April 29, 1994
FORM OF TENDER SCHEDULE OF ITEMS AND PRICES FT-4
Item Estimated
Description Unit Unit Price Total
No. Quantity
PART 1 - HIGHBURY AVENUE CHANNELIZATION ROADWORKS
1.1 SP Clear and grub work area L.S. 1.0 $0.00
1.2 SP Remove and dispose of existing 375 m. 10.0 $0.00
CSP culvert
1.3 SP Strip/stockpile topsoil m3 1500.0 $0.00
1.4 SP Excavation m3 2000.0 $0.00
1.5 SP Place and compact imported t. 1000.0 $0.00
SR Granular C fill
1.6 SP Fine grading of subgrade m2 4000.0 $0.00
1.7 SP Subexcavation m3 250.0 $0.00
1.8 SP Supply, place and compact granular
SR subbase
a) Granular A t. 2000.0 $0.00
b) Granular B t. 5000.0 $0.00
1.9 SP Supply, place and compact asphalt
SR a) HL-8 binder t. 300.0 $0.00
b) HL-3 surface t. 200.0 $0.00
1.10 SP, SR Milling (SR-13.0) m. 700.0 $0.00
1.11 SP Topsoil ditches m2 4500.0 $0.00
SR
1.12 SP Hydroseed ditches c/w bonded fibre m2 4500.0 $0.00
SR matrix
1.13 SP Remove existing line markings m 350.0 $0.00
1.14 SP Remove existing centreline ea 30.0 $0.00
reflectors
1.15 SP Temporary centreline reflectors ea. 45.0 $0.00
$0.00
April 29, 1994
FORM OF TENDER SCHEDULE OF ITEMS AND PRICES FT-5
Item Estimated
Description Unit Unit Price Total
No. Quantity
$0.00
1.16 SP Permanent line markings
SR a) 100 mm wide m. 1500.0 $0.00
b) turn arrow ea. 3.0 $0.00
1.17 SP Strawbale filters ea. 10.0 $0.00
1.18 SP Supply and install 450 mm dia. m. 45.0 $0.00
SW culverts
1.19 SP Adjust existing valve box grade ea. 1.0 $0.00
SW
1.20 SP Adjust existing manhole frame and ea. 1.0 $0.00
SW cover to grade
1.21 SP Remove and relocate existing traffic ea. 1.0 $0.00
SR sign
1.22 SP Granular shoulder rounding sealant m2 500.0 $0.00
SR
TOTAL PART 1 - HIGHBURY AVENUE CHANNELIZATION ROADWORKS $0.00
PART 2 - WATERMAIN CROSSING
2.1 SP Sawcut, remove and dispose of m2 150.0 $0.00
asphalt
2.2 SP Sheet piling removal m2 70.0 $0.00
2.3 SP Expose and connect to existing 1050 ea. 2.0 $0.00
SW mm bulkheads
2.4 SP Supply and install 1050 mm dia.
SW watermains
a) shop drawings L.S. 1.0 $0.00
b) watermain material L.S. 1.0 $0.00
c) installation m. 46.0 $0.00
2.5 SP Supply and install 1050 mm dia.
SW bulkheads c/w blowoffs
a) shop drawings L.S. 1.0 $0.00
b) watermain material L.S. 1.0 $0.00
c) installation ea. 2.0 $0.00
$0.00
April 29, 1994
FORM OF TENDER SCHEDULE OF ITEMS AND PRICES FT-6
Item Estimated
Description Unit Unit Price Total
No. Quantity
$0.00
2.6 SP Supply, place and compact granular
SR subbase
a) Granular B t. 200.0 $0.00
b) Granular A t. 90.0 $0.00
2.7 SP Supply, place and compact asphalt
SR a) HL-8 binder t. 60.0 $0.00
b) HL-3 surface t. 35.0 $0.00
2.8 SP, SR Milling m. 32.0 $0.00
2.9 SP Swabbing, testing, flushing, L.S. 1 $0.00
SW disinfection, etc.
2.10 SP Trench subexcavation m3 100.0 $0.00
2.11 SP, SW Crushed stone bedding t 250.0 $0.00
2.12 SP Geotextile surround m2 400.0 $0.00
TOTAL PART 2 - WATERMAIN CROSSING $0.00
PART 3 - STORM SEWERS
3.1 SP Supply and install 300 mm dia. SDR
SW 35 PVC c/w Type 1 bedding
a) plug to STMH 1 m. 7.0 $0.00
b) STMH 1 to STMH 2 m. 100.0 $0.00
c) STMH 2 to STMH 3 m. 55.0 $0.00
d) STMH 3 to STMH 4 m. 79.0 $0.00
e) STMH 4 to outlet m. 3.0 $0.00
3.2 SP Supply and install 1200 mm dia.
SW precast manholes
a) STMH 1 (c/w flap gate) L.S. 1.0 $0.00
b) STMH 2 L.S. 1.0 $0.00
c) STMH 3 L.S. 1.0 $0.00
d) STMH 4 L.S. 1.0 $0.00
3.3 SP Video Inspection m 244.0 $0.00
SW
$0.00
April 29, 1994
FORM OF TENDER SCHEDULE OF ITEMS AND PRICES FT-7
Item Estimated
Description Unit Unit Price Total
No. Quantity
$0.00
3.4 SP Strip/stockpile topsoil 3 500.0 $0.00
m
3.5 SP Supply, place and compact granular
SR subbase
a) Granular A t. 250.0 $0.00
b) Granular B t. 500.0 $0.00
3.6 SP Topsoil ditches m2 1700.0 $0.00
SR
3.7 SP Hydroseed ditches c/w bonded fibre m2 1700.0 $0.00
SR matrix
3.8 SP Remove and relocate existing traffic ea. 4.0 $0.00
SR markers
3.9 SP Granular shoulder rounding sealant m2 150.0 $0.00
SR
3.10 SP Trench subexcavation m3 70.0 $0.00
3.11 SP, SW Crushed stone bedding t 150.0 $0.00
3.12 SP Geotextile surround m2 300.0 $0.00
TOTAL PART 3 - STORM SEWERS $0.00
PART 4 - PERL DRAIN WORKS (AS PER SPRIET ASSOCIATES DRAWINGS)
4.1 SP Construct grassed waterway L.S. 1 $0.00
(chainage 0+077 to 0+346
on east side of Highbury Avenue,
south of Southeast Reservoir
Pumping Station site)
4.2 SP Spread topsoil and seed grassed L.S. 1 $0.00
waterway (chainage 0+077 to 0+346
on east side of Highbury Avenue,
south of Southeast Reservoir
Pumping Station site)
TOTAL PART 4 - PERL DRAIN WORKS $0.00
April 29, 1994
FORM OF TENDER SCHEDULE OF ITEMS AND PRICES FT-8
Item Estimated
Description Unit Unit Price Total
No. Quantity
PART 5 - MISCELLANEOUS
5.1 SP Install City project sign boards ea. 2.0 $0.00
5.2 SP Bonds
a) Labour and materials L.S. 1.0 $0.00
b) Maintenance L.S. 1.0 $0.00
5.3 SP Traffic control plan / L.S. 1.0 $0.00
implementation
5.4 SP Dust Control
a) mechanical sweeping hr. 20.0 $0.00
b) calcium chloride flakes ea. 100.0 $0.00
(25 kg bag)
5.5 SP Offsite disposal of excess/unsuitable m3 1200.0 $0.00
excavated material
5.6 SP Message sign boards ea. 2.0 $0.00
5.7 SP Supply and install 75mm dia. PVC m. 22.0 $0.00
Bell conduit
TOTAL PART 5 - MISCELLANEOUS $0.00