Progress



Phase II



 Interim housing work. - Completed

 Modernizations to permanent classroom beginning June 07 and scheduled for completion Summer 08.

 Modernizations to include: new roofing, flooring, interior finishes, heating, ventilating and air conditioning

systems, accessibility issues such as doors, hardware and windows, new data and electrical systems

and remodeling of existing bathrooms to meet state standards.

 Under District Safety Program - New security cameras throughout campus - Completed

 ADA Gymnasium Bleachers.

 Model Classroom



Phase I



 Electrical, gas, sewer, water and storm drain piping is complete and functioning.

 Irrigation upgrades will be performed under future landscape plans (in design phase)









Prop H Ballot Measure



 Replace aging roofs and deteriorated covered walkways

 Repair or replace aging plumbing systems

 Upgrade deteriorated restrooms

 Increase and upgrade electrical capacity and technology infrastructure for safety and better access to

technology

 Upgrade fire alarms, sprinkler, and public address systems for improved safety

 Repair and renovate academic classrooms including repainting, replacing deteriorated flooring and

ceiling, installing energy efficient lighting, and upgrading marker boards

 Add new academic classrooms to relieve overcrowding

 Expand and upgrade outdated science labs

 Renovate and expand library

 Remove asbestos and lead paint from buildings

 Upgrade deteriorated heating and air conditioning with energy efficient systems

 Upgrade building exteriors including repainting, replacing doors and windows, and installing energy

efficient outdoor lighting to improve safety and security

 Repair and renovate 75-year old multi-purpose and cafeteria facilities including ceilings, floors, walls,

lighting and windows

 Repair or replace old drinking fountains

 Upgrade existing district offices for compliance with Federal Americans with Disabilities Act requirements



Non-Bond Campus Projects



 Stadium Lighting - Summer 07

 Stadium Scoreboard - Completed

 Lunch Shelters- Completed

 Baseball Building - In Design

 Softball Dugouts - In Design

 Synthetic Track Installation - In Design

 Theater Renovation - In Design



For more information, please contact:

Debbie Murray

Facilities Planner (619) 644-8158



Related docs
Other docs by Nuhman Paramba...
answering 10330
Views: 6  |  Downloads: 0
exp-trading-algorithms
Views: 1  |  Downloads: 0
Dear Patients Merged
Views: 1  |  Downloads: 0
Day1Radiologist
Views: 3  |  Downloads: 0
California_and_Hawaii_1999
Views: 1  |  Downloads: 0
Tapeworm_Infection
Views: 3  |  Downloads: 0
Serial Powering Logbook
Views: 2  |  Downloads: 0
09_57_32_faisal ksa _2_
Views: 4  |  Downloads: 0
University_Canada2011
Views: 7  |  Downloads: 0
By registering with docstoc.com you agree to our
privacy policy

You are almost ready to download!

You are almost ready to download!