					                                                                              ATTACHMENT A
                                                                     INCOMING CEQA DOCUMENTS LOG
                                                                   MARCH 1, 2006 THROUGH MARCH 31, 2006

            TITLE/                                                            PROJECT                                                    TYPE OF                  LEAD                 COMMENT
           DIST. LOG                                                        DESCRIPTION                                                   DOC.                   AGENCY                 STATUS*
                                                           Goods Movement/Intermodal Projects
1LAC060322-01LI                           The proposed project includes changes to the project description since the close of               Revised         Port of Los Angeles               1
TraPac Berths 136-147 Container           comments on the previously circulated Notice of Preparation. The proposed project                 NOP/IS                                        Comments
Terminal Expansion Project                was previously called Berths 136-147 and is now identified as Berths 136-149. The                                                               Submitted
                                          size of the terminal would increase form 176 acres to 251 acres by the year 2030.                                                                3/29/06
                                          Phase I project s would be completed by 2015 and Phase II by 2030. Harry Bridges
                                          will only be moved 50 feet to the north instead of 580 feet to the north.
                                          Comment Period: 3/7/06 – 4/7/06                                  Public Hearing: NYD
                                                                         Education Projects
2LAC060310-02CB                           The proposed project includes reuse of a 75,000 square-foot building, on an                          ND           City of Huntington                  3
Pacific Charter School                    approximately 3-acre parcel.                                                                                      Park
Development                               Comment Period: 3/13/06 – 4/13/06                                Public Hearing: NYD
2ORC060317-01CB                           The proposed project includes construction of a 133,400 square-foot Social &                         ND           University of                       2
Social & Behavioral Sciences              Behavioral Sciences building.                                                                                     California, Irvine
Building                                  Comment Period: 3/17/06 – 4/15/06                                Public Hearing: NYD
2ORC060328-04CB                           The proposed project includes construction of a new education center and a new K-                    ND           Irvine Unified                      3
Creekside Education Center and            12 expansion facility totaling 81,000 square feet.                                                                School District
K-12 Expansion Facility                   Comment Period: 3/26/06 – 4/26/06                                Public Hearing: NYD
2RVC060310-04GM                           The proposed project includes demolition of three existing school buildings and                      ND           San Jacinto Unified                 2
San Jacinto High School                   construction of two new two-story classroom buildings and a new gymnasium. In                                     School District
Expansion #2                              addition, a 1,085 square-foot addition is proposed to the school’s existing
                                          gym/weight/wrestling room and six additional temporary modular classroom
                                          buildings would be installed.
                                          Comment Period: 3/10/06 – 4/10/06                             Public Hearing: 4/11/06
                                                              Solid Waste/Wastewater Projects
3LAC060301-01CB                           The proposed project includes construction of a municipal solid waste transfer                      FEIR          City of Pomona                      4
Grand Central Waste Transfer              station. The proposed project would process up to 1,500 tons per day of municipal
Station                                   solid waste on approximately 14.5 acres.
                                          Comment Period: N/A                                             Public Hearing: N/A
                                                                                                           # = Project may have potential environmental justice concerns due to the nature
FEIR - Final Environmental Impact Report                  FONSI - Finding of No Significant Impact             and/or location of the project.
DEIR - Draft Environmental Impact Report                  IS - Initial Study                               * This column reports on the current review and comment status of a document.
SEIR - Subsequent Environmental Impact Report             NOP - Notice of Preparation                        1 = AQMD will comment
DEA - Draft Environmental Assessment                      EIS - Environmental Impact Statement               2 = Document Reviewed - No Comments Sent
RDEIR - Revised Draft Environmental Impact Report         ND - Negative Declaration                          3 = Currently Under Review
SupEIR – Supplemental EIR                                 N/A - Not Applicable                               4 = Document does not require comments (e.g., public notices, plot plans, FEIRs)
Other - Typically notices of public meetings              NYD - Not Yet Determined                           5 = No Review Conducted – No Comments Sent
                                                                                                     A-1
                                                                              ATTACHMENT A
                                                                     INCOMING CEQA DOCUMENTS LOG
                                                                   MARCH 1, 2006 THROUGH MARCH 31, 2006

            TITLE/                                                            PROJECT                                                    TYPE OF                  LEAD                 COMMENT
           DIST. LOG                                                        DESCRIPTION                                                   DOC.                   AGENCY                 STATUS*
3ORC060310-01GM                           The proposed project includes designing and constructing mechanical, electrical,                     ND           Orange County                       2
MacArthur Pump Station                    instrumentation and controls, structural, and architectural improvements to bring                                 Sanitation District
Rehabilitation Project                    the existing facility into compliance with Sanitation District standards and local,
                                          state, and national codes.
                                          Comment Period: 3/10/06 – 4/12/06                                 Public Hearing: NYD
3RVC060308-04GM                           The proposed project includes renovating and expanding certain portions of the                       ND           Valley Sanitary                     3
Valley Sanitary District                  existing wastewater treatment facility to accommodate residential and commercial                                  District
Wastewater Treatment Plant                growth.
Expansion                                 Comment Period: 3/3/06 – 4/2/06                                   Public Hearing: NYD
                                                                           Airport Projects
                                          No projects received.
                                                                   General Land Use Projects
5LAC060301-03LI                  The proposed project would allow for the development of 375,000 square feet of                             NOP/IS          City of Gardena                   1
Artesia Corridor Specific Plan   general commercial uses, 40,000 square feet of restaurant uses and 300 residential                                                                       Comments
                                 units including up to 70 live-work units with 500 square feet of office space each.                                                                      Submitted
                                 Comment Period: 2/27/06 – 3/27/06                                Public Hearing: NYD                                                                      3/7/06
5LAC060301-05GM                  The proposed project includes construction of a 937,000 square-foot office                                  DEIR           US General                        3
Los Angeles FBI Federal Building building, plus a secure parking garage with 1,200 parking stalls.                                                          Services
                                                                                                                                                            Administration,
                                          Comment Period: 2/24/06 – 4/24/06                              Public Hearing: NYD                                Region 9
5LAC060301-06CB                           The proposed project includes subdividing 52.6 acres into 20 single-family lots.                     ND           County of Los                       2
TR062921/RENVT200500133/                                                                                                                                    Angeles
RCUPT200500119                            Comment Period: 2/27/06 – 3/27/06                               Public Hearing: NYD
5LAC060302-01GM                           The proposed project includes demolition of an existing gas station building with                    ND           City of Rancho                      3
7-Eleven Convenience Store and            service bays and construction of a new 2,754 square-foot 7-Eleven convenience                                     Palos Verdes
Gas Station                               store building.
                                          Comment Period: 3/1/06 – 3/28/06                             Public Hearing: 3/28/06



                                                                                                           # = Project may have potential environmental justice concerns due to the nature
FEIR - Final Environmental Impact Report                  FONSI - Finding of No Significant Impact             and/or location of the project.
DEIR - Draft Environmental Impact Report                  IS - Initial Study                               * This column reports on the current review and comment status of a document.
SEIR - Subsequent Environmental Impact Report             NOP - Notice of Preparation                        1 = AQMD will comment
DEA - Draft Environmental Assessment                      EIS - Environmental Impact Statement               2 = Document Reviewed - No Comments Sent
RDEIR - Revised Draft Environmental Impact Report         ND - Negative Declaration                          3 = Currently Under Review
SupEIR – Supplemental EIR                                 N/A - Not Applicable                               4 = Document does not require comments (e.g., public notices, plot plans, FEIRs)
Other - Typically notices of public meetings              NYD - Not Yet Determined                           5 = No Review Conducted – No Comments Sent
                                                                                                     A-2
                                                                              ATTACHMENT A
                                                                     INCOMING CEQA DOCUMENTS LOG
                                                                   MARCH 1, 2006 THROUGH MARCH 31, 2006

            TITLE/                                                            PROJECT                                                    TYPE OF                  LEAD                 COMMENT
           DIST. LOG                                                        DESCRIPTION                                                   DOC.                   AGENCY                 STATUS*
5LAC060303-02LI                           The proposed project includes construction of a 131,512 square-foot store that                    NOP/IS          City of La Mirada                 1
Home Depot and Retail                     includes 108,120 square feet of retail floor area and a 23,392 square-foot garden                                                               Comments
Commercial Project                        center on 9.2 acres. In addition, three retail pads totaling 15,286 acres are also                                                              Submitted
                                          proposed.                                                                                                                                        3/15/06
                                          Comment Period: 2/24/06 – 3/24/06                                 Public Hearing: NYD
5LAC060314-02LI                           The proposed project consists of a 102,083 square-foot Home Depot store with a                    NOP/IS          City of Claremont                 1
Conditional Use Permit 06-C01 –           34,784 square-foot outdoor garden center.                                                                                                       Comments
The Home Depot                                                                                                                                                                            Submitted
                                          Comment Period: 3/14/06 – 4/14/06                                 Public Hearing: NYD                                                            3/17/06
5LAC060314-03CB                           The proposed project includes construction of 32,000 square feet of retail space,                    ND           City of Temple City               2
Piazza Las Tunas Project                  65,600 square feet of “specialty” retail space, 19,000 square feet of quality
                                          restaurant space, an 8,000 square-foot banquet hall, for a total of 124,600 square
                                          feet. In addition, the mixed-use development would have 58 residential units.
                                          Comment Period: 3/10/06 – 4/10/06                                 Public Hearing: NYD
5LAC060314-04GM                           The proposed project will necessitate the acquisition of 11 parcels and the                        DEIR           City of La Mirada                   2
Alondra Center North                      demolition of the existing commercial uses. The proposed project includes
Redevelopment Project                     development of 44 single-family detached residential dwelling units.
                                          Comment Period: 3/15/06 – 4/28/06                                 Public Hearing: NYD
5LAC060314-05LI                           The proposed project includes construction of an 11,000 square-foot church on a                   NOP/IS          City of Los Angeles               1
New Paradise Church                       54,506 square-foot parcel.                                                                                                                      Comments
                                                                                                                                                                                          Submitted
                                          Comment Period: 3/10/06 – 4/10/06                               Public Hearing: NYD                                                              3/17/06
5LAC060321-01GM                           The proposed project includes subdividing a single lot into three separate parcels                   ND           City of La Puente                 3
Tentative Parcel Map 26641                for future development of two additional single-family dwelling units.
                                          Comment Period: 3/16/06 – 4/4/06                                Public Hearing: NYD
5LAC060322-03CB                           The proposed project includes adoption of these two amendments and would                             ND           City of Whittier                    2
Amendments to the                         reinstitute the Whittier Redevelopment Agency’s eminent domain authority in the
Redevelopment Plans for the               select portions of the project areas.
Greenleaf Avenue/Uptown and
Whittier Boulevard Project Areas          Comment Period: 3/22/06 – 4/11/06                                 Public Hearing: 5/9/06

                                                                                                           # = Project may have potential environmental justice concerns due to the nature
FEIR - Final Environmental Impact Report                  FONSI - Finding of No Significant Impact             and/or location of the project.
DEIR - Draft Environmental Impact Report                  IS - Initial Study                               * This column reports on the current review and comment status of a document.
SEIR - Subsequent Environmental Impact Report             NOP - Notice of Preparation                        1 = AQMD will comment
DEA - Draft Environmental Assessment                      EIS - Environmental Impact Statement               2 = Document Reviewed - No Comments Sent
RDEIR - Revised Draft Environmental Impact Report         ND - Negative Declaration                          3 = Currently Under Review
SupEIR – Supplemental EIR                                 N/A - Not Applicable                               4 = Document does not require comments (e.g., public notices, plot plans, FEIRs)
Other - Typically notices of public meetings              NYD - Not Yet Determined                           5 = No Review Conducted – No Comments Sent
                                                                                                     A-3
                                                                              ATTACHMENT A
                                                                     INCOMING CEQA DOCUMENTS LOG
                                                                   MARCH 1, 2006 THROUGH MARCH 31, 2006

            TITLE/                                                            PROJECT                                                    TYPE OF                  LEAD                 COMMENT
           DIST. LOG                                                        DESCRIPTION                                                   DOC.                   AGENCY                 STATUS*
5LAC060322-06CB                           The proposed project includes the adaptive reuse of a 75,000 square-foot building,                 Other          City of Huntington                  4
Public Hearing Notice, P.C. Case          on an approximately 3-acre parcel, from an industrial use to a school use.                                        Park
NO. 1788-General Plan                     Improvements include interior and exterior modifications to support occupancy by a
Amendment/Zone                            middle school and a high school.
Change/Development Permit                 Comment Period: N/A                                             Public Hearing: 4/5/06
5LAC060322-07GM                           The proposed project includes development of the 6.45-acre site currently used as a                  ND           City of West                        3
Tract Map No. 62346, Precise              dairy and a commercial storage facility with a 58-unit, industrial condominium                                    Covina
Plan No. 05-20, Conditional Use           development and a 145,500 square-foot public storage facility.
Permit No. 05-24                          Comment Period: 3/22/06 – 4/11/06                                Public Hearing: NYD
5LAC060328-03GM                           The proposed project includes construction of a 34,000 square-foot Sheriff’s Station                 ND           County of Los                       3
Athens Sheriff’s Station,                 with a 5,000 square-foot service building, an 800 square-foot car wash facility, a                                Angeles
Centinela Area Probation Office           new 30,000 square-foot Probation Office building with a 5,000 square-foot
Replacement, and New County               Building and Safety Office building, and a two-story approximately 60,000 square-
Building                                  foot Administration building.
                                          Comment Period: 3/27/06 – 4/27/06                                Public Hearing: NYD
5LAC060328-07CB                           The proposed project includes construction of a 47,797 square-foot two-story                         ND           City of Agoura                      3
Center Court Plaza                        medical office building on 3.2 acres.                                                                             Hills
                                          Comment Period: 3/31/06 – 5/1/06                                 Public Hearing: NYD
5LAC060329-02                             The proposed project includes construction of 188 single-family residences,                       NOP/IS          City of Los Angeles               1
Hidden Creeks Estates                     associated roadways and infrastructure; a 17-acre public park and a new 26-acre                                                                 Comments
                                          equestrian boarding facility.                                                                                                                   Submitted
                                          Comment Period: 3/13/06 – 4/12/06                                Public Hearing: NYD                                                             3/31/06
5ODP060323-01CB                           The proposed project includes installation and operation of a floating storage and                Revised         California State                  3
Cabrillo Port Liquefied Natural           regasification unit (FSRU), installation and operation of two 24-inch natural gas                  DEIR           Lands Commission
Gas Deepwater Port                        pipelines, 22.77 statute miles in length, from the FSRU to the Reliant Energy
                                          facility at Ormond Beach, and construction and operation of two onshore natural
                                          gas pipelines and related facilities.
                                          Comment Period: 3/13/06 – 4/28/06                       Public Hearing: 4/17,18,19/06



                                                                                                           # = Project may have potential environmental justice concerns due to the nature
FEIR - Final Environmental Impact Report                  FONSI - Finding of No Significant Impact             and/or location of the project.
DEIR - Draft Environmental Impact Report                  IS - Initial Study                               * This column reports on the current review and comment status of a document.
SEIR - Subsequent Environmental Impact Report             NOP - Notice of Preparation                        1 = AQMD will comment
DEA - Draft Environmental Assessment                      EIS - Environmental Impact Statement               2 = Document Reviewed - No Comments Sent
RDEIR - Revised Draft Environmental Impact Report         ND - Negative Declaration                          3 = Currently Under Review
SupEIR – Supplemental EIR                                 N/A - Not Applicable                               4 = Document does not require comments (e.g., public notices, plot plans, FEIRs)
Other - Typically notices of public meetings              NYD - Not Yet Determined                           5 = No Review Conducted – No Comments Sent
                                                                                                     A-4
                                                                              ATTACHMENT A
                                                                     INCOMING CEQA DOCUMENTS LOG
                                                                   MARCH 1, 2006 THROUGH MARCH 31, 2006

            TITLE/                                                            PROJECT                                                    TYPE OF                  LEAD                 COMMENT
           DIST. LOG                                                        DESCRIPTION                                                   DOC.                   AGENCY                 STATUS*
5ORC060303-04LI                           The proposed project includes a request for approval of Tentative Parcel Map 05-                  NOP/IS          City of Laguna                    1
1770 Thurston Drive Subdivision           01, Coastal Development Permit 05-12 and Variance 7205 to extend Thurston                                         Beach                         Comments
                                          Drive and subdivide the existing 13.38-acre property into six parcels, three of which                                                           Submitted
                                          would be residential building sites.                                                                                                             3/15/06
                                          Comment Period: 2/28/06 – 3/28/06                                 Public Hearing: NYD
5ORC060310-03LI                           The proposed project includes two project-specific developments consistent with                   NOP/IS          City of Santa Ana                 1
Metro East Mixed Use Overlay              the objectives of the proposed overlay zone designation. The first development                                                                  Comments
Zone                                      includes construction of 573 residential units, 3,800 square feet of residential                                                                Submitted
                                          amenity space, and 7,800 square feet of commercial and retail space. The second                                                                  3/15/06
                                          development includes a 23-story high-rise tower with approximately 200 units, and
                                          two six-story mid-rise towers with approximately 120 units.
                                          Comment Period: 3/9/06 – 4/9/06                                   Public Hearing: NYD
5ORC060310-08CB                           The proposed project includes reuse of 23.95 acres of land currently occupied by                   DEIR           City of Buena Park                  3
Nabisco Reuse Project                     the Nabisco Foods Processing Plant. The plant has ceased active operations and
                                          will be demolished to provide for a range of commercial/retail redevelopment.

                                          Comment Period: 3/6/06 – 4/21/06                                Public Hearing: NYD
5ORC060324-01CB                           The proposed project includes construction of a water well facility housed in a                      ND           City of Tustin                      2
Pasadena Avenue Well Site                 1,450 square-foot structure with a paved service yard and surrounded by landscaped
                                          grounds.
                                          Comment Period: 3/23/06 – 4/24/06                               Public Hearing: NYD
5ORC060328-05LI                           The proposed project includes an update to the adopted General Plan.                              NOP/IS          City of Orange                     1
City of Orange Comprehensive                                                                                                                                                              Comments
General Plan Update                                                                                                                                                                       Submitted
                                          Comment Period: 3/24/06 – 4/25/06                                Public Hearing: NYD                                                             3/31/06
5RVC060301-02LI                           The proposed project includes adding territory to the area included within the                    NOP/IS          City of Murrieta                   1
2006 Amendment to the                     Original Project Area and amending Section 602 of the Plan by increasing the limit                                                              Comments
Redevelopment Plan for the                on the amount of bonded indebtedness which may be outstanding at one time.                                                                      Submitted
Murrieta Redevelopment Project            Comment Period: 2/24/06 – 3/27/06                                Public Hearing: NYD                                                              3/7/06


                                                                                                           # = Project may have potential environmental justice concerns due to the nature
FEIR - Final Environmental Impact Report                  FONSI - Finding of No Significant Impact             and/or location of the project.
DEIR - Draft Environmental Impact Report                  IS - Initial Study                               * This column reports on the current review and comment status of a document.
SEIR - Subsequent Environmental Impact Report             NOP - Notice of Preparation                        1 = AQMD will comment
DEA - Draft Environmental Assessment                      EIS - Environmental Impact Statement               2 = Document Reviewed - No Comments Sent
RDEIR - Revised Draft Environmental Impact Report         ND - Negative Declaration                          3 = Currently Under Review
SupEIR – Supplemental EIR                                 N/A - Not Applicable                               4 = Document does not require comments (e.g., public notices, plot plans, FEIRs)
Other - Typically notices of public meetings              NYD - Not Yet Determined                           5 = No Review Conducted – No Comments Sent
                                                                                                     A-5
                                                                             ATTACHMENT A
                                                                    INCOMING CEQA DOCUMENTS LOG
                                                                  MARCH 1, 2006 THROUGH MARCH 31, 2006

            TITLE/                                                           PROJECT                                                    TYPE OF                  LEAD                 COMMENT
           DIST. LOG                                                       DESCRIPTION                                                   DOC.                   AGENCY                 STATUS*
5RVC060301-04LI                  The proposed project includes approximately 2,063 dwelling units, a 27-hole golf                          Revised         City of Desert Hot                1
Palmwood Specific Plan           course, associated amenities and an 18-hole golf course; community commercial                             NOP/IS          Springs                       Comments
                                 uses to include a proposed 400-room resort spa hotel with related recreational                                                                          Submitted
                                 amenities; general commercial uses to include a proposed amphitheater; and open                                                                          3/15/06
                                 space land uses.
                                 Comment Period: 2/17/06 – 3/17/06                                 Public Hearing: NYD
5RVC060303-03CB                  The original Ramsgate Specific Plan was adopted by the Lake Elsinore City                                    ND           City of Lake                        2
Tuscany West Tentative Tract No. Council in June 1984. The proposed project updates the previously approved                                                Elsinore
25473, Revision No. 1            subdivision by proposing grading and construction for 164 single-family residential
                                 lots, eight open space lots, three water quality basins and water tank site, all on 58.7
                                 acres. The remaining portions of the original map site were either purchased by or
                                 donated to Riverside County for conservation purposes.
                                 Comment Period: 3/3/06 – 4/2/06                                   Public Hearing: NYD
5RVC060307-01GM                  The proposed project includes development of 7.3 acres into a multi-family housing                           ND           City of Lake                        3
Conditional Use Permit No. 2005- development. The development will consist of 46 buildings with a total of 92 units.                                       Elsinore
10, Design Review – Multi-
Family No. 2005-11, Tentative
Tract Map No. 33820, and The
Lakeshore Drive Pedestrian
Bridge                           Comment Period: 3/3/06 – 4/3/06                                   Public Hearing: NYD
5RVC060308-02GM                  The proposed project includes construction of approximately 283 single-family                                ND           City of San Jacinto                 3
Rancho Estrella Specific Plan    residences on 81.6 acres.
                                 Comment Period: 3/8/06 – 4/7/06                                   Public Hearing: NYD
5RVC060314-01GM                  The proposed project includes development of 105 residential lots on 72 acres; 36.1                          ND           City of Lake                        3
Design Review – Tentative Tract  acres will be left as open space.                                                                                         Elsinore
Map No. 33140                    Comment Period: 3/10/06 – 4/10/06                                 Public Hearing: NYD
5RVC060315-01CB                  The proposed project includes a development plan application to build 98 multi-                            Other          City of Temecula                  1
PA12 Redhawk                     family residential condominium units on 8.9 acres.                                                                                                      Comments
                                                                                                                                                                                         Submitted
                                          Comment Period: 3/15/06 – 4/5/06                                  Public Hearing: NYD                                                           3/31/06

                                                                                                          # = Project may have potential environmental justice concerns due to the nature
FEIR - Final Environmental Impact Report                 FONSI - Finding of No Significant Impact             and/or location of the project.
DEIR - Draft Environmental Impact Report                 IS - Initial Study                               * This column reports on the current review and comment status of a document.
SEIR - Subsequent Environmental Impact Report            NOP - Notice of Preparation                        1 = AQMD will comment
DEA - Draft Environmental Assessment                     EIS - Environmental Impact Statement               2 = Document Reviewed - No Comments Sent
RDEIR - Revised Draft Environmental Impact Report        ND - Negative Declaration                          3 = Currently Under Review
SupEIR – Supplemental EIR                                N/A - Not Applicable                               4 = Document does not require comments (e.g., public notices, plot plans, FEIRs)
Other - Typically notices of public meetings             NYD - Not Yet Determined                           5 = No Review Conducted – No Comments Sent
                                                                                                    A-6
                                                                              ATTACHMENT A
                                                                     INCOMING CEQA DOCUMENTS LOG
                                                                   MARCH 1, 2006 THROUGH MARCH 31, 2006

            TITLE/                                                            PROJECT                                                    TYPE OF                  LEAD                 COMMENT
           DIST. LOG                                                        DESCRIPTION                                                   DOC.                   AGENCY                 STATUS*
5RVC060321-02CB                           The proposed project consists of a Planned Development District to establish a site                  ND           City of Palm                        2
Smoke Tree Ranch Cottages                 plan, design standards and guidelines, and a Tentative Tract Map for the phased                                   Springs
                                          subdivision of a 41.22-acre parcel into a 21.05-acre area with 49 residential lots
                                          with 52 cottages and private streets. The proposed project would include the
                                          remainder of the 41.22-acre parcel from the subdivision.
                                          Comment Period: 3/18/06 – 3/27/06                                Public Hearing: NYD
5RVC060322-02GM                           The proposed project consists of widening the bridge from a two lane to six lane                     ND           City of Palm                        3
Gene Autry Trail Bridge                   bridge with the construction occurring on the east side of the existing structure.                                Springs
Widening Project                          Comment Period: 3/25/06 – 4/24/06                                Public Hearing: NYD
5RVC060323-03GM                           The proposed project includes construction of 71 buildings with a total of 213                       ND           City of Temecula                    3
Planning Application No. PA-05-           individually owned single-family attached units.
0167, Rancho Highlands II
(Maravilla)                               Comment Period: 3/28/06 – 4/16/06                             Public Hearing: NYD
5RVC060324-02                             The proposed project includes incorporating Annexation 27 into County Service                      Other          County of                           4
LAFCO No. 2006-14-1                       Area 132 to provide street lighting services.                                                                     Riverside
                                          Comment Period: 3/23/06 – 4/14/06                             Public Hearing: NYD
5RVC060324-03                             The proposed project includes incorporating Annexation 91 into County Service                      Other          County of                           4
LAFCO No. 2006-04-1                       Area 103 to provide street lighting services.                                                                     Riverside
                                          Comment Period: 3/23/06 – 4/14/06                             Public Hearing: NYD
5RVC060324-04                             The proposed project includes incorporating Annexation 101 into County Service                     Other          County of                           4
LAFCO No. 2006-15-1                       Area 103 to provide street lighting services.                                                                     Riverside
                                          Comment Period: 3/23/06 – 4/14/06                             Public Hearing: NYD
5RVC060324-05                             The proposed project includes incorporating Annexation 18 into County Service                      Other          County of                           4
LAFCO No. 2006-06-1                       Area 134 to provide street lighting services.                                                                     Riverside
                                          Comment Period: 3/23/06 – 4/14/06                             Public Hearing: NYD
5RVC060324-06                             The proposed project includes incorporating Annexation 69 into County Service                      Other          County of                           4
LAFCO No. 2006-03-3                       Area 84 to provide street lighting services.                                                                      Riverside
                                          Comment Period: 3/23/06 – 4/14/06                             Public Hearing: NYD



                                                                                                           # = Project may have potential environmental justice concerns due to the nature
FEIR - Final Environmental Impact Report                  FONSI - Finding of No Significant Impact             and/or location of the project.
DEIR - Draft Environmental Impact Report                  IS - Initial Study                               * This column reports on the current review and comment status of a document.
SEIR - Subsequent Environmental Impact Report             NOP - Notice of Preparation                        1 = AQMD will comment
DEA - Draft Environmental Assessment                      EIS - Environmental Impact Statement               2 = Document Reviewed - No Comments Sent
RDEIR - Revised Draft Environmental Impact Report         ND - Negative Declaration                          3 = Currently Under Review
SupEIR – Supplemental EIR                                 N/A - Not Applicable                               4 = Document does not require comments (e.g., public notices, plot plans, FEIRs)
Other - Typically notices of public meetings              NYD - Not Yet Determined                           5 = No Review Conducted – No Comments Sent
                                                                                                     A-7
                                                                              ATTACHMENT A
                                                                     INCOMING CEQA DOCUMENTS LOG
                                                                   MARCH 1, 2006 THROUGH MARCH 31, 2006

            TITLE/                                                            PROJECT                                                    TYPE OF                  LEAD                 COMMENT
           DIST. LOG                                                        DESCRIPTION                                                   DOC.                   AGENCY                 STATUS*
5RVC060328-01LI                           The proposed project includes subdividing 22 parcels to allow construction of a                   NOP/IS          City of Indo                      1
The NorthGate Crossing Specific           mixed use project to include multi-story residential, commercial and retail                                                                     Comments
Plan                                      development.                                                                                                                                    Submitted
                                          Comment Period: 3/20/06 – 4/30/06                                  Public Hearing: NYD                                                           3/31/06
5RVC060328-02CB                           The proposed project includes relocating the existing unsignalized main entrance to                  ND           City of Canyon                    3
Skylink Drive Extension Project           the golf course from its current location to a location 1,500 feet west of Canyon                                 Lake
                                          Lake Drive South and approximately 700 feet northeast of the signalized
                                          intersection of Skylink Drive.
                                          Comment Period: 3/24/06 – 4/25/06                                  Public Hearing: NYD
5RVC060328-06GM                           The objectives of the proposed project are to: 1) ensure reliable access to the                    DEIR           Metropolitan Water                  3
Lake Perris Pollution Prevention          existing 65,000 acre-feet of flexible storage of water in Lake Perris; 2) enhance                                 District of Southern
and Source Protection Program             dissolved oxygen levels; 3) reduce risk of waterborne pathogens by preventative                                   California
                                          measures within Lake Perris watershed; and 4) maintain recreational opportunities.
                                          Comment Period: 3/27/06 – 5/10/06                                  Public Hearing: NYD
5RVC060329-01GM                           The proposed project includes subdividing 17.99 acres into 6 commercial lots.                        ND           City of Temecula                    3
Planning Application No. PA05-
0004, Selby Parcel Map 32924              Comment Period: 3/27/06 – 4/27/06                                Public Hearing: NYD
5SBC060302-02LI                           The proposed project includes implementing Phases 1 to 11 to resubdivide 27                       NOP/IS          County of San                     1
Tentative Tract Map 15923 -               residential pads to create 495 numbered residential lots and 18 lettered common                                   Bernardino                    Comments
Hampton Heights Project                   area lots for private streets on a total of 159 acres.                                                                                          Submitted
                                          Comment Period: 2/28/06 – 3/28/06                                Public Hearing: NYD                                                             3/15/06
5SBC060303-01LI                           The proposed project includes construction of a 136,000 square-foot home                          NOP/IS          City of San                       1
Lowe’s Home Improvement                   improvement warehouse, a 30,000 square-foot retail building, and a 6,000 square-                                  Bernardino                    Comments
Warehouse                                 foot retail/restaurant building on 14.1 acres.                                                                                                  Submitted
                                          Comment Period: 3/3/06 – 4/3/06                                  Public Hearing: NYD                                                             3/15/06
5SBC060308-01CB                           The proposed project includes construction of a new bridge and removes the                         DEIR           California                        3
Big Bear Lake Bridge                      existing bridge, located on top of Big Bear Dam.                                                                  Department of
Replacement Project                       Comment Period: 3/10/06 – 4/10/06                                Public Hearing: NYD                              Transportation



                                                                                                           # = Project may have potential environmental justice concerns due to the nature
FEIR - Final Environmental Impact Report                  FONSI - Finding of No Significant Impact             and/or location of the project.
DEIR - Draft Environmental Impact Report                  IS - Initial Study                               * This column reports on the current review and comment status of a document.
SEIR - Subsequent Environmental Impact Report             NOP - Notice of Preparation                        1 = AQMD will comment
DEA - Draft Environmental Assessment                      EIS - Environmental Impact Statement               2 = Document Reviewed - No Comments Sent
RDEIR - Revised Draft Environmental Impact Report         ND - Negative Declaration                          3 = Currently Under Review
SupEIR – Supplemental EIR                                 N/A - Not Applicable                               4 = Document does not require comments (e.g., public notices, plot plans, FEIRs)
Other - Typically notices of public meetings              NYD - Not Yet Determined                           5 = No Review Conducted – No Comments Sent
                                                                                                     A-8
                                                                              ATTACHMENT A
                                                                     INCOMING CEQA DOCUMENTS LOG
                                                                   MARCH 1, 2006 THROUGH MARCH 31, 2006

            TITLE/                                                            PROJECT                                                    TYPE OF                  LEAD                 COMMENT
           DIST. LOG                                                        DESCRIPTION                                                   DOC.                   AGENCY                 STATUS*
5SBC060308-03CB                           The proposed project includes construction of a 5,808 square-foot concrete                           ND           City of Colton                      2
File Index No. DAP-000-504                industrial and office building. The industrial use will comprise 5,328 square feet of
                                          the building and will provide seven units and bays.
                                          Comment Period: 3/7/06 – 3/27/06                                  Public Hearing: NYD
5SBC060308-05CB                           The proposed project includes a conditional use permit to allow: 1) the installation              Revised         City of Colton                      3
Pacific Rail Industries Metal             and operation of a metal shredding operation as an expansion of a scrap metal                      DEIR
Shredding Operation                       recycling facility; and 2) an increase in the volume of transloading on the project
                                          site. The metal shredder would be relocated from an existing facility in Carson to
                                          the City of Colton where it would shred raw metal sources and separate metal and
                                          non-metal material by physical and chemical means. Transloading would increase
                                          from 25,100 tons to 37,620 tons per month.
                                          Comment Period: 3/10/06 – 4/24/06                                 Public Hearing: NYD
5SBC060310-07GM                           The proposed project includes construction of a four-lane highway from Valley                        ND           California Dept. of                 3
Cypress Avenue Overcrossing               Boulevard on the north to Slover Avenue on the south.                                                             Transportation,
Project                                                                                                                                                     Federal Highway
                                          Comment Period: 1/31/06 – 3/2/06                                  Public Hearing: NYD                             Administration
5SBC060322-04GM                           The proposed project includes construction of a new ARCO gasoline station with a                     ND           City of Loma Linda                  3
ARCO AM/PM                                10-fuel dispenser; a 3,000 square-foot canopy, a 3,600 square-foot convenience
                                          store, 980 square-foot automatic self-service carwash, three underground fuel
                                          storage tanks, a 3,000 square-foot fast food restaurant with drive-thru, and two
                                          separate retail stores totaling 11,380 square feet.
                                          Comment Period: 3/16/06 – 4/4/06                                  Public Hearing: NYD
5SBC060323-02CB                           The proposed project consists of the demolition of structures currently existing on-               DEIR           City of Redlands                    3
Redlands Promenade                        site and the construction of a retail shopping center on the approximately 14.27-acre
                                          site. The retail center includes a total of up to 160,000 square feet of retail space
                                          comprising two major tenant stores, two secondary major tenant stores, five shop
                                          buildings, and a sit-down restaurant.
                                          Comment Period: 3/27/06 – 5/10/06                                 Public Hearing: NYD



                                                                                                           # = Project may have potential environmental justice concerns due to the nature
FEIR - Final Environmental Impact Report                  FONSI - Finding of No Significant Impact             and/or location of the project.
DEIR - Draft Environmental Impact Report                  IS - Initial Study                               * This column reports on the current review and comment status of a document.
SEIR - Subsequent Environmental Impact Report             NOP - Notice of Preparation                        1 = AQMD will comment
DEA - Draft Environmental Assessment                      EIS - Environmental Impact Statement               2 = Document Reviewed - No Comments Sent
RDEIR - Revised Draft Environmental Impact Report         ND - Negative Declaration                          3 = Currently Under Review
SupEIR – Supplemental EIR                                 N/A - Not Applicable                               4 = Document does not require comments (e.g., public notices, plot plans, FEIRs)
Other - Typically notices of public meetings              NYD - Not Yet Determined                           5 = No Review Conducted – No Comments Sent
                                                                                                     A-9
                                                                              ATTACHMENT A
                                                                     INCOMING CEQA DOCUMENTS LOG
                                                                   MARCH 1, 2006 THROUGH MARCH 31, 2006

            TITLE/                                                            PROJECT                                                     TYPE OF                  LEAD                 COMMENT
           DIST. LOG                                                        DESCRIPTION                                                    DOC.                   AGENCY                 STATUS*
5SBC06322-05GM                            The proposed project includes demolition of two existing residential structures with                  ND           City of Loma Linda                  3
Precise Plan of Design No. 06-02          an adjoining accessory building in order to construct a new 42,000 square-foot
(Loma Linda University                    three-story student apartment building with an underground parking garage.
Apartments)                               Comment Period: 3/16/06 – 4/4/06                                Public Hearing: NYD
                                                              Warehouse/Commercial Projects
6RVC060310-05CB                           The proposed project includes construction of 3 warehouse buildings totaling                        Other          City of Moreno                    1
Case Nos. PA06-0021 & PA06-               1,980,000 square feet on 84.68 acres.                                                                              Valley                        Comments
0022 - Tentative Parcel Map                                                                                                                                                                Submitted
34577 and 34576                           Comment Period: 3/6/06 – 3/21/06                                Public Hearing: NYD                                                               3/21/06
6RVC060310-06CB                           The proposed project includes construction of an industrial complex containing                      Other          City of Moreno                    1
Case Number PA06-0017                     office and warehouse facilities consisting of 569,200 square feet on 28.64 acres.                                  Valley                        Comments
                                                                                                                                                                                           Submitted
                                          Comment Period: 3/6/06 – 3/21/06                                    Public Hearing: NYD                                                           3/21/06




                 TOTAL DOCUMENTS RECEIVED THIS REPORTING COMMENT PERIOD: 60




                                                                                                            # = Project may have potential environmental justice concerns due to the nature
FEIR - Final Environmental Impact Report                  FONSI - Finding of No Significant Impact              and/or location of the project.
DEIR - Draft Environmental Impact Report                  IS - Initial Study                                * This column reports on the current review and comment status of a document.
SEIR - Subsequent Environmental Impact Report             NOP - Notice of Preparation                         1 = AQMD will comment
DEA - Draft Environmental Assessment                      EIS - Environmental Impact Statement                2 = Document Reviewed - No Comments Sent
RDEIR - Revised Draft Environmental Impact Report         ND - Negative Declaration                           3 = Currently Under Review
SupEIR – Supplemental EIR                                 N/A - Not Applicable                                4 = Document does not require comments (e.g., public notices, plot plans, FEIRs)
Other - Typically notices of public meetings              NYD - Not Yet Determined                            5 = No Review Conducted – No Comments Sent
                                                                                                     A-10
                                                                       ATTACHMENT B
                                                         ONGOING ACTIVE PROJECTS FOR WHICH AQMD HAS
                                                               OR WILL CONDUCT A CEQA REVIEW


            TITLE/                                                            PROJECT                                                    TYPE OF                  LEAD                 COMMENT
           DIST. LOG                                                        DESCRIPTION                                                   DOC.                   AGENCY                 STATUS*

                                                           Goods Movement/Intermodal Projects
                                          No projects received.

                                                                         Education Projects
2LAC060207-04GM                           The proposed project includes upgrading the lighting system and additional            Subsequent                  Los Angeles                         2
Narbonne High School Stadium              bleacher seating, new restroom facilities, as well as field and scoreboard               ND                       Unified School
Lighting and Improvements                 improvements.                                                                                                     District
Project                                   Comment Period: 1/31/06 – 3/1/06                                  Public Hearing: NYD
2LAC060208-02GM                           The proposed project includes construction of a new high school on 16 acres.            DEIR                      Los Angeles                         3
Proposed South Region High                                                                                                                                  Unified School
School #2                                 Comment Period: 2/7/06 – 3/23/06                                 Public Hearing: NYD                              District
2LAC060209-06CB                           The proposed project includes improvements include new facilities, renovated                       DEIR           Rio Hondo                           2
Rio Hondo Community College               facilities, parking and circulation improvements, and infrastructure.                                             Community
Master Plan                               Comment Period: 2/9/06 – 3/18/06                                 Public Hearing: NYD                              College
2RVC060207-07GM                           The proposed project includes construction of a new 37,380 square-foot Student                       ND           University of                       2
Student Academic Support                  Academic Support Services Building.                                                                               California,
Services Building                         Comment Period: 1/31/06 – 3/1/06                                 Public Hearing: NYD                              Riverside
2SBC060210-09CB                           The proposed project includes construction of a new middle school on 24.5 acres.                     ND           Fontana Unified                     2
Middle School No. 10                      Comment Period: 2/10/06 – 3/13/06                                Public Hearing: NYD                              School District
                                                              Solid Waste/Wastewater Projects
3LAC060208-03CB                           The proposed project includes construction of a new force main sewer extending                     DEIR           City of Los Angeles                 2
Venice Pumping Plant Dual Force           from the Venice Pumping Plant to the North Outfall Sewer.                                                         Department of
Main Project                              Comment Period: 2/1/06 – 3/17/06                                 Public Hearing: NYD                              Public Works
3RVC060207-05CB                           The proposed project includes construction of a 4.3 million gallon water storage                     ND           Eastern Municipal                   2
McLaughlin Reservoir Project              reservoir, pump station, and associated pipelines, access road, and tie-ins.                                      Water District
                                          Comment Period: 2/6/06 – 3/6/06                                  Public Hearing: NYD


                                                                                                           # = Project may have potential environmental justice concerns due to the nature
FEIR - Final Environmental Impact Report                  FONSI - Finding of No Significant Impact             and/or location of the project.
DEIR - Draft Environmental Impact Report                  IS - Initial Study                               * This column reports on the current review and comment status of a document.
SEIR - Subsequent Environmental Impact Report             NOP - Notice of Preparation                        1 = AQMD will comment
DEA - Draft Environmental Assessment                      EIS - Environmental Impact Statement               2 = Document Reviewed - No Comments Sent
RDEIR - Revised Draft Environmental Impact Report         ND - Negative Declaration                          3 = Currently Under Review
SupEIR – Supplemental EIR                                 N/A - Not Applicable                               4 = Document does not require comments (e.g., public notices, plot plans, FEIRs)
Other - Typically notices of public meetings              NYD - Not Yet Determined                           5 = No Review Conducted – No Comments Sent
                                                                                                     B-1
                                                                       ATTACHMENT B
                                                         ONGOING ACTIVE PROJECTS FOR WHICH AQMD HAS
                                                               OR WILL CONDUCT A CEQA REVIEW


            TITLE/                                                            PROJECT                                                    TYPE OF                  LEAD                 COMMENT
           DIST. LOG                                                        DESCRIPTION                                                   DOC.                   AGENCY                 STATUS*

                                                                           Airport Projects
4SBC060210-03GM                    The proposed project includes construction of a new 500,000 gallon capacity fuel                            ND           San Bernardino                      2
San Bernardino International       farm facility near the location of the original Air Force fuel tanks which have been                                     International
Airport Aircraft Fuel Farm Project removed.                                                                                                                 Airport Authority
                                   Comment Period: 2/9/06 – 3/11/06                                   Public Hearing: NYD
                                                                   General Land Use Projects
5LAC060202-02                             The proposed project consists of the demolition of 14 buildings and the demolition                NOP/IS          Port of Los Angeles                 3
Southwest Marine Buildings                or relocation of seven cranes at the former Southwest Marine Shipyard at Berth
Demolition Project                        240Z.
                                          Comment Period: 1/25/06 – 3/13/06                               Public Hearing: NYD
5LAC060210-06CB                           The proposed project includes construction of a motocross park facility on a 10-acre                 ND           City of Los Angeles                 3
ENV-2004-3451-MND-REC1                    lot.
                                          Comment Period: 2/21/06 – 3/21/06                               Public Hearing: NYD
5LAC060223-01CB                           The proposed project includes construction of a 13-unit mixed-use development.                       ND           City of Lomita                      2
General Plan Amendment No.
2006-01 and Conditional Use
Permit No. 246                            Comment Period: 2/22/06 – 5/31/06                               Public Hearing: NYD
5LAC060223-02CB                           The proposed project includes construction of a 20-unit senior housing                               ND           City of Lomita                      2
Tentative Tract Map No. 060165            development.
and Modification to Development
Agreement No. 2003-01                     Comment Period: 2/22/06 – 3/13/06                                Public Hearing: NYD
5LAC060223-03GM                           The proposed project includes installation of up to six multi-depth soil gas probes.                 ND           County Sanitation                   2
Multi-Level Soil Gas Probe                The multi-depth soil gas probes will be installed along the northeast boundary of                                 District of Los
Study, Palos Verdes Landfill              the Palos Verdes Landfill, which will be outside the refuse footprint.                                            Angeles County
                                          Comment Period: 2/22/06 – 3/22/06                                Public Hearing: NYD




                                                                                                           # = Project may have potential environmental justice concerns due to the nature
FEIR - Final Environmental Impact Report                  FONSI - Finding of No Significant Impact             and/or location of the project.
DEIR - Draft Environmental Impact Report                  IS - Initial Study                               * This column reports on the current review and comment status of a document.
SEIR - Subsequent Environmental Impact Report             NOP - Notice of Preparation                        1 = AQMD will comment
DEA - Draft Environmental Assessment                      EIS - Environmental Impact Statement               2 = Document Reviewed - No Comments Sent
RDEIR - Revised Draft Environmental Impact Report         ND - Negative Declaration                          3 = Currently Under Review
SupEIR – Supplemental EIR                                 N/A - Not Applicable                               4 = Document does not require comments (e.g., public notices, plot plans, FEIRs)
Other - Typically notices of public meetings              NYD - Not Yet Determined                           5 = No Review Conducted – No Comments Sent
                                                                                                     B-2
                                                                       ATTACHMENT B
                                                         ONGOING ACTIVE PROJECTS FOR WHICH AQMD HAS
                                                               OR WILL CONDUCT A CEQA REVIEW


            TITLE/                                                            PROJECT                                                    TYPE OF                  LEAD                 COMMENT
           DIST. LOG                                                        DESCRIPTION                                                   DOC.                   AGENCY                 STATUS*
5LAC060228-01CB                           The proposed project includes construction of a new 90,000 square-foot industrial                    ND           City of Carson                      2
Design Overlay Review No. 923-            building on 4.7 acres.
05, Tenatative Tract Map NO.
065504                                    Comment Period: 2/22/06 – 3/14/06                                Public Hearing: NYD
5LAC060228-07GM                           The proposed project includes demolition and replacement of an existing 120,000                      ND           City of Carson                      3
Design Overlay Review No. 892-            square-foot retail building and construction of a new 146,000 square-foot building
05                                        on 8.7 acres.
                                          Comment Period: 2/27/06 – 3/28/06                                Public Hearing: NYD
5LAC060221-05GM                           The proposed project includes installing a new, low emissions flare to provide long-                 ND           County Sanitation                   3
Palos Verdes Landfill Flare               term flaring compatibility of the landfill gas as the methane content diminishes.                                 Districts of Los
Station Improvement                       The new flare will be installed on an existing concrete pad located within the                                    Angeles County
                                          Methane Gas Turbine Generator Facility adjacent to Hawthorne Boulevard.
                                          Comment Period: 2/16/06 – 3/16/06                                Public Hearing: NYD
5ORC060201-02GM                           The proposed project includes a zone change to create the Irvine Business Complex                    ND           City of Irvine                      2
Irvine Business Complex                   (IBC) Residential Mixed Use Overlay Zone, as part of an overall vision plan policy
Residential Mixed Use Overlay             statement for the IBC to be considered by the City Council in conjunction with the
Zone and Vision Plan                      zone change.
                                          Comment Period: 1/26/06 – 2/16/06                                Public Hearing: NYD
5ORC060207-01GM                           The proposed project would change the allowed land uses from industrial,                           DEIR           City of Lake Forest                 2
Opportunities Study General Plan          commercial, and open space to residential and mixed uses. The proposed project
Amendment and Zone Change                 parcels currently have approximately 9.8 million square feet of approved industrial
                                          and commercial development rights. The proposed project evaluates replacing the
                                          existing entitlements with up to 5,415 dwelling units, 650,000 square feet of
                                          commercial uses, 50 acres of neighborhood parks, 45 acres of Sports Park and
                                          Community/Civic Center.
                                          Comment Period: 1/31/06 – 3/16/06                                Public Hearing: NYD
5ORC060209-05GM                           The proposed project includes converting the existing building located at 2101                       ND           City of Newport                     2
Land Rover Newport Beach                  Dove Street into a vehicle service center and storage facility.                                                   Beach
Service Center                            Comment Period: 2/9/06 – 3/10/06                                 Public Hearing: NYD

                                                                                                           # = Project may have potential environmental justice concerns due to the nature
FEIR - Final Environmental Impact Report                  FONSI - Finding of No Significant Impact             and/or location of the project.
DEIR - Draft Environmental Impact Report                  IS - Initial Study                               * This column reports on the current review and comment status of a document.
SEIR - Subsequent Environmental Impact Report             NOP - Notice of Preparation                        1 = AQMD will comment
DEA - Draft Environmental Assessment                      EIS - Environmental Impact Statement               2 = Document Reviewed - No Comments Sent
RDEIR - Revised Draft Environmental Impact Report         ND - Negative Declaration                          3 = Currently Under Review
SupEIR – Supplemental EIR                                 N/A - Not Applicable                               4 = Document does not require comments (e.g., public notices, plot plans, FEIRs)
Other - Typically notices of public meetings              NYD - Not Yet Determined                           5 = No Review Conducted – No Comments Sent
                                                                                                     B-3
                                                                       ATTACHMENT B
                                                         ONGOING ACTIVE PROJECTS FOR WHICH AQMD HAS
                                                               OR WILL CONDUCT A CEQA REVIEW


            TITLE/                                                            PROJECT                                                    TYPE OF                  LEAD                 COMMENT
           DIST. LOG                                                        DESCRIPTION                                                   DOC.                   AGENCY                 STATUS*
5ORC060216-04GM                           The proposed project includes General Plan amendments to revise zoning in various                  DEIR           City of Irvine                      2
Planning Areas 18, 33 (Lot 109),          planning areas.
34, and 39 General Plan
Amendment and Zone Change                 Comment Period: 2/14/06 – 3/31/06                                 Public Hearing: NYD
5ORC060221-01CB                           The proposed project includes construction of a 5.7-acre groundwater recharge                      DEIR           Orange County                       2
La Jolla Recharge Basin                   basin that would add as much as 9,000 acre-feet of recharge capacity a year.                                      Water District
                                          Comment Period: 2/10/06 – 3/27/06                                 Public Hearing: NYD
5ORC060221-02GM                           The proposed project includes construction of a 45,000 square-foot, three-story                      ND           City of Placentia                   2
Placentia-Linda Medical Plaza             medical office building, on-site parking improvements, and installation of
                                          landscaping.
                                          Comment Period: 2/17/06 – 3/8/06                                  Public Hearing: NYD
5ORC060222-05GM                           The proposed project includes replacement of an existing dock facility adjacent to                   ND           County of Orange                    2
The Ocean Institute Dock                  the Ocean Institute.                                                                                              Dana Point Harbor
Replacement                               Comment Period: 2/20/06 – 3/22/06                                 Public Hearing: NYD                             Dept.
5ORC060228-06CB                           The proposed project includes a tentative parcel map to create 4 parcels on                          ND           City of Seal Beach                  2
400 Marina Drive Project                  approximately 0.31 acres to construct four single-family residences.
                                          Comment Period: 2/23/06 – 3/27/06                                 Public Hearing: NYD
5RVC060201-07GM                           The proposed project involves the amendment of the Agency’s existing                               DEIR           County of                           2
I-215 Corridor Redevelopment              Redevelopment Plan for the I-215 Corridor Project Area to include additional                                      Riverside
Project Area, Amendment No. 1B            territory. It encompasses approximately 3,289 acres of the Sun City/Quail Valley
– Sun City/Quail Valley Sub-Area          Sub-Area. The overall goal of the Project is to alleviate blighting conditions in the
                                          3,289-acre Amendment Area, and to continue to alleviate blight in the existing I-
                                          215 Corridor Project Area.
                                          Comment Period: 1/26/06 – 3/13/06                                 Public Hearing: NYD




                                                                                                           # = Project may have potential environmental justice concerns due to the nature
FEIR - Final Environmental Impact Report                  FONSI - Finding of No Significant Impact             and/or location of the project.
DEIR - Draft Environmental Impact Report                  IS - Initial Study                               * This column reports on the current review and comment status of a document.
SEIR - Subsequent Environmental Impact Report             NOP - Notice of Preparation                        1 = AQMD will comment
DEA - Draft Environmental Assessment                      EIS - Environmental Impact Statement               2 = Document Reviewed - No Comments Sent
RDEIR - Revised Draft Environmental Impact Report         ND - Negative Declaration                          3 = Currently Under Review
SupEIR – Supplemental EIR                                 N/A - Not Applicable                               4 = Document does not require comments (e.g., public notices, plot plans, FEIRs)
Other - Typically notices of public meetings              NYD - Not Yet Determined                           5 = No Review Conducted – No Comments Sent
                                                                                                     B-4
                                                                       ATTACHMENT B
                                                         ONGOING ACTIVE PROJECTS FOR WHICH AQMD HAS
                                                               OR WILL CONDUCT A CEQA REVIEW


            TITLE/                                                            PROJECT                                                    TYPE OF                  LEAD                 COMMENT
           DIST. LOG                                                        DESCRIPTION                                                   DOC.                   AGENCY                 STATUS*
5RVC060201-08GM                           The proposed project involves the amendment of the Agency’s existing                               DEIR           County of                           2
I-215 Corridor Redevelopment              Redevelopment Plan for the I-215 Corridor Project Area to include additional                                      Riverside
Project Area, Amendment No. 1A            territory. It encompasses approximately 2,820 acres of the Lakeview/Nuevo Sub-
– Lakeview/Nuevo Sub-Area                 Area. The overall goal of the Project is to alleviate blighting conditions in the
                                          2,820-acre Amendment Area, and to continue to alleviate blight in the existing I-
                                          215 Corridor Project Area.
                                          Comment Period: 1/26/06 – 3/13/06                                 Public Hearing: NYD
5RVC060207-09GM                           The proposed project includes subdividing approximately 285 acres into 388 single-                 Other          City of Perris                    1
Tentative Tract Map 33973                 family lots.                                                                                                                                    Comments
                                                                                                                                                                                          Submitted
                                          Comment Period: 1/31/06 – 2/15/06                              Public Hearing: NYD                                                               3/3/06
5RVC060209-01GM                           The proposed project includes development of 254 residential lots on 162 acres and                 DEIR           County of                         2
Tentative Tract No. 32693,                730 residential lots on 396 acres and 109 acres of open space.                                                    Riverside
Tentative Tract No. 32694
(Rancho Santa Rosa)                       Comment Period: 2/1/06 – 3/20/06                                Public Hearing: NYD
5RVC060210-08GM                           The proposed project includes subdividing 23 acres into three lots for the                           ND           City of Indio                       2
Tentative Tract Map 33932,                construction of 261 condominium units, one hotel, and conference building.
Conditional Use Permit 05-8-435           Comment Period: 2/1/06 – 2/21/06                                Public Hearing: NYD
5RVC060214-03GM                           The proposed project includes construction of a 56,160 square-foot commercial                        ND           City of Murrieta                    2
Development Plan 004-201                  center on a 6-acre site.
                                          Comment Period: 2/10/06 – 3/1/06                                Public Hearing: NYD
5RVC060216-03                             The proposed project includes subdividing 116 acres into 200 residential lots.                     Other          City of Perris                      3
Tentative Tract Map 33900                 Comment Period: 2/13/06 – 2/28/06                               Public Hearing: NYD




                                                                                                           # = Project may have potential environmental justice concerns due to the nature
FEIR - Final Environmental Impact Report                  FONSI - Finding of No Significant Impact             and/or location of the project.
DEIR - Draft Environmental Impact Report                  IS - Initial Study                               * This column reports on the current review and comment status of a document.
SEIR - Subsequent Environmental Impact Report             NOP - Notice of Preparation                        1 = AQMD will comment
DEA - Draft Environmental Assessment                      EIS - Environmental Impact Statement               2 = Document Reviewed - No Comments Sent
RDEIR - Revised Draft Environmental Impact Report         ND - Negative Declaration                          3 = Currently Under Review
SupEIR – Supplemental EIR                                 N/A - Not Applicable                               4 = Document does not require comments (e.g., public notices, plot plans, FEIRs)
Other - Typically notices of public meetings              NYD - Not Yet Determined                           5 = No Review Conducted – No Comments Sent
                                                                                                     B-5
                                                                       ATTACHMENT B
                                                         ONGOING ACTIVE PROJECTS FOR WHICH AQMD HAS
                                                               OR WILL CONDUCT A CEQA REVIEW


            TITLE/                                                             PROJECT                                                    TYPE OF                  LEAD                 COMMENT
           DIST. LOG                                                         DESCRIPTION                                                   DOC.                   AGENCY                 STATUS*
5RVC060221-04CB                           The proposed project includes change conditionally allowable land uses in Planning                    ND           City of Banning                     2
Sun Lakes Village North Specific          Areas B and E to include auto dealers; amend planning area boundaries for
Plan Amendment #4, Tentative              Planning Areas B, D and E; relocate Street C easterly to allow adequate street
Parcel Map 33326                          spacing with the adjacent assisting living facility; change cross-section of Streets A,
                                          B and C from 72 feet of right-of-way to 80 feet of right-of-way; increase allowable
                                          signage by allowing two additional electron reader signs; change the landscaping
                                          design guidelines, reducing the landscaping standards for auto dealerships within
                                          the project site. The proposed project also includes subdividing a 47.1-acre parcel
                                          into 14 commercial parcels.
                                          Comment Period: 2/20/06 – 3/13/06                              Public Hearing: 3/28/06
5RVC060228-03CB                           The proposed project includes construction of a 66,000 square-foot professional                       ND           City of Hemet                     1
Professional Development Center           development center and transportation department facility on a 15.05 acres site.                                                                 Comments
and Transportation Department                                                                                                                                                              Submitted
Facility                                  Comment Period: 2/16/06 – 3/16/06                                Public Hearing: NYD                                                              3/10/06
5SBC060201-05CB                           The proposed project is a request for a conditional use permit to establish a 31,500                Other          County of San                     2
P200600005/GPA/CUP/MDS –                  square-foot warehouse/manufacturing building on 3.65 acres.                                                        Bernardino
Schroeder Iron Corp                       Comment Period: 2/1/06 – 2/10/06                                 Public Hearing: NYD
5SBC060202-01CB                           The proposed project includes a comprehensive vision for the redevelopment and                      DEIR           City of Montclair                   2
North Montclair Downtown                  revitalization of the proposed Downtown Plan area consistent with the principles of
Specific Plan                             transit oriented and traditional neighborhood design.
                                          Comment Period: 1/31/06 – 3/16/06                                Public Hearing: NYD
5SBC060207-02CB                           The proposed project includes replacing several existing culverts with a railroad                     ND           California Dept. of                 2
Horsethief Creek Bridge Mojave            flatcar bridge at a riparian area road crossing along an unpaved access road for the                               Water Resources
Siphon Maintenance Road                   Mojave Siphon, a component of the East Branch of the State Water Project.
                                          Comment Period: 2/3/06 – 3/6/06                                  Public Hearing: NYD
5SBC060209-02CB                           The proposed project includes construction of a 44 unit, three-story apartment                        ND           City of Loma Linda                  2
Conditional Use Permit No. 06-01          building, 25 condominiums and 37 single-family homes on 8.82 acres.
and Variance No. 06-01                    Comment Period: 2/9/06 – 2/28/06                                 Public Hearing: NYD


                                                                                                            # = Project may have potential environmental justice concerns due to the nature
FEIR - Final Environmental Impact Report                   FONSI - Finding of No Significant Impact             and/or location of the project.
DEIR - Draft Environmental Impact Report                   IS - Initial Study                               * This column reports on the current review and comment status of a document.
SEIR - Subsequent Environmental Impact Report              NOP - Notice of Preparation                        1 = AQMD will comment
DEA - Draft Environmental Assessment                       EIS - Environmental Impact Statement               2 = Document Reviewed - No Comments Sent
RDEIR - Revised Draft Environmental Impact Report          ND - Negative Declaration                          3 = Currently Under Review
SupEIR – Supplemental EIR                                  N/A - Not Applicable                               4 = Document does not require comments (e.g., public notices, plot plans, FEIRs)
Other - Typically notices of public meetings               NYD - Not Yet Determined                           5 = No Review Conducted – No Comments Sent
                                                                                                      B-6
                                                                       ATTACHMENT B
                                                         ONGOING ACTIVE PROJECTS FOR WHICH AQMD HAS
                                                               OR WILL CONDUCT A CEQA REVIEW


            TITLE/                                                            PROJECT                                                    TYPE OF                  LEAD                 COMMENT
           DIST. LOG                                                        DESCRIPTION                                                   DOC.                   AGENCY                 STATUS*
5SBC060217-03CB                           The proposed project includes subdividing 117.36 acres into 135 lots and 32                          ND           City of Chino                       2
Master site Approval No. 2005-04          additional lettered lots for the future development of 278 single-family residential
& TTM Nos. 17057, 17571,                  units and 665 multi-family units, including 250 affordable apartments resulting in a
17572, 17626 & 17635                      total of 943 dwelling units.
                                          Comment Period: 2/17/06 – 3/19/06                                Public Hearing: NYD
5SBC060228-04GM                           The proposed project includes construction of a 187-unit condominium project on                    DEIR           City of Fontana                     3
Covenant Apartments                       8.39 acres.
                                          Comment Period: 2/27/06 – 4/13/06                                Public Hearing: NYD
5ALL060209-07GM                           The proposed project is a comprehensive facilities plan that identifies a range of                 DEIR           Orange County                       2
Long-Term Facilities Plan and             projects that the District might undertake to manage the basin effectively through                                Water District
Annexations                               2025. The District also proposes annexation of additional lands that are not
                                          currently under its jurisdiction as requested by City of Anaheim and the Irvine
                                          Ranch Water District.
                                          Comment Period: 2/9/06 – 2/24/06                                 Public Hearing: NYD
5LAC060221-05GM                           The proposed project includes installing a new, low emissions flare to provide long-                 ND           County Sanitation                   3
Palos Verdes Landfill Flare               term flaring compatibility of the landfill gas as the methane content diminishes.                                 Districts of Los
Station Improvement                       The new flare will be installed on an existing concrete pad located within the                                    Angeles County
                                          Methane Gas Turbine Generator Facility adjacent to Hawthorne Boulevard.
                                          Comment Period: 2/16/06 – 3/16/06                                Public Hearing: NYD
5RVC060210-01CB                           The proposed project includes construction of a storm drain in Golf Club Drive, an                   ND           Riverside County                    2
Palm Springs Master Drainage              earthen 6.7 acre detention basin and approximately 6,000 linear feet of an                                        Flood Control and
Plan Line 41, Stage 3 Flood               underground reinforced concrete pipe storm drain ranging from 66 to 96 inches in                                  Water Conservation
Control Project                           diameter.                                                                                                         District
                                          Comment Period: 1/30/06 – 3/1/06                                 Public Hearing: NYD
5RVC060210-02CB                           The proposed project includes construction of a series of reinforced concrete pipe                   ND           Riverside County                    2
Calimesa Line L Project                   ranging from approximately 36 inches to 96 inches in diameter.                                                    Flood Control and
                                                                                                                                                            Water Conservation
                                          Comment Period: 1/30/06 – 3/1/06                                   Public Hearing: NYD                            District


                                                                                                           # = Project may have potential environmental justice concerns due to the nature
FEIR - Final Environmental Impact Report                  FONSI - Finding of No Significant Impact             and/or location of the project.
DEIR - Draft Environmental Impact Report                  IS - Initial Study                               * This column reports on the current review and comment status of a document.
SEIR - Subsequent Environmental Impact Report             NOP - Notice of Preparation                        1 = AQMD will comment
DEA - Draft Environmental Assessment                      EIS - Environmental Impact Statement               2 = Document Reviewed - No Comments Sent
RDEIR - Revised Draft Environmental Impact Report         ND - Negative Declaration                          3 = Currently Under Review
SupEIR – Supplemental EIR                                 N/A - Not Applicable                               4 = Document does not require comments (e.g., public notices, plot plans, FEIRs)
Other - Typically notices of public meetings              NYD - Not Yet Determined                           5 = No Review Conducted – No Comments Sent
                                                                                                     B-7
                                                                       ATTACHMENT B
                                                         ONGOING ACTIVE PROJECTS FOR WHICH AQMD HAS
                                                               OR WILL CONDUCT A CEQA REVIEW


            TITLE/                                                            PROJECT                                                    TYPE OF                  LEAD                 COMMENT
           DIST. LOG                                                        DESCRIPTION                                                   DOC.                   AGENCY                 STATUS*
5RVC060210-01CB                           The proposed project includes construction of a storm drain in Golf Club Drive, an                   ND           Riverside County                    2
Palm Springs Master Drainage              earthen 6.7 acre detention basin and approximately 6,000 linear feet of an                                        Flood Control and
Plan Line 41, Stage 3 Flood               underground reinforced concrete pipe storm drain ranging from 66 to 96 inches in                                  Water Conservation
Control Project                           diameter.                                                                                                         District
                                          Comment Period: 1/30/06 – 3/1/06                                 Public Hearing: NYD
5RVC060210-02CB                           The proposed project includes construction of a series of reinforced concrete pipe                   ND           Riverside County                    2
Calimesa Line L Project                   ranging from approximately 36 inches to 96 inches in diameter.                                                    Flood Control and
                                                                                                                                                            Water Conservation
                                          Comment Period: 1/30/06 – 3/1/06                                   Public Hearing: NYD                            District
                                                              Warehouse/Commercial Projects
6LAC060214-01GM                           The proposed project includes construction of a two-story, 95,010 square-foot                        ND           City of Agoura                    1
Agoura Oaks Plaza                         business park office building on 5.17 acres.                                                                      Hills                         Comments
                                                                                                                                                                                          Submitted
                                          Comment Period: 2/16/06 – 3/17/06                                Public Hearing: NYD                                                             3/17/06
6RVC060207-08CB                           The proposed project includes subdividing a 55.45-acre parcel into 23 individual                     ND           City of Moreno                    2
Stoneridge Towne Centre                   parcels and a master plot plan and various plot plans consisting of a 563,328                                     Valley
                                          square-foot commercial retail center including two anchor stores, seven major retail
                                          buildings and numerous out parcel retail/restaurant pads.
                                          Comment Period: 2/1/06 – 3/1/06                                  Public Hearing: NYD
6SBC060222-01CB                           The proposed project includes a conditional use permit for a 600,000 square-foot                   Other          County of San                     1
Project No. P200500723 –                  industrial building on 28.5 acres.                                                                                Bernardino                    Comments
Riverside Commercial Investors                                                                                                                                                            Submitted
                                          Comment Period: 2/20/06 – 3/20/06                                  Public Hearing: NYD                                                           3/17/06




                                                                                                           # = Project may have potential environmental justice concerns due to the nature
FEIR - Final Environmental Impact Report                  FONSI - Finding of No Significant Impact             and/or location of the project.
DEIR - Draft Environmental Impact Report                  IS - Initial Study                               * This column reports on the current review and comment status of a document.
SEIR - Subsequent Environmental Impact Report             NOP - Notice of Preparation                        1 = AQMD will comment
DEA - Draft Environmental Assessment                      EIS - Environmental Impact Statement               2 = Document Reviewed - No Comments Sent
RDEIR - Revised Draft Environmental Impact Report         ND - Negative Declaration                          3 = Currently Under Review
SupEIR – Supplemental EIR                                 N/A - Not Applicable                               4 = Document does not require comments (e.g., public notices, plot plans, FEIRs)
Other - Typically notices of public meetings              NYD - Not Yet Determined                           5 = No Review Conducted – No Comments Sent
                                                                                                     B-8
                                                                  ATTACHMENT B
                                                    ONGOING ACTIVE PROJECTS FOR WHICH AQMD HAS
                                                          OR WILL CONDUCT A CEQA REVIEW


                             TOTAL NUMBER OF REQUESTS TO AQMD FOR DOCUMENT REVIEW: 0
                         TOTAL NUMBER OF COMMENT LETTERS SENT OUT THIS REPORTING PERIOD: 21
                         TOTAL NUMBER OF DOCUMENTS REVIEWED, BUT NO COMMENTS WERE SENT: 45
                               TOTAL NUMBER OF DOCUMENTS CURRENTLY UNDER REVIEW: 32
                            TOTAL NUMBER OF DOCUMENTS THAT DO NOT REQUIRE COMMENTS: 7
                                TOTAL NUMBER OF DOCUMENTS THAT WERE NOT REVIEWED: 0




                                                                                                     # = Project may have potential environmental justice concerns due to the nature
FEIR - Final Environmental Impact Report            FONSI - Finding of No Significant Impact             and/or location of the project.
DEIR - Draft Environmental Impact Report            IS - Initial Study                               * This column reports on the current review and comment status of a document.
SEIR - Subsequent Environmental Impact Report       NOP - Notice of Preparation                        1 = AQMD will comment
DEA - Draft Environmental Assessment                EIS - Environmental Impact Statement               2 = Document Reviewed - No Comments Sent
RDEIR - Revised Draft Environmental Impact Report   ND - Negative Declaration                          3 = Currently Under Review
SupEIR – Supplemental EIR                           N/A - Not Applicable                               4 = Document does not require comments (e.g., public notices, plot plans, FEIRs)
Other - Typically notices of public meetings        NYD - Not Yet Determined                           5 = No Review Conducted – No Comments Sent
                                                                                               B-9
                                                               ATTACHMENT C
                                                      ACTIVE AQMD LEAD AGENCY PROJECTS
                                                            THROUGH MARCH 31, 2006

                                 Project                                         Project                 Type of                      Status                  Consultant
                               Description                                     Proponent                Document
California Cascade is a commercial business of pressure treating         California Cascade       Negative Declaration        Final Negative             ENGEO, Inc.
lumber for retail sales. The proposed project is to convert the wood     Fontana Inc.                                         Declaration
treating process from using chromium and arsenic based chemical                                                               completed. Waiting
solutions to using copper-based and ammonia based chemicals.                                                                  for permits to be
                                                                                                                              processed before
                                                                                                                              certification can occur.
BP is proposing upgrades at its Carson Refinery to comply with           BP                       Environmental Impact        Notice of                  Environmental Audit,
SCAQMD Rule 1105.1 and improve reliability and safety of the FCC,                                 Report                      Preparation/Initial        Inc.
Alkylation Unit, Sulfur Plant, etc.                                                                                           Study close of
                                                                                                                              comments December
                                                                                                                              9, 2005. SCAQMD
                                                                                                                              reviewing draft EIR.
Chevron Texaco is proposing modifications at its El Segundo Refinery     Chevron Texaco           Environmental Impact        Notice of                  ENSR
to allow it to process heavier, higher residuum (residue) composition                             Report                      Preparation/Initial
crude supplies. Modifications are also proposed for the cokes unit to                                                         Study close of
improve reliability.                                                                                                          comments on October
                                                                                                                              28, 2005. SCAQMD
                                                                                                                              reviewing draft EIR.
Paramount Petroleum Refinery operators are considering SCR sytems     Paramount Petroleum       Negative Declaration          Consultant preparing       Environmental Audit,
upgrades. One option is to install a new SCR on existing heater.      Refinery                                                administrative draft       Inc.
Option two involves upgrading an existing SCR that services four                                                              Initial Study
existing heaters.
Operators at the Shell (formerly Equilon) Los Angeles Refinery are    Shell Oil Products        Negative Declaration          Draft Negative             Environmental Audit,
proposing modification of the Fluid Catalytic Cracking Unit to comply U.S.                                                    Declaration close of       Inc.
with SCAQMD Rule 1105.1. The old electrostatic precipitators (ESPs)                                                           comments March 30,
will be replaced with new ESPs.                                                                                               2006.
A shaded row indicates a new project.
# = AQMD was contacted regarding potential environmental justice concerns due to the nature and/or location of the project.