TITLE/ by X83301uh

VIEWS: 4 PAGES: 20

									                                                                                 ATTACHMENT A
                                                                       INCOMING CEQA DOCUMENTS LOG
                                                                      APRIL 1, 2006 THROUGH APRIL 30, 2006


            TITLE/                                                             PROJECT                                                    TYPE OF                 LEAD                  COMMENT
           DIST. LOG                                                         DESCRIPTION                                                   DOC.                  AGENCY                  STATUS*

                                                           Goods Movement/Intermodal Projects
1SBC060427-09GM                           The proposed project includes: demolition of the existing structures; construction of               DEIR           City of Los                         3
Pacific Gateway Cargo Center at           cargo handling/warehouse space, administrative and commercial office space, retail                                 Angeles, Los
Ontario International Airport             space and ancillary facilities; airside construction of aircraft parking aprons and                                Angeles World
                                          taxiway connectors; and landside construction of access roads and surface lots.                                    Airports
                                          Comment Period: 4/27/06 – 6/12/06                                   Public Hearing: NYD
                                                                          Education Projects
2LAC060404-06GM                           The proposed project involves the consolidation of the Alhambra Unified School                        ND           Alhambra Unified                    2
Alhambra Unified School District          District Administration, Transportation, Maintenance, and Storage facilities into                                  School District
“Facilities Consolidation Project”        one industrial property located at 1515 West Mission Road. No student classrooms
                                          are proposed at this location.
                                          Comment Period: 3/30/06 – 5/1/06                               Public Hearing: NYD
2LAC060418-01CB                           The proposed project includes construction of a 161,000 square-foot high school on                  DEIR           Los Angeles                         3
Proposed South Region High                12.6 acres.                                                                                                        Unified School
School No. 7                              Comment Period: 4/18/06 – 5/26/06                              Public Hearing: NYD                                 District
2LAC060418-07CB                           The proposed project includes construction of a 13,000 square-foot early education                    ND           Los Angeles                         2
Valley Region Early Education             center on 1 acre.                                                                                                  Unified School
Center #1                                 Comment Period: 4/13/06 – 5/12/06                              Public Hearing: NYD                                 District
2LAC060419-05GM                           The proposed project includes construction of a new 182,000 square-foot high                        DEIR           Los Angeles                         3
Proposed South Region High                school.                                                                                                            Unified School
School No. 4                              Comment Period: 4/13/06 – 5/28/06                              Public Hearing: NYD                                 District
2LAC060427-10GM                           The proposed project includes construction of a new 127,000 square-foot high                        DEIR           Los Angeles                         3
Proposed Valley Region High               school.                                                                                                            Unified School
School No. 4                              Comment Period: 4/25/06 – 6/9/06                               Public Hearing: NYD                                 District
2SBC060418-02GM                           The proposed project includes construction of a new high school and middle school                   DEIR           San Bernardino                      3
Curtis High School and New                on 84 acres.                                                                                                       City Unified School
Middle School                             Comment Period: 4/18/06 – 6/1/06                               Public Hearing: NYD                                 District

                                                                                                            # = Project may have potential environmental justice concerns due to the nature
FEIR - Final Environmental Impact Report                   FONSI - Finding of No Significant Impact             and/or location of the project.
DEIR - Draft Environmental Impact Report                   IS - Initial Study                               * This column reports on the current review and comment status of a document.
SEIR - Subsequent Environmental Impact Report              NOP - Notice of Preparation                        1 = AQMD will comment
DEA - Draft Environmental Assessment                       EIS - Environmental Impact Statement               2 = Document Reviewed - No Comments Sent
RDEIR - Revised Draft Environmental Impact Report          ND - Negative Declaration                          3 = Currently Under Review
SupEIR – Supplemental EIR                                  N/A - Not Applicable                               4 = Document does not require comments (e.g., public notices, plot plans, FEIRs)
Other - Typically notices of public meetings               NYD - Not Yet Determined                           5 = No Review Conducted – No Comments Sent
                                                                                                      A-1
                                                                          ATTACHMENT A
                                                                INCOMING CEQA DOCUMENTS LOG
                                                               APRIL 1, 2006 THROUGH APRIL 30, 2006


            TITLE/                                                      PROJECT                                                    TYPE OF                 LEAD                  COMMENT
           DIST. LOG                                                  DESCRIPTION                                                   DOC.                  AGENCY                  STATUS*

                                                        Solid Waste/Wastewater Projects
3LAC060411-01CB                  The proposed project includes two nanofiltration facilities in El Dorado Regional                       ND           City of Long Beach                  2
El Dorado Regional Park          Park. The facilities would demineralize excess recycled water into near-potable
Reclaimed Water Nanofiltration   quality water that would be utilized in six existing lakes in the Park.
Project                          Comment Period: 4/4/06 – 5/3/06                                    Public Hearing: NYD
3LAC060427-13CB                  This document consists of responses to comments submitted by the AQMD on the                          Other          County of Los                       4
BFI Sunshine Canyon              CEQA document for the proposed project. The proposed condition changes will                                          Angeles
City/County Landfill             adjust the daily and weekly trash intake tonnages to 12,100 tons per day (from the
                                 current 6,600 tons) and 66,000 tons per week (from the current 36,000 tons). The
                                 proposed project changes will also increase the working face from 2 to 3 acres to a
                                 total of approximately 10 acres.
                                 Comment Period: N/A                                                 Public Hearing: N/A
3ORC060404-12                    The proposed project includes: West Wash Water Tank Refurbishment and seismic                          FEIR          Metropolitan Water                1
Robert B. Diemer Treatment Plant upgrades; site preparation; relocation of telecommunications equipment;                                              District of Southern          Comments
Improvement Project              construction of Wash Water Reclamation Plant No. 3; placement of shotcrete,                                          California                    Submitted
                                 irrigation and vegetation thinning at various locations throughout the Diemer Plant                                                                 4/28/06
                                 property; and construction of a new electrical switchyard and new power poles for
                                 the Ozone Retrofit Project.
                                 Comment Period: N/A                                                 Public Hearing: N/A
3ORC060412-01CB                  This document consists of responses to comments submitted by the AQMD on the                          Other          City of Tustin                      4
Rawlings Reservoir Replacement CEQA document for the proposed project. The proposed project includes
Project                          demolition of the existing 4.2 million gallon Rawlings Reservoir and the
                                 construction of two new 3.0 million gallon concrete domestic water tanks within the
                                 same site.
                                 Comment Period: N/A                                                 Public Hearing: N/A




                                                                                                     # = Project may have potential environmental justice concerns due to the nature
FEIR - Final Environmental Impact Report            FONSI - Finding of No Significant Impact             and/or location of the project.
DEIR - Draft Environmental Impact Report            IS - Initial Study                               * This column reports on the current review and comment status of a document.
SEIR - Subsequent Environmental Impact Report       NOP - Notice of Preparation                        1 = AQMD will comment
DEA - Draft Environmental Assessment                EIS - Environmental Impact Statement               2 = Document Reviewed - No Comments Sent
RDEIR - Revised Draft Environmental Impact Report   ND - Negative Declaration                          3 = Currently Under Review
SupEIR – Supplemental EIR                           N/A - Not Applicable                               4 = Document does not require comments (e.g., public notices, plot plans, FEIRs)
Other - Typically notices of public meetings        NYD - Not Yet Determined                           5 = No Review Conducted – No Comments Sent
                                                                                               A-2
                                                                                ATTACHMENT A
                                                                      INCOMING CEQA DOCUMENTS LOG
                                                                     APRIL 1, 2006 THROUGH APRIL 30, 2006


            TITLE/                                                            PROJECT                                                    TYPE OF                 LEAD                  COMMENT
           DIST. LOG                                                        DESCRIPTION                                                   DOC.                  AGENCY                  STATUS*
3RVC060404-12CB                           The proposed project involves revising the facility’s Solid Waste Facility Permit in                 ND           Riverside County                    3
Robert A. Nelson Transfer                 order to: 1) increase the permitted capacity from 2,700 tons per day (tpd) to 4,000                               Waste Management
Station/Materials Recovery                tpd; 2) expand the permitted site acreage from 12.5 acres to approximately 22.03                                  Dept.
Facility                                  acres; and 3) expand operating hours.
                                          Comment Period: 3/28/06 – 5/1/06                                 Public Hearing: NYD
3RVC060418-08GM                           The proposed project includes improvements to the levee in the area westerly of                      ND           Eastern Municipal                   2
Perris Valley Channel                     Indian Street to Perris Boulevard.                                                                                Water District
Improvements                              Comment Period: 4/17/06 – 5/17/06                                Public Hearing: NYD
                                                                           Airport Projects
4LAC060427-07GM                           The proposed project includes improvements to the existing terminal and related                    Other          City of Long Beach                  2
Long Beach Airport Terminal               facilities at the Airport to accommodate recent increases in flight activity at the
Area Improvements Project                 Airport as well as increases which might occur in the future consistent with the
                                          operation limitation of the Airport Noise Compatibility Ordinance.
                                          Comment Period: 4/27/06 – 5/27/06                                 Public Hearing: NYD
                                                                   General Land Use Projects
5LAC060404-01LI                           The proposed project includes construction of 35 townhome-style residential                       NOP/IS          City of Los Angeles               1
Sea Glass Townhome Project                condominium units and 4,000 square feet of retail space on the ground floor on 3.3                                                              Comments
                                          acres.                                                                                                                                          Submitted
                                          Comment Period: 3/31/06 – 5/1/06                                Public Hearing: NYD                                                              4/6/06
5LAC060404-03GM                           The proposed project includes construction of a mixed-use development containing                   DEIR           City of Los Angeles               3
Hollywood/Garfield Mixed-Use              108 multi-family residential units and 10,000 square feet of commercial/retail
Development                               space.
                                          Comment Period: 4/4/06 – 5/19/06                                Public Hearing: NYD
5LAC060404-04                             The proposed project includes construction of a 147-unit condominium building                       FEIR          City of Los Angeles                 4
2055 Avenue of the Stars                  with associated amenities on a 3.8-acre site.
Condominiums                              Comment Period: N/A                                              Public Hearing: N/A



                                                                                                           # = Project may have potential environmental justice concerns due to the nature
FEIR - Final Environmental Impact Report                  FONSI - Finding of No Significant Impact             and/or location of the project.
DEIR - Draft Environmental Impact Report                  IS - Initial Study                               * This column reports on the current review and comment status of a document.
SEIR - Subsequent Environmental Impact Report             NOP - Notice of Preparation                        1 = AQMD will comment
DEA - Draft Environmental Assessment                      EIS - Environmental Impact Statement               2 = Document Reviewed - No Comments Sent
RDEIR - Revised Draft Environmental Impact Report         ND - Negative Declaration                          3 = Currently Under Review
SupEIR – Supplemental EIR                                 N/A - Not Applicable                               4 = Document does not require comments (e.g., public notices, plot plans, FEIRs)
Other - Typically notices of public meetings              NYD - Not Yet Determined                           5 = No Review Conducted – No Comments Sent
                                                                                                     A-3
                                                                                ATTACHMENT A
                                                                      INCOMING CEQA DOCUMENTS LOG
                                                                     APRIL 1, 2006 THROUGH APRIL 30, 2006


            TITLE/                                                            PROJECT                                                    TYPE OF                 LEAD                  COMMENT
           DIST. LOG                                                        DESCRIPTION                                                   DOC.                  AGENCY                  STATUS*
5LAC060404-07LI                           The proposed project involves the development of 542 residential units and 13,000                 NOP/IS          City of Long Beach                1
Press-Telegram Mixed Use                  square feet of ground floor commercial space on an approximately 2.5-acre site.                                                                 Comments
Development                                                                                                                                                                               Submitted
                                          Comment Period: 3/29/06 – 4/27/06                              Public Hearing: NYD                                                               4/6/06
5LAC060404-09LI                           The proposed project includes construction of an 185,000 square-foot Leadership in                NOP/IS          County of Los                     1
Consolidated Fire Protection              Energy and Environmental Design certified building. An approximately 147,722                                      Angeles                       Comments
District Headquarters Complex             square-foot multilevel parking structure and a 107,000 square-foot office building                                                              Submitted
                                          are also proposed.                                                                                                                               4/6/06
                                          Comment Period: 4/20/06 – 5/22/06                              Public Hearing: NYD
5LAC060405-05LI                           The proposed project includes construction of 106 single-family residential units on              NOP/IS          City of Santa                     1
Mancara Residential Project               185 acres.                                                                                                        Clarita                       Comments
                                                                                                                                                                                          Submitted
                                          Comment Period: 4/5/06 – 5/3/06                             Public Hearing: NYD                                                                  4/12/06
5LAC060405-06LI                           The proposed project includes improvements on State Route 60 at Lemon Avenue                       Other          California Dept. of               1
State Route 60 at Lemon Avenue            in the City of Diamond Bar to reduce traffic congestion.                                                          Transportation                Comments
                                                                                                                                                                                          Submitted
                                          Comment Period: 3/27/06 – 4/30/06                               Public Hearing: NYD                                                              4/12/06
5LAC060413-02LI                           The proposed project includes regional-scale commercial retail development to                     NOP/IS          City of Bellflower                1
West Artesia Boulevard                    ensure the long-term economic viability of the area by providing appropriate                                                                    Comments
Commercial Highway Planning               development and design standards and guidelines that will regulate and control                                                                  Submitted
Area Specific Plan                        future commercial development occurring within the subject area.                                                                                 4/18/06
                                          Comment Period: 4/12/06 – 5/12/06                               Public Hearing: NYD
5LAC060413-05                             The proposed project is a request for a new 30-year lease through September 30,                   NOP/IS          California State                  1
Chevron El Segundo Marine                 2032. This would allow Chevron to continue operating the Marine Terminal, the                                     Lands Commission              Comments
Terminal New 30-Year Lease                Chevron El Segundo Refinery and associated onshore storage facilities.                                                                          Submitted
                                          Comment Period: 3/22/06 – 4/21/06                               Public Hearing: NYD                                                              4/18/06




                                                                                                           # = Project may have potential environmental justice concerns due to the nature
FEIR - Final Environmental Impact Report                  FONSI - Finding of No Significant Impact             and/or location of the project.
DEIR - Draft Environmental Impact Report                  IS - Initial Study                               * This column reports on the current review and comment status of a document.
SEIR - Subsequent Environmental Impact Report             NOP - Notice of Preparation                        1 = AQMD will comment
DEA - Draft Environmental Assessment                      EIS - Environmental Impact Statement               2 = Document Reviewed - No Comments Sent
RDEIR - Revised Draft Environmental Impact Report         ND - Negative Declaration                          3 = Currently Under Review
SupEIR – Supplemental EIR                                 N/A - Not Applicable                               4 = Document does not require comments (e.g., public notices, plot plans, FEIRs)
Other - Typically notices of public meetings              NYD - Not Yet Determined                           5 = No Review Conducted – No Comments Sent
                                                                                                     A-4
                                                                                ATTACHMENT A
                                                                      INCOMING CEQA DOCUMENTS LOG
                                                                     APRIL 1, 2006 THROUGH APRIL 30, 2006


            TITLE/                                                            PROJECT                                                    TYPE OF                 LEAD                  COMMENT
           DIST. LOG                                                        DESCRIPTION                                                   DOC.                  AGENCY                  STATUS*
5LAC060418-05CB                           The proposed project consists of the addition of approximately 2,700 square feet to                  ND           City of La Mirada                   2
Aquatic Center and Public Safety          the existing resource center building to serve the needs of the Los Angeles County
Facility Expansion                        Sheriff’s Department. The proposed project also consists of the construction of an
                                          Aquatics Center including three pools, a springboard diving area, slides, play areas,
                                          a flowing river channel and appurtenant locker room and equipment building.
                                          Comment Period: 4/14/06 – 5/5/06                                   Public Hearing: NYD
5LAC060418-06GM                           The proposed project includes development of three sites in Downtown Los                           DEIR           City of Los Angeles                 3
Herald Examiner Project                   Angeles: 1) the rehabilitation of the existing Broadway building; 2) the demolition
                                          of an existing building and then the construction of a 23-story mixed-use building
                                          including above-ground and subterranean parking on the Hill Street site; and 3) the
                                          demolition of surface parking and the construction of 37-story mixed use structure
                                          with a parking structure including above-ground and subterranean parking levels on
                                          the 12th Street site.
                                          Comment Period: 4/18/06 – 6/2/06                                   Public Hearing: NYD
5LAC060419-01CB                           The proposed project includes construction of a two-story single-family residence                    ND           City of Agoura                      2
Roser Residence                           including a two-car garage and workshop on 5.25 acres.                                                            Hills
                                          Comment Period: 4/25/06 – 5/24/06                                  Public Hearing: NYD
5LAC060419-02CB                           The proposed project includes an asphalt plant that would produce asphalt by                         ND           City of Downey                      3
Conditional Use Permit No. 05-            mixing new and recycled materials within four self-contained, 200 ton silos.
134                                       Comment Period: 4/10/06 – 5/10/06                                  Public Hearing: NYD
5LAC060419-03GM                           The proposed project includes a text amendment to allow self-storage facilities as a                 ND           City of Lomita                      3
Zone Text Amendment No. 2006-             permitted use in the Commercial, General Zone and to establish an off-street
02 & Site Plan No. 1085                   parking requirement for such use. The proposed project also includes a 36,265
                                          square-foot self-storage facility distributed among three warehouse structures.
                                          Comment Period: 4/19/06 – 5/19/06                                  Public Hearing: NYD
5LAC060420-01LI                           The proposed project includes improvements to natural habitat, economic values,                   NOP/IS          City of Los Angeles               1
Los Angeles River Revitalization          water quality, recreation, and open space. Creation of treatment wetlands in and                                                                Comments
Master Plan                               around the river to treat effluent river flows and to restore missing linkages of                                                               Submitted
                                          fragmented habitat would also be pursued.                                                                                                        4/21/06
                                          Comment Period: 3/30/06 – 4/30/06                                  Public Hearing: NYD
                                                                                                           # = Project may have potential environmental justice concerns due to the nature
FEIR - Final Environmental Impact Report                  FONSI - Finding of No Significant Impact             and/or location of the project.
DEIR - Draft Environmental Impact Report                  IS - Initial Study                               * This column reports on the current review and comment status of a document.
SEIR - Subsequent Environmental Impact Report             NOP - Notice of Preparation                        1 = AQMD will comment
DEA - Draft Environmental Assessment                      EIS - Environmental Impact Statement               2 = Document Reviewed - No Comments Sent
RDEIR - Revised Draft Environmental Impact Report         ND - Negative Declaration                          3 = Currently Under Review
SupEIR – Supplemental EIR                                 N/A - Not Applicable                               4 = Document does not require comments (e.g., public notices, plot plans, FEIRs)
Other - Typically notices of public meetings              NYD - Not Yet Determined                           5 = No Review Conducted – No Comments Sent
                                                                                                     A-5
                                                                                ATTACHMENT A
                                                                      INCOMING CEQA DOCUMENTS LOG
                                                                     APRIL 1, 2006 THROUGH APRIL 30, 2006


            TITLE/                                                            PROJECT                                                    TYPE OF                 LEAD                  COMMENT
           DIST. LOG                                                        DESCRIPTION                                                   DOC.                  AGENCY                  STATUS*
5LAC060426-01LI                           The proposed project includes construction of 235,600 square feet of commercial                   NOP/IS          City of Los Angeles               1
The Harbor Freeway Gateway                space and construction of a mixed-use development consisting of a single-story                                                                  Comments
Center                                    5,000 square-foot commercial retail building, a 16,750 square-foot four-story retail                                                            Submitted
                                          building and 51 residential condominium units on the upper three levels.                                                                         4/28/06
                                          Comment Period: 4/18/06 – 5/19/06                                Public Hearing: NYD
5LAC060426-02LI                           The proposed project would consist of the realignment of approximately 1,250 feet                 Revised         County of Los                     1
SR 90 Realignment Project and             of SR 90 between Mindanao Way and Lincoln Boulevard and construction of a                         NOP/IS          Angeles                       Comments
Admiralty Way Improvements                Connector Road between SR 1 and Admiralty Way. The Admiralty Way                                                                                Submitted
Project                                   Improvements Project would improve intersections and add or reconfigure lanes                                                                    4/28/06
                                          along the length of Admiralty Way from Fiji Way through to Via Marina.
                                          Comment Period: 2/22/06 – 5/31/06                                Public Hearing: NYD
5LAC060427-01LI                           The proposed project includes reconstruction and rehabilitation of the bridge to                  NOP/IS          City of Santa                     1
California Incline Replacement            meet current seismic standards. The bridge will remain a three-lane roadway that                                  Monica                        Comments
Project                                   terminates at either end with a signalized intersection.                                                                                        Submitted
                                          Comment Period: 4/24/06 – 5/29/06                                Public Hearing: NYD                                                             4/28/06
5LAC060427-02LI                           The proposed project includes a mixed-use development consisting of up to                         NOP/IS          City of Los Angeles               1
9th and Flower Mixed-Use Project          1,631,248 square feet including up to 114,361 square feet of ground floor retail                                                                Comments
                                          space and up to 1,516,887 square feet of residential floor area and the construction                                                            Submitted
                                          of 1,302 residential dwelling units.                                                                                                             4/28/06
                                          Comment Period: 4/25/06 – 5/25/06                                Public Hearing: NYD
5LAC060427-05GM                           The proposed project includes reuse and redevelopment of a 92-acre site.                           DEIR           City of Hawthorne                   3
Century Business Center Specific
Plan                                      Comment Period: 4/24/06 – 6/8/06                            Public Hearing: NYD
5LAC060427-12LI                           The proposed project includes construction of 165 condominium units on 9.1 acres.                 NOP/IS          County of Los                     1
Westshire                                                                                                                                                   Angeles                       Comments
                                                                                                                                                                                          Submitted
                                          Comment Period: 4/28/06 – 5/30/06                            Public Hearing: NYD                                                                 4/28/06
5ORC060404-13GM                           The proposed project consists of a General Plan amendment and zone change to                        SEIR          City of Irvine                    2
Irvine Business Complex                   allow for the development of 445 residential condominium units.
                                          Comment Period: 3/29/06 – 5/15/06                            Public Hearing: NYD
                                                                                                           # = Project may have potential environmental justice concerns due to the nature
FEIR - Final Environmental Impact Report                  FONSI - Finding of No Significant Impact             and/or location of the project.
DEIR - Draft Environmental Impact Report                  IS - Initial Study                               * This column reports on the current review and comment status of a document.
SEIR - Subsequent Environmental Impact Report             NOP - Notice of Preparation                        1 = AQMD will comment
DEA - Draft Environmental Assessment                      EIS - Environmental Impact Statement               2 = Document Reviewed - No Comments Sent
RDEIR - Revised Draft Environmental Impact Report         ND - Negative Declaration                          3 = Currently Under Review
SupEIR – Supplemental EIR                                 N/A - Not Applicable                               4 = Document does not require comments (e.g., public notices, plot plans, FEIRs)
Other - Typically notices of public meetings              NYD - Not Yet Determined                           5 = No Review Conducted – No Comments Sent
                                                                                                     A-6
                                                                                 ATTACHMENT A
                                                                       INCOMING CEQA DOCUMENTS LOG
                                                                      APRIL 1, 2006 THROUGH APRIL 30, 2006


            TITLE/                                                             PROJECT                                                    TYPE OF                 LEAD                  COMMENT
           DIST. LOG                                                         DESCRIPTION                                                   DOC.                  AGENCY                  STATUS*
5ORC060412-02GM                           The proposed project includes demolition of an existing 225,000 square-foot                           ND           City of Fullerton                   2
Kimberly Business Center                  processing building and all accessory structures, facilities and equipment on site;
                                          remediation of existing site conditions; and construction of 12 industrial buildings
                                          housing up to 20 businesses, of which six will be industrial condominiums.
                                          Comment Period: 4/10/06 – 5/10/06                               Public Hearing: 5/10/06
5ORC060412-03CB                           The proposed project includes construction of 760 dwelling units, a 17.1-acre                      Revised         City of Fullerton                   3
West Coyote Hills Specific Plan           multiple use site, a 5.2-acre neighborhood commercial development and a 1.3-acre                    DEIR
Amendment                                 fire station on 179 acres.
                                          Comment Period: 4/10/06 – 6/9/06                                  Public Hearing: NYD
5ORC060418-03CB                           The proposed project includes converting an existing building into a vehicle service               Recirc.         City of Newport                     2
Land Rover Newport Beach                  center and storage facility.                                                                        ND             Beach
Service Center                            Comment Period: 4/12/06 – 5/1/06                                  Public Hearing: NYD
5ORC060421-01LI                           The proposed project includes construction of 64 single-family townhomes on 5.5                    IS/NOP          City of Buena Park                1
Stanton/Crescent Townhome                 acres.                                                                                                                                           Comments
Project                                                                                                                                                                                    Submitted
                                          Comment Period: 4/20/06 – 5/22/06                                Public Hearing: NYD                                                              4/25/06
5ORC060421-02                             The proposed project includes a zoning ordinance amendment to amend the                               ND           City of Santa Ana                 3
Crazy Horse Square                        provision of Specific Development No. 8 to create a third project area that would
                                          allow the development of 20,154 square feet of retail and food uses on the project
                                          site; and Site Plan Review approval to construct the project within a specific
                                          development zone.
                                          Comment Period: 4/18/06 – 5/18/06                             Public Hearing: 5/22/06
5ORC060421-03CB                           The proposed project consists of a General Plan Amendment, Specific Plan                            DEIR           City of San                         3
Pacific Golf and Residential              Amendment, Site Development Permit, and Tentative Tract No. 16910 to allow for                                     Clemente
Project                                   the construction of up to 381 residential units on approximately 77.6 acres of the
                                          248-acre project site.
                                          Comment Period: 4/18/06 – 6/2/06                                 Public Hearing: NYD
5ORC060427-04CB                           The proposed project includes construction of 169 new residential units on 51 acres.                DEIR           City of Irvine                      3
Lambert Ranch General Plan
Amendment and Zone Change                 Comment Period: 4/25/06 – 6/9/06                                    Public Hearing: NYD
                                                                                                            # = Project may have potential environmental justice concerns due to the nature
FEIR - Final Environmental Impact Report                   FONSI - Finding of No Significant Impact             and/or location of the project.
DEIR - Draft Environmental Impact Report                   IS - Initial Study                               * This column reports on the current review and comment status of a document.
SEIR - Subsequent Environmental Impact Report              NOP - Notice of Preparation                        1 = AQMD will comment
DEA - Draft Environmental Assessment                       EIS - Environmental Impact Statement               2 = Document Reviewed - No Comments Sent
RDEIR - Revised Draft Environmental Impact Report          ND - Negative Declaration                          3 = Currently Under Review
SupEIR – Supplemental EIR                                  N/A - Not Applicable                               4 = Document does not require comments (e.g., public notices, plot plans, FEIRs)
Other - Typically notices of public meetings               NYD - Not Yet Determined                           5 = No Review Conducted – No Comments Sent
                                                                                                      A-7
                                                                          ATTACHMENT A
                                                                INCOMING CEQA DOCUMENTS LOG
                                                               APRIL 1, 2006 THROUGH APRIL 30, 2006


            TITLE/                                                      PROJECT                                                    TYPE OF                 LEAD                  COMMENT
           DIST. LOG                                                  DESCRIPTION                                                   DOC.                  AGENCY                  STATUS*
5ORC060404-05CB                    The proposed project would increase recharge capacity in the near term through the Recirculated                    Orange County                       2
Orange County Water District       development of several new recharge basins and the rehabilitation or expansion of      DPEIR                       Water District
Application to Appropriate Santa   existing recharge facilities.
Ana River Water                    Comment Period: 3/30/06 – 5/16/06                                  Public Hearing: NYD
5RVC060404-08LI                    The proposed project includes: construction of 122 residential units, 350,000 square   NOP/IS                      City of Indio                     1
Polo Square                        feet of commercial retail uses; 200,000 square feet of commercial office space, a                                                                Comments
                                   250 room hotel, and a 120 room extended stay hotel, 450 residential condominiums                                                                 Submitted
                                   and 35,000 square feet of commercial or public uses on 51.65 acres.                                                                               4/6/06
                                   Comment Period: 3/30/06 – 4/30/06                                  Public Hearing: NYD
5RVC060404-11GM                    The proposed project includes construction of 1,500 single-family residential units,    DEIR                       City of Banning                     3
Black Bench Specific Plan Project a school site, and park/recreational facilities, and the preservation of 869 acres of
                                   open space on 1,488 acres.
                                   Comment Period: 3/30/06 – 5/15/06                                  Public Hearing: NYD
5RVC060404-14CB                    The proposed project includes construction of a 34,592 square-foot church on 5.38        ND                        City of Murrieta                    2
Conditional Use Permit 004-138     acres.
                                   Comment Period: 4/4/06 – 5/4/06                                    Public Hearing: NYD
5RVC060405-02CB                    The proposed project would add 195 acres into the City’s western Sphere of               ND                        County of                           2
Sphere of Influence Updates for    Influence. In addition, 4,606 acres of land from the Prado Basin would be removed                                  Riverside
the Cities of Corona and Riverside from the City of Corona’s Sphere of Influence and incorporated into the City of
                                   Riverside’s Sphere of Influence.
                                   Comment Period: 3/31/06 – 5/1/06                                   Public Hearing: NYD




                                                                                                     # = Project may have potential environmental justice concerns due to the nature
FEIR - Final Environmental Impact Report            FONSI - Finding of No Significant Impact             and/or location of the project.
DEIR - Draft Environmental Impact Report            IS - Initial Study                               * This column reports on the current review and comment status of a document.
SEIR - Subsequent Environmental Impact Report       NOP - Notice of Preparation                        1 = AQMD will comment
DEA - Draft Environmental Assessment                EIS - Environmental Impact Statement               2 = Document Reviewed - No Comments Sent
RDEIR - Revised Draft Environmental Impact Report   ND - Negative Declaration                          3 = Currently Under Review
SupEIR – Supplemental EIR                           N/A - Not Applicable                               4 = Document does not require comments (e.g., public notices, plot plans, FEIRs)
Other - Typically notices of public meetings        NYD - Not Yet Determined                           5 = No Review Conducted – No Comments Sent
                                                                                               A-8
                                                                                 ATTACHMENT A
                                                                       INCOMING CEQA DOCUMENTS LOG
                                                                      APRIL 1, 2006 THROUGH APRIL 30, 2006


            TITLE/                                                             PROJECT                                                    TYPE OF                 LEAD                  COMMENT
           DIST. LOG                                                         DESCRIPTION                                                   DOC.                  AGENCY                  STATUS*
5RVC060405-03GM                           The proposed project includes development of a residential community and a                         Revised         City of Coachella                   3
Shadow View Specific Plan                 mixed-use commercial center on approximately 529 acres. Planning Area No. 1                         DEIR
                                          would contain the mixed-use commercial component with a maximum of 1,000,000
                                          square feet on approximately 100 acres. Planning Area No. 1 will also include a
                                          residential overlay with the potential to include up to 1,000 high-density residential
                                          dwelling units. Planning Area No. 2 would contain the residential component and
                                          include 1,600 dwelling units on approximately 380 acres. Planning Area No. 3
                                          would include a 40-acre plus public park and Planning Area No. 4 would consist of
                                          dedications for a fire station, an electrical substation, and a well site, totaling
                                          approximately 5 acres.
                                          Comment Period: 4/4/06 – 5/18/06                                    Public Hearing: NYD
5RVC060412-04GM                           The proposed project includes development of a mixed-use community with up to                         ND           City of Coachella                   3
Travata Tentative Tract Map               477 residential lots on 135 acres.
31694                                     Comment Period: 4/7/06 – 5/9/06                                     Public Hearing: NYD
5RVC060413-01CB                           This document consists of responses to comments submitted by the AQMD on the                        Other          County of                           4
Fast Tract No. 2004-06, Change            CEQA document for the proposed project. The proposed project includes changing                                     Riverside
of Zone No. 7234, Tentative               the current zoning from industrial park, manufacturing-service commercial, and
Parcel Map No. 32479, Amended             manufacturing-Heavy with a minimum lot size of five acres to industrial park.
No. 1, Tentative Parcel Map No.           Tentative Parcel Map No. 32479 includes a schedule “E” subdivision of 37.69 acres
34178, and Plot Plan No. 19980,           into 10 industrial lots. Tentative Parcel Map No. 34178 includes a Schedule “E”
Amended No. 1                             subdivision of 9.4 acres into two lots for industrial and commercial condominium
                                          purposes. Plot Plan No. 19980 includes a proposal to construct 17 industrial
                                          buildings with office and mezzanine space and one commercial building. The total
                                          development includes 18 buildings totaling approximately 454,262 square feet.
                                          Comment Period: N/A                                                   Public Hearing: N/A
5RVC060413-03CB                           The proposed project includes a funding mechanism for the systematic construction                     ND           County of                           2
Winchester Ranch Infrastructure           of the infrastructure needed to support previously approved development in the                                     Riverside
Community Facilities District             Winchester Valley area of Riverside County.
                                          Comment Period: 4/7/06 – 5/1/06                                     Public Hearing: NYD

                                                                                                            # = Project may have potential environmental justice concerns due to the nature
FEIR - Final Environmental Impact Report                   FONSI - Finding of No Significant Impact             and/or location of the project.
DEIR - Draft Environmental Impact Report                   IS - Initial Study                               * This column reports on the current review and comment status of a document.
SEIR - Subsequent Environmental Impact Report              NOP - Notice of Preparation                        1 = AQMD will comment
DEA - Draft Environmental Assessment                       EIS - Environmental Impact Statement               2 = Document Reviewed - No Comments Sent
RDEIR - Revised Draft Environmental Impact Report          ND - Negative Declaration                          3 = Currently Under Review
SupEIR – Supplemental EIR                                  N/A - Not Applicable                               4 = Document does not require comments (e.g., public notices, plot plans, FEIRs)
Other - Typically notices of public meetings               NYD - Not Yet Determined                           5 = No Review Conducted – No Comments Sent
                                                                                                      A-9
                                                                                ATTACHMENT A
                                                                      INCOMING CEQA DOCUMENTS LOG
                                                                     APRIL 1, 2006 THROUGH APRIL 30, 2006


            TITLE/                                                            PROJECT                                                     TYPE OF                 LEAD                  COMMENT
           DIST. LOG                                                        DESCRIPTION                                                    DOC.                  AGENCY                  STATUS*
5RVC060413-04GM                           The proposed project would consist of development of an existing agricultural                       DEIR           City of San Jacinto                 2
Villages of San Jacinto                   operation into a suburban development including residential, commercial, business
                                          park, public facility and open space uses on 475 acres.
                                          Comment Period: 4/10/06 – 5/24/06                                 Public Hearing: NYD
5RVC060418-04GM                           The proposed project includes subdividing 35.2 acres into 126 single-family                           ND           City of Indio                       2
Brighton Properties                       residential lots.
                                          Comment Period: 3/15/06 – 4/4/06                                  Public Hearing: NYD
5RVC060419-06CB                           This document consists of responses to comments submitted by the AQMD on the                        Other          City of Murrieta                    2
Proposed 2006 Amendment to the            CEQA document for the proposed project. The proposed project includes adding
Redevelopment Plan for the                territory to the area included within the Original Project Area and amending Section
Murrieta Redevelopment Project            602 of the Plan by increasing the limit on the amount of bonded indebtedness which
                                          may be outstanding at one time.
                                          Comment Period: N/A                                                Public Hearing: N/A
5RVC060421-04GM                           The proposed project includes subdivision of a 65-acre parcel into 171 residential                    ND           City of Banning                     3
Tentative Tract Map 33540                 lots, as well as lots for open space, cemetery and flood control.
                                          Comment Period: 4/19/06 – 5/19/06                                 Public Hearing: NYD
5RVC060421-05CB                           The proposed project includes an annexation report, plan for providing services, and                Other          City of Riverside                   2
Planning Case P06-0453 –                  the establishment of appropriate pre-zoning and General Plan designations for
Annexation 107 – Alta Cresta              approximately 340 acres of residential, commercial and vacant land.
Remainder                                 Comment Period: 4/11/06 – 5/11/06                                 Public Hearing: NYD
5RVC060427-06CB                           The proposed project includes construction of 110 age-restricted condo units on a                     ND           City of Temecula                    2
Silver Oaks Tentative Tract Map           7.32-acre site.
and Development Plan                      Comment Period: 4/27/06 – 5/16/06                                 Public Hearing: NYD
5RVC060427-08CB                           The proposed project includes construction of 40.8 acres of residential                            SupEIR          County of                           3
Lake Nuevo Village                        development, 13.4 acres of commercial/mixed uses, 2.2 acres of parks, 4.6 acres of                                 Riverside
                                          natural open space, and 3.6 acres for project roadways.
                                          Comment Period: 4/27/06 – 5/27/06                                 Public Hearing: NYD



                                                                                                            # = Project may have potential environmental justice concerns due to the nature
FEIR - Final Environmental Impact Report                  FONSI - Finding of No Significant Impact              and/or location of the project.
DEIR - Draft Environmental Impact Report                  IS - Initial Study                                * This column reports on the current review and comment status of a document.
SEIR - Subsequent Environmental Impact Report             NOP - Notice of Preparation                         1 = AQMD will comment
DEA - Draft Environmental Assessment                      EIS - Environmental Impact Statement                2 = Document Reviewed - No Comments Sent
RDEIR - Revised Draft Environmental Impact Report         ND - Negative Declaration                           3 = Currently Under Review
SupEIR – Supplemental EIR                                 N/A - Not Applicable                                4 = Document does not require comments (e.g., public notices, plot plans, FEIRs)
Other - Typically notices of public meetings              NYD - Not Yet Determined                            5 = No Review Conducted – No Comments Sent
                                                                                                     A-10
                                                                                ATTACHMENT A
                                                                      INCOMING CEQA DOCUMENTS LOG
                                                                     APRIL 1, 2006 THROUGH APRIL 30, 2006


            TITLE/                                                            PROJECT                                                     TYPE OF                 LEAD                  COMMENT
           DIST. LOG                                                        DESCRIPTION                                                    DOC.                  AGENCY                  STATUS*
5RVC060427-11LI                           The proposed project includes construction of 217 single-family residences, trail                  NOP/IS          City of Beaumont                  1
Tentative Tract Map 31162                 system and open space lots on 130 acres.                                                                                                         Comments
                                                                                                                                                                                           Submitted
                                          Comment Period: 4/20/06 – 5/20/06                                Public Hearing: NYD                                                              4/28/06
5RVC060419-04CB                           The proposed project includes a 10-year plan detailing the management framework                     DEIR           U.S. Dept. of the                 2
Draft Coachella Canal Area                for the conservation, protection, enhancement, development, and use of the natural                                 Interior, Bureau of
Resource Management Plan                  and cultural resources along the Coachella Canal.                                                                  Reclamation
                                          Comment Period: 4/11/06 – 6/2/06                                 Public Hearing: NYD
5SBC060404-10CB                           The proposed project includes a conditional use permit for an acid regeneration                     Other          County of San                       3
P200500524/CUP                            plant on 370.60 acres.                                                                                             Bernardino
                                          Comment Period: 4/4/06 – 3/31/06                                 Public Hearing: NYD
5SBC060407-01GM                           The proposed project includes construction of 430 single-family residential                         DEIR           City of Ontario                     3
Parkside Specific Plan Project            dwelling units and 1,517 multi-family residential units. It also provides for
                                          approximately 12 acres of commercial uses.
                                          Comment Period: 4/11/06 – 5/25/06                                Public Hearing: NYD
5SBC060407-02CB                           The proposed project includes construction of a 140,000 square-foot Home Depot                      DEIR           City of Fontana                     3
Home Depot Retail Center                  and two retail stores totaling approximately 11,000 square feet on 14 acres.
                                          Comment Period: 4/7/06 – 5/22/06                                 Public Hearing: NYD
5SBC060418-09LI                           The proposed project includes guidelines necessary to guide development of the                     NOP/IS          City of Yucaipa                   1
Yucaipa Freeway Corridor                  1,234-acre Yucaipa Freeway Corridor Specific Plan area.                                                                                          Comments
Specific Plan                                                                                                                                                                              Submitted
                                          Comment Period: 4/14/06 – 5/14/06                              Public Hearing: NYD                                                                4/20/06
5SBC060421-06GM                           The proposed project includes construction of 187 single-family detached                            DEIR           City of Colton                    3
Iron Horse Hills Residential              residential units on approximately 119.6 acres.
Project                                   Comment Period: 4/21/06 – 6/5/06                               Public Hearing: NYD
5SBC060427-03                             The proposed project includes construction of 304 single-family detached units on                  NOP/IS          City of Fontana                   1
Monarch Hills Development                 approximately 83.6 acres.                                                                                                                        Comments
                                                                                                                                                                                           Submitted
                                          Comment Period: 4/25/06 – 5/25/06                                   Public Hearing: NYD                                                           4/28/06

                                                                                                            # = Project may have potential environmental justice concerns due to the nature
FEIR - Final Environmental Impact Report                  FONSI - Finding of No Significant Impact              and/or location of the project.
DEIR - Draft Environmental Impact Report                  IS - Initial Study                                * This column reports on the current review and comment status of a document.
SEIR - Subsequent Environmental Impact Report             NOP - Notice of Preparation                         1 = AQMD will comment
DEA - Draft Environmental Assessment                      EIS - Environmental Impact Statement                2 = Document Reviewed - No Comments Sent
RDEIR - Revised Draft Environmental Impact Report         ND - Negative Declaration                           3 = Currently Under Review
SupEIR – Supplemental EIR                                 N/A - Not Applicable                                4 = Document does not require comments (e.g., public notices, plot plans, FEIRs)
Other - Typically notices of public meetings              NYD - Not Yet Determined                            5 = No Review Conducted – No Comments Sent
                                                                                                     A-11
                                                                                ATTACHMENT A
                                                                      INCOMING CEQA DOCUMENTS LOG
                                                                     APRIL 1, 2006 THROUGH APRIL 30, 2006


            TITLE/                                                            PROJECT                                                     TYPE OF                 LEAD                  COMMENT
           DIST. LOG                                                        DESCRIPTION                                                    DOC.                  AGENCY                  STATUS*
                                                              Warehouse/Commercial Projects
6LAC060405-04CB                           The proposed project includes construction of 4.2 million square feet of                            Other          City of Santa                       2
Gate-King Industrial Park                 industrial/commercial uses on 203.2 acres.                                                                         Clarita
                                          Comment Period: 3/31/06 – 5/8/06                               Public Hearing: NYD
6RVC060404-02LI                           The proposed project includes construction of up to two million square feet of light                 NOP           City of Perris                    1
Perris Ridge Commerce Center              industrial warehouse uses and supporting amenities within the approximately 91-                     (no IS                                       Comments
Project                                   acre project site.                                                                                attached)                                      Submitted
                                          Comment Period: 3/31/06 – 5/1/06                               Public Hearing: NYD                                                                4/6/06




                 TOTAL DOCUMENTS RECEIVED THIS REPORTING COMMENT PERIOD: 69




                                                                                                            # = Project may have potential environmental justice concerns due to the nature
FEIR - Final Environmental Impact Report                  FONSI - Finding of No Significant Impact              and/or location of the project.
DEIR - Draft Environmental Impact Report                  IS - Initial Study                                * This column reports on the current review and comment status of a document.
SEIR - Subsequent Environmental Impact Report             NOP - Notice of Preparation                         1 = AQMD will comment
DEA - Draft Environmental Assessment                      EIS - Environmental Impact Statement                2 = Document Reviewed - No Comments Sent
RDEIR - Revised Draft Environmental Impact Report         ND - Negative Declaration                           3 = Currently Under Review
SupEIR – Supplemental EIR                                 N/A - Not Applicable                                4 = Document does not require comments (e.g., public notices, plot plans, FEIRs)
Other - Typically notices of public meetings              NYD - Not Yet Determined                            5 = No Review Conducted – No Comments Sent
                                                                                                     A-12
                                                                       ATTACHMENT B
                                                         ONGOING ACTIVE PROJECTS FOR WHICH AQMD HAS
                                                               OR WILL CONDUCT A CEQA REVIEW

            TITLE/                                                            PROJECT                                                    TYPE OF                  LEAD                 COMMENT
           DIST. LOG                                                        DESCRIPTION                                                   DOC.                   AGENCY                 STATUS*
                                                           Goods Movement/Intermodal Projects
                                          No projects received.
                                                                         Education Projects
2LAC060310-02CB                           The proposed project includes reuse of a 75,000 square-foot building, on an                          ND           City of Huntington                  3
Pacific Charter School                    approximately 3-acre parcel.                                                                                      Park
Development                               Comment Period: 3/13/06 – 4/13/06                                Public Hearing: NYD
2ORC060317-01CB                           The proposed project includes construction of a 133,400 square-foot Social &                         ND           University of                       2
Social & Behavioral Sciences              Behavioral Sciences building.                                                                                     California, Irvine
Building                                  Comment Period: 3/17/06 – 4/15/06                                Public Hearing: NYD
2ORC060328-04CB                           The proposed project includes construction of a new education center and a new K-                    ND           Irvine Unified                      2
Creekside Education Center and            12 expansion facility totaling 81,000 square feet.                                                                School District
K-12 Expansion Facility                   Comment Period: 3/26/06 – 4/26/06                                Public Hearing: NYD
2RVC060310-04GM                           The proposed project includes demolition of three existing school buildings and                      ND           San Jacinto Unified                 2
San Jacinto High School                   construction of two new two-story classroom buildings and a new gymnasium. In                                     School District
Expansion #2                              addition, a 1,085 square-foot addition is proposed to the school’s existing
                                          gym/weight/wrestling room and six additional temporary modular classroom
                                          buildings would be installed.
                                          Comment Period: 3/10/06 – 4/10/06                             Public Hearing: 4/11/06
                                                              Solid Waste/Wastewater Projects
3ORC060310-01GM                           The proposed project includes designing and constructing mechanical, electrical,                     ND           Orange County                       2
MacArthur Pump Station                    instrumentation and controls, structural, and architectural improvements to bring                                 Sanitation District
Rehabilitation Project                    the existing facility into compliance with Sanitation District standards and local,
                                          state, and national codes.
                                          Comment Period: 3/10/06 – 4/12/06                                 Public Hearing: NYD
3RVC060308-04GM                           The proposed project includes renovating and expanding certain portions of the                       ND           Valley Sanitary                     2
Valley Sanitary District                  existing wastewater treatment facility to accommodate residential and commercial                                  District
Wastewater Treatment Plant                growth.
Expansion                                 Comment Period: 3/3/06 – 4/2/06                                   Public Hearing: NYD

                                                                                                           # = Project may have potential environmental justice concerns due to the nature
FEIR - Final Environmental Impact Report                  FONSI - Finding of No Significant Impact             and/or location of the project.
DEIR - Draft Environmental Impact Report                  IS - Initial Study                               * This column reports on the current review and comment status of a document.
SEIR - Subsequent Environmental Impact Report             NOP - Notice of Preparation                        1 = AQMD will comment
DEA - Draft Environmental Assessment                      EIS - Environmental Impact Statement               2 = Document Reviewed - No Comments Sent
RDEIR - Revised Draft Environmental Impact Report         ND - Negative Declaration                          3 = Currently Under Review
SupEIR – Supplemental EIR                                 N/A - Not Applicable                               4 = Document does not require comments (e.g., public notices, plot plans, FEIRs)
Other - Typically notices of public meetings              NYD - Not Yet Determined                           5 = No Review Conducted – No Comments Sent
                                                                                                     B-1
                                                                       ATTACHMENT B
                                                         ONGOING ACTIVE PROJECTS FOR WHICH AQMD HAS
                                                               OR WILL CONDUCT A CEQA REVIEW

            TITLE/                                                             PROJECT                                                    TYPE OF                  LEAD                 COMMENT
           DIST. LOG                                                         DESCRIPTION                                                   DOC.                   AGENCY                 STATUS*
                                                                            Airport Projects
                                          No projects received.
                                                                    General Land Use Projects
5LAC060301-05GM                  The proposed project includes construction of a 937,000 square-foot office                                   DEIR           US General                        1
Los Angeles FBI Federal Building building, plus a secure parking garage with 1,200 parking stalls.                                                           Services                      Comments
                                                                                                                                                             Administration,               Submitted
                                          Comment Period: 2/24/06 – 4/24/06                              Public Hearing: NYD                                 Region 9                       4/26/06
5LAC060301-06CB                           The proposed project includes subdividing 52.6 acres into 20 single-family lots.                      ND           County of Los                     2
TR062921/RENVT200500133/                                                                                                                                     Angeles
RCUPT200500119                            Comment Period: 2/27/06 – 3/27/06                                 Public Hearing: NYD
5LAC060302-01GM                           The proposed project includes demolition of an existing gas station building with                     ND           City of Rancho                      2
7-Eleven Convenience Store and            service bays and construction of a new 2,754 square-foot 7-Eleven convenience                                      Palos Verdes
Gas Station                               store building.
                                          Comment Period: 3/1/06 – 3/28/06                                Public Hearing: 3/28/06
5LAC060314-03CB                           The proposed project includes construction of 32,000 square feet of retail space,                     ND           City of Temple City                 2
Piazza Las Tunas Project                  65,600 square feet of “specialty” retail space, 19,000 square feet of quality
                                          restaurant space, an 8,000 square-foot banquet hall, for a total of 124,600 square
                                          feet. In addition, the mixed-use development would have 58 residential units.
                                          Comment Period: 3/10/06 – 4/10/06                                 Public Hearing: NYD
5LAC060314-04GM                           The proposed project will necessitate the acquisition of 11 parcels and the                         DEIR           City of La Mirada                   2
Alondra Center North                      demolition of the existing commercial uses. The proposed project includes
Redevelopment Project                     development of 44 single-family detached residential dwelling units.
                                          Comment Period: 3/15/06 – 4/28/06                                 Public Hearing: NYD
5LAC060321-01GM                           The proposed project includes subdividing a single lot into three separate parcels                    ND           City of La Puente                   2
Tentative Parcel Map 26641                for future development of two additional single-family dwelling units.
                                          Comment Period: 3/16/06 – 4/4/06                                  Public Hearing: NYD




                                                                                                            # = Project may have potential environmental justice concerns due to the nature
FEIR - Final Environmental Impact Report                   FONSI - Finding of No Significant Impact             and/or location of the project.
DEIR - Draft Environmental Impact Report                   IS - Initial Study                               * This column reports on the current review and comment status of a document.
SEIR - Subsequent Environmental Impact Report              NOP - Notice of Preparation                        1 = AQMD will comment
DEA - Draft Environmental Assessment                       EIS - Environmental Impact Statement               2 = Document Reviewed - No Comments Sent
RDEIR - Revised Draft Environmental Impact Report          ND - Negative Declaration                          3 = Currently Under Review
SupEIR – Supplemental EIR                                  N/A - Not Applicable                               4 = Document does not require comments (e.g., public notices, plot plans, FEIRs)
Other - Typically notices of public meetings               NYD - Not Yet Determined                           5 = No Review Conducted – No Comments Sent
                                                                                                      B-2
                                                                       ATTACHMENT B
                                                         ONGOING ACTIVE PROJECTS FOR WHICH AQMD HAS
                                                               OR WILL CONDUCT A CEQA REVIEW

            TITLE/                                                            PROJECT                                                    TYPE OF                  LEAD                 COMMENT
           DIST. LOG                                                        DESCRIPTION                                                   DOC.                   AGENCY                 STATUS*
5LAC060322-03CB                           The proposed project includes adoption of these two amendments and would                             ND           City of Whittier                    2
Amendments to the                         reinstitute the Whittier Redevelopment Agency’s eminent domain authority in the
Redevelopment Plans for the               select portions of the project areas.
Greenleaf Avenue/Uptown and
Whittier Boulevard Project Areas          Comment Period: 3/22/06 – 4/11/06                               Public Hearing: 5/9/06
5LAC060322-07GM                           The proposed project includes development of the 6.45-acre site currently used as a                  ND           City of West                        2
Tract Map No. 62346, Precise              dairy and a commercial storage facility with a 58-unit, industrial condominium                                    Covina
Plan No. 05-20, Conditional Use           development and a 145,500 square-foot public storage facility.
Permit No. 05-24                          Comment Period: 3/22/06 – 4/11/06                                Public Hearing: NYD
5LAC060328-03GM                           The proposed project includes construction of a 34,000 square-foot Sheriff’s Station                 ND           County of Los                       2
Athens Sheriff’s Station,                 with a 5,000 square-foot service building, an 800 square-foot car wash facility, a                                Angeles
Centinela Area Probation Office           new 30,000 square-foot Probation Office building with a 5,000 square-foot
Replacement, and New County               Building and Safety Office building, and a two-story approximately 60,000 square-
Building                                  foot Administration building.
                                          Comment Period: 3/27/06 – 4/27/06                                Public Hearing: NYD
5LAC060328-07CB                           The proposed project includes construction of a 47,797 square-foot two-story                         ND           City of Agoura                      2
Center Court Plaza                        medical office building on 3.2 acres.                                                                             Hills
                                          Comment Period: 3/31/06 – 5/1/06                                 Public Hearing: NYD
5ODP060323-01CB                           The proposed project includes installation and operation of a floating storage and                Revised         California State                    3
Cabrillo Port Liquefied Natural           regasification unit (FSRU), installation and operation of two 24-inch natural gas                  DEIR           Lands Commission
Gas Deepwater Port                        pipelines, 22.77 statute miles in length, from the FSRU to the Reliant Energy
                                          facility at Ormond Beach, and construction and operation of two onshore natural
                                          gas pipelines and related facilities.
                                          Comment Period: 3/13/06 – 4/28/06                       Public Hearing: 4/17,18,19/06
5ORC060310-08CB                           The proposed project includes reuse of 23.95 acres of land currently occupied by                   DEIR           City of Buena Park                1
Nabisco Reuse Project                     the Nabisco Foods Processing Plant. The plant has ceased active operations and                                                                  Comments
                                          will be demolished to provide for a range of commercial/retail redevelopment.                                                                   Submitted
                                          Comment Period: 3/6/06 – 4/21/06                                 Public Hearing: NYD                                                             4/21/06



                                                                                                           # = Project may have potential environmental justice concerns due to the nature
FEIR - Final Environmental Impact Report                  FONSI - Finding of No Significant Impact             and/or location of the project.
DEIR - Draft Environmental Impact Report                  IS - Initial Study                               * This column reports on the current review and comment status of a document.
SEIR - Subsequent Environmental Impact Report             NOP - Notice of Preparation                        1 = AQMD will comment
DEA - Draft Environmental Assessment                      EIS - Environmental Impact Statement               2 = Document Reviewed - No Comments Sent
RDEIR - Revised Draft Environmental Impact Report         ND - Negative Declaration                          3 = Currently Under Review
SupEIR – Supplemental EIR                                 N/A - Not Applicable                               4 = Document does not require comments (e.g., public notices, plot plans, FEIRs)
Other - Typically notices of public meetings              NYD - Not Yet Determined                           5 = No Review Conducted – No Comments Sent
                                                                                                     B-3
                                                                  ATTACHMENT B
                                                    ONGOING ACTIVE PROJECTS FOR WHICH AQMD HAS
                                                          OR WILL CONDUCT A CEQA REVIEW

            TITLE/                                                       PROJECT                                                    TYPE OF                  LEAD                 COMMENT
           DIST. LOG                                                   DESCRIPTION                                                   DOC.                   AGENCY                 STATUS*
5ORC060324-01CB                  The proposed project includes construction of a water well facility housed in a                          ND           City of Tustin                      2
Pasadena Avenue Well Site        1,450 square-foot structure with a paved service yard and surrounded by landscaped
                                 grounds.
                                 Comment Period: 3/23/06 – 4/24/06                                 Public Hearing: NYD
5RVC060303-03CB                  The original Ramsgate Specific Plan was adopted by the Lake Elsinore City                                ND           City of Lake                        2
Tuscany West Tentative Tract No. Council in June 1984. The proposed project updates the previously approved                                            Elsinore
25473, Revision No. 1            subdivision by proposing grading and construction for 164 single-family residential
                                 lots, eight open space lots, three water quality basins and water tank site, all on 58.7
                                 acres. The remaining portions of the original map site were either purchased by or
                                 donated to Riverside County for conservation purposes.
                                 Comment Period: 3/3/06 – 4/2/06                                   Public Hearing: NYD
5RVC060307-01GM                  The proposed project includes development of 7.3 acres into a multi-family housing                       ND           City of Lake                        2
CUP No. 2005-10, – Multi-        development. The development will consist of 46 buildings with a total of 92 units.                                   Elsinore
Family No. 2005-11, Tentative
Tract Map No. 33820, and The
Lakeshore Drive Pedestrian
Bridge                           Comment Period: 3/3/06 – 4/3/06                                   Public Hearing: NYD
5RVC060308-02GM                  The proposed project includes construction of approximately 283 single-family                            ND           City of San Jacinto                 2
Rancho Estrella Specific Plan    residences on 81.6 acres.
                                 Comment Period: 3/8/06 – 4/7/06                                   Public Hearing: NYD
5RVC060314-01GM                  The proposed project includes development of 105 residential lots on 72 acres; 36.1                      ND           City of Lake                        3
Design Review – Tentative Tract  acres will be left as open space.                                                                                     Elsinore
Map No. 33140                    Comment Period: 3/10/06 – 4/10/06                                 Public Hearing: NYD
5RVC060321-02CB                  The proposed project consists of a Planned Development District to establish a site                      ND           City of Palm                        2
Smoke Tree Ranch Cottages        plan, design standards and guidelines, and a Tentative Tract Map for the phased                                       Springs
                                 subdivision of a 41.22-acre parcel into a 21.05-acre area with 49 residential lots
                                 with 52 cottages and private streets. The proposed project would include the
                                 remainder of the 41.22-acre parcel from the subdivision.
                                 Comment Period: 3/18/06 – 3/27/06                                 Public Hearing: NYD


                                                                                                      # = Project may have potential environmental justice concerns due to the nature
FEIR - Final Environmental Impact Report             FONSI - Finding of No Significant Impact             and/or location of the project.
DEIR - Draft Environmental Impact Report             IS - Initial Study                               * This column reports on the current review and comment status of a document.
SEIR - Subsequent Environmental Impact Report        NOP - Notice of Preparation                        1 = AQMD will comment
DEA - Draft Environmental Assessment                 EIS - Environmental Impact Statement               2 = Document Reviewed - No Comments Sent
RDEIR - Revised Draft Environmental Impact Report    ND - Negative Declaration                          3 = Currently Under Review
SupEIR – Supplemental EIR                            N/A - Not Applicable                               4 = Document does not require comments (e.g., public notices, plot plans, FEIRs)
Other - Typically notices of public meetings         NYD - Not Yet Determined                           5 = No Review Conducted – No Comments Sent
                                                                                                B-4
                                                                       ATTACHMENT B
                                                         ONGOING ACTIVE PROJECTS FOR WHICH AQMD HAS
                                                               OR WILL CONDUCT A CEQA REVIEW

            TITLE/                                                            PROJECT                                                    TYPE OF                  LEAD                 COMMENT
           DIST. LOG                                                        DESCRIPTION                                                   DOC.                   AGENCY                 STATUS*
5RVC060322-02GM                           The proposed project consists of widening the bridge from a two lane to six lane                     ND           City of Palm                        2
Gene Autry Trail Bridge                   bridge with the construction occurring on the east side of the existing structure.                                Springs
Widening Project                          Comment Period: 3/25/06 – 4/24/06                                Public Hearing: NYD
5RVC060323-03GM                           The proposed project includes construction of 71 buildings with a total of 213                       ND           City of Temecula                    2
Planning Application No. PA-05-           individually owned single-family attached units.
0167, Rancho Highlands II
(Maravilla)                               Comment Period: 3/28/06 – 4/16/06                                  Public Hearing: NYD
5RVC060328-02CB                           The proposed project includes relocating the existing unsignalized main entrance to                  ND           City of Canyon                      2
Skylink Drive Extension Project           the golf course from its current location to a location 1,500 feet west of Canyon                                 Lake
                                          Lake Drive South and approximately 700 feet northeast of the signalized
                                          intersection of Skylink Drive.
                                          Comment Period: 3/24/06 – 4/25/06                                  Public Hearing: NYD
5RVC060328-06GM                           The objectives of the proposed project are to: 1) ensure reliable access to the                    DEIR           Metropolitan Water                  2
Lake Perris Pollution Prevention          existing 65,000 acre-feet of flexible storage of water in Lake Perris; 2) enhance                                 District of Southern
and Source Protection Program             dissolved oxygen levels; 3) reduce risk of waterborne pathogens by preventative                                   California
                                          measures within Lake Perris watershed; and 4) maintain recreational opportunities.
                                          Comment Period: 3/27/06 – 5/10/06                                  Public Hearing: NYD
5RVC060329-01GM                           The proposed project includes subdividing 17.99 acres into 6 commercial lots.                        ND           City of Temecula                    2
Planning Application No. PA05-
0004, Selby Parcel Map 32924              Comment Period: 3/27/06 – 4/27/06                                Public Hearing: NYD
5SBC060308-01CB                           The proposed project includes construction of a new bridge and removes the                         DEIR           California                          3
Big Bear Lake Bridge                      existing bridge, located on top of Big Bear Dam.                                                                  Department of
Replacement Project                       Comment Period: 3/10/06 – 4/10/06                                Public Hearing: NYD                              Transportation
5SBC060308-03CB                           The proposed project includes construction of a 5,808 square-foot concrete                           ND           City of Colton                      2
File Index No. DAP-000-504                industrial and office building. The industrial use will comprise 5,328 square feet of
                                          the building and will provide seven units and bays.
                                          Comment Period: 3/7/06 – 3/27/06                                 Public Hearing: NYD




                                                                                                           # = Project may have potential environmental justice concerns due to the nature
FEIR - Final Environmental Impact Report                  FONSI - Finding of No Significant Impact             and/or location of the project.
DEIR - Draft Environmental Impact Report                  IS - Initial Study                               * This column reports on the current review and comment status of a document.
SEIR - Subsequent Environmental Impact Report             NOP - Notice of Preparation                        1 = AQMD will comment
DEA - Draft Environmental Assessment                      EIS - Environmental Impact Statement               2 = Document Reviewed - No Comments Sent
RDEIR - Revised Draft Environmental Impact Report         ND - Negative Declaration                          3 = Currently Under Review
SupEIR – Supplemental EIR                                 N/A - Not Applicable                               4 = Document does not require comments (e.g., public notices, plot plans, FEIRs)
Other - Typically notices of public meetings              NYD - Not Yet Determined                           5 = No Review Conducted – No Comments Sent
                                                                                                     B-5
                                                                       ATTACHMENT B
                                                         ONGOING ACTIVE PROJECTS FOR WHICH AQMD HAS
                                                               OR WILL CONDUCT A CEQA REVIEW

            TITLE/                                                            PROJECT                                                    TYPE OF                  LEAD                 COMMENT
           DIST. LOG                                                        DESCRIPTION                                                   DOC.                   AGENCY                 STATUS*
5SBC060308-05CB                           The proposed project includes a conditional use permit to allow: 1) the installation              Revised         City of Colton                      2
Pacific Rail Industries Metal             and operation of a metal shredding operation as an expansion of a scrap metal                      DEIR
Shredding Operation                       recycling facility; and 2) an increase in the volume of transloading on the project
                                          site. The metal shredder would be relocated from an existing facility in Carson to
                                          the City of Colton where it would shred raw metal sources and separate metal and
                                          non-metal material by physical and chemical means. Transloading would increase
                                          from 25,100 tons to 37,620 tons per month.
                                          Comment Period: 3/10/06 – 4/24/06                                Public Hearing: NYD
5SBC060310-07GM                           The proposed project includes construction of a four-lane highway from Valley                        ND           California Dept. of                 2
Cypress Avenue Overcrossing               Boulevard on the north to Slover Avenue on the south.                                                             Transportation,
Project                                                                                                                                                     Federal Highway
                                          Comment Period: 1/31/06 – 3/2/06                                  Public Hearing: NYD                             Administration
5SBC060322-04GM                           The proposed project includes construction of a new ARCO gasoline station with a                     ND           City of Loma Linda                  2
ARCO AM/PM                                10-fuel dispenser; a 3,000 square-foot canopy, a 3,600 square-foot convenience
                                          store, 980 square-foot automatic self-service carwash, three underground fuel
                                          storage tanks, a 3,000 square-foot fast food restaurant with drive-thru, and two
                                          separate retail stores totaling 11,380 square feet.
                                          Comment Period: 3/16/06 – 4/4/06                                  Public Hearing: NYD
5SBC060323-02CB                           The proposed project consists of the demolition of structures currently existing on-               DEIR           City of Redlands                    2
Redlands Promenade                        site and the construction of a retail shopping center on the approximately 14.27-acre
                                          site. The retail center includes a total of up to 160,000 square feet of retail space
                                          comprising two major tenant stores, two secondary major tenant stores, five shop
                                          buildings, and a sit-down restaurant.
                                          Comment Period: 3/27/06 – 5/10/06                                 Public Hearing: NYD
5SBC06322-05GM                            The proposed project includes demolition of two existing residential structures with                 ND           City of Loma Linda                  2
Precise Plan of Design No. 06-02          an adjoining accessory building in order to construct a new 42,000 square-foot
(Loma Linda University                    three-story student apartment building with an underground parking garage.
Apartments)                               Comment Period: 3/16/06 – 4/4/06                                  Public Hearing: NYD
                                                              Warehouse/Commercial Projects
                                          No projects received.
                                                                                                           # = Project may have potential environmental justice concerns due to the nature
FEIR - Final Environmental Impact Report                  FONSI - Finding of No Significant Impact             and/or location of the project.
DEIR - Draft Environmental Impact Report                  IS - Initial Study                               * This column reports on the current review and comment status of a document.
SEIR - Subsequent Environmental Impact Report             NOP - Notice of Preparation                        1 = AQMD will comment
DEA - Draft Environmental Assessment                      EIS - Environmental Impact Statement               2 = Document Reviewed - No Comments Sent
RDEIR - Revised Draft Environmental Impact Report         ND - Negative Declaration                          3 = Currently Under Review
SupEIR – Supplemental EIR                                 N/A - Not Applicable                               4 = Document does not require comments (e.g., public notices, plot plans, FEIRs)
Other - Typically notices of public meetings              NYD - Not Yet Determined                           5 = No Review Conducted – No Comments Sent
                                                                                                     B-6
                                                                  ATTACHMENT B
                                                    ONGOING ACTIVE PROJECTS FOR WHICH AQMD HAS
                                                          OR WILL CONDUCT A CEQA REVIEW


                             TOTAL NUMBER OF REQUESTS TO AQMD FOR DOCUMENT REVIEW: 0
                         TOTAL NUMBER OF COMMENT LETTERS SENT OUT THIS REPORTING PERIOD: 22
                         TOTAL NUMBER OF DOCUMENTS REVIEWED, BUT NO COMMENTS WERE SENT: 51
                               TOTAL NUMBER OF DOCUMENTS CURRENTLY UNDER REVIEW: 28
                            TOTAL NUMBER OF DOCUMENTS THAT DO NOT REQUIRE COMMENTS: 4
                                TOTAL NUMBER OF DOCUMENTS THAT WERE NOT REVIEWED: 0




                                                                                                     # = Project may have potential environmental justice concerns due to the nature
FEIR - Final Environmental Impact Report            FONSI - Finding of No Significant Impact             and/or location of the project.
DEIR - Draft Environmental Impact Report            IS - Initial Study                               * This column reports on the current review and comment status of a document.
SEIR - Subsequent Environmental Impact Report       NOP - Notice of Preparation                        1 = AQMD will comment
DEA - Draft Environmental Assessment                EIS - Environmental Impact Statement               2 = Document Reviewed - No Comments Sent
RDEIR - Revised Draft Environmental Impact Report   ND - Negative Declaration                          3 = Currently Under Review
SupEIR – Supplemental EIR                           N/A - Not Applicable                               4 = Document does not require comments (e.g., public notices, plot plans, FEIRs)
Other - Typically notices of public meetings        NYD - Not Yet Determined                           5 = No Review Conducted – No Comments Sent
                                                                                               B-7
                                                               ATTACHMENT C
                                                     ACTIVE AQMD LEAD AGENCY PROJECTS
                                                            THROUGH APRIL 30, 2006
                                 Project                                         Project                 Type of                      Status                Consultant
                               Description                                     Proponent                Document
California Cascade is a commercial business of pressure treating         California Cascade       Negative Declaration        Final Negative           ENGEO, Inc.
lumber for retail sales. The proposed project is to convert the wood     Fontana Inc.                                         Declaration certified
treating process from using chromium and arsenic based chemical                                                               April 4, 2006.
solutions to using copper-based and ammonia based chemicals.
BP is proposing upgrades at its Carson Refinery to comply with           BP                       Environmental Impact        Notice of                Environmental Audit,
SCAQMD Rule 1105.1 and improve reliability and safety of the FCC,                                 Report                      Preparation/Initial      Inc.
Alkylation Unit, Sulfur Plant, etc.                                                                                           Study close of
                                                                                                                              comments December
                                                                                                                              9, 2005. SCAQMD
                                                                                                                              reviewing
                                                                                                                              administrative draft
                                                                                                                              EIR.
Chevron Texaco is proposing modifications at its El Segundo Refinery Chevron Texaco             Environmental Impact          Draft EIR circulated     ENSR
to allow it to process heavier, higher residuum (residue) composition                           Report                        for 45-day public
crude supplies. Modifications are also proposed for the cokes unit to                                                         review period on April
improve reliability.                                                                                                          25, 2006.
Paramount Petroleum Refinery operators are considering SCR systems Paramount Petroleum          Negative Declaration          Consultant preparing     Environmental Audit,
upgrades. One option is to install a new SCR on existing heater.      Refinery                                                administrative draft     Inc.
Option two involves upgrading an existing SCR that services four                                                              Initial Study
existing heaters.
Operators at the Shell (formerly Equilon) Los Angeles Refinery are    Shell Oil Products        Negative Declaration          Final Negative           Environmental Audit,
proposing modification of the Fluid Catalytic Cracking Unit to comply U.S.                                                    Declaration certified    Inc.
with SCAQMD Rule 1105.1. The old electrostatic precipitators (ESPs)                                                           April 27, 2006.
will be replaced with new ESPs.
Operators at the ExxonMobil are preparing to install particulate      ExxonMobil                Not yet determined            Consultant preparing     URS Corporation
controls to comply with AQMD Rule 1105.1 Reduction of PM10 and                                                                Initial Study
Ammonia Emissions from Fluid Catalytic Cracking Units.
A shaded row indicates a new project.
# = AQMD was contacted regarding potential environmental justice concerns due to the nature and/or location of the project.

								
To top