Command Control Communications Development

(LC3D)









LTCOL Phil Baker – A/DLC3D

Tel: (02) 6265 7332, Email: Philippe.Baker@defence.gov.au

Australian Government

Department of Defence

Capability Development Group







DLC3D Overview



 Land NCW Big Picture.

 DCP: JP2072, L75 and L125.

 The Plan.

 End State.

Australian Government

Department of Defence

Land NCW Milestones

Capability Development Group







Gen 0 Milestone 2

Milestone 3 Milestone 4

Current 6RAR

1st Bde 2nd Bde

Force Gen 1

Gen 2 + SE Milestone 5

Gen 2 JTF+

Land SE

Gen 2

Network Dev Block 1



Network Dev Block 2



Network Dev Block 3



2006 2007 2008 2009 2010 2011 2012 2013 2014 2015





Gen 0 Gen 1 Gen 2







Army in Being HNA(+)









Force elements capable of more complex tasks at less risk

Australian Government

Milestone 2

Department of Defence

Capability Development Group

Networked Battle Group (NBG)

2010 - 2011

 This milestone will provide an automated Blue Force Common Operating

Picture (COP) within a battle group, from dismounted fire-team leader (half-

section level) through to mounted battalion headquarters. The battle

group will be based on a motorised infantry battalion headquarters.

 A key effect of this milestone will be to provide combat ID based on shared

situational awareness (SA) and blue force tacking (BFT) for all dismounted

and mounted elements of the battle group.

 The achievement of this milestone will be through the development of a

coherent battle management and communication infrastructure combined

with the application of tactics, techniques and procedures (TTP) that

support the networked battle group. The ability to exchange data with

external land elements and HQs is important however is not essential to

the achievement of this milestone.

 IOC will be achieved by the delivery of effects attributed to:

 Land 125 ph 3 Battle Management System - Dismounted (BMS-D) (C3I element).

Provides C2 and battle management systems to dismounted close combatant

fire-team leaders.

 Land 75 Ph 3.4 Battle Management System - Mounted (BMS-M). Provides battle

management systems to all manoeuvre elements of the battle group.

 JP 2072 Ph 1. Provides C3 systems to all manoeuvre elements of the battle

group.

Australian Government

Department of Defence

Capability Development Group

BCS (L) Subsystems

Supported Systems

Command Support systems (JCSE, BCSS, BMS, AFATDS, PEFCS)

Sensor systems Weapon Platform systems Information systems





BCS(L)







Tactical Range Extension

Allied / Subsystem Australian

Coalition Strategic

Communication Communication

and Tactical and

Combat Radio Tactical Trunk

Information Data Distribution Information

Subsystem Subsystem

Systems Subsystem Systems





Local

Subsystem





Network Management Subsystem





Other communication Systems

Commercial / public terrestrial / satellite systems

Personal Communication Systems

Australian Government

Department of Defence

Capability Development Group









TBC

The Plan

Australian Government

Department of Defence

Capability Development Group



JP2072-1 JP2072-ELF 1 L75-3.4 L75-ELF 1&2 L125-C3I L125-ELF 1&2

$80M TBC $150M TBC $75M $150M $100M $30M



Initial Sys Design: BG





Pri 1 – L200: BOP 1 BG + 2xELF BG L75 BMS-M: BOP 1 BG + 2xELF BG + Sp Ele L125 BMS-D: BOP 5xBG + 2xELF BG + Sp Ele





Pri 2 – TDDS: BOP ? + 2xELF BG L125 BMS-CP: BOP 5xBG+ 2xELF BG + Sp Ele

L75 BCSS: BOP 3 x Bde + 2xELF BG + Sp Ele



Pri 3 – HF: BOP ? + 2xELF BG L125 C2-D: BOP 5xBG + 2xELF BG + Sp Ele





Pri 4 - RAAF : BOP ? + 2xELF BG





Final Sys Design Veh Integration Lead Soldier Integration Lead









JP2072-2 JP2072-ELF 2 L75-4 Assumptions:

$450M $250M TBC $200M 1. ELF legacy capability (voice C2) not delivered by DCP.

CRS: BOP Bde(+) + 2xELF BG 2. ELF new capability delivered in line with associated DCP Phase.

L75 BMS-M: BOP 2 Bde 3. L75-3.4 to lead integration on vehicles.

TDDS: BOP Bde(+) + 2xELF BG

4. L125-3 to lead integration on all dismounted platforms (RAInf &

CS).

TRES: BOP Bde(+) + 2xELF BG

5. JP2072-1 to provide Pri 1 to L75 and L125 as GFM.

TTS: BOP Bde(+) + 2xELF BG 6. Intent to deliver new capability to units once only

7. Intent to install new capability on vehicles once only.

LAS: BOP Bde(+) + 2xELF BG

8. Network MS LD2 BG (6RAR) is ME for C4 capability delivery.

Other units to follow.

NMS: BOP Bde(+) + 2xELF BG

9. L125-3 C3I component does not impact on L125-3 non C3I

capability delivery schedule.

Australian Government

Department of Defence

Capability Development Group

Army has Agreed:



 The need to impose a program management approach across

the three core projects.

 The proposed block schedule that identifies the 6 RAR

Battlegroup as the first land force unit to receive co-ordinated

delivery of the communications capabilities to be delivered by

the three projects, followed by roll-out to the ELF Battalions (8/9

RAR and 7 RAR) and their supporting troops.

 That 6 RAR’s role as Army’s ‘learn-by-doing’ NCW

transformation engine should be formalised as a directed task

for the initial 2010/2011 Introduction into Service (IIS) phase.

Proposed Schedule of Delivery

Australian Government

Department of Defence of the Initial C4I Capability To Army

Capability Development Group





2009 2010 2011 2012 2013 2014

75

DA BM-6 mths 6 RAR



125









L 75-3.4 Funds

8/9 RAR



7 RAR



L75-ELF Funds



Land 75 Ph 4 5 RAR



JP2072 Ph 2A

1 RAR



Rest of Force





8/9 RAR BN IOC to FOC



7 RAR BN IOC to FOC



NCW BG Milestone NCW Bde Milestone NCW Div Milestone





Legend:

Proposed schedule NCW & ELF Milestones

Australian Government

Department of Defence

Capability Development Group

The End State



 6 RAR, 8/9 RAR and 7RAR – Networked.

 6 RAR – A ‘Test Bed’.

 Nucleus of a Network ‘savvy’ force.

 Embryonic Tools – Integration Lab & Battle Lab.

 Robust C2 Grid with the Infantry Based BG.

 Meet the legacy voice service needs.

 Meet the ‘new’ data service needs.

 Set the foundation for the OS and ISR grids.

 Robust and ‘seamless’ Blue SA with the Infantry Based BG.

 Inform and Justify follow on phases.

Australian Government

Department of Defence

Capability Development Group

Questions?









LTCOL Phil Baker – A/DLC3D

Tel: (02) 6265 7332, Email: Philippe.Baker@defence.gov.au


Related docs
Other docs by HC111208043811
21510
Views: 0  |  Downloads: 0
Abd�as
Views: 0  |  Downloads: 0
Sheet1
Views: 3  |  Downloads: 0
Results
Views: 0  |  Downloads: 0
Example NewsBrief
Views: 2  |  Downloads: 0
Conducting Bicycle Counts
Views: 0  |  Downloads: 0
perez
Views: 4  |  Downloads: 0
Book2 SmallMoments PersonalNarrativeWriting
Views: 0  |  Downloads: 0
DSS-EA-318�11/97
Views: 0  |  Downloads: 0
By registering with docstoc.com you agree to our
privacy policy

You are almost ready to download!

You are almost ready to download!