Embed
Email

timeline

Document Sample

Shared by: qingyunliuliu
Categories
Tags
Stats
views:
0
posted:
12/5/2011
language:
English
pages:
2
Timelines for IEPM-BW project D:\Docstoc\Working\pdf\7a78d16c-9d13-43f8-aafd-498c198b1a8e.xls









Month 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

Docum

ent Improv

goals, e

benefit Extend & docum

s cleanup existing entatio

desired IEPM web site n on Prepare and make

outcom & incoporate setting presentations on

Web site e new project up sites

Contact experiences and status

next

Contact site

Select next Install Select and

Install Train CERN next site IEPM- Train next site next establis Train next site

IEPM- person and help site and BW at person and help site h POC, person and help

BW at set up tier 1 & 2 (see establis next set up tier 1 & 2 (see install set up tier 1 & 2

CERN remote sites below) h POC site remote sites below) swr remote sites

Monitoring sites Select Contact

next next

IEPM- site

Contact BW and

BNL Install Train BNL monitor establis Train next site

and Set up IEPM- person and help ing site h POC, person and help

establis ssh BW at set up tier 1 & 2 (see install set up tier 1 & 2

h POC account BNL remote sites below) swr remote sites



Enhance code to enable Integrate new features

Enhance code to enable reduced security and make code

IEPM-toolkit less network traffic requirements distributable Distribute new version of IEPM Distribute new version of IEPM

Compare tools, choose

Analysis (also using Develop tool for Document traceroute Develop prototype tools most appropriate, Integrate anomaly Add web services access

funding from US Dept traceroute analysis, analysis with a Program to automate the understand behavior with Document with a detection and to IEPM-BW bandwidth

of State for NIIT visualization and Logic Manual, and detection of anomalous the parameters, and for Add visualization of the Program Logic Manual, traceroutes into IEPM- measuremennts and

Pakistan students) topology map integrate into IEPM-BW changes in bandwdth functions the tool applies changes write publication BW traceroutes

Define required changes.

Provide information on Understand and Allocate resources to

current status and plans analyze the develop improvemnts.

Add database to Improve ability to select for IEPM-BW. Solicit requests, decide Set up a CVS repository

Add required aid in data which groups of sites to input for improvemnts to on most cost- to enable distributed Develop chosen Integrate improvements into main

improvements selection display IEPM-BW effective to add development requested improvements distribution

Add web services

access to IEPM-BW Document how to access

bandwidth IEPM-BW data

measuremennts and interactively and via web

Data access traceroutes services API

Provide consulting to users of IEPM-BW, keep web site up to date, organize and lead occassional phone meetings of participants, fix bugs, provide coordination, write reports (e.g. for DoE), write and present

Ongoing talks and papers



Related work but Productize lighweight Investigate integratiion of Understand I2 OWAMP data and Investigate using event

unfunded by the bandwidth estimation Use traceroute tools with traceroute tools with experiment with anomalous event Add OWAMP to IEPM- detection with OWAMP

present proposal tool NLANR AMP data AMP and Internet2 detection BW data

Depends on interest to HENP (BaBar, LHC (ATLAS & CMS), D0, CDF) and ESnet community. Also depends on willingness of site to contribute resources to manage monitoring (10-20% FTE). Sites of potential

interest not mentioned above include Umich, Caltech, SDSC, ESnet, IN2P3, DESY, RAL, StarLight, ORNL N.b. SLAC is already a monitoring site with about 40 remote sites and as part of our preliminary

Site selection preparation we have already set up FNAL as a monitoring site, to prove feasability, and understand requirements etc. We have also contacted CERN and DESY and have agreements to set them up as IEPM-

Travel Travel to publicize project to network & Grid community, to assist new sites. Three US trips per year, 1 International per year









Prepared by cottrell 12/5/2011 Page 1

Timelines for IEPM-BW project D:\Docstoc\Working\pdf\7a78d16c-9d13-43f8-aafd-498c198b1a8e.xls









Month 25 26 27 28 29 30 31 32 33 34 35 36 Month









Continu

ed from Write & submit

last publications and talks on

Web site page experience & results Web site

Contact

next site

and

Select establis Train next site

next site h POC, person and help

(see install set up tier 1 & 2

below) swr remote sites

Monitoring sites Select Monitoring sites

next Contact

IEPM- next site

BW and

monitori establis Train next site

ng site h POC, person and help

(see install set up tier 1 & 2

below) swr remote sites

Cont.

from

last

IEPM-toolkit page IEPM-toolkit



Analysis (also using Design architecture for on Analysis (also using

funding from US Dept Design and develop an demand info gathering Develop package to use funding from US Dept

of State for NIIT event filtering and warning following an anomalous existing tools to gather Make code of State for NIIT

Pakistan students) syste event information distributable Pakistan students)





Evaluate need for central access to

Evaluate need for IEPM_BW data, e.g. a central

Add required schedulinmg and possible archive, iproved tools for gathering Provide scheduling Make code Add required

improvements solutions data from multiple sites etc. solution distributable improvements









Data access Data access



Ongoing Continued Ongoing



Related work but Related work but

unfunded by the Modify event detection to Integrate event detection unfunded by the

present proposal accept I2 OWAMP data into I2 PiPES present proposal





Site selection Continued Site selection

Travel Continued Travel









Prepared by cottrell 12/5/2011 Page 2



Related docs
Other docs by qingyunliuliu
Work Resume - Grauwald Creative
Views: 11  |  Downloads: 0
Gulf_Impacts_v2
Views: 0  |  Downloads: 0
1615_RPI_091208
Views: 0  |  Downloads: 0
Gudelines_for_applicants
Views: 0  |  Downloads: 0
Suzuki Violin Lessons
Views: 14  |  Downloads: 0
court_2005_028_fr
Views: 0  |  Downloads: 0
082607homily
Views: 0  |  Downloads: 0
Role of the Chartered Man Acct_i_
Views: 8  |  Downloads: 0
By registering with docstoc.com you agree to our
privacy policy

You are almost ready to download!

You are almost ready to download!