Team Number: 20

Week: 4



Program Size (SLOC) Actual

Base 0

Added 0

Deleted 0

Modified 0

Reused 0

# of COTS 0

Total New SLOC 0



Effort (Hours) Planned Actual

Project Mgmt. 9 8

Requirements 5 4

COTS Assessment

Design

Life Cycle Planning 2 2

Configuration Mgmt.

Feasibility Analysis

Code

COTS Tailoring

COTS Glue Code development

Test

Deployment

Cumulative No. Of tasks Man-hours

Actual Planned Actual

Planned

Date Wk. Completed On Sched Late Date Wk. This Wk. Cumulative This Wk. Cumulative



09/19/2007 1 10 7 0 09/19/2007 1 73.5 73.5

09/26/2007 2 7 7 0 09/26/2007 2 98 171.5

10/03/2007 3 7 7 0 10/03/2007 3 121 292.5

10/10/2007 4 5 5 0 10/10/2007 4 87 379.5

10/17/2007 5 10/17/2007 5

10/24/2007 6 10/24/2007 6

10/31/2007 7 10/31/2007 7

11/07/2007 8 11/07/2007 8

11/14/2007 9 11/14/2007 9

11/21/2007 10 11/21/2007 10

11/28/2007 11 11/28/2007 11

12/05/2007 12 12/05/2007 12









Based on submitted effort reports…





Progress Description:

Describe the progress on the project during the past week, both in qualitative and quantitative.



1. List any significant accomplishments since the last status report (including the completion/revision of project deliverables).

a. Met our Client, Dr. Chris Boehm to get feedback on the prototypes that we have prepared

b. We contacted our off campus team member Ausin Cole to discuss about the first wiki win win negotiation session

c. Held a second WIKI win win negotiation session with the client to reduce the requirment sets

d. Prepared wiki win win negotiation report.

e. Prepared the MS Project Plan for the coming week.

f. Performed risk assesment using Dart tool

g. Prepared LCO CORE which consists of following documents SSRD V1.0, OCD V1.1 and SID V1.0

2. If you are using COTS Process Framework, list the process areas that you worked in the past week (For example, P3, P4, etc.).

a.

b.

c.







Weekxx_PR_S02b_Txx.xls

d.

3. Attach any client meeting notes. If you have not had a client meeting in the past week, say "No client meetings were scheduled".

a. Meeting with the client held on October 9, 2007. - Report attached as a pdf file.

b.

c.

d.









Weekxx_PR_S02b_Txx.xls

Top Project Risks as of 10/10/2007



Last

This Week Risk Description Risk Mitigation Action Items Weeks Active

Week



The client wants the system to be used globally.

1 2 If there are a lot of users trying to access the Make the system capable of dealing with heavy loads 2

system in the future. The system may collapse



Currently the development team is planning to

use SQL server database or Oracle 9i.

The team needs to properly analyze the pros and cons of

Sqlserver does not support multimedia

2 2 each type of database and come up with the one which is 3

applications very well and Oracle 9i is not very

most suitable for the development of this project.

compatible with .Net which is being used as the

front end development tool.









Weekxx_PR_S02b_Txx.xls

# of Defects Injected Removed

Project Mgmt. 1 1

Requirements 4 4

COTS Assessment

Design

Life Cycle Planning 1 1

Configuration Mgmt.

Feasibility Analysis

Code

COTS Tailoring

COTS Glue Code development

Test

Deployment



Total 6 6

Problem Reports as of mm/dd/yyyy: 10/10/2007

* See QMP or Below for Definitions



Type New Opened New Closed Old Closed Current

Issues 3 3 0

Defects 6 6 0

Problem Reports





Definitions

Issues Issues are problems that the "Author" can not fix solely in the artifact or at that specific time

Defects Defects in the artifact caused either by a human error (Avoidable Defect) or by situations that the "Author"

has no control over ( Unavoidable Defect - e.g. change in the requirement).

Problem Reports In case the team is using a Defect Tracking tool, that is the number of problems reported in the tool. You

can also use the Review Forms to collect that information. In that case, this will be the total number of

Concerns provided by the reviewers. Concers can be an issue, a defect or neither (consider that reviewers

might indicate false defects).









Problem Description:

List any problems team is experiencing. This includes things that have caused delays, rework or any other roadblocks to anticipated progress.

No. Problem Description Proposed Solutions Is it COTS Related? (Y/N)

1









Weekxx_PR_S02b_Txx.xls

2









3





4







5





…









Weekxx_PR_S02b_Txx.xls

progress.









Weekxx_PR_S02b_Txx.xls

List of third-party components being considered for use in the system as of 10/10/2007





Component Component use in the

Function of the component in the system Related components

Name system

Black White Modify

Dependency Interaction

Box Box Code









Components that were filtered in the previous week



Component

Rationale for filtering the component Notes and References

Name

Project Indicators as of xx/yy/zzzz





Cumulative Project Effort



400

Man-hours





300

Planned

200

Actual

100

0





Week









Project Progress

Cumulative no. of tasks









12 Late

10

8 On Sched

6

4 Completed

2 Planned

0





Week no.









Weekxx_PR_S02b_Txx.xls



Related docs
Other docs by ajizai
Fall 2010
Views: 0  |  Downloads: 0
Math 111
Views: 0  |  Downloads: 0
Training_listing_275360_7
Views: 1  |  Downloads: 0
C4-051739
Views: 0  |  Downloads: 0
DEFINITIONS
Views: 0  |  Downloads: 0
Unit POPULATIONS
Views: 0  |  Downloads: 0
albhed
Views: 0  |  Downloads: 0
price_list
Views: 9  |  Downloads: 0
By registering with docstoc.com you agree to our
privacy policy

You are almost ready to download!

You are almost ready to download!