HARRIS COUNTY
Construction Information JOB _06/0449________
Date Due: January 8, 2007
DUE NO LATER THAN 2:00 P.M.
LOCAL TIME IN HOUSTON, TEXAS
Bids received later than the date and time above
will not be considered.
BID FOR: Construction of Crestlane Street (Detour Road) from Union Pacific Railroad to the End of
Barbours Cut Terminal in Precinct 2
Scope of Project: Crestlane Street (Detour Road) project from Union Pacific Railroad to the end of Barbours
Cut Terminal consists of constructing approximately 8,800 linear feet, 14-foot wide, 10-inch thick continuously
reinforced concrete pavement of detour roadway, 685 linear feet four lane divided, 15-inch thick fast track
reinforced concrete pavement adjacent to the Union Pacific Railroad, 209 linear feet of 8' x 6' precast box storm
sewer system, SWPPP, traffic control, traffic pavement markings and all the necessary appurtenances in
Precinct 2. This is a unit price bid estimated at $1,511,500.
Engineering Division Project Manager: Stephen C. Ko, P.E. Phone Number: (713) 755-5214
Consulting Firm: R. W. Patrick & Associates, Inc.
Bid Period: 4 weeks
Pre-bid: Y Mandatory: Y
Date: Tuesday, 19 December 2006
Time: 9:00 a.m.
Location: Harris County Administration Building, Engineering Large Conference Room, 1001 Preston
Avenue, 7th Floor, Houston, Texas 77002.
RETURN BID TO:
HARRIS COUNTY PURCHASING AGENT
1001 PRESTON AVENUE, SUITE 670
HOUSTON, TEXAS 77002