Change text: EQVideo LYONDELLBASELL Chemical is one

1:14:15 of the largest producers of ethylene and

Lyondellbasell polyethylene in the world today. These

Chemicals, LP materials are used in the plastics

 Produces: industry.

-Ethylene,

-Polyethylene 1:16:06





 Used in

manufacture

of plastic

products

1:09:12









3

Lyondellbasell Site Specific Training Multimedia Program

FINAL Script 6/24/2011

3 Generic Bkdg. While working in the plant you are

LYONDELLBASEL Change text /logo expected to follow all plant rules as well

L Safety Policy for each area as participate in all aspects of the Safety

You must follow all but keep program.

Plant Rules header title



Change text to:

―To ensure that all At Lyondellbasell, it is our policy to

Contractor personnel ensure that all contractor personnel

accomplish their job working at our facility accomplish their

without job tasks without compromising the

compromising safety safety and health of you, other

and health‖ contractor employees or Lyondellbasell

employees.



OSHA VPP Star Lyondellbasell OSHA has recognized the

Worksite Disk 11 - VPP Lyondellbasell Morris Plant as a

Voluntary Protection Program (VPP)

Star worksite.

Generic

Our Commitment bkdg/logo We are committed to maintaining a safe

 Maintain safe and healthy workplace, to operate in an

& healthy work environmentally responsible manner,

place and to assure that the utmost care is

 Environment- taken in the manufacture of our

ally responsible products.

 Careful

manufacturing

We are Dedicated to being ―Injury Free‖

our productions

Our Vision is GOAL ZERO and it takes

each and everyone one of us.

4 Basic plant The Lyondellbasell Morris plant

Morris Plant layout – see consists of Six process units.

Overview plant design

map

-6 process units: Indicate- The Olefin unit, waste water/utilities

- Olefin control room unit, polyethylene unit, shipper/loaders

- Waste locations. unit, polyethylene finishing and linear

Water/Utilities low-density polyethylene units.

- Polyethylene

- Shipper/Loaders

- Polyethylene

Finishing

- Linear Low

Density

Polyethylene







4

Lyondellbasell Site Specific Training Multimedia Program

FINAL Script 6/24/2011

5 Section 2 Generic Bkdg. When you arrive at the plant, you will

Entering the Logo report to the security center for a badge.

Plant

-Report to security Photo: You must park in designated parking

center Guard house areas east of the building.



-Park in designated

areas





EQ ID disk2-23 You are also required to carry a

LYONDELLBASELL TRSC ID – LYONDELLBASELL and TRSC ID

and TRSC ID Citgo Disk 17- card at all times. You will use them to

required at all times 83 enter or exit the plant through a pre-

Visitor ID- scan assigned gate..

Enter through a for program

preassigned gate

EQ d3-25

Admin Bldg.

Report lost badges to

security immediately EQD3-29 If you lose any of your ID cards report it

Lyondellbasell to plant security immediately.

Disk 4-38 Entry

Gate



6 Graphic/illustr Regardless of whether your job requires

Change Text: ation: a respirator, full beards, goatees with

Facial Hair Policy narrow and wide mustaches, extended

Unacceptable facial Not allowed side burns, Fu Manchu mustaches and

hair facial hair wide mustaches are a violation of the

illustration used MORRIS PLANT facial hair policy and

Show other facial in CITGO video are not allowed at the plant.

hair styles as

mentioned- graphic

with titles Picture: Clean All contractors working unescorted in

shaven man the plant must be either clean-shaven or

Change text: from have a narrow mustache.

Acceptable facial hair ExxonMobil

Clean Shaven video 16:16:12

Narrow Mustaches



Facial hair allowed if Contractors or visitors that are escorted

escorted by an BP GEN TC through the plant may have facial hair if

Morris plant 6:13:17 a Morris plant employee escorts them at

Employee all times.

7 Generic While working at the plant you are





5

Lyondellbasell Site Specific Training Multimedia Program

FINAL Script 6/24/2011

Change Text: Bkgd./logo required to wear the proper personal

Personal Protective protective equipment.

Equipment- PPE

Photo: Your contracting company is required to

Your Company must Lyondellbasell enforce the Morris Plant PPE policy and

enforce use of PPE Disk 5 # 51 to provide you with the necessary

Need new Pic personal protective equipment.

Change text:



 Approved Lyondellbasell At minimum, your contracting company

gloves Disk 5- images: must provide you with approved gloves,

 Hard hats 46 – PPE Hand hard hats, safety glasses with hard side

 Safety glasses 47-head shot shields, and suitable shoes. Suitable

with hard side Need New shoes may not be open toed or canvas.

shields Head Shot

 Suitable shoes 45-feet shot



Change text: Although steel or composite toe safety

shoes are not required for contractors,

Safety shoes strongly CITGO 17-84- they are strongly recommended.

recommended CU of work

boots









6

Lyondellbasell Site Specific Training Multimedia Program

FINAL Script 6/24/2011

8 Photos: All employees, contractors, truck

Fire Retardant Lyondellbasell carriers and visitors are required to wear

Clothing (FRC) Disk 5#49 – fire retardant clothing (FRC) as the

Outermost garment Unit PPE outer garment when entering designated

Required in all FRC Need new areas. FRC protects against flash fire

areas Image exposure.

Protects against flash

fire exposure

Keep image

Must be clean and throughout FRC must be clean and grease-free. It

grease free may not be ripped or torn.

Must be fully zipped FRC must be fully zipped or buttoned

or buttoned, sleeves with sleeves rolled down and secured at

down and secured at the wrist.

wrist Furthermore, your company must

No ripped or torn provide you with FRC and they must

garments select a color scheme approved by the

Color approved by Morris plant.

The Morris plant



Occasionally, in addition to FRC you

Occasionally: may need to wear rainwear or chemical

Rainwear or protective equipment as your outermost

chemical protective garment, but those times are the

equipment as exception and your job rep will inform

outermost garment you when additional outerwear is

approved for use.

9 Photo: Safety glasses with hard side shields are

Safety glasses: Lyondellbasell required in all plant areas. Goggles must

 Must have Disk 11 be worn whenever you open process

hard side images#94 & lines, or operate overhead chain valves.

shields 93 – safety Goggles must also be worn whenever

glasses there is the possibility of chemical

Goggles must be exposure when indicated on your work

worn when: permit or when entering yellow chained

- Opening process Lyondellbasell areas.

lines Disk 11

- Operating images#91&92-

overhead chain goggles bitmap

valves or goggles

- Chemical picture

exposure

- As required by

work permit

10 Photo: Fall protection is necessary whenever

Fall Protection Lyondellbasell you are working 4 or more feet above





7

Lyondellbasell Site Specific Training Multimedia Program

FINAL Script 6/24/2011

Disk 8 – 76 grade.

Required: Working from

- 4 or more feet JLG 2

above grade.

- In aerial lifts, In addition, a full body harness and

man baskets, lanyard properly attached must be worn

yellow-tagged Exmo 7-51- whenever working in aerial lifts or man

scaffolds, and man in full baskets, on yellow-tagged scaffolds and

ladders body harness when using ladders.



Always select secure

anchor point.

Always tie off when Also remember to always tie off to a

using fall protection EQ 7-67 secure anchor point. You must tie off

working from whenever you use fall protection.

For problems JLG

selecting an anchor If you need help selecting an anchor

point, contact Morris point your supervisor should contact

Plant Safety. Keep image for Morris plant Safety.

rest of section

Your company must Your company is responsible for

provide you fall training you in the proper use and

protection training. inspection of fall protection equipment.

Breathing Air Need picture of Breathing Air is one of the life critical

breathing air procedures at the Morris Plant.

-Compressed, Grade bottles & If you are using breathing air on a job, it

D breathing air Certificate of must meet the following requirements:

-Certificate of analysis, and air -It must be compressed, grade D

Analysis bottle with breathing air

-Yellow Safety Morris plant -It must have a certificate of analysis for

Sticker sticker each cylinder. (This is usually found in

(Change the cap of the cylinder)

pictures with - It must also be tested by the Morris

text) Plant safety department. Morris Plant

safety will test and attach a yellow

safety stick to each cylinder.

11 Photo: Contractors are responsible for selecting

Hearing Protection Lyondellbasell and providing appropriate hearing

Disk 6 – 56 protection for the task.

Required: Hearing

 In all designated Protection Sign Hearing protection is required in all

areas designated areas or if the noise level of

 Wherever high your job makes hearing protection

noise levels exist necessary.



Additional hearing





8

Lyondellbasell Site Specific Training Multimedia Program

FINAL Script 6/24/2011

protection: If you believe that you are exposed to

 May be high noise levels and need additional

needed in hearing protection, your supervisor

high noise should contact the Morris plant

areas Industrial Hygienist.

 See your

supervisor

13 Photo: Hard hats must meet ANSI standards.

Hard hats required in: Lyondellbasell You are required to wear a hard hat in

- All production Disk 5 – 47 and all production areas, warehouses and

areas 49 Unit PPE outdoor fabrication areas.

- Outdoor Sign

fabrication areas Need new hard

- Warehouses hat picture

The bill of your hat must face forward

Bill must face and the color of your hard hat must be

forward approved by The Morris plant site.



Hard hat color must

be approved by The

Morris plant

14 Photo: Any contractors that use respirators

Respirator Use Lyondellbasell must:

Disk 11 – 95 - Use properly selected respirators,

Contractors must: Respirator - Receive training in the use of

- Properly select respirators,

respirators - Be medically cleared to use

- Train their respirators, and

employees - Receive annual fit testing.

- Ensure their

employees have

been medically

cleared to use

respirators

- Provide annual fit

testing



Morris site contact

will verify respirator Generic Bkgd. Your site contact will verify that your

requirements contracting company properly

documents these requirements.

Contracting

Company must select Contracting companies are responsible

and provide for selecting and providing appropriate

appropriate Generic Bkgd. respiratory protection for the task.

respiratory





9

Lyondellbasell Site Specific Training Multimedia Program

FINAL Script 6/24/2011

protection

15 Photo: Examples of hand protection include cut

Hand Protection Lyondellbasell resistant, leather gloves, chemical

Disk 5 – 46 handling gloves and electrical gloves.

Hand protection PPE Hands

required as Your company must provide you with

appropriate for job. appropriate hand protection that meets

ANSI standards and is approved by The

Hand protection must Morris plant site management.

meet ANSI and

Morris Plant

requirements.

16 Photo: plant At THE MORRIS PLANT you are

Morris Plant telephone use required to report emergencies

Emergency Action ExxonMobil immediately. The Morris Plant

Plan image from considers incidents, whether

video 19:05:11 environmental or safety related, to be

- Report emergencies.

Emergencies

Immediately

- An emergency Photo: One way to report emergencies is to use

can be Lyondellbasell the plant telephone, and dial extension

environmental or Disk 10 –86 7777. This is a direct line to the main

safety related Emergency gate. Be prepared to give your name, the

Phone 2 location and details of the incident.

Plant Phone--Dial (Gaitronics

7777 Phone)

Another way to report emergencies is

Gai-tronics Phones via the Gai-tronic (gay-tronic) phones

Disk 9-77 available throughout the plant. These

CU of phone phones allow you to communicate

directly to the plant control room to get

assistance. Check the location of all

telephones prior to beginning any job.





17 Emergency The Morris Plant emergency siren is

siren sound file tested every Monday at Noon.

Fire horn tested – On mini-tape

Mondays at Noon over image of Whenever an alarm is activated during

plant sign an emergency you must:

When alarm sounds: D3-26 - Stop all work.

- Stop all work Need new sign - Pull to the side of the roadway if you

- Pull vehicle to out front picture are driving a vehicle. Turn off the

side of roadway ignition and leave the keys in the

- Turn off ignition BP-GEN video vehicle.





10

Lyondellbasell Site Specific Training Multimedia Program

FINAL Script 6/24/2011

- Leave keys in T18: 49:21 - Turn off all other equipment and

ignition vehicles.

- Turn off all other - Then walk to your designated SAFE

equipment & EQ D3-25 HAVEN.

vehicles Admin bldg.

- Walk to Your designated Safe Havens are

designated SAFE usually where you received your work

HAVEN area Evac pt, sign permit. Your Morris Plant contact will

D3-28 take attendance for accountability.

Plant Evacuation

Follow posted route Photos: Disk 6- If a plant evacuation is ordered, follow

signs to rally point 54 Evacuation posted evacuation route signs to your

Route Sign and Designated area

Disk 3-32 Rally

Plant Evacuation Point Sign



Need new

Picture of the Remember that where you go during an

grove emergency depends on where you are

working, the nature of the emergency

and the location of the emergency.



Plant Evacuation Photo: Disk 7-

Do not enter areas 61 Flashing Do not enter areas that have posted

that have posted light signs or any form of warning devices.

signs or any form of instructions 2

warning devices.



Generic Bkg.

After Evacuation: Finally, once you have evacuated to a

Notify your safe haven, notify the supervisor or the

supervisor or the unit unit operator so they know you are

operator accounted for. Also using a plant phone

at your designated area all contractors

Change text dial 7979 for accountability.



During an

emergency, all work Please note that during an emergency,

permits are cancelled all work permits are cancelled and must

and must be be reauthorized before you can resume

reauthorized work.

19 Quiz will not Checkpoint 1 Check point # 1

Check point 1 have any ―Test your Now you are ready to test your

audio knowledge‖ knowledge. This portion of the program

is not narrated.









11

Lyondellbasell Site Specific Training Multimedia Program

FINAL Script 6/24/2011

Remember, you have 2 attempts to

answer each question correctly.



If after the second attempt you answer

incorrectly, you will not have another

opportunity to answer the question.



Some questions say, ―Please select all

that apply‖. You must select all the

correct answers before clicking the

check arrow.



Your answer will be recorded as an

incorrect for that question, and you will

move on to answer the next question.

To see the next question, click the

continue button.









12

Lyondellbasell Site Specific Training Multimedia Program

FINAL Script 6/24/2011

20 & 21 Bullet points Bkgd. w/ logo

Work Permits & come on in for entire

Procedures sync to section

narration Management of change is part of

Management of OSHA’s process safety management

Change law. It is part of the training you

Get permission for received in your TRSC Contractor

changes Orientation and refresher course.



•Must have The law states that you must get

permission to change permission if you plan to make changes

anything on process that involve process equipment

equipment

--Such as adding a valve, or removing a

- Adding a valve, or section of pipe…

removing a section of

pipe etc…

Making substitution or upgrading

• Substitute or materials, for example using a different

upgrade materials grade of steel.



-Change affects Also if your modification affects how

How the equipment is the equipment is operated or maintained.

operated or For example, operating at a higher or

maintained lower temperature or changes requiring

a different preventive maintenance

schedule.

•An emergency or

temporary change Management of Change also applies if

the change is for an emergency or is

•24 hours per day, 7 temporary.

days per week

The Management of change law applies

•THE MORRIS 24 hours a day, 7 days a week.

PLANT completes

any paperwork Do not make changes on process

equipment until you have the proper

permissions, and The Morris Plant has

completed all paperwork such as ―RFC‖

request for change associated with

Management of Change.

22 Generic Bkgd. While at the Morris Plant, you must

Work Permits & for entire understand the following rules which

Procedures section apply to all permits:

Rules for all permits:

1. When a plant alarm sounds, all work







13

Lyondellbasell Site Specific Training Multimedia Program

FINAL Script 6/24/2011

- Permits cancelled permits are cancelled. You must

when alarm evacuate your work area.

sounds

- Wear required 2. Follow all the PPE requirements

PPE listed on a permit.



- See/Inspect job 3. You must see and inspect the job

site site before work begins



- Conduct Show 4. Conduct Show Me and discuss the

Me and discuss work you are performing with the

work with Unit Unit Operator or Supervisor before

Operator or beginning any work.

Supervisor

5. Ensure that all safety equipment is in

- Ensure safety working condition.

equipment is working

6. Inform the Unit Operator or

- Inform Unit Supervisor if anyone is added or

Operator if removed from the job. Each worker

anyone must ensure that his or her name is

added/removed added or removed as necessary to

from job the job site and control room copies

of the permit.

- Contractor

Provides 7. If locks are required, your company

Approved Locks is responsible for providing color-

coded locks approved by The Morris

Plant.

- DO NOT remove

any one else’s 8. Black locks are currently required

locks for contractor group locks.



- Do ONLY 9. You may NOT remove or open any

authorized work other craft lock.



10. You may do ONLY the work

authorized by the permit. Nothing

- REMAIN more or less.

ALERT!

11. Remain alert to job hazards at all

times.

- Report hazards

IMMEDIATELY 12. Report any hazard or unusual

- DO NOT DO occurrences to the Unit Operator or

ANYTHING Supervisor IMMEDIATELY.







14

Lyondellbasell Site Specific Training Multimedia Program

FINAL Script 6/24/2011

YOU THINK IS

UNSAFE! 13. Lastly, if you believe that unsafe

work conditions exist, DO NOT

perform the job!

23 Generic Bkgd, The Morris plant considers certain types

Life Critical for entire of work ―life critical procedures‖.

Procedures: section

- Where fatality A life critical procedure is one which, if

could occur if not followed, may result in termination,

procedures not serious injury, or death.

followed



Life critical procedures include

Includes: Confined space entry, Lockout/tagout,

- Confined space Work permitting, first line break, safety

entry system bypassing, fall protection,

- LO/TO breathing air and excavations.

- Work Permitting

- First Line Break

- Safety System

Bypassing

- Fall Protection

- Breathing air You MUST follow life critical

- Excavations procedures without deviation.



Life Critical

Procedures MUST be

followed without If you think the procedure is incorrect,

deviation! does not apply to your task or scope of

work, or cannot be followed, STOP and

review the job with your supervisor. DO

DO NOT DO NOT improvise!

ANYTHING YOU

THINK IS UNSAFE!

When accepting or returning work

permits, pay attention to the details and

Make sure everyone make sure that both parties understand

understands all of the all of the conditions.

work conditions

The Morris plant does NOT tolerate

violations of permit or policy

Violations of permit requirements.

policy are NOT

tolerated!

Deviating from a procedure or policy for

even a second is NOT acceptable.







15

Lyondellbasell Site Specific Training Multimedia Program

FINAL Script 6/24/2011

Violations of safety Failure to comply with the Morris plant

procedures or life critical procedures may result in

policies may result in removal from the site.

your removal from

the plant.

24 Photo: To request a work permit, go to the

Work Permits Lyondellbasell Control Room for the process area

Requested at Disk 7 –66 where you are working.

Control Room Sign-On Permit

Need new pic of After you have initiated a work permit

After Job is someone request, the work permit will be issued

Complete: signing permit to you at the job site.

- Clean up area

- Show Operations Generic bkgd. Upon completion of the job, you must:

that Job is Until the end of 1. Clean up the work area.

Complete section 2. Show operations the completed job.

- Complete Job Reverse Show Me‖

Closure Section 3. Completely fill in the Closure

of Permit Section of the Permit, and

- Have Operations 4. Have operations sign off the

Sign Off Permit completed permit.









16

Lyondellbasell Site Specific Training Multimedia Program

FINAL Script 6/24/2011

25 At The Morris Plant there are some key

Key Definitions Generic bkdg. definitions that you should be familiar

Help you understand /logo with before you begin work at the plant.

the permit system These terms will help you better

understand the permit systems:

Are we using

Cold Work the generic The term ―Cold Work‖ refers to any

- Maintenance or budge here too? maintenance or construction work that

construction work does NOT require hot work or confined

that does NOT space entry.

require hot work or

confined space entry.



―Unit Operator and

Unit Supervisor‖ The ―Unit Operator and Unit

- Lyondellbasell Supervisor‖ are Lyondellbasell

employees who employees who are in charge of the

are in charge of operating area where you may be

the operating working.

area



The ―Designated

Maintenance The ―Designated Maintenance Worker‖

Worker‖ is an individual from the maintenance

group or contractor company who has

- An individual been designated by the Maintenance or

from the Contract Supervisor to handle

maintenance permitting for a specific job.

group or

contractor

company

designated to

handle permitting



-Must be a working

member of the crew This Designated Maintenance Worker

shall be a working member of the crew

that will be assigned to the job.

26 Text appears LYONDELLB Each section of the Morris Work permit

The Permit System at in sync with ASELL- images conveys important information about the

THE MORRIS narration from form- work that you will be doing.

PLANT need to scan

NEW form The top of each permit contains certain

Top section of the basic permit information. It includes the

permit: equipment number, the equipment

name, the work order number, the date,







17

Lyondellbasell Site Specific Training Multimedia Program

FINAL Script 6/24/2011

- Equipment a listing of who the permit is issued to,

Number the area of the plant and the workers

- Equipment Name assigned to the job.

- Work Order

Number

- The Date

- A Listing Of Who

The Permit Is

Issued To

- The Area Of The

Plant The

Workers Assigned

To The Job.



27 Depending on whether you will be

Morris Plant Work Need new doing cold work, hot work or confined

Permit Sections permit space work, the appropriate sections of

the permit must be filled in.

Make sure

appropriate sections

of the permit are

filled in.



All workers however, must comply with

All workers must: all requirements on the permit, perform

an initial review of the job site with

- Comply with all operations and stop work and advice

permit operations of job changes.

requirements.



- Perform an initial

review of the job

site with

operations.



- Stop work and

advise operations

of job changes.



28 Show picture Graphics: ALL Each type of work (cold work, hot work

Morris Plant Work of front of NEW Plant or confined space) has very similar

Permit Sections permit. Work Permit information that must be completed by a

unit operator before beginning work.









18

Lyondellbasell Site Specific Training Multimedia Program

FINAL Script 6/24/2011

Check Cold The Cold Work Section describes the

Work work to be done. You will need a cold

work permit for any work



Check these That you do anywhere in the operating

sections as they units.

are said.

Any air tests needed for cold work are

recorded here.



Check Hot The right side of the permit includes the

Work Section Pre-Job Hazard Review, PPE

Requirements and Field Review. These

Check sections are also completed for every

Confined Space type of work and highlight all the

section important safety aspects of your job.



Special requirements for hot work

Check back of appear in this section of the permit.

permit

―Document Confined Space requirements are

Confined Space covered here and on the back of the

Atmospheric permit. We will discuss confined space

Testing‖ and hot work in more detail shortly.



-Highlight Air tests for confined space will be

―Start Time, documented on the back of the permit.

Valid To‖ at top

left



-Highlight from

Confined space Also on the front of the permit, it is

section important to note the ―start time‖ and

―valid to‖ times. Cold Work and Hot

-Highlight work start and end times are noted here.

―Approvals

(Hot & Cold)‖ Confined Space ―Start Time‖ and

-Zoom in on ―Valid to‖ times are noted here.

DMW section



At the bottom of the front of the permit

-Highlight is the ―Approval‖ section for hot and

―Confined cold work. Note that one member of

Space your crew will sign the permit as the

Approvals‖ Designated Maintenance Worker or

-Highlight DMW.







19

Lyondellbasell Site Specific Training Multimedia Program

FINAL Script 6/24/2011

―Hazard

Evaluation The confined space approval section is

Reviewed and more extensive as you can see here. It

signed by All requires that all employees read and sign

Workers‖ a hazard evaluation and that the

Section then attendant communication device be

-Highlight checked at the jobsite.

‖Attendant

Communication

Device Checked

at Site‖ section



30 Hot Work ALL NEW Hot work permits are required when

Hot Work Permits Permit Graphic: there is a possible source of ignition that

Permitting Hot Work could ignite flammable liquids, gases, or

•Used for any Permit other combustible materials.

activity which

generates heat

Typical jobs requiring a hot work permit

include:

Job Require Hot

Work Permits:

 Welding, burning, grinding or use of

 Welding, burning, Exmo disk 13- open flames.

grinding or use of 105 Welding

open flames.

 Electrically  Electrically powered tools.

powered tools.

Exmo 14-106  Pneumatically powered tools with

Power tool/Drill spark potential.

 Pneumatically

powered tools  Abrasive blasting.

Keep image  Concrete breaking.

with spark

potential.  Drilling, chipping, ripping, cutting

 Abrasive blasting. by impact, or soldering.

 Concrete

breaking.

 Drilling,

chipping, ripping,

cutting by impact

or soldering.





 Electrical and  Using electrical and battery powered

Exmo 14-107

battery powered test and analytical equipment unless

test equipment

test and they are intrinsically safe. All lights

analytical must be rated for the area

equipment unless classification.





20

Lyondellbasell Site Specific Training Multimedia Program

FINAL Script 6/24/2011

it is intrinsically

safe.



 Operating  Operating internal combustion

internal engines. NOTE: Internal combustion

combustion Generic Bkdg. engines CANNOT be left running

engines. unattended in a designated hot work

area.



Hot Work Permit Use When a hot work permit is required the

Procedures Generic Bkgd. operator prepares it in a similar manner

to the Cold Work permit. After

-Prepared Similar to reviewing the precautions stated on the

Cold Work Permit permit and viewing the work area with

-View the work area the Unit Operator, sign the approval

-Sign the approval section of the permit.

section

31 Use fire A fire watch at The Morris Plant is

Fire Guard fighting picture called a ―fire guard‖.

Requirements for Fire from

Guards: ExxonMobil- Training requirements for fire guards

- Fire guard 10-60 consists of:

orientation  Fire guard orientation

- Hot work Keep image  Hot work procedures,

procedures throughout  Live fire extinguisher training within

- Live fire the last 36 months, and

extinguisher  Knowledge of LEL/02/ CO meter

training within used

last 24 months  Upon Completion will receive a

- Knowledge of sticker for hardhat.

combustible

meter used

32 All new permit When your work involves a confined

Confined Space Work Permit- space, you will use the confined space

Permits highlight portion of your MORRIS PLANT

confined space permit.

portion



Verify:

All energy sources EQDisk 9 You and your co-workers will verify

are tagged and that all energy sources are tagged and

blinded or physically blinded or physically disconnected

disconnected according to the confined space

procedures..

Unit operator and

supervisor: EQDisk 1-2 The Unit Operator or Supervisor must





21

Lyondellbasell Site Specific Training Multimedia Program

FINAL Script 6/24/2011

Show you the work Workers discuss show you the work area and review the

area Permit Need precautions stated on the permit per the

Review the stated new pic ―show me‖ section of the permit.

precautions

―Show Me‖ Section

of Permit Highlight ―Show

Me‖ section of

permit (from top

back of permit)



-Highlight

DMW DMW approval Next, the Designated Maintenance

Signs the permit section, front of Worker will sign the (DMW) confined

permit, space portion of the permit.

Confined Space

Approvals



DMW Photo: Disk 7-

Verifies equipment 64, Lock box 2 The Designated Maintenance Worker

isolation. and each contractor employee will

verify the isolation of the equipment.

Each person will The DMW will then place a black group

place hi/ her personal Photo: Disk 1- 9 lock on the lock box or isolation device.

lock on the lock box Permit Posted Following that, each person will place

New his or her personal lock and tag on the

The card stock copy lock box.

of the entry permit is

posted with the Lastly, the card stock copy of the entry

associated work permit is posted together with the

permit at the job site. associated work permit at the job site.



33 Photo: Each person working in and around

Confined Space ExxonMobil confined spaces has a responsibility to:

Worker 10-59

Responsibilities Confined Space



 Inspect job  Inspect the job site and discuss the

site job with the Unit Operator or

 Review the Graphic: Supervisor.

Confined Confined Space  Review and sign the confined Space

space Hazard Hazard Hazard Evaluation. Your signature

Evaluation Evaluation acknowledges that you understand

document to the hazards listed on the Hazard

 Read and sign scan Changed Evaluation.

special Document  When provided, read and sign the

procedures special procedures applicable to





22

Lyondellbasell Site Specific Training Multimedia Program

FINAL Script 6/24/2011

your job.

 Sign in and  Sign-in and out with the appropriate

out information on the attendant’s log

each time upon entering or leaving

the confined space.

Graphic: Scan

back of permit,

attendant’s log  Immediately alert the attendant of

Possible New any dangerous or prohibited

 Alert the Permit condition or any unusual occurrence

attendant of or incident.

any dangers  Inspect to ensure the proper working

Generic Bkdg. condition of the prescribed safety

equipment.

 Respond promptly to instructions

 Inspect from the attendant to vacate the

working confined space and

conditions  Clean up the job site when work is

completed.

 Respond

promptly to

attendant

instructions



 Clean –up job

site

34 Photo: CITGO Contractors may serve as attendants on

Confined Space Confined Space confined space entry jobs. Their

Attendant Duties: Entry Watch responsibilities include the following:

exmo 13-102



- Review and Exmo 13-94  Review and understand the entry

understand permit requirements.

permit

requirements



 Maintain contact with the Unit

- Maintain contact Operator to determine if entry

with Unit conditions change.

Operator



- Review and sign Exmo 13-101  Review and sign the Confined Space

Confined Space Hazard Evaluation form

Hazard acknowledging that he or she

Evaluation understands the hazards listed on the

evaluation.





23

Lyondellbasell Site Specific Training Multimedia Program

FINAL Script 6/24/2011

 Read and sign the

special  When provided, read and sign the

procedures special procedures applicable to

applicable to your your job.

job.







- Maintain EQ D1-2  Maintain a sign-in/sign-out log and

accurate count of make sure every entrant’s full name

entrants is placed on the log along with the

date and time each time an entrant

enters or leaves the space.



- Remain at

entrance to BP GEN video-  Remain at the entrance as long as

confined space 17:43:12 personnel are inside the confined

space.





- Maintain contact Keep image  Maintain contact with the entrants at

with entrants all times, visual if possible, and

- Order evacuation order evacuation in case of

in case of emergency.

emergency  Immediately report any unusual

occurrence or incident to

Lyondellbasell personnel



 Continuously monitor the oxygen

- Immediately and flammable gas (LEL) meter.

report ANY Call for the entrants to leave the

unusual confined space immediately if

occurrence readings change or if the monitor

audible alarm sounds. The oxygen

monitor will alarm if the

concentration increases to 23.5% or

- Continuously We have LEL decreases to 19.5%. The LEL

monitor meter picture monitor alarm will sound if the

atmosphere inside not previously concentration increases to 10% LEL.

confined space shown in text Other toxic gas alarms may also

apply.

- Initiate rescue by  In an emergency, the first priority is

calling for help Photo: Air to initiate rescue by using the air

- NEVER ENTER meter from horn or radio as planned to summon

THE CONFINED ExxonMobil – help. Once contact with help has





24

Lyondellbasell Site Specific Training Multimedia Program

FINAL Script 6/24/2011

SPACE sent as jpeg been made, a non-entry rescue

- Untangle attempt can be made. DO NOT

retrieval lines ENTER the confined space to make

a rescue under any circumstance.

- Prevent

unauthorized  Ensure that retrieval lines do not

entry become entangled.

 Lastly, prevent unauthorized entry.

35 New Permits - Whether the work is completed or not at

Permit Closure Graphics: point the end of the work shift, the designated

to applicable maintenance worker shall:

At End of Work Shift sections of the  Mark whether the permit as

 Mark whether work permit for complete or not

the work permit And show entire section  Fill in the completion time and date.

is complete or ―Work  Summarize the status of the job,

not Complete‖,  Review the job with the unit

back of permit operator at the job site, and

 Return the form to the supervisor or

 Fill in the Show the Board Person. The board person

completion time ―Completion will ensure that the Supervisor

and date, Time‖ receives the permit.



 Summarize the Highlight the

status of the job, whole ―Permit

 Review the job Closure –

with the unit Return to

operator at the Owner‖

job site, and section

 Return the

form to the

supervisor or

the Board

Person.



 The board

person will

ensure that

the Supervisor

receives the

permit.





36 New Permit At the completion of work, all workers

Permit Summary Generic Bkdg. must completely fill in the permit

closure section. As always, the names of

All workers must any workers added during the course of





25

Lyondellbasell Site Specific Training Multimedia Program

FINAL Script 6/24/2011

completely fill in the work must have been changed on the

permit closure permits.

section.

Lastly, stop work if you believe that you

Always stop work if are performing an unsafe act.

the job becomes

unsafe.

37 Need photo of A first line break is the first opening of a

First Line Break person opening line in process equipment or piping. It is

(FLB) Permitting line also referred to as FLB.



First Line Break It involves either breaking of flanges,

involves: removal or swinging of blinds and

- Breaking of unthreading of pipe or threaded devices.

flanges

- Removal/ You will find the ―First line break

swinging of procedure‖ information, if it is

blinds applicable to your job, in the PPE

- Unthreading of section of the Morris plant permit.

pipe or threaded

devices First line breaking may require special

PPE as indicated by the permit. At

See information in minimum, goggles must be worn for all

PPE section of first line breaks regardless of the content

Morris plant permit. of the pipe or equipment.

38 Line break PPE for first line break must follow

First Line Break photo these guidelines:

PPE  A face shield is required when liquid

or debris may spray out of the

Potential PPE equipment.

Requirements:  Full acid suits including a hood and

- Face shield to face shield are required for lines

protect from containing corrosive materials.

spray and debris  FRC clothing must be worn.

- Full acid suit and However sometimes higher levels of

face shield for protective clothing such as flash

corrosive suits or bunker gear, may be

materials required for lines containing

- Nomex, flash hydrocarbons.

suits or bunker  Slicker suits and face shield will

gear for lines always be required for lines

containing containing hot water.

hydrocarbons  The Permit will specify the type of

- Slicker suits and PPE required.

face shield for hot

water





26

Lyondellbasell Site Specific Training Multimedia Program

FINAL Script 6/24/2011





The Permit will

specify PPE required

39 Line break The following minimum guidelines

First Line Break photo apply to all first line breaks:

Minimum  First line break should be performed

Guidelines so that the equipment opens up away

from all workers.

- Open equipment  Lines and equipment susceptible to

away from others plugging may require continued use

- DO NOT use of PPE until the entire system is

threaded proven clear of any plugging.

connections  Permit has a special proportion on

unless there is no First line break (FLB) and it must be

other choice filled out prior to starting work

- PPE worn until

entire system is

depressured









27

Lyondellbasell Site Specific Training Multimedia Program

FINAL Script 6/24/2011

40 Excavation Before you do any work in or around

Excavation photo excavations.

Permitting



Before working in or You and the Unit supervisor should

around excavations: review the underground drawings,

- Verify no survey the area for underground

underground installations, and ensure the ground has

installation been marked showing all known

- Ensure ground underground installations.

has been marked

to show

underground

installations

- Competent person A competent person must also review

reviews and and approve the excavation or trench by

approves completing an Excavation Site Safety

Excavation Site Checklist provided by the contractor

Safety Checklist company.

- Contractors

barricade and Contractors should ensure that proper

light excavation barricading and lighting of the

- Obtain Confined excavation has been completed.

Space Entry

Permit if They should further ensure than a

excavation is 4 or Confined Space Entry Permit is

more feet deep obtained for any excavation that is 4 or

more feet deep. Confined space

excavations will also need continuous

- Ensure lifelines monitoring for oxygen and LEL.

used as required

Lifelines will also be required unless the

Unit Supervisor, Maintenance or

Contractor Supervisor and Safety

Department deem the lifelines a safety

hazard.

41 Pam, have all Checkpoint 2 Checkpoint 2

instructions Test Your You are now ready for another

Checkpoint 2 Quiz appear at once knowledge checkpoint. The guidelines are the same

on screen with as before. Click the checkpoint arrow

Test your knowledge checkpoint when you are ready to begin.

button

Click forward button appearing

to advance to quiz after the text.



2 attempts to answer







28

Lyondellbasell Site Specific Training Multimedia Program

FINAL Script 6/24/2011

each question



After 2 attempts

answer recorded as

wrong answer



Move on to the next

question

42 Generic To obtain information about the

Section title text: Bkgd./logo potential hazards of the chemicals you

Hazard may use while at The Morris Plant refer

Communications to the MSDS or Material Safety Data

Sheet for the chemical.

Change text:

MSDS’s- Material Photo: Disk 7- You may obtain MSDSs for chemicals

Safety Data Sheets MSDS in Supv typically used at The Morris Plant at any

Office Need computer at the Morris plant.

MSDS’s located: picture of Additionally hard copies are kept at the

-At computers computer and admin building, safety building and

-Admin Building MSDS sheet. main guard house.

-Safety Building

-Main Guard House





Industrial Hygiene

reviews and approves Photo: MSDS Before bringing any chemical into the

all chemicals to be from CITGO plant, your company must provide the

brought onsite. 18-79 Morris Plant Industrial Hygienist with

an MSDS. The Morris Plant Industrial

Hygienist will review the MSDS and

determine if the chemical is approved to

use onsite.

43 Photos: Disk 4 - You should know the hazards unique to

Hazards Unique to 40– Unit this site and be able to identify

this Site Hazard Sign potentially hazardous situations.

Identify potentially

hazardous situations

Disk 5 – 48Unit Because exposure to hazardous

Exposure can lead to Hazards materials can lead to serious injury—

serious injury maybe maybe even cause death.

even cause death.



Pipe Labels Disk 5-43 To help you identify the product inside

Numbers on unit Pipe Labels 2 process pipes, the pipes are labeled. The

pipes coordinate with numbers on unit pipes coordinate with

the index posted at the index of products posted at ground





29

Lyondellbasell Site Specific Training Multimedia Program

FINAL Script 6/24/2011

ground level. level.

Disk 4 –44

Pipe Labels 1 or Potential hazards at The Morris Plant

Potential hazards 2 include asbestos, radiation, pyrophoric

 Asbestos materials, lead and hydrocarbons such

 Radiation as ethylene, propylene oxide, benzene

 Pyrophoric and 1,3 butadiene (1,3 beau-ta-die-een)

material

 Lead

 Hydrocarbons

 Ethylen

 Propylene

Oxide

 Benzene

 1,3 Butadiene





Generic Bkgd. Your work permit will specify any

Your work permit will special considerations or PPE that is

specify any special required for your task. Following is

considerations or information on these materials.

PPE

43-a Disk 1-11 In addition, signs mark utility station

Utility Station Utility Hoses commodities such as air, water, steam

Markings and nitrogen.



-Signs and color

codes identify Disk 1-12 Sometimes color codes are used as

commodities Utility Station indicated by signs posted in the process

Designated units.

Colors





Utility Stations: Photo: Air and At the Morris plant, air and water hoses

- Air and water water hose are black in color. They are connected

hoses black. w/Chicago with Chicago couplings and must be

- Connected with coupling pinned at all connections.

Chicago

couplings Photo: N2 hose

with quick Nitrogen hoses are blue or black with

-Nitrogen hoses blue disconnects quick disconnect fittings. Nitrogen is

or black with quick also marked with blue piping at the

disconnects utility stations.

- Blue piping at Photo: Steam

utility station hose w/Boss

fitting Steam hoses at the Morris plant are red





30

Lyondellbasell Site Specific Training Multimedia Program

FINAL Script 6/24/2011

-Steam hoses red with yellow stripes and utilize Boss

with yellow stripes Keep image fittings as shown here.

-Boss fittings used

Do not interchange couplings to connect

Do NOT interchange one commodity with another. Hoses and

couplings! couplings should be used in accordance

with Morris plant rules.

44 Exmo 11-63 Asbestos is a material that is typically

Asbestos Worker used in insulation, gaskets and other

Usage: working w building materials, such as floor tiles

 Insulation, asbestos and transite.

 Gaskets

 Building

materials

Generic Bkgd. It is a known carcinogen, causing

diseases such as asbestosis and

Known Carcinogen mesothelioma.

Causes:

 Asbestos It can enter your body by ingestion and

 Mesothelioma inhalation. Only specially trained

workers can work with asbestos.





Photo: Materials suspected of containing

Materials suspected Insulation on asbestos must be tested to determine

of containing concrete (key whether it contains asbestos fibers. You

Asbestos must be phrase: do not cannot tell by looking at it whether the

tested disturb material material contains asbestos. Do not

DO NOT disturb suspected of disturb material suspected of containing

material suspected of containing asbestos.

containing asbestos asbestos.)





Pipe & Vessel EQ Disk 8-69 Pipe and vessel insulation at the Morris

Insulation - will be Asbestos Plant will be marked and banded.

marked and banded Marking Pipe



Non-asbestos material will be blue

Use EQ Disk 8, banded. Silver banding indicates

Asbestos potential asbestos bearing material.

Marking Pipe

photo – left side

is blue banded,

right side is

silver banded

and marked as







31

Lyondellbasell Site Specific Training Multimedia Program

FINAL Script 6/24/2011

bearing asbestos



Use ―Janitor 2‖ All janitors at the plant should be

photo sent trained in special techniques to prevent

under separate the release of asbestos fibers while

cover cleaning floors.

45 BP GEN video The Morris Plant will take care of

Radiation 13:36:00 locking out any radiation sources as

Will lock out any necessary.

radiation sources

Exmo 11-67 Radiation sources may be located on the

Radiation Sources: Radiation sign sides of vessels and tanks as well in

 Sides of areas where welds are being x-rayed.

vessels

 Tanks

 Welds being

x-rayed



Radiation Area Exmo 11-66 Radiation areas are indicated by

Indicators: Radiation radiation warning signs and barrier

Radiation warning barrier sign tapes.

signs & barrier tapes.







Observe the radiation Keep image You must observe the radiation barriers

barriers that keep above that keep you a minimum of 50 feet

you a minimum of 50 from radiation sources.

feet from radiation

sources.

46 Generic Bkdg. The Morris Plant has several

Pyrophoric pyrophorics. Pyrophoric materials burn

Materials when exposed to air. Additionally, the

Pyrophoric materials materials must be kept wet with solvents

burn when exposed to or they will burn.

air (have bullets

Must be kept wet with fly in with Never use water to extinguish or wet the

solvents or they will text) materials because water will cause a

burn. violent reaction such as an explosion.

Never use water to

extinguish or wet the

materials



47 Lead is a heavy metal often contained in

Lead Generic Bkgd. paints; weld rods, welding flux and

other materials.





32

Lyondellbasell Site Specific Training Multimedia Program

FINAL Script 6/24/2011

 Paints

 Weld rods

 Welding flux

 Other

materials







Enters the Body: Lead enters the body by inhalation or

Inhalation ingestion and is absorbed into the body,

Ingestion accumulating in the body’s fatty tissues.

Absorbed into the Overexposure may cause neurological

body-- accumulating damage.

in the body’s fatty

tissues EQ Disk 8-72 & Painted surfaces in the Morris plant will

73 usually be marked to indicate whether

Painted surfaces Lead Free lead is present.

containing lead are Vessel and Pipe

marked and Lead Free

Close Up

Do not weld, cut or Do not weld, cut or grind on painted

grind on painted Keep images surfaces containing - or suspected of

surfaces containing - lead.

48 deleted 49 & 50 Generic Bkdg. Several chemicals used at the Morris

and included them /logo until plant are hydrocarbons.

here. Benzene section

Hydrocarbons Hydrocarbons are flammable or

- Flammable or combustible and can cause giddiness or

combustible euphoria, tiredness, vomiting, fainting

- Cause giddiness or asphyxiation and death.

or euphoria,

tiredness, The types of hydrocarbons present at the

vomiting, fainting Morris plant are

or asphyxiation

and death

Ethylene a slightly sweet-smelling

Ethylene hydrocarbon present in the Ethylene unit

- Slightly sweet as well as each of the polymer units.

smelling

- Slightly heavier It is a colorless gas that is slightly

than air heavier than air and it is extremely

- Extremely flammable.

flammable

It is used as a feedstock for the

Ethylene production of plastic products. It is

A feedstock for the produced and used in large quantities at





33

Lyondellbasell Site Specific Training Multimedia Program

FINAL Script 6/24/2011

production of plastic the Morris plant.

products



1,3 Butadiene 1,3 Butadiene is found in the olefins

- Present in Olefins unit.It has a mild aromatic odor and is

Unit much lighter than air. It is a known

- Mild aromatic odor carcinogen, so special precautions will

- Lighter than air be discussed with you prior to your job.

- Known carcinogen

- Special precautions

will be discussed

prior to your job

Benzene is a sweet smelling, aromatic

Benzene Citgo 20-100 hydrocarbon. It is present in the

- Sweet-smelling, Benzene sign ethylene plant, waste water/utilities, and

aromatic shipper’s loaders units.

hydrocarbon

- Present in

ethylene plant,

waste

water/utilities,

and shippers Exmo 8-70 & In addition to the acute effects of all

loaders units 71 hydrocarbons, benzene is a known

- Known carcinogen, and may cause blood related

carcinogen: may diseases such as leukemia and anemia as

cause leukemia, well as other cancers.

anemia, other

cancers

- Special Special precautions will be discussed

precautions will with you prior to your work with

be discussed prior benzene.

to your job

51 Pam, have all Checkpoint 3 Checkpoint 3

Checkpoint 3 instructions Test your You are now ready for another

Checkpoint 3 Quiz appear at once knowledge checkpoint. The guidelines are the same

on screen with as before. Click the checkpoint arrow

Test your knowledge checkpoint when you are ready to begin.

button

Click forward button appearing

to advance to quiz after the text.



2 attempts to answer

each question



After 2 attempts

answer recorded as







34

Lyondellbasell Site Specific Training Multimedia Program

FINAL Script 6/24/2011

wrong answer



Move on to the next

question

52 Exxon 14-111 Cell phones are prohibited inside

Other Concerns & 113 operating units or control rooms.

Cell Phones

• No cell phones in

operating units or

Control Rooms

53 BP GEN video You are required to inspect all tools

Tools 5:12:22 daily.

•Inspect Tools Daily

•Tools must be clean Keep image All tools must be clean, in safe working

and in safe working throughout condition and they must be used in a

condition safe manner.

•Tools must be used

in a safe manner When using tools you must follow these

-Only used for work rules…

as intended  Tools are used only for the work for

-Trigger locks which they are designed.

removed  Trigger locks are not allowed.

-All guards and  All guards and safety devices must

safety devices in be in place. Removal or alteration of

place guards and safety devices it NOT

-Electric tools must allowed.

have separate ground  A separate ground wire and

wire, polarized plugs polarized plug and receptacles must

and receptacles ground portable electrical driven

tools.

54 Do not build EQ 7-68, All ladders used at The Morris Plant

Ladders on text bring Man working should be Type 1 Industrial Ladder

on blocks of from Ladder made of fiberglass.

Type 1 Industrial text one at a

Ladder made of time.

fiberglass.



Must inspect it before Ladder If you use a ladder you must inspect it

each use—daily inspection tag before each use—daily. And you must

EQDisk 2-19 or sign the ladder tag. (more ladder tags are

Sign the ladder tag. Ladder located in the maintenance tool room)

Inspection

Second person Sticker or scan Also a second person must hold or toe

needed: inspection tag) the ladder if you are working from an 8

When working from to 12 foot stepladder.

an 8 to 12 foot





35

Lyondellbasell Site Specific Training Multimedia Program

FINAL Script 6/24/2011

stepladder.







Portable rung ladders EQ 7-68 Portable rung ladders must be placed or

Placed or used to used in such as manner as to prevent the

prevent the ladder ladder from slipping.

from slipping.

Keep image Properly secure extension ladders using

one person to hold the ladder while

Extension Ladders another person climbs the ladder and

anchors it.

One person to hold

while another person

climbs the ladder and

ties it off.

Generic Bkgd.

Prohibited ladders: Certain ladders are prohibited at The

 Stepladders Morris Plant. They are:

longer than 12  Stepladders longer than 12 feet

feet  Portable rung single ladders more

 Portable rung than 30 feet long and

single ladders  Portable rung extension ladders

more than 30 feet more than 48 feet long.

long and

 Portable rung

extension ladders

more than 48 feet

long.









36

Lyondellbasell Site Specific Training Multimedia Program

FINAL Script 6/24/2011

55 EQ Disk 9-84 At the Morris plant scaffolds must be

Scaffolds Scaffold properly tagged.

Yellow tags= ready

to use with caution. EQ Disk 9- Yellow tags to indicate that the scaffold

83Scaffold is ready to use with caution and requires

Green tags= meets Yellow Tag proper use of fall protection.

OSHA standards

Lyondellbasell Green tags to indicate that the scaffold

Red tags= NOT safe Disk 2-17 meets OSHA standards.

to use

And red or no tags to indicate that the

scaffold is NOT safe to use. Remember,

only scaffold builders may work on red

Report unsafe or no tagged scaffolds.

scaffolding Keep image

If you encounter scaffold that appears to

be unsafe, advice all workers to leave

the scaffold, make sure that the red tag

portion of the tag is showing, and

inform your supervisor immediately.

56 EQDisk 6-55 All vehicles at The Morris Plant are

Vehicle Safety Bikes, Golf Cart regulated. This includes motor vehicles,

 Operate all golf carts and bicycles used for

vehicles in a safe employee and contractor transportation

manner and work within the plant.

 Maintain all

vehicles in safe While using these vehicles you must

operating operate them in a safe manner at all

condition times.

 Report any

incidents or All vehicles must be maintained in safe

vehicle problems Car from operating condition at all times. You

to your supervisor ExxonMobil must inspect plant vehicles daily before

immediately (delete speed use to ensure that they are in good

limit sign) condition.



If you experience any incident, accident

or other problems involving vehicles

report the problem to your supervisor

immediately.



57 Generic Bkgd. While operating vehicles in the plant,

Vehicle Rules you must comply with all federal, state

and local motor vehicle regulations.

Must comply with all

federal, state and





37

Lyondellbasell Site Specific Training Multimedia Program

FINAL Script 6/24/2011

local motor vehicle This means that your vehicles must be

regulations. properly registered and you must

possess a valid driver’s license and

 Proper proof of insurance. Additionally, a

registration vehicle pass must be displayed on the

 Valid Drivers driver’s side dash board of the vehicle.

License

 Proof of You must have and use a seat belt for

insurance every employee in the vehicle.

 Display

vehicle pass



Main Speed limited The plant speed limit is 20 miles per

20 mph hour or as posted and all vehicles must

follow all plant speed limits. Some

congested areas of the plant it is 5 mph.

Yield the right of way

to pedestrians.

All vehicles must yield the right of way

to pedestrians.

Company vehicles

and on-site All company vehicles and on-site

contractor vehicles contractor vehicles must have an audible

must have an audible back-up alarm. All other vehicles driven

back-up alarm within the plant must sound their horn

twice prior to backing up.



Transporting When personnel are transported in the

personnel via pick up bed of a pickup truck, they must sit on

truck: the floor of the truck bed.

They must sit on the

floor of the truck bed. The tailgate must be kept closed.



The tailgate must be If a cap encloses the bed, personnel

kept closed. may be seated on benches if they are

provided.

Enclosed cap trucks:

Personnel may be Leaving a running vehicle unattended is

seated on benches prohibited. Motor vehicles must be

turned off when the driver exits the

vehicle.









38

Lyondellbasell Site Specific Training Multimedia Program

FINAL Script 6/24/2011





Other vehicle rules

Other vehicle rules at The Morris Plant

 DO not block include:

fire hydrants

or fire  Parked vehicles must not block

equipment. fire hydrants or fire equipment.





 DO not drive  DO not drive a vehicle around

a vehicle road barricades or danger signs

around road unless you have permission from

barricades the Morris Plant Area

Supervisor.



 To drive into

production  If you need to drive into

areas, you production areas, you must have

must have a a hot work permit.

hot work

permit.



 Materials being transported must

 Materials be properly secured to prevent

being rolling, sliding, falling, or

transported swaying from side to side.

must be

properly

secured to

prevent

rolling,

sliding,

falling, or

swaying from

side to side.

 All vehicles  And all vehicles owners parked

owners parked within the plant must leave their

within the plant keys in the ignition of the vehicle.

must leave their

keys in the

ignition of the

vehicle.









39

Lyondellbasell Site Specific Training Multimedia Program

FINAL Script 6/24/2011

58 Generic Bkgd. Smoking is NOT permitted in any

Smoking building, roadway, or inside vehicles.

 No smoking in

any building, EQ 6 –60 Smoking is allowed outdoors in

roadway, or Smoking Area designated smoking areas.

inside vehicles, and/or Smoker

 Smoking Close-Up

permitted in

outdoor ExxonMobil

designated areas 12-78

only Lighter/matches Bringing matches and lighters into the

photos with plant is STRICTLY prohibited

 Matches and universal ―NO‖

Lighters symbol?

STRICTLY

Prohibited Disk 6 – 60 The Morris Plant provides special

 The Morris Plant Cigarette strikers for lighting cigarettes.

provides strikers Lighter

for lighting

cigarettes

59 Lyondellbasell Morris Plant management and all

Video 33:05 employees strive to make our operation

All health, safety and Environmental safer.

environmental Beauty Shot

incidents can be Our policy is to maintain a safe and

prevented. healthy workplace, to operate in an

environmentally responsible manner,

All employees must Keep for entire and to assure that the utmost care is

help prevent section taken in the manufacture and storage of

accidents. our products.



A fundamental part of this policy is that

health, safety and environmental

incidents can be prevented and that

every employee has an obligation to

contribute to the elimination of all

accidents.

59A –We added this Generic Bkgd. Lastly, as part of the Morris plant’s

whole slide ongoing commitment to continuous

Morris Accident improvement we have implemented a

Reduction System system called MARS.

(MARS)

Mars stands for Morris Accident

Identifies and Reduction System. Its purpose is to

corrects unsafe identify and correct unsafe practices by

practices. conducting random, unscheduled





40

Lyondellbasell Site Specific Training Multimedia Program

FINAL Script 6/24/2011

observations of people at work. All

contractors and Morris plant employees

Keep image participate in Mars observations.



Your safety and Mars observers will always tell you

health are important what they observed and offer

to us! suggestions for improvement as

necessary. Our most important

commitment is YOUR safety and

health!

60 Pam, have all Checkpoint 4

Checkpoint 4 instructions This is your last checkpoint! The

Checkpoint 4 Quiz appear at once guidelines are the same as before. Click

on screen with the checkpoint arrow when you are

Test your knowledge checkpoint ready to begin.

button

Click forward button appearing

to advance to quiz after the text.



2 attempts to answer

each question



After 2 attempts

answer recorded as

wrong answer

Move on to the next

question









41



Related docs
Other docs by wuzhenguang
Is Air Quality a Problem in My Home
Views: 7  |  Downloads: 0
IHRM Chapter 6
Views: 8  |  Downloads: 0
37.10593
Views: 6  |  Downloads: 0
December_break
Views: 7  |  Downloads: 0
Lectures for 2nd Edition
Views: 8  |  Downloads: 0
Google Chart
Views: 29  |  Downloads: 0
By registering with docstoc.com you agree to our
privacy policy

You are almost ready to download!

You are almost ready to download!