Revised Proposal Summary
Pages 1 – 3 provided with Addendum #1
to replace pages PS1 – PS2
September 18, 2007
NOTICE: No substitution or revision to this Proposal Summary form will be accepted. Truckee Meadows Water
Authority will reject any Bid that is received that has changes or alterations to this document. Although
the Prevailing Wages are provided in this bid document, the bidder is responsible to verify with the Labor
Commissioner if any addendums have been issued. If different, the successful bidder will be required to
provide the current Prevailing Wages used in preparation of their bid within 24 hours of bid submission.
BID # 0708-053
BID TITLE: Hawkings Court Well
PRICES must be valid for 30 calendar days after the bid opening.
A COPY OF THE "CERTIFICATE" of eligibility to receive a preference in bidding on public works issued to him/her
by the State Contractors' Board must be submitted with his/her bid to the Contracts Division in accordance with N.R.S.
338.147 for the preference to be considered. This Statute does not apply to projects expected to cost less than $250,000.
COMPLETION of this project is expected PURSUANT TO CONTRACT DOCUMENTS.
BIDDER acknowledges receipt of _______ Addendums.
______________________________________________
(signature)
SUMMARY
Description Scheduled Unit Total
Value Unit Price Price
1. Mobilization, Bonds, and Insurance 1 LS Lump Sum
(see Note 3 below).
2. Demobilization and Cleanup. 1 LS Lump Sum
3. Sitework including, but not limited 1 LS Lump Sum
to, demolition, clearing and grubbing,
excavation, structural fill, grading,
rock slope protection, drain piping,
manholes, vaults, air gap tank,
equipment pads, sidewalk, aggregate
base, asphalt concrete, and surface
restoration.
4. Fences and gate including, but not 1 LS Lump Sum
limited to, concrete post footings,
View fence with metal posts, rails,
and pickets, Privacy gate and fence
with metal posts, HSS gate posts and
frame, wood rails and boards, clear
waterproofing sealer, fabricated latch,
and hardware.
Addendum #1 – Revised Proposal Summary Page 1 of 3
Description Scheduled Unit Total
Value Unit Price Price
5. Landscaping and irrigation 1 LS Lump Sum
including, but not limited to, trees,
shrubs, boulders, river rock, weed
barrier, piping, valves, backflow
prevention device, and irrigation
controller.
6. Pump station structure including, 1 LS Lump Sum
but not limited to, reinforced concrete
footings and slab, pump foundation,
CMU building, pre-engineered
trusses, roofing, rough and finish
carpentry, stucco finish, doors and
door hardware, roof hatch, and
painting.
7. Vertical turbine pump and motor, 1 LS Lump Sum
including but not limited to, 3000 gpm
pump, 400 HP motor, and installation
in the well casing.
8. Piping and pump station equipment 1 LS Lump Sum
including, but not limited to, piping,
valves, fittings, pipe supports,
hypochlorite storage tank,
hypochlorite solution pump, eyewash
station, signs, startup, testing,
flushing, disinfection, and
appurtenances.
9. Instrumentation including, but not 1 LS Lump Sum
limited to, providing RTU, PT, flow
meters, sensors, HVAC and other
controls, installation of TMWA
furnished instruments, and telephone
service conduit.
10. HVAC equipment including, but 1 LS Lump Sum
not limited to, providing evaporative
cooler, split system air conditioner,
supply fan, louvers, ductwork, control
piping, and electric heaters.
11. Electrical and site electrical 1 LS Lump Sum
including, but not limited to,
providing main switchgear, VFD,
manual transfer switch, panels,
lighting, gutters, conduit, conductors,
grounding, SPPC vaults, and primary
and secondary conduit.
12 Total Bid Price
13 Total Bid Price Written in Words:
Addendum #1 – Revised Proposal Summary Page 2 of 3
Notes to Bid Schedule:
1. This Project is bid on a lump sum basis and includes all necessary appurtenances for a complete in-
place, functional facility as described in the Contract Documents. Prices include all labor, equipment,
materials, supervision, profit, overheads, and incidental costs for all work required by the Contract
Documents for the full duration of the Contract Time.
2. Item pricing on this schedule is for internal TMWA use only. Item descriptions are not intended to be
all inclusive. Bidders shall include costs for work not specifically mentioned in the most appropriate
item.
3. Refer to Article 7 of the General Conditions for a list of items that may be included in the mobilization
bid item.
4. TMWA reserves the right to perform extra work using time and expense or negotiated lump sum
procedures.
Addendum #1 – Revised Proposal Summary Page 3 of 3