Task/Activities Responsible Team Member(s)

1 Project Planning

2 Obtain Customer Needs (continuous) All

3 Define Engineering Specifications All

4 Create Preliminary Plan Julie

5 Define Possible Risks (preliminary) Caroline / All

6 Create / Define Team Norms & Values Chris

7 Choose Team Leader All

8 Benchmarking / Research

9 Physics of Sound Julie / Ted

10 Sound Measurement Julie

11 Internal Combustion Engine Chris

12 Current Noise Reduction Methods Caroline

13 Concept Generation (Noise Reduction)

14 Contact Acoustics Experts (D-R & Dr. Wyffels) Julie / Caroline

15 Validate Assumptions Chris

16 Become Familiar with Sound in Mufflers Julie

17 Research Absorption Materials - Muffler Design Caroline

18 Research Anti-Phase Design Ted

19 Create List of Design Options All

20 System Analysis

21 Feasibility Study of Available Designs All

22 Risk Assessment - Updated All

23 Obtain Actual Sound Exhaust Recording & Measurements Caroline / Julie

24 Create Visual Aids - Exhaust System Layout (black boxes) Chris & Julie

25 Compile Presentation & Practice All

26 Perform System Level Design Review All

27 Engine Characterization

28 Define Process & Inputs Ted / Julie

29 Look at Current Formula car Chris / Caroline

30 Determine Sensors & Equipment need Chris / Caroline

31 Acquire Sensors & Other Equipment (if needed) Chris / Caroline

32 Set-up Formula Car for Testing Chris, Julie, Caroline, Ted

33 Obtain Data from Formula Car Chris, Julie, Caroline, Ted

34 Analyze Data - Create "Map" of engine Chris, Julie, Caroline, Ted

35 Mid-Project Scope Evaluation

36 Finalize Scope All

37 Update Needs, Specs, Plan, Risks All

38 Detailed Design Analysis

39 Develop Absorption Mechanical Option Caroline

40 Finalize Design 0

41 Create Drawings 0

42 Create BOM 0

43 Calculate Cost 0

44 Develop Resonator Mechanical Option Julie

45 Finalize Design 0

46 Create Drawings 0

47 Create BOM 0

48 Calculate Cost 0

49 Develop ANC Design Ted

50 Create System Layout 0

51 Develop Packaging 0

52 Develop / Obtain Test Rig for Engine Chris

53 Final Design Analysis 0

54 Update Risk Assessment Chris

55 Formalize Engine Characterization results Chris & Julie

56 Compile Data & Information for EE's Ted

57 Perform Detailed Design Review All

58 Project Review 0

59 Update Risk Assessment 0

60 Perform Project Review All

61 Complete & upload all documentation on EDGE Julie & Caroline

62 MSD II Preparation / Planning Caroline

63 Create specification sheet and summary for EE's 0

64 Create WBS and plan / schedule 0

0 0 0

65 Buy pressure level meter Caroline

66 Obtain Materials for Absorption Muffler Designs Caroline

67 Buy two perforated pipes for designs 1 and 3 0

68 Buy perforated sheet for design 2 0

69 Buy rock wool 0

70 Buy steel wool - three weights 0

71 Obtain fiberglass from Formula team 0

72 Buy steel sheets for outer tubes and end caps 0

73 Manufacture Absorption Muffler Designs Caroline

74 Bend inner tube for design 3 into sine curve Caroline

75 Cut and weld the inner tube for design 2 Caroline

76 Cut outer tubes, end caps, and flange sections Caroline

77 Weld flanges Caroline

78 Weld together outer tubes, end caps, inner tubes, flanges Caroline

79 Design Resonator Demo for ImagineRIT Julie & Chris

80 Create Design - Concentric Tube Resonator Julie

81 Create Drawings - Concentric Tube Resonator Julie

82 Create BOM - Concentric Tube Resonator Julie

83 Create Design - Helmholtz Resonator Chris

84 Create Drawings - Helmholtz Resonator Chris

85 Create BOM - Helmholtz Resonator Chris

86 Design Attachment Section to Engine Chris

87 Obtain flanges Chris

88 Obtain 1" pipe Chris

89 Weld 1" Pipe to Engine Exhaust Chris

90 Weld a Flange to 1" Pipe Chris

91 Obtain Gaskets to Seal Interface Chris

92 Obtain Parts and Materials for Resonator Demo Chris

93 Register for ImagineRIT Chris

0 0 0

94 Team Meeting All

95 Meet with EE Team All

### #REF! #REF!

### #REF! #REF!

96 Construct Resonator Demo Julie

97 Create Helmholtz Resonator Demo Julie

98 Create Concentric Tube Resonator Demo Julie

99 Update EDGE Julie

100 Meet with Hanzlik All

101 Complete Manufacture of Absorption Designs (if needed) Caroline

102 Update EDGE Julie

103 Meet with Hanzlik All

104 Update EDGE Julie

105 Meet with Hanzlik All

106 Build ANC Design Ted & EE Team

107 Build housing/mount speakers & sensors Ted

108 Install and test DSP Ted

109 Complete system and mount to engine Ted & EE Team

110 Update EDGE Julie

111 Meet with Hanzlik All

112 Complete all attachment sections between mufflers & engine Chris & Caroline

113 Create Engine Test Stand for ImagineRIT Ted

114 Obtain table Ted

119 Mount engines to table Ted

120 Testing & Debugging All

121 Exhaust End Cap Testing Chris

122 Hybrid System Testing Chris & Caroline

123 ANC system (with EE team) Ted

124 Update EDGE Julie

125 Meet with Hanzlik All

130 Update EDGE Julie

131 Meet with Hanzlik All

132 Update EDGE Julie

133 Meet with Hanzlik All

134 Absorption Design Selection for ImagineRIT Caroline

135 Update EDGE Julie

136 Meet with Hanzlik All

137 Update EDGE Julie

138 Meet with Hanzlik All

139 Prepare for ImagineRIT All

140 Acquire supplies for booth (TV, canopy, etc) Julie

141 Obtain and dissect car mufflers Caroline

142 Make sure registration is okay Chris

143 Practice all absorption muffler tests Caroline

144 Practice with the Resonator Demo Julie & Chris

145 Examining visual techniques to show noise cancellation Ted

146 Update Risk Assessment All

147 Create Schedule for the day Julie

148 Create posters Julie

149 Run through presentation with EEs All

150 Ensure engine/exhaust systems are ready Caroline and Ted

151 Set-up booth (morning day of) All

152 ImagineRIT fair All

153 Write Technical Paper All

154 75% Paper due All

155 100% Paper due All

156 Create Project Poster All

157 Project Review Presentation All

158 Create Presentation All

159 Practice Presentation All

160 Perform Review All

161 Improve Designs All

162 Update EDGE Julie

163 Meet with Hanzlik All

164 Update EDGE Julie

165 Final Project Review All

166 Create Presentation all

167 Practice Presentation all

168 Perform Review all

169 Final EDGE Update Julie

170 0 0

171 0 0

172 0 0

173 0 0

174 0 0

175 0 0

0 0 0

0 Rev: H 0

0 0 0

0 0 0

0 0 0

0 0 0

0 0 0

0 0 0

Comments

Task Done









Risk - make sure all assumptions are valid before proceeding









Risk - car not available





Risk - may take awhile to get needed equipment

Risk - car not in condition to test

September October November March

ID Task Name Duration Start Finish

10 17 24 1 8 15 22 29 5 12 19 11 18

1 Project Planning 15 days Fri 9/10/10 Fri 9/24/10 x x x

2 Obtain Customer Needs (continuous) 8 days Fri 9/10/10 Fri 9/17/10 x x

3 Define Engineering Specifications 8 days Fri 9/17/10 Fri 9/24/10 x x

4 Create Preliminary Plan 1 day Thu 9/23/10 Thu 9/23/10 x

5 Define Possible Risks (preliminary) 1 day Thu 9/23/10 Thu 9/23/10 x

6 Create / Define Team Norms & Values 1 day Thu 9/23/10 Thu 9/23/10 x

7 Choose Team Leader 1 day Thu 9/23/10 Thu 9/23/10 x

8 Benchmarking / Research 7 days Fri 9/10/10 Thu 9/16/10 x x

9 Physics of Sound 7 days Fri 9/10/10 Thu 9/16/10 x x

10 Sound Measurement 7 days Fri 9/10/10 Thu 9/16/10 x x

11 Internal Combustion Engine 7 days Fri 9/10/10 Thu 9/16/10 x x

12 Current Noise Reduction Methods 7 days Fri 9/10/10 Thu 9/16/10 x x

13 Concept Generation (Noise Reduction) 10 days Fri 9/24/10 Tue 10/5/10 x x x

14 Contact Acoustics Experts (D-R & Dr. Wyffels) 2 days Mon 9/27/10 Tue 9/28/10 x x

15 Validate Assumptions 2 days Mon 10/4/10 Tue 10/5/10 x

16 Become Familiar with Sound in Mufflers 12 days Fri 9/24/10 Tue 10/5/10 x x x

17 Research Absorption Materials - Muffler Design 2 days Wed 9/29/10 Thu 9/30/10 x x

18 Research Anti-Phase Design 7 days Fri 9/24/10 Thu 9/30/10 x x

19 Create List of Design Options 4 days Fri 10/1/10 Mon 10/4/10 x

20 System Analysis 5 days Mon 10/4/10 Fri 10/8/10

21 Feasibility Study of Available Designs 3 days Mon 10/4/10 Wed 10/6/10 x x

22 Risk Assessment - Updated 1 day Wed 10/6/10 Thu 10/7/10 x x

23 Obtain Actual Sound Exhaust Recording & Measurements 2 days Mon 10/4/10 Tue 10/5/10 x x

24 Create Visual Aids - Exhaust System Layout (black boxes) 1 day Wed 10/6/10 Wed 10/6/10 x x

25 Compile Presentation & Practice 2 day Wed 10/6/10 Thu 10/7/10 x x

26 Perform System Level Design Review 1 day Fri 10/8/10 Fri 10/8/10 x

27 Engine Characterization 7 days Mon 10/4/10 Thu 10/14/10 x x x

28 Define Process & Inputs 2 day Mon 10/4/10 Tue 10/5/10 x

29 Look at Current Formula car 1 day Fri 10/8/10 Fri 10/8/10 x

30 Determine Sensors & Equipment need 1 day Tue 10/5/10 Tue 10/5/10 x

31 Acquire Sensors & Other Equipment (if needed) 5 days Tue 10/5/10 Sat 10/9/10 x x

32 Set-up Formula Car for Testing 1 day Thu 10/21/10 Thu 10/21/10 x

33 Obtain Data from Formula Car 1 day Thu 10/21/10 Thu 10/21/10 x

34 Analyze Data - Create "Map" of engine 2 days Thu 10/21/10 Fri 10/22/10 x

35 Mid-Project Scope Evaluation 10 days Tue 10/12/10 Thu 10/21/10 x

36 Finalize Scope 8 days Tue 10/12/10 Tue 10/19/10 x x

37 Update Needs, Specs, Plan, Risks 2 days Wed 10/20/10 Thu 10/21/10 x

38 Detailed Design Analysis 14 days Fri 10/22/10 Thu 11/4/10 x x x

39 Develop Absorption Mechanical Option 14 days Fri 10/22/10 Thu 11/4/10 x x x

40 Finalize Design x x x

41 Create Drawings x x x

42 Create BOM x x x

43 Calculate Cost x x x

44 Develop Resonator Mechanical Option 14 days Fri 10/22/10 Thu 11/4/10 x x x

45 Finalize Design x x x

46 Create Drawings x x x

47 Create BOM x x x

48 Calculate Cost x x x

49 Develop ANC Design 14 days Fri 10/22/10 Thu 11/4/10 x x x

50 Create System Layout x x x

51 Develop Packaging x x x

52 Develop / Obtain Test Rig for Engine 14 days Fri 10/22/10 Thu 11/4/10 x x x

53 Final Design Analysis 7 days Wed 11/3/10 Thu 11/4/10 x

54 Update Risk Assessment 1 day Thu 11/4/10 Thu 11/4/10 x

55 Formalize Engine Characterization results 2 days Wed 11/3/10 Thu 11/4/10 x

56 Compile Data & Information for EE's 2 days Wed 11/3/10 Thu 11/4/10 x

57 Perform Detailed Design Review 1 day Fri 11/5/10 Fri 11/5/10 x

58 Project Review 3 days Wed 11/17/10 Fri 11/19/10 x

59 Update Risk Assessment 3 days Wed 11/17/10 Thu 11/18/10 x

60 Perform Project Review 1 day Fri 11/19/10 Fri 11/19/10 x

61 Complete & upload all documentation on EDGE 3 days Mon 11/15/10 Wed 11/17/10 x

62 MSD II Preparation / Planning 7 days Mon 11/15/10 Wed 11/17/10 x

63 Create specification sheet and summary for EE's 2 days Tue 11/16/10 Wed 11/17/10 x

64 Create WBS and plan / schedule 6 days Fri 11/12/10 Wed 11/17/10 x



65 Buy pressure level meter 3 mo Mon 11/29/10 Mon 2/28/11

66 Obtain Materials for Absorption Muffler Designs 1 mo Mon 11/28/11 Tue 12/20/11

67 Buy two perforated pipes for designs 1 and 3

68 Buy perforated sheet for design 2

69 Buy rock wool

70 Buy steel wool - three weights

71 Obtain fiberglass from Formula team

72 Buy steel sheets for outer tubes and end caps

73 Manufacture Absorption Muffler Designs 2 mo Mon 1/10/11 Mon 2/28/11

74 Bend inner tube for design 3 into sine curve

75 Cut and weld the inner tube for design 2

76 Cut outer tubes, end caps, and flange sections

77 Weld flanges

78 Weld together outer tubes, end caps, inner tubes, flanges

79 Design Resonator Demo for ImagineRIT 3 mo Mon 11/29/10 Mon 2/28/11

80 Create Design - Concentric Tube Resonator 26 days Mon 11/29/10 Fri 12/24/10

81 Create Drawings - Concentric Tube Resonator 17 days Wed 1/5/11 Fri 1/21/11

82 Create BOM - Concentric Tube Resonator 17 days Wed 1/5/11 Fri 1/21/11

83 Create Design - Helmholtz Resonator 26 days Mon 11/29/10 Fri 12/24/10

84 Create Drawings - Helmholtz Resonator 17 days Wed 1/5/11 Fri 1/21/11

85 Create BOM - Helmholtz Resonator 17 days Wed 1/5/11 Fri 1/21/11

86 Design Attachment Section to Engine 3 mo Mon 11/29/10 Mon 2/28/11

87 Obtain flanges

88 Obtain 1" pipe

89 Weld 1" Pipe to Engine Exhaust

90 Weld a Flange to 1" Pipe

91 Obtain Gaskets to Seal Interface

92 Obtain Parts and Materials for Resonator Demo 36 days Mon 1/24/11 Mon 2/28/11

93 Register for ImagineRIT 3 days Mon 1/17/11 Wed 1/19/11



94 Team Meeting 1 day Tue 3/8/11 Tue 3/8/11 x

95 Meet with EE Team 1 day Wed 3/9/11 Wed 3/9/11 x

96 Construct Resonator Demo 15 days Fri 3/11/11 Fri 3/25/11 x x

97 Create Helmholtz Resonator Demo 15 days Fri 3/11/11 Fri 3/25/11 x x

98 Create Concentric Tube Resonator Demo 15 days Fri 3/11/11 Fri 3/25/11 x x

99 Update EDGE 1 day Thu 3/10/11 Thu 3/10/11 x

100 Meet with Hanzlik 1 day Fri 3/11/11 Fri 3/11/11 x

101 Complete Manufacture of Absorption Designs (if needed) 5 days Mon 3/7/11 Fri 3/11/11 x

102 Update EDGE 1 day Thu 3/17/11 Thu 3/17/11 x

103 Meet with Hanzlik 1 day Fri 3/18/11 Fri 3/18/11 x

104 Update EDGE 1 day Thu 3/17/11 Thu 3/17/11 x

105 Meet with Hanzlik 1 day Fri 3/18/11 Fri 3/18/11 x

106 Build ANC Design 32 days Mon 3/14/11 Fri 4/15/11

Finalize Bipole box design for engine x

107 Build housing/mount speakers & sensors 15 days Mon 3/14/11 Fri 4/1/11

108 Install and test DSP 8 days Fri 4/1/11 Fri 4/8/11

109 Complete system and mount to engine 12 days Mon 4/4/11 Fri 4/15/11

110 Complete all attachment sections between mufflers & engine 32 days Mon 3/14/11 Thu 4/14/11

111 Create Engine Test Stand for ImagineRIT 32 days Mon 3/14/11 Thu 4/14/11

112 Obtain table 11 days Mon 3/14/11 Thu 3/24/11 x

113 Mount engines to table 18 days Mon 3/28/11 Thu 4/14/11

114 Testing & Debugging 46 days Mon 3/14/11 Thu 4/28/11

115 Absorption Ideal Density Testing x

116 Absorption Geometry comparison testing x

117 Resonator 1/4 & 1/2 wave length testing x

118 ANC Engine System Testing

119 Exhaust End Cap Testing 32 days Mon 3/14/11 Thu 4/14/11 x

120 Hybrid System Testing 18 days Mon 3/28/11 Thu 4/14/11

121 ANC system (with EE team) 18 days Mon 4/11/11 Thu 4/28/11

122 Update EDGE 1 day Thu 3/24/11 Thu 3/24/11

123 Meet with Hanzlik 1 day Fri 3/25/11 Fri 3/25/11

124 Update EDGE 1 day Thu 3/31/11 Thu 3/31/11

125 Meet with Hanzlik 1 day Fri 4/1/11 Fri 4/1/11

126 Update EDGE 1 day Thu 4/7/11 Thu 4/7/11

127 Meet with Hanzlik 1 day Fri 4/8/11 Fri 4/8/11

128 Update EDGE 1 day Thu 4/14/11 Thu 4/14/11

129 Meet with Hanzlik 1 day Fri 4/15/11 Fri 4/15/11

130 Absorption Design Selection for ImagineRIT 4 days Tue 4/19/11 Fri 4/22/11

131 Update EDGE 1 day Thu 4/28/11 Thu 4/28/11

132 Meet with Hanzlik 1 day Fri 4/29/11 Fri 4/29/11

133 Update EDGE 1 day Thu 5/5/11 Thu 5/5/11

134 Meet with Hanzlik 1 day Fri 5/6/11 Fri 5/6/11

135 Prepare for ImagineRIT 41 days Mon 3/28/11 Sat 5/7/11

136 Acquire supplies for booth (TV, canopy, etc) 25 days Mon 3/28/11 Fri 4/29/11

137 Obtain and dissect car mufflers 20 days Mon 4/11/11 Thu 4/28/11

138 Make sure registration is okay 3 days Wed 4/20/11 Fri 4/22/11

139 Practice all absorption muffler tests 11 days Mon 4/25/11 Wed 5/4/11

140 Practice with the Resonator Demo 11 days Mon 4/25/11 Wed 5/4/11

141 Examining visual techniques to show noise cancellation 11 days Mon 4/25/11 Wed 5/4/11

142 Update Risk Assessment 11 days Mon 4/25/11 Wed 5/4/11

143 Create Schedule for the day 11 days Mon 4/25/11 Wed 5/4/11

144 Create posters 11 days Mon 4/25/11 Wed 5/4/11

145 Run through presentation with EEs 11 days Mon 4/25/11 Wed 5/4/11

146 Ensure engine/exhaust systems are ready 11 days Mon 4/25/11 Wed 5/4/11

147 Set-up booth (morning day of) 1 day Sat 5/7/11 Sat 5/7/11

148 ImagineRIT fair 1 day Sat 5/7/11 Sat 5/7/11

149 Write Technical Paper 37 days Wed 4/6/11 Fri 5/13/11

150 75% Paper due 1 day Fri 4/29/11 Fri 4/29/11

151 100% Paper due 1 day Fri 5/13/11 Fri 5/13/11

152 Create Project Poster 17 days Wed 4/20/11 Fri 5/6/11

153 Project Review Presentation 7 days Sat 5/7/11 Fri 5/13/11

154 Create Presentation 5 days Sat 5/7/11 Wed 5/11/11

155 Practice Presentation 1 day Thu 5/12/11 Thu 5/12/11

156 Perform Review 1 day Fri 5/13/11 Fri 5/13/11

157 Improve Designs 5 days Mon 5/9/11 Fri 5/13/11

158 Update EDGE 1 day Thu 5/12/11 Thu 5/12/11

159 Meet with Hanzlik 1 day Fri 5/13/11 Fri 5/13/11

160 Update EDGE 1 day Wed 5/18/11 Wed 5/18/11

161 Final Project Review 1 day TBA TBA

162 Create Presentation 5 days

163 Practice Presentation 1 day

164 Perform Review 1 day

165 Final EDGE Update 1 day Fri 5/20/11 Fri 5/20/11

166

167

168

169

170

171

172

173 Rev: H

174

175

March April May

25 1 8 15 22 29 6 13 20 Person

Concrete Date

All Topic

All Task

Julie complete task x

Caroline / All

Chris

All



Julie / Ted

Julie

Chris

Caroline



Julie / Caroline

Chris

Julie

Caroline

Ted

All



All

All

Caroline / Julie

Chris & Julie

All

All



Ted / Julie

Chris / Caroline

Chris / Caroline

Chris / Caroline

Chris, Julie, Caroline, Ted

Chris, Julie, Caroline, Ted

Chris, Julie, Caroline, Ted



All

All



Caroline

Julie









Ted





Chris



Chris

Chris & Julie

Ted

All





All

Julie & Caroline

Caroline









Caroline Concrete Date

Caroline Topic

Task

complete task x









Caroline

Caroline

Caroline

Caroline

Caroline

Caroline

Julie & Chris

Julie

Julie

Julie

Chris

Chris

Chris

Chris

Chris

Chris

Chris

Chris

Chris

Chris

Chris



All Concrete Date

All Topic

x Julie Task

x Julie Completed Task x

x Julie

Julie

All

Caroline

Julie

All

Julie

All

Ted & EE Team

x x x x Ted

Ted

Ted

Ted & EE Team

Chris & Caroline

Ted

x Ted

Ted

All

x x x x x x Caroline

x x x x x x Caroline

x x x x x x Julie

Ted & EE team

x x x x Chris

x x x Chris & Caroline

Ted

x Julie

x All

x Julie

x All

x Julie

x All

x Julie

x All

x Caroline

x Julie

All

Julie

All

All

Julie

Caroline

x Chris

x Caroline

Julie & Chris

Ted

All

Julie

Julie

All

Caroline and Ted

All

All

All

x All

All

All

All

All

All

All

All

Julie

All

Julie

All

all

all

all

Julie

Preliminary 3-week Breakdown Structure

Person Role Week 0->1 Tasks Week 1->2 Tasks



Research internal combustion

Christopher Team Leader /

Become familiar with project. engines and sound generation

Morehouse Mechanical Engineer

sources.



EDGE Manager / Research physics of sound and

Julie Maier Become familiar with project.

Mechanical Engineer measurement options.



Research current sound

Caroline Bills Mechanical Engineer Become familiar with project.

reduction methods.





Ted Zachwieja Mechanical Engineer Become familiar with project. Research physics of sound.







Project Objectives:

1. Investigate the physics of sound generation and transmission.

2. Identify the sources and causes of major noise contributors in an internal combustion engine.

3. Analyze and model the noise generation of an internal combustion engine.

4. Propose design for noise reduction mechanism.

5. Provide sufficient background to EE team for potential active noise cancellation system.

6. Provide noise reduction demonstrator for Spring 2011 Imagine RIT.



Person Role Definition

Christopher Engine noise, system level integration, floater (help

Morehouse where needed)



Mechanical Options for Noise Reduction, Sound experts,

Julie Maier

Sound, EDGE documentation

Mechanical Options for Noise Reduction, sound

Caroline Bills

measurement and recording



Anti-phase Noise cancellation option - design &

Ted Zachwieja

package/layout, report for EE team, what EE team needs

Week 2->3 Tasks

Create one page summary. Help define

customer needs and engineering specs.

Review all documentation before Friday

meeting.



Create plan and preliminary WBS. Help

define customer needs and engineering specs.



Help define customer needs and engineering

specs. Put them into a logical format.

Compile risk list.



Help define customer needs and engineering

specs. Start work on team norms and values.

Create presentation for Friday.

Design 1: CC

Design 2: 1 to 3 to 1 bulb (131)

Design 3: SIN



IT inner tube / OT outer tube / CC concentric cylinders / SIN sin wave / 131 bulbous



Absorption muffler plan

Buy 1" ID, 12" long, 16-22 gage, steel pipe for CC All ITs: 40-60%

Buy 1" ID, 12" long, 16-22 gage, steel pipe for SIN

Buy perforated steel sheet for 131, 16-22 gage 131: 12" x 3pi" max + screw ups and excess = 12"x10" + excess =

15"x15"

Buy rock wool

Buy steel wool - 3 weights

Steal fiberglass from Formula team - try different packing densities









Total: 12 x #REF!

For ends CC: D 5" with 1" center hole 5 x 5"

SIN: D 6" with 1" center hole 6 x 6"

131: D 7" with 1" center hole 7 x 7"

Bend the SIN IT into desired shape

Cut and weld the two 131 IT halves

Cut the three OTs, end caps, flange flat sections, and flange pipe sections

Weld flanges

Weld together OTs, end caps, ITs, and flanges

Run sound tests on all shapes vs all materials and densities

Determine which designs will be displayed at IRIT

Run through all tests as they will be at IRIT



Concrete Date

Topic

Task

x

complete task









Risks -Absorption Prevent If it happens

Cannot buy materials needed. Change budget

Create comprehensive BoM anddesigns. before ordering parts.

Run out of money. Change budget before ordering parts.

Create comprehensive BoM anddesigns/reduce number of designs.

Cannot bend the inner tube for design 3. Change design.

Discuss design with shop prior to work order.

Cannot build the inner tube for design 2. Change to work

Discuss designs with shop prior design. order.

Cannot weld together parts correctly. Change designs.

Discuss designs with welders prior to work order.

None of the mufflers work. Explain why.

Materials/mufflers are destroyed/ruined during testing. Buy excess material. Buy more material.



WE HAVE to guess which muffler is going to work best. Why?

WE HAVE to order/make a back pressure level meter.

make separate tab for MSD 2

and excess = 12"x10" + excess =









#REF! #REF!

19.63 25

28.27 36

38.48 49









esigns/reduce number of designs.



Related docs
Other docs by ajizai
Fall 2010
Views: 0  |  Downloads: 0
Math 111
Views: 0  |  Downloads: 0
Training_listing_275360_7
Views: 1  |  Downloads: 0
C4-051739
Views: 0  |  Downloads: 0
DEFINITIONS
Views: 0  |  Downloads: 0
Unit POPULATIONS
Views: 0  |  Downloads: 0
albhed
Views: 0  |  Downloads: 0
price_list
Views: 9  |  Downloads: 0
By registering with docstoc.com you agree to our
privacy policy

You are almost ready to download!

You are almost ready to download!