Timelines for IEPM-BW project D:\Docstoc\Working\pdf\7a78d16c-9d13-43f8-aafd-498c198b1a8e.xls
Month 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
Docum
ent Improv
goals, e
benefit Extend & docum
s cleanup existing entatio
desired IEPM web site n on Prepare and make
outcom & incoporate setting presentations on
Web site e new project up sites
Contact experiences and status
next
Contact site
Select next Install Select and
Install Train CERN next site IEPM- Train next site next establis Train next site
IEPM- person and help site and BW at person and help site h POC, person and help
BW at set up tier 1 & 2 (see establis next set up tier 1 & 2 (see install set up tier 1 & 2
CERN remote sites below) h POC site remote sites below) swr remote sites
Monitoring sites Select Contact
next next
IEPM- site
Contact BW and
BNL Install Train BNL monitor establis Train next site
and Set up IEPM- person and help ing site h POC, person and help
establis ssh BW at set up tier 1 & 2 (see install set up tier 1 & 2
h POC account BNL remote sites below) swr remote sites
Enhance code to enable Integrate new features
Enhance code to enable reduced security and make code
IEPM-toolkit less network traffic requirements distributable Distribute new version of IEPM Distribute new version of IEPM
Compare tools, choose
Analysis (also using Develop tool for Document traceroute Develop prototype tools most appropriate, Integrate anomaly Add web services access
funding from US Dept traceroute analysis, analysis with a Program to automate the understand behavior with Document with a detection and to IEPM-BW bandwidth
of State for NIIT visualization and Logic Manual, and detection of anomalous the parameters, and for Add visualization of the Program Logic Manual, traceroutes into IEPM- measuremennts and
Pakistan students) topology map integrate into IEPM-BW changes in bandwdth functions the tool applies changes write publication BW traceroutes
Define required changes.
Provide information on Understand and Allocate resources to
current status and plans analyze the develop improvemnts.
Add database to Improve ability to select for IEPM-BW. Solicit requests, decide Set up a CVS repository
Add required aid in data which groups of sites to input for improvemnts to on most cost- to enable distributed Develop chosen Integrate improvements into main
improvements selection display IEPM-BW effective to add development requested improvements distribution
Add web services
access to IEPM-BW Document how to access
bandwidth IEPM-BW data
measuremennts and interactively and via web
Data access traceroutes services API
Provide consulting to users of IEPM-BW, keep web site up to date, organize and lead occassional phone meetings of participants, fix bugs, provide coordination, write reports (e.g. for DoE), write and present
Ongoing talks and papers
Related work but Productize lighweight Investigate integratiion of Understand I2 OWAMP data and Investigate using event
unfunded by the bandwidth estimation Use traceroute tools with traceroute tools with experiment with anomalous event Add OWAMP to IEPM- detection with OWAMP
present proposal tool NLANR AMP data AMP and Internet2 detection BW data
Depends on interest to HENP (BaBar, LHC (ATLAS & CMS), D0, CDF) and ESnet community. Also depends on willingness of site to contribute resources to manage monitoring (10-20% FTE). Sites of potential
interest not mentioned above include Umich, Caltech, SDSC, ESnet, IN2P3, DESY, RAL, StarLight, ORNL N.b. SLAC is already a monitoring site with about 40 remote sites and as part of our preliminary
Site selection preparation we have already set up FNAL as a monitoring site, to prove feasability, and understand requirements etc. We have also contacted CERN and DESY and have agreements to set them up as IEPM-
Travel Travel to publicize project to network & Grid community, to assist new sites. Three US trips per year, 1 International per year
Prepared by cottrell 12/5/2011 Page 1
Timelines for IEPM-BW project D:\Docstoc\Working\pdf\7a78d16c-9d13-43f8-aafd-498c198b1a8e.xls
Month 25 26 27 28 29 30 31 32 33 34 35 36 Month
Continu
ed from Write & submit
last publications and talks on
Web site page experience & results Web site
Contact
next site
and
Select establis Train next site
next site h POC, person and help
(see install set up tier 1 & 2
below) swr remote sites
Monitoring sites Select Monitoring sites
next Contact
IEPM- next site
BW and
monitori establis Train next site
ng site h POC, person and help
(see install set up tier 1 & 2
below) swr remote sites
Cont.
from
last
IEPM-toolkit page IEPM-toolkit
Analysis (also using Design architecture for on Analysis (also using
funding from US Dept Design and develop an demand info gathering Develop package to use funding from US Dept
of State for NIIT event filtering and warning following an anomalous existing tools to gather Make code of State for NIIT
Pakistan students) syste event information distributable Pakistan students)
Evaluate need for central access to
Evaluate need for IEPM_BW data, e.g. a central
Add required schedulinmg and possible archive, iproved tools for gathering Provide scheduling Make code Add required
improvements solutions data from multiple sites etc. solution distributable improvements
Data access Data access
Ongoing Continued Ongoing
Related work but Related work but
unfunded by the Modify event detection to Integrate event detection unfunded by the
present proposal accept I2 OWAMP data into I2 PiPES present proposal
Site selection Continued Site selection
Travel Continued Travel
Prepared by cottrell 12/5/2011 Page 2